ANNEXURE 2SB

DIFFERENT NATURE OF PROJECTS HANDLED


1. CONSULTING & DESIGN ENGINEERING FOR URBAN UTILITY SYSTEM DEVELOPMENT:
Development of Bangalore Water Supply & Sewerage System Stage IV, Phase 2
Role & Employer
Client & Duty Location
Duration
Nature of Activity

:
:
:
:

Project Engineer, Tata Consulting Engineers Ltd.


Bangalore Water Supply & Sewerage Board, Mumbai & Jamshedpur, India
Jan. 2009 to Feb.2014
Office based Consulting Engineering & Project Management Consultancy

Project Background & Features :


This project envisaged augmenting water supply to Bangalore City by an additional 500 MLD to improve the per capita water
supply from 105 to 150 L and to increase the waste water treatment facility from 650 MLD to 1053 MLD by installing waste water
treatment facilities of 405 ML capacity. This task also comprised of distribution improvement component which aims to reduce
the unaccounted for water from the present values to 16% in an area of about 300 Sq. Km covering 3 lacs connections.
Development of Solid Waste Management & Treatment Facility at Taloja, Maharashtra
Role & Employer
Client & Duty Location
Duration
Nature of Activity

:
:
:
:

Project Engineer, Tata Consulting Engineers Ltd.


Mumbai Metropolitan Regional Development Authority (MMRDA) ,Jamshedpur, India
Jan. 2009 to Aug. 2010
Office based Consulting Engineering & Project Management Consultancy

Project Background & Features :


MMRDA in association with National Environmental Engineering Research Institute (NEERI) has conceptualized a first of its kind
regional landfill site with an integrated Solid Waste Management & Treatment facility at Taloja, Maharashtra, catering to 13
urban local bodies. TCE was appointed to carry out techno commercial feasibility for this development by providing best
combination of available technologies for Solid Waste Management and processing in line with legal, commercial and
technological viabilities.
Development of Sewerage System under - Nabadiganta Water Management Limited, Kolkata
Role & Employer
: Manager Process Design ,Jamshedpur Utility & Service Company Ltd.
Client & Duty Location : Nabadiganta Water Management Limited (Kolkata), Jamshedpur, India
Duration
: October,2009 to Jan.2012
Nature of Activity
: Office based Design Engineering & EPC supporting
Project Background & Features :
The system has a capacity to handle 3 Million Gallons of Water per Day to serve about 2.3 Lakh populations. This development
comprised of development of a Sewage Treatment Plant of 2 MGD capacity, an intermediate pumping station and sewer line
network spread for 18 km.
Refurbishment of Sewage Treatment Plant in Bara, Jamshedpur
Role & Employer
: Project Manager Construction, Jamshedpur Utility & Service Company Ltd.
Client & Duty Location
: Internal Project, Jamshedpur
Duration
: April,2010 to Dec.,2010
Nature of Activity
: Site Based Project Management of Construction
Project Background & Features :
45MLD capacity Sewage Treatment Plant based on Conventional Activated Sludge Process with sludge handling facilities like
Anaerobic Sludge Digestion and Centrifuge for dewatering. The objective of this task was to recover from the frequent upset
caused in the biological treatment system.
Development of Sewage Treatment Facility in Pakyong, Sikkim, India
Role & Employer
Client & Duty Location
Duration
Nature of Activity

:
:
:
:

Project Manager, JB Enviro Consultants Pvt. Ltd.


The Water Security & PHE Department, Govt. of Sikkim, Pakyong, Gangtok(Sikkim) & Kolkata, India
Ongoing ( Status : DPR has prepared & submitted )
Office based Consulting Engineering & Project Management Consultancy

Project Background & Features :


The only airport of the state of Sikkim is in the process of development in Pakyong near Gangtok. To serve the existing
community and the potential community growth, 3 sewage treatment plants and sewer line network was planned to be
developed. JBECPL has been deployed as an engineering consultant for this job. The DPR has already been submitted for.
Three STP having capacity of 8, 5 & 5.5 MLD was proposed. Plotting sewer line & STP in the uneven contour of mountain area
of Pakyong is the real challenge associated with this job.

Page 1 of 6

Development of Sewage Treatment Facility in Champdani Town, Hooghly, West Bengal, India
Role & Employer
Client & Duty Location
Location
Duration
Nature of Activity

:
:
:
:
:

Project Manager, JB Enviro Consultants Pvt. Ltd.


Kolkata Metropolitan Development Authority (KMDA), Hooghly, West Bengal & Kolkata, India
Champdani, Hooghly, West Bengal, India
March,2014- May2015
Office based Consulting Engineering & Project Management Consultancy

Project Background & Features :


The National Ganga River Basin Authority (NGRBA), India has decided that no untreated municipal wastewater and industrial
effluents would be allowed to enter River Ganga after 2020 under Mission Clean Ganga. Kolkata Metropolitan Development
Agency (KMDA) has been identified as the nodal agency for implementing the objectives of NGRBA in the State of West Bengal.
JBECPL has been deployed by KMDA to provide the necessary engineering consultancy services for preparation of a DPR and
submission to NGBRA. A centralized sewage treatment facility estimated at 15.5 MLD having Sequential Batch Reactor (SBR)
was proposed in Champdani of Hooghly district in the state of West Bengal. Wastewater will be treated to tertiary level treatment
before disposal to nearby DVC canal with provision of reuse of the effluent is provided.
Development of Storm Water Drainage Scheme for Jalpaiguri Town, West Bengal, India
Role & Employer
Client & Duty Location
Duration
Nature of Activity

:
:
:
:

Project Manager, JB Enviro Consultants Pvt. Ltd.


Jalpaiguri Municipality, Jalpaiguri Town, West Bengal & Kolkata , India
March,2014- Nov.2014
Office based Consulting Engineering & Project Management Consultancy

Project Background & Features :


Jalpaiguri is located in the plains of North Bengal by the right bank of river Tista. Occasional flooding has been and still is a
chronic problem in Jalpaiguri. During monsoon, a vast area near the State Highway becomes inundated and plinths of many
houses remain submerged for hours together. Such water-logging results sufferings of people and causes outbreak of various
diseases during this season. JBECPL has been engaged by Jalpaiguri Municipality to provide the necessary consultancy
services for preparation of a DPR for development of storm line network.
2. CONSULTING & DESIGN ENGINEERING FOR INDUSTRIAL POLLUTION CONTROL SYSTEM DEVELOPMENT:
Capacity augmentation of Coke Plant Effluent Treatment system of Tata Steel
Role & Employer
Client & Duty Location
Duration
Nature of Activity

: i. Consultant side Project Engineer for Tata Consulting Engineers Ltd.


ii. Internal consultant - Project Management, Jamshedpur Utility & Service Company (JUSCO) Ltd.
iii. Client side internal engineering consultant for Tata Steel Ltd.
: Tata Steel Ltd., Jamshedpur, India
: Nov.2008 to Sept. 2012
: Site based Consulting Engineering & Project Management Consultancy.

Project Background & Features :


Steel making capacity rise (5 MTPA to 10 MTPA) of Tata Steel caused increased demand of coke. This demand rise was
planned to be supported by augmentation of existing coke oven batteries and installation of some new batteries. This ensured
higher waste water generation from coke oven plant in increased production scenario. The existing ETP was supported with
double stage activated sludge process and clarification unit and its design capacity was 120 m 3/hr where as the existing
operating load was 75 m 3/hr. The future expansion extrapolated nearly 225 m3/hr of waste water generation. So the ETP was
planned for augmentation with the above mentioned scope in a difficult brown-field environment. Tata Consulting Engineers Ltd.
was deployed as the Consulting Engineer & JUSCO was deployed as the local sub-contractor of Advent for this project. Advent,
USA was the technology supplier.
Development of new Effluent Treatment Plant at Cold Rolling Mill, Bara of Tata Steel
Role & Employer
Client & Duty Location
Duration
Nature of Activity

i. Consultant side Project Engineer for Tata Consulting Engineers Ltd.


: ii. Internal consultant - Project Management, Jamshedpur Utility & Service Company (JUSCO) Ltd.
iii. Client side internal engineering consultant for Tata Steel Ltd.
: Tata Steel Ltd., Jamshedpur, India
: Jan. 2009 to Feb.2014
: Site based Consulting Engineering & Project Management Consultancy

Project Background & Features :


Tata Steel has developed a Cold Rolling Mill of 2.5 MTPA capacity along with 0.5 MTPA push pull hot role pickling line. 0.5
MTPA acid regeneration plant and Roll Grinder at Bara factory in Jamshedpur. TCE was deployed as the Consulting Engineer
3
for this project. An ETP of 80 m /hr capacity was installed in this project by Voltas.
Capacity up gradation of Air Pollution Control System in Tata Steel
Role & Employer

: i.

Consultant side Project Engineer for Tata Consulting Engineers Ltd.

Page 2 of 6

Client & Duty Location


Duration
Nature of Activity

ii. Client side internal engineering consultant for Tata Steel Ltd.
: Tata Steel Ltd., Jamshedpur, India
: Sept. 2008 to Feb.2014
: Site based Consulting Engineering & Project Management Consultancy

Project Background & Features :


This project was targeted to balance the air pollution emission in course of stage wise steelmaking capacity enhancement (5
MTPA to 10 MTPA) of Tata Steel. TCE was deployed as the Consulting Engineer for this project. Installation/Retrofication of one
Waste Gas & one Dedusting ESP for Sinter Plant no: 2 & 3 and Power House 4 and 24 no: of Bag Filter in Refractory Process
Unit of the factory was the scope of services of the project modules I was attached with. The capacity upgradation of the air
pollution devices was planned in such a way that augmented level of air purification with present operating load will ensure the
emission within the prescribed standard of air pollutant stack discharge of Central Pollution Control Board, India during future
enhanced steel manufacturing scenario. Fl Smidth & HSC was two major suppliers of ESP & Fabric Filters for this assignment.
Installation of Continuous Emission Monitoring System in Tata Steel Limited.
Role & Employer
Client & Duty Location
Duration
Nature of Activity

:
:
:
:

Project engineer in TCE, Tata Consulting Engineers Ltd.


Tata Steel Ltd., Jamshedpur, India
Sept. 2008 to Feb.2011
Site based Consulting Engineering & Project Management Consultancy

Project Background & Features :


This project was targeted to develop a continuous air pollution emission system in Tats Steel factory. Installation of sensor
based online air emission quality monitoring system for both ambient & stack was under the scope of service. TCE was
deployed as the Consulting Engineer for this project. IT implementation team & Instrumentation team was co-worker in this
assignment. One of the major suppliers of the project was Chemtrol.
Refurbishment of existing effluent treatment plant of The Tinplate Company of India Limited.
Role & Employer
Client & Duty Location
Duration
Nature of Activity

:
:
:
:

Project Manager, Jamshedpur Utility & Service Company


The Tinplate Company of India Ltd., Jamshedpur, India
May,2011 to Nov.2011
Site based Design Engineering & EPC supporting

Project Background & Features :


Both the effluent treatment plant of Cold Rolling Mill & Electroplating Tinning Line was underperforming in terms of removal of
Chemical Oxygen Demand & the latter one also for removal of Cr 6+ (The high rate solid contact clarifier was not working
properly). Refurbishment accomplished with these objectives for both ETP.
Modification of existing effluent treatment plant of Tata Cummins Limited.
Role & Employer
Client & Duty Location
Duration
Nature of Activity

:
:
:
:

Project Manager, Jamshedpur Utility & Service Company


Tata Cummins Ltd., Jamshedpur, India
August,2011 to Jan.2012
Site based Design Engineering & EPC supporting

Project Background & Features :


The existing effluent treatment plant was underperforming due to ineffectiveness of exiting diffused aeration system and
membranes of Reverse Osmosis Unit. Both these unit was augmented under this assignment.
Construction of new package type Sewage Treatment Plant at Tata Cummins Limited
Role & Employer
: Project Manager, Jamshedpur Utility & Service Company
Client & Duty Location
: Tata Cummins Ltd., Jamshedpur, India
Duration
: August,2011 to Jan.2012
Nature of Activity
: Supervision OF Engineering, Procurement & Construction.
Project Background & Features :
For this assignment a modular sewage treatment of capacity was installed for the waste water generated from office, kitchen &
workers room. The target was to reuse the water for industrial cooling & landscaping.
Refurbishment of existing effluent treatment plant of Dhunseri Petrochem Limited
Role & Employer
: Project Manager, JB Enviro Consultants Pvt. Ltd
Client & Duty Location
: Dhunseri Petrochem Ltd., Haldia & Kolkata, India
Duration
: August,2014 to Till Date
Nature of Activity
: Site based Consulting Engineering & Project Management Consultancy
Project Background & Features :
The existing effluent treatment plant was underperforming due to ineffectiveness of exiting surface aeration system and up-flow
anaerobic sludge blanket (UASB) unit. Both these unit was augmented under this task.

Page 3 of 6

Installation of new effluent treatment plant in Raja Rani Agro Food Pvt. Limited
Role & Employer
Client & Duty Location
Duration
Nature of Activity

:
:
:
:

Project Manager, JB Enviro Consultants Pvt. Ltd


Raja Rani Agro Food Pvt. Ltd., Kolkata, India
June,2014 to February,2015
Site based Consulting Engineering & Project Management Consultancy

Project Background & Features :


Effluent Treatment Plant of 600 KLD capacity (Anaerobic Baffled Reactor Method, Oxidation Pond, Dual media filter and
activated carbon filter) was installed for recycling of treated waste water in to the process.
3. STABILIZATION & COMMISSIOINING ASSISTANCE INDUSTRIAL POLLUTION CONTROL SYSTEM:
Pilot Scale stabilization of Waste Water Treatment Plant in Paradip Refinery of Indian Oil Corporation Limited.
Role & Hirer
Client & Duty Location
Duration
Nature of Activity

:
:
:
:

Consultant of Biological system stabilization, Asianol Spatiality Chemicals Pvt. Ltd. (ASCPL)
WABAG India. Paradip & Kolkata, India
Sept. 2012 to Nov.2013
System Survey & Process Stabilization

Project Background & Features :


WABAG had a proposed collaborative plant trial study (through pilot plant observation) for stabilization of the biological treatment
system with Novozyme Biological Solution (application of molecule specific bio-augmented microbe). ASCPL is their Indian
representative and was accounted for to conduct the study.
Stabilization of Waste Water Treatment Plant in
i. LPG Terminal of Indian Oil Petronas Limited, Haldia.
ii. Haldia Refinery of Indian Oil Corporation Limited.
Role & Hirer
Client & Duty Location
Duration
Nature of Activity

:
:
:
:

Consultant of Biological system stabilization , Asianol Spatiality Chemicals Pvt. Ltd. (ASCPL)
Indian Oil Petronas Limited, Haldia. & Haldia Refinery -IOC Limited, Haldia & Kolkata, India
July 2007 to Jan 2008 (Indian Oil Petronas Ltd.),Sept. 2007 to July 2008 (IOC Ltd.)
System Survey & Process Stabilization

Project Background & Features :


Indian Oil Petronas and IOC Haldia Refinery decided to stabilize their waste water treatment plant by Novozyme Biological
Solution (application of molecule specific bio-augmented microbe). ASCPL was their Indian representative and was accounted
for to conduct the study of system survey, microbe screening.
4. CONSULTING & DESIGN ENGINEERING FOR UPSCALING OF RESEARCH PROJECTS:
Application of Coke Breeze as an adsorbent for Coke Oven Effluent Tertiary Treatment
Role & Employer
Client & Duty Location
Duration
Nature of Activity

:
:
:
:

Chief Design Consultant, Tata Steel Ltd.


Internal Project of Tata Steel Ltd. Jamshedpur, India
February,2012 to February,2014
Design Engineering of Pilot Scale Experimental setup, Consulting support to regular pilot scale
observation.

Project Background & Features :


Tertiary treatment through adsorption of critical parameters like Phenol, Cyanide and Thio-cyanide present in coke oven
biologically treated effluent by Coke Breeze (a coke making scrap) was effective in laboratory scale observation. The objective of
this study was further upscaling of the same. Effective management of a coke making solid waste and development of new
adsorbent for effluent treatment were two target benefits.
Removal of Phosphorus from Steel Making LD Slag
Role & Employer
Client & Duty Location
Duration
Nature of Activity

:
:
:
:

Chief Design Consultant, Tata Steel Ltd.


Internal Project of Tata Steel Ltd. Jamshedpur, India
February,2012 to February,2014
Design of Pilot Plant set-up.

Project Background & Features :


Removal of Phosphorus content from 2-3 % to < 1% can make the material applicable to use as refluxing agent in Sinter Plant.
The research task was successful in laboratory scale by phosphorus removal through froth floatation process. Objective of this
study was further upscaling of the same to fit into pilot scale. Design of the pilot plant was a significant part of this study.
-

Development of water desalination system (RO based) to reduce Cl & SO4


Works, Tata Steel Ltd.

Page 4 of 6

2-

concentration in water intake of Haldia

Role & Employer


Client & Duty Location
Duration
Nature of Activity

:
:
:
:

Project Leader, Tata Steel Ltd.


Internal Project of Tata Steel Ltd. Jamshedpur, India
June,2012 to February,2014
Consulting support to regular implementation scale observation.

Project Background & Features :


Reuse of treated effluent generated from different unit process & operation of Tata Steel Ltd. was very challenging caused due
2-.
to presence of Cl & SO4 This was caused due to contaminated water intake (proximity to Bay of Bengal) in Haldia works and
thus the coke produced & waste water use to have significant concentration of this two parameter. The objective of this task was
to develop Reverse Osmosis based desalination system to ensure treated & less contaminated entry of sea water to the plant.
5. VENDOR SIDE PROJECT MANAGEMENT FOR INDUSTRIAL POLLUTION CONTROL SYSTEM DEVELOPMENT:
Capacity upgradation of Effluent Treatment Plant for Emami Paper Mill
Role & Employer
Client & Duty Location
Duration
Nature of Activity

:
:
:
:

Project Engineer, Welltech Environmental Engineering Pvt. Ltd.


Emami Paper Mill Ltd., Kolkata, India
Sept. 2004 to June .2006
Proposal & Contract Management; Site based Project Management.

Project Background & Features :


Upgradation of Effluent Treatment Plant to 2300 KLD of a paper factory of 50 TPD production capacity.
Installation of new Effluent Treatment Plant in Delta Fabrics Pvt. Ltd.
Role & Employer
Client & Duty Location
Duration
Nature of Activity

:
:
:
:

Project Engineer, Welltech Environmental Engineering Pvt. Ltd.


Delta Fabrics Pvt. Ltd., Kolkata, India
May. 2004 to July 2007
Proposal & Contract Management; Site based Project Management.

Project Background & Features :


3

Installation of new Effluent Treatment Plant of 50m /day capacity for a dyeing and bleaching factory.
Installation of new Air Pollution Control Facility in Vedanta Aluminium Ltd.
Role & Employer
Client & Duty Location
Duration
Nature of Activity

:
:
:
:

Project Engineer, Welltech Environmental Engineering Pvt. Ltd.


Vedanta Aluminium Ltd., Jharsuguda, Orissa & Kolkata, India
October 2003 to April 2006
Proposal & Contract Management; Site based Project Management.

Project Background & Features :


Installation of dedusting bag filters ad cyclones in the factory.
6. ENVIRONMENTAL IMPACT ASSESSMENT (EIA) ASSIGNMENTS REPORTING JOBS:
Capacity Expansion of
i. Joda East Iron Ore Mines of Tata Steel &
ii. West Bokaro Coal Mine of Tata Steel
Role & Employer
Client & Duty Location
Duration
Nature of Activity

:
:
:
:

Functional Expert (Water, Air, Hazardous Waste and .Noise & Vibration), Tata Consulting Engineering Ltd.
Tata Steel Ltd., Joda, Orissa & Jamshedpur, India
October 2008 to April 2010
Office based Consulting Engineering & Project Management.

Project Background & Features :


EIA study to receive consent to establishment & operate for expanding mining capacity of iron ore in Joda East Iron ore mine, Orissa
and construction of new washery & captive thermal power plant in West Bokaro Coal Mine to support rise of steel production target
from 5 MTPA to 10 MTPA of Tata Steel
Development of new cold rolling mill of Tata Steel in Bara, Jamshedpur
Role & Employer
Client & Duty Location
Duration
Nature of Activity

:
:
:
:

Functional Expert (Water, Air, Hazardous Waste and .Noise & Vibration),Tata Consulting Engineering Ltd.
Tata Steel Ltd., West Bokaro, Jharkhand, India
June 2009 to April 2010
Office based Consulting Engineering & Project Management.

Project Background & Features :


EIA study required for getting consent to establishment & operate for construction of new cold rolling unit to support rise of steel
production target from 5 MTPA to 10 MTPA of Tata Steel.

Page 5 of 6

Continuous Annealing and Pickling Line development job in Tata Steel, Jamshedpur
Role & Employer
Client & Location
Duration
Nature of Activity

:
:
:
:

Functional Expert (Water, Air, Hazardous Waste and .Noise & Vibration),Tata Consulting Engineering Ltd.
Tata Steel Ltd., West Bokaro, Jharkhand, India
October 2009 to September, 2010
Office based Consulting Engineering & Project Management.

Project Background & Features :


This was a JV project with Nippon Steel. EIA study required for getting consent to establishment & operate for construction of new
annealing and pickling plant to support rise of steel production target from 5 MTPA to 10 MTPA of Tata Steel.
Construction of Real Estate & Commercial infrastructure as :
1. New Refugee Rehabilitation and Residential Project in Bonhooghly, Kolkata
2. New Residential & Commercial Project in 117 BT Road, Kamarhati, Kolkata
3. New Hosiery Park, Howrah
Role & Employer
Client & Location
Duration
Nature of Activity

: Functional Expert (Water, Air, Hazardous Waste and .Noise & Vibration),JB Enviro Consultants Pvt. Ltd.
: (1) R&R Dept., West Bengal Govt. (2) Ujjal Barter Trading Co: (3) West Bengal Hosiery Association
Kolkata, India.
: October 2009 to September, 2010
: Office based Consulting Engineering & Project Management(Arrangement of baseline information
collection, Environmental Modelling, Impact Assessment including microclimatic effects, Environment
Management Planning, Technical presentation to statutory agency, Report Generation, Public Hearing,
Social Impact study.

7. ENVIRONMENTAL SITE ASSESSMENT (ESA) & DUE DILIGENCE REPORTING JOBS:


Phase I ESA study for expansion of Beck India Limited
Role & Employer
Client & Duty Location
Duration
Nature of Activity

:
:
:
:

Project Engineer, Tata Consulting Engineers Ltd.


Beck India Ltd., , Gujarat & Mumbai, India
September 2008 to October, 2008
Site based Consulting Engineering (Information collection on site use history, Review of pollution
documents, Identification of existing and potential source of contamination, Reporting)

Phase II ESA study for construction of new office building of Tata Consulting Engineers Ltd. In Jamshedpur
Role & Employer
Client & Duty Location
Duration
Nature of Activity

:
:
:
:

Project Engineer, Tata Consulting Engineers Ltd.


Internal Project, Tata Consulting Engineers Ltd., Jamshedpur, India
April. 2009 to July 2009
Site based Consulting Engineering (Surface & Sub-surface soil, Surface & Ground water
,sediment sampling, Use of transportation model for contaminant migration study)

8. INDUSTRIAL RISK ASSESSMENT & HAZARD STUDY:


HAZOP Study for different Gas Holders
Role & Employer
Client & Location
Duration
Nature of Activity

: Project Engineer, Tata Consulting Engineers Ltd.


: Tata Steel Ltd., Jamshedpur, India
: November,2008 to April,2009
: Site based Consulting Engineering (Working with multi-disciplinary team, Study of PFDs & PIDs,
Quantification of probability and consequence of all possible events, Using by HAZOP PRO Software.)

Project Background & Features :


Study of holders of the process gas from BF, BOF units
Risk Analysis of stamp charging coke oven batteries
Role & Employer
Client & Location
Duration
Nature of Activity

:
:
:
:

Project Engineer, Tata Consulting Engineers Ltd.


Tata Steel Ltd., Jamshedpur, India
September,2009 to March, 2010
Site based Consulting Engineering (Working with multi-disciplinary team, Study of PFDs & PIDs,
Quantification of probability and consequence of all possible events, Reporting by PHAST Software.)

Project Background & Features :


Part of comparative cost-benefit study of stamp & top charging coke oven batteries during steel production rise.
Kolkata, India
26-09-2015

Suvranil Banerjee

Page 6 of 6

P.T.O.