You are on page 1of 6

RESUMEN GENERAL

PROYECTO
UBICACIN

: TUBERIA - PANTALN MARA JIRAY


: HUARI

SECCION

OBRAS
MECNICAS S/.

DESCRIPCION

OBRAS CIVILES
S/.

TOTAL
GENERAL S/.

SUMINISTRO DE MATERIALES

1.0

SUMINISTRO PANTALON 18"

0.00

0.00

2.0

SUMINISTRO TUBERIA BIFURCACION 10"

0.00

0.00

3.0

BRIDAS EMPAQUETADURAS PERNOS

0.00

0.00

Total Suministro de Equipamiento Mecnico


II

0.00

0.00

0.00

MONTAJE MECANICO

1.0

MONTAJE PANTALON 18"

0.00

0.00

2.0

MONTAJE TUBERIA BIFURCACION 10"

0.00

0.00

3.0

BRIDAS EMPAQUETADURAS PERNOS

0.00

0.00

III

OBRAS CIVILES

1.0

OBRAS PROVISIONALES

0.00

0.00

2.0

OBRAS PRELIMINARES

0.00

0.00

3.0

MOVIMIENTO DE TIERRAS

0.00

0.00

4.0

CONCRETO SIMPLE

0.00

0.00

5.0

CONCRETO ARMADO

0.00

0.00

0.00

0.00

IV

DESMONTAJE MECANICO

1.0

DESMONTAJE MECANICO

Total Montaje de Equipamiento Mecanico

0.00

0.00

0.00
0.00

Total Obras civiles

Total Desmontaje Mecanico

0.00

0.00

0.00

0.00

Resumen General

1.0 Suministro de Materiales

0.00

0.00

0.00

2.0 Montaje mecanico

0.00

0.00

0.00

3.0 Obras Civiles

0.00

0.00

0.00

4.0 Desmontaje mecanico

0.00

5.0 Transporte

0.00

0.00

0.00

6.0 Gastos Generales Directos

0.00

0.00

0.00

Gastos Generales Indirectos

0.00

0.00

0.00

Utilidades

0.00

0.00

0.00

0.00

0.00

0.00

TOTAL GENERAL S/.


PLAZO DE EJECUCIN

60 d.c.

0.00

TUBERIA - PANTALN MARA JIRAY


1.2

SUMINISTRO DE EQUIPOS Y MATERIALES


Item

I
1.0
1.1
1.2
1.3
1.4

DESCRIPCION

SUMINISTRO DE EQUIPAMIENTO MECANICO


SUMINISTRO PANTALON 18"
Tramo Recto de 18" de dimetro x 1 550 mm de longitud x 19 mm de espesor.
Tramo de Reduccin de 18" de dimetro x 800 mm de longitud x 19 mm de espesor
Refuerzo de bifurcacin de 19 mm de espesor x 742 mm de longitud x 686 mm de ancho.
Conjunto del pantaln de 1 550 mm / 350 mm / 800 mm x 55.31

Und

U
U
U
Cjto.

Costo S/.

Metrado
Total

Unitario

1.00
1.00
1.00
1.00

0.00
0.00
0.00
0.00

SUBTOTAL 1.00
2.00
2.1
2.2
2.3
2.4
2.5

SUMINISTRO TUBERIA BIFURCACION 10"


Tramo Recto N 1 de 10" de dimetro SCH-80 x 5 900 mm de longitud
Tramo Recto N 2 de 10" de dimetro SCH-80 x 3 500 mm de longitud
Codo de 10" de dimetro de 61 de 3 tramos x 900 mm.
Tramo Recto N 3 de 10" de dimetro SCH-80 x 2 340 mm de longitud
Anillos de anclaje de 12.5 mm de espesor x 450 mm de dimetro.

0.00

U
U
U
U
U

1.00
1.00
1.00
1.00
3.00

0.00
0.00
0.00
0.00
0.00

SUBTOTAL 2.00
3.00
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11

BRIDAS EMPAQUETADURAS PERNOS


Esparragos de 2" x 350 mm long. VCL - 140 para brida plana de 18"
Esparragos de 1 3/8" x 220 mm long. VCL - 140 para brida plana de 10"
Tuerca exagonal de 2" Unc, ASTMA 563
Tuerca exagonal de 1 3/8" Unc, ASTMA 563
Arandela plana de 2", ASTMF436
Arandela plana de 1 3/8", ASTMF436
Brida plana de 18" x 94 mm (e) x 783 mm ext. X 460 mm interno
Brida plana de 10" x 50 mm (e) x 473 mm ext. X 279 mm interno tramo cnico
Brida plana de 10" x 50 mm (e) x 473 mm ext. X 275 mm interno tramo recto
Empaquetadura de 18" x " (e) de jebe C. con trama de lona, refuerzo 70 -5. Shore A.
Empaquetadura de 10" x " (e) de jebe C. con trama de lona, refuerzo 70 -5. Shore A.

Total

0.00

U
U
U
U
U
U
U
U
U
U
U

40.00
36.00
80.00
72.00
80.00
72.00
4.00
1.00
5.00
2.00
3.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SUBTOTAL 3.00

0.00

S/.

0.00

TUBERIA - PANTALN MARA JIRAY


MONTAJE MECANICO
Item

II
1.00

DESCRIPCION

Und

Metrado
Total

Unitario

Costo S/.
Total

MONTAJE MECANICO
MONTAJE PANTALON 18"

1.1

Montaje Tramo Recto de 18" de dimetro x 1 550 mm de longitud x 19 mm de espeso, incluye, manipuleo,
soldadura, pruebas con tintes penetrantes, limpieza y pintura.

1.00

0.00

1.2

Montaje Tramo de Reduccin de 18" de dimetro x 800 mm de longitud x 19 mm de espesor incluye, manipuleo,
soldadura, pruebas con tintes penetrantes, limpieza y pintado.

1.00

0.00

1.3

Montaje de Refuerzo de bifurcacin de 19 mm de espesor x 742 mm de longitud x 686 mm de ancho, incluye,


manipuleo, soldadura, pruebas con tintes penetrantes, limpieza y pintura.

1.00

0.00

1.4

Montaje de Conjunto del pantaln de 1 550 mm / 350 mm / 800 mm x 55.31, incluye manipuleo, soldadura,
pruebas con tintes penetrantes, limpieza y pintura.

Cjto.

1.00

0.00

SUBTOTAL 1.00
2.00

0.00

MONTAJE TUBERIA BIFURCACION 10"

2.1

Montaje Estructuras Nuevas Tramo Recto N 1 de 10" de dimetro SCH-80 x 5 900 mm de longitud, incluye,
manipuleo, soldadura, pruebas con tintes penetrantes, limpieza y pintura.

1.00

0.00

2.2

Montaje Estructuras Nuevas Tramo Recto N 2 de 10" de dimetro SCH-80 x 3 500 mm de longitud, incluye
manipuleo, soldadura, pruebas con tintes penetrantes, limpieza y pintura.

1.00

0.00

2.3

Montaje de Estructuras Nuevas Codo de 10" de dimetro de 61 de 3 tramos x 900 mm, incluye, manipuleo,
soldadura, pruebas con tintes penetrantes, limpieza y pintura.

1.00

0.00

2.4

Montaje de Estructuras Nuevas Tramo Recto N 3 de 10" de dimetro SCH-80 x 2 340 mm de longitud (h), incluye,
manipuleo, soldadura, pruebas con tintes penetrantes, limpieza y pintura.

1.00

0.00

2.5

Montaje de Estructuras Nuevas Anillos de anclaje de 12.5 mm de espesor x 450 mm , incluye, manipuleo,
soldadura, prueba con tintes penetrantes, limpieza y pintura.

3.00

0.00

SUBTOTAL 2.00
3.00
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11

BRIDAS EMPAQUETADURAS PERNOS


Esparragos de 2" x 350 mm long. VCL - 140 para brida plana de 18"
Esparragos de 1 3/8" x 220 mm long. VCL - 140 para brida plana de 10"
Tuerca exagonal de 2" Unc, ASTMA 563
Tuerca exagonal de 1 3/8" Unc, ASTMA 563
Arandela plana de 2", ASTMF436
Arandela plana de 1 3/8", ASTMF436
Brida plana de 18" x 94 mm (e) x 783 mm ext. X 460 mm interno
Brida plana de 10" x 50 mm (e) x 473 mm ext. X 279 mm interno tramo cnico
Brida plana de 10" x 50 mm (e) x 473 mm ext. X 275 mm interno tramo recto
Empaquetadura de 18" x " (e) de jebe C. con trama de lona, refuerzo 70 -5. Shore A.
Empaquetadura de 10" x " (e) de jebe C. con trama de lona, refuerzo 70 -5. Shore A.

0.00

U
U
U
U
U
U
U
U
U
U
U

40.00
36.00
80.00
72.00
80.00
72.00
4.00
1.00
5.00
2.00
3.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

SUBTOTAL 3.00

0.00

TOTAL MONTAJE MECANICO

0.00

TUBERIA - PANTALN MARA JIRAY


MONTAJE MECANICO
Item

DESCRIPCION

Und

Metrado
Total

Unitario

Costo S/.
Total

IV

DESMONTAJE MECANICO

4.1

Desmontaje Tramo Recto de 18" de dimetro x 1 550 mm de longitud x 19 mm de espeso, incluye manipuleo,
soldadura, pruebas con tintes penetrantes, limpieza y pintura

1.00

0.00

4.2

Desmontaje Tramo de Reduccin de 18" de dimetro x 800 mm de longitud x 19 mm de espesor, incluye


manipuleo, soldadura, pruebas con tintes penetrantes, limpieza y pintura

1.00

0.00

4.3
4.4
4.5
4.6
4.7

Desmontaje
Desmontaje
Desmontaje
Desmontaje
Desmontaje

u
u
u
u
u

1.00
1.00
1.00
1.00
1.00

0.00
0.00
0.00
0.00
0.00

de
de
de
de
de

estructuras Antiguas Tramo Recto N 1 de 10" de dimetro SCH-80 x 5 900 mm de longitud


estructuras Antiguas Tramo Recto N 2 de 10" de dimetro SCH-80 x 3 500 mm de longitud
Estructuras Antiguas Codo de 10" de dimetro de 61 de 3 tramos x 900 mm.
Estructuras Antiguas Tramo Recto N 3 de 10" de dimetro SCH-80 x 2 340 mm de longitud
Estructuras Antiguas Anillos de anclaje de 12.5 mm de espesor x 450 mm de dimetro.
TOTAL DESMONTAJE MECANICO

1.0
2.0
3.0
4.0
5.0

RESUMEN GENERAL
Suministro de Materiales
Montaje mcanico
Desmontaje mcanico
Transporte
Gastos Generales Directos
Gastos Generales Indirectos
Utilidades

TOTAL OBRAS MECANICAS

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

TUBERIA - PANTALN MARA JIRAY


PRESUPUESTO BASE
SECCION III: OBRAS CIVILES
TEM
1.00
1.20
1.30

DESCRIPCIN
OBRAS PROVISIONALES
Delimitacin del Area de seguridad
Oficinas, almacn para la obra.

Und.
glb
m

Metrado
Total
1.00
60.00

COSTO (S/.)
Unitario
Total
500.00
62.93

500.00
3,775.80
4,275.80

2.00
2.10
2.20
2.30

OBRAS PRELIMINARES
Movilizacin y Desmovilizacin de Equipos
Limpieza y preparacin de la zona de trabajo
Trazo y Replanteo de Obra

glb
m
m

1.00
500.00
15.00

6000.00
0.85
12.00

6,000.00
425.00
180.00
6,605.00

3.00
3.10

DEMOLICION DE BASES EXISTENTES


Demolicin de base de concreto de tubera de 10" en servicio.

13.20

132.79

1,752.83
1,752.83

4.00
4.10
4.20

ELIMINACION DE MATERIAL DEMOLIDO


Acarreo de Base Demolida
Eliminacin de Base demolida

m
m

13.20
13.20

33.40
141.43

440.88
1,866.88
2,307.76

5.00
5.10
5.30
5.40
5.50
5.60
5.70

CONSTRUCCION DE NUEVAS BASES


BASE DE TUBERIA - MOVIMIENTO DE TIERRA
Excavacin de material suelto
Excavacin para estructuras roca suelta
Relleno compactado Material propio
Relleno compactado con arena gravosa
Acarreo material propio excedente
Eliminacin de material propio excedente

m
m
m
m
m
m

13.60
6.80
3.00
3.00
20.40
20.40

38.17
66.79
38.52
88.52
22.26
118.27

519.11
454.17
115.56
265.56
454.10
2,412.71
4,221.21

6.00
6.10
6.20
6.30
6.40

BASE TUBERIA - OBRAS DE CONCRETO


Concreto simple f'= 10 MPa (Solado)
Concreto f'c = 21 MPa
Encofrado y desencofrado caravista recto
Acero de refuerzo (fy = 4,200 Kg/cm)

m
m
m
Kgs.

4.50
8.10
16.20
700.00

27.98
410.35
70.98
5.33

125.91
3,323.84
1,149.88
3,731.00
8,330.63

TOTAL OBRAS CIVILES


4.0 Obras Civiles

27,493.23
27493.23

5.0 Gastos Generales Directos

0.00

6.0 Gastos Generales Indirectos

0.00

7.0 Utilidades

TOTAL GENERAL OBRAS CIVILES

0.00
27,493.23

TUBERIA - PANTALON MARIA JIRAY


OBRAS CIVILES
COSTO (S/.)
Unitario
Total

Item

Descripcin

Und.

Metrado

1.00
1.01
1.02

OBRAS PROVISIONALES
Malla plstica P/Seal de peligro-lmite de obra incluye postes de made
Movilizacin y desmovilizacin de equipos, maquinaria y herramientas

M
GLB

30.00
1.00

2.00
2.01
2.02

OBRAS PRELIMINARES
Trazo niveles y replanteo
Demolicin de estructuras existentes

M2
M3

8.40
9.19

3.00
3.01
3.02
3.03
3.04
3.05

MOVIMIENTO DE TIERRAS
Excavacin manual de zanjas
Nivelacin interior y compactado en fondo de zanja
Relleno compactado con material propio
Acarreo interno de material de excavacin (30M)
Eliminacin material excedente

M3
M2
M3
M3
M3

38.76
8.40
17.34
39.80
39.80

4.00
4.01

CONCRETO SIMPLE
Solado de 6" para bases con mezcla 1:10 cemento hormigon

M2

8.40

CONCRETO ARMADO
Bloque de concreto armado
Concreto f'c=210 kg/cm2 para bloque
Encofrado y desencofrado cara vista
Acero de refuerzo fy=4,200 kg/cm2 en bloque de concreto

M3
M2
KG

32.76
45.24
2,163.84

5.00
5.01
5.01.01
5.01.02
5.01.03

Resumen General
1.0
Obras Civiles
2.0
Gastos Generales Directos
Gastos Generales Indirectos
Utilidades
TOTAL GENERAL OBRAS CIVILES

0.00%
0.00%
0.00%

You might also like