The project started on site in May 2015 and is due to be complete in Q4 of 2016. The
development comprises of eight oors above ground with two basement levels. The
roof area will accommodate the majority of all plant requirements for the building.

Work on site to-date has focused on the construction of a new two storey podium extension to the east and north of the existing structure along with some structural
amendments to the existing structure. These relatively minor structural amendments are designed to make eect to the particular needs of the bank. This includes some
new stairs, bridges and extended oor plates within the atrium space to improve connectivity between the oors and to facilitate its use as a collaborative environment.

Northern & Eastern Podium Extensions Construction Work Commenced

Northern & Eastern Podium Extensions Construction Work Commenced

Northern & Eastern Podium Extensions Podium Level Currently

May 2015

May, 2015

Being Constructed in the East, New Basement Entrance Ramps being


Constructed in North October 2015

Eastern Extension Construction of Podium Slab Commencement

Eastern Extension Construction of Podium Slab Commencement

Eastern Extension Construction of Podium Slab Commencement

October 2015

October 2015

October 2015

October 2015

CENTRAL BANK OF IRELAND


CONSTRUCTION UPDATE

Northern Extension Piling Complete June 2015

Northern Extension Ramp Construction Commencing October 2015

Northern Extension Ramp Construction Commencing October 2015

Internal structural alterations are ongoing and include cutting out of new stair openings in the atrium area and creating new door

New Stair Opening

New Stair Opening on Atrium Level 2

New Stair Opening on Level 1

HJL Team Peter McGovern, Collette Burns, Pat


Kirwan, Stephen Casey, Miriam Corcoran, Ailish
Walker (Amy Murphy and Maria Mulcahy - Concept
Design to Construction Stage, Gordon Mills Tender
Stage).
The design team have a full time presence on site for
the duration of the project.
L-R. John O Brien OCSC Mechanical, Pierce
Stakelum AECOM Cost Control, Donna Geraghty
AECOM Structural, Brendan Cullen OCSC Electrical,
Pat Kirwan HJL
New Door Openings

View from Site


October 2015

CENTRAL BANK OF IRELAND


CONSTRUCTION UPDATE

Glass Manufacturing Plant, Leeds. Manufacturing all Unitised Panel Glass

Glass Toughening Process

FACADE
The procurement of the facade commenced in early 2014, one year ahead the start of site
operations. During the design and development phase of the external envelope, the design
team undertook a number of QA/QC visits to the facade contractors supply chain. These
included, glass manufacture, glazed unit manufacture, unitised panel assembly, anodising
plant and stone quarries.

Unitised Panel Glass ready for shipment to Carey Glass in Tipperary.

Heat Soaking Kiln All toughened glass being used on the project is being

Unitised Panel Glass being cut to size in Carey Glass, Tipperary.

Unitised Panel Manufacture Architectural Aluminium, Dublin.

heat soaked. This reduces the risk of the glass breakage due to Nickel
Sulphite Inclusions.

Facade Prototype Performance Testing Wintech Laboratories, UK.

Anodising Plant London

Kilkenny Limestone - Quarry

Kilkenny Limestone - Stone Cutting

October 2015

Anodising Plant London

Unitised Panel Installation October, 2015