Aqua

Aquachem Enviro Engineers Pvt. Ltd.

REGD.OFFICE:5th&6thFLOOR,SUNVISION,OPP.INGVYASYABANK,HANUMANROAD,VILEPARLE(E),
MUMBAI400057TEL.:26119768/8226101217FAX:26103618
CINU74140MH1989PTC052061
EMail:aquachem@aquaengg.comwww.aquaengg.com

AEEPL: CBCRDT: 006:TPL: 309


13th March, 2015

Tata Projects Ltd.


Minthona Towers -1, #1-7-80 to 87,
Prendergast Road,
Secunderabad 500 003, Telangana.
Subject : Project for installation, operation, & maintenance of RO drinking
water plants in the villages of Kolar & Chickballapur districts in
Karnataka state on Build-Operate-Transfer basis under CSR
initiatives of Canara Bank.
Dear Sir,
This is in reference to the work order placed by M/s. Canara Bank Centenary Rural
Development Trust, Bangalore and would like to inform you that we have been appointed
by them as the Project consultants for the above stated project and would request you to
kindly submit the following documents :
Annexure A

Questionnaire at the earliest

Annexure B

Engineering Package as work progress

We trust the above is inline and would request you to the needful at the earliest.
Please feel free to call on us for any more clarification / information.
Thanking you,
Yours faithfully,
For Aquachem Enviro Engineers Pvt. Ltd.

Hemang Shah
Project Manager
CC :
Canara Bank,
Banagalore.
Mr. Jeetendra Rao (AGM)
jeetendrarao@canarabank.com

CELEBRATING THREE DECADES OF WATER & WASTEWATER MANAGEMENT

Aquachem Enviro Engineers Pvt. Ltd


ANNEXURE A - QUESTIONNAIRE
Sr. no.

Detail

Address & Contact details of each site and


local person at each site

Source of water & analysis report

Location & Distance of water source from


R. O. Plant

Plot Plan & Site Clearance letter from


District Magistrate

Source of Electrical Power its Availability


and authorization

Name & Addresses of Approved


Laboratories for water analysis

Methodology & Permission of Disposal of


Reject Water

Any Deviations from tender requirements

Attach proof of all statutory labor


compliances like Provident fund,
Workmens Compensation, etc.

Response (Attach Relevant


Documents wherever required)

CELEBRATING THREE DECADES OF WATER & WASTEWATER MANAGEMENT

Aquachem Enviro Engineers Pvt. Ltd


ANNEXURE B ENGINEERING PACKAGE
Annexure I

BASIC ENGINEERING PACKAGE


Soil Investigation Report

Annexure II

Bar Chart

Annexure III

General Arrangement Drawing of Plant Room

Annexure IV

PCC & RCC Design Mix Calculations and RCC design Calculations

Annexure V

Process Design Calculation including Equipment Sizing

Annexure VI

Process Flow Diagram

Annexure VII

Process & Instrumentation Drawing

Annexure VIII

Item wise Power Consumption

Annexure IX

Chemical Consumption

Annexure X

Reverse Osmosis Projections vetted by Membrane Manufacturer

Annexure XI

Reject Water Disposal Scheme

Annexure XII

DETAILED ENGINEERING PACKAGE


Control Philosophy

Annexure XIII

Quality Assurance Plan

Annexure XIV

Valve Schedule

Annexure XV

Technical Data Sheets for Mechanical Equipments

Annexure XVI

Technical Data Sheets for Electrical Equipments

Annexure XVII

Technical Data Sheets for Instruments

Annexure XVIII

Technical Data Sheets for Valves

Annexure XIX

Piping Layout

Annexure XX

Electrical Installations Drawing

Annexure XXII

Internal Inspection Reports

Annexure XXIII

Reports of Treated Water

Annexure XXIV

Operation & Maintenance Manual

CELEBRATING THREE DECADES OF WATER & WASTEWATER MANAGEMENT