MODELAJE Y DISEO HIDRULICO USANDO


HEC-RAS Contents
ARTICLE MAY 2014

READS

843

5 AUTHORS, INCLUDING:
Jean Hernandez

Felix Santiago

University of Puerto Rico at Mayagez

University of Puerto Rico at Mayagez

1 PUBLICATION 0 CITATIONS

6 PUBLICATIONS 0 CITATIONS

SEE PROFILE

SEE PROFILE

Angel Piero
University of Puerto Rico at Mayagez
4 PUBLICATIONS 0 CITATIONS
SEE PROFILE

Available from: Angel Piero


Retrieved on: 16 November 2015

Universidad de Puerto Rico


Recinto Universitario de Mayagez
Ingeniera Civil y Agrimensura

MODELAJE Y DISEO
HIDRULICO USANDO HEC-RAS

INCI 5006 Hidrulica Aplicada


Prof. Walter Silva Araya, Ph.D
21 de mayo de 2014

Por: ngel Piero Lugo, Oscar A. Vlez Ramos, Jean M. Hernndez


Hernndez, Flix L. Santiago Collazo, Efran Soto Valentn

Contents
Introduccin .................................................................................................................................................. 5
Alcance del Proyecto..................................................................................................................................... 5
Parte I: Quebrada sin Puente ........................................................................................................................ 6
1.

Resumen ........................................................................................................................................... 6

2.

Antecedentes .................................................................................................................................... 6

3.

Discusin ......................................................................................................................................... 12

4.

Conclusin ....................................................................................................................................... 15

Parte II- Quebrada con Puente ................................................................................................................... 16


1.

Resumen: ........................................................................................................................................ 16

2.

Antecedentes: ................................................................................................................................. 16

Puente ............................................................................................................................................. 16

Alcantarilla (Culvert) ................................................................................................................... 21

3.

Discusin y Resultados .................................................................................................................... 24

Puente ............................................................................................................................................. 24

Alcantarilla (Culvert) ................................................................................................................... 30

4.

Conclusin ....................................................................................................................................... 33

PARTE III: Mejoras en el Tramo de la Quebrada en Tierra ......................................................................... 34


1.

Resumen ......................................................................................................................................... 34

2.

Antecedentes .................................................................................................................................. 34

3.

Discusin ......................................................................................................................................... 34

4.

Conclusin ....................................................................................................................................... 43

Referencias Bibliogrficas ........................................................................................................................... 44


Apendices .................................................................................................................................................... 45
Apendice A Informe HEC-RAS (plan sin puente) .................................................................................. 45
Apendice B Informe HEC-RAS (plan con puente) ................................................................................. 74
Apendice C Informe HEC-RAS canalizacin de tramo en tierra por seccion optima ......................... 113

Lista de Figuras
FIGURA 1: VISTA DE PLANTA DEL REA DEL PROYECTO
FIGURA 2: SECCIN TRANSVERSAL TOMADA EN EL TRAMO ESTUDIADO DE LA QUEBRADA DE ORO
Modelaje y Diseo Hidrulico Usando HEC-RAS
INCI 5006 Hidrulica Aplicada

FIGURA 3: DATOS DE LA SECCIN TRANSVERSAL EN EL PROGRAMA HEC-RAS.


FIGURA 4: VISTA DE PLANTA DE LAS SECCIONES TRANSVERSALES DEL TRAMO ESTUDIADO
FIGURA 5: DISTANCIAS ENTRE SECCIONES EN EL PROGRAMA HEC-RAS
FIGURA 6: CONDICIONES DE BORDE PARA EL MODELO DE HEC-RAS DEL TRAMO ESTUDIADO.
FIGURA 7: COEFICIENTE DE MANNING EN CADA TRAMO DE LA SECCIN.
FIGURA 8: SECCIN TRANSVERSAL CON PROFUNDIDAD MXIMA.
FIGURA 9: FLUJO OBTENIDO PARA EL TRAMO ESTUDIADO.
FIGURA 10: SECCIONES TRANSVERSALES CON EL FLUJO OBTENIDO.
FIGURA 11: PROFUNDIDAD NORMAL Y CRITICA DEL TRAMO ESTUDIADO EN LA QUEBRADA DE ORO
FIGURA 12: ERRORES Y ADVERTENCIAS QUEBRADA DE ORO SIN PUENTE.
FIGURA 13: VISTA DEL PUENTE A SER ANALIZADO.
FIGURA 14: ESQUEMTICO DEL PUENTE AGUAS ABAJO (FUENTE: AUTOCAD)
FIGURA 15: ESQUEMTICO DEL PUENTE AGUAS ARRIBA (FUENTE: AUTOCAD)
FIGURA 16: DATOS DE LA CUBIERTA DEL PUENTE (FUENTE: HEC-RAS)
FIGURA 17: DATOS DEL TOPE EN PENDIENTE DEL PUENTE (FUENTE: HEC-RAS)
FIGURA 18: GEOMETRA DEL CANAL (FUENTE: HEC-RAS)
FIGURA 19: DATOS DE LA CUBIERTA DEL PUENTE PARA EL CULVERT (FUENTE: HEC-RAS)
FIGURA 20: GEOMETRA DEL CANAL CON EL CULVERT (FUENTE: HEC-RAS)
ILUSTRACIN 21: DATOS DEL CULVERT (FUENTE: HEC-RAS)
FIGURA 22: VISTA TRANSVERSAL DEL CULVERT PARA AGUAS ARRIBA Y AGUAS ABAJO (FUENTE:
HEC-RAS)
FIGURA 23: PERFIL DEL CANAL (FUENTE: HEC-RAS)
FIGURA 24: SECCIN AGUAS ARRIBA DEL PUENTE
FIGURA 25: DATOS EN LA SECCIN DEL PUENTE HACIA AGUAS ARRIBA
FIGURA 26: DATOS DEL PUENTE HACIA AGUAS ABAJO
FIGURA 27: SECCIN AGUAS ABAJO DEL PUENTE
FIGURA 28: DATOS DEL PUENTE AGUAS ARRIBA
FIGURA 29: DATOS DEL PUENTE AGUAS ABAJO
FIGURA 30: PERFIL DEL CULVERT (FUENTE: HEC-RAS)
FIGURA 31: DATOS EN LA SECCIN DE CULVERT (FUENTE: HEC-RAS)
FIGURA 32: SECCIN AGUAS ABAJO DEL CULVERT (FUENTE: HEC-RAS)
FIGURA 33: SECCIN AGUAS ARRIBA DEL CULVERT (FUENTE: HEC-RAS)
FIGURA 34: SECCIN HIDRULICA EFICIENTE TRAPEZOIDAL EN HORMIGN
FIGURA 35: NGULO DE REPOSO - RIPRAP
FIGURA 36: TRAPEZOIDE REVESTIDO CON RIPRAP
FIGURA 37: PANEL DE OPCIONES PARA MODIFICAR CANALES.
FIGURA 38: DATOS PARA MODIFICACIN CON SECCIN OPTIMA EN HORMIGN.
FIGURA 39: RESULTADOS DE COMPARACIN ENTRE CANAL DE TIERRA Y CANALIZACIN EN
HORMIGN
FIGURA 40: VISTA DE PERFIL DEL ANTES Y DESPUS DE LA CANALIZACIN EN HORMIGN.
Modelaje y Diseo Hidrulico Usando HEC-RAS
INCI 5006 Hidrulica Aplicada

FIGURA 41: COMPARACIN DE SECCIONES DEL CANAL ANTES Y DESPUS DE CANALIZACIN EN


HORMIGN

Lista de Tablas
TABLA 1: DISTANCIA ENTRE SECCIONES (M)
TABLA 2: PENDIENTES UTILIZADAS PARA DETERMINAR LAS CONDICIONES DE FRONTERA.
TABLA 3: COEFICIENTES DE MANNING UTILIZADOS EN LAS SECCIONES.
TABLA 4: RESULTADOS DEL ANLISIS DEL CANAL INSERTANDO SECCIONES DE PUENTE
TABLA 5: RESULTADOS DE ANLISIS DEL CANAL INSERTANDO CULVERT

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

Introduccin
El objetivo principal de este proyecto es generar un modelo con las condiciones
hidrulicas de la Quebrada de Oro mediante el cual se puedan realizar unos diseos
hidrulicos que ayuden a controlar la erosin en el canal natural y mitiguen las
inundaciones en el lugar. Para eso se realizar un modelo hidrulico de un tramo de la
Quebrada de Oro que se asemeje a lo que realmente existe en el lugar. Luego, realizaremos
diferentes anlisis del canal para ver el comportamiento del mismo. Adems, se estarn
realizando varias alternativas para canalizar el rea del canal natural y que este cumpla con
el flujo que recibe el mismo, pueda controlar la erosin y mitigar las inundaciones en el
tramo a estudiar.

Alcance del Proyecto


El rea del proyecto se encuentra ubicada en el municipio de Mayagez, en los predios
del Recinto Universitario de Mayagez de la Universidad de Puerto Rico. El anlisis de
proyecto comienza cerca del puente del edificio de artes plsticas (Seccin 9) y culmina en
el rea recta del canal de hormign (Seccin 0) (ver figura 1). Se realizara un estudio
hidrulico de este tramo de la Quebrada de Oro sin los puentes, con los puentes y
canalizando el canal natural.

Figura 1: Vista de Planta del rea del Proyecto

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

Parte I: Quebrada sin Puente


1.

Resumen
En esta parte del proyecto, se estar modelando el tramo estudiado en la Quebrada de
Oro sin incluir los puentes que se encuentran en dicho tramo. Esta parte del proyecto ser
utilizada para introducir las secciones transversales en el programa de HEC-RAS con sus
respectivas caractersticas. Luego de entrada todas las secciones, se proceder a calcular
un flujo mximo sin que las secciones lleguen al punto de desbordamiento. A
continuacin, los pasos y la informacin requerida para obtener dicho resultado.

2.

Antecedentes
Para poder modelar nuestro proyecto en el programa HEC-RAS, se necesita la
informacin de la geometra del canal, el flujo mximo sin que ocurra desbordamiento,
distancias entre las secciones, los coeficientes de Manning y las condiciones de fronteras
para poder realizar un proyecto que se asemeje a lo que est ocurriendo realmente en el
campo. A continuacin, la informacin utilizada para la modelacin del tramo de la
Quebrada de Oro para nuestro proyecto.
Secciones Transversales
Las secciones transversales de nuestro proyecto fueron medidas en un
levantamiento topogrfico realizado durante el semestre acadmico. Un total de
nueve (9) secciones fueron medidas para poder realizar nuestro modelaje
hidrulico de la Quebrada de Oro.
1) Geometra
La geometra de las secciones se midi en el levantamiento topogrfico.
Se consider el rea del canal y el rea de inundacin del mismo. En la
figura 1, podemos ver un ejemplo de la geometra de las secciones
medidas en el campo.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

Seccin 1
8
7
Elevacin (m)

6
5

Seccion 1

4
3
2
1
0
0

20

40

60
Estacin (m)

80

100

120

Figura 2: Seccin Transversal Tomada en el Tramo Estudiado de la Quebrada de Oro

Una vez obtenidas todas las secciones transversales del tramo a estudiar,
procedimos a introducir las secciones en el programa HEC-RAS. En la
figura 2, podemos apreciar los datos geomtricos de la seccin 1. Este
proceso se realiz para cada una de las secciones en nuestro tramo de
estudio. Una vez introducimos todas las secciones al programa, obtenemos
una vista de planta con las ubicaciones de las secciones (Ver figura 3).

Figura 3: Datos de la Seccin Transversal en el Programa HEC-RAS.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

Figura 4: Vista de Planta de las Secciones Transversales del Tramo Estudiado

2) Distancias entre Secciones

Las distancias entre secciones fueron calculadas utilizando las


coordenadas de los puntos tomados en el levantamiento
topogrfico. Son las distancias aguas abajo desde cada seccin
hasta la prxima. Por ejemplo, para la seccin 2 son las distancias
entre la Seccin 1 y la Seccin 2 y as sucesivamente. En la tabla 1,
podemos ver las distancias en metros entre las secciones
mencionadas anteriormente.
Tabla 1: Distancia entre Secciones (m)
Seccin 1 (Peatonal Mangual)
MC
ROB
114.49
117.67
Seccin 2
LOB
MC
ROB
106.09
102.26
98.77
LOB
112.09

En el programa de HEC-RAS, las distancias entre secciones se


colocan en el rea de secciones transversales ya que esto es parte
de la geometra de la seccin. Es de esta forma tambin que el
programa toma en cuenta los meandros o curvas en el canal. En la

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

figura 4, muestra un ejemplo de donde se insertan estas distancias.

Figura 5: Distancias entre Secciones en el Programa HEC-RAS

3) Condiciones de Frontera

El programa HEC-RAS necesita unas condiciones de frontera


para que sus resultados se asemejen a lo que realmente pasa en ese
cuerpo de agua. Por lo tanto, para nuestro proyecto se asignaron
condiciones de frontera aguas arriba y aguas abajo. Esto es debido
a que tenemos un posible salto hidrulico y tendramos que utilizar
un flujo mixto ya que en el salto hidrulico el flujo pasa de spercrtico a sub-crtico y por ende se tienen que tomar en cuenta
ambas condiciones de flujo.

La condicin de frontera utilizada ser la profundidad normal.


Para esto, necesitamos la pendiente promedio aguas arriba y aguas
abajo. En nuestro proyecto se utilizaron las pendientes promedios
aguas arriba y aguas abajo del salto hidrulico (Ver tabla 2). Estas
pendientes de las elevaciones del centro del canal en cada seccin
de frontera con respecto a la distancia entre ellas.
Tabla 2: Pendientes Utilizadas para Determinar las Condiciones de Frontera.

Direccin
Aguas Arriba
Aguas Abajo

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

Pendiente Promedio
0.0011
0.000629

Para introducir los datos al programa, utilizamos la opcin


Steady Flow Data y luego a Reach Boundary Conditions. El
tipo de condicin utilizada es la profundidad normal y para esta
necesitamos la pendiente. Este proceso se realiz para aguas arriba
y aguas abajo como muestra la figura 5.

Figura 6: Condiciones de Borde para el Modelo de HEC-RAS del Tramo Estudiado.

4) Coeficiente de Manning

Los coeficientes de Manning fueron asignados para cada seccin


y para ciertos tramos de la misma seccin. Debido al cambio de
superficies entre secciones se le asign el coeficiente de Manning
correspondiente a cada seccin. Tambin, en la mayora de las
secciones, los coeficientes de Manning cambian debido a que la
seccin no tiene un material uniforme. En la tabla 3, se muestran
las superficies que tenemos en el tramo estudiado y los coeficientes
de Manning utilizados para cada una de ellas.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

10

Tabla 3: Coeficientes de Manning Utilizados en las Secciones.


Lugar
Superficie
Coeficiente de Manning
Aceras
concrete trowel finish
0.013
Canal de Hormign
concrete trowel finish
0.013
Canal de tierra lado
Main Channels (b)
vegetado (izquierdo y
(Tabla Coeficientes)
0.035
central)
Canal de tierra lado
Main Channels (a)
0.030
derecho
(Tabla Coeficientes)
Planicie de grama
Floodplains Short
0.030
Grass
Carretera
Asphalt Rough
0.016

Estos coeficientes de Mannings son introducidos al programa de


HEC-RAS asignndolos a cada seccin transversal y a cada tramo
de la seccin que tenga una superficie de terreno distinta. En la
figura 6, vemos un ejemplo de una seccin y sus coeficientes de
Manning a travs de esta. Para asignarle un coeficiente de
Manning a cada tramo de la seccin hubo que modificar la entrada
de este dato. En el programa, se busca la opcin para ajustar el
coeficiente de Manning y el programa permite hacer una variacin
horizontal a travs de una misma seccin (Ver figura 6).

Figura 7: Coeficiente de Manning en Cada Tramo de la Seccin.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

11

3.

Discusin
-

Flujo
El flujo para el anlisis del tramo estudiado se obtuvo aumentando el flujo hasta
que una de las secciones llegara a su profundidad normal mxima. La figura 7
muestra la seccin transversal que determin el flujo para este proyecto. Este flujo
ser el utilizado para las partes II y III. Ese flujo es el que entra a la primera
seccin transversal aguas arriba. El flujo calculado para nuestro tramo de estudio
ser de 50 m3/s (Ver figura 8).

Figura 8: Seccin Transversal con Profundidad Mxima.

Figura 9: Flujo Obtenido para el Tramo Estudiado.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

12

Secciones
Todas las secciones cumplen con el flujo establecido. La seccin 8 es la nica
que tiene una profundidad mxima. Si aumentamos el flujo, esta seccin no
cumple por desbordamiento.

Seccin 8

Figura 10: Secciones Transversales con el Flujo Obtenido.

Profundidad Normal y Crtica


En el clculo de las profundidades crticas y normales que realiza el programa de
HEC-RAS podemos apreciar que hay una cada hidrulica. Esta cada ocurre a 140
metros de la primera seccin aguas arriba (ver figura 10). Esto ocurre debido a que la
profundidad crtica es mayor que la profundidad normal en esa rea a causa de una
pequea contraccin junto con una bajada sbita en la seccin 3. El canal tiene un
flujo sper-crtico los 100 metros siguientes aproximadamente y luego pasa
nuevamente a flujo sub-critico ocasionando un salto hidrulico en el canal.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

13

Figura 11: Profundidad Normal y Critica del Tramo Estudiado en la Quebrada de Oro

Errores o Advertencias
La mayora de las advertencias que nos brinda el programa HEC-RAS es debido a
la distancia tan grande que hay entre secciones. Las prdidas de energa, la razn de
convergencia y la velocidad en el canal estn por encima de los valores esperados.
Por esa razn, el programa nos indica que tenemos que aadir ms secciones para
disminuir o aumentar estos valores. El programa tambin nos brinda unas anotaciones
que nos indican que est ocurriendo en la seccin. En nuestro caso, las notas nos
indican que tenemos flujo sper-crtico comenzando en la seccin 3 y un salto
hidrulico entre las secciones 1 y 2.

Figura 12: Errores y Advertencias Quebrada de Oro sin Puente.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

14

4.

Conclusin
Segn el anlisis, podemos concluir que el flujo obtenido como flujo base para
nuestro tramo de estudio cumple en todas las secciones transversales. Este flujo sera
el mximo permisible ya que si aumenta tendramos desbordamiento en una de las
secciones. El modelo del canal se comporta parecido al campo ya que tambin simula
el salto hidrulico que se haba obtenido en pasados proyectos realizados en la
Quebrada y que sabamos que estaba presente. En cuanto a los avisos del programa se
puede argumentar que en nuestro caso se pueden descartar ya que la parte canalizada
es bastante uniforme y el tramo en tierra no es muy extenso lo que significa que no
vara mucho su geometra en la distancia medida. Este modelo representa bien la
topografa del campo y el comportamiento del flujo en la quebrada. Se estar
utilizando este modelo en las siguientes partes del proyecto.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

15

Parte II- Quebrada con Puente


1.

Resumen:
En la segunda parte del proyecto se analiz el canal incluyendo los puentes que
Cruzan el mismo. Para este anlisis se prosigui con el procedimiento de la parte I y
se le aadieron las secciones en los puentes. Estas secciones adicionales tomadas en
los puentes fueron insertadas en el programa HEC-RAS para analizar el canal. Por
otra parte se analizaron los puentes como Alcantarillas (Culverts). Se repiti el
procedimiento pero se le indico al programa que en lugar de ser puente sera un
Alcantarillado. Por ltimo se obtuvieron los resultados para ambos mtodos y se
compararon los resultados de los mismos. En las siguientes secciones se explica al
detalle la metodologa utilizada, los resultados y las conclusiones.

2.

Antecedentes:
Para realizar el modelaje del cruce de la carretera se utilizaron dos distintas formas.
La primera fue el modelaje de la quebrada con puente. La segunda forma fue el
modelaje de la quebrada con alcantarilla (culvert). Los dos mtodos se describen a
continuacin.

Puente
Se analiz la quebrada con el puente que conecta la Avenidas las Palmeras
con la Avenida Las Maras. Para esto se tomaron diferentes secciones aguas
arriba y aguas abajo del puente. Se midieron las invertidas en el centro y en
las esquinas del puente para obtener los detalles del puente. En la figura 13,
podemos observar dicho puente.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

16

Figura 13: Vista del Puente a Ser Analizado.

Se midi el grosor del puente y se midi el parapeto. El puente tiene una


altura de 2.9m aguas abajo y 3.05 aguas arriba. Se presenta un esquemtico
en la figura 14 para aguas abajo y en la figura 15 para aguas arriba.

Figura 14: Esquemtico del Puente Aguas Abajo (fuente: AutoCAD)

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

17

Figura 15: Esquemtico del Puente Aguas Arriba (fuente: AutoCAD)

Para el anlisis de puentes se pueden evaluar de varias maneras. Una de las


maneras es considerar el puente como un vertedor. Para esto la profundidad
del agua en el canal debe sobrepasar el parapeto del puente. Otra manera de
analizarlo es como si fuera flujo a presin en donde el nivel del agua choca
con la losa pero no se va por encima causando que la apertura del puente se
llene completamente y trabaje como flujo a presin. Tambin se podra
analizar cuando la profundidad del canal no alcance la altura del puente.
Luego correr el programa HEC-RAS y obtener la profundidad del canal en la
seccin del puente se puede determinar cul de los diferentes anlisis se
implementar.
Se introdujeron las secciones del puente en HEC-RAS. En la figura 16, se
puede observar los datos entrados al programa. Se le dio la distancia entre la
seccin ms cercana y el puente. Esta distancia fue de 0.1m ya que la ltima
seccin antes aguas arriba del puente fue relativamente la cara del puente
hacia aguas arriba. El ancho del puente se obtuvo con los valores topogrficos
obtenidos del campo.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

18

Figura 16: Datos de la Cubierta del Puente (fuente: HEC-RAS)

El rea inefectiva se obtiene insertando las elevaciones de las invertidas de


la losa del puente con su respectiva estacin. Bsicamente formando un
polgono solido de rea inefectiva. En la figura 17 se puede observar los datos
entrados al programa los cuales fueron obtenidos con los puntos topogrficos.

Figura 17: Datos del Tope en Pendiente del Puente (fuente: HEC-RAS)

Una vez se entraron todos los detalles del puente se procedi a analizar el
canal. En la figura 18 se observa la geometra del canal y se observa el puente
peatonal entre la estacin 1 y 1.04 y otro a una mayor escala entre las
secciones 3 y 4.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

19

Figura 18: Geometra del Canal (fuente: HEC-RAS)

Una vez se introdujo toda la informacin necesaria se procedi a analizar el


canal. Los resultados se muestran en la siguiente seccin.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

20

Alcantarilla (Culvert)

Del mismo modo en el que se introdujeron las secciones del puente en HECRas, se hizo lo mismo para el modelaje del culvert. Se puede observar los
datos entrados al programa para las estaciones y el high chord, tanto para
aguas arriba como para aguas abajo.

Figura 19: Datos de la Cubierta del Puente para el Culvert (fuente: HEC-RAS)

Luego de haber entrado los datos del detalle del deck/roadway se procedi a
analizar el culvert. La siguiente figura nos muestra la geometra del canal y se
puede observar el culvert entre las secciones 3 y 4.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

21

Figura 20: Geometra del Canal con el Culvert (fuente: HEC-RAS)


Se prosigui a insertar los datos requeridos para el anlisis del culvert. Para
modelar el cruce con un culvert, se necesit informacin de algunas estaciones
en las secciones 3 y 4, antes y despus del cruce de la carretera. Luego se
continu con el modelaje de la alcantarilla con el icono de add culvert y se
entraron los datos necesarios. Existen 9 distintos tipos de culverts, entre ellos
se encuentran: circular, box, pipe arch, ellipse, arch, semi-circle,
low arch, high arch y conspan arch. Dentro de estos culverts se escogi
el culvert tipo box. Se ingres el dato del ancho (span) y alto (rise) los cuales
fueron 6.2m y 3.05m respectivamente. Para los culvert tipos Box, hay que
escoger el tipo de nmero de grfica y el nmero de escala. Para el modelaje
del culvert se escogi la grfica nmero 8 flared wingwalls y con un
numero de escala 1 wingwall flared 30 a 75 grados.
Siguiente se entraron los valores de la distancia hacia aguas arriba que fue
de 0.1m y el largo del culvert de 10.57m. Para los coeficientes de prdidas de
entrada se fue a la tabla 6.4 del manual de Hec-Rass y se obtuvo un
coeficiente de prdida de 0.5. La n de Manning se obtuvo de la tabla 6.1 con
un valor de n=0.0013. La elevacin de la invertida tanto aguas arriba como
para aguas abajo fueron de 4.4m y 4.36m respectivamente. Por ultimo,
colocamos los datos de las estaciones del centro para aguas arriba y aguas
abajo, 33.91 y 106.22 respectivamente. En la siguiente figura se muestran los
datos insertados para el anlisis del culvert.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

22

Figura 21: Datos del Culvert (fuente: HEC-RAS)

En la siguiente figura se muestra una vista transversal del culvert tanto para
aguas arriba como para aguas abajo.

Figura 22: Vista Transversal del Culvert para Aguas Arriba y Aguas Abajo (fuente: HEC-RAS)

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

23

3.

Discusin y Resultados
-

Puente
Se corri el programa y se obtuvieron los resultados del mismo.
Tabla 4: Resultados del Anlisis del Canal Insertando Secciones de Puente

En el primer puente se crea una estrangulacin del flujo debido a la contraccin en


el canal esto causa que el nivel del agua sea crtico. A medida que el agua pasa por
debajo del puente el flujo se torna de crtico a supercrtico. Luego hay un cambio
hacia una pendiente ms suave la cual causa que el flujo reduzca su velocidad
pasando nuevamente a sub-crtico y por ende generando un salto hidrulico entre las
secciones 1 y 2. Se puede observar en la tabla donde los valores del nmero de
Froude cambian de mayor de 1 a menor de 1 indicando flujo que va de supercrtico a
sub crtico. Esto se puede apreciar en la figura 23, donde la raya roja entrecortada es
el nivel del agua crtico y la raya azul es el nivel real del agua. Se ve claramente que
pasa de abajo hacia arriba indicando el mismo cambio de condiciones de flujo
previamente mencionados.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

24

Figura 23: Perfil del Canal (fuente: HEC-RAS)

Tambin se midieron secciones en las caras aguas arriba y aguas abajo del puente.
Estas secciones lo son la seccin la seccin 4 y 3. Adems el programa genera unas
secciones aguas arriba y abajo del puente interpoladas dependiendo de la distancia
que se le indique que se encuentra el puente desde la seccin aguas arriba. Los
resultados para dichas secciones se pueden ver en las figuras 24, 25, 26 y 27.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

25

Figura 24: Seccin aguas arriba del Puente

Figura 25: Datos en la seccin del puente hacia Aguas Arriba

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

26

Figura 26: Datos del Puente Hacia Aguas Abajo

Figura 27: Seccin aguas Abajo del Puente

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

27

Se puede observar en la tabla de datos que entre la seccin 2 y 1 cercano al cruce


peatonal de Mangual ocurre un salto hidrulico. El nmero de Froude va de 1.81
(supercrtico) a 0.69 (Sub-crtico). Esto se puede confirmar al observar los datos
detallados para dicha seccin. El programa evala esta seccin en 2 casos. El primer
caso evala la ecuacin de energa con la profundidad crtica para la superficie de
agua. En la siguiente figura se muestran dichos datos con sus advertencias.

Figura 28: Datos del Puente Aguas Arriba

El segundo caso para este puente evala la ecuacin de energa con el error mnimo
entre los valores asumidos y computados de la superficie de agua. En la figura 29, se
observan estos datos y advertencias.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

28

Figura 29: Datos del Puente Aguas Abajo

La profundidad mxima del canal alcanza unos 1.49m mientras que la altura del
cruce de 2.92m. Por lo tanto la superficie del agua no alcanza la altura del cruce.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

29

Alcantarilla (Culvert)
La siguiente figura muestra los resultados obtenidos luego de correr el programa
con el modelaje del culvert.

Tabla 5: Resultados de Anlisis del Canal Insertando Culvert

Se puede observar en la siguiente figura que se crea un salto hidrulico aguas arriba
del culvert, convirtiendo as el flujo en uno supercrtico, y luego del culvert se
observa una cada.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

30

Figura 30: Perfil del Culvert (fuente: HEC-RAS)


La siguiente figura nos muestra los resultados para la seccin 3.5 en el culvert.

Figura 31: Datos en la Seccin de Culvert (fuente: HEC-RAS)


Modelaje y Diseo Hidrulico Usando HEC-RAS
INCI 5006 Hidrulica Aplicada

31

Las siguientes tablas muestran los resultados para la seccin 4 aguas arriba y la
seccin 3 aguas abajo al haber modelado un culvert.

Figura 32: Seccin Aguas Abajo del Culvert (fuente: HEC-RAS)

Para la seccin aguas arriba se puede observar que la profundidad mxima del canal
alcanza unos 2.58m, mientras que la altura del culvert es de 3.05m por lo tanto al
igual que sucedi en el puente la superficie del agua no alcanza la altura del culvert.

Figura 33: Seccin Aguas Arriba del Culvert (fuente: HEC-RAS)

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

32

4.

Conclusin
Al haber finalizado el modelaje tanto para el puente como para el culvert se obtuvieron
resultados los cuales nos mostraban lo que ocurrira con el canal si se construyera un
puente o un culvert. Para ambas formas de modelaje se encontr que producan una cada
hidrulica en la seccin 4 aguas arriba del canal y/o culvert, lo cual producira un flujo
supercrtico. A causa de esto se forma un salto hidrulico cierta distancia aguas abajo del
puente cuando el flujo vuelve a ser subcritico debido a la pendiente menos empinada. La
altura del puente aguas arriba y del culvert es de 3.05m. Esto es comparado con la altura
critica que producira la cada hidrulica, para el puente fue de 1.49m y para el culvert fue
de 2.58m segn es mostrado por los resultados en las tablas antes presentadas. Para los
dos casos la superficie del agua no alcanza la altura del puente y del culvert. No obstante,
es recomendado el modelaje del puente ya que es el que produce una altura crtica menor
comparado con la altura crtica del culvert y se pueden editar la geometra con ms
detalle.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

33

PARTE III: Mejoras en el Tramo de la Quebrada en Tierra

1.

Resumen
El propsito de esta parte del informe fue evaluar la posibilidad de realizarle mejoras al
canal. Se evala la posibilidad de eliminar el salto hidrulico y se sugieren ciertas
medidas para lidiar con la contraccin que lo causa. Adems se evalan varias opciones
de canalizacin como hormign o riprap demostrando que la mejor de ambas es la de
hormign.

2.

Antecedentes
Como parte de la solucin en las mejoras del tramo de la quebrada de oro, el cual une al
canal trapezoidal revestido de hormign con el canal natural de tierra. Se requera hacer
una canalizacin entre las secciones 9 y 6 el tramo de canal en tierra. Para esto se
escogieron 2 tipos de revestimiento, en hormign y en Riprap.
Adems se requera tratar de mejorar las condiciones de flujo entre las secciones 3 y 5
donde comienza el canal en hormign y termina el puente de mangual. En estas secciones
ocurre una cada hidrulica que provoca un salto hidrulico aguas debajo de puente. Se
requiere determinar si el salto hidrulico es posible eliminarlo.
Por ltimo se utilizara el programa HEC-RAS para determinar si el diseo del
revestimiento hecho con los mtodos en clase est de acuerdo con los datos del modelo
generado previamente.

3.

Discusin
-

Diseo preliminar.
Se propuso como solucin para canalizar este tramo de tierra natural el revestirlo
con un canal de seccin trapezoidal de hormign. Para esta seccin utilizamos la
seccin ptima hidrulica para asignar algunas de sus dimensiones. La seccin
hidrulica ptima es una seccin que produce una descarga mxima para un rea de
flujo especfica. Segn la teora, la seccin hidrulica ptima produce el canal ms
econmico para su construccin. Para nuestro canal propuesta la seccin hidrulica
ptima para un trapezoide es el cual tiene un ngulo de las paredes del canal de 60

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

34

grados, con respecto a la horizontal. En otras palabras, las paredes del canal revestido
con hormign debe de tener una pendiente de 1.73 m/m; lo que significa que por cada
metro que subimos nos movemos horizontalmente 0.577 metros. Este valor es uno
muy bajo, el cual produce que las paredes del revestimiento sean casi verticales,
adems nos permite utilizar un ancho de fondo menor.
Para disear nuestro canal de revestimiento de hormign utilizamos los siguientes
parmetros. Nuestro flujo de diseo fue de 50 metros cbicos por segundo, el cual es
producido por la lluvia de los 100 aos. Nuestra pendiente del fondo del canal, dada
por la diferencia en elevacin de los puntos bajos del centro del canal y distancias
entre las secciones del tramo de tierra natural fue de 0.00109 metros por metros.
Adems vamos a brindar un acabado para el hormign conocido como trowel, el
cual es un hormign de superficie rugoso, estilo la gran mayora de las aceras de
nuestros vecindarios. Este acabado brinda una rugosidad hidrulica de 0.013. Con
todos estos valores podemos determinar nuestra profundidad normal dada las
condiciones. Cabe destacar, que segn nuestros valores de campo de este tramo de la
quebrada, la profundidad mxima de nuestro canal, el cual si se sobre pasa llega al
nivel de la carretera, es de 2.80 metros. Asumiendo un ancho de fondo de 8.45
metros, utilizamos la Ecuacin de Manning y resolvemos para la profundidad normal.
Dada todas las condiciones obtuvimos una profundidad normal de 1.734 metros, el
cual produce un flujo normal de 50 metros cubico por segundo. A este nivel normal
del agua debemos aadir un freeboard, el cual depende de la profundidad normal y
de una constante C, la cual depende del flujo de diseo. El freeboard se define
como la distancia vertical desde el nivel del agua normal hasta la ancho de tope del
canal. Para nuestro canal, la constante C fue de 0.65 para as obtener un freeboard
de 1.06 metros. Por ende, nuestra profundidad total fue de 2.79 metros, la cual est
por debajo de nuestra profundidad mxima fsica provista por el canal. Adems
obtenemos un ancho de tope de 11.7 metros. Donde su rea de flujo es de 16.4
metros cuadrados y un permetro mojado de 12.5 metros, para s obtener un radio
hidrulico de la seccin de 1.3 metros. En la figura 34, se observar un esquemtico
sobre la seccin transversal propuesta para el revestimiento del canal natural.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

35

Figura 34: Seccin Hidrulica Eficiente Trapezoidal En Hormign


Nuestra segunda solucin propuesta fue el revestir este tramo de canal natural con
Riprap. Este revestimiento es uno flexible y ajustable compuesto de rocas con una
gradacin en particular. El criterio principal para este revestimiento es escoger las
dimensiones y propiedades adecuadas para que esfuerzo mximo cortante en la
frontera no exceda el esfuerzo cortante mximo para producir erosin.
Utilizando el mtodo propuesto por el National Cooperative Highway Research
Program conocido como NCHRP por sus siglas en ingls, del ao 1970. Para este
proceso asumimos un dimetro de roca de 3 pulgadas o 0.25 pies, donde asumimos
que la roca va hacer triturada. Con la siguiente figura, muestra grafica para el ngulo
de reposo de la roca, obtenida de la presentacin del profesor W. Silva, obtenemos un
ngulo de reposo de 41.5 grados

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

36

Figura 35: ngulo de Reposo - Riprap

Segn los datos de campo sobre nuestro segmento, tenemos que la pendiente de los
lados no puede ser menor de 1.5 metros, ya que esto podra causar inestabilidad en los
taludes, por lo tanto utilizamos una pendiente de los lados de 2.0 metros.
Al calcular el esfuerzo cortante crtico para que inicie el movimiento de las rocas,
con la siguiente ecuacin:
; donde
es el dimetro de las rocas en pies,
obtenemos un valor de 47.88 pascasles. Luego calculamos el valor de la rugosidad
hidrulica de la ecuacin modificada de Strickler,
, el cual nos dio
un valor de 0.0317. Asumiendo un fondo de canal de 18 metros y con el flujo pico,
podemos obtener de la ecuacin de Mannings la profundidad normal, la cual fue una
de 1.744metros. Por lo tanto obtenemos un rea de flujo de 37.48 metros cuadrados,
con un permetro mojado de 25.8 metros y un radio hidrulico de 1.45 metros.
Ahora verificando el valor de esfuerzo mximo cortante de la pared, mediante la
siguiente ecuacin:
; donde y es la profundidad normal, R es el radio
hidrulico y gama es la gravedad especifica del agua , donde se asumi una
temperatura del agua de 20 grados Celcius (

). Obtuvimos un esfuerzo

cortante mximo en la pared de 23.3 pascales, donde al comparar con el esfuerzo


cortante crtico, observamos que menor, por lo tanto nuestro diseo es uno
satisfactorio.
Como parte del diseo del revestimiento se calcul el espesor del banco, el cual es
el espesor de las rocas del revestimiento en las paredes del trapezoide, en donde se
obtuvo mediante la siguiente ecuacin:
; obtuvimos un valor de 5.25
pulgadas o 0.13 metros. Tambin se calculo el espesor del dedo, el cual es el espero

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

37

de rocas en la esquina del fondo donde termina los lados, en donde se obtuvo
mediante la siguiente ecuacin:
; obtuvimos un valor de 9 pulgadas o
0.23 metros. Podemos observar que este espesor es mucho ms grueso debido a que
en el fondo del canal existen mayores velocidades las cuales producen que se
erosione ms.
Para este canal se calcul tambin el valor de Freeboard, el cual con su valor de
la constante C de 0.65, obtuvimos un Freeboard 1.07 metros. Para as obtener una
profundidad total de 2.8 metros. Con la cual obtenemos un ancho de tope de
29.2metros. En la figura 36, podemos observar una seccin de nuestro trapezoide
revestido con Riprap.

Figura 36: Trapezoide Revestido con Riprap

Comparacin de Resultado HEC RAS


En esta parte del estudio se compararon los resultados obtenidos de las secciones
obtenidas en la parte anterior contra los resultados en HEC-RAS. Se utiliz la opcin
de Channel Modification (original) en las opciones de geometra de HEC-RAS bajo
Tools. En la figura 37, se muestra el panel para seleccionar la opcin de modificacin
de canal.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

38

Figura 37: Panel de Opciones para Modificar Canales.

Una vez seleccionada la opcin de Channel Modification procedemos a insertar los


datos del canal deseado. Al programa se le indica que se modificaran las secciones 6 a
la 9 en donde en el primer caso las revestiremos en hormign. Le indicamos al
programa que haga los cortes necesarios. Para la primera parte utilizamos la seccin
ptima de hormign trapezoidal. Adems se le indica que proyecte la pendiente
calculada anteriormente de 0.00109 m/m desde la seccin aguas arriba hacia aguas
abajo.
A continuacin la tabla de valores de entrada para la modificacin a base de los
parmetros determinados previamente (figura 38).

Figura 38: Datos para Modificacin con Seccin Optima en Hormign.

Luego de esto se guarda la data nueva de canalizacin y se procede a analizar bajo


el mismo flujo de 50 metros cbicos por segundo. Una vez el programa hace su

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

39

anlisis procedemos a comparar los datos entre las secciones que haban naturalmente
y las nuevas canalizadas. A continuacin se muestra una tabla con las diferencias
entre los valores de antes y despus de la canalizacin (figura 39).

Figura 39: Resultados de Comparacin entre Canal de Tierra y Canalizacin en Hormign

Se puede ver de la tabla de resultados del nivel del agua en las secciones aguas
arriba a disminuido alrededor de unos 0.3 metros al igual que la velocidad promedio
por unos 0.4 m/s. Podemos tener una mejor idea del comportamiento si vemos una
vista de perfil comparando ambos anlisis. La figura 40, muestra la vista de perfil
comparando ambos resultados.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

40

Figura 40: Vista de Perfil del Antes y Despus de la Canalizacin en Hormign.

De la vista en perfil se puede ver que despus de la canalizacin el nivel del agua
es mucho ms uniforme en las secciones aguas arriba. An se sigue generando el
salto hidrulico ya que solo canalizamos desde la seccin 6 a la 9 y no se
consideraron las secciones 3 a la 5 que es donde se genera un estrangulamiento del
flujo, estas se tocaran ms adelante. Adems se debe sealar que precisamente debido
a esto el nivel del agua es mayor en los cmputos de HEC-RAS ya que en los
cmputos a mano no se consider la contraccin y la baja sbita entre las secciones 3
y 5 lo cual afectan el flujo aguas arriba ya que este es sub crtico. Por ltimo se
pueden observar las diferencias entre las secciones antes de canalizar el tramo y
despus (figura 41).
En la figura 41, se puede observar que la lnea rosa es el trazado de la seccin
modificada mientras que la lnea negra es la seccin natural del canal. Adems se
puede observar la diferencia entre los niveles de agua donde la lnea azul es el del
canal natural en tierra y la lnea roja es la del canal nuevo en hormign. Se pueden ver
otros datos por cada seccin como velocidad, lnea del gradiente de energa etc.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

41

Figura 41: Comparacin de Secciones del Canal Antes y Despus de Canalizacin en Hormign

Mejoramiento de Flujo entre Secciones 3 y 5


Para esta parte del estudio se trat de realizar una canalizacin parecida a la de la
parte anterior con una pendiente que conecte uniformemente a la seccin 4 para as
evitar una bajada sbita entre las secciones 3 y 5. Se corri el programa y se encontr
que los resultados fueron bien parecidos a los de la parte anterior con mrgenes de
error despreciables. Esto nos deja saber que el salto hidrulico que ocurre en la
quebrada es mayormente a causa de sus reas inefectivas que crean una contraccin
en el flujo y retienen el agua provocando que tenga que aumentar nivel (con su
posible inundacin en el rea) su energa para poder pasar y por ende aumentando la
velocidad y llegando a estado crtico.
Se recomienda alterar este puente de manera que la contraccin no afecte tanto el
estado del flujo en conjunto con suavizar ms la pendiente ya que ocurre un cambio
sbito y esto aporta tambin a la causa. Se podra realizar una transicin ms
compleja en esa rea del puente donde se reduzcan las reas inefectivas y aumente el
paso del flujo para as reducir las probabilidades de que pase por un estado crtico
cual provoque un salto hidrulico.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

42

4.

Conclusin
Podemos concluir que, para el canal de seccin hidrulica optima, cumple con
parmetros de campo, ya que nuestro ancho de tope mximo que tiene nuestro tramo
natural es de 17 metros. Tambin, cumple con nuestra profundidad mxima del
segmento, la cual es 2.8 metros. Adems, cumple con las recomendaciones de que la
velocidad mxima para un canal revestido con hormign no es mayor a 18 ft/s, el cual
para esta seccin fue de 10 ft/s. Lo nico que tenemos que modificar seria el ancho del
fondo, ya que para este segmento nuestro ancho mximo es de 8 metros, pero nuestro
ancho de fondo de diseo es muy parecido, por ende no tendremos problemas algunos en
excavar 0.5 metros.
Al comparar la opcin de revestir el canal natural con Riprap con los parmetros fsicos
de nuestro canal, podemos ver que cumple con la profundidad mxima de nuestro canal,
el cual fue de 2.8 metros. Por otra parte, podemos ver que el ancho del fondo de canal
que cumple para nuestro diseo no cumple con el mximo fsico el cual era de 8 metros.
Adems, este diseo no cumple con el ancho mximo de tope, ya que sobre pasa los 17
metros por 12.2metros. Por lo tanto, al comparar los requisitos que cumple cada diseo,
observamos que la opcin de canalizar el tramo mediante un revestimiento de hormign
trapezoidal es la ms efectiva y apropiada para la geometra de nuestra seccin.
Podemos mencionar que al comparar los datos de las secciones canalizadas en el
modelo con el diseo a mano los resultados varan bastante. Esto se debe mayormente a
que el programa toma en cuenta el tramo entero y eso incluye la transicin del puente de
Mangual el cual afecta el flujo aguas arriba ya que antes de llegar ah es sub crtico y
todas las condiciones aguas abajo afectan el flujo aguas arriba siempre y cuando sea sub
critico lo cual causa que el flujo se aguante y suba su nivel de agua ms de los esperado
en los cmputos a mano. Adems, podemos concluir que para las condiciones presentes
en el campo del tramo en tierra el revestimiento que provee las condiciones de flujo ms
adecuadas es hormign esto se puede ver ya que los cmputos del canal en Riprap las
dimensiones del Top Width dieron mayores del espacio disponible para hacer el canal de
acuerdo con el flujo especificado y por esta misma razn no se pudo modelar en HECRAS.
Por ltimo, el salto hidrulico que se produce a cause de las condiciones geomtricas
entre las secciones 3 y 5 se debe mayormente a la contraccin del canal en esta parte del
tramo. Se trat de ajustar la pendiente del tramo pero an se generan condiciones crticas
en el puente que son causa del salto hidrulico en la quebrada canalizada. Se recomienda
reestructurar este puente o canalizar una transicin que provea un movimiento de flujo
sub crtico a travs de cauce para as evitar cambios de estado en el flujo.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

43

Referencias Bibliogrficas
USACE. (2010). HEC-RAS River Analysis System.Users Manual ver.4.1.
Silva Araya,W. (2014). Presentaciones Open Channel, Clase INCI 5006

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

44

Apendices
Apendice A Informe HEC-RAS (plan sin puente)
HEC-RAS Version 4.1.0 Jan 2010
U.S. Army Corps of Engineers
Hydrologic Engineering Center
609 Second Street
Davis, California

X XXXXXX

X X

X X

XXXX
X

XXXX

X X

X X

X X X

XXXXXXX XXXX

X X

X X

X X

X XXXXXX

X X

XXXXXX

XXXX

X X
X

XXXX

XXX XXXX

X X
XXXX

XX

X X

X
X XXXXX

PROJECT DATA
Project Title: INCI5006
Project File : INCI5006.prj

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

45

Run Date and Time: 5/21/2014 3:51:07 AM

Project in SI units

PLAN DATA

Plan Title: QUEBRADA SIN PUENTE


Plan File : C:\Users\Angel Pi\Downloads\ProyectoINCI5006( 1 y 2)\INCI5006.p02

Geometry Title: QuebradasinPuente


Geometry File : C:\Users\Angel Pi\Downloads\ProyectoINCI5006( 1 y 2)\INCI5006.g01

Flow Title

: FlujoPico

Flow File

: C:\Users\Angel Pi\Downloads\ProyectoINCI5006( 1 y 2)\INCI5006.f01

Plan Summary Information:


Number of: Cross Sections = 10

Multiple Openings = 0

Culverts

= 0

Inline Structures = 0

Bridges

= 0

Lateral Structures =

Computational Information
Water surface calculation tolerance = 0.003

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

46

Critical depth calculation tolerance = 0.003


Maximum number of iterations

= 20

Maximum difference tolerance

= 0.1

Flow tolerance factor

= 0.001

Computation Options
Critical depth computed only where necessary
Conveyance Calculation Method: At breaks in n values only
Friction Slope Method:

Average Conveyance

Computational Flow Regime:

Mixed Flow

FLOW DATA

Flow Title: FlujoPico


Flow File : C:\Users\Angel Pi\Downloads\ProyectoINCI5006( 1 y 2)\INCI5006.f01

Flow Data (m3/s)

River

Reach

Quebrada Oro

Oro

RS

PF 1
9

50

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

47

Boundary Conditions

River

Reach

Quebrada Oro

Profile

Oro

Upstream

PF 1

Normal S = 0.0011

Downstream

Normal S = 0.000629

GEOMETRY DATA

Geometry Title: QuebradasinPuente


Geometry File : C:\Users\Angel Pi\Downloads\ProyectoINCI5006( 1 y 2)\INCI5006.g01

CROSS SECTION

RIVER: Quebrada Oro


REACH: Oro

RS: 9

INPUT
Description:
Station Elevation Data

num=

25

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

48

Sta

Elev

Sta Elev

0 10.84

4.4

9.37

Sta

Elev

8.32

Sta Elev

8.56 17.32

Sta

Elev

8.31 22.77

8.31

29.25

8.44 31.79

7.89 34.95

7.57 36.27

6.95 37.61

6.69

40.34

6.17 41.96

5.59 42.64

4.82 44.76

4.62 46.16

4.87

47.2

6.54 47.96

8.01 51.93

8.25 55.13

8.28 55.24

8.14

61.36

8.16 61.45

8.3 64.63

8.29 77.34

8.39

8.43

Manning's n Values
Sta n Val
0

.03

51.93

num=

Sta n Val
8.32

Bank Sta: Left Right


34.95 47.96

Sta n Val

.016 22.77

.013 55.13

89.2

Sta n Val

.03 34.95

.016 61.45

Sta n Val

.035 46.16

.013 64.63

.03

Lengths: Left Channel Right


52.97 53.46 53.14

.03

Coeff Contr. Expan.


.1

.3

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

7.94

Element

Vel Head (m)

0.25

Wt. n-Val.

W.S. Elev (m)

7.70

Reach Len. (m)

52.97

Crit W.S. (m)

7.00

Flow Area (m2)

0.08

E.G. Slope (m/m)

0.003255

Q Total (m3/s)

50.00

Top Width (m)

14.11

Left OB Channel Right OB


0.030

Area (m2)

Flow (m3/s)
Top Width (m)

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

0.08

0.034

0.02
1.26

53.46

53.14

22.72
22.72
49.98
12.85

49

Vel Total (m/s)

2.19

Avg. Vel. (m/s)

0.30

Max Chl Dpth (m)

3.08

Conv. Total (m3/s)

876.4

Conv. (m3/s)

0.4

Length Wtd. (m)

53.46

Wetted Per. (m)

1.27

Min Ch El (m)

4.62

Alpha

1.01

Frctn Loss (m)

Note:

Shear (N/m2)

0.06

1.77
876.0

2.03

15.17
47.80

Stream Power (N/m s) 4270.71

0.16

C & E Loss (m)

Hydr. Depth (m)

2.20

Cum Volume (1000 m3)

0.01

Cum SA (1000 m2)

0.00

0.00

6.70

0.03

4.76

0.00
0.05
0.20

Manning's n values were composited to a single value in the main channel.

CROSS SECTION

RIVER: Quebrada Oro


REACH: Oro

RS: 8

INPUT
Description:
Station Elevation Data
Sta
0
15.91

Elev
8.5

num=

Sta Elev
4.39

8.43

5.99 15.94

Sta
9.57

25
Elev

Sta Elev

7.93 11.93

5.99 16.86

Sta

6.36 13.59

5.63 17.98

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

Elev
6.16

5.01 19.13

4.69

50

20.53

4.57 20.74

4.6 21.56

4.62 21.82

5 21.99

5.15

22.95

6.72 23.45

7.02 24.09

7.59 31.95

8 35.13

7.98

35.23

7.85 41.25

7.85 41.38

8 44.49

8.02 47.91

8.16

Manning's n Values
Sta n Val
0

.03

35.13

num=

Sta n Val
9.57

Sta n Val

.035 20.53

.016 41.38

Bank Sta: Left Right


9.57 24.09

8
Sta n Val

.03 24.09

.013 44.49

Sta n Val

.03 31.95

.013

.03

Lengths: Left Channel Right


51.06 51.38 53.14

Coeff Contr. Expan.

.1

.3

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

7.78

Element

Vel Head (m)

0.21

Wt. n-Val.

W.S. Elev (m)

7.56

Reach Len. (m)

Crit W.S. (m)

6.79

Flow Area (m2)

E.G. Slope (m/m)

0.002710

Q Total (m3/s)

50.00

Top Width (m)

13.93

Vel Total (m/s)

2.05

Left OB Channel Right OB

Area (m2)

Flow (m3/s)
Top Width (m)
Avg. Vel. (m/s)

Max Chl Dpth (m)

2.99

Conv. Total (m3/s)

960.4

Hydr. Depth (m)


Conv. (m3/s)

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

0.033
51.06

51.38

53.14

24.34
24.34
50.00
13.93
2.05
1.75
960.4

51

Length Wtd. (m)

51.38

Min Ch El (m)

4.57

Alpha

1.00

Frctn Loss (m)


C & E Loss (m)

Wetted Per. (m)


Shear (N/m2)

16.02
40.38

Stream Power (N/m s) 2293.83

0.26
0.05

Cum Volume (1000 m3)


Cum SA (1000 m2)

0.00
5.44
4.04

0.00
0.05
0.20

Warning: The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning: The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.
This may indicate the need for additional cross sections.
Warning: The energy loss was greater than 1.0 ft (0.3 m). between the current and previous cross
section. This may indicate the
need for additional cross sections.
Note:

Manning's n values were composited to a single value in the main channel.

CROSS SECTION

RIVER: Quebrada Oro


REACH: Oro

RS: 7

INPUT
Description:

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

52

Station Elevation Data


Sta
0

Elev

Sta

num=

Elev

9.43 12.16

34

Sta Elev

9.01 14.09

Sta

Elev

8.53 30.27

Sta Elev

8.58

42.4

8.57

52.27

8.41

60.7

8.05 61.61

6.62 62.18

6.37 63.04

6.18

63.9

5.8 64.28

5.34 64.53

4.94 66.06

4.77 67.42

4.65

67.91

4.54

68.1

4.62 68.34

4.72 68.69

4.79 69.08

4.77

69.29

4.96 69.69

5.44 70.59

5.92 70.91

6.65 72.47

7.39

73.24

7.82 77.27

7.94 78.85

7.98 79.08

7.83

7.8

85.29

7.95 88.43

7.97 98.41

7.87 118.31

7.85

Manning's n Values
Sta n Val
0

num=

Sta n Val

.03 30.27

77.27

.016

.013 78.85

Bank Sta: Left Right


60.7 73.24

85.1

Sta n Val
42.4

.03

.016 85.29

Sta n Val
60.7

Sta n Val

.035 69.08

.013 88.43

.03

Lengths: Left Channel Right


13.46 14.42 14.63

.03

Coeff Contr. Expan.

.1

.3

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

7.47

Element

Vel Head (m)

0.70

Wt. n-Val.

W.S. Elev (m)

6.77

Reach Len. (m)

Crit W.S. (m)

6.77

Flow Area (m2)

Left OB Channel Right OB

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

0.034
13.46

14.42

14.63

13.46

53

E.G. Slope (m/m)

0.012425

Q Total (m3/s)

50.00

Top Width (m)

9.64

Vel Total (m/s)

3.72

Area (m2)

Flow (m3/s)

13.46
50.00

Top Width (m)

9.64

Avg. Vel. (m/s)

3.72

Max Chl Dpth (m)

2.23

Conv. Total (m3/s)

448.6

Conv. (m3/s)

448.6

Length Wtd. (m)

14.42

Wetted Per. (m)

11.30

Min Ch El (m)

4.54

Alpha
Frctn Loss (m)
C & E Loss (m)

1.00

Hydr. Depth (m)

Shear (N/m2)

1.40

145.13

Stream Power (N/m s) 5664.43

0.02
0.16

Cum Volume (1000 m3)


Cum SA (1000 m2)

0.00
4.47
3.43

0.00
0.05
0.20

Warning: The energy equation could not be balanced within the specified number of iterations.
The program used critical depth
for the water surface and continued on with the calculations.
Warning: The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning: The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.
This may indicate the need for additional cross sections.
Warning: During the standard step iterations, when the assumed water surface was set equal to
critical depth, the calculated
water surface came back below critical depth. This indicates that there is not a valid
subcritical answer. The program
defaulted to critical depth.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

54

Note:

Manning's n values were composited to a single value in the main channel.

CROSS SECTION

RIVER: Quebrada Oro


REACH: Oro

RS: 6

INPUT
Description:
Station Elevation Data
Sta
0

Elev
7.83

num=

Sta Elev

Sta

15
Elev

6.37 7.54 12.97

Sta Elev

7.2 17.31

Sta

Elev

6.68 22.14

4.53

25.3

4.49 27.65

4.49 29.84

6.97 33.23

7.45 39.08

7.33

54.12

7.34 57.81

7.2 65.49

6.99 78.17

6.76

6.72

Manning's n Values
Sta n Val
0

num=

Sta n Val

.03 12.97

12.97 33.23

Sta n Val

.013 33.23

Bank Sta: Left Right

Sta n Val

.03 39.08

.98

Sta n Val

.016 54.12

Lengths: Left Channel Right


.96

86.4

1.06

.1

.03

Coeff Contr. Expan.


.3

CROSS SECTION OUTPUT Profile #PF 1

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

55

E.G. Elev (m)

7.29

Element

Vel Head (m)

0.18

Wt. n-Val.

W.S. Elev (m)

7.12

Reach Len. (m)

Crit W.S. (m)

6.22

Flow Area (m2)

E.G. Slope (m/m)

0.000398

Q Total (m3/s)

50.00

Top Width (m)

42.74

Vel Total (m/s)

1.56

2505.2
0.98

Alpha
Frctn Loss (m)
C & E Loss (m)

1.41

0.06

1.06

25.62

Area (m2)

6.45

25.62

6.45

48.30

Hydr. Depth (m)

1.70

17.21
1.89

25.53
0.26

1.49

0.25

Conv. (m3/s)

2420.1

85.1

Wetted Per. (m)

18.82

Shear (N/m2)

Stream Power (N/m s) 4136.66

0.00

0.030

0.98

Avg. Vel. (m/s)

Conv. Total (m3/s)

4.49

0.96

Top Width (m)

2.63

Min Ch El (m)

0.013

Flow (m3/s)

Max Chl Dpth (m)

Length Wtd. (m)

Left OB Channel Right OB

Cum Volume (1000 m3)


Cum SA (1000 m2)

5.32

25.94
0.97

0.00
4.18
3.24

0.00
0.00
0.01

Warning: Divided flow computed for this cross-section.


Warning: The cross-section end points had to be extended vertically for the computed water
surface.
Warning: The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning: The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

56

This may indicate the need for additional cross sections.

CROSS SECTION

RIVER: Quebrada Oro


REACH: Oro

RS: 5

INPUT
Description:
Station Elevation Data
Sta
0

Elev
8.12

num=

Sta Elev
6.9

18

Sta

Elev

8.13 17.08
4.49

8.09 25.08

33.29

7.78 34.42

51.47

7.99

65.3

8 68.21

94.98

7.26

98.5

7.31 103.48

Manning's n Values
Sta n Val
0

Sta n Val

.03 33.29

68.21

37.8

num=

Sta Elev

4.47

Elev

7.92 31.22

7.72

39.8

4.51 42.56

7.85

7.98 74.73

7.65 89.34

7.5

7.28

Sta n Val

.013 42.56

Sta

Sta n Val

.03 51.47

.016

Sta n Val
65.3

.013

.03

Bank Sta: Left Right


33.29 42.56

Lengths: Left Channel Right


1.87

1.81

1.79

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

.1

Coeff Contr. Expan.


.3

57

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

7.23

Element

Vel Head (m)

0.82

Wt. n-Val.

W.S. Elev (m)

6.41

Reach Len. (m)

Crit W.S. (m)

6.41

Flow Area (m2)

E.G. Slope (m/m)

0.001992

Q Total (m3/s)

50.00

Top Width (m)

7.61

Vel Total (m/s)

4.01

Left OB Channel Right OB


0.013
1.87

1.81
12.46

Area (m2)

Flow (m3/s)

12.46
50.00

Top Width (m)

7.61

Avg. Vel. (m/s)

4.01

Max Chl Dpth (m)

1.94

Conv. Total (m3/s)

1120.3

Conv. (m3/s)

1120.3

1.81

Wetted Per. (m)

9.87

Length Wtd. (m)


Min Ch El (m)
Alpha
Frctn Loss (m)
C & E Loss (m)

4.47
1.00

Hydr. Depth (m)

Shear (N/m2)

1.64

24.67

Stream Power (N/m s) 4954.40

0.00
0.00

Cum Volume (1000 m3)


Cum SA (1000 m2)

1.79

0.00

0.00

4.17
3.23

Warning: The energy equation could not be balanced within the specified number of iterations.
The program used critical depth
for the water surface and continued on with the calculations.
Warning: During the standard step iterations, when the assumed water surface was set equal to
critical depth, the calculated

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

58

water surface came back below critical depth. This indicates that there is not a valid
subcritical answer. The program
defaulted to critical depth.

CROSS SECTION

RIVER: Quebrada Oro


REACH: Oro

RS: 4

INPUT
Description:
Station Elevation Data
Sta

Elev

num=

Sta Elev
8.83

17

Sta

7.97 15.96

Elev

Sta Elev

7.94 20.19

Sta

Elev

7.91 26.25

7.95

30.3

7.96 30.82

4.4 33.02

4.43

34.6

4.47 36.17

4.47

37

4.48 39.08

7.96 43.49

7.95

51.4

7.84 63.69

7.87

86.98

7.91 127.37

Manning's n Values
Sta n Val
0

.03

7.72

num=

Sta n Val
30.3

30.3 39.08

Sta n Val

.013 39.08

Bank Sta: Left Right

.03

Sta n Val
51.4

.016 63.69

Lengths: Left Channel Right


10.52 10.67

Sta n Val

11.7

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

.1

.03

Coeff Contr. Expan.


.3

59

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

7.18

Element

Vel Head (m)

1.21

Wt. n-Val.

W.S. Elev (m)

5.97

Reach Len. (m)

Crit W.S. (m)

6.25

Flow Area (m2)

E.G. Slope (m/m)

0.003640

Q Total (m3/s)

50.00

Top Width (m)

7.30

Vel Total (m/s)

4.88

Conv. (m3/s)

Length Wtd. (m)

10.67

Wetted Per. (m)

Min Ch El (m)

4.40

10.24
50.00
7.30
4.88

Hydr. Depth (m)

Shear (N/m2)

1.40
828.7
9.50
38.50

Stream Power (N/m s) 6098.21

0.00
0.04

Cum Volume (1000 m3)


Cum SA (1000 m2)

11.70

10.24

Avg. Vel. (m/s)

828.7

C & E Loss (m)

10.67

Top Width (m)

Conv. Total (m3/s)

Frctn Loss (m)

10.52

Flow (m3/s)

1.57

1.00

0.013

Area (m2)

Max Chl Dpth (m)

Alpha

Left OB Channel Right OB

0.00

0.00

4.15
3.22

Warning: The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Note:

Program found supercritical flow starting at this cross section.

CROSS SECTION

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

60

RIVER: Quebrada Oro


REACH: Oro

RS: 3

INPUT
Description:
Station Elevation Data
Sta
0

Elev
7.63

num=

Sta Elev
.36

Sta

7.69 16.14

20
Elev

Sta Elev

7.64 37.46

Elev

7.71 37.54

7.68 77.99

109.98

4.41 114.52

7.73 118.58

7.84 154.4

7.82 185.77

7.8

190.36

7.87 192.84

7.87 197.15

7.77 229.46

7.79 260.64

7.81

Sta n Val
0

Sta n Val

.016 38.55

197.15

num=

7.57 102.46

7.67

38.55

Manning's n Values

7.72 98.13

Sta

4.41

Sta n Val

.03 98.13

4.44 105.81

Sta n Val

.013 118.58

Sta n Val

.016 185.77

.03

.016

Bank Sta: Left Right


98.13 114.52

Lengths: Left Channel Right


23.73 26.95 29.56

Coeff Contr. Expan.


.1

.3

CROSS SECTION OUTPUT Profile #PF 1

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

61

E.G. Elev (m)

7.08

Element

Vel Head (m)

1.68

Wt. n-Val.

W.S. Elev (m)

5.40

Reach Len. (m)

Crit W.S. (m)

5.92

Flow Area (m2)

E.G. Slope (m/m)

0.007450

Q Total (m3/s)

50.00

Top Width (m)

10.20

Vel Total (m/s)

5.74

Left OB Channel Right OB


0.013
23.73

26.95
8.71

Area (m2)

Flow (m3/s)

8.71
50.00

Top Width (m)


Avg. Vel. (m/s)

10.20
5.74

Max Chl Dpth (m)

0.99

Conv. Total (m3/s)

579.3

Conv. (m3/s)

579.3

Length Wtd. (m)

26.95

Wetted Per. (m)

10.84

Min Ch El (m)

4.41

Alpha
Frctn Loss (m)
C & E Loss (m)

1.00

Hydr. Depth (m)

Shear (N/m2)

0.85

58.72

Stream Power (N/m s) 12478.89

0.05
0.05

29.56

Cum Volume (1000 m3)


Cum SA (1000 m2)

0.00

0.00

4.04
3.12

Warning: The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning: The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.
This may indicate the need for additional cross sections.

CROSS SECTION

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

62

RIVER: Quebrada Oro


REACH: Oro

RS: 2

INPUT
Description:
Station Elevation Data
Sta
0

Elev

num=

Sta Elev

7.82 20.93

19

Sta

Elev

7.6 28.88

Sta Elev

7.51 29.36

Sta

Elev

7.56 29.87

7.52

29.9

7.56 31.09

7.5 52.77

7.89 78.75

7.82 84.03

7.19

84.23

6.4 88.08

4.34 91.98

4.31 94.99

4.32 98.98

7.23

119.55

7.67 119.66

Manning's n Values
Sta n Val
0

7.81 151.11

num=

Sta n Val

.016 52.77

Bank Sta: Left Right


84.03 98.98

7.84 184.79

Sta n Val

.03 78.75

7.77

Sta n Val

.013 119.66

Sta n Val

.03 151.11

Lengths: Left Channel Right


106.09 102.28 98.78

.016

Coeff Contr. Expan.


.1

.3

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

6.82

Element

Vel Head (m)

1.40

Wt. n-Val.

Left OB Channel Right OB

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

0.013

63

W.S. Elev (m)

5.42

Reach Len. (m)

Crit W.S. (m)

5.86

Flow Area (m2)

E.G. Slope (m/m)

0.005681

Q Total (m3/s)

50.00

Top Width (m)

10.44

Vel Total (m/s)

5.25

663.3
102.28

Min Ch El (m)

4.31

C & E Loss (m)

50.00
10.44
5.25

Hydr. Depth (m)

0.91

Conv. (m3/s)

Length Wtd. (m)

Frctn Loss (m)

9.53

Avg. Vel. (m/s)

Conv. Total (m3/s)

663.3

Wetted Per. (m)


Shear (N/m2)

11.07
47.96

Stream Power (N/m s) 8847.35

0.17
0.08

Cum Volume (1000 m3)


Cum SA (1000 m2)

98.78

9.53

Top Width (m)

1.11

1.00

102.28

Area (m2)

Flow (m3/s)

Max Chl Dpth (m)

Alpha

106.09

0.00

0.00

3.80
2.84

Warning: The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.

CROSS SECTION

RIVER: Quebrada Oro


REACH: Oro

RS: 1

INPUT

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

64

Description:
Station Elevation Data
Sta
0

Elev
6.87

num=

Sta Elev
8.92

30

Sta

Elev

6.66 21.73

Sta Elev

6.68 26.04

6.77

Sta

Elev

26.1

6.63

26.45

6.65 26.49

6.67

30.3

6.79 30.35

6.9 30.99

6.91

31.1

6.83 35.96

6.71 36.07

6.67 36.42

6.67 36.65

6.84

38.92 6.81 39.36

6.67 39.36

6.66 43.13

6.57 45.63

4.3

49.51

4.28 51.34

4.31 52.65

4.34 56.89

6.58 57.37

6.77

59.7

6.71 69.58

6.79 78.58

6.76 95.42

6.88 103.97

7.3

Manning's n Values
Sta n Val
0

num=

Sta n Val

.016 38.92

Bank Sta: Left Right


38.92 57.37

.013

Sta n Val
59.7

.03

Lengths: Left Channel Right


112.12 114.54 117.65

Coeff Contr. Expan.


.1

.3

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

6.58

Element

Vel Head (m)

0.35

Wt. n-Val.

W.S. Elev (m)

6.23

Reach Len. (m)

Crit W.S. (m)

5.84

Flow Area (m2)

E.G. Slope (m/m)

0.000779

Left OB Channel Right OB

Area (m2)

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

0.013
112.12

114.54

117.65

18.96
18.96

65

Q Total (m3/s)

50.00

Top Width (m)

12.72

Vel Total (m/s)

2.64

Flow (m3/s)
Top Width (m)

1.95

Conv. Total (m3/s)

1792.0

Conv. (m3/s)

Length Wtd. (m)

114.54

Wetted Per. (m)

Min Ch El (m)

4.28
1.00

Frctn Loss (m)

2.64

Hydr. Depth (m)

Shear (N/m2)

1.49
1792.0
13.93
10.39

Stream Power (N/m s) 4977.86

0.08

C & E Loss (m)

12.72

Avg. Vel. (m/s)

Max Chl Dpth (m)

Alpha

50.00

Cum Volume (1000 m3)

0.03

0.00

0.00

2.34

Cum SA (1000 m2)

1.66

Note: Hydraulic jump has occurred between this cross section and the previous upstream
section.

CROSS SECTION

RIVER: Quebrada Oro


REACH: Oro

RS: 0

INPUT
Description: Ultima Seccion Aguas Abajo (POSTE)
Station Elevation Data
Sta

Elev

num=

Sta Elev

Sta

14
Elev

Sta Elev

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

Sta

Elev

66

0 8.172

1.43 8.217

1.58 6.222

5.48 4.309

8.19 4.279

12.36 4.248 16.65 5.949 19.49 6.558 22.21 6.561 25.33 6.572
31.42 6.621 38.98 6.599 49.88 6.502 58.35

Manning's n Values
Sta n Val
0

.016

num=

Sta n Val
1.58

1.58 19.49

Sta n Val

.013 19.49

Bank Sta: Left Right

6.45

.03

Coeff Contr. Expan.


.1

.3

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

6.48

Element

Vel Head (m)

0.27

Wt. n-Val.

W.S. Elev (m)

6.21

Reach Len. (m)

Crit W.S. (m)

5.75

Flow Area (m2)

E.G. Slope (m/m)

0.000629

Q Total (m3/s)

50.00

Top Width (m)

16.26

Vel Total (m/s)

2.28

Area (m2)

Flow (m3/s)
Top Width (m)
Avg. Vel. (m/s)

Max Chl Dpth (m)

1.96

Conv. Total (m3/s)

1992.9

Length Wtd. (m)

Left OB Channel Right OB

Hydr. Depth (m)


Conv. (m3/s)

Wetted Per. (m)

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

0.013

21.92
21.92
50.00
16.26
2.28
1.35
1992.9
17.06

67

Min Ch El (m)

4.25

Alpha

1.00

Frctn Loss (m)

Shear (N/m2)

7.93

Stream Power (N/m s) 2793.67

0.00

0.00

Cum Volume (1000 m3)

C & E Loss (m)

Cum SA (1000 m2)

SUMMARY OF MANNING'S N VALUES

River:Quebrada Oro

Reach

River Sta.

n1

n2

n3

n4

n5

n6

n7

n8

Oro

.03

.016

.03

.035

.03

.013

.016

.013

Oro

.03

.035

.03

.03

.013

.016

.013

.03

Oro

.03

.016

.03

.035

.03

.013

.016

.013

Oro

.03

.013

.03

.016

.03

Oro

.03

.013

.03

.016

.013

Oro

.03

.013

.03

.016

.03

Oro

.016

.03

.013

.016

.03

Oro

.016

.03

.013

.03

.016

Oro

.016

.013

.03

Oro

.016

.013

.03

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

n9

.03

.03

.03

.016

68

SUMMARY OF REACH LENGTHS

River: Quebrada Oro

Reach

River Sta.

Left

Channel

Right

Oro

52.97

53.46

53.14

Oro

51.06

51.38

53.14

Oro

13.46

14.42

14.63

Oro

.96

.98

Oro

1.87

1.81

Oro

10.52

10.67

11.7

Oro

23.73

26.95

29.56

Oro

106.09

102.28

98.78

Oro

112.12

114.54

117.65

Oro

1.06
1.79

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

69

SUMMARY OF CONTRACTION AND EXPANSION COEFFICIENTS


River: Quebrada Oro

Reach

River Sta.

Contr.

Oro

.1

.3

Oro

.1

.3

Oro

.1

.3

Oro

.1

.3

Oro

.1

.3

Oro

.1

.3

Oro

.1

.3

Oro

.1

.3

Oro

.1

.3

Oro

.1

.3

Expan.

Profile Output Table - Standard Table 1

Reach
River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G.
Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s)
(m2)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m)

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

70

Oro
22.80

9
14.11

PF 1
0.53

50.00

4.62

7.70

7.00

7.94

0.003255

2.20

Oro
24.34

8
13.93

PF 1
0.50

50.00

4.57

7.56

6.79

7.78

0.002710

2.05

Oro
13.46

7
9.64

PF 1
1.00

50.00

4.54

6.77

6.77

7.47

0.012425

3.72

Oro
32.07

6
42.74

PF 1
0.49

50.00

4.49

7.12

6.22

7.29

0.000398

1.89

Oro
12.46

5
7.61

PF 1
1.00

50.00

4.47

6.41

6.41

7.23

0.001992

4.01

Oro
10.24

4
7.30

PF 1
1.32

50.00

4.40

5.97

6.25

7.18

0.003640

4.88

Oro
8.71

3
10.20

PF 1
1.98

50.00

4.41

5.40

5.92

7.08

0.007450

5.74

Oro
9.53

2
10.44

PF 1
1.75

50.00

4.31

5.42

5.86

6.82

0.005681

5.25

Oro
18.96

1
12.72

PF 1
0.69

50.00

4.28

6.23

5.84

6.58

0.000779

2.64

Oro
21.92

0
16.26

PF 1
0.63

50.00

4.25

6.21

5.75

6.48

0.000629

2.28

ERRORS WARNINGS AND NOTES


Errors Warnings and Notes for Plan : Quebrada

River: Quebrada Oro Reach: Oro

RS: 9

Profile: PF 1

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

71

Note: Manning's n values were composited to a single value in the main channel.
River: Quebrada Oro Reach: Oro

RS: 8

Profile: PF 1

Warning:The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning:The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.
This may indicate the need for additional cross sections.
Warning:The energy loss was greater than 1.0 ft (0.3 m). between the current and previous
cross section. This may indicate
the need for additional cross sections.
Note: Manning's n values were composited to a single value in the main channel.
River: Quebrada Oro Reach: Oro

RS: 7

Profile: PF 1

Warning:The energy equation could not be balanced within the specified number of iterations.
The program used critical depth
for the water surface and continued on with the calculations.
Warning:The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning:The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.
This may indicate the need for additional cross sections.
Warning:During the standard step iterations, when the assumed water surface was set equal to
critical depth, the calculated
water surface came back below critical depth. This indicates that there is not a valid
subcritical answer. The
program defaulted to critical depth.
Note: Manning's n values were composited to a single value in the main channel.
River: Quebrada Oro Reach: Oro

RS: 6

Profile: PF 1

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

72

Warning:Divided flow computed for this cross-section.


Warning:The cross-section end points had to be extended vertically for the computed water
surface.
Warning:The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning:The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.
This may indicate the need for additional cross sections.
River: Quebrada Oro Reach: Oro

RS: 5

Profile: PF 1

Warning:The energy equation could not be balanced within the specified number of iterations.
The program used critical depth
for the water surface and continued on with the calculations.
Warning:During the standard step iterations, when the assumed water surface was set equal to
critical depth, the calculated
water surface came back below critical depth. This indicates that there is not a valid
subcritical answer. The
program defaulted to critical depth.
River: Quebrada Oro Reach: Oro

RS: 4

Profile: PF 1

Warning:The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Note: Program found supercritical flow starting at this cross section.
River: Quebrada Oro Reach: Oro

RS: 3

Profile: PF 1

Warning:The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning:The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.
This may indicate the need for additional cross sections.
River: Quebrada Oro Reach: Oro

RS: 2

Profile: PF 1

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

73

Warning:The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
River: Quebrada Oro Reach: Oro

RS: 1

Profile: PF 1

Note: Hydraulic jump has occurred between this cross section and the previous upstream
section.

Apendice B Informe HEC-RAS (plan con puente)

HEC-RAS Version 4.1.0 Jan 2010


U.S. Army Corps of Engineers
Hydrologic Engineering Center
609 Second Street
Davis, California

X XXXXXX

X X

X X

XXXX
X

XXXX

X X

X X

X X X

XXXXXXX XXXX

X X

X X

X X

X XXXXXX

X X

XXXXXX

XXXX

X X
X

XXXX

XXX XXXX

X X
XXXX

XX

X X

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

X
X XXXXX

74

PROJECT DATA
Project Title: INCI5006
Project File : INCI5006.prj
Run Date and Time: 5/21/2014 3:56:08 AM

Project in SI units

PLAN DATA

Plan Title: QuebradaCONPUENTE


Plan File : C:\Users\Angel Pi\Downloads\ProyectoINCI5006( 1 y 2)\INCI5006.p03

Geometry Title: QuebradaconPuente


Geometry File : C:\Users\Angel Pi\Downloads\ProyectoINCI5006( 1 y 2)\INCI5006.g02

Flow Title

: FlujoPico

Flow File

: C:\Users\Angel Pi\Downloads\ProyectoINCI5006( 1 y 2)\INCI5006.f01

Plan Summary Information:


Number of: Cross Sections = 10
Culverts

= 0

Multiple Openings = 0

Inline Structures = 0

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

75

Bridges

= 2

Lateral Structures =

Computational Information
Water surface calculation tolerance = 0.003
Critical depth calculation tolerance = 0.003
Maximum number of iterations

= 20

Maximum difference tolerance

= 0.1

Flow tolerance factor

= 0.001

Computation Options
Critical depth computed only where necessary
Conveyance Calculation Method: At breaks in n values only
Friction Slope Method:

Average Conveyance

Computational Flow Regime:

Mixed Flow

FLOW DATA

Flow Title: FlujoPico


Flow File : C:\Users\Angel Pi\Downloads\ProyectoINCI5006( 1 y 2)\INCI5006.f01

Flow Data (m3/s)

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

76

River

Reach

Quebrada Oro

RS

Oro

PF 1
9

50

Boundary Conditions

River

Reach

Quebrada Oro

Profile

Oro

PF 1

Upstream

Normal S = 0.0011

Downstream

Normal S = 0.000629

GEOMETRY DATA

Geometry Title: QuebradaconPuente


Geometry File : C:\Users\Angel Pi\Downloads\ProyectoINCI5006( 1 y 2)\INCI5006.g02

CROSS SECTION

RIVER: Quebrada Oro


REACH: Oro

RS: 9

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

77

INPUT
Description:
Station Elevation Data
Sta

Elev

num=

Sta Elev

0 10.84

4.4

9.37

Sta

25
Elev

8.32

Sta Elev

8.56 17.32

Sta

Elev

8.31 22.77

8.31

29.25

8.44 31.79

7.89 34.95

7.57 36.27

6.95 37.61

6.69

40.34

6.17 41.96

5.59 42.64

4.82 44.76

4.62 46.16

4.87

47.2

6.54 47.96

8.01 51.93

8.25 55.13

8.28 55.24

8.14

61.36

8.16 61.45

8.3 64.63

8.29 77.34

8.39

8.43

Manning's n Values
Sta n Val
0

.03

51.93

num=

Sta n Val
8.32

Bank Sta: Left Right


34.95 47.96

Sta n Val

.016 22.77

.013 55.13

89.2

Sta n Val

.03 34.95

.016 61.45

Sta n Val

.035 46.16

.013 64.63

.03

.03

Lengths: Left Channel Right


52.98 53.47 53.14

Coeff Contr. Expan.


.1

.3

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

7.94

Element

Vel Head (m)

0.25

Wt. n-Val.

W.S. Elev (m)

7.69

Reach Len. (m)

Left OB Channel Right OB


0.030

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

52.98

0.034
53.47

53.14

78

Crit W.S. (m)

7.00

E.G. Slope (m/m)

0.003320

Q Total (m3/s)

50.00

Top Width (m)

14.00

Vel Total (m/s)

2.21

Flow Area (m2)

0.07

Area (m2)

Flow (m3/s)

0.07
0.02

Top Width (m)


Avg. Vel. (m/s)

22.58

49.98

1.16
0.29

3.07

Conv. Total (m3/s)

867.7

Conv. (m3/s)

0.3

Length Wtd. (m)

53.47

Wetted Per. (m)

1.16

Min Ch El (m)

4.62

Alpha

1.00

Frctn Loss (m)


C & E Loss (m)

Note:

Hydr. Depth (m)

12.84
2.21

Max Chl Dpth (m)

Shear (N/m2)

22.58

0.06

1.76
867.4

1.90

15.16
48.50

Stream Power (N/m s) 4270.71

0.16
0.01

Cum Volume (1000 m3)


Cum SA (1000 m2)

0.00
0.04

0.00
6.69
4.70

0.00
0.08
0.23

Manning's n values were composited to a single value in the main channel.

CROSS SECTION

RIVER: Quebrada Oro


REACH: Oro

RS: 8

INPUT
Description:

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

79

Station Elevation Data


Sta
0

Elev
8.5

num=

Sta Elev
4.39

25

Sta

8.43

9.57

Elev

Sta Elev

7.93 11.93

Sta

Elev

6.36 13.59

6.16

15.91

5.99 15.94

5.99 16.86

5.63 17.98

5.01 19.13

20.53

4.57 20.74

4.6 21.56

4.62 21.82

5 21.99

5.15

22.95

6.72 23.45

7.02 24.09

7.59 31.95

8 35.13

7.98

35.23

7.85 41.25

7.85 41.38

8 44.49

8.02 47.91

8.16

Manning's n Values
Sta n Val
0

.03

35.13

num=

Sta n Val
9.57

Bank Sta: Left Right


9.57 24.09

Sta n Val

.035 20.53

.016 41.38

4.69

Sta n Val

.03 24.09

.013 44.49

Sta n Val

.03 31.95

.013

.03

Lengths: Left Channel Right


51.08 51.36 53.17

Coeff Contr. Expan.

.1

.3

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

7.77

Element

Vel Head (m)

0.22

Wt. n-Val.

W.S. Elev (m)

7.55

Reach Len. (m)

Crit W.S. (m)

Left OB Channel Right OB

Flow Area (m2)

E.G. Slope (m/m)

0.002778

Q Total (m3/s)

50.00

Area (m2)

Flow (m3/s)

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

0.033
51.08

51.36

53.17

24.13
24.13
50.00

80

Top Width (m)

13.89

Vel Total (m/s)

2.07

Top Width (m)

13.89

Avg. Vel. (m/s)

2.07

Max Chl Dpth (m)

2.98

Conv. Total (m3/s)

948.7

Conv. (m3/s)

948.7

Length Wtd. (m)

51.36

Wetted Per. (m)

15.97

Min Ch El (m)

4.57

Alpha

1.00

Frctn Loss (m)


C & E Loss (m)

Hydr. Depth (m)

Shear (N/m2)

1.74

41.16

Stream Power (N/m s) 2293.83

0.23
0.03

Cum Volume (1000 m3)


Cum SA (1000 m2)

0.00
0.01

0.00
5.45
3.99

0.00
0.08
0.23

Warning: The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning: The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.
This may indicate the need for additional cross sections.
Note:

Manning's n values were composited to a single value in the main channel.

CROSS SECTION

RIVER: Quebrada Oro


REACH: Oro

RS: 7

INPUT

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

81

Description:
Station Elevation Data
Sta
0

Elev

num=

Sta Elev

9.43 12.16

34

Sta

Elev

9.01 14.09

Sta Elev

8.53 30.27

Sta

8.58

Elev

42.4

8.57

52.27

8.41

60.7

8.05 61.61

6.62 62.18

6.37 63.04

6.18

63.9

5.8 64.28

5.34 64.53

4.94 66.06

4.77 67.42

4.65

67.91

4.54

68.1

4.62 68.34

4.72 68.69

4.79 69.08

4.77

69.29

4.96 69.69

5.44 70.59

5.92 70.91

6.65 72.47

7.39

73.24

7.82 77.27

7.94 78.85

7.98 79.08

7.83

7.8

85.29

7.95 88.43

7.97 98.41

7.87 118.31

7.85

Manning's n Values
Sta n Val
0

num=

Sta n Val

.03 30.27

77.27

.016

.013 78.85

Bank Sta: Left Right


60.7 73.24

85.1

Sta n Val
42.4

.03

.016 85.29

Sta n Val
60.7

Sta n Val

.035 69.08

.013 88.43

.03

Lengths: Left Channel Right


13.45 14.41 14.62

.03

Coeff Contr. Expan.

.1

.3

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

7.51

Element

Vel Head (m)

0.51

Wt. n-Val.

W.S. Elev (m)

7.00

Reach Len. (m)

Left OB Channel Right OB

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

0.034
13.45

14.41

14.62

82

Crit W.S. (m)

Flow Area (m2)

E.G. Slope (m/m)

0.007945

Q Total (m3/s)

50.00

Top Width (m)

10.28

Vel Total (m/s)

3.17

15.79

Area (m2)

Flow (m3/s)

15.79
50.00

Top Width (m)

10.28

Avg. Vel. (m/s)

3.17

Max Chl Dpth (m)

2.46

Conv. Total (m3/s)

561.0

Conv. (m3/s)

561.0

Length Wtd. (m)

14.42

Wetted Per. (m)

12.12

Min Ch El (m)

4.54

Alpha

1.00

Frctn Loss (m)


C & E Loss (m)

Hydr. Depth (m)

Shear (N/m2)

1.54

101.49

Stream Power (N/m s) 5664.43

0.01
0.11

Cum Volume (1000 m3)


Cum SA (1000 m2)

0.00
0.01

0.00
4.42
3.37

0.00
0.08
0.23

Warning: The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning: The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.
This may indicate the need for additional cross sections.
Note:

Manning's n values were composited to a single value in the main channel.

CROSS SECTION

RIVER: Quebrada Oro

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

83

REACH: Oro

RS: 6

INPUT
Description:
Station Elevation Data
Sta
0

Elev
7.83

num=

Sta Elev
6.37

Sta

15
Elev

7.54 12.97

Sta Elev

7.2 17.31

Sta

Elev

6.68 22.14

4.53

25.3

4.49 27.65

4.49 29.84

6.97 33.23

7.45 39.08

7.33

54.12

7.34 57.81

7.2 65.49

6.99 78.17

6.76

6.72

Manning's n Values
Sta n Val
0

num=

Sta n Val

.03 12.97

12.97 33.23

Sta n Val

.013 33.23

Bank Sta: Left Right

Sta n Val

.03 39.08

Sta n Val

.016 54.12

Lengths: Left Channel Right


.96

86.4

.98

1.06

.03

Coeff Contr. Expan.

.1

.3

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

7.39

Element

Vel Head (m)

0.14

Wt. n-Val.

W.S. Elev (m)

7.25

Reach Len. (m)

Crit W.S. (m)


E.G. Slope (m/m)

Left OB Channel Right OB


0.030

Flow Area (m2)


0.000314

Area (m2)

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

0.013

0.96
0.02

0.030

0.98
28.03

0.02

1.06
10.15

28.03

10.15

84

Q Total (m3/s)

50.00

Top Width (m)

49.68

Vel Total (m/s)

1.31

Flow (m3/s)
Top Width (m)
Avg. Vel. (m/s)

Max Chl Dpth (m)

2.76

Conv. Total (m3/s)

Alpha

0.05

Conv. (m3/s)

0.98

Wetted Per. (m)


Shear (N/m2)

18.84

0.04

29.89
0.28

1.49

0.34

0.1

2658.2

162.8

0.96

20.47

30.42

0.08

4.22

Stream Power (N/m s) 4136.66

0.00

2.89

1.68

2821.1

1.56

C & E Loss (m)

0.95

0.02

4.49

Frctn Loss (m)

47.11

Hydr. Depth (m)

Length Wtd. (m)


Min Ch El (m)

0.00

Cum Volume (1000 m3)


Cum SA (1000 m2)

0.00
0.00

1.03

0.00
4.10
3.16

0.00
0.01
0.02

Warning: Divided flow computed for this cross-section.


Warning: The cross-section end points had to be extended vertically for the computed water
surface.
Warning: The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning: The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.
This may indicate the need for additional cross sections.

CROSS SECTION

RIVER: Quebrada Oro

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

85

REACH: Oro

RS: 5

INPUT
Description:
Station Elevation Data
Sta

Elev

0 8.12

num=

Sta Elev
6.9

18

Sta

Elev

8.13 17.08
4.49

8.09 25.08

33.29

7.78 34.42

51.47

7.99

65.3

8 68.21

94.98

7.26

98.5

7.31 103.48

Manning's n Values
Sta n Val
0

.03 33.29

68.21

37.8

num=

Sta n Val

Sta Elev

4.47

Sta

Elev

7.92 31.22

7.72

39.8

4.51 42.56

7.85

7.98 74.73

7.65 89.34

7.5

7.28

Sta n Val

.013 42.56

Sta n Val

.03 51.47

.016

Sta n Val
65.3

.013

.03

Bank Sta: Left Right


33.29 42.56

Lengths: Left Channel Right


1.87

1.81

1.79

Coeff Contr. Expan.

.1

.3

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

7.35

Element

Vel Head (m)

0.50

Wt. n-Val.

W.S. Elev (m)

6.84

Reach Len. (m)

Left OB Channel Right OB

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

0.013
1.87

1.81

1.79

86

Crit W.S. (m)

Flow Area (m2)

E.G. Slope (m/m)

0.001008

Q Total (m3/s)

50.00

Top Width (m)

8.12

Vel Total (m/s)

3.14

15.91

Area (m2)

Flow (m3/s)

15.91
50.00

Top Width (m)

8.12

Avg. Vel. (m/s)

3.14

Max Chl Dpth (m)

2.38

Conv. Total (m3/s)

1574.6

Conv. (m3/s)

1574.6

1.81

Wetted Per. (m)

10.90

Length Wtd. (m)


Min Ch El (m)

4.47

Alpha

1.00

Frctn Loss (m)

Shear (N/m2)

1.96

14.43

Stream Power (N/m s) 4954.40

0.00

C & E Loss (m)

Hydr. Depth (m)

Cum Volume (1000 m3)

0.02

0.00

0.00

4.08

Cum SA (1000 m2)

3.14

CROSS SECTION

RIVER: Quebrada Oro


REACH: Oro

RS: 4

INPUT
Description:
Station Elevation Data
Sta

Elev

num=

Sta Elev

Sta

17
Elev

Sta Elev

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

Sta

Elev

87

8.83

7.97 15.96

7.94 20.19

7.91 26.25

7.95

30.3

7.96 30.82

4.4 33.02

4.43

34.6

4.47 36.17

4.47

37

4.48 39.08

7.96 43.49

7.95

51.4

7.84 63.69

7.87

86.98

7.91 127.37

Manning's n Values
Sta n Val
0

.03

7.72

num=

Sta n Val
30.3

Sta n Val

.013 39.08

Bank Sta: Left Right


30.3 39.08

5
Sta n Val

.03

51.4

.016 63.69

Lengths: Left Channel Right


10.52 10.67

Sta n Val

11.7

.03

Coeff Contr. Expan.

.1

.3

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

7.32

Element

Vel Head (m)

0.42

Wt. n-Val.

W.S. Elev (m)

6.90

Reach Len. (m)

Crit W.S. (m)

6.26

Flow Area (m2)

E.G. Slope (m/m)

0.000811

Q Total (m3/s)

50.00

Top Width (m)

7.99

Vel Total (m/s)

2.88

Left OB Channel Right OB

Area (m2)

Flow (m3/s)
Top Width (m)
Avg. Vel. (m/s)

Max Chl Dpth (m)

2.50

Conv. Total (m3/s)

1756.2

Hydr. Depth (m)


Conv. (m3/s)

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

0.013
0.10

0.10

0.10

17.37
17.37
50.00
7.99
2.88
2.17
1756.2

88

Length Wtd. (m)

0.10

Min Ch El (m)
Alpha

Wetted Per. (m)

4.40
1.00

Frctn Loss (m)

11.98

Stream Power (N/m s) 6098.21

0.00

C & E Loss (m)

Shear (N/m2)

11.53

Cum Volume (1000 m3)

0.05

Cum SA (1000 m2)

0.00

0.00

4.05
3.13

Warning: The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning: The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.
This may indicate the need for additional cross sections.

BRIDGE

RIVER: Quebrada Oro


REACH: Oro

RS: 3.5

INPUT
Description:
Distance from Upstream XS =
Deck/Roadway Width
Weir Coefficient

.1

= 10.51
=

1.4

Upstream Deck/Roadway Coordinates

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

89

num=

Sta Hi Cord Lo Cord


30.3

8.85

Sta Hi Cord Lo Cord

7.45 39.08

8.85

7.45

Upstream Bridge Cross Section Data


Station Elevation Data
Sta

Elev

num=

Sta Elev
8.83

17

Sta

7.97 15.96

Elev

Sta Elev

7.94 20.19

Sta

Elev

7.91 26.25

7.95

30.3

7.96 30.82

4.4 33.02

4.43

34.6

4.47 36.17

4.47

37

4.48 39.08

7.96 43.49

7.95

51.4

7.84 63.69

7.87

86.98

7.91 127.37

Manning's n Values
Sta n Val
0

7.72

num=

.03

Sta n Val
30.3

Sta n Val

.013 39.08

Bank Sta: Left Right


30.3 39.08

.03

Sta n Val
51.4

Sta n Val

.016 63.69

.03

Coeff Contr. Expan.


.1

.3

Downstream Deck/Roadway Coordinates


num=

Sta Hi Cord Lo Cord

Sta Hi Cord Lo Cord

77.99

7.72

0 98.13

102.46

8.74

7.32 105.81

7.84
8.74

7.32 98.13

Sta Hi Cord Lo Cord


8.74

7.32 114.52

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

7.32

8.74

7.32

90

114.52

7.82

0 154.4

7.82

Downstream Bridge Cross Section Data


Station Elevation Data
Sta
0

Elev
7.63

num=

Sta Elev
.36

20

Sta

Elev

7.69 16.14

Sta

Elev

7.64 37.46

Elev

7.71 37.54

7.68 77.99

109.98

4.41 114.52

7.73 118.58

7.84 154.4

7.82 185.77

7.8

190.36

7.87 192.84

7.87 197.15

7.77 229.46

7.79 260.64

7.81

Sta n Val
0

Sta n Val

.016 38.55

197.15

num=

7.57 102.46

7.67

38.55

Manning's n Values

7.72 98.13

Sta

4.44 105.81

4.41

Sta n Val

.03 98.13

Sta n Val

.013 118.58

Sta n Val

.016 185.77

.03

.016

Bank Sta: Left Right


98.13 114.52

Coeff Contr. Expan.


.1

.3

Upstream Embankment side slope

Downstream Embankment side slope

0 horiz. to 1.0 vertical


=

0 horiz. to 1.0 vertical

Maximum allowable submergence for weir flow =


Elevation at which weir flow begins

Energy head used in spillway design

Spillway height used in design

.98

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

91

Weir crest shape

= Broad Crested

Number of Abutments = 2

Abutment Data
Upstream

num=

Sta

Elev

30.3

7.45 30.82

Downstream
Sta

Sta Elev
7.45

num=

Elev

94.13

Sta Elev

7.32 102.46

7.32

Abutment Data
Upstream

num=

Sta

Elev

37

7.45 39.08

Downstream
Sta
109.98

Elev

Sta Elev

num=

7.45
2

Sta Elev

7.32 118.58

7.32

Number of Bridge Coefficient Sets = 1

Low Flow Methods and Data


Energy

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

92

Selected Low Flow Methods = Highest Energy Answer

High Flow Method


Energy Only

Additional Bridge Parameters


Add Friction component to Momentum
Do not add Weight component to Momentum
Class B flow critical depth computations use critical depth
inside the bridge at the upstream end
Criteria to check for pressure flow = Upstream energy grade line

BRIDGE OUTPUT Profile #PF 1

E.G. US. (m)

7.32

Element

W.S. US. (m)

6.90

E.G. Elev (m)

Q Total (m3/s)

50.00

W.S. Elev (m)

6.33

5.62

Crit W.S. (m)

6.33

6.07

Q Weir (m3/s)

Max Chl Dpth (m)

1.93

1.21

Weir Sta Lft (m)

Vel Total (m/s)

Weir Sta Rgt (m)

Flow Area (m2)

Weir Submerg

Froude # Chl

Q Bridge (m3/s)

50.00

Weir Max Depth (m)


Min El Weir Flow (m)

Inside BR US Inside BR DS

Specif Force (m3)


7.72

Hydr Depth (m)

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

7.27

7.17

4.30

5.51

11.63
1.00

9.07
1.60

32.85
1.88

32.47
1.21

93

Min El Prs (m)

7.45

W.P. Total (m)

9.96

Delta EG (m)

0.17

Conv. Total (m3/s)

992.3

657.6

Delta WS (m)

1.52

Top Width (m)

6.18

7.52

BR Open Area (m2)

18.57

BR Open Vel (m/s)

5.51

Coef of Q

Shear Total (N/m2)

Br Sel Method

9.92

Frctn Loss (m)

0.04

C & E Loss (m)

0.06
29.08

Energy only Power Total (N/m s)

51.86
0.00

0.00

Warning: For the final momentum answer at the bridge, the upstream energy was computed
lower than the downstream energy.
This is not physically possible, the momentum answer has been disregarded.
Warning: The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning: The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.
This may indicate the need for additional cross sections.
Note:

The energy method has computed a class B profile.

CROSS SECTION

RIVER: Quebrada Oro


REACH: Oro

RS: 3

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

94

INPUT
Description:
Station Elevation Data
Sta
0

Elev
7.63

num=

Sta Elev
.36

Sta

7.69 16.14

20
Elev

Sta

7.64 37.46

Sta

Elev

7.71 37.54

7.68 77.99

109.98

4.41 114.52

7.73 118.58

7.84 154.4

7.82 185.77

7.8

190.36

7.87 192.84

7.87 197.15

7.77 229.46

7.79 260.64

7.81

Sta n Val
0

Sta n Val

.016 38.55

197.15

num=

7.57 102.46

7.67

38.55

Manning's n Values

7.72 98.13

Elev

4.41

Sta n Val

.03 98.13

4.44 105.81

Sta n Val

.013 118.58

Sta n Val

.016 185.77

.03

.016

Bank Sta: Left Right


98.13 114.52

Lengths: Left Channel Right


23.74 26.95 29.56

Coeff Contr. Expan.


.1

.3

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

7.15

Element

Vel Head (m)

1.77

Wt. n-Val.

W.S. Elev (m)

5.38

Reach Len. (m)

Crit W.S. (m)

5.92

Flow Area (m2)

E.G. Slope (m/m)

0.008071

Left OB Channel Right OB

Area (m2)

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

0.013
23.74

26.95

29.56

8.48
8.48

95

Q Total (m3/s)

50.00

Top Width (m)

10.14

Vel Total (m/s)

5.90

Flow (m3/s)

50.00

Top Width (m)


Avg. Vel. (m/s)

10.14
5.90

Max Chl Dpth (m)

0.97

Conv. Total (m3/s)

556.6

Conv. (m3/s)

556.6

Length Wtd. (m)

26.95

Wetted Per. (m)

10.76

Min Ch El (m)

4.41

Alpha

1.00

Frctn Loss (m)


C & E Loss (m)

Hydr. Depth (m)

Shear (N/m2)

0.84

62.37

Stream Power (N/m s) 12478.89

0.00

Cum Volume (1000 m3)

0.02

Cum SA (1000 m2)

0.00

0.00

3.94
3.06

Warning: The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Note:

The energy method has computed a class B profile.

CROSS SECTION

RIVER: Quebrada Oro


REACH: Oro

RS: 2

INPUT
Description:
Station Elevation Data

num=

19

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

96

Sta
0

Elev

Sta Elev

7.82 20.93

Sta

Elev

7.6 28.88

Sta Elev

7.51 29.36

Sta

Elev

7.56 29.87

7.52

29.9

7.56 31.09

7.5 52.77

7.89 78.75

7.82 84.03

7.19

84.23

6.4 88.08

4.34 91.98

4.31 94.99

4.32 98.98

7.23

119.55

7.67 119.66

Manning's n Values
Sta n Val
0

7.81 151.11

num=

Sta n Val

.016 52.77

Bank Sta: Left Right


84.03 98.98

7.84 184.79

7.77

Sta n Val

.03 78.75

Sta n Val

.013 119.66

Sta n Val

.03 151.11

Lengths: Left Channel Right


106.09 102.26 98.77

.016

Coeff Contr. Expan.


.1

.3

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

6.87

Element

Vel Head (m)

1.47

Wt. n-Val.

W.S. Elev (m)

5.40

Reach Len. (m)

Crit W.S. (m)

5.86

Flow Area (m2)

E.G. Slope (m/m)

0.006109

Q Total (m3/s)

50.00

Top Width (m)

10.37

Vel Total (m/s)

5.38

Max Chl Dpth (m)

Left OB Channel Right OB

Area (m2)

Flow (m3/s)
Top Width (m)
Avg. Vel. (m/s)

1.09

Hydr. Depth (m)

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

0.013
95.56

95.56

95.56

9.30
9.30
50.00
10.37
5.38
0.90

97

Conv. Total (m3/s)

639.7

Length Wtd. (m)


Min Ch El (m)
Alpha

Conv. (m3/s)

Wetted Per. (m)

10.99

Shear (N/m2)

50.69

4.31
1.00

Frctn Loss (m)

Stream Power (N/m s) 8847.35

0.19

C & E Loss (m)

639.7

Cum Volume (1000 m3)

0.09

Cum SA (1000 m2)

0.00

0.00

3.70
2.78

Warning: The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.

BRIDGE

RIVER: Quebrada Oro


REACH: Oro

RS: 1.04

INPUT
Description: Peatonal de Mangual
Distance from Upstream XS = 95.56
Deck/Roadway Width
Weir Coefficient

= 6.68
=

1.4

Upstream Deck/Roadway Coordinates


num=

Sta Hi Cord Lo Cord

Sta Hi Cord Lo Cord

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

98

84.03

8.79

7.19 98.98

8.83

7.23

Upstream Bridge Cross Section Data


Station Elevation Data
Sta
0

Elev

num=

Sta Elev

7.82 20.93

19

Sta

Elev

7.6 28.88

Sta Elev

7.51 29.36

Sta

Elev

7.56 29.87

7.52

29.9

7.56 31.09

7.5 52.77

7.89 78.75

7.82 84.03

7.19

84.23

6.4 88.08

4.34 91.98

4.31 94.99

4.32 98.98

7.23

119.55

7.67 119.66

7.81 151.11

Manning's n Values
Sta n Val
0

num=

Sta n Val

.016 52.77

84.03 98.98

7.77

Sta n Val

.03 78.75

Bank Sta: Left Right

7.84 184.79

Sta n Val

.013 119.66

Sta n Val

.03 151.11

.016

Coeff Contr. Expan.


.1

.3

Downstream Deck/Roadway Coordinates


num=

Sta Hi Cord Lo Cord


43.13

8.17

Sta Hi Cord Lo Cord

6.57 56.89

8.18

6.58 57.37

Sta Hi Cord Lo Cord


8.18

6.77

Downstream Bridge Cross Section Data


Station Elevation Data

num=

30

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

99

Sta
0

Elev
6.87

Sta Elev
8.92

Sta

Elev

6.66 21.73

Sta

Elev

6.68 26.04

6.77

Sta

Elev

26.1

6.63

26.45

6.65 26.49

6.67

30.3

6.79 30.35

6.9 30.99

6.91

31.1

6.83 35.96

6.71 36.07

6.67 36.42

6.67 36.65

6.84

38.92

6.81 39.36

6.67 39.36

6.66 43.13

6.57 45.63

4.3

49.51

4.28 51.34

4.31 52.65

4.34 56.89

6.58 57.37

6.77

59.7

6.71 69.58

6.79 78.58

6.76 95.42

6.88 103.97

7.3

Manning's n Values
Sta n Val
0

num=

Sta n Val

.016 38.92

Bank Sta: Left Right


43.13 56.89

.013

Sta n Val
59.7

.03

Coeff Contr. Expan.


.1

.3

Upstream Embankment side slope

Downstream Embankment side slope

0 horiz. to 1.0 vertical


=

0 horiz. to 1.0 vertical

Maximum allowable submergence for weir flow =


Elevation at which weir flow begins

Energy head used in spillway design

Spillway height used in design


Weir crest shape

.98

=
= Broad Crested

Number of Bridge Coefficient Sets = 1

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

100

Low Flow Methods and Data


Energy
Selected Low Flow Methods = Highest Energy Answer

High Flow Method


Energy Only

Additional Bridge Parameters


Add Friction component to Momentum
Do not add Weight component to Momentum
Class B flow critical depth computations use critical depth
inside the bridge at the upstream end
Criteria to check for pressure flow = Upstream energy grade line

BRIDGE OUTPUT Profile #PF 1

E.G. US. (m)

6.87

Element

W.S. US. (m)

5.40

E.G. Elev (m)

Q Total (m3/s)

50.00

W.S. Elev (m)

6.24

6.23

Crit W.S. (m)

5.86

5.85

Q Weir (m3/s)

Max Chl Dpth (m)

1.93

1.95

Weir Sta Lft (m)

Vel Total (m/s)

Weir Sta Rgt (m)

Flow Area (m2)

Q Bridge (m3/s)

50.00

Inside BR US Inside BR DS

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

6.59

2.60
19.22

6.58

2.64
18.96

101

Weir Submerg

Froude # Chl

Weir Max Depth (m)


Min El Weir Flow (m)

0.69

Specif Force (m3)


7.19

0.69

29.82

Hydr Depth (m)

29.94

1.47

1.49

Min El Prs (m)

7.23

W.P. Total (m)

14.21

Delta EG (m)

0.19

Conv. Total (m3/s)

1807.5

1791.9

Delta WS (m)

-0.83

Top Width (m)

13.11

12.72

BR Open Area (m2)

23.56

BR Open Vel (m/s)

2.64

Coef of Q

Shear Total (N/m2)

Br Sel Method

13.93

Frctn Loss (m)

0.01

C & E Loss (m)

0.00
10.15

Energy only Power Total (N/m s)

10.40
0.00

0.00

Note: Momentum answer is not valid if the water surface is above the low chord or if there is
weir flow. The momentum
answer has been disregarded.
Warning: The energy equation could not be balanced within the specified number of iterations.
The program used critical depth
for the water surface and continued on with the calculations.
Warning: The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning: The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.
This may indicate the need for additional cross sections.
Warning: The energy loss was greater than 1.0 ft (0.3 m). between the current and previous cross
section. This may indicate the
need for additional cross sections.
Warning: The energy equation could not be balanced within the specified number of iterations.
Modelaje y Diseo Hidrulico Usando HEC-RAS
INCI 5006 Hidrulica Aplicada

102

The program selected the water


surface that had the least amount of error between computed and assumed values.

CROSS SECTION

RIVER: Quebrada Oro


REACH: Oro

RS: 1

INPUT
Description:
Station Elevation Data
Sta
0

Elev
6.87

num=

Sta Elev
8.92

30

Sta

Elev

6.66 21.73

Sta Elev

6.68 26.04

6.77

Sta

Elev

26.1

6.63

26.45

6.65 26.49

6.67

30.3

6.79 30.35

6.9 30.99

6.91

31.1

6.83 35.96

6.71 36.07

6.67 36.42

6.67 36.65

6.84

38.92

6.81 39.36

6.67 39.36

6.66 43.13

6.57 45.63

4.3

49.51

4.28 51.34

4.31 52.65

4.34 56.89

6.58 57.37

6.77

59.7

6.71 69.58

6.79 78.58

6.76 95.42

6.88 103.97

7.3

Manning's n Values
Sta n Val
0

num=

Sta n Val

.016 38.92

.013

Sta n Val
59.7

.03

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

103

Bank Sta: Left Right

Lengths: Left Channel Right

43.13 56.89

112.09 114.49 117.67

Coeff Contr. Expan.


.1

.3

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

6.58

Element

Vel Head (m)

0.35

Wt. n-Val.

W.S. Elev (m)

6.23

Reach Len. (m)

Crit W.S. (m)

5.84

Flow Area (m2)

E.G. Slope (m/m)

0.000779

Q Total (m3/s)

50.00

Top Width (m)

12.72

Vel Total (m/s)

2.64

Conv. (m3/s)

Length Wtd. (m)

114.49

Wetted Per. (m)

Min Ch El (m)

4.28

18.96
50.00
12.72
2.64

Hydr. Depth (m)

Shear (N/m2)

1.49
1791.9
13.93
10.40

Stream Power (N/m s) 4977.86

0.00
0.00

Cum Volume (1000 m3)


Cum SA (1000 m2)

117.67

18.96

Avg. Vel. (m/s)

1791.9

C & E Loss (m)

114.49

Top Width (m)

Conv. Total (m3/s)

Frctn Loss (m)

112.09

Flow (m3/s)

1.95

1.00

0.013

Area (m2)

Max Chl Dpth (m)

Alpha

Left OB Channel Right OB

0.00

0.00

2.34
1.66

CROSS SECTION

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

104

RIVER: Quebrada Oro


REACH: Oro

RS: 0

INPUT
Description: Ultima Seccion Aguas Abajo (POSTE)
Station Elevation Data
Sta

num=

Elev

Sta Elev

0 8.172

1.43 8.217

14

Sta

Elev

Sta Elev

1.58 6.222

Sta

5.48 4.309

Elev

8.19 4.279

12.36 4.248 16.65 5.949 19.49 6.558 22.21 6.561 25.33 6.572
31.42 6.621 38.98 6.599 49.88 6.502 58.35

Manning's n Values
Sta n Val
0

.016

num=

Sta n Val
1.58

1.58 19.49

Sta n Val

.013 19.49

Bank Sta: Left Right

6.45

.03

Coeff Contr. Expan.


.1

.3

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

6.48

Element

Vel Head (m)

0.27

Wt. n-Val.

W.S. Elev (m)

6.21

Reach Len. (m)

Left OB Channel Right OB

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

0.013

105

Crit W.S. (m)

5.75

Flow Area (m2)

E.G. Slope (m/m)

0.000629

Q Total (m3/s)

50.00

Top Width (m)

16.26

Vel Total (m/s)

2.28

1992.9

Alpha

1.00

Frctn Loss (m)

50.00
16.26

Avg. Vel. (m/s)

Conv. Total (m3/s)

4.25

21.92

Top Width (m)

1.96

Min Ch El (m)

Area (m2)

Flow (m3/s)

Max Chl Dpth (m)

Length Wtd. (m)

21.92

2.28

Hydr. Depth (m)

1.35

Conv. (m3/s)

1992.9

Wetted Per. (m)

17.06

Shear (N/m2)

7.93

Stream Power (N/m s) 2793.67

0.00

0.00

Cum Volume (1000 m3)

C & E Loss (m)

Cum SA (1000 m2)

Note: Hydraulic jump has occurred between this cross section and the previous upstream
section.

SUMMARY OF MANNING'S N VALUES

River:Quebrada Oro

Reach

River Sta.

n1

n2

n3

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

n4

n5

n6

n7

n8

n9

106

Oro

.03

.016

.03

.035

.03

.013

.016

.013

Oro

.03

.035

.03

.03

.013

.016

.013

.03

Oro

.03

.016

.03

.035

.03

.013

.016

.013

Oro

.03

.013

.03

.016

.03

Oro

.03

.013

.03

.016

.013

Oro

.03

.013

.03

.016

.03

Oro

3.5

Oro

.016

.03

.013

.016

.03

Oro

.016

.03

.013

.03

.016

Oro

1.04

Oro

.016

.013

.03

Oro

.016

.013

.03

.03

.03

.03

Bridge
.016

Bridge

SUMMARY OF REACH LENGTHS

River: Quebrada Oro

Reach

River Sta.

Left

Channel

Right

Oro

52.98

53.47

53.14

Oro

51.08

51.36

53.17

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

107

Oro

13.45

14.41

14.62

Oro

.96

.98

Oro

1.87

1.81

Oro

10.52

10.67

11.7

Oro

3.5

Oro

23.74

26.95

29.56

Oro

106.09

102.26

98.77

Oro

1.04

Bridge

Oro

112.09

114.49

117.67

Oro

1.06
1.79

Bridge

SUMMARY OF CONTRACTION AND EXPANSION COEFFICIENTS


River: Quebrada Oro

Reach

River Sta.

Contr.

Oro

.1

.3

Oro

.1

.3

Oro

.1

.3

Oro

.1

.3

Expan.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

108

Oro

.1

.3

Oro

.1

.3

Oro

3.5

Oro

.1

.3

Oro

.1

.3

Oro

1.04

Oro

.1

.3

Oro

.1

.3

Bridge

Bridge

Profile Output Table - Standard Table 1

Reach
River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G.
Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s)

(m)

(m)

(m)

(m)

(m/m)

(m/s)

(m2)

(m)

Oro
22.65

9
14.00

PF 1
0.53

50.00

4.62

7.69

Oro
24.13

8
13.89

PF 1
0.50

50.00

4.57

7.55

7.77

0.002778

2.07

Oro
15.79

7
10.28

PF 1
0.82

50.00

4.54

7.00

7.51

0.007945

3.17

Oro
38.20

6
49.68

PF 1
0.44

50.00

4.49

7.25

7.39

0.000314

1.68

Oro
15.91

5
8.12

PF 1
0.72

50.00

4.47

6.84

7.35

0.001008

3.14

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

7.00

7.94

0.003320

2.21

109

Oro
17.37

4
7.99

PF 1
0.62

Oro

3.5

Oro
8.48

3
10.14

PF 1
2.06

Oro
9.30

2
10.37

PF 1
1.81

50.00

4.40

6.90

6.26

7.32

0.000811

2.88

50.00

4.41

5.38

5.92

7.15

0.008071

5.90

50.00

4.31

5.40

5.86

6.87

0.006109

5.38

Bridge

Oro

1.04

Bridge

Oro
18.96

1
12.72

PF 1
0.69

50.00

4.28

6.23

5.84

6.58

0.000779

2.64

Oro
21.92

0
16.26

PF 1
0.63

50.00

4.25

6.21

5.75

6.48

0.000629

2.28

ERRORS WARNINGS AND NOTES


Errors Warnings and Notes for Plan : Puente

River: Quebrada Oro Reach: Oro

RS: 9

Profile: PF 1

Note: Manning's n values were composited to a single value in the main channel.
River: Quebrada Oro Reach: Oro

RS: 8

Profile: PF 1

Warning:The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning:The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.
This may indicate the need for additional cross sections.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

110

Note: Manning's n values were composited to a single value in the main channel.
River: Quebrada Oro Reach: Oro

RS: 7

Profile: PF 1

Warning:The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning:The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.
This may indicate the need for additional cross sections.
Note: Manning's n values were composited to a single value in the main channel.
River: Quebrada Oro Reach: Oro

RS: 6

Profile: PF 1

Warning:Divided flow computed for this cross-section.


Warning:The cross-section end points had to be extended vertically for the computed water
surface.
Warning:The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning:The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.
This may indicate the need for additional cross sections.
River: Quebrada Oro Reach: Oro

RS: 4

Profile: PF 1

Warning:The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning:The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.
This may indicate the need for additional cross sections.
River: Quebrada Oro Reach: Oro

RS: 3.5

Profile: PF 1

Warning:For the final momentum answer at the bridge, the upstream energy was computed
lower than the downstream energy. This
is not physically possible, the momentum answer has been disregarded.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

111

River: Quebrada Oro Reach: Oro

RS: 3.5

Profile: PF 1 Downstream

Warning:The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning:The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.
This may indicate the need for additional cross sections.
Note: The energy method has computed a class B profile.
River: Quebrada Oro Reach: Oro

RS: 3

Profile: PF 1

Warning:The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Note: The energy method has computed a class B profile.
River: Quebrada Oro Reach: Oro

RS: 2

Profile: PF 1

Warning:The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
River: Quebrada Oro Reach: Oro

RS: 1.04

Profile: PF 1

Note: Momentum answer is not valid if the water surface is above the low chord or if there
is weir flow. The momentum
answer has been disregarded.
River: Quebrada Oro Reach: Oro

RS: 1.04

Profile: PF 1 Upstream

Warning:The energy equation could not be balanced within the specified number of iterations.
The program used critical depth
for the water surface and continued on with the calculations.
Warning:The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning:The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.
This may indicate the need for additional cross sections.
Warning:The energy loss was greater than 1.0 ft (0.3 m). between the current and previous
Modelaje y Diseo Hidrulico Usando HEC-RAS
INCI 5006 Hidrulica Aplicada

112

cross section. This may indicate


the need for additional cross sections.
River: Quebrada Oro Reach: Oro

RS: 1.04

Profile: PF 1 Downstream

Warning:The energy equation could not be balanced within the specified number of iterations.
The program selected the water
surface that had the least amount of error between computed and assumed values.
River: Quebrada Oro Reach: Oro

RS: 0

Profile: PF 1

Note: Hydraulic jump has occurred between this cross section and the previous upstream
section.

Apendice C Informe HEC-RAS canalizacin de tramo en tierra por seccion


optima
HEC-RAS Version 4.1.0 Jan 2010
U.S. Army Corps of Engineers
Hydrologic Engineering Center
609 Second Street
Davis, California

X XXXXXX

X X

X X

XXXX
X

XXXX

X X

X X

X X X

XXXXXXX XXXX

X X

X X

X X

XX
X

X X

XXX XXXX

X X

XXXX

XXXXXX

XXXX

X X

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

113

X XXXXXX

XXXX

X X

X XXXXX

PROJECT DATA
Project Title: INCI5006
Project File : INCI5006.prj
Run Date and Time: 5/21/2014 3:58:20 AM

Project in SI units

PLAN DATA

Plan Title: QuebradaOptima


Plan File : C:\Users\Angel Pi\Downloads\ProyectoINCI5006( 1 y 2)\INCI5006.p01

Geometry Title: QuebradaOptimaHormigon


Geometry File : C:\Users\Angel Pi\Downloads\ProyectoINCI5006( 1 y 2)\INCI5006.g04

Flow Title

: FlujoPico

Flow File

: C:\Users\Angel Pi\Downloads\ProyectoINCI5006( 1 y 2)\INCI5006.f01

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

114

Plan Summary Information:


Number of: Cross Sections = 10

Multiple Openings = 0

Culverts

= 0

Inline Structures = 0

Bridges

= 2

Lateral Structures =

Computational Information
Water surface calculation tolerance = 0.003
Critical depth calculation tolerance = 0.003
Maximum number of iterations

= 20

Maximum difference tolerance

= 0.1

Flow tolerance factor

= 0.001

Computation Options
Critical depth computed only where necessary
Conveyance Calculation Method: At breaks in n values only
Friction Slope Method:

Average Conveyance

Computational Flow Regime:

Mixed Flow

FLOW DATA

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

115

Flow Title: FlujoPico


Flow File : C:\Users\Angel Pi\Downloads\ProyectoINCI5006( 1 y 2)\INCI5006.f01

Flow Data (m3/s)

River

Reach

Quebrada Oro

Oro

RS

PF 1
9

50

Boundary Conditions

River

Reach

Quebrada Oro

Oro

Profile

PF 1

Upstream

Normal S = 0.0011

Downstream

Normal S = 0.000629

GEOMETRY DATA

Geometry Title: QuebradaOptimaHormigon


Geometry File : C:\Users\Angel Pi\Downloads\ProyectoINCI5006( 1 y 2)\INCI5006.g04

CROSS SECTION

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

116

RIVER: Quebrada Oro


REACH: Oro

RS: 9

INPUT
Description:
Station Elevation Data
Sta

num=

Elev

Sta Elev

Sta

0 10.84

4.4 9.37

8.32

24
Elev

Sta Elev

8.56 17.32

Sta

Elev

8.31 22.77

8.31

29.25

8.44 31.79

7.89 34.95

44.76

4.62 45.71

4.62 45.82 4.809 46.16

4.87

47.2

6.54

47.96

8.01 51.93

8.25 55.13

8.28 55.24

8.14 61.36

8.16

61.45

8.3 64.63

8.29 77.34

8.39

Manning's n Values
Sta n Val
0

.03

num=

Sta n Val

.035 46.16

64.63

.03

Bank Sta: Left Right


34.95 47.96

89.2

4.62

8.43

11

Sta n Val

8.32 .016 22.77

45.82

7.57 35.705 7.216 37.21

.03 51.93

Sta n Val

.03 34.95

Sta n Val

.035 35.705

.013 55.13

.016 61.45

Lengths: Left Channel Right


52.98 53.47 53.14

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

.013
.013

Coeff Contr. Expan.


.1

.3

117

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

7.46

Element

Vel Head (m)

0.17

Wt. n-Val.

W.S. Elev (m)

7.29

Reach Len. (m)

Crit W.S. (m)

6.06

Flow Area (m2)

E.G. Slope (m/m)

0.000452

Q Total (m3/s)

50.00

Top Width (m)

12.05

Vel Total (m/s)

1.80

Left OB Channel Right OB


0.018
52.98

53.47
27.72

Area (m2)

Flow (m3/s)

27.72
50.00

Top Width (m)

12.05

Avg. Vel. (m/s)

1.80

Max Chl Dpth (m)

2.67

Conv. Total (m3/s)

2352.7

Conv. (m3/s)

2352.7

Length Wtd. (m)

53.47

Wetted Per. (m)

15.06

Min Ch El (m)

4.62

Alpha

1.00

Frctn Loss (m)


C & E Loss (m)

Note:

Hydr. Depth (m)

2.30

Shear (N/m2)

8.15

Stream Power (N/m s) 4270.71

0.03
0.00

Cum Volume (1000 m3)


Cum SA (1000 m2)

53.14

0.00
0.01

0.00
7.52
4.69

0.00
0.09
0.24

Manning's n values were composited to a single value in the main channel.

CROSS SECTION

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

118

RIVER: Quebrada Oro


REACH: Oro

RS: 8

INPUT
Description:
Station Elevation Data
Sta
0

Elev
8.5

num=

Sta Elev
4.39

8.43

Sta
9.57

20
Elev

Sta Elev

4.62 21.82

22.95

6.72 23.45

7.02 24.09

7.59 31.95

35.23

7.85 41.25

7.85 41.38

8 44.49

Sta n Val
0

.03

31.95

num=

Sta n Val
9.57

.013 35.13

Bank Sta: Left Right


9.57 24.09

5 21.99

5.15

8 35.13

7.98

8.02 47.91

8.16

Sta n Val

.035 11.29

Elev

7.93 11.29 6.786 12.58 4.562

21.08 4.562 21.107 4.609 21.56

Manning's n Values

Sta

Sta n Val

.013 21.107

.016 41.38

Sta n Val

.03 24.09

.013 44.49

.03

Lengths: Left Channel Right


51.08 51.36 53.17

.03

.1

Coeff Contr. Expan.


.3

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

7.43

Element

Vel Head (m)

0.15

Wt. n-Val.

Left OB Channel Right OB

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

0.019

119

W.S. Elev (m)

7.28

Crit W.S. (m)

Reach Len. (m)

51.08

Flow Area (m2)

E.G. Slope (m/m)

0.000490

Q Total (m3/s)

50.00

Top Width (m)

13.19

Vel Total (m/s)

1.71

51.36

29.19

Area (m2)

Flow (m3/s)

29.19
50.00

Top Width (m)

13.19

Avg. Vel. (m/s)

1.71

Max Chl Dpth (m)

2.72

Conv. Total (m3/s)

2259.0

Conv. (m3/s)

2259.0

Length Wtd. (m)

51.36

Wetted Per. (m)

15.97

Min Ch El (m)

4.56

Alpha

1.00

Frctn Loss (m)


C & E Loss (m)

Note:

Hydr. Depth (m)

2.21

Shear (N/m2)

8.78

Stream Power (N/m s) 2293.83

0.02
0.00

Cum Volume (1000 m3)


Cum SA (1000 m2)

53.17

0.00
0.01

0.00
6.00
4.02

0.00
0.09
0.24

Manning's n values were composited to a single value in the main channel.

CROSS SECTION

RIVER: Quebrada Oro


REACH: Oro

RS: 7

INPUT

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

120

Description:
Station Elevation Data
Sta
0

Elev

num=

Sta Elev

9.43 12.16

19

Sta

Elev

9.01 14.09

Sta Elev

8.53 30.27

Sta

8.58

Elev

42.4

8.57

52.27

8.41 60.664 8.052 62.72 4.506 71.22 4.506 73.095 7.739

73.24

7.82 77.27

7.94 78.85

7.98 79.08

7.83

85.29

7.95 88.43

7.97 98.41

7.87 118.31

7.85

Manning's n Values
Sta n Val
0
77.27

num=

Sta n Val

.03 30.27
.013 78.85

Bank Sta: Left Right


60.664 73.24

7.8

Sta n Val

.016

85.1

42.4

Sta n Val

.03 60.664

.016 85.29

Sta n Val

.013 73.095

.013 88.43

.03

Lengths: Left Channel Right


13.45 14.41 14.62

.03

Coeff Contr. Expan.


.1

.3

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

7.41

Element

Vel Head (m)

0.17

Wt. n-Val.

W.S. Elev (m)

7.24

Reach Len. (m)

Crit W.S. (m)

Left OB Channel Right OB

Flow Area (m2)

E.G. Slope (m/m)

0.000242

Q Total (m3/s)

50.00

Area (m2)

Flow (m3/s)

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

0.013
13.45

14.41

14.62

27.62
27.62
50.00

121

Top Width (m)

11.68

Vel Total (m/s)

1.81

Top Width (m)

11.68

Avg. Vel. (m/s)

1.81

Max Chl Dpth (m)

2.74

Conv. Total (m3/s)

3215.8

Conv. (m3/s)

3215.8

Length Wtd. (m)

14.42

Wetted Per. (m)

14.83

Min Ch El (m)

4.51

Alpha

1.00

Frctn Loss (m)

Note:

2.37

Shear (N/m2)

4.41

Stream Power (N/m s) 5664.43

0.00

C & E Loss (m)

Hydr. Depth (m)

Cum Volume (1000 m3)

0.02

Cum SA (1000 m2)

0.00

0.00
0.01

4.54
3.38

0.00
0.09
0.24

Manning's n values were composited to a single value in the main channel.

CROSS SECTION

RIVER: Quebrada Oro


REACH: Oro

RS: 6

INPUT
Description:
Station Elevation Data
Sta
0

Elev
7.83

num=

Sta Elev
6.37

Sta

7.54 12.97

16
Elev

Sta Elev

7.2 17.31

Sta

Elev

6.68 17.674 6.518

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

122

18.85

4.49

25.3

4.49 27.65

4.49 29.84

6.97 33.23

7.45

39.08

7.33 54.12

7.34 57.81

7.2 65.49

6.99 78.17

6.76

86.4

6.72

Manning's n Values
Sta n Val
0

num=

Sta n Val

.03 12.97

39.08

Sta n Val

.013 17.674

.016 54.12

Bank Sta: Left Right


12.97 33.23

7
Sta n Val

.013 27.35

Sta n Val

.013 33.23

.03

.03

Lengths: Left Channel Right


.96

.98

1.06

Coeff Contr. Expan.

.1

.3

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

7.39

Element

Vel Head (m)

0.10

Wt. n-Val.

W.S. Elev (m)

7.28

Reach Len. (m)

Crit W.S. (m)

Left OB Channel Right OB


0.030

Flow Area (m2)

E.G. Slope (m/m)

0.000212

Q Total (m3/s)

50.00

Top Width (m)

51.55

Vel Total (m/s)

1.15

Area (m2)

Flow (m3/s)
Top Width (m)
Avg. Vel. (m/s)

Max Chl Dpth (m)

2.79

Conv. Total (m3/s)

3432.0

0.013

0.96
0.07

0.98
32.19

0.07
0.00

1.06
11.23

32.19
47.25

1.64
0.06

Hydr. Depth (m)

0.04

Conv. (m3/s)

0.3

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

0.030

19.09
1.47

11.23
2.75
30.82
0.24

1.69

0.36

3243.2

188.6

123

Length Wtd. (m)

0.98

Min Ch El (m)
Alpha

4.49
1.54

Frctn Loss (m)


C & E Loss (m)

Wetted Per. (m)


Shear (N/m2)

1.64
0.09

21.47
3.12

Stream Power (N/m s) 4136.66

0.00
0.04

Cum Volume (1000 m3)


Cum SA (1000 m2)

0.00
0.00

31.39
0.74

0.00
4.11
3.16

0.00
0.01
0.02

Warning: Divided flow computed for this cross-section.


Warning: The cross-section end points had to be extended vertically for the computed water
surface.
Warning: The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning: The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.
This may indicate the need for additional cross sections.
Warning: When the Manning's n value for the channel was composited, the computed n value
was larger [smaller] than the
largest [smallest] user entered n value. The n value has been set to the largest [smallest]
entered value. The user may
wish to examine this cross section and enter a single n value for the entire channel.
Note:

Manning's n values were composited to a single value in the main channel.

CROSS SECTION

RIVER: Quebrada Oro

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

124

REACH: Oro

RS: 5

INPUT
Description:
Station Elevation Data
Sta
0

Elev
8.12

33.29

num=

Sta Elev
6.9

18

Sta

Elev

8.13 17.08

7.78 34.42

4.49

8.09 25.08

37.8

51.47 7.99

65.3

8 68.21

94.98

98.5

7.31 103.48

7.26

Manning's n Values
Sta n Val
0

Sta n Val

.03 33.29

68.21

num=

Sta Elev

4.47

Elev

7.92 31.22

7.72

39.8

4.51 42.56

7.85

7.98 74.73

7.65 89.34

7.5

7.28

Sta n Val

.013 42.56

Sta

Sta n Val

.03 51.47

.016

Sta n Val
65.3

.013

.03

Bank Sta: Left Right


33.29 42.56

Lengths: Left Channel Right


1.87

1.81

1.79

Coeff Contr. Expan.

.1

.3

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

7.35

Element

Vel Head (m)

0.50

Wt. n-Val.

W.S. Elev (m)

6.84

Reach Len. (m)

Left OB Channel Right OB

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

0.013
1.87

1.81

1.79

125

Crit W.S. (m)

Flow Area (m2)

E.G. Slope (m/m)

0.001008

Q Total (m3/s)

50.00

Top Width (m)

8.12

Vel Total (m/s)

3.14

15.91

Area (m2)

15.91

Flow (m3/s)

50.00

Top Width (m)

8.12

Avg. Vel. (m/s)

3.14

Max Chl Dpth (m)

2.38

Conv. Total (m3/s)

1574.6

Conv. (m3/s)

1574.6

1.81

Wetted Per. (m)

10.90

Length Wtd. (m)


Min Ch El (m)

4.47

Alpha

1.00

Frctn Loss (m)

Shear (N/m2)

1.96

14.43

Stream Power (N/m s) 4954.40

0.00

C & E Loss (m)

Hydr. Depth (m)

Cum Volume (1000 m3)

0.02

Cum SA (1000 m2)

0.00

0.00

4.08
3.14

CROSS SECTION

RIVER: Quebrada Oro


REACH: Oro

RS: 4

INPUT
Description:
Station Elevation Data
Sta Elev

Sta

num=

Elev

17

Sta Elev

Sta

Elev

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

Sta Elev

126

8.83

7.97 15.96

7.94 20.19

7.91 26.25

7.95

30.3

7.96 30.82

4.4 33.02

4.43

34.6

4.47 36.17

4.47

37

4.48 39.08

7.96 43.49

7.95

51.4

7.84 63.69

7.87

86.98

7.91 127.37

Manning's n Values
Sta n Val
0

.03

7.72

num=

Sta n Val
30.3

Sta n Val

.013 39.08

Bank Sta: Left Right


30.3 39.08

5
Sta n Val

.03

51.4

.016 63.69

Lengths: Left Channel Right


10.52 10.67

Sta n Val

11.7

.03

Coeff Contr. Expan.

.1

.3

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

7.32

Element

Vel Head (m)

0.42

Wt. n-Val.

W.S. Elev (m)

6.90

Reach Len. (m)

Crit W.S. (m)

6.26

Flow Area (m2)

E.G. Slope (m/m)

0.000811

Q Total (m3/s)

50.00

Top Width (m)

7.99

Vel Total (m/s)

2.88

Left OB Channel Right OB

Area (m2)

Flow (m3/s)
Top Width (m)
Avg. Vel. (m/s)

Max Chl Dpth (m)

2.50

Conv. Total (m3/s)

1756.2

Hydr. Depth (m)


Conv. (m3/s)

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

0.013
0.10

0.10

0.10

17.37
17.37
50.00
7.99
2.88
2.17
1756.2

127

Length Wtd. (m)

0.10

Min Ch El (m)
Alpha

Wetted Per. (m)

4.40
1.00

Frctn Loss (m)

11.98

Stream Power (N/m s) 6098.21

0.00

C & E Loss (m)

Shear (N/m2)

11.53

Cum Volume (1000 m3)

0.05

Cum SA (1000 m2)

0.00

0.00

4.05
3.13

Warning: The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning: The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.
This may indicate the need for additional cross sections.

BRIDGE

RIVER: Quebrada Oro


REACH: Oro

RS: 3.5

INPUT
Description:
Distance from Upstream XS =
Deck/Roadway Width
Weir Coefficient

.1

= 10.51
=

1.4

Upstream Deck/Roadway Coordinates

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

128

num=

Sta Hi Cord Lo Cord


30.3

8.85

Sta Hi Cord Lo Cord

7.45 39.08

8.85

7.45

Upstream Bridge Cross Section Data


Station Elevation Data
Sta

Elev

num=

Sta Elev
8.83

17

Sta

7.97 15.96

Elev

Sta Elev

7.94 20.19

Sta

Elev

7.91 26.25

7.95

30.3

7.96 30.82

4.4 33.02

4.43

34.6

4.47 36.17

4.47

37

4.48 39.08

7.96 43.49

7.95

51.4

7.84 63.69

7.87

86.98

7.91 127.37

Manning's n Values
Sta n Val
0

7.72

num=

.03

Sta n Val
30.3

Sta n Val

.013 39.08

Bank Sta: Left Right


30.3 39.08

.03

Sta n Val
51.4

Sta n Val

.016 63.69

.03

Coeff Contr. Expan.


.1

.3

Downstream Deck/Roadway Coordinates


num=

Sta Hi Cord Lo Cord

Sta Hi Cord Lo Cord

77.99

7.72

0 98.13

102.46

8.74

7.32 105.81

7.84
8.74

7.32 98.13

Sta Hi Cord Lo Cord


8.74

7.32 114.52

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

7.32

8.74

7.32

129

114.52

7.82

0 154.4

7.82

Downstream Bridge Cross Section Data


Station Elevation Data
Sta
0

Elev
7.63

num=

Sta Elev
.36

20

Sta

Elev

7.69 16.14

Sta Elev

7.64 37.46

Elev

7.71 37.54

7.68 77.99

109.98

4.41 114.52

7.73 118.58

7.84 154.4

7.82 185.77

7.8

190.36

7.87 192.84

7.87 197.15

7.77 229.46

7.79 260.64

7.81

Sta n Val
0

Sta n Val

.016 38.55

197.15

num=

7.57 102.46

7.67

38.55

Manning's n Values

7.72 98.13

Sta

4.44 105.81

4.41

Sta n Val

.03 98.13

Sta n Val

.013 118.58

Sta n Val

.016 185.77

.03

.016

Bank Sta: Left Right


98.13 114.52

Coeff Contr. Expan.


.1

.3

Upstream Embankment side slope

Downstream Embankment side slope

0 horiz. to 1.0 vertical


=

0 horiz. to 1.0 vertical

Maximum allowable submergence for weir flow =


Elevation at which weir flow begins

Energy head used in spillway design

Spillway height used in design

.98

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

130

Weir crest shape

= Broad Crested

Number of Abutments = 2

Abutment Data
Upstream

num=

Sta

Elev

30.3

7.45 30.82

Downstream
Sta

Sta Elev
7.45

num=

Elev

94.13

Sta Elev

7.32 102.46

7.32

Abutment Data
Upstream

num=

Sta

Elev

37

7.45 39.08

Downstream
Sta
109.98

Elev

Sta Elev

num=

7.45
2

Sta Elev

7.32 118.58

7.32

Number of Bridge Coefficient Sets = 1

Low Flow Methods and Data


Energy

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

131

Selected Low Flow Methods = Highest Energy Answer

High Flow Method


Energy Only

Additional Bridge Parameters


Add Friction component to Momentum
Do not add Weight component to Momentum
Class B flow critical depth computations use critical depth
inside the bridge at the upstream end
Criteria to check for pressure flow = Upstream energy grade line

BRIDGE OUTPUT Profile #PF 1

E.G. US. (m)

7.32

Element

W.S. US. (m)

6.90

E.G. Elev (m)

Q Total (m3/s)

50.00

W.S. Elev (m)

6.33

5.62

Crit W.S. (m)

6.33

6.07

Q Weir (m3/s)

Max Chl Dpth (m)

1.93

1.21

Weir Sta Lft (m)

Vel Total (m/s)

Weir Sta Rgt (m)

Flow Area (m2)

Weir Submerg

Froude # Chl

Q Bridge (m3/s)

50.00

Weir Max Depth (m)


Min El Weir Flow (m)

Inside BR US Inside BR DS

Specif Force (m3)


7.72

Hydr Depth (m)

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

7.27

7.17

4.30

5.51

11.63
1.00

9.07
1.60

32.85
1.88

32.47
1.21

132

Min El Prs (m)

7.45

W.P. Total (m)

9.96

Delta EG (m)

0.17

Conv. Total (m3/s)

992.3

657.6

Delta WS (m)

1.52

Top Width (m)

6.18

7.52

BR Open Area (m2)

18.57

BR Open Vel (m/s)

5.51

Coef of Q

Shear Total (N/m2)

Br Sel Method

9.92

Frctn Loss (m)

0.04

C & E Loss (m)

0.06
29.08

Energy only Power Total (N/m s)

51.86
0.00

0.00

Warning: For the final momentum answer at the bridge, the upstream energy was computed
lower than the downstream energy.
This is not physically possible, the momentum answer has been disregarded.
Warning: The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning: The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.
This may indicate the need for additional cross sections.
Note:

The energy method has computed a class B profile.

CROSS SECTION

RIVER: Quebrada Oro


REACH: Oro

RS: 3

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

133

INPUT
Description:
Station Elevation Data
Sta

Elev

0 7.63

num=

Sta Elev
.36

Sta

7.69 16.14

20
Elev

Sta Elev

7.64 37.46

Elev

7.71 37.54

7.68 77.99

109.98

4.41 114.52

7.73 118.58

7.84 154.4

7.82 185.77

7.8

190.36

7.87 192.84

7.87 197.15

7.77 229.46

7.79 260.64

7.81

Sta n Val
0

Sta n Val

.016 38.55

197.15

num=

7.57 102.46

7.67

38.55

Manning's n Values

7.72 98.13

Sta

4.41

Sta n Val

.03 98.13

4.44 105.81

Sta n Val

.013 118.58

Sta n Val

.016 185.77

.03

.016

Bank Sta: Left Right


98.13 114.52

Lengths: Left Channel Right


23.74 26.95 29.56

Coeff Contr. Expan.


.1

.3

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

7.15

Element

Vel Head (m)

1.77

Wt. n-Val.

W.S. Elev (m)

5.38

Reach Len. (m)

Crit W.S. (m)

5.92

Flow Area (m2)

E.G. Slope (m/m)

0.008071

Left OB Channel Right OB

Area (m2)

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

0.013
23.74

26.95

29.56

8.48
8.48

134

Q Total (m3/s)

50.00

Top Width (m)

10.14

Vel Total (m/s)

5.90

Flow (m3/s)

50.00

Top Width (m)


Avg. Vel. (m/s)

10.14
5.90

Max Chl Dpth (m)

0.97

Conv. Total (m3/s)

556.6

Conv. (m3/s)

556.6

Length Wtd. (m)

26.95

Wetted Per. (m)

10.76

Min Ch El (m)

4.41

Alpha

1.00

Frctn Loss (m)


C & E Loss (m)

Hydr. Depth (m)

Shear (N/m2)

0.84

62.37

Stream Power (N/m s) 12478.89

0.00

Cum Volume (1000 m3)

0.02

Cum SA (1000 m2)

0.00

0.00

3.94
3.06

Warning: The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Note:

The energy method has computed a class B profile.

CROSS SECTION

RIVER: Quebrada Oro


REACH: Oro

RS: 2

INPUT
Description:
Station Elevation Data

num=

19

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

135

Sta
0

Elev

Sta Elev

7.82 20.93

Sta

Elev

7.6 28.88

Sta Elev

7.51 29.36

Sta

Elev

7.56 29.87

7.52

29.9

7.56 31.09

7.5 52.77

7.89 78.75

7.82 84.03

7.19

84.23

6.4 88.08

4.34 91.98

4.31 94.99

4.32 98.98

7.23

119.55

7.67 119.66

Manning's n Values
Sta n Val
0

7.81 151.11

num=

Sta n Val

.016 52.77

Bank Sta: Left Right


84.03 98.98

7.84 184.79

7.77

Sta n Val

.03 78.75

Sta n Val

.013 119.66

Sta n Val

.03 151.11

Lengths: Left Channel Right


106.09 102.26 98.77

.016

Coeff Contr. Expan.


.1

.3

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

6.87

Element

Vel Head (m)

1.47

Wt. n-Val.

W.S. Elev (m)

5.40

Reach Len. (m)

Crit W.S. (m)

5.86

Flow Area (m2)

E.G. Slope (m/m)

0.006115

Q Total (m3/s)

50.00

Top Width (m)

10.37

Vel Total (m/s)

5.38

Max Chl Dpth (m)

Left OB Channel Right OB

Area (m2)

Flow (m3/s)
Top Width (m)
Avg. Vel. (m/s)

1.09

Hydr. Depth (m)

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

0.013
95.56

95.56

95.56

9.29
9.29
50.00
10.37
5.38
0.90

136

Conv. Total (m3/s)

639.4

Length Wtd. (m)


Min Ch El (m)
Alpha

Conv. (m3/s)

Wetted Per. (m)

10.98

Shear (N/m2)

50.73

4.31
1.00

Frctn Loss (m)

Stream Power (N/m s) 8847.35

0.19

C & E Loss (m)

639.4

Cum Volume (1000 m3)

0.09

Cum SA (1000 m2)

0.00

0.00

3.70
2.78

Warning: The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.

BRIDGE

RIVER: Quebrada Oro


REACH: Oro

RS: 1.04

INPUT
Description: Peatonal de Mangual
Distance from Upstream XS = 95.56
Deck/Roadway Width
Weir Coefficient

= 6.68
=

1.4

Upstream Deck/Roadway Coordinates


num=

Sta Hi Cord Lo Cord

Sta Hi Cord Lo Cord

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

137

84.03

8.79

7.19 98.98

8.83

7.23

Upstream Bridge Cross Section Data


Station Elevation Data
Sta
0

Elev

num=

Sta Elev

7.82 20.93

19

Sta

Elev

7.6 28.88

Sta Elev

7.51 29.36

Sta

Elev

7.56 29.87

7.52

29.9

7.56 31.09

7.5 52.77

7.89 78.75

7.82 84.03

7.19

84.23

6.4 88.08

4.34 91.98

4.31 94.99

4.32 98.98

7.23

119.55

7.67 119.66

7.81 151.11

Manning's n Values
Sta n Val
0

num=

Sta n Val

.016 52.77

84.03 98.98

7.77

Sta n Val

.03 78.75

Bank Sta: Left Right

7.84 184.79

Sta n Val

.013 119.66

Sta n Val

.03 151.11

.016

Coeff Contr. Expan.


.1

.3

Downstream Deck/Roadway Coordinates


num=

Sta Hi Cord Lo Cord


43.13

8.17

Sta Hi Cord Lo Cord

6.57 56.89

8.18

6.58 57.37

Sta Hi Cord Lo Cord


8.18

6.77

Downstream Bridge Cross Section Data


Station Elevation Data

num=

30

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

138

Sta
0

Elev
6.87

Sta Elev
8.92

Sta

Elev

6.66 21.73

Sta

Elev

6.68 26.04

6.77

Sta

Elev

26.1

6.63

26.45

6.65 26.49

6.67

30.3

6.79 30.35

6.9 30.99

6.91

31.1

6.83 35.96

6.71 36.07

6.67 36.42

6.67 36.65

6.84

38.92

6.81 39.36

6.67 39.36

6.66 43.13

6.57 45.63

4.3

49.51

4.28 51.34

4.31 52.65

4.34 56.89

6.58 57.37

6.77

59.7

6.71 69.58

6.79 78.58

6.76 95.42

6.88 103.97

7.3

Manning's n Values
Sta n Val
0

num=

Sta n Val

.016 38.92

Bank Sta: Left Right


43.13 56.89

.013

Sta n Val
59.7

.03

Coeff Contr. Expan.


.1

.3

Upstream Embankment side slope

Downstream Embankment side slope

0 horiz. to 1.0 vertical


=

0 horiz. to 1.0 vertical

Maximum allowable submergence for weir flow =


Elevation at which weir flow begins

Energy head used in spillway design

Spillway height used in design


Weir crest shape

.98

=
= Broad Crested

Number of Bridge Coefficient Sets = 1

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

139

Low Flow Methods and Data


Energy
Selected Low Flow Methods = Highest Energy Answer

High Flow Method


Energy Only

Additional Bridge Parameters


Add Friction component to Momentum
Do not add Weight component to Momentum
Class B flow critical depth computations use critical depth
inside the bridge at the upstream end
Criteria to check for pressure flow = Upstream energy grade line

BRIDGE OUTPUT Profile #PF 1

E.G. US. (m)

6.87

Element

W.S. US. (m)

5.40

E.G. Elev (m)

Q Total (m3/s)

50.00

W.S. Elev (m)

6.24

6.23

Crit W.S. (m)

5.86

5.85

Q Weir (m3/s)

Max Chl Dpth (m)

1.93

1.95

Weir Sta Lft (m)

Vel Total (m/s)

Weir Sta Rgt (m)

Flow Area (m2)

Q Bridge (m3/s)

50.00

Inside BR US Inside BR DS

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

6.59

2.60
19.22

6.58

2.64
18.96

140

Weir Submerg

Froude # Chl

Weir Max Depth (m)


Min El Weir Flow (m)

0.69

Specif Force (m3)


7.19

0.69

29.82

Hydr Depth (m)

29.94

1.47

1.49

Min El Prs (m)

7.23

W.P. Total (m)

14.21

Delta EG (m)

0.19

Conv. Total (m3/s)

1807.5

1791.9

Delta WS (m)

-0.83

Top Width (m)

13.11

12.72

BR Open Area (m2)

23.56

BR Open Vel (m/s)

2.64

Coef of Q

Shear Total (N/m2)

Br Sel Method

13.93

Frctn Loss (m)

0.01

C & E Loss (m)

0.00
10.15

Energy only Power Total (N/m s)

10.40
0.00

0.00

Note: Momentum answer is not valid if the water surface is above the low chord or if there is
weir flow. The momentum
answer has been disregarded.
Warning: The energy equation could not be balanced within the specified number of iterations.
The program used critical depth
for the water surface and continued on with the calculations.
Warning: The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning: The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.
This may indicate the need for additional cross sections.
Warning: The energy loss was greater than 1.0 ft (0.3 m). between the current and previous cross
section. This may indicate the
need for additional cross sections.
Warning: The energy equation could not be balanced within the specified number of iterations.
Modelaje y Diseo Hidrulico Usando HEC-RAS
INCI 5006 Hidrulica Aplicada

141

The program selected the water


surface that had the least amount of error between computed and assumed values.

CROSS SECTION

RIVER: Quebrada Oro


REACH: Oro

RS: 1

INPUT
Description:
Station Elevation Data
Sta
0

Elev
6.87

num=

Sta Elev
8.92

30

Sta

Elev

6.66 21.73

Sta Elev

6.68 26.04

6.77

Sta

Elev

26.1

6.63

26.45

6.65 26.49

6.67

30.3

6.79 30.35

6.9 30.99

6.91

31.1

6.83 35.96

6.71 36.07

6.67 36.42

6.67 36.65

6.84

38.92

6.81 39.36

6.67 39.36

6.66 43.13

6.57 45.63

4.3

49.51

4.28 51.34

4.31 52.65

4.34 56.89

6.58 57.37

6.77

59.7

6.71 69.58

6.79 78.58

6.76 95.42

6.88 103.97

7.3

Manning's n Values
Sta n Val
0

num=

Sta n Val

.016 38.92 .013

Sta n Val
59.7

.03

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

142

Bank Sta: Left Right

Lengths: Left Channel Right

43.13 56.89

112.09 114.49 117.67

Coeff Contr. Expan.


.1

.3

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

6.58

Element

Vel Head (m)

0.35

Wt. n-Val.

W.S. Elev (m)

6.23

Reach Len. (m)

Crit W.S. (m)

5.84

Flow Area (m2)

E.G. Slope (m/m)

0.000779

Q Total (m3/s)

50.00

Top Width (m)

12.72

Vel Total (m/s)

2.64

Conv. (m3/s)

Length Wtd. (m)

114.49

Wetted Per. (m)

Min Ch El (m)

4.28

18.96
50.00
12.72
2.64

Hydr. Depth (m)

Shear (N/m2)

1.49
1791.9
13.93
10.40

Stream Power (N/m s) 4977.86

0.00
0.00

Cum Volume (1000 m3)


Cum SA (1000 m2)

117.67

18.96

Avg. Vel. (m/s)

1791.9

C & E Loss (m)

114.49

Top Width (m)

Conv. Total (m3/s)

Frctn Loss (m)

112.09

Flow (m3/s)

1.95

1.00

0.013

Area (m2)

Max Chl Dpth (m)

Alpha

Left OB Channel Right OB

0.00

0.00

2.34
1.66

CROSS SECTION

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

143

RIVER: Quebrada Oro


REACH: Oro

RS: 0

INPUT
Description: Ultima Seccion Aguas Abajo (POSTE)
Station Elevation Data
Sta

num=

Elev

Sta Elev

0 8.172

1.43 8.217

14

Sta

Elev

Sta Elev

1.58 6.222

Sta

5.48 4.309

Elev

8.19 4.279

12.36 4.248 16.65 5.949 19.49 6.558 22.21 6.561 25.33 6.572
31.42 6.621 38.98 6.599 49.88 6.502 58.35

Manning's n Values
Sta n Val
0

.016

num=

Sta n Val
1.58

1.58 19.49

Sta n Val

.013 19.49

Bank Sta: Left Right

6.45

.03

Coeff Contr. Expan.


.1

.3

CROSS SECTION OUTPUT Profile #PF 1

E.G. Elev (m)

6.48

Element

Vel Head (m)

0.27

Wt. n-Val.

W.S. Elev (m)

6.21

Reach Len. (m)

Left OB Channel Right OB

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

0.013

144

Crit W.S. (m)

5.75

Flow Area (m2)

E.G. Slope (m/m)

0.000629

Q Total (m3/s)

50.00

Top Width (m)

16.26

Vel Total (m/s)

2.28

1992.9

Alpha

1.00

Frctn Loss (m)

50.00
16.26

Avg. Vel. (m/s)

Conv. Total (m3/s)

4.25

21.92

Top Width (m)

1.96

Min Ch El (m)

Area (m2)

Flow (m3/s)

Max Chl Dpth (m)

Length Wtd. (m)

21.92

2.28

Hydr. Depth (m)

1.35

Conv. (m3/s)

1992.9

Wetted Per. (m)

17.06

Shear (N/m2)

7.93

Stream Power (N/m s) 2793.67

0.00

0.00

Cum Volume (1000 m3)

C & E Loss (m)

Cum SA (1000 m2)

Note: Hydraulic jump has occurred between this cross section and the previous upstream
section.

SUMMARY OF MANNING'S N VALUES

River:Quebrada Oro

Reach
n11

River Sta.

n1

n2

n3

n4

n5

n6

n7

n8

n9

n10

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

145

Oro
.013

.03

.016

.03

.035

.013

.035

.03

.013

.016

Oro

.03

.035

.013

.03

.03

.013

.016

.013

.03

Oro

.03

.016

.03

.013

.03

.013

.016

.013

.03

Oro

.03

.013

.013

.013

.03

.016

.03

Oro

.03

.013

.03

.016

.013

.03

Oro

.03

.013

.03

.016

.03

Oro

3.5

Oro

.016

.03

.013

.016

.03

Oro

.016

.03

.013

.03

.016

Oro

1.04

Oro

.016

.013

.03

Oro

.016

.013

.03

.03

Bridge
.016

Bridge

SUMMARY OF REACH LENGTHS

River: Quebrada Oro

Reach

Oro

River Sta.

Left

52.98

Channel

53.47

Right

53.14

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

146

Oro

51.08

51.36

53.17

Oro

13.45

14.41

14.62

Oro

.96

.98

Oro

1.87

1.81

Oro

10.52

10.67

11.7

Oro

3.5

Oro

23.74

26.95

29.56

Oro

106.09

102.26

98.77

Oro

1.04

Bridge

Oro

112.09

114.49

117.67

Oro

1.06
1.79

Bridge

SUMMARY OF CONTRACTION AND EXPANSION COEFFICIENTS


River: Quebrada Oro

Reach

River Sta.

Contr.

Oro

.1

.3

Oro

.1

.3

Oro

.1

.3

Expan.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

147

Oro

.1

.3

Oro

.1

.3

Oro

.1

.3

Oro

3.5

Oro

.1

.3

Oro

.1

.3

Oro

1.04

Oro

.1

.3

Oro

.1

.3

Bridge

Bridge

Profile Output Table - Standard Table 1

Reach
River Sta Profile
Plan
Q Total Min Ch El W.S. Elev Crit W.S.
E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl
(m3/s)
(m/s)

(m2)

Oro
0.000452

Oro
0.003320

Oro
0.000490

Oro
0.002778

(m)

(m)

(m)

(m)

(m/m)

(m)

1.80

PF 1
27.72

CanalOptimo 50.00
12.05
0.38

2.21

PF 1
22.65

Puente
14.00

1.71

PF 1
29.19

CanalOptimo 50.00
13.19
0.37

2.07

PF 1
24.13

Puente
13.89

50.00
0.53

50.00
0.50

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

4.62

4.62

4.56

4.57

7.29

7.69

7.28

7.55

6.06

7.00

7.46

7.94

7.43

7.77

148

Oro
0.000242

Oro
0.007945

Oro
0.000212

Oro
0.000314

Oro
0.001008

Oro
0.001008

Oro
0.000811

Oro
0.000811

Oro

CanalOptimo 50.00
11.68
0.38

3.17

PF 1
15.79

Puente
10.28

1.47

PF 1
43.48

CanalOptimo 50.00
51.55
0.36

1.68

PF 1
38.20

Puente
49.68

3.14

PF 1
15.91

CanalOptimo 50.00
8.12
0.72

3.14

PF 1
15.91

Puente
8.12

2.88

PF 1
17.37

CanalOptimo 50.00
7.99
0.62

2.88

PF 1
17.37

Puente
7.99

3.5

Oro
0.008071

Oro
0.008071

Oro

1.81

PF 1
27.62

50.00
0.82

50.00
0.44

50.00
0.72

50.00
0.62

4.51

4.54

4.49

4.49

4.47

4.47

4.40

4.40

7.24

7.41

7.00

7.51

7.28

7.39

7.25

7.39

6.84

7.35

6.84

6.90

6.90

7.35

6.26

6.26

7.32

7.32

Bridge

5.90

PF 1
8.48

CanalOptimo 50.00
10.14
2.06

5.90

PF 1
8.48

Puente
10.14

PF 1

CanalOptimo

50.00
2.06

50.00

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

4.41

4.41

4.31

5.38

5.38

5.40

5.92

5.92

5.86

7.15

7.15

6.87

149

0.006115
Oro
0.006109

Oro

5.38

9.29

5.38

PF 1
9.30

10.37

1.81

Puente
10.37

50.00
1.81

1.04

Oro
0.000779

Oro
0.000779

Oro
0.000629

Oro
0.000629

4.31

5.40

5.86

6.87

Bridge

2.64

PF 1
18.96

CanalOptimo 50.00
12.72
0.69

2.64

PF 1
18.96

Puente
12.72

2.28

PF 1
21.92

CanalOptimo 50.00
16.26
0.63

2.28

PF 1
21.92

Puente
16.26

50.00
0.69

50.00
0.63

4.28

4.28

4.25

4.25

6.23

6.23

6.21

6.21

5.84

5.84

6.58

6.58

5.75

5.75

6.48

6.48

ERRORS WARNINGS AND NOTES


Errors Warnings and Notes for Plan : CanalOptimo

River: Quebrada Oro Reach: Oro

RS: 9

Profile: PF 1

Note: Manning's n values were composited to a single value in the main channel.
River: Quebrada Oro Reach: Oro

RS: 8

Profile: PF 1

Note: Manning's n values were composited to a single value in the main channel.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

150

River: Quebrada Oro Reach: Oro

RS: 7

Profile: PF 1

Note: Manning's n values were composited to a single value in the main channel.
River: Quebrada Oro Reach: Oro

RS: 6

Profile: PF 1

Warning:Divided flow computed for this cross-section.


Warning:The cross-section end points had to be extended vertically for the computed water
surface.
Warning:The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning:The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.
This may indicate the need for additional cross sections.
Warning:When the Manning's n value for the channel was composited, the computed n value
was larger [smaller] than the largest
[smallest] user entered n value. The n value has been set to the largest [smallest] entered
value. The user may
wish to examine this cross section and enter a single n value for the entire channel.
Note: Manning's n values were composited to a single value in the main channel.
River: Quebrada Oro Reach: Oro

RS: 4

Profile: PF 1

Warning:The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning:The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.
This may indicate the need for additional cross sections.
River: Quebrada Oro Reach: Oro

RS: 3.5

Profile: PF 1

Warning:For the final momentum answer at the bridge, the upstream energy was computed
lower than the downstream energy. This
is not physically possible, the momentum answer has been disregarded.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

151

River: Quebrada Oro Reach: Oro

RS: 3.5

Profile: PF 1 Downstream

Warning:The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning:The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.
This may indicate the need for additional cross sections.
Note: The energy method has computed a class B profile.
River: Quebrada Oro Reach: Oro

RS: 3

Profile: PF 1

Warning:The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Note: The energy method has computed a class B profile.
River: Quebrada Oro Reach: Oro

RS: 2

Profile: PF 1

Warning:The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
River: Quebrada Oro Reach: Oro

RS: 1.04

Profile: PF 1

Note: Momentum answer is not valid if the water surface is above the low chord or if there
is weir flow. The momentum
answer has been disregarded.
River: Quebrada Oro Reach: Oro

RS: 1.04

Profile: PF 1 Upstream

Warning:The energy equation could not be balanced within the specified number of iterations.
The program used critical depth
for the water surface and continued on with the calculations.
Warning:The velocity head has changed by more than 0.5 ft (0.15 m). This may indicate the
need for additional cross sections.
Warning:The conveyance ratio (upstream conveyance divided by downstream conveyance) is
less than 0.7 or greater than 1.4.
This may indicate the need for additional cross sections.
Warning:The energy loss was greater than 1.0 ft (0.3 m). between the current and previous
Modelaje y Diseo Hidrulico Usando HEC-RAS
INCI 5006 Hidrulica Aplicada

152

cross section. This may indicate


the need for additional cross sections.
River: Quebrada Oro Reach: Oro

RS: 1.04

Profile: PF 1 Downstream

Warning:The energy equation could not be balanced within the specified number of iterations.
The program selected the water
surface that had the least amount of error between computed and assumed values.
River: Quebrada Oro Reach: Oro

RS: 0

Profile: PF 1

Note: Hydraulic jump has occurred between this cross section and the previous upstream
section.

Modelaje y Diseo Hidrulico Usando HEC-RAS


INCI 5006 Hidrulica Aplicada

153