No 7. On the sheet entitled "Determination" there are some inputs that you may/may not need.
They are located in blocks G47-G50 and C-50. These blocks are not locked and you make inputs
directly into them.
As you will notice we now have 2 LD rates, one for the first day (because legal is
involved only on the first day) and one for each day after. These two rates need to both be
identified to your contractor.
Page 1
TITLE
NAME
HOURLY
RATE ($)
Contracting Officer
_________
Contract Administrators
__________
2. In determining the hourly rate for a contract administrator, the average hourly rate was used for liquidated
damages. A firm amount cannot be determined prior to issuance of the solicitation because it is not known which
administrator will be working with the project after award. The average hourly rate is determined to be the most
fair and reasonable method in computing liquidated damages for Operational Contracting personnel.
0
Contracting Officer
Date:
TITLE
NAME
HOURLY
RATE ($)
SUM $
2. In determining the hourly rate for a staff judge advocate, the average hourly rate was used for liquidated
damages. A firm amount cannot be determined prior to issuance of the solicitation because it is not
known which of the above individuals will be reviewing the solicitation/contract. The average hourly rate
is determined to be the most fair and reasonable method in computing liquidated damages for
the staff judge advocate.
0
Contracting Officer
Date:
0
0
1. In accordance with FAR 36.206 and DOD FAR Sup 236.206, liquidated damages (LDs) will be
assessed for each calendar day of delay required to complete work on subject contract.
As a minimum, LDs in the amount of
for the first day and
Err:509
for each day thereafter will be changed, based upon the following:
a. The contractor has complete control of the pace of work.
b. The contract provides for liquidated damages for delay of work for each calendar day
of the contract.
c. Considering the requirement, the rate of assessment is reasonable.
0
Contracting Officer
Date:
LEGAL
Staff Judge Advocate
(first day only)
1.0 hours
@ Err:509
Err:509
=
=
Err:509
CIVIL ENGINEERING
Total Engineering Cost/Day, including transportation.
per day
CONTRACTING
Contracting Officer
Administrator
Vehicle Costs
(See attached chart)
1.0 hours
1.0 hours
@ Err:509
@ Err:509
Err:509
Err:509
ADDITIONAL DAMAGES
per day
per day
per day
0.00