You are on page 1of 4

BILL OF QUANTITIES

HAJI GUL KALLE BRIDGE UNION COUNCIL BEHLOLA

SUMMARY
Section

Amount (Rs.)

Section I
Consultancy Charges/Designing & Vetting
Section II
Bridge Structure

Section III
Approaches

TOTAL

\\0k\d\10000\100\280\10089\110\110\Haji Gul Kalle Bridge (12-5-01).xls


Summary

BILL OF QUANTITIES
HAJI GUL KALLE BRIDGE UNION COUNCIL BEHLOLA

BRIDGE STRUCTURE
Item No.
KCE/CSR
P(d)/16-26-a

P(b)/16-28-b

EX2/03.09-c

Description of Item

Quantity

Unit

1.00

Job

144.00

Rate (Rs.)

Amount (Rs.)

Construct and load test one


pile of 750mm nominal
diameter as shown on the
drawings as stipulated in
the specifications and as
additionally directed by the
Engineer including
preparation and submission
of load test report. This item
includes all materials,
equipment instruments and
temporary works required to
construct the pile, load test
and load-settlement
readings of the test piles.

Boring for Cast-In-place


RCC piles in Gravelly soils:
Dia 660 - 910 mm.
Excavation in foundations
and/ or pile caps including
all shoring and de-watering,
backfill and compact
suitable excavated material
on completion of work in
excavation and dispose off
surplus any where on the
site of works as directed by
the Engineer.

m3
CO-f/06-05-f

CO-a/
06-06-a-03

Supply, mix, form, place,


compact and cure blinding
of Lean concrete under
pilecaps & approach slabs

35.50

m3

36.40

m3

124.00

m3

Supply, mix, form, place,


compact, remove formwork
and cure Type C Concrete
in:
a) Pile-Caps
b) Girders, Slab,
Diaphragms, Kerbs,
Railings, Abutment walls,
transoms backwalls
buttresses and approach
slab including formation of
bearing recesses.

\\0k\d\10000\100\280\10089\110\110\Haji Gul Kalle Bridge (12-5-01).xls


Section I

BILL OF QUANTITIES
HAJI GUL KALLE BRIDGE UNION COUNCIL BEHLOLA

BRIDGE STRUCTURE
Item No.
KCE/CSR
CO-a/
06-06-b-02

ST / 06-07

Description of Item

Quantity

Unit

72.50

m3

a) Plain mild steel bars.

7.79

M.Ton

b) deformed bars.

18.10

M.Ton

Supply, mix, form, place,


compact remove formwork
and cure Type B concrete in
Piles.

Rate (Rs.)

Amount (Rs.)

Supply, cut, bend, place


and tie reinforcement
including the cost of binding
wire:

J(e) / 16-30-a Supply and fix in position


neoprene bearing pads of
size 306X406X45 mm
comprising two neoprene
rubber plates 15mm thick
mild steel pates on all sides
i/c preparation of pad
recesses with mortar as
shown on the drawings.

TOTAL

Aziz ul Hakee

As per instructio
S.A.A. the 25 %
above the CSR 1

22,362

Cm3.

Rs.

\\0k\d\10000\100\280\10089\110\110\Haji Gul Kalle Bridge (12-5-01).xls


Section I

BILL OF QUANTITIES
HAJI GUL KALLE BRIDGE UNION COUNCIL BEHLOLA

APPROACHES TO BRIDGE
Item
KCE/C&W

Description

Unit

Estimated
Quantity

EX1/03-23 d

Structural excavation in all


types of material

EM(c)/03-05-a

Formation of embankment
from all types of borrow
material.

1,708.00

Aggregate Base

86.24

Asphalt concrete for


wearing coarse (Class A)

18.62

CO-f/06-05-I

Lean concrete

24.64

CO-b/06-05-h

Class B Concrete

6.20

229.17

38.84

BC1/16-04-a
SPA-a/16-12-b

M1(b)/08-01-d-03 Random Rubble Masonry in


Retaining Walls(1:6
C.S.mortar)
W2(e)/19-30-a

Grouted Rip Rap Class A

Item
Rate (Rs.)

Amount
(Rs.)

153.00

TOTAL

\\0k\d\10000\100\280\10089\110\110\Haji Gul Kalle Bridge (12-5-01).xls