1224 Federal Register / Vol. 70, No.

4 / Thursday, January 6, 2005 / Notices

(866) 208–3676 (toll free). For TTY, call foot-long, transmission line; and (6) filed, either a preliminary permit
(202) 502–8659. appurtenant facilities. The project application or a development
Comment Date: January 28, 2005. would have an annual generation of application (specify which type of
2.407 gigawatt-hours that would be sold application). A notice of intent must be
Magalie R. Salas,
to a local utility. served on the applicant(s) named in this
Secretary. l. Locations of Applications: A copy of public notice.
[FR Doc. E5–8 Filed 1–5–05; 8:45 am] the application is available for q. Proposed Scope of Studies Under
BILLING CODE 6717–01–P inspection and reproduction at the Permit: A preliminary permit, if issued,
Commission in the Public Reference does not authorize construction. The
Room, located at 888 First Street NE., term of the proposed preliminary permit
DEPARTMENT OF ENERGY Room 2A, Washington DC 20426, or by would be 36 months. The work
calling (202) 502–8371. This filing may proposed under the preliminary permit
Federal Energy Regulatory also be viewed on the Commission’s would include economic analysis,
Commission Web site at http://www.ferc.gov using preparation of preliminary engineering
Notice of Application Accepted for the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental
Filing and Soliciting Motions To number excluding the last three digits in impacts. Based on the results of these
Intervene, Protests, and Comments the docket number field to access the studies, the Applicant would decide
document. For assistance, please contact whether to proceed with the preparation
December 30, 2004. FERC Online Support at of a development application to
Take notice that the following FERCOnlineSupport@ferc.gov or toll construct and operate the project.
hydroelectric application has been filed free at 1–866–208–3676, or TTY, contact r. Comments, Protests, or Motions to
with the Commission and is available (202) 502–8659. A copy is also available Intervene: Anyone may submit
for public inspection: for inspection and reproduction at the comments, a protest, or a motion to
a. Type of Application: Preliminary address in item h. above. intervene in accordance with the
permit. m. Individuals desiring to be included requirements of Rules of Practice and
b. Project No.: 12551–000. on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214.
c. Date Filed: October 12, 2004. so indicate by writing to the Secretary In determining the appropriate action to
d. Applicant: Mansfield Hollow of the Commission. take, the Commission will consider all
Hydro. n. Competing Preliminary Permit: protests or other comments filed, but
e. Name of Project: Mansfield Hollow Anyone desiring to file a competing only those who file a motion to
Project. application for preliminary permit for a intervene in accordance with the
f. Location: On the Natchaug River, in proposed project must submit the Commission’s Rules may become a
Tolland County, Connecticut. The dam competing application itself, or a notice party to the proceeding. Any comments,
is administered by the U.S. Army Corps of intent to file such an application, to protests, or motions to intervene must
of Engineers. the Commission on or before the be received on or before the specified
g. Filed Pursuant to: Federal Power specified comment date for the comment date for the particular
Act, 16 U.S.C. 791(a)–825(r). particular application (see 18 CFR 4.36). application.
h. Applicant Contact: Mr. Salvatore Submission of a timely notice of intent Comments, protests and interventions
Shifrin, Mansfield Hollow Hydro, 78 allows an interested person to file the may be filed electronically via the
Bricktop Road, Windham, CT 06280, competing preliminary permit Internet in lieu of paper; see 18 CFR
(860) 423–3731. application no later than 30 days after 385.2001(a)(1)(iii) and the instructions
i. FERC Contact: Robert Bell, (202) the specified comment date for the on the Commission’s Web site under ‘‘e-
502–6062. particular application. A competing filing’’ link. The Commission strongly
j. Deadline for Filing Comments, preliminary permit application must encourages electronic filing.
Protests, and Motions to Intervene: 60 conform with 18 CFR 4.30(b) and 4.36. s. Filing and Service of Responsive
days from the issuance date of this o. Competing Development Documents: Any filings must bear in all
notice. Application: Any qualified development capital letters the title ‘‘COMMENTS’’,
The Commission’s Rules of Practice applicant desiring to file a competing ‘‘RECOMMENDATIONS FOR TERMS
and Procedure require all intervenors development application must submit to AND CONDITIONS’’, ‘‘PROTEST’’, OR
filing documents with the Commission the Commission, on or before a ‘‘MOTION TO INTERVENE’’, as
to serve a copy of that document on specified comment date for the applicable, and the Project Number of
each person in the official service list particular application, either a the particular application to which the
for the project. Further, if an intervenor competing development application or a filing refers. Any of the above-named
files comments or documents with the notice of intent to file such an documents must be filed by providing
Commission relating to the merits of an application. Submission of a timely the original and the number of copies
issue that may affect the responsibilities notice of intent to file a development provided by the Commission’s
of a particular resource agency, they application allows an interested person regulations to: The Secretary, Federal
must also serve a copy of the document to file the competing application no Energy Regulatory Commission, 888
on that resource agency. later than 120 days after the specified First Street, NE., Washington, DC 20426.
k. Description of Project: The comment date for the particular A copy of any motion to intervene must
proposed project would consist of: (1) application. A competing license also be served upon each representative
Proposed intake, (2) a proposed 12-foot- application must conform with 18 CFR of the Applicant specified in the
wide, 8-foot-high stone line canal 330 4.30(b) and 4.36. particular application.
feet long, (3) an existing powerhouse p. Notice of Intent: A notice of intent t. Agency Comments: Federal, state,
containing three generating units having must specify the exact name, business and local agencies are invited to file
a total installed capacity of 500 address, and telephone number of the comments on the described application.
kilowatts, (4) an existing 100-foot-long, prospective applicant, and must include A copy of the application may be
5-foot-wide, 7-foot-high concrete an unequivocal statement of intent to obtained by agencies directly from the
conduit tailrace, (5) a proposed 275- submit, if such an application may be Applicant. If an agency does not file

VerDate jul<14>2003 15:45 Jan 05, 2005 Jkt 205001 PO 00000 Frm 00005 Fmt 4703 Sfmt 4703 E:\FR\FM\06JAN1.SGM 06JAN1
Federal Register / Vol. 70, No. 4 / Thursday, January 6, 2005 / Notices 1225

comments within the time specified for transmission line, and (3) appurtenant filed, either a preliminary permit
filing comments, it will be presumed to facilities. application or a development
have no comments. One copy of an The project would have an annual application (specify which type of
agency’s comments must also be sent to generation of 17.52 gigawatt-hours that application). A notice of intent must be
the Applicant’s representatives. would be sold to a local utility. served on the applicant(s) named in this
l. Locations of Applications: A copy of public notice.
Magalie R. Salas, the application is available for q. Proposed Scope of Studies Under
Secretary. inspection and reproduction at the Permit: A preliminary permit, if issued,
[FR Doc. E5–1 Filed 1–5–05; 8:45 am] Commission in the Public Reference does not authorize construction. The
BILLING CODE 6717–01–P Room, located at 888 First Street, NE., term of the proposed preliminary permit
Room 2A, Washington, DC 20426, or by would be 36 months. The work
calling (202) 502–8371. This filing may proposed under the preliminary permit
DEPARTMENT OF ENERGY also be viewed on the Commission’s would include economic analysis,
Web site at http://www.ferc.gov using preparation of preliminary engineering
Federal Energy Regulatory the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental
Commission number excluding the last three digits in impacts. Based on the results of these
the docket number field to access the studies, the Applicant would decide
Notice of Application Accepted For
document. For assistance, please contact whether to proceed with the preparation
Filing and Soliciting Motions To FERC Online Support at of a development application to
Intervene, Protests, and Comments FERCOnlineSupport@ferc.gov or toll construct and operate the project.
December 30, 2004. free at 1–866–208–3676, or TTY, contact r. Comments, Protests, or Motions To
Take notice that the following (202) 502–8659. A copy is also available Intervene: Anyone may submit
hydroelectric application has been filed for inspection and reproduction at the comments, a protest, or a motion to
with the Commission and is available address in item h. above. intervene in accordance with the
for public inspection: m. Individuals desiring to be included requirements of Rules of Practice and
a. Type of Application: Preliminary on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214.
permit. so indicate by writing to the Secretary In determining the appropriate action to
b. Project No.: 12519–000. of the Commission. take, the Commission will consider all
c. Date Filed: July 12, 2004, and n. Competing Preliminary Permit: protests or other comments filed, but
supplemented on November 1, 2004. Anyone desiring to file a competing only those who file a motion to
d. Applicant: Florida Hydro, Inc. application for preliminary permit for a intervene in accordance with the
e. Name of Project: Gulf Stream proposed project must submit the Commission’s Rules may become a
Energy Project. competing application itself, or a notice party to the proceeding. Any comments,
f. Location: On Gulf Stream in the of intent to file such an application, to protests, or motions to intervene must
Atlantic Ocean, near Palm Beach the Commission on or before the be received on or before the specified
County, Florida. No Federal land or specified comment date for the comment date for the particular
facilities would be used. particular application (see 18 CFR 4.36). application.
g. Filed Pursuant to: Federal Power Submission of a timely notice of intent Comments, protests and interventions
Act, 16 U.S.C. 791(a)–825(r). allows an interested person to file the may be filed electronically via the
h. Applicant Contact: Mr. Michael J. competing preliminary permit Internet in lieu of paper; see 18 CFR
Hoover, Florida Hydro, Inc., 171 application no later than 30 days after 385.2001(a)(1)(iii) and the instructions
Comfort Road, Palatka, FL 33177, (386) the specified comment date for the on the Commission’s Web site under ‘‘e-
328–2368. particular application. A competing filing’’ link. The Commission strongly
i. FERC Contact: Robert Bell, (202) preliminary permit application must encourages electronic filing.
502–6062. conform with 18 CFR 4.30(b) and 4.36. s. Filing and Service of Responsive
j. Deadline for Filing Comments, o. Competing Development Documents: Any filings must bear in all
Protests, and Motions To Intervene: 60 Application: Any qualified development capital letters the title ‘‘COMMENTS’’,
days from the issuance date of this applicant desiring to file a competing ‘‘RECOMMENDATIONS FOR TERMS
notice. development application must submit to AND CONDITIONS’’, ‘‘PROTEST’’, or
The Commission’s Rules of Practice the Commission, on or before a ‘‘MOTION TO INTERVENE’’, as
and Procedure require all intervenors specified comment date for the applicable, and the Project Number of
filing documents with the Commission particular application, either a the particular application to which the
to serve a copy of that document on competing development application or a filing refers. Any of the above-named
each person in the official service list notice of intent to file such an documents must be filed by providing
for the project. Further, if an intervenor application. Submission of a timely the original and the number of copies
files comments or documents with the notice of intent to file a development provided by the Commission’s
Commission relating to the merits of an application allows an interested person regulations to: The Secretary, Federal
issue that may affect the responsibilities to file the competing application no Energy Regulatory Commission, 888
of a particular resource agency, they later than 120 days after the specified First Street, NE., Washington, DC 20426.
must also serve a copy of the document comment date for the particular A copy of any motion to intervene must
on that resource agency. application. A competing license also be served upon each representative
k. Description of Project: The application must conform with 18 CFR of the Applicant specified in the
proposed project would consist of: (1) A 4.30(b) and 4.36. particular application.
generation farm containing up to 8 p. Notice of Intent: A notice of intent t. Agency Comments: Federal, State,
submerged two-counter rotating must specify the exact name, business and local agencies are invited to file
fiberglass blades and integrated turbine address, and telephone number of the comments on the described application.
generating units having a total installed prospective applicant, and must include A copy of the application may be
capacity of 2 to 3 megawatts, (2) a an unequivocal statement of intent to obtained by agencies directly from the
proposed 3-mile-long, sub marine submit, if such an application may be Applicant. If an agency does not file

VerDate jul<14>2003 15:45 Jan 05, 2005 Jkt 205001 PO 00000 Frm 00006 Fmt 4703 Sfmt 4703 E:\FR\FM\06JAN1.SGM 06JAN1