Project
P j Background
B k d
Estimate Summary
Summary Schedule
Construction Plan
LEED NC Analysis
Safety Plan
Use of BIM
Questions?
Estimate Summary
Our services allow owner advanced visual stimulations of
Summary Schedule
2D plans to allow the owner to see the end result before
Construction Plan any actual construction begins.
begins It is our goal to never fall
LEED NC Analysis into the trap of not trying new innovative technology and
Safety Plan building methods because of the idea “that’s the way
Use of BIM we’ve always done it.”
Questions?
Ralph Kreider
(Executive Principal)
(Head Building Information Modeler)
Who is MACH 5? (MEP Coordination Supervisor)
P j
Project B
Background
k d
Estimate Summary
Use of BIM
Carmen Brutico
Maria Piergallini
Questions?
(Superintendent)
(Marketing and Public (Senior Estimator)
Relations) (Interior Sequence
(Project Safety Coordinator) Coordinator)
"As one of the nation's leading research universities, Penn State positively impacts our region, our
state, our nation, and beyond. Whether the impact is global or local, the object of these efforts remains
the same: to create new knowledge that improves people's lives."
—Eva J. Pell, Senior Vice President for Research and Dean of The Graduate School
Who is MACH 5?
Unique Features
Project
P j Background
B k d
• Cytometry rooms • Biophoton labs
• Dark room • Material characterization labs
Estimate Summary • RNA room • Dielectric labs
Summary Schedule • Autoclave •Surface science labs
• Clean rooms •Nano research labs
Construction Plan
• Etching
Et hi b bay •Neuro-physics.
N h i
LEED NC Analysis • Lith bay •Electro-active polymers
• Piezoelectrics •Organic electron and photon labs
Safety Plan
Use of BIM
Questions?
Present
Who is MACH 5?
Project
P j Background
B k d
Estimate Summary
Summary Schedule
Construction Plan
LEED NC Analysis
Safety Plan
Use of BIM
Questions? Future
Existing conditions that must be
Who is MACH 5? demolished.
Project
P j Background
B k d
Estimate Summary
Summary Schedule
Construction Plan
LEED NC Analysis
Safety Plan
Proposed location of the Material and Life Sciences II Building.
Use of BIM
New Health Services Building and
Questions? the Eisenhower Parking Deck
Project
P j Background
B k d
Estimate Summary
Summary Schedule
Tree line along Pollock Road
Construction Plan
LEED NC Analysis
A Penn State tree to be re-planted
Safety Plan
Use of BIM
Questions?
Summary Schedule •Steel frame cantilever system supporting the open center courtyard
Construction Plan
LEED NC Analysis
Safety Plan
Use of BIM
Questions?
View through corner. View of green roofs form parking deck. View of green roofs from Thomas.
Who is MACH 5?
Project
P j Background
B k d
Estimate Summary
Summary Schedule
Construction Plan
LEED NC Analysis
Safety Plan
North Elevation
Use of BIM
Questions?
West Elevation
East Elevation
South Elevation
Estimate Summary
Code Division Name Detailed Cost Percentage Sq Ft Cost Projected Cost
$6,000,000
$5,000,000
$ , ,
$4,000,000
$3,000,000
Who is MACH 5? $2,000,000
Project
P j Background
B k d $1,000,000
$1 000 000
Estimate Summary $0
Sep-08 Dec-08 Mar-09 Jul-09 Oct-09 Jan-10 May-10 Aug-10
Summary Schedule
Monthly Cash Flow In Monthly Cash Flow Out
Month Paid Out Cash Flow In
Construction Plan Mar‐09
LEED NC Analysis
$90,000,000
Cumulative Cash Flow Backfill ‐$659,735.80
$80,000,000 Concrete ‐$807,737.22
Steel ‐$2,053,146.67
Safety Plan
$70,000,000 Electrical ‐$3,932,259.38
Total ‐$7,452,879.07
Use of BIM $60,000,000 Owner $4,393,090.19
Who is MACH 5?
Project
P j Background
B k d
Estimate Summary
Summary Schedule
Construction Plan
LEED NC Analysis
Safety Plan
Use of BIM
Questions?
VS
Who is MACH 5?
Project
P j Background
B k d
Garden Roof® Duro‐Last® Membrane
Estimate Summary
Summary Schedule
By Public Law 104-106:
Construction Plan
“E h executive
“Each ti agency shall
h ll establish
t bli h and
d maintain
i t i cost-effective
t ff ti
LEED NC Analysis value engineering procedures and processes."
Safety Plan
(note: some of the information in this section is from Nicholas Nigro Senior Thesis)
Who is MACH 5?
Project
P j Background
B k d
Estimate Summary
Summary Schedule
Construction Plan
Current Structural
P
Proposed
d St
Structural
t l
LEED NC Analysis
Safety Plan
The move away from the cantilever design
Use of BIM to the use of steel columns would
significantly lower the cost of the structural
Questions?
system as the steel supports can be
greatly downsized.
Section Section Section Section Section
4 D C B A
Who is MACH 5?
Steel Erection
Steel Erection
Project
P j Background
B k d
Section Section
Estimate Summary Deck Installation
3 E
Summary Schedule
Construction Plan
Use of BIM
Questions? Section
1
Project
P j Background
B k d
Estimate Summary
Summary Schedule
Construction Plan
LEED NC Analysis
Safety Plan
Use of BIM
Questions?
Who is MACH 5?
Project
P j Background
B k d
Estimate Summary
Summary Schedule
Construction Plan
LEED NC Analysis
Safety Plan
Use of BIM
Questions?
Demo area
Existing Demolition Excavation Substructure Superstructure Exterior Interiors Completion
Excavation
Who is MACH 5?
Project
P j Background
B k d
Estimate Summary
Summary Schedule
Construction Plan
LEED NC Analysis
Safety Plan
Use of BIM
Questions?
Who is MACH 5?
Project
P j Background
B k d
Estimate Summary
Summary Schedule
Construction Plan
LEED NC Analysis
Safety Plan
Use of BIM
Questions?
Who is MACH 5?
Project
P j Background
B k d
Estimate Summary
Summary Schedule
Construction Plan
LEED NC Analysis
Safety Plan
Use of BIM
Questions?
Who is MACH 5?
Project
P j Background
B k d
Estimate Summary
Summary Schedule
Construction Plan
LEED NC Analysis
Safety Plan
Use of BIM
Questions?
Who is MACH 5?
Project
P j Background
B k d
Estimate Summary
Summary Schedule
Construction Plan
LEED NC Analysis
Safety Plan
Use of BIM
Questions?
Who is MACH 5?
Project
P j Background
B k d
Estimate Summary
Summary Schedule
Construction Plan
LEED NC Analysis
Safety Plan
Use of BIM
Questions?
Project
P j Background
B k d
Estimate Summary
Summary Schedule
Construction Plan
LEED NC Analysis
Safety Plan
Use of BIM
Questions?
Delivery
Route
Loading Dock
Loading Dock
Traffic Flow
Who is MACH 5?
P j
Project B
Background
k d Site offices, Bigler
Traffic Flow parking, & Road
Estimate Summary
Delivery storage
Summary Schedule Route
Construction Plan
Exit
Exit
LEED NC Analysis Route
Pollock Road Route
Safety Plan
Use of BIM
Questions?
y Sustainable Sites 8 points
y Water Efficiency 3 points
y Energy & Atmosphere 5 points
y Materials & Resources 5 points
Who is MACH 5? y IEQ 12 points
Project
P j Background
B k d y Innovation & Design 2 points
Estimate Summary TOTAL 35 points
Summary Schedule “SILVER”
Construction Plan
LEED NC Analysis
Safety Plan
Use of BIM
Summary Schedule
Construction Plan
O 3 Pillars
Our Pill
LEED NC Analysis
• Education
Safety Plan
Intoxicated students and/or This could result in bodily To minimize the risk of
Summary Schedule
visitors onsite harm, damage to the intruders, proper
Construction Plan project,
p j and/or missingg or precautions will be taken
p
damaged equipment. to secure the site including
LEED NC Analysis an adequate fence around
the site perimeter. Special
Safety Plan care will be taken on
holidays, football
Use of BIM weekends,, and during g the
Central Pennsylvania
Questions?
Festival of the Arts.
Cantilever construction The complex design could The work flow has been
result in complications adequately planned to
duringg steel erection. If minimize p problems. All
not carefully planned and workers will complete
executed, erection, safety training prior to
especially of the erection.
cantilevers, could result in
serious injuries.
Building Information Modeling Capabilities
Project
P j Background
B k d
Why we use a Building Information Model
Estimate Summary
•Accurate Takeoffs
Summary Schedule •Collaborative Process
Construction Plan •Design construction and operational visualization
•Design,
LEED NC Analysis •Facility Lifecycle Management
Safety Plan
Use of BIM
Questions?
Manage BIM
•Subcontractor Systems
•Facilitate Subcontractors
Who is MACH 5?
Project
P j Background
B k d
Estimate Summary
Summary Schedule
Construction Plan
LEED NC Analysis
Safety Plan
Use of BIM
Questions?
Virtual Clash Detection
•Facilitate Coordination
• Avoid Field Clashes
• Monetary Savings
Who is MACH 5?
Project
P j Background
B k d
Estimate Summary
Summary Schedule
Construction Plan
LEED NC Analysis
Safety Plan
Use of BIM
Promotional
P ti lB
Building
ildi W Website
b it
Questions?
•Owner visualization of product before built
•Facility Management
•Develop p interest in Penn State and its p
programs
g
•Attract undergraduate and graduate students
•Student Interaction
Who is MACH 5?
Project
P j Background
B k d
Estimate Summary
Summary Schedule
Construction Plan
LEED NC Analysis
Safety Plan
Use of BIM
Questions?
Safety Plan
•Commitment to sustainability
Use of BIM •Team experience and cohesiveness
Questions?
Who is MACH 5?
Project
P j Background
B k d
Estimate Summary
Summary Schedule
Construction Plan
LEED NC Analysis
Safety Plan
Use of BIM
Questions?
Who is MACH 5?
Project
P j Background
B k d
Estimate Summary
Summary Schedule
Construction Plan
LEED NC Analysis
Safety Plan
Use of BIM
Questions?
Who is MACH 5?
Project
P j Background
B k d
Estimate Summary
Summary Schedule
Construction Plan
LEED NC Analysis
Safety Plan
Use of BIM
Questions?
Who is MACH 5?
Project
P j Background
B k d
Estimate Summary
Summary Schedule
Construction Plan
LEED NC Analysis
Safety Plan
Use of BIM
Questions?
Who is MACH 5?
Project
P j Background
B k d
Estimate Summary
Summary Schedule
Construction Plan
LEED NC Analysis
Safety Plan
Use of BIM
Questions?
Project Staff % on Precon % on Construction Total % on Job Resulting Weeks
Project Manager 100 50 60 57.6
Assistant Project Manager 100 50 60 57.6
Superintendent 25 100 85 81.6
Assistant Superintendent 25 100 85 81.6
Assistant Superintendent 25 100 85 81.6
Who is MACH 5? Field Survey/Engineer 25 100 85 81.6
Project Engineer 75 50 55 52.8
Project
P j Background
B k d
Office Engineer 75 50 55 52.8
Estimate Summary Field Engineer
01 25
General Requirements 50 454.33% 43.2
$14.53 $3,759,541.00
Office Manager 25 50 45 43.2
Summary Schedule Administrative Expenses $1,422,365.00
Timekeeper 25 50 45 43.2
Temporary Construction $519,662.00
Construction Plan Secretaryy 25 50 45 43.2
General Operations $
$1,817,514.00
LEED NC Analysis GENERAL CONDITIONS
PROJECT: Material & Life Sciences II
Safety Plan OWNER: Chris Magent
Labor Material
Use of BIM Code Description Qty Unit Unit Price Burden Cost Unit Price Cost Total Cost
Administrative Expense
Questions? MANAGEMENT & SUPERVISION
1001 Project Manager 57.6 wks $2,100 $120,960 $ 120,960
1002 Assistant Project Manager 57.6 wks $1,600 $92,160 $ 92,160
1003 Project Superintendent 81.6 wks $1,950 $159,120 $ 159,120
1004 Assistant Superintendent 81.6 wks $1,550 $126,480 $ 126,480
1005 A i
Assistant Superintendent
S i d 81 6
81.6 wks
k $1 550
$1,550 $126 480
$126,480 $ 126,480
$ 126 480
1006 Field Survey/Engineer 81.6 wks $1,125 $91,800 $ 91,800
ENGINEERING & SAFETY
1101 Project Engineer 52.8 wks $1,750 $92,400 $ 92,400
1102 Office Engineer 52.8 wks $1,300 $68,640 $ 68,640
1103 Field Engineer 43.2 wks $1,125 $48,600 $ 48,600