Professional Documents
Culture Documents
2.
3.
4.
5.
BLEVE
6.
Business Interruption
7.
The consequence
analysis in an RBI
program is performed
to provide
8.
Damage mechanisms
include:
9.
10.
water curtain
11.
12.
Environmental Cost
13.
14.
An Event is?
15.
Excessive inspections
can have what effect
on risk level:
16.
Failure is?
17.
18.
19.
A Hazard is?
20.
Implementation of RBI
plans will?
21.
In most consequence
evaluations, a key
element in determining
the magnitude of the
consequence is?
the volume of
fluid released.
22.
23.
Inspection
Optimization
24.
for assessing
the effectiveness of past
inspections
25.
It is beneficial to the
accuracy and quality of an
RBI analysis to assure that
the data is?
26.
27.
Loss of containment is
generally evaluated as?
29.
Mitigation action is an
appropriate response to?
30.
Mitigation is?
28.
41.
RBI as a continuous
improvement tool provides a
vehicle to?
Improve inspection of
facilities and systematically
reduce the risk associated
with pressure boundary
failures
42.
HAZOP Study
PHA
MI Programs
None
Answer: None
on POF a probabilistic
approach use what type of
data to calculate POF
32.
33.
Probabilities of incidents
generally ____________ with
the severity of the incident.
decrease
34.
Probability of Fire
(Probability of Failure)
(Probability of Ignition)
35.
Probability of No Fire
(Probability of Failure
Probability of Non-ignition) +
Probability of No Failure
1x 10-5 power = 0.00001
31.
40.
36.
Probability x Consequence
Risk
37.
38.
QRA
39.
System Id
Hazards id
Probability assessment
Consequence analysis
Risk Results
43.
Relative Risk
44.
45.
engineering, maintenance
and operations
46.
inaccurate or missing
information,
inadequate designs or
faulty equipment
installation,
operating outside the
acceptable IOWs,
not effectively executing the
plans,
lack of qualified personnel
or teamwork,
lack of sound engineering or
operational judgment.
47.
48.
49.
risk-based
inspection
50.
Risk is?
51.
Risk management
plans should be
adjusted when?
52.
Risk Reduction
53.
risk reduction
54.
Risk reduction is
part of?
Risk management
55.
Semi quantitative
Analysis results are
given as?
56.
Stakeholder
57.
Start-up and
shutdown
conditions as well
as emergency and
non-routine
conditions should
also be reviewed
for?
58.
59.
60.
In most regardless of
type or level
61.
Hydrocarbon and
chemical process
industry
62.
A representation on a
constant risk level.
63.
significantly reduced.