Culture Documents
2.
Survey Company
November12,2014-- Gafoors
Wharf, Houston, East Bank
Demerara , Guyana
Guyana Maritime Bureau Inc.
3.
Surveyors Name
Joseph lewis
4.
H & M / P&I
5.
Remarks.
It is important that the nature and extent of all defect should be stated in the List of defects (proforma enclosed) A recommendation for
rectification of any deficiency should also be made, but in suitable broad terms to allow the operator or owner to make his own arrangements as
appropriate.
Each defect item/recommendation should be indicated as immediate/urgent/non-urgent/dry-dock, (or repair period). The Insurer will further
define these when communicating with the Assured. The normal periods are, immediate 7 days, urgent 30 days, non-urgent 90 days, drydock next scheduled dry-dock or repair period.
The List of defects and recommendations, must be signed for receipt by the Master or any other managers or owners representative and the
original returned to the Insurer. If a signature is refused or is unobtainable this should be stated with the reason. A copy of the signed page(s)
should be left with the person signing with the request that it is passed to the ships managers or operators. The surveyor should explain that the
recommendations made would be forwarded to the Insurer who will subsequently inform the Assured as appropriate.
The Insurer usually requires a few photographs to indicate the type and layout and condition of the vessel, and then photographs of defects.
Photocopies of plans or diagrams to supplement the report, preferably A4 size. If information is required from the vessel or owners/managers
once the surveyor has departed the vessel, then the vessels owner / manager should be requested to forward these directly to the Insurer.
For all sections please use the following numbering:
1
2
3
Name of vessel
FAIRLAND
2. Previous names
-----
Georgetown / Guyana
7500762 / 0000562
5.
8 RPH
Call signal
6. Owners
7. Operators
8. Technical superintendency
by
1975
GENERAL CARGO
NOT CLASSED
N/A
.......................
70.92m
/
15. Deadweight, t
2635 t
N/A
17. Certificates
Date of issue
Date of expiry
Certificate of Registry
Jan.11,2011
Feb.25,2011
June 12,2014
June 11,2019
June 12,2014
June 11,2019
June 12,2014
June 12,2014
ISPSC
Jan.13,2011
Feb.18,2011
April 8,2014
April 7,2015
June 12,2014
June12,2014
Document of Compliance
4
June 11,2019
June 11,2019
June 11,2019
June 11,2019
N/A
B.
Item
1.
SURVEY REPORT
2
X
Item
2.
2
X
Item
3.
Openings in Hull, Superstructure and their Closing Appliances incl. Hatchways of cargo
holds/tanks, Tightening arrangements and Securing arrangements, Closing gears, Hatch
coamings, Cargo ports, Companion hatches, Skylights and Ventilating trunks, Scuttles,
Outside and Inside doors, Sliding doors, Swan necks, Cowls etc.
2
X
2
X
Item
5.
Anchor, cable, winch and other system in good condition although some corrosion observed
on winch platform.
2
X
Mooring arrangement
All mooring arrangements forward and aft inclusive of windlass, capstan, fairleads, guide
rollers, bollards in good condition.
Estimation of technical condition
7.
2
X
Towing arrangement
Vessel does not have any established means for towage.
Estimation of technical condition
9
Item
8.
Vessel has onboard signal mirror , whistle, international code of signal(flags), aldis lamp and
pyrotechnics as signal means------- all in very good operating condition.
1
X
Life-saving appliances
Vessel has a full complement of life-saving appliances that are all well maintained.
Lifeboats to be replaced by additional 10 person liferafts. On the the lifeboat to be used as a
rescue boat.
1
X
10
Item
Vsl is equipped with gears for handling general / break bulk cargo --- all in very good
condition.
1
X
11
Item
Vessel has full complement of radio equipment for sea areas A1,A2.
All equipment in very good operational condition and with necessary certificates for trading
area.
1
X
12
Item
2
X
2
X
2
X
13
Item
1
X
2
X
2
X
14
Item
2
X
1
X
15
Item
ADDITIONAL
INFORMATION
Main engine (single )
Maker/ Makers no.
Ser.# 5470559
Type x Total capacity, kW x RPM
SBA12M x 1450 x 750
DEUTZ / SBA 12M528 ---built 1975
Total running hours
Running hours since last overhaul
3250
Repair size of bearings
Nos.
Main bearings
Crank bearings
Piston pins
1
Standard
standard
2
3
If crankshaft will be changed, please note date of changing and
running hours
standard
N/A
16
Item
Type x RPM
VTR250 x 22,500
Total running hours
3250
Information about damages of turbo-chargers during last 5 years
NIL
2.
Nos.
Main bearings
Crank bearings
Piston pins
1
17
Item
Turbo-charger nos.
Maker/ Makers nos.
.................
..........................................................................
Type x Total capacity, kW x RPM
Total running hours
3.
Item
Deutz
Running hours since last overhaul
378 hrs ( overhauled October,2013)
Repair size of bearings
Nos.
Main bearings
Crank bearings
Piston pins
1
2
3
4
Standard- 02141738
Standard-- 02425319
Standard
N/A
NIL
Name of companies who did the repairs during last 5 years
N/A
Turbo-charger nos.
Item
4.
00913
Being overhauled
Repair size of bearings
Nos.
Main bearings
Crank bearings
Piston pins
20
Item
02142317
02425323KZ142-06
Standard
n/a
Turbo-charger nos.
Maker/ Makers nos.
....................
..........................................................................
Type x Total capacity, kW x RPM
Total running hours
21
Item
5.
610
610
Repair size of bearings
Nos.
Main bearings
Crank bearings
Piston pins
1
Standard 85122600
EFN
2
3
4
If crankshaft will be changed, please note date of changing and
running hours
Information about damages of motor during last 5 years
Turbo-charger nos.
.........
Item
6.
7.
8.
9.
Fuel viscosity
23
Item
Auxiliary mashinery
Boilers
removable blades
---
controllable pitch
---
N/A
N/A
NIL
13. Shaft bearing (outer)
Type
Babbit ( oil lubricated)
14. Shaft bearing (inner)
Clearance, mm
No record
Type
Clearance, mm
Babbit
.
24
Item
Clearance, mm
..
..
Type
Clearance, mm
Simplex
Simplex -compact
16. Shaft seal (inner)
25
Item
nil
26
LIST OF DEFECTS/RECOMENDATIONS
1
2
Defects
Recommendations
Date of rectification
Before next voyage
Before next voyage
Lifeboats launching procedures not at location Procedures for launching and Before next voyage.
of boat stations
retrieval of boats to be posted at
boat stations.
27