Introduction

On 20 June 2014, we have a site visit which organized by our measurement 1


lecturer, Sr. Ang where located at Jalan Klang Lama, Mukim Petaling. It was
somewhere nearby The Pearl International Hotel Kuala Lumpur. The employer of the
project was Aikbee Timbers Sdn. Bhd. While the main contractor was Encorp
Construction Sdn Bhd and the quantity surveyor was PCM Kos Perunding Sdn Bhd.
It was a construction of a 25 storey multipurpose building. Two Basement which are
B1 and B2 are car park for shopping mall while first floor and second floor was
shopping mall. 3rd floor until 7th floor are car park for residence while 7th floor
onward was residential area. It had 403 units for residence
The size of the land was roughly around 1 acre. It is a two years contract, estimate to
complete on November 2014 including all the construction, engineering and
commissioning works. The total amount for the project was roughly around RM 106.1
millions.

Objective

Observe the usage of machinery at the construction site. For example, bar
bending machine, concrete mixer, mechanical plants, cutting machine, tower
crane.
Aware the importance of personal safety on the construction site. Require to
wear safety helmet and safety shoes when going in to avoid accident.
Experience the working place of quantity surveyor which is dealing with
weather and the risks may occur on the site.
Gain more basics of the construction process through a site visit.
Increase personal knowledge of the construction process by listening the
professionals briefing and gathering all the information carry on site.
Explore the type of building materials and technology use to construct a
building.
Recognize the measurable items for substructure and reinforced concrete
frameworks.

Photos & Descriptions


4

View of the site

Bore Piling

Independent Scaffolding

Mobile access tower

Safety net

Making of concrete spacers

Making of concrete spacers

Making of concrete spacers

Staircase

Concrete pipe

Description board

Precaution on the site

10

Precaution on the site

bents

11

Main bars and stirrups in the beam

Car park sloping slab

12

Starter bars

pipes

13

Various type of sample

14

15

Plans of the

Lifting tower

building

tower crane

16

Links &
Bents

Mesh Fabric Reinforcement (BRC)

17

Column

Concrete Staircase

18

Forklift

Hold Trailer Concrete Pump

19

Conclusion

Throughout the site visit, I had learnt the real feeling compared with study at the
university lifestyle. It was more tough than I was thought. It really a fresh experience
for me that I ever had. I learnt to be more patient and careful because of the weather
condition and the risk will be happen everywhere on the site. Teamwork also an
important element in constructing a building.
In the university, I will only learnt about the knowledge based on the slide or book
that given by lecturers to improve ourselves. But we cant feel the real life working on
outside.
As conclusion, I had gained a lots knowledge about the basic of the construction
process, experience of actual working space, the usage of machinery, the usage of
technology and different of building materials and others. The most memorable
moment was the contractor let us to walk down scaffolding from 5 th floor to
experience the reality of the professionals .
The site visit was useful and bring me to overcome the problem which could happen
in my future. I wish I could have more practical knowledge to prepare a better me in
my working future.