You are on page 1of 3

Saudi Aramco Engineering Procedures

(Index of Active SAEPs)


September 2006
Document
About SAEPs
SAEP-12
SAEP-13
SAEP-14
SAEP-15
SAEP-16
SAEP-20
SAEP-21
SAEP-22
SAEP-25
SAEP-31
SAEP-32
SAEP-50
SAEP-103
SAEP-110
SAEP-119
SAEP-120
SAEP-121
SAEP-122
SAEP-125
SAEP-127
SAEP-133
SAEP-134
SAEP-135
SAEP-136
SAEP-140
SAEP-201
SAEP-301
SAEP-302
SAEP-303
SAEP-305
SAEP-306

Title
Saudi Aramco Engineering Procedures
Project Execution Plan
Project Environmental Impact Assessments
Project Proposal
Preparation of Restricted Vendor Lists for Process Automation Systems
Project Execution Guide for Process Automation Systems
Equipment Inspection Schedule
Royalty/Custody Metering Facilities Execution Guide
Tank Calibration Requirements
Estimate Preparation Guidelines
Corporate Equipment and Spare Parts Data Requirements
Environmental Performance Assessment (EPA) Program
Project Execution Requirements for Third Party Royalty/Custody Metering Systems
Metric Units of Weights and Measures
Saudi Aramco Standard Drawings
Saudi Aramco Materials System Specifications
Saudi Aramco Security Drawings
Operating Instructions for New Facilities
Project Records
Preparation of Saudi Aramco Engineering Standards
Security and Control of Saudi Aramco Engineering Data
Instructions for the Development of "Regulated Vendors List" Engineering Standards
Saudi Aramco Engineering Procedure Preparations
Saudi Aramco Process Automation System (PAS) Obsolescence Program
Saudi Aramco Management of Electric Equipment Obsolescence Program
Project Training Impact Assessment
Saudi Aramco Engineering Reports
Instructions for Establishing and Maintaining Mandatory
Saudi Aramco Engineering Requirements
Instructions for Obtaining a Waiver of a Mandatory
Saudi Aramco Engineering Requirement
Engineering Reviews of Project Proposal and Detail Design Documentation
Saudi Aramco Library Drawings
Evaluating the Remaining Strength of Corroded Pipelines

Index of Active SAEPs

Current
Issue

Previous
Issue

5/31/2003
8/31/2004
6/29/2005
9/20/2006
6/30/2003
5/31/2003
9/28/2005
5/3/12004
4/4/2006
8/15/2006
9/30/2003
6/30/2003
7/30/2003
4/30/2005
3/31/2004
4/30/2005
3/31/2004
8/31/2002
7/31/2005
5/31/2003
6/30/2004
1/4/2006
4/30/2003
7/30/2003
6/30/2004
5/31/2004
3/31/2004

2/26/2003
5/31/2000
6/30/2003
8/15/2006
4/28/1999
5/29/2002
1/29/2003
4/30/2003
New
New
8/31/1998
2/26/2003
12/1/1996
12/1/1996
6/30/2002
5/31/2003
11/30/1999
1/27/1998
2/29/2004
3/31/2003
12/31/2002
6/29/2005
New
New
New
New
1/31/2001

Next
Planned
Update
3/1/2008
9/1/2009
7/1/2010
8/15/2011
71/2008
6/1/2008
10/1/2010
6/1/2009
4/4/2011
8/15/2011
10/1/2008
3/1/2008
8/1/2008
5/1/2010
4/1/2009
6/1/2008
4/1/2009
9/1/2007
3/1/2009
4/1/2008
1/1/2008
7/1/2010
5/1/2008
8/1/2006
7/1/2009
6/1/2009
4/1/2009

11/13/2005

6/29/2005

5/1/2007

10/12/2005

01/31/05

7/1/2007

7/31/2002
3/31/2004
6/29/2005

12/31/1996
11/30/1999
3/29/2000

8/1/2007
4/1/2009
7/1/2010
page 1 of 5

Document
SAEP-308
SAEP-309
SAEP-310
SAEP-311
SAEP-312
SAEP-313
SAEP-314
SAEP-316
SAEP-317
SAEP-318
SAEP-319
SAEP-321
SAEP-322
SAEP-323
SAEP-324
SAEP-325
SAEP-327
SAEP-329
SAEP-332
SAEP-333
SAEP-334
SAEP-335
SAEP-339
SAEP-340
SAEP-341
SAEP-342
SAEP-343
SAEP-347
SAEP-348
SAEP-349
SAEP-350
SAEP-351
SAEP-352

Title
Plant Inspection Unit Reviews
Inspection of Community and Operations Support Facilities
Pipeline Repair and Maintenance
Installation of Hot Tapped and Stopple Connections
PLIDCO Weld+Ends Couplings
PLIDCO Split Sleeves
Use of PLIDCO Smith Pipeline Repair Clamps
Performance Qualification of Coating Personnel
Testing and Inspection (T&I) of Shell and Tube Heat Exchangers
Pressure Relief Valve Program Authorization for Installation, Deletion and Changes
Pressure Relief Valves Routine Test, Inspection, Quality Assurance and Regulation
Performance Qualification Testing and Certification of Saudi Aramco Welders
Performance Qualification Testing and Certification of Saudi Aramco Brazers
Performance Qualification Testing of Contract Welders and Brazers
Certification Review and Registration of Project Welders and Brazers
Inspection Requirements for Pressurized Equipment
Disposal of Wastewater from Cleaning, Flushing, and Dewatering Pipelines and Vessels
Project Close-Out Report
Cathodic Protection Commissioning
Cathodic Protection Monitoring
Retrieval, Certification and Submittal of Saudi Aramco Engineering & Vendor Drawings
Boiler Condition Assessment
Marine Dredging and Landfilling Approval and Permitting
Air Quality Impact Analysis and Assessment
Equipment Life Cycle Cost Procedure
Engineering Drawings Emergency Delivery Plan
Risk-Based Inspection (RBI) for In-Plant Static Equipment
Supplying Material from Stockists
Chemical Cleaning, Disinfection, Post Treatment
and Storage of Reverse Osmosis Membranes
Advanced Process Control (APC) Systems
Regular Maintenance and Testing for Industrial Stationary Batteries
Bolted Flange Joints Assembly
Welding Procedures Review and Approval

Current
Issue

Previous
Issue

5/31/2004
6/30/2004
11/30/2005
12/28/2005
01/31/05
01/31/05
01/31/05
11/13/2010
7/30/2003
10/31/2004
10/31/2004
6/30/2003
6/30/2003
6/30/2003
6/30/2003
6/30/2004
5/31/2003
11/23/2005
5/31/2005
7/31/2004
1/4/2006
2/28/2005
12/29/2004
12/21/2005
3/15/2006
3/31/2004
12/14/2005
10/31/2004

7/30/2003
4/30/2000
1/29/2003
11/13/2005
1/29/2003
1/29/2003
1/29/2003
7/30/2003
3/29/2000
3/31/2003
10/30/2002
1/31/2000
1/31/2000
1/31/2000
1/31/2000
3/31/2001
8/30/2000
3/31/2001
9/30/2002
11/28/2001
9/29/2004
1/28/2004
12/31/2000
1/30/2002
6/30/2001
1/29/2003
2/28/2005
7/31/2004

Next
Planned
Update
6/1/2009
7/1/2009
4/1/2006
12/1/2010
2/1/2010
2/1/2010
2/1/2010
8/1/2008
8/1/2008
11/1/2009
11/1/2009
7/1/2008
7/1/2008
7/1/2008
7/1/2008
7/1/2009
6/1/2006
12/1/2010
6/1/2010
8/1/2009
1/1/2009
6/1/2009
1/1/2008
1/1/2011
3/15/2009
2/1/2008
1/1/2007
8/1/2006

7/31/2004

New

8/1/2009

11/30/2004
5/31/2004
4/30/2003
5/31/2003

New
New
New
New

12/1/2007
6/1/2009
5/1/2006
6/1/2008

Thank you for using www.freepdfconvert.com service!


Only two pages are converted. Please Sign Up to convert all pages.
https://www.freepdfconvert.com/membership

You might also like