RESUMEN
UNIVERSIDAD DE CUENCA
ABSTRACT
This thesiss overall objective is to establish a technical methodology for
normal operation wind farm analyzing, and the evaluations impacts on grid by
introducing energy from wind power. First have revised Ecuadorian laws in
technical, administrative and regulatory ambits; then, we examined state of the
art of both wind power and wind farms. After, we've described the Wind Park
Huascachaca in their respective spheres; it was taken like an example for work
done apply to.
Then, wind farm was modeled for electrical grid impacts considered as: load
flow, evaluation of thermal limits, voltage variations; a second modeling was
developed for short circuit event, and wind park influence on supply quality,
given the wind power variability.
Thus, one result of the thesis is a methodology applicable to any park. The
complete model could consider behavior of both: steady and transient state,
this last case is possible when having enough information. Whichever, the
methodology would predict the behavior of the wind farm under several
disturbances.
UNIVERSIDAD DE CUENCA
INDICE
Captulo 1.- Introduccin .................................................................................... 14
1.1 Problemas no resueltos...................................................................... 18
1.2 Situacin problmica .......................................................................... 19
1.3 Formulacin del problema .................................................................. 20
1.4 Hiptesis ............................................................................................ 20
1.5 Objeto de estudio ............................................................................... 21
1.6 Campo de accin ............................................................................... 21
1.7 Objetivos: general y especficos ......................................................... 21
1.8 Mtodos ............................................................................................. 22
1.9 Definicin de variables ....................................................................... 22
1.10 Tareas ................................................................................................ 23
1.11 Justificacin ........................................................................................ 23
1.12 Viabilidad............................................................................................ 24
1.13 Consecuencias de la investigacin .................................................... 25
1.14 Estructura de la tesis............................................................................ 25
Captulo 2.- Antecedentes ................................................................................ 27
2.1 El sistema elctrico ecuatoriano............................................................ 32
2.2 Las energas renovables en el Ecuador ................................................. 48
2.3 La energa elica en el Ecuador ........................................................... 50
2.4 Contexto regulatorio de las energas alternativas en el Ecuador .......... 54
Captulo 3.- Estado del Arte............................................................................... 61
3.1 Introduccin a la energa elica ............................................................ 61
3.2 Las turbinas elicas ............................................................................... 62
3.3 Caractersticas de las turbinas elicas .................................................. 68
3.4 Parque Elico ........................................................................................ 76
3.5 Control de frecuencia ............................................................................ 78
3.6 Conmutacin de la granja elica a la red elctrica ................................. 82
3.7 Control de voltaje .................................................................................. 85
3.8 Maniobras en caso de falla ................................................................... 85
3.9 Efectos de la conexin de parques elicos a la red elctrica ............. 86
Captulo 4.- Simulacin de la integracin del proyecto de generacin
elico Huascachaca ala red de transmisin ecuatoriana .............................. 102
4.1 Resea histrica .................................................................................. 102
4.2 Descripcin general del proyecto ......................................................... 104
4.3 Caractersticas tcnicas del proyecto................................................... 106
4.4 Descripcin econmica - financiera del proyecto elico....................... 111
4.5 Preparacin de datos. Escenarios ...................................................... 117
4.6 Modelacin de la turbina elica ............................................................ 118
4.7 Reporte delasimulacin de la integracin del parque elico Huascachaca
a la red elctrica ecuatoriana ..................................................................... 135
Captulo 5.- Conclusiones y Recomendaciones ............................................. 169
Anexos ............................................................................................................... 177
Autor: Pablo Florencio Chacho Ochoa
UNIVERSIDAD DE CUENCA
Lista de figuras
Pg.
Figura 1.1 Capacidad instalada total de energa elica a nivel mundial,
periodo 2010 - primer semestre del 2011. Fuente Asociacin Mundial de la
energa Elica ................................................................................................. 15
Figura 2.1 Produccin nacional de energa al ao 2006. Fuente MEER ....... 28
Figura 2.2 Importaciones de energa del ao 2006. Fuente MEER. .............. 29
Figura 2.3 Exportaciones de energa del ao 2006. Fuente MEER............... 30
Figura 2.4 Demanda domstica de energa, 2006. Fuente MEER. .............. 31
Figura 2.5 Consumo energtico sectorial al ao 2006. Fuente MEER. ......... 31
Figura 2.6 Potencia Efectiva por tipo de central (CONELEC, 2010)............... 35
Figura 2.7 Sistema nacional de transmisin (fuente CONELEC). .................. 39
Figura 2.8 Detalle del SNI, anillo troncal a 230 kV(fuente: Transelectric). ...... 44
Figura 3.1 Partes de la turbina elica. ............................................................ 63
Figura 3.2 Funcionamiento Aerodinmico de la turbina Elica. ...................... 64
Figura 3.3. Turbina elica de velocidad fija con generador de induccin jaula
de ardilla, directamente conectada a la red ..................................................... 71
Figura 3.4 Turbina elica de velocidad variable con generador de rotor
bobinado y resistencia variable, directamente conectado a la red .................. 73
Figura 3.5 Turbina elica de velocidad variable con convertidor de frecuencia
a escala parcial. Tipo C ................................................................................... 74
Figura 3.6 Turbina elica de velocidad variable con convertidor de frecuencia
a escala total. Tipo D....................................................................................... 75
Figura 3.7 Condicin de estabilidad de la potencia y demanda en la frecuencia
........................................................................................................................ 79
Figura 3.8 Activacin de la potencia de reserva y la frecuencia del SEP como
una funcin del tiempo, en una situacin donde se ha desconectado del
sistema una planta generadora grande (Ackermann, 2005) ........................... 80
Figura 3.9 Diagrama simplificado que representa la conexin de la generacin
elica a una red elctrica ................................................................................ 83
Figura 3.10 Efectos principales de la calidad de la potencia energa en la
red elctrica, debido: A) Armnicos, B) Flicker de voltaje y C) Factor de
potencia (Burton, David, & Bossanyi, 2001). ................................................... 90
Figura 3.11 Influencia de la frecuencia en la perceptibilidad de los cambios
sinusoidales de voltaje (Burton, David, & Bossanyi, 2001) ............................. 92
Figura 4.1 Esquema del Parque Elico, Circuitos Internos y Ubicacin
Subestacin Uchucay .................................................................................... 103
Autor: Pablo Florencio Chacho Ochoa
4
UNIVERSIDAD DE CUENCA
Figura 4.2 Ubicacin de los dos grupos que conforman el parque elico
Huscachaca (fuente: CIE, 2010) ................................................................... 108
Figura 4.3 Estructura general del modelo de una turbina elica de velocidad
variable con generador inductivo de doble alimentacin, tipo C (Ackermann,
2005) ............................................................................................................. 121
Figura 4.4 Generador de Induccin Doblemente alimentado (DFIG) ........... 124
Figura 4.5 Caracterstica Potencia-velocidad de rotor para generadores de
velocidad variable. Lnea continua caracterstica optima, en interpuntada la
real o prctica. (Ackerman, 2005) ................................................................. 128
Figura 4.6 Modelo de control de ngulo de inclinacin de aspa (pitch
angle).(Ackerman, 2005). .............................................................................. 129
Figura 4.7Modelo de control de voltaje para turbinas de velocidad variable tipo
C.(Ackerman, 2005) ...................................................................................... 130
Figura 4.8Modelo agregado de Parque Elico, de N turbinas,
transformadores elevadores de cada turbina (nivel medio de tensin) y
transformador(s) del parque elico, PCC es el punto de conexin comn de la
turbina y la red............................................................................................... 135
Figura 4.9 Detalle del modelo del parque elico Huascachaca instalado a la
barra Cuenca, 138 kV en el software Power Factory de Digsilent (escenario de
mxima carga al 2014). ................................................................................. 138
Figura 4.10Detalle del modelo del parque elico Huascachaca instalado a la
barras Cuenca y Loja a 138 kV en el software Power Factory de Digsilent
(escenario de mxima carga al 2014) ........................................................... 139
Figura 4.11Detalle de la zona Molino-Milagro, del SNI proporcionado por el
CENACE, implementado el parque Huascachaca, conectado a las barras a
Cuenca 138 y Loja 138, en DIGSILENT ........................................................ 143
Figura 4.12Detalle de la barra Cuenca 69 ................................................... 144
Figura 4.13Detalle de la barras Loja69. ....................................................... 145
Figura 4.14 Curva P-V en condiciones de mnima carga con el parque elico
Huascachaca desconectado ......................................................................... 146
Figura 4.15Curva P-V en condiciones de mnima carga con el parque elico
Huascachaca conectado. .............................................................................. 147
Figura 4.16Detalle de la zona austral en donde se implementara el parque
Huascachaca, las lneas Uchucay - Cuenca y Uchuca Loja,aparecen
resaltadas consideradas para el estudio de contingencias y salida de servicio
...................................................................................................................... 148
Figura 4.17 Detalle del diagrama unifilar del parque Huascachaca, con la
barra MV en cortocircuito .............................................................................. 152
Autor: Pablo Florencio Chacho Ochoa
UNIVERSIDAD DE CUENCA
UNIVERSIDAD DE CUENCA
Lista de tablas
Pg.
Tabla 1.1 Capacidad instalada mundial por pases, primer semestre del 2011.
Fuente Asociacin Mundial de la energa Elica ............................................. 16
Tabla 2.1 Potencia por tipo de energa y tipo de central. (CONELEC,
Estadsticas del ao 2010) .............................................................................. 34
Tabla 2.2 SNI, elementos de compensacin (fuente: CONELEC). ................ 45
Tabla 2.3 Proyectos hidroelctricos en ejecucin en el Ecuador (fuente MEER,
2012) ............................................................................................................... 49
Tabla 2.4 Proyectos previstos de Generacin Elica en el Ecuador (fuente
MEER) ............................................................................................................. 51
Tabla 3.1Conceptos de turbinas elicas tomado del libro Wind Power in
Power System (Ackermann, 2005). ................................................................. 70
Tabla 4.1 Caractersticas de los aerogeneradores ....................................... 109
Tabla4.2 Equipo primario de la subestacin Uchucay (fuente: CIE, 2010) ... 110
Tabla A1.1 Caractersticas del aerogenerador considerado para la simulacin
realizada ........................................................................................................ 179
Tabla A1.2 Caractersticas del transformador elevador 690 / 36000 voltios. 180
Tabla A1.3 Caractersticas del transformador Uchucay 36000 / 138000 voltios
...................................................................................................................... 180
Tabla A1.4 Caractersticas de las lneas UchucayCuenca y UchucayLoja,
nivel detensin 138 kV .................................................................................. 182
Tabla A1.5 Equivalentes en cortocircuito en barras para mximas y mnimas
corrientes, barra Cuenca (138 kV). ............................................................... 188
Tabla A1.6 Potencias y corrientes en barras para mximas y mnimas
corrientes, barra Cuenca (138 kV). ............................................................... 189
UNIVERSIDAD DE CUENCA
UNIVERSIDAD DE CUENCA
Universidad de Cuenca
Facultad de Ingeniera, Departamento de Posgrados
Cuenca, Ecuador
2012
UNIVERSIDAD DE CUENCA
Director:
Juan Leonardo Espinoza Abad PhD
Lnea de Investigacin:
Energas Alternativas
Universidad de Cuenca
Facultad de Ingeniera, Departamento de Posgrados
Cuenca, Ecuador
2012
10
UNIVERSIDAD DE CUENCA
Dedicatoria
presente.
Perrucio
tu
sola
11
UNIVERSIDAD DE CUENCA
Proverbio holands
12
UNIVERSIDAD DE CUENCA
Agradecimientos
En estos ltimos meses de intenso trabajo junto a mi estuvieron muchas
personas colaborando en distintas maneras, no solo en esta tarea en
particular, sino apoyndome, comprendindome, facilitndome informacin y
conocimientos, brindndome su amistad y compaa, haciendo que las tareas
cotidianas sean ms fciles y llevaderas: quiero agradecer al director de tesis
Juan Leonardo, por proponer el tema, por la gua constante, por las rpidas
contestaciones y oportunas correcciones, y comentarios, muchas gracias. A mi
esposa por llevar toda la tarea de la casa, por acompaar a mis hijos, por todo
el tiempo de familia sacrificado. A mi madre y hermanos por el respaldo
incondicional, a mi hermana Ana por el ejemplo en el estudio. A mis
compaeros de trabajo: Vctor, Telmo, Celso, Carlos, Diego, Juan Pablo,
Walter, Fabin, Galo, los dos Xavieres, a Teodoro, a Leslie, a Juanito, Nelly, a
Sonia y Fernanda, a Israel por explicarme los mtodos numricos, a Patricio
Quituisaca de la Empresa Elctrica Centrosur por sacrificar unos cuantos
domingos para ayudarme a dar los primeros pasos en Dig Silent, a Francisco
Andrade de Elecaustro por la informacin proporcionada; a Hermgenes
Flores por las consultas a cualquier hora siempre amable y magistralmente
contestadas, a Wilson Meja tambin del CENACE, por toda su colaboracin,
en este punto a todo la institucin, el CENACE lo hace muy bien!; a Julver
Pino, a Rodrigo Semprtegui, a Anita Rodrguez y a todo el personal de
posgrados de la facultad de Ingeniera de la Universidad de Cuenca, Gracias.
Para ser breve y no ser injusto en este reconocimiento. A todos los que
estuvieron conmigo en este tiempo, Gracias Totales!
13
UNIVERSIDAD DE CUENCA
14
UNIVERSIDAD DE CUENCA
Figura 1.1 Capacidad instalada total de energa elica a nivel mundial, periodo 2010
- primer semestre del 2011. Fuente Asociacin Mundial de la energa Elica
En el 2011, China supero a todos los pases del mundo en cuanto a capacidad
instalada, relegando a Estados Unidos a la segunda posicin, sin embargo
"Half Year 2011 Worldwide Wind Energy Statistics Report" de World Wind Energy
Association.
15
UNIVERSIDAD DE CUENCA
Tabla 1.1 Capacidad instalada mundial por pases, primer semestre del 2011. Fuente
Asociacin Mundial de la energa Elica
Posicin
Pas
Capacidad
Total
Capacidad
Total
Capacidad
Total
(MW)
(MW)
(MW)
a junio - 2011
a fines del
2010
a fines del
2009
China
52.800
44.733
25.810
Estados Unidos
42.432
40.180
35.159
Alemania
27.981
27.215
25.777
Espaa
21.150
20.676
19.149
India
14.550
13.065
11.807
Italia
6.200
5.797
4.850
Francia
6.060
5.660
4.574
Reino Unido
5.707
5.203
4.092
Canad
4.611
4.008
3.319
10
3.960
3.702
3.357
Portugal
29.500
26.441
21.872
Total
215.000
196.682
159.766
16
UNIVERSIDAD DE CUENCA
En cuanto a Amrica Latina, esta permaneci por debajo del crecimiento del
2009 y agreg slo 467,00 MW, alcanzando una capacidad total de 1.983,00
MW. Su tasa de crecimiento (30,8 %) fue superior a la media en todo el
mundo, sin embargo, muy por debajo del 113 % del ao anterior.
Para fines del 2010, el continente representaba slo el 1,2% de los
aerogeneradores instalados a nivel mundial. Slo seis pases de Amrica
Latina instalaron nuevos aerogeneradores en el ao 2010: Brasil (320 MW),
Mxico (104,5 MW), Argentina (25,3 MW), Uruguay (10 MW), Cuba (4,5 MW)
y Chile (2,6 MW)2.
Con la excepcin de Brasil y Mxico, el mercado elico en Amrica Latina se
puede considerar en sus primeros estadios.
En este contexto el Ecuador, al ao 2012, an no ha integrado energa elica
en ninguna red de transmisin o de distribucin, el nico parque elico
existente y en operacin, se sita aisladamente en las islas Galpagos con 2,4
MW de capacidad.
Esperando que para los meses finales del 2012 entre en funcionamiento el
primer parque elico continental que eventualmente ser integrado al sistema
nacional interconectado, Villonaco de 15 MW en el sur del pas. Es decir la
integracin de energas no convencionales es absolutamente incipiente.
En el Ecuador a partir de enero del 2007 se crea el Ministerio de Electricidad y
Energas Renovables (MEER), y se establecen las polticas energticas
conducentes a garantizar un suministro energtico de calidad, que satisfaga
la demanda en el momento oportuno, con precios adecuados que garanticen
el acceso a todos los ecuatorianos a la oferta energtica, con responsabilidad
17
UNIVERSIDAD DE CUENCA
Citado en Polticas Energticas del Ecuador, 2008-2020. MEER publicacin oficial, 2008.
18
UNIVERSIDAD DE CUENCA
de
experiencia
administradores de las
de
los
manejadores,
redes elctricas en
controladores
la integracin de
19
UNIVERSIDAD DE CUENCA
considerable
de
generacin
elica
caracterizada
por
su
incrementar su cuota de
1.4 Hiptesis
Dada la gran complejidad y volumen que entraa el estudio de las energas
renovables en los mbitos que le competen, sumado esto el tiempo que
demandara esa tarea, se ha dejado de lado otros aspectos que son
connaturales a la generacin elica como el medio ambiente, las obras civiles,
el equipamiento mecnico de los aerogeneradores, por mencionar algunos.
Por todo lo anteriormente expuesto este trabajo de investigacin se enfoca
fundamentalmente en el mbito tcnico elctrico.
El anlisis y estudio de la integracin de parques elicos a la red elctrica,
conduce a afirmar que la sinergia entre las energas elicas y no renovables
es perspectiva en el Ecuador.
20
UNIVERSIDAD DE CUENCA
Energa Elica
21
UNIVERSIDAD DE CUENCA
1.8 Mtodos
La metodologa de este trabajo se llevar conforme a los pasos que dicta la
lgica operativa del proceso del desarrollo de la investigacin a travs de:
Anlisis y revisin de los desarrollos tericos y matemticos de los
aerogeneradores y parques elicos, en base a las tecnologas y
experiencias actualmente utilizadas.
Modelacin y simulacin
22
UNIVERSIDAD DE CUENCA
1.10 Tareas
Las tareas para realizar esta investigacin pueden ser resumidas en el
siguiente listado:
Recopilacin de informacin terica.
Revisin de la situacin del desarrollo de las energas renovables en el
pas, de la normativa y regulacin ecuatorianas al respecto.
Revisin del estado de arte de la integracin de la energa elica en un
sistema de potencia.
Revisin de modelacin de los componentes de un parque elico.
Descripcin del proyecto elico sobre el que se aplicar el trabajo
desarrollado.
Establecimiento y evaluacin de los distintos escenarios de operacin.
Modelacin y simulacin del parque elico que servir de ejemplo de
aplicacin en el software especializado.
Evaluacin de los resultados obtenidos.
Redaccin, presentacin y defensa exitosa de la Tesis de Grado.
1.11 Justificacin
Una razn bsica para desarrollar este trabajo de investigacin es la inquietud
personal de conocer y aprender la problemtica que envuelve la integracin de
una energa renovable con caractersticas especiales como la elica en redes
elctricas con generacin no renovable, lo cual en un futuro puede ser un
complemento a las actividades profesionales del sustentante.
As mismo se considera que este trabajo ser una gua para las personas
interesadas en investigar y desarrollar una propuesta en este amplio campo
Autor: Pablo Florencio Chacho Ochoa
23
UNIVERSIDAD DE CUENCA
1.12 Viabilidad
El tema es perfectamente viable para su desarrollo pues es de mucho inters
en el rea del estudio de energas renovables, dentro del campo de la
ingeniera elctrica. Los conocimientos adquiridos durante los 2 aos de
maestra, y en especial dentro de la asignatura de Operacin Dinmica de un
Sistema Elctrico de Potencia, hacen posible que el tema se pueda desarrollar
de forma coherente y precisa. En cuanto a la disponibilidad de bibliografa, en
la actualidad se cuenta con mucha bibliografa especializada relacionada con
el tema, a la cual se puede acceder fcilmente ya sea de forma impresa o
digital.
El software a utilizarse es de probada confiabilidad y de utilizacin comn para
operadores, administradores y planificadores de redes elctricas alrededor del
mundo, se cuenta con los conocimientos necesarios de utilizacin requeridos,
como herramienta se necesita nicamente un computador personal con el
software, que es un programa de calculo que permite implementar y simular
todos los elementos constitutivos del parque elico. El programa es capaz de
realizar los clculos del estado de la red bajo condiciones normales y de falla,
a travs de la determinacin de las tensiones, ngulos, corrientes y potencias
en cada nodo del sistema, mediante simulaciones numricas y grficas, que
permitirn aproximar a la realidad, el comportamiento de las redes elctricas
ante la accin de la entrada de la energa elica. Los resultados obtenidos por
Autor: Pablo Florencio Chacho Ochoa
24
UNIVERSIDAD DE CUENCA
el programa nos permitirn contar con mejores criterios para evaluar los
efectos de la integracin de energa elica a las redes de transmisin.
UNIVERSIDAD DE CUENCA
26
UNIVERSIDAD DE CUENCA
mayoritaria
responsabilidad
27
UNIVERSIDAD DE CUENCA
28
UNIVERSIDAD DE CUENCA
all del
29
UNIVERSIDAD DE CUENCA
30
UNIVERSIDAD DE CUENCA
31
UNIVERSIDAD DE CUENCA
En
la
Constitucin
del
2008
que
fuera
redactada
entre
el 30
de
UNIVERSIDAD DE CUENCA
dos
grandes
corporaciones:
CNEL
Corporacin
Nacional
de
La
generadoras
Hidropaute,
Electroguayas,
Termoesmeraldas,
33
UNIVERSIDAD DE CUENCA
Generacin
En el ao 2010, Ecuador dispona de una potencia nominal o instalada de
5.142,68 MW de generacin nacional, y 650 MW que corresponden a las
interconexiones con Colombia (540 MW nominal 525 MW efectivos), y 110
MW de potencia nominal y efectiva con Per.
En el mismo ao la potencia efectiva de produccin nacional fue de 4.761,39
MW, de estos ltimos 4.203,53 MW estn incorporados al Sistema Nacional
Interconectado (S.N.I.), mientras que 557,87 MW corresponden a sistemas
aislados o No Incorporados (Estadstica del Sector Elctrico Ecuatoriano CONELEC, ao 2010).
Tabla 2.1 Potencia por tipo de energa y tipo de central. (CONELEC, Estadsticas del
ao 2010)
34
UNIVERSIDAD DE CUENCA
fundamentalmente
de
los
periodos
de
mantenimiento,
35
UNIVERSIDAD DE CUENCA
UNIVERSIDAD DE CUENCA
Transmisin
El Sistema Nacional de Transmisin (S.N.T.) est administrado por la
Corporacin Elctrica del Ecuador (CELEC), a travs de su Unidad de
Negocio, Transelectric (CELEC-Transelectric).
37
UNIVERSIDAD DE CUENCA
38
UNIVERSIDAD DE CUENCA
Distribucin
El CONELEC (2009) define a las empresas distribuidoras como aquellas que
tienen como funcin principal suministrar energa a los clientes dentro de su
rea de concesin, para la cual deben proveerse de la energa ya sea por
Autor: Pablo Florencio Chacho Ochoa
39
UNIVERSIDAD DE CUENCA
UNIVERSIDAD DE CUENCA
Los clientes son clasificados en: Clientes Regulados, que son aquellos
cuya facturacin se rige a lo dispuesto en el pliego tarifario. No
Regulados, que son aquellos cuya facturacin por el suministro de
energa obedece a un contrato a trmino realizado entre la empresa
que suministra la energa y la que lo recibe: estos contratos se los
conoce tambin como de libre pactacin.
UNIVERSIDAD DE CUENCA
42
UNIVERSIDAD DE CUENCA
Se cuenta con dos sistemas a distinto nivel de voltaje. El anillo troncal a 230kV
cierra el circuito Paute (El Molino) Milagro - Pascuales Quevedo Sto.
Domingo Santo Rosa (Quito) Totoras Riobamba El Molino. De estas
subestaciones parten en forma radial lneas a 230 y 138 kV, que unen estas
subestaciones con las restantes.
43
UNIVERSIDAD DE CUENCA
Figura 2.8 Detalle del SNI, anillo troncal a 230 kV(fuente: Transelectric).
44
UNIVERSIDAD DE CUENCA
Elementos de Compensacin
Para lograr un incremento o disminucin del nivel de tensin a travs del
aporte de potencia reactiva, en el SNI se cuenta con los siguientes elementos:
Tabla 2.2 SNI, elementos de compensacin (fuente: CONELEC).
ELEMENTO
CAPACIDAD
SUBESTACION
(MVAR)
CAPACITOR
C1= 6
IBARRA
C2= 6
CAPACITOR
C1= 6
MACHALA
C2= 6
CAPACITOR
C1= 18
MILAGRO
CAPACITOR
C1= 6
POLICENTRO
C2= 6
CAPACITOR
C1= 3
TULCAN
REACTOR
R1=-10
EL MOLINO
R2=-10
REACTOR
RCX=-10
PASCUALES
RCW=-10
REACTOR
RCW=-20
QUEVEDO
REACTOR
RCQ=-10
RIOBAMBA
REACTOR
RCW=-10
SANTO DOMINGO
REACTOR
RCX=-10
SANTA ROSA
RCW=-10
REACTOR
RCQ=-10
TOTORAS
45
UNIVERSIDAD DE CUENCA
Interconexiones Internacionales
Conexin con Colombia.
A travs de una lnea de transmisin a 138 kV Ecuador Colombia:
comprende un circuito de 15,5 km de longitud (8,0 km en Colombia y 7,5 km
en Ecuador), a las subestaciones Panamericana en Colombia y Tulcn e
Ibarra en Ecuador; la capacidad de transmisin trmica por circuito es 112
MVA y hasta 120 MVA por 20 minutos.
Lnea de transmisin a 230 kV Ecuador Colombia: compuesta por dos
circuitos de 213,5 km de longitud (78,0 km en Colombia y 135,5 km en
Ecuador), la ampliacin de las subestaciones Jamondino (Pasto) y Pomasqui
(Quito); la capacidad de transmisin trmica por circuito es 332 MW hasta 428
MW por 20 minutos.
Conexin con Per.
A travs de una lnea de transmisin a 230 kV Ecuador Per: que
comprende un circuito de 110 km de longitud (55 km en Per y 55 km en
Ecuador), la ampliacin de las subestaciones Machala y Zorritos; la capacidad
de transmisin mxima es de 110 MW y la capacidad de transmisin mxima
back to back es de 125 MW.
Autor: Pablo Florencio Chacho Ochoa
46
UNIVERSIDAD DE CUENCA
a) Subestaciones
A junio de 2009 se tena 32 subestaciones fijas y 1 mvil, tenan una
capacidad instalada de 4.741,88 MVA cuando se enfran con aceite y aire,
6.207,20 MVA cuando lo hacen con aire forzado y 7.640,58 MVA con aire y
aceite forzado.
A esto habra que agregar que en el 2010, el S.N.T. cont con tres nuevas
subestaciones fijas, la subestacin San Gregorio ubicada en Portoviejo, con
voltajes 230/138/13,8 kV y 225 MVA de potencia.; la subestacin Sinincay
ubicada en Cuenca, con voltajes 230/69/13,8 kV y potencia de 165,5 MVA; y,
la subestacin de seccionamiento Zhoray a 230 kV, localizada en Azogues.
Una mvil adicional, dando un total de 37; como se mencion antes.
b) Transformadores y Autotransformadores
La capacidad mxima de transformacin de CELEC-Transelectric, alcanz
6.758,59 MVA en operacin y 881,99 MVA en reserva, dando un total de
7.640,58 MVA; conformado por 9 transformadores y 102 autotransformadores
dentro de sus subestaciones (se incluyen 14 autotransformadores y 1
transformador en reserva).
c) Lneas de Transmisin
En el 2010, el Sistema Nacional de Transmisin, dispuso de 3.605,00 km de
lneas de transmisin:
1.722,46 km en lneas de transmisin, a nivel de 230 kV.
1.882,54 km en lneas de transmisin; a nivel de 138 kV.
Autor: Pablo Florencio Chacho Ochoa
47
UNIVERSIDAD DE CUENCA
48
UNIVERSIDAD DE CUENCA
Sin embargo esta situacin est cambiando, como se ver en los prximos
prrafos:
En las estadsticas del Consejo Nacional de Electricidad,CONELEC del ao
2010, la energa elica tiene una participacin del 0,48% de la potencia
efectiva no incorporada al SNI, con apenas 2,40 MW, que corresponde al
parque elico San Cristbal, en Galpagos. La energa solar con 0,02 MW en
la misma situacin que el anterior, no llega a presentar cifras porcentuales
cuantificables.
PROVINCIA - REGIN
POTENCIA
Manduriacu
Coca-Codo-Sinclair
Quijos
Napo - Amazona
50
ToachiPilatn
253
Mazar- Dudas
Caar - Sierra
21
Delsitanisagua
115
275
Sopladora
487
(MW)
60
1.500
49
UNIVERSIDAD DE CUENCA
50
UNIVERSIDAD DE CUENCA
Disponible en:
http://www.tech4cdm.com/uploads/documentos/documentos_La_Energia_Eolica_en_Ecuador
_fa0ef98a.pdf
51
UNIVERSIDAD DE CUENCA
Barreras Tecnolgicas
La integracin en la red, es decir la falta de experiencia en el manejo de
una energa de disponibilidad aleatoria, de una localizacin libre y
atomizada y situaciones de inestabilidad.
Falta de proyectistas, instaladores y mantenedores capacitados, debido
a la inmadurez del mercado de energa elica.
Desconocimiento del potencial que las tecnologas de energa elica
pueden ofrecer en Ecuador, debido a que no existe ninguna estimacin
del potencial que ofrecen las tecnologas de energa elica en Ecuador.
Para poder desarrollar un mercado, es necesario conocer cul es el
potencial de ese mercado, para que as, los diferentes actores
conozcan las ventajas tcnicas y de ahorro, tanto energtico como
econmico, que ofrece la implantacin de las tecnologas de energa
elica.
Idem.
52
UNIVERSIDAD DE CUENCA
Precios
regulados
preferenciales
para
centrales
renovables
no
53
UNIVERSIDAD DE CUENCA
54
UNIVERSIDAD DE CUENCA
55
UNIVERSIDAD DE CUENCA
10
Artculo incorporado mediante Ley 2000-1 (Ley para la Promocin de la Inversin y la Participacin Ciudadana)
publicada en el Suplemento del Registro Oficial No.144 de 18 de agosto de 2000.
11
Artculo sustituido mediante Ley 2006-55 (Ley Reformatoria de la Ley de Rgimen del Sector Elctrico) publicado en
el Registro Oficial No.364 de 26 de septiembre de 2006.
12
56
UNIVERSIDAD DE CUENCA
energa producida
57
UNIVERSIDAD DE CUENCA
condiciones de las
soberana alimentaria, ni
58
UNIVERSIDAD DE CUENCA
el Sector Energtico,
59
UNIVERSIDAD DE CUENCA
expresadas
en
las
leyes
que
evidentemente
son
60
UNIVERSIDAD DE CUENCA
61
UNIVERSIDAD DE CUENCA
alturas menores, por ejemplo a 100 metros, los llamados vientos de superficie
son muy influenciados por la rugosidad de la superficie terrestre y por los
obstculos. Para las aplicaciones de energa elica, los vientos de superficie
son los ms importantes ya que de ellos se extrae la energa mecnica
(Villarubia, 2004).
62
UNIVERSIDAD DE CUENCA
63
UNIVERSIDAD DE CUENCA
DE
TO
EN
LE
VA
N
TA
M
IE
NT
O
U
FL
JO
VI
FLUJO DE
VIENTO
ARRAS
TRE
Las turbinas elicas se disean para convertir la energa del movimiento del
viento (energa cintica) en la energa mecnica, a travs del movimiento de
un eje. Despus siguiendo el proceso, esta energa mecnica se convertir en
electricidad en los generadores. Finalmente, la electricidad generada puede
ser almacenada en bateras, o ser utilizada directamente.
64
UNIVERSIDAD DE CUENCA
(3.1)
(3.2)
3.2.2
65
UNIVERSIDAD DE CUENCA
UNIVERSIDAD DE CUENCA
67
UNIVERSIDAD DE CUENCA
68
UNIVERSIDAD DE CUENCA
69
UNIVERSIDAD DE CUENCA
Tabla 3.1Conceptos de turbinas elicas tomado del libro Wind Power in Power
System (Ackermann, 2005).
70
UNIVERSIDAD DE CUENCA
RED EXTERNA
ENGRA NAJ E
Figura 3.3. Turbina elica de velocidad fija con generador de induccin jaula de
ardilla, directamente conectada a la red
71
UNIVERSIDAD DE CUENCA
72
UNIVERSIDAD DE CUENCA
ENGRA NAJ E
RED EXTERNA
Figura 3.4 Turbina elica de velocidad variable con generador de rotor bobinado y
resistencia variable, directamente conectado a la red
3.3.1.3 Turbina elica (TE) de velocidad variable con convertidor de
73
UNIVERSIDAD DE CUENCA
CONVER TIDOR DE
FRECU ENCIA
ESCA LA PA RCIAL
RED EXTERNA
ENGRA NAJ E
sncrono
WRSG,
(wound
rotor
74
UNIVERSIDAD DE CUENCA
ENGRA NAJ E
RED EXTERNA
velocidad
variable,
generador
sncrono
de
excitacin
magntica
75
UNIVERSIDAD DE CUENCA
de
- Subestacin transformadora
Autor: Pablo Florencio Chacho Ochoa
76
UNIVERSIDAD DE CUENCA
77
UNIVERSIDAD DE CUENCA
- Plataformas de montaje
Las plataformas se construyen con el nico fin de realizar el montaje de los
aerogeneradores. Posteriormente slo sern necesarias para la realizacin de
grandes mantenimientos, como cambiar una pala de un aerogenerador.
78
UNIVERSIDAD DE CUENCA
DEMANDA
POTENCIA
PRODUCCION
FRECUENCIA
79
UNIVERSIDAD DE CUENCA
Figura 3.8 Activacin de la potencia de reserva y la frecuencia del SEP como una
funcin del tiempo, en una situacin donde se ha desconectado del sistema una
planta generadora grande (Ackermann, 2005)
80
UNIVERSIDAD DE CUENCA
81
UNIVERSIDAD DE CUENCA
82
UNIVERSIDAD DE CUENCA
Pw+jQw
Energa Elica
Red
U1
Z=R+jX
U2
P
LD +jQLD
Pw+jQw
Carga
Se tiene que la red elctrica puede ser representada por una fuente de tensin
U1, y la potencia de cortocircuito Sk, en el punto de conexin de la energa
elica puede ser considerado como:
83
UNIVERSIDAD DE CUENCA
(3.4)
En donde:
84
UNIVERSIDAD DE CUENCA
Despus de los trastornos graves, puede suceder que se desconecte varias lneas de
transmisin y parte del sistema puede ser aislado (o reducido a islas) y puede darse
un desequilibrio entre la produccin y el consumo de esa parte de la red. Como regla
general, actualmente se tiene que los parques elicos no estn obligados a
desconectarse, siempre y cuando no rebasen determinados lmites de tensin y
frecuencia, la normativa y regulaciones para esto, estn en desarrollo no habiendo
hasta la presente fecha una estandarizacin internacional al respecto(Matevosyan &
Bolik, 2005).
85
UNIVERSIDAD DE CUENCA
2. Garantizar que los parques elicos no sufran daos por impactos procedentes
de fallas en la red.
86
UNIVERSIDAD DE CUENCA
14
La cizalladura del viento es la diferencia en la velocidad del viento o su direccin entre dos puntos en
la atmsfera terrestre. Dependiendo de si los dos puntos estn a diferentes altitudes o en diferentes
localizaciones geogrficas, la cizalladurapuede ser vertical u horizontal.
87
UNIVERSIDAD DE CUENCA
88
UNIVERSIDAD DE CUENCA
matemtica,
luego
en
su
cuantificacin
los
mtodos
Flicker de voltaje;
Variaciones de Voltaje
Niveles de falla
Capacidad trmica
Protecciones
89
UNIVERSIDAD DE CUENCA
3.9.1 Armnicos
Son fenmenos asociados a la distorsin de la onda bsica sinusoidal, que en
el caso de la red elctrica se supone pura en una situacin ideal. Dependiendo
del
orden
del
armnico
se
tendr
la
correspondiente
distorsin
90
UNIVERSIDAD DE CUENCA
celdas
fotovoltaicas,
mquinas
generadoras
que
utilicen
91
UNIVERSIDAD DE CUENCA
92
UNIVERSIDAD DE CUENCA
(3.5)
Dnde:
-
93
UNIVERSIDAD DE CUENCA
Dnde:
-
El factor de flicker de paso viene dado para los valores especficos del ngulo
de fase de la impedancia de la red (30, 50, 70 y 85) y as mismo para tipos
especficos de maniobras.
Al igual que el anterior, en el caso de las TEs de velocidad variable este factor
ser ms bien bajo, al contrario de las turbinas de velocidad fija que se espera
sea entre medio y alto.
94
UNIVERSIDAD DE CUENCA
95
UNIVERSIDAD DE CUENCA
(3.7)
Dnde:
-
Umin y Umax son el mnimo y mximo voltaje en valor RMS, fase neutro previsto
a la maniobra;
El factor de cambio de voltaje viene dado para los valores especficos del
ngulo de fase de la impedancia de la red (30, 50, 70 y 85) y as mismo
para especficas de maniobras de conmutacin.
El factor de cambio de voltaje, ku de disrupcin es similar a su similar de
corriente ki, siendo esta la relacin entre la mxima corriente de disrupcin y la
promedio, aunque ku sea una funcin del ngulo de fase de la impedancia de
la red. En valores numricos ku ser cercano a ki.
En el caso de las turbinas de velocidad variable este factor ser ms bien muy
bajo, al contrario de las turbinas de velocidad fija que se espera sea medio.
96
UNIVERSIDAD DE CUENCA
3.9.5 Fallos
En el caso de un fallo de cortocircuito en la red, todos los productores
contribuirn a las corrientes de falla. En consecuencia, las maniobras de
conmutacin de parte del operador de la red de distribucin y del generador
distribuido, debern ser evaluadas para soportar los efectos de la red
combinada, as como las corrientes de falla del generador distribuido. Al
encontrarse el punto de conexin ms alejada de la red de transmisin, la
impedancia que interviene, va a aumentar, y el fallo de la red contribuir a la
falla. Cuando la conexin de la generacin distribuida aumente los niveles de
la falla ms all de la calificacin de los actuales el operador de la red de
distribucin a travs de la conmutacin deber reemplazar a esa
unidad,(Kiprakis, Harrison, & Wallace, 2003).
97
UNIVERSIDAD DE CUENCA
la
produccin
de energa
elctricapuede
ser
mantenida
98
UNIVERSIDAD DE CUENCA
3.9.7 Protecciones
Por lo general, el funcionamiento de la red de distribucin es fuerte y fiable,
por la disposicin y la coordinacin de los dispositivos de proteccin en las
fuentes de energa, en los puntos de conmutacin y en las cargas. Esto
garantiza la integridad y la seguridad del suministro a los consumidores sobre
la base del funcionamiento tradicional de la red.
Las protecciones de los sistemas se han diseado y coordinado en gran
medida para el flujo unidireccional, y en el caso de la generacin distribuida
(que es el caso de la generacin elica), es necesaria la previsin de los flujos
de corrientes bidireccionales que pudieran poner en riesgo el funcionamiento
llevando a la inestabilidad (Kiprakis, Harrison, & Wallace, 2003).
UNIVERSIDAD DE CUENCA
David, & Bossanyi, 2001), pero hay dos diferencias significativas. Debido a
que los parques elicos son frecuentemente conectados a la periferia del
sistema de potencia, es comn encontrar que las corrientes de falla debidas a
los flujos en caso de fallo de aislamiento son bastante pequeas. Aunque es
algo deseable desde el punto de vista de la reduccin de riesgos, esta falta de
corriente puede suponer dificultades significativas para la deteccin rpida y
fiable de las fallas. En particular, en algunos diseos que utilicen fusibles de
alta tensin, estos se basan en la energa dentro del arco para su correcta
operacin. Por consiguiente, no podrn actuar para interrumpir corrientes de
falla pequeas cuando la energa del arco es baja.
En segundo lugar, los aerogeneradores de velocidad fija, utilizan mquinas de
induccin, y los de velocidad variable, estn interconectados a la red a travs
de convertidores de voltaje. Ni los generadores de induccin, ni los
convertidores de voltaje son fuentes confiables de corrientes de falla, de
manera que sobre los rels sensores de voltaje o frecuencia, recae
obligadamente la necesidad de detectar condiciones anormales provenientes
de los generadores de las turbinas elicas.
La proteccin de un parque elico tiene muchas similitudes con la proteccin
de una gran carga industrial equipada con motores, que pueden retroalimentar
a la red con efectos no deseables para la misma. De manera anloga en el
caso de un parque elico, este puede ser considerado como un conjunto de
maquinaria industrial, en el que se observar que las tensiones entre
terminales y la frecuencia de las mquinas elctricas estn determinadas por
las condiciones de la red. La red de distribucin proporciona una fuente fiable
de fallos actual que puede ser utilizada para detectar fallas de aislamiento,
aunque tambin existe la posibilidad que las mquinas de rotacin participen
en la corriente de fallo de la red.
100
UNIVERSIDAD DE CUENCA
101
UNIVERSIDAD DE CUENCA
102
UNIVERSIDAD DE CUENCA
Figura 4.1 Esquema del Parque Elico, Circuitos Internos y Ubicacin Subestacin
Uchucay
5,9 m/s
1.100msnm
18C
1.500 kW
15
103
UNIVERSIDAD DE CUENCA
Nmero de turbinas: 20
Capacidad total de la Planta: 30 MW
Altura del Eje: 60m
Dimetro del rotor: 71m
Energa anual bruta: 76.881 MWh
16
Tomado del Informe Final del Estudio de Factibilidad Avanzada realizado por la Corporacin
para la Investigacin Energtica, CIE. Agosto 2010.
17
Idem.
18
Idem.
104
UNIVERSIDAD DE CUENCA
105
UNIVERSIDAD DE CUENCA
4.2.4Scada
Tanto el parque elico, como la S/E Uchucay, estarn comandados por un
sistema SCADA que permitiralaoperacin de las mismas de forma local o
remota. El SCADA brindar total control en todas las funciones y permitir
tener acceso a los eventos y repostes generados en cualquier instante.
Contar con un UTR en cada uno de los aerogeneradores, en los mstiles
meteorolgicos y en la subestacin. Toda esta informacin se receptar en el
computador SCADA ubicado en la S/E. La transmisin de datosse lo
realizar mediante fibra ptica utilizando el cable de guarda OPGW con que
cuenta la lnea Cuenca-Loja del SIN(Corporacin para la Investigacin
Energtica, 2010).
106
UNIVERSIDAD DE CUENCA
19
Informe final del Estudio de factibilidad avanzada realizado por la Corporacin para la
Investigacin Energtica, agosto 2010.
107
UNIVERSIDAD DE CUENCA
Figura 4.2 Ubicacin de los dos grupos que conforman el parque elico Huscachaca
(fuente: CIE, 2010)
4.3.1 Aerogeneradores
108
UNIVERSIDAD DE CUENCA
REPOWER
Variable
Pitch
2000
11.2
3
24
92.5
6720
3
7,8 15,0
GER
diversos
Modular
planetaria / ejes
paralelos
3
1:96
Doble alimentacin
1
720 a 1440
690
va convertidor
50/60
Pitch
variable va
microprocesador / paso
de pala activo
Giro de palas (Pitch)
Freno de disco
Motores elctricos
REguard
68 / 80 / 100
109
UNIVERSIDAD DE CUENCA
Tipo
Forma
Proteccin a la corrosin
Pesos
Una pala
Rotor (incl. buje)
Gndola (sin rotor y buje)
Certificaciones
Clase
Acero Tubular
Cnica
si
7,9 t
40,7 t
69,0 t
IIA / IIA / IIIA
110
UNIVERSIDAD DE CUENCA
DESCRIPCIN
UNIDAD
CANTIDAD
c/u
Interruptor de 138 kV
c/u
c/u
c/u
10
c/u
c/u
12
c/u
Parque elico:
-
b)
c)
111
UNIVERSIDAD DE CUENCA
Viabilidad Ambiental
-
112
UNIVERSIDAD DE CUENCA
Energa en
firme
Potencia de Generacin
Rendimiento
Potencia bornes G.
Factor de Planta
Energa producida
50,00 MW
0,95
47,50 MW
0,30
124.830,00 MWh-ao
la
tonelada
41.868.000.000,00 Julios o
equivalente
de
11.630,00kWh.
petrleo,
En
el
definida
caso
del
como:
proyecto
113
UNIVERSIDAD DE CUENCA
Precio de la Energa
Segn se revis anteriormente(ver: 2.5
Inversin
114
UNIVERSIDAD DE CUENCA
Plazo
El plazo de construccin de los parques elicos, es de los menores respecto a
otros tipos de centrales, lo que constituye una ventaja de esta tecnologa. Un
estimado de los tiempos de construccin de Huascachaca se podra ubicar
alrededor de 12 meses.
20
115
UNIVERSIDAD DE CUENCA
MODELACIN Y SIMULACIN DE LA
INTEGRACIN DEL PROYECTO
HUASCACHACA A LA RED
ECUATORIANA
116
UNIVERSIDAD DE CUENCA
es
una de
pas
con un
rgimen
elctrico nacional.
Ante la perspectiva del inters que pudieran tener en este nuevo campo de la
generacin elctrica, y antes que los eventuales proyectistas e inversores de
dentro y fuera del Ecuador tengan la intencin de llevar a cabo el desarrollo de
estos recursos, y la posterior operacin de las granjas elicas conectadas a la
red, se hace necesario plantear el anlisis como el contenido en el presente
estudio. Y finalmente, y dejando de ladoel marco regulatorio y legal; se debe
tener en cuenta que la red elctrica podra representar un potencial problema,
con respecto y en la medida que la generacin elica sea explotada cada vez
en mayor escala en el Ecuador.
Por lo que el establecimiento de una metodologa para los estudios de
integracin a la red en proyectos onshore, en los cuales el pas carece
totalmente de experiencia, se pretende abordar en esta tesis a travs de la
demostracin
de enfoques de
los
parques
117
UNIVERSIDAD DE CUENCA
UNIVERSIDAD DE CUENCA
abordar
el
problema
nicamente
se
toma
los
componentes
119
UNIVERSIDAD DE CUENCA
120
UNIVERSIDAD DE CUENCA
Modelo de
velocidad
del viento
o
secuencia
medida
Pitch
Angle
Potencia
Activa y
Reactiva
Velocidad
del viento
Potencia
Mecnica
Modelo
del Rotor
Modelo del
generador
doblemente
alimentado
Corrientes
de Rotor
Velocidad
de Rotor
Control de
"Pitch
Angle"
Voltaje y
Frecuencia
Modelo de
red en
frecuencia
fundamental
Control de
velocidad
de Rotor
"Set
Point"
de
Potencia
Activa
Convertidor
y
proteccin
del sistema
"Set
Point"
de
Potencia
Reactiva
Control de
voltaje en
terminales
Figura 4.3 Estructura general del modelo de una turbina elica de velocidad variable
con generador inductivo de doble alimentacin, tipo C (Ackermann, 2005)
mediciones. La
se
utiliza
una
velocidad
puede
generar
secuencias de
estableciendo
el valor de
caractersticas a
los
parmetros
121
UNIVERSIDAD DE CUENCA
Valor promedio:
Turbulencia:
ecuacin:
(4.1)
adems
de
la
densidad
de
potencia
espectral
elica
(Ackerman,2005).
122
UNIVERSIDAD DE CUENCA
(4.2)
Dnde:
Pwt, es la potencia extrada del viento (en vatios).
, es la densidad del are (kg/m3)
cp, coeficiente de rendimiento o potencia.
, es la relacin de velocidad de punta entre vt/vw, la relacin entre la
velocidad del extremo de la aspa, vt(m/s), y la velocidad del viento a la
altura del buje contracorriente del rotor, vw (m/s),
, ngulo de lanzamiento (pitch angle), en grados sexagesimales.
Aw, area cubierta por el rotor de la turbina (m2).
Sin embargo se debe puntualizar que en este caso particular (turbina tipo C),
tratndose de un control de potencia de aspa, tipo pitch angle, el coeficiente
de rendimiento no solo depender de la relacin de velocidad de punta , sino
del ngulo de lanzamiento , en definitiva el coeficiente de rendimiento cp, es
generalmente dado por los fabricantes de turbinas a travs de curvasque
representan aproximaciones numricas basadas en la experiencia.
Las variaciones de la velocidad del viento de alta frecuencia, son fenmenos
particulares que dependen de la localizacin de la turbina, se dan a lo largo
de la
superficie del rotor, sobre todo cuando las turbinas de viento son grandes.
Para estudiar este efecto se incluye un filtro de paso bajo en el modelo del
rotor
123
UNIVERSIDAD DE CUENCA
~~
Red Elec.
DFIG
Caja de Cambios
Engranajes
Este tipo de generador cuenta con una proteccin de sobre corriente para el
convertidor en el lado del rotor, que funciona de la siguiente manera, cuando
una corriente elevada sobrepasa el valor lmite es bloqueada y desviada
(bypass). Este sistema se conoce como proteccin crow-bar.
Modelo del Convertidor
El convertidor se
corriente fundamental,
sin
embargo
de frecuencia
este supuesto
de
la
124
UNIVERSIDAD DE CUENCA
125
UNIVERSIDAD DE CUENCA
es
esencial
para
el
convertidor.
En
cambio
en
el
caso
del generador, es distinto ya que este s es capaz por s mismo de soportar las
corrientes de falla.
El principio de funcionamiento de la proteccin de sobre corriente es el
siguiente:
Cuando se produce una cada de voltaje, la corriente del rotor aumenta
rpidamente, esto es advertido por la parte electrnica del convertidor al lado
del rotor, entonces los devanados del rotor son acortados usando la llamada
crow bar explicada anteriormente, que bsicamente convierte al generador
DFIG en un generador tipo jaula de ardilla. A continuacin un interruptor acta
entre el estator y la red, y la turbina elica se desconecta por completo.
El lado de la red del convertidor tambin advierte de la cada de tensin y el
correspondiente aumento de la corriente. Despus que el voltaje es
restablecido la turbina nuevamente se conecta a la red.
La proteccin anti-islanding de los aerogeneradores acta en respuesta a las
desviaciones de la tensin y/o la frecuencia o los cambios de ngulo de fase.
El lado de la red del convertidor da las medidas de la tensin de la red con una
frecuencia de muestreo alta. Por otra parte existen distintos criterios que se
aplican a la proteccin de un sistema para determinar si existe o se ha
formado una isla. La turbina elica se desconectar si estos se cumplen
positivamente.
Los criterios que se aplican son un trato entre el riesgo de no detectar y por
tanto dejar pasar un eminente islanding, y una deteccin incorrecta.
126
UNIVERSIDAD DE CUENCA
127
UNIVERSIDAD DE CUENCA
a velocidades de
128
UNIVERSIDAD DE CUENCA
Velocidad
del rotor
p.u.
+
-
Kp
fps
Pitch Angle
Set point
(deg.)
Ma xima
Velocidad
del rotor p.u.
Kp
fps
Pitch Angle
(deg.)
129
UNIVERSIDAD DE CUENCA
dr,gen
Voltaje en
terminales
(p.u.)
Kv
Set point
(p.u.)
+
Voltaje de
referencia
(p.u.)
1
S
dr,mag.
dr
(p.u.)
Set point
(p.u.)
-ut
? s Lm
Dnde:
KV
es la constante del control de voltaje.
ut
es el voltaje en terminales
s
frecuencia angular del estator.
Lm
inductancia mutua del circuito equivalente del DFIG.
idr
componente directa de la corriente del rotor.
idr, magn; corriente de magnetizacin del generador
idr,gen corriente en el generador.
130
UNIVERSIDAD DE CUENCA
(4.3)
131
UNIVERSIDAD DE CUENCA
132
UNIVERSIDAD DE CUENCA
133
UNIVERSIDAD DE CUENCA
HV
Tr1
PCC
Transformador de
la granja elica
Tr2
MV
N x Trf (elevadores)
WT1
G
~
Nx WTG
G1
134
UNIVERSIDAD DE CUENCA
135
UNIVERSIDAD DE CUENCA
136
UNIVERSIDAD DE CUENCA
al
proyecto
Huascachaca,
esto
en
ambos
escenarios
considerados (ver
Anexo B).
137
UNIVERSIDAD DE CUENCA
Figura 4.9 Detalle del modelo del parque elico Huascachaca instalado a la barra
Cuenca, 138 kV en el software Power Factory de Digsilent (escenario de mxima
carga al 2014).
138
UNIVERSIDAD DE CUENCA
Figura 4.10Detalle del modelo del parque elico Huascachaca instalado a la barras
Cuenca y Loja a 138 kV en el software Power Factory de Digsilent (escenario de
mxima carga al 2014)
A continuacin se hizo un anlisis de contingencia del tipo n-1 en las lneas del
rea circundante, sin observarse as mismo ningn problema referente a
lmites trmicos.
139
UNIVERSIDAD DE CUENCA
Teniendo en cuenta por supuesto que los costos estn asociados a la longitud
de la lnea y el tiempo al ao en que ocurra la sobrecarga, y por otro lado el
tiempo que la granja elica sea limitada para generar menos.
140
UNIVERSIDAD DE CUENCA
141
UNIVERSIDAD DE CUENCA
los requerimientos en el
21
142
UNIVERSIDAD DE CUENCA
143
UNIVERSIDAD DE CUENCA
144
UNIVERSIDAD DE CUENCA
145
UNIVERSIDAD DE CUENCA
Figura 4.14 Curva P-V en condiciones de mnima carga con el parque elico
Huascachaca desconectado
146
UNIVERSIDAD DE CUENCA
147
UNIVERSIDAD DE CUENCA
148
UNIVERSIDAD DE CUENCA
de
pocos
milisegundos,
de
manera
que
influencian
en
un
149
UNIVERSIDAD DE CUENCA
150
UNIVERSIDAD DE CUENCA
Sk"
MVA
6,134
I1
Corrientes
kA
de
secuencia 0,059
Corriente
kA
0,295
I2
kA
3xIo
kA
0,059
0,534
UNIVERSIDAD DE CUENCA
Figura 4.17 Detalle del diagrama unifilar del parque Huascachaca, con la barra MV en
cortocircuito
152
UNIVERSIDAD DE CUENCA
la
alternativa
ms
econmica
ciertamente-
de
conectar
153
UNIVERSIDAD DE CUENCA
154
UNIVERSIDAD DE CUENCA
Sin embargo cada uno de estos estudios son complejos, no nicamente son
dependientes de los tcnicas y metodologas desarrolladas para la evaluacin,
dependen tambin delas caractersticas propias de cada pas e incluso regin,
en donde se realice el estudio, y adems de involucrar aspectos tcnicoadministrativos del operador de la red, la normatividad del sector elctrico y la
experiencia que se vaya adquiriendo en el transcurso de desarrollar las
energas alternativas y particularmente elicas(Morales, Robe, & Maun, 2009).
A continuacin se expone a modo de sumario las tpicas caractersticas de
calidad de suministro para varios tipos de turbinas elicas tomado del libro
WindPower in PowerSystem de Thomas Ackerman (pag. 85).
155
UNIVERSIDAD DE CUENCA
Figura 4.19 Sumario de las caractersticas tpicas de calidad de suministro segn los
distintos tipos turbinas elicas (Ackerman,2005)
156
UNIVERSIDAD DE CUENCA
157
UNIVERSIDAD DE CUENCA
Dnde:
ines la corriente armnica de orden n, inkes la corriente armnica de orden n de
la fuente k; y
158
UNIVERSIDAD DE CUENCA
159
UNIVERSIDAD DE CUENCA
Figura 4.20 Detalle de la red unifilar del parque elico Huascachaca en el punto de
conexin, PCC desarrollado en DigSilent, mostrando unos de los valores obtenidos
en una prueba de simulacin.
160
UNIVERSIDAD DE CUENCA
corriente y la tensin.
161
UNIVERSIDAD DE CUENCA
162
UNIVERSIDAD DE CUENCA
Rfic
Lfic
+
U0 (t)
Ufic(t)
im(t)
Este modelo simple da una tensin simulada con el valor instantneo U fic(t), de
acuerdo con:
(4.7)
22
NTC 5412, norma tcnica colombiana para la evaluacin y medida de calidad de suministro
en la red elctrica con aerogeneradores, 2006.
163
UNIVERSIDAD DE CUENCA
fic(t)
u0(t)<<u0(t) .
Para cumplir con estas propiedades, uo(t) se define como:
(4.8)
Dnde:
-
f(t)
164
UNIVERSIDAD DE CUENCA
debera ser de 50; esto para obtener simulaciones de tensin en la escala del
flickometro, sin embargo el escoger un valor adecuado es responsabilidad
del administrador de la red.
Determinacin del flicker en operacin contina.
En el caso de la evaluacin del flicker en operacin continua el anlisis terico
se desarrolla del siguiente modo:
El coeficiente de flicker
La emisin de flicker producido por una turbina elica conectada a la red con
una potencia arbitraria de corto circuito Sk puede ser calculada por:
(4.12)
(4.13)
, la emisin de cada
turbina individualmente.
165
UNIVERSIDAD DE CUENCA
viento normal.
proporcin:
(4.14)
(4.15)
166
UNIVERSIDAD DE CUENCA
(4.16)
Coeficiente de flicker
167
UNIVERSIDAD DE CUENCA
para un solo
generador.
Para evaluar el parpadeo de una granja elica entera, segn IEC 61400-21 se
puede asumir que parmetros como la turbulencia del viento y otros (por
ejemplo, sombra de la torre) no estn correlacionados. Y a partir de ah la
siguiente frmula puede ser aplicada para calcular el flicker de una granja del
viento entera con n turbinas basndose en el parpadeo individual de un solo
aerogenerador, donde
elica:
(4.17)
168
UNIVERSIDAD DE CUENCA
de la
UNIVERSIDAD DE CUENCA
UNIVERSIDAD DE CUENCA
para
de
la
torre
towershadowing-,
etc.)
son
estocsticamente
171
UNIVERSIDAD DE CUENCA
172
UNIVERSIDAD DE CUENCA
Bibliografa
Ackermann, T. (2005). Wind Power in Power Systems. Chichester, West
Sussex: John Wiley & Sons.
Babypriya, B., & Chilambuchelvan, A. (2010). Modelling and Analysis of DFIG
Wind Turbine Harmonics Generated in Grids. International Journal of
Engineering and Technology Vol.2(3) , 185-189.
Burton, T., David, S., & Bossanyi, E. (2001). Wind Energy Handbook.
Chichester: John Wiley & Sons.
Carlin, P., Laxson, A., & E.B., M. (2001). The History and State of the Art of
Variable-Speed Wind Turbine. Golden, Colorado: National Technical
Information Service, http://www.doe.gov/bridge.
Chang, G., Xu, W., & Ribeiro, P. (2005). MODELING OF HARMONIC
SOURCES. Alberta (Canada): University of Alberta.
CONELEC. (2011). Estadsticas del Sector Elctrico Ecuatoriano.Quito:
ASTUREG S.A.
Conroy, J., & Watson, R. (2009). Aggregate modelling of wind farms containing
full-converter wind turbine generators with permanent magnet synchronous
ma-chines: transient stability studies. Renewable Power Generation, IET , 5062.
Corporacin para la Investigacin Energtica (CIE). (28 de Diciembre de
2009). energia.org.ec. Recuperado el 2011, de
http://www.energia.org.ec/docs/ProjectOverview.pdf
Corporacin para la Investigacin Energtica. (2010). Informe Final del Estudio
de Factibilidad Avanzada.Quito.
Dib, S., Ferdi, B., & Benachaiba, C. (2011). Doubly Fed Induction Generator
Based Wind Turbine Associated to a Shunt Active Power Filter for Current
Harmonics Mitigation. International Journal of Engineering Science and
Technology (IJEST) , 3375-3381.
173
UNIVERSIDAD DE CUENCA
Eping, C., Stenzel, J., Poller, M., & Muller, H. (2007). Impact of Large Scale
Wind Power on Power System Stability. Gomaringen (Germany): DigSilent
Gmbh - Institute of Electrical Power Systems, Darmstadt.
Espinoza, J. L., & Vredenburg, H. (2010). The development of Renewable
Energy industries in emerging economies: the role of economic, institutional,
and socio-cultural contexts in Latin America. International journal of economics
and business research Vol. 2, No. 3/4 , 245-270.
GEC Global Energy Concept. (2004). Windpower Development Toolkit V1. Rio
de Janeiro: USAID.
Instituto Colombiano de Normas Tcnicas y Certificacin. (2006). Norma
tecnica colombiana NTC-5412. Referencia IEC 61400-21 .Bogota: ICONTEC.
Jarrett, K., Hedgecock, J., Gregory, R., & Warham, T. (Febrero de 2004). A
Technical Guide to the Connexion of Generation to the Distribution Network.
Recuperado el Marzo de 2011, de energynetworks.org:
www.energynetworks.org/pdfs/FES_00318_v040211.pdf
Kiprakis, A., Harrison, G. P., & Wallace, A. R. (Mayo de 2003). see.ed.ac.uk.
Recuperado el 2011, de www.see.ed.ac.uk/~gph/publications/REGENproof.pdf
Larsson, A. (2000). The power quality of wind turbines. Goteborg, Suecia:
Chalmers University.
Matevosyan, J., & Bolik, S. (2005). Technical Regulations for the
Interconnection of Wind Farms to the Power System. En T. Ackermann, Wind
power in Power Systems (pgs. 115-140). Chichester: John Wiley & Sons.
Ministerio de Elctricidad y Energas Revnovables del Ecuador. (2008).
Polticas Energticas del Ecuador 2008-2020. Quito: Publicacin Oficial.
Morales, A., Robe, X., & Maun, J. (2009). Assessment of Wind Power Quality:
Implementation of IEC61400-21 Procedures. Brussels (Belgium): Universit
Libre de Bruxelles, Department of Electrical Engineering.
Mur Amada, J. (2009). Wind Power Variability in the Grid.Zaragoza:
Universidad de Zaragoza, Departamento de Ingeniera Elctrica.
Perdana, A. (2006). Wind Turbine Models for Power System Stability Studies.
Gteborg, Sweden: Chalmers university of technology.
Autor: Pablo Florencio Chacho Ochoa
174
UNIVERSIDAD DE CUENCA
Perdana, A. (2006). Wind Turbine Models for Power System Stability Studies.
Goteborg, Sweden: CHALMERS UNIVERSITY OF TECHNOLOGY.
Pierik, J. (2002). Electrical Systems in Wind Turbines and Integration of Wind
Energy into the Grid. www.ecn.nl/_files/wind/
documents/Tilaran02_GridImpCR.pdf.
Pller, M., & Achilles, S. (2003). Aggregated Wind Park Models forAnalysing
Power System Dynamics. Roskilde, Dinamarca: DigSilent.
Pller, M., & Achilles, S. (2003). Aggregated Wind Park Models forAnalysing
Power System Dynamics. Denmark: Technical report from DIgSilent.
Rudion, K., Styczynski, Z., Orths, A., & Ruhle, O. (2008). MaWind-Tool for the
Ag-gregation of Wind Farm Models.Pittsburgh PA: Power and Energy Society .
Slootweg, J., Polinder, H., & WL, K. (2005). Reduced - order modelling of wind
turbines. En T. Ackermann, Wind power in power systems (pgs. 555-585).
Chichester: John Wiley & Sons.
Sorensen, P., Hansen, A., Janosi, L., & Al., e. (2001). Simulation of interaction
between wind farm and power system. Roskilde, Denmark: DigSilent.
Tande, J. O. (2005). Power Quality Standards for Wind Turbines. En T.
Ackermann, Wind Power in Power Systems (pgs. 79-95). Chichester: John
Wiley & Sons.
TECH4CDM - Organizacin de las Naciones Unidas. (2009). La energa elica
en el Ecuador.Quito.
The development of Renewable Energy industries in emerging economies: the
role of economic, institutional, and socio-cultural contexts in Latin America Vol.
2, No. 3/4, 20102010International Journal of Economics and Business
Research (IJEBR) 245 - 270
Tongdan, J., & Zhigang, T. (2010). Uncertainty Analysis for Wind Energy Production with Dynamic Power Curves. Singapure: Probabilistic Methods Applied
to Power Systems (PMAPS).
Tore, W. (2009). Developing Wind Power Projects. London: Earthscan.
Villarubia, M. (2004). Energa Elica. Barcelona: CEAC.
Autor: Pablo Florencio Chacho Ochoa
175
UNIVERSIDAD DE CUENCA
176
UNIVERSIDAD DE CUENCA
Anexos
Se adjuntan los siguientes anexos:
177
UNIVERSIDAD DE CUENCA
178
UNIVERSIDAD DE CUENCA
J
R
X
Rs
Xs
XM
RrA
XrA
Irb/In
Parmetro
Potencia aparente nominal
Tensin nominal
Frecuencia
Corriente nominal
Factor de Potencia
Velocidad nominal
Inercia del Rotor
Conexin de Bobinados
Resistencia de secuencia cero
Reactancia de secuencia cero
Resistencia del estator
Reactancia del estator
Reactancia de magnetizacin
Resistencia del rotor
Reactancia del Rotor
Corriente rotor bloqueado
R/X rotor bloqueado
Valor
2 222 kVA
690 V
60 Hz
3,22 kA
0,8952
1782,18 rpm
75 kg/m2
Y
0,01 pu
0,1 pu
0,01 p.u.
0,1 p.u.
3,5 p.u.
0,01 p.u.
0,1 p.u.
7 p.u.
0,428
179
UNIVERSIDAD DE CUENCA
Parmetro
Valor
2 500 kVA
690 / 36000 V
60 Hz
3
6%
Yy (YN yn)
Natural
Parmetro
Potencia aparente nominal
Relacin de tensin nominal
Frecuencia
Nmero de fases
Voltaje de cortocircuito.
Valor
33,33 MVA
36000 / 138000 V
60 Hz
3
7%
180
UNIVERSIDAD DE CUENCA
Grupo de conexin
Perdidas en el hierro
Regulacin de tensin
Yd (YN d)
3,16 KW
Conmutacin
Natural
181
UNIVERSIDAD DE CUENCA
de 81,45 km de
Parmetro
Resistencia Sec. 1-2
Reactancia Sec. 1-2
Resistencia Sec. 0
Reactancia Sec. 0
Susceptancia B Sec. 1-2
Susceptancia B Sec. 0
Corriente Nominal
Valor
0,161 Ohm/km
0,504 Ohm/km
0,416 Ohm/km
1,692 Ohm/km
3,612 uS/km
2,018 uS/km
590 Amp.
182
UNIVERSIDAD DE CUENCA
Rs
Zrot
Xs
Xm
Ur
Ur'=Ur.e
-jwrt
UAC
UDC
Dnde:
-
Rs
Xs
Xm
Reactancia de magnetizacin
Zrot
183
UNIVERSIDAD DE CUENCA
(1)
(2)
Si las simulaciones
(5)
Dnde:
Autor: Pablo Florencio Chacho Ochoa
184
UNIVERSIDAD DE CUENCA
(7)
185
UNIVERSIDAD DE CUENCA
186
UNIVERSIDAD DE CUENCA
Figura A1.3 Cuadro de dilogo de DigSilentPower Factory, datos para flujo de carga
del modelo del generador asncrono utilizado.
187
UNIVERSIDAD DE CUENCA
12,216
12,211
12,212
41,401
36,56
35,869
35,855
6,089
5,329
4,76
4,724
20,866
18,66
16,503
16,141
6,1
5,033
4,629
4,601
21,057
18,793
17,013
16,616
188
UNIVERSIDAD DE CUENCA
Observaciones:
* Para todos los aos los clculos de cortocircuito se realizan considerando la influencia de la generacin de la zona.
* Las simulaciones de cortocircuitos monofsicos y trifsicos fueron realizados para los escenarios de mximas y
mnimas corrientes de cortocircuito
* Se incluye en los equivalentes el aporte de cortocircuito de la generacin desde Ocaa (2011_S_MAX), Dudas
Mazar (2013_S_MAX) y Soldados Yanuncay (2014_L_MAX).
* Para todos los aos y en todos los escenarios se considera el aporte de la generacin de Hidroabanico. Esto a
travs de la linea que interconecta Cuenca-Gualaceo-Limn-Mndez-Abanico.
1361,54
1497,46
1527,12
5,163
5,696
6,265
6,389
391,053
425,82
449,706
455,095
189
UNIVERSIDAD DE CUENCA
Ikss
1:A
(kA)
5,041
4,908
5,344
5,644
5,712
Observaciones:
* Las simulaciones de cortocircuitos monofsicos (fase A) y trifsicos fueron realizados para los escenarios de
mximas y mnimas corrientes de cortocircuito segn IEC 60909.
Figura A1.4 Esquema de equivalente Thvenin del SNI en la barra Cuenca 138,
proporcionado por la Empresa Elctrica Regional Centrosur
190