1.
2.
3.
4.
5.
The
plotted
Dated: 28-09-2006
following
residential
composition
rates
for
compoundable
violations
in
Department and HUDA have been approved by the Govt. These rates shall come
into force with immediate effect.
S.No.
Description of violation
1.
a.
Construction raised without getting plan Compounding @ Rs. 400/- per sq. mts.
sanctioned and the construction so made
conform to the building bye laws /
zoning.
Construction without building plans Compoundable @ Rs. 100/- per sq. mts.
revalidated.
on constructed area.
COVERED AREA:
b.
2.
a.
b.
c.
Composition rates
3.
a.
4.
a.
b.
5.
Compoundable
Nil
Rs.2000/- per sq. mts. Of covered area
subject to the maximum of 12 sq. mts.
a.
6.
a.
Change of design, height, size and Compoundable @ Rs. 1000/- each per
location of the gate / wicket gate and violation up to the maximum of 10% in
size and height of gate / wicket gate and
boundary wall.
boundary wall.
DAMP PROOF COURSE (DPC)
7.
a.
a.
b.
c.
b.
8.
d.
e.
9.
d.
Sanctionable projection but not shown in Compoundable @ Rs. 100/- per sq. mts.
the sanctioned building plan.
Non-Sanctionable cantilever projection
Compoundable @ Rs. 500/- per sq. mts.
but within zoning line.
Non-Sanctionable cantilever projection Violation up to maximum limit of 10% of
outside zoning line.
the set back line is compoundable @
Rs.11000/- per sq mt .
Cantilever Cup Board / bay window
To be counted in covered area violation.
e.
10.
VENTILATION SHAFT:
a.
b.
11.
MISCELLANEOUS:
a.
Un-authorized occupation
b.
c.
d.
a.
b.
c.
e.
NOTE: All the violations no covered by the composition rates listed above are noncompoundable except minor variation in Public Health Services such as
construction of under ground water tank etc. which are to be ignored.
-sdDistrict Town Planner,
For Chief Administrator, HUDA,
Panchkula.