Professional Documents
Culture Documents
20964
CEB Coal
IPP Thermal
SPP Wind
Note: Generation from other SPPs (Mini Hydro, Solar and Biomass) is not included
Cumulative Dispatch
From 01st November 08th November
Category
Dispatch (MWh)
CEB Hydro
160,183
Dispatch (GWh)
65.65%
CEB Hydro
3,800
34.69%
3,742
1.53%
997
9.10%
CEB Coal
78,400
32.13%
CEB Coal
4,001
36.52%
IPP Thermal
349
0.14%
IPP Thermal
1,200
10.96%
SPP Wind
1,313
0.54%
Renewable
956
8.73%
Total
243,987
Total
10,955
Note: Generation from Mini Hydro, Solar and Biomass power plants in September, October and
November is not included in annual cumulative renewable generation figure.
6000
5000
4000
Rated Capacity
Available
Dispatched
3000
2000
1000
250
200
Installed
Capacity
150
Available
Capacity
Night Peak Load
100
50
1347.7
CEB Coal
IPP Thermal
SPP Wind
85.6%
94.9%
95.8%
Maussakelle
83.3%
Kotmale
Victoria
66.4%
Randenigala Samanalawewa
Note: Hydro Reservoir Storage Capacity as at 08th November 2015 1092.8GWh (86.83%)
GWh
1200
1000
800
2012
2013
600
2014
2015
400
200
MW
2200
2000
1800
1600
1400
1200
Nigh Peak
1000
Day Peak
800
Minimum
Demand
600
400
200
Note: Contribution from Mini Hydro, Solar and Biomass is not included
5-Nov
22-Oct
8-Oct
24-Sep
10-Sep
27-Aug
13-Aug
30-Jul
16-Jul
2-Jul
18-Jun
4-Jun
21-May
7-May
23-Apr
9-Apr
26-Mar
12-Mar
26-Feb
12-Feb
29-Jan
15-Jan
1-Jan
MW
1500
1200
CEB Hydro
IPP Thermal
900
600
300
Time of Day
Note: Contribution from Wind, Mini Hydro, Solar and Biomass is not included
8
GWh
12,000
10,000
8,000
SPP Wind
IPP
CEB Coal
6,000
CEB Oil
CEB Hydro
4,000
2,000
2014
2015
Year
GWh
12000
11000
10000
9000
8000
7000
2014
6000
2015
5000
4000
3000
2000
1000
0
Note: Generation from SPP Mini Hydro, Solar and Biomass is not included
10
Capacity (MW)
Primary Fuel
CEB Hydro
Victoria
Ukuwela
Kotmale
Randenigala
Rantambe
Bowatenna
Nilambe
Upper Kotmale
Old Laxapana
New Laxapana
Polpitiya
Wimalasurendra
Canyon
Samanalawewa
Kukuleganga
Inginiyagala
Udawalawe
210
40
201
122
49
40
3.2
150
50
115
75
50
60
120
75
10
6
CEB Thermal
Sapugaskanda 1
Sapugaskanda 2
Kelanitissa Small Gas Turbines
GT 7 - Kelanitissa
Kelanitissa CCY
Lakvijaya (Puttalam Coal)
Lakvijaya (Puttalam Coal) Stage II
Lakvijaya (Puttalam Coal) Stage III
Uthuru Janani
72
72
68
115
165
285
285
285
24
51
163
270
27
11
Heavy Fuel
Heavy Fuel
Auto Diesel
Auto Diesel
Naptha & Diesel
Coal
Coal
Coal
Heavy Fuel
Heavy Fuel
Auto Diesel
Low Sulphur Furnace oil
Auto Diesel