Professional Documents
Culture Documents
,
Ghaziabad, India. Reproduction, utilisation or disclosure to
third parties in any form whatsoever is not allowed without
written consent of the proprietors.
DOC
PROCESS DOCUMENT
PICK UP ELEMENT
(C-BAND)
VERSIO
N
P1
SH.
NO.
01-07
CH.
DATE
ISSU
VERSIO
N E
SH SH
NO.
HELD
IN
GAD
NO. OF SH
CHANGE
PREP
SEEMA.D
APPR
S. CHOUBE
DATE
13.09.12
DATE
13.09.12
APPROVED
NO.
13.09.12
PROVISIONAL
S.CHOUB
E
Change Record
BEL-PLM00601
PS
P1
00
PART NUMBER
CONTENTS
DOC
PROCESS DOCUMENT
PICK UP ELEMENT
(C-BAND)
PS
ISSU
VERSIO
N E
SH SH
NO.
HELD
IN
GAD
NO. OF SH
P1
00
PART NUMBER
2
7
PREP
SEEMA.D
APPR
S. CHOUBE
DATE
13.09.12
DATE
13.09.12
1. INTRODUCTION:............................................................................3
2. MATERIALS................................................................................... 3
3. PROCEDURE DESCRIPTION OF DIELECTRIC SLAB BONDING:..............3
3.1 MACHINIG:......................................................................................................... 4
3.1.1..................................................................................................................... Purpose:
............................................................................................................................................. 4
3.1.2........................................................................................................................ Scope:
............................................................................................................................................. 4
3.1.3.................................................................................................. Equipment & Utilities:
............................................................................................................................................. 4
3.1.4........................................................................................................... Input Materials:
............................................................................................................................................. 4
3.1.5.................................................................................................................. Procedure:
............................................................................................................................................. 4
3.1.6................................................................................................................ Precautions:
............................................................................................................................................. 5
BEL-PLM00601
3.2 INSPECTION:...................................................................................................... 5
3.2.1..................................................................................................................... Purpose:
............................................................................................................................................. 5
3.2.2........................................................................................................................ Scope:
............................................................................................................................................. 5
3.2.3.................................................................................................. Equipment & Utilities:
............................................................................................................................................. 5
3.2.4........................................................................................................... Input Materials:
............................................................................................................................................. 6
3.2.5.................................................................................................................. Procedure:
............................................................................................................................................. 6
3.2.6................................................................................................................. Precaution:
............................................................................................................................................. 6
DOC
PROCESS DOCUMENT
PICK UP ELEMENT
(C-BAND)
1.
ISSU
VERSIO
N E
SH SH
NO.
HELD
IN
GAD
NO. OF SH
3
7
PREP
SEEMA.D
APPR
S. CHOUBE
DATE
13.09.12
DATE
13.09.12
Introduction:
Pick up element is a reduced size circular guide aperture centrally loaded with a
dielectric rod of smaller radius which yields broad beam patterns in both E and H
planes. The dielectric rod is a ceramic of dielectric constant 12. The ceramic rod is
made by bonded dielectric slab. By machining, bonded slab is turn into cylindrical
rod as shown in the figure. The nichrome film, centrally located in the pickup
element absorbs any undesired orthogonal signal.
2.
Materials
Machining
Inspection
BEL-PLM00601
PS
P1
00
PART NUMBER
Pick Up Element
(1410 052 310 72)
M/C
S
p
DOC
PROCESS DOCUMENT
PICK UP ELEMENT
(C-BAND)
PS
ISSU
VERSIO
N E
SH SH
NO.
HELD
IN
GAD
NO. OF SH
P1
00
PART NUMBER
4
7
PREP
SEEMA.D
APPR
S. CHOUBE
DATE
13.09.12
DATE
13.09.12
3.1 MACHINIG:
Bonded ceramic slabs required for the fabrication of pickup elements are
machined accurately to get the specified dimensions and shape as per drawing.
3.1.1 Purpose:
Achieve the specified dimensions and shape of ceramic pickup
elements.
3.1.2 Scope:
This procedure covers the machining of ferrite rods, yokes and pickup elements.
3.1.3 Equipment & Utilities:
S.No.
1.
Equipment
Surface Grinder for Vertical Grinding
2.
3.
Cylindrical Grinder
4.
Ultrasonic cleaner
5.
S.No.
1.
Utilities
Diamond Grinding Wheels
2.
Machine Oils
3.
4.
Old cloth
5.
DI Water
6.
Ordinary Water
BEL-PLM00601
Qty
Remark
R-12 for Height
MPS-3H132
(GMN)
Outer Diameter
for Step and
Parting Operation
Qty
Remark
DOC
PROCESS DOCUMENT
PICK UP ELEMENT
(C-BAND)
PS
ISSU
VERSIO
N E
SH SH
NO.
HELD
IN
GAD
NO. OF SH
P1
00
PART NUMBER
PREP
SEEMA.D
APPR
S. CHOUBE
DATE
13.09.12
DATE
13.09.12
3.1.5 Procedure:
1. Grind the rectangular shaped bonded ceramic slabs on a cylindrical grinder to
make it round shaped as required (ref GA 1410 052 310 72)
BEL-PLM00601
3.2.1
Purpose:
DOC
PROCESS DOCUMENT
PICK UP ELEMENT
(C-BAND)
3.2.2
PS
ISSU
VERSIO
N E
SH SH
NO.
HELD
IN
GAD
NO. OF SH
P1
00
PART NUMBER
PREP
SEEMA.D
APPR
S. CHOUBE
Scope:
Micrometers
Vernier calipers.
3.2.4
Input Materials:
Procedure:
Precaution:
BEL-PLM00601
DATE
13.09.12
DATE
13.09.12
DOC
PROCESS DOCUMENT
PICK UP ELEMENT
(C-BAND)
ISSU
VERSIO
N E
SH SH
NO.
HELD
IN
GAD
NO. OF SH
7
7
PREP
SEEMA.D
APPR
S. CHOUBE
Table-1
Batch ID:
Date:
Date
Function
Rough Outer
Diameter
Final Outer
Diameter
Parting
Rough Height
Final Height
Inspection
BEL-PLM00601
PS
P1
00
PART NUMBER
Specification
Total In
Qty of
rods:
Total
Accepte
d Qty of
rods:
Total
Rejecte
d Qty
of rods:
Remark
Sign
DATE
13.09.12
DATE
13.09.12