You are on page 1of 4

www.LaoJee.

Com

Zakir Ahmad

GEOLOGIST

Nationality
Muzaffarabad Azad Kashmir Pakistan
Email Id:
Cell phone no. 00746695xxxx (Doha), 0092344595xxxx(Pak)
Passport No:
CE1161211
Date of Birth: 04-04-1989

2011

2012

2014

2015

Education:
Qualification

Year Of Passing

MS APPLIED GEOLOGY

2012-2014, 3.6/4 CGPA

Institute

AJ&K
University
Muzaffarabad
Pakistan
BS (Applied Geology) 2008-2012, 04/4 CGPA AJ&K
University
Muzaffarabad
honors 4 years
(1st position)
Pakistan
Main Subjects: Structure geology, Engineering Geology, Field Geology, Geophysics, Petroleum
Geology Petrology, Stratigraphy, Paleontology, Field Geology, Petroleum Engineering.
Professional Objective:
I am a Geologist and want to become a part of your company that offer a variety of challenging opportunities
and reckoning the future goal, keeping the moral of its team exemplary and that I can utilized my
knowledge, skills and professional experience for the mutual benefits of myself, working organization.

PROJECTS:
1. xxxx Metro Project xxx (September 2014 to present)
Worked a xxxx Metro heart station Msheireb, Joaan station xxxx C ring station as a Geological/site engineer.
Responsibilities
Produce activity charts for individual projects.
Check actual construction and compare with drawings.
Incorporate any constrains from council and communicate them to higher-ups accordingly.
Check for any geotechnical works required. Check earth works if required.
Inspect concrete works on site and also checked pre cast concrete blocks.
Execution of work at site, slope stability work Anchors (CFRP & steel), pilling, diaphragm wall, Whaler
beam, grouting, meetings with consultant related site issues and technical problems, preparation
daily, weekly and monthly reports.
Execution of work at site, slope stability work Anchors (CFRP & steel), pilling, diaphragm wall, Whaler
beam, grouting, meetings with consultant related site issues and technical problems, preparation
daily, weekly and monthly reports.
LaoJee does not represent or guarantee the truthfulness, accuracy, or reliability of this CV which is being provided to the Employer on as is basis by LaoJee
Jobs. Viewing, using and processing of this CV shall automatically deemed that you have read & accepted our Terms and Conditions at our website
www.LaoJee.com. If you dont agree please do not view and use this CV. We do not guarantee candidates availability, willingness or agreement to accept
your planned opening / position. We have not verified his/her professional references / qualification & experience. We strongly recommend that before
selection clients should verify these references on their own. If you need our assistance or need more CVs please send us your request us at
RESUME@LaoJee.com. Thanks for using LaoJee Jobs.

www.LaoJee.Com
2. Pakistan Patrind Hydro Power Project ( 150 MW) Daewoo E&C South Korea
Duration: February 2012 to September 2014
I joined Daewoo Engineering and Construction (a Korea based world known organization) as a Tunnel
Engineer/Geologist in February, 2013. The Project is entitled as Construction of 147 MW Patrind Hydro Power
Project, AJ&K.
Responsibilities: Being a Tunnel Engineer/ Geological Engineer I was engaged in the following tasks at the project:
Conduct face mapping at each station and analyze that data by using standardized Geotechnical
Classification method Rock Mass Rating (RMR) in order to define the Rock Grade. Decide the
reinforcement (systematic & random rock bolt, fore poling, pipe roof etc.,) and direction of rock bolts to
be installed at each excavated face and confirm it after installation. Also decide the type (H-beam and
Lattice girder) and position of support to be installed and confirm it after installation. Check the results
of rock bolt pulling test and Shotcrete test by QA/QC according to specifications.
Preparation and record the Geological data for the each station. Data includes Checklist,
Face and
wall
Mapping,
Blasting
Pattern
and
Blasting
Results
of
each
station.
Investigating the ground water status at each face.
Monitoring the weak zones (fault, fracture zone, shear zone etc.,), decide the most suitable excavating
method by considering the geological features such as geological rock condition, upper ground level
circumstances.
Undertake
investigations regarding rock falling, collapse/failure at weak zones and take appropriate measurements
to prevent the rock falling. Reducing the over break during the excavation as small as possible.
Checking invoice of subcon. Convergence and Crown settlement Monitoring (Geodetic Survey &
Extensometer). Preparation of Method statement of Water way Tunnel, Letter responding and
documentation, Slope Mapping of Access Roads, Supervision (Quality Control) of Powerhouse
permanent slope excavation and protection works (PT Anchors, Shotcrete, Rock bolt Grouting.) slope
stability work.
I worked on detail design geology volume, rock quality and ground water chapters.
Compiled geology volume annexure of borehole logs, core photos, in-situ tests and water data.
I assessed rock quality from borehole logs and scanline data
Calculated RMR (rock mass rating), GSI (geological strength index) and Q-system values, which were
incorporated in the final design report.
I was responsible for project drilling data of 11000 meters for the whole project, which included
borehole logs, packer tests results, constant head permeability tests, water elevation, water
temperature, SPT and CPT data for each borehole.
Supervised laboratory tests on rocks e.g. Brazilian tests, triaxial tests, Schmidt hammer, point load test
and sieve analysis, unconfined compressive test, permeability tests on soil samples.
Used HoleBase 3.1 to keep projects exploratory drilling database. It accommodated core recovery,
geology and discontinuity data in a borehole log along with insitu tests.
Used dips software for scanline data of surface mapping and adits wall mapping for rock discontinuity
analysis in final design report.
LaoJee does not represent or guarantee the truthfulness, accuracy, or reliability of this CV which is being provided to the Employer on as is basis by LaoJee
Jobs. Viewing, using and processing of this CV shall automatically deemed that you have read & accepted our Terms and Conditions at our website
www.LaoJee.com. If you dont agree please do not view and use this CV. We do not guarantee candidates availability, willingness or agreement to accept
your planned opening / position. We have not verified his/her professional references / qualification & experience. We strongly recommend that before
selection clients should verify these references on their own. If you need our assistance or need more CVs please send us your request us at
RESUME@LaoJee.com. Thanks for using LaoJee Jobs.

www.LaoJee.Com
Based on drilling and scanline data drafted fault zone subsurface geological conditions report for power
tunnels design.
Drafted project progress report on weekly and monthly basis and corresponded with site office on
numerous day to day issues.
Conducted landslide investigation/stability study along the proposed Skardu Road of 22 km stretch.
Worked on borehole location drawing of all project structures and prepared a drawing for proposed
core boxes shed.

Neelum Jhelum Hydro Power Project (969 MW)


Worked as a Tunnel Engineer/Geological Engineer In Neelum Jhelum Hydroelectric Project (JV
between MWH, NORPLAN, NESPAK, ACE, NDC)
Duration: August 2011 to January 2013
Responsibilities:
Supervised and monitored excavation with (TBM) Excavation of tunnels (D&B, TBM)
Preparation of weekly, monthly Production repots and delays analysis
Responsibilities in the project include Excavation (D & B) for tunnels and power house cavern,
Geological/Geotechnical Mapping and Rock support Evaluation,
Supervision of blasting works,
Supervision of rock support with Lattice Girders, Shotcrete Ribs, Rock bolts (Expansion shell end
anchored rock bolts, resin anchored rock bolts, Fully cement grouted rock bolts ) and Shotcreeting
(Fiber reinforced shotcreeting, shotcreeting with wire mesh), Grouting, Probing.
Modelling on Phase II software, Preparation of geological sections along Headrace tunnel and of Power
House complex (Structure Contouring).
Wedge analysis in power house complex using Dips and Unwedge softwares, Insitue testing (over
coring, hydro jacking), Review and self-check of engineering drawings, Forecasting, Co-ordinate with
internal project support departments to ensure design constructability, documentation & Revision of BOQ.
Recommended crown and walls initial support for head race tunnel walls depending on rock condition
encountered.
Checked contractors rock assessment and compared ours with it for payment approval.
Inspected site before a concrete job as per design specification.
Supervised concrete pressure tunnel lining for crown, walls and invert.
Supervised cushion concreting on invert of power tunnels.
Checked quality of each concrete pour, look for water lenses, cracks, and segregation and cold joints.
Used to check slump of concrete, amount of admixture, transportation time of each mixer trucks.
Concrete pour time, use of concrete vibrators during pour which gave acceptable results.
Supervised concrete cylinders casting and compression tests
Revised mix design water and admixture quantities.
Issued several site instructions for improvements.
Suggested easy and time saving methods of invert cushion concrete pouring.
Regularly reviewed and self-checked engineering drawings.
All the correspondence was documented/filed and drafted weekly and monthly reports for document section.
LaoJee does not represent or guarantee the truthfulness, accuracy, or reliability of this CV which is being provided to the Employer on as is basis by LaoJee
Jobs. Viewing, using and processing of this CV shall automatically deemed that you have read & accepted our Terms and Conditions at our website
www.LaoJee.com. If you dont agree please do not view and use this CV. We do not guarantee candidates availability, willingness or agreement to accept
your planned opening / position. We have not verified his/her professional references / qualification & experience. We strongly recommend that before
selection clients should verify these references on their own. If you need our assistance or need more CVs please send us your request us at
RESUME@LaoJee.com. Thanks for using LaoJee Jobs.

www.LaoJee.Com
Pre-concrete pour, I checked the survey points, as per design thickness.
Lining section cleaning, curing and woodwork was confirmed.
Computer Skills
MS Office, Excel, Power Point, Auto Cade, Software: Wedge, Kingdom Geographics
Research Work
BS thesis in geophysics
MS thesis work Integrated Study for Reservoir Evaluation by using Seismic and Wireline log data in Badin
area of Lower Indus Basin, Pakistan.
Research report on Geology and Geography of Kashmir and Hazara areas (Pakistan): Institute of
Geology AJK University. (Summer 2008)
Examined the geology and geography of KASHMIR & HAZARA areas Examined rock outcrops and
studied various features associated with geology and geography and have written a 65-pages paper.
Technical field report on Stratigraphy and Paleontology of Salt range Pakistan: Institute of Geology AJK
University. (Summer 2009)
Researched on Stratigraphy and paleontology of Salt range Pakistan known as the paradise of Geology
all over the world and wrote a research paper of 70 page
Research report on Tectonic elements of Northern Pakistan, Institute of Geology AJK University.
(Summer2010) Visited the Northern Areas of Pakistan to see the important tectonic elements of
Pakistan like MBT, MCT, MKT, MMT and Kohistan island arc and wrote a report.
Achievements
CGPA: 04/4 in BS applied geology.
Completion of 2.170km headrace tunnel at Pakistan Patrind Hydro Power Project 150 MW in
Muzaffarabad Azad Kashmir Pakistan.
Completion of slope stability work ai Doha Metro Heart station Msheireb Doha Qatar (Anchoring
pilling wailer beam. Soil nailing)
Certification
Technical work shop (Hydrocarbon Exploration Techniques) Pakistan Association of petroleum Geosciences,
06months diploma of English language and conversation, 06months diploma of Auto Cad, MS Office, Micro Soft
Excel, power point. Wavelet software, Position holder and remained CR in BS Applied geology.
Hobbies and Interest
Playing cricket, hockey, and volley ball. Visit healthy place, listening music
Volunteer Experience & Causes
Supply everyday commodities in remote earthquake affected areas (Kashmir):
Identify easy and safe access to village or houses. Plan for their needs based on available local guides. Hire
trucks or vans and deliver them safely.
November 2005 January 2006 (3 months).
REFERENCES Mr. Sewang Hwan Jun (Construction/Tunnel Manager Mr.Chal Sook Park Overseas Business Dept. Manager
LaoJee does not represent or guarantee the truthfulness, accuracy, or reliability of this CV which is being provided to the Employer on as is basis by LaoJee
Jobs. Viewing, using and processing of this CV shall automatically deemed that you have read & accepted our Terms and Conditions at our website
www.LaoJee.com. If you dont agree please do not view and use this CV. We do not guarantee candidates availability, willingness or agreement to accept
your planned opening / position. We have not verified his/her professional references / qualification & experience. We strongly recommend that before
selection clients should verify these references on their own. If you need our assistance or need more CVs please send us your request us at
RESUME@LaoJee.com. Thanks for using LaoJee Jobs.

You might also like