B SCHOOL FOR PRESIDENCY UNIVERSITY

Legend

PROJECT : PROPOSED PRESIDENCY UNIVERSITY B.SCHOOL


SUBJECT : PRICE COMARATIVE STATEMENT FOR EXTERNAL HT ELECTRICAL WORKS -RO

Sl#

Description

SINGLE POLE STRUCTURE:


Supply, installation, interconnection (between EB line,
GOSs,DOLO fuse, ), testing and commissioning of 1 No. 11
Mtrs RCC Spun pole with following components mounted : a)
1 set of 11KV, 500Amps,GOS b) 1 set of 11KV, DOLO fuse
unit c) 1 set of 9KV, 5KA, lightning arrester. Rate shall
include all necessary accessories like mounting bracket for
GOS, DOLO , Interconnection of components using suitable
size of aluminium conductor thro alkathilene tube, excavation
, refilling ,foundation for the RCC pole, etc etc complete .

A.2

11KV metering cubicle


Supply, installation, testing and commissioning of outdoor
11KV metering cubicle made up of 14SWG CRCA sheet with
powder coating consisting of following:
- 3nos Current Transformer, resincast, 2.75VA, Class:0.2. - Potential tansformer, resincast, 25VA, class :0.2,
-11KV/110V. - Electronic trivector meter,class:0.2,
Parameters : KWh,KAVRh, MDI in KVA with all necessary
parameters as per EB. Rate shall include all necessary hard
ware complete.
Make: MEI/Star switch gear/Banavathy
(Rate shall exclude civil works for foundation)

A.3

A.4

A.5

A.6
A.6.1

Units

Consultant's Estimate
SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

Rate

ANPCPMC Estimate
SUPPLY
INSTALLATION
Amount
Rate
Amount

M/s Grid Electricals


SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

M/s Flutech Electricals


SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

M/s Veeresh Electricals


SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

M/s Megatron
SUPPLY
INSTALLATION
Rate
Amount
Rate

External Electrical Works

A.1

A.3

Qty

95% less than Consultant's Estimate


Between 95% & 105% to Consultant's Estimate
105% greater than Consultant's Estimate

11KV VCB PANEL (For Transformer-500KVA):


Supply, installation, testing and commissioning of Outdoor
type 11KV Vaccum circuit breaker for 1000KVA Transformer
Protection Unit made up of 16SWG CRCA sheet for body
and 14 SWG CRCA sheet for door, floor mounting, powder
coated, with necessary hard ware, interconnection wiring &
accessories complete.Comprising of following:
-1 no's of 11KV 400A 350MVA 26.3KA 3P VCB Horizontal
drawout
- Transformer protection relay( Minimum OC,SC, EL,
W.Temp)
- "RYB", " TRIP CIRCUIT HEALTH LED" , "ALL Faults" LED
type indicator
- Expandable
Rate shall include all necessary hardwares for installation
complete & shall be as per BESCOM requirement
Make: ABB/ Scheinder
(Rate shall exclude civil works for foundation)
500kVA LOW LOSS TRANSFORMER WITH OLTC
Supply of 11KV/433V 5000KVA transformer, copper wound,
Delta/star grounded, 3 phase,50hz, Dyn11, + 5%or - 15%
ON circuit tap changeover in 17 steps (1.25%/step), suitable
for floor mounting, Impedence as per IS, HT side cable box ,
LT side cable box. Rate shall include factory routine tests as
per IS.
Important: 50%Load loss - 1600Watts , Full load loss 5500watts
Following accessories shall be provided as minimum:
1. Bokholz relay
2. Oil temperature guage/relay.
3. Oil level guage.
4. Winding temp. relay
Make:
OLTC: OLG/CRT
RTCC Relay:Precission Measurements/Peacon
(Rate shall exclude civil works for foundation)
Out door LT box
Supply, installation, testing and commissioning of " L.T
KIOSK" ,outdoor type, IP56, pole mounting, powder coated,
make out of 14 SWG CRCA sheet steel for body and 14
SWG for doors with1 No. of 800Amps 36KA TPN MCCB ,
outgoing cabel box , necessary mounting hard ware &
accessories complete.
(Rate shall exclude civil works for foundation)
YARD FENCING as per STANDARD ELECTRICAL
PRACTICE
Supply & installation of Chain linked fencing for transformer
yard as per below specification:
Frame Size 2.5m x 1.5m
MS Angle 50 x 6mm
Chain Link 8swg GI
Supporting ISMB 75 x 40mm
Paint - 2 coats Red oxide and 2 Coats Enamel.

3 Each

95,000

285,000

12,000

36,000

72,000

216,000

14,500

43,500

63,000

189,000

10,580

31,740

70,000

210,000

25,000

75,000

70,000

210,000

13,000

39,000

92,000

276,000

32,000

1 Each

175,000

175,000

3,500

3,500

180,000

180,000

8,000

8,000

195,000

195,000

7,500

7,500

180,000

180,000

10,000

10,000

194,500

194,500

9,000

9,000

187,594

187,594

22,500

1 Each

450,000

450,000

6,000

6,000

415,000

415,000

10,500

10,500

396,000

396,000

7,500

7,500

490,000

490,000

12,000

12,000

357,000

357,000

12,000

12,000

459,281

459,281

22,500

1 Each

1,520,000

1,520,000

8,000

8,000

1,215,000

1,215,000

18,500

18,500

1,196,800

1,196,800

17,500

17,500

1,185,000

1,185,000

10,000

10,000

1,235,500

1,235,500

15,000

15,000

983,250

983,250

25,000

1 Set

65000

65,000

3,500

3,500

75850

75,850

6,000

6,000

79,000

79,000

4,800

4,800

75,750

75,750

8,500

8,500

79,000

79,000

3,800

3,800

79,005

79,005

12,000

50 Mtrs

1,600

80,000

250

12,500

2,750

137,500

250

12,500

2,500

125,000

485

24,250

4,200

210,000

500

25,000

1,875

93,750

150

7,500

2,800

140,000

400

HT CABLE TERMINATION
Supply and installation of 3Cx185Sqmm 11KV cable heat

A N Prakash Construction Project Management Consultants Pvt. Ltd

Page : 107

B SCHOOL FOR PRESIDENCY UNIVERSITY


Sl#

A.6.2

A.7

Description

Qty

Units

Consultant's Estimate
SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

ANPCPMC Estimate
SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

M/s Flutech Electricals


SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

M/s Veeresh Electricals


SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

M/s Megatron
SUPPLY
INSTALLATION
Rate
Amount
Rate

shrinkable type end termination . Rate shall included all


necessary acessories like glands, copper lugs, mounting
brackets etc etc complete. Make: Raychem
Indoor
Outdoor

3 Each
3 Each

6,800
5,000

20,400
15,000

500
400

1,500
1,200

7,250

21,750
-

1,875

5,625
-

7,425
6,550

22,275
19,650

2,000
2,000

6,000
6,000

4,600
6,500

13,800
19,500

1,500
2,250

4,500
6,750

5,250
5,800

15,750
17,400

1,650
1,780

4,950
5,340

7,087
10,242

21,261
30,726

3,200
3,500

Supply and installation of 3Cx95Sqmm 11KV cable heat


shrinkable type end termination . Rate shall included all
necessary acessories like glands, copper lugs, mounting
brackets etc etc complete. Make: Raychem
Indoor

2 Each

6,800

13,600

500

1,000

6,250

12,500

1,650

3,300

4,810

9,620

1,750

3,500

4,500

9,000

1,500

3,000

4,780

9,560

1,450

2,900

5,922

11,844

3,000

1 Each

750,000

750,000

8,000

8,000

750,000

750,000

15,000

15,000

743,580

743,580

8,700

8,700

757,350

757,350

16,500

16,500

774,600

774,600

10,000

10,000

791,775

791,775

22,500

MAIN L.T PANEL


Supply installation, testing and commissioning of following
L.T PANEL made up of 14SWG CRCA sheet for body and 14
SWG CRCA sheet for door, Outdoor type, floor mounting,
powder coated, with necessary hard ware, interconnection
wiring & accessories complete as per SLD drg#
S668-E-S-Ext-01

A.7.1 Main L.T Panel with PLC


A.8

H.T / L.T CABLES & CABLE TERMINATION


H.T / L.T CABLES
Supply,Laying and testing of 1.1/13KV, armoured, PVC
insulated, alumnimum cables. Cable shall be laid in
exisitng hume pipes/trench/cable tray.

A.8.1
A.8.2
A.8.3
A.8.4
A.8.5
A.8.6

3C x 185 Sqmm XLPE 11KV Al.Armoured Cable


3C x 95 Sqmm XLPE 11KV Al.Armoured Cable
3.5C 240 Sqmm XLPE 1.1KV Al. Armoured cable
4C 25 Sqmm XLPE 1.1KV Al. Armoured cable
4C 16 Sqmm XLPE 1.1KV Al. Armoured cable
4C 2.5 Sqmm copper. Armoured cable

A.9

CABLE END TERMINATION


End terminations of the below listed cables including supply
of brass glands, solders long barrel type copper lugs etc
complete.

A.9.1
A.9.2
A.9.3
A.9.4

3.5C 240 Sqmm XLPE 1.1KV Al. Armoured cable


4C 25 Sqmm XLPE 1.1KV Al. Armoured cable
4C 16 Sqmm XLPE 1.1KV Al. Armoured cable
4C 2.5 Sqmm copper. Armoured cable

15
10
1400
1200
1500
200

Mtrs
Mtrs
Mtrs
Mtrs
Mtrs
Mtrs

1300
19,500
950
9,500
1,100 1,540,000
170
204,000
140
210,000
120
24,000

120
90
90
40
20
20

1,800
900
126,000
48,000
30,000
4,000

1175
819
960
166
125
137

17,625
8,190
1,344,000
199,200
187,500
27,400

50
40
72
30
25
20

750
400
100,800
36,000
37,500
4,000

950
640
820
155
115
130

14,250
6,400
1,148,000
186,000
172,500
26,000

130
90
150
35
30
25

1,950
900
210,000
42,000
45,000
5,000

950
625
845
145
110
125

14,250
6,250
1,183,000
174,000
165,000
25,000

85
75
85
30
25
15

1,275
750
119,000
36,000
37,500
3,000

980
650
870
164
115
150

14,700
6,500
1,218,000
196,800
172,500
30,000

130
106
160
34
32
28

1,950
1,060
224,000
40,800
48,000
5,600

1,162
775
1,023
176
133
146

17,430
7,750
1,432,200
211,200
199,500
29,200

180
120
200
38
35
25

14
8
12
20

Each
Each
Each
Each

1,800
125
100
60

350
70
60
35

4,900
560
720
700

1,833
311
230
140

25,662
2,488
2,760
2,800

238
50
45
35

3,332
400
540
700

1,400
150
130
75

19,600
1,200
1,560
1,500

545
60
35
28

7,630
480
420
560

2,500
225
190
150

35,000
1,800
2,280
3,000

550
150
140
125

7,700
1,200
1,680
2,500

1,100
200
150
100

15,400
1,600
1,800
2,000

650
150
100
75

9,100
1,200
1,200
1,500

1,823
155
140
60

25,522
1,240
1,680
1,200

800
100
90
40

25,200
1,000
1,200
1,200

A.10

9Mtrs RCC
Supply & installation of 9Mtrs RCC pole, Rate shall include
all accessories like J-hook and suspension clamp for
mounting 3x 120Sqmm 11KV Aerial Bunched cable ABC ,
sprial earthing, excavation , concreting etc etc complete

A.11

8Mtrs RCC Stud pole


Supply & installation of 8Mtrs RCC pole (Note: Rate shall
include sprial earthing, excavation , concreting etc etc
complete)

A.12

Guy set with No.15 strain insulator & Concreting materials

A.13

Over head Line(H.T)


Supply, installation, testing and commissioning of Standard
compacted circular Aluminum conductor, conductor
screened with extruded semi conducting compound followed
by copper tape,each core sheathed with PVC type ST-2
compound, 3C twisted around XLPE insulated Aluminum
alloy messenger wire to form 11kV grade Aerial Bunched
Cable (ABC) with specified to IS 7098/II/85 and confirming to
the GTP with wire rope.
(Note:-Rateshall exclude RCC pole,Insulators & Cross arm)

A.13.1 3Runs X 120 Sqmm

A.14

M/s Grid Electricals


SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

Supply & installation of one set of dead end clamp and


bracket sutiable for 3x 120Sqmm 11KV Aerial Bunched
cable ABC on existing 11Mtrs pole with accessories like
brackets , hardware etc. complete

A.14a EARTHING
A.14a.1 G.I PIPE EARTHING
Supply, installation, testing and commissioning of G.I
pipe electrode type earth station as per IS 3043
complete with 38mm dia class 'B' pipe, funnel, test
link, brick masonry chamber with heavy duty cover,
etc etc complete.

22 Each

7,000

154,000

1,000

22,000

6,500

143,000

1,500

33,000

5,750

126,500

1,250

27,500

6,150

135,300

1,575

34,650

6,800

149,600

1,875

41,250

7,303

160,666

2,800

5 Each

4,000

20,000

750

3,750

5,975

29,875

1,250

6,250

5,800

29,000

1,100

5,500

5,950

29,750

1,075

5,375

6,037

30,185

1,650

8,250

7,015

35,075

2,500

5 Each

1,100

5,500

300

1,500

1,500

7,500

500

2,500

1,650

8,250

435

2,175

1,250

6,250

1,000

5,000

1,905

9,525

1,600

8,000

1,500

7,500

500

950 Mtrs

700

665,000

100

95,000

805

764,750

75

71,250

920

874,000

55

52,250

810

769,500

215

204,250

805

764,750

68

64,600

851

808,450

125

8 Each

700

5,600

350

2,800

575

4,600

250

2,000

235

1,880

40

320

1,250

10,000

1,000

8,000

675

5,400

175

1,400

850

6,800

400

10 Each

3,500

35,000

1,250

12,500

4,800

48,000

1,500

15,000

4,800

48,000

1,500

15,000

3,500

35,000

2,500

25,000

4,600

46,000

1,750

17,500

5,800

58,000

2,000

A.14a.2 COPPER PLATE EARTHING


Supply, installation, testing and commissioning of
Copper plate 600x600x3mm electrode earth station as
per IS 3043 complete with 38mm dia class 'B' pipe,
A N Prakash Construction Project Management Consultants Pvt. Ltd

Page : 108

B SCHOOL FOR PRESIDENCY UNIVERSITY


Sl#

Description

Qty

Units

Consultant's Estimate
SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

ANPCPMC Estimate
SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

M/s Grid Electricals


SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

M/s Flutech Electricals


SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

M/s Veeresh Electricals


SUPPLY
INSTALLATION
Rate
Amount
Rate
Amount

M/s Megatron
SUPPLY
INSTALLATION
Rate
Amount
Rate

funnel, test link, brick masonry chamber with heavy


duty cover, etc etc complete.

2 Each

13,500

27,000

2,000

4,000

13,500

27,000

1,500

3,000

12,500

25,000

1,800

3,600

11,500

23,000

4,000

8,000

13,800

27,600

2,250

4,500

14,000

28,000

2,000

A.14a.3 MIANTENANCE FREE EARTH STATION


Supply , Installation , testing and commissioning of 1
number of 3mtr length 5/8" dia JK steel rod moleculerly
bonded with 250 microns copper with SS U clamps & nuts
for interconnecting along with alternative layers of soil and
grounding enchancing matrerial (GEM) which consists of 1
set of 5 Kgs Part 1 (mixture of calcium carbonate,
tetrasodium hexacynoferrate & sodium sulphate) + Part 2 +
1 set of 5Kgs Part 2 (copper sulphate). Rate shall include
excavation, refilling, with heavy duty weather proof
polyplastic earth pit chamber & cover(model#PPC02) etc
complete.
Contact # 09886008218(Mr. Shanth Kumar)

2 Each

12,000

24,000

2,000

4,000

12,250

24,500

2,000

4,000

22,000

44,000

2,500

5,000

15,500

31,000

4,500

9,000

11,000

22,000

2,000

4,000

12,000

24,000

2,000

A.15.1 40x6mm Hotdipped 80micron GI Strip

110 Mtrs

228

25,080

55

6,050

170

18,700

30

3,300

185

20,350

40

4,400

165

18,150

75

8,250

340

37,400

40

4,400

196

21,560

55

A.15.2 25x6mm Hotdipped 80micron GI Strip

100 Mtrs

175

17,500

44

4,400

130

13,000

16

1,600

115

11,500

30

3,000

95

9,500

40

4,000

182

18,200

32

3,200

130

13,000

40

A.15.3 25x3mm GI Strip

250 Mtrs

90

22,500

34

8,500

50

12,500

12

3,000

85

21,250

25

6,250

65

16,250

35

8,750

108

27,000

28

7,000

51

12,750

38

A.15.4 25x6 copper Flat

20 Mtrs

950

19,000

60

1,200

945

18,900

20

400

970

19,400

30

600

795

15,900

40

800

875

17,500

32

640

1,041

20,820

45

2 Each

25,000

50,000

2,000

4,000

22,250

44,500

2,500

5,000

22,500

45,000

3,000

6,000

27,500

55,000

2,500

5,000

22,000

44,000

1,250

2,500

22,138

44,276

3,000

A.16.1 Supply and laying of 150mm Dia 6KG PVC pipe. Rate
shall included excavation and refilling(for incoming Cable)

75 Mtrs

560

42,000

175

13,125

34,875

175

13,125

520

39,000

45

3,375

275

20,625

45

3,375

480

36,000

40

3,000

445

33,375

250

A.16.2 Supply and laying of 75mm Dia 6KG PVC pipe. Rate
shall included excavation and refilling(for incoming Cable)

R/O Mtrs

200

120

250

A.16.3 Supply and laying of 50mm Dia 6KG PVC pipe. Rate shall
included excavation and refilling(for incoming TV & Tel Cable)

R/O Mtrs

85

90

165

4 Each

325

1,300

50

2 Each

298

596
-

A.15

EARTHING STRIP
Supply , laying & termination of following earth strip. Rate
shall include all necessary accessories including clamping
to the walls, cables, cable trays etc complete.

A.15a STREET LIGHTING PANEL (out Door)


Supply, installtion, testing and commissioning of STREET
LIGHT PANEL made up of 16SWG CRCA sheet for body
and 14 SWG CRCA sheet for door, outdoor type, floor
mounting, powder coated,Degree of projection IP56, with
necessary hard ware, interconnection wiring & accessories
complete comprising of the following
Incomming : 40A 4P 10KA MCB
+ 2 nos. 32A 3P AC1 contactor
+ 2 nos. 24hrs Timer
Outgoings : 8 Nos 20A 10KA SP MCB
A.16

MISCELLANEOUS ITEMS

A.16.4 Supply & Installing Danger name plates of approved shape


and size
A.16.6 Supply & installing Shock chart as approved by the
electrical inspectorate
A.16.7 Excavation and refilling upto a depth of 750mm for Cables

465

165

150

200

250

1,000

25

50

100

250

500

12

144,000

365

35

225

35

210

30

250

180

148

30

175

35

175

28

191

150

100

100

400

25

50

480

960

102,000

32

500

2,000

150

750

1,500

50

600,000

450

1,800

75

100

200

980

1,960

40

480,000

Cft

A.16.8 Sand for cable laying

1200

Cft

100

120,000

10

12,000

60

72,000

10

12,000

45

54,000

12

14,400

290

348,000

40

48,000

A.16.9 Burnt bricks for cable laying

2100

Cft

60

126,000

15

31,500

15

31,500

10

21,000

25

52,500

10,500

290

609,000

45

94,500

70

147,000

30 Nos

450

13,500

50

1,500

250

7,500

100

3,000

195

5,850

40

1,200

275

8,250

75

2,250

275

8,250

300,000

300,000

300,000

300,000

200,000

200,000

325,000

325,000

A.17

PROFESSIONAL AND LAISONING CHARGES


(With EB and INSPECTORATE)
Liasion with EB/ Electrical inspectorate, preparation &
getting approval of drawings by Electriciity Board(EB),
obtaining clearence from CEIG for the installation, filing
application and follow-up at different levels with EB,
co-ordinating with MRT dept etc etc complete upto servicing
of power. (Note : Including Deposits)

TOTAL PART
VAT 14.5% and 5.5%
Service Tax 14.0%
GRAND TOTAL

A N Prakash Construction Project Management Consultants Pvt. Ltd

908,922

5,979,775

1,392,532

600

12000

A.16.10 Cast iron cable route marker

1,661,855

3,000

50

100

200

800

1,600

50

15

180,000

80

96,000
-

75

2,250

275,000

275,000

970,905

6,145,425

Included

N/A

730,537

N/A

Included

127,249

194,954

232,660

163,505

7,754,081

7,912,133

8,199,280

9,496,959

8,247,801

L1

L4

L2

698,489

6,040,530

750

6,783,176

632,019

6,903,955

300

1,167,890

875,877

24

75

90,000

25

75

157,500

25

750

22,500

75

500,000

6,456,530
936,197

9,435,926

Page : 109

B SCHOOL FOR PRESIDENCY UNIVERSITY

M/s Megatron
INSTALLATION
Amount

96,000

22,500

22,500

25,000

12,000

20,000

A N Prakash Construction Project Management Consultants Pvt. Ltd

Page : 110

B SCHOOL FOR PRESIDENCY UNIVERSITY


M/s Megatron
INSTALLATION
Amount

9,600
10,500

6,000

22,500

2,700
1,200
280,000
45,600
52,500
5,000

11,200
800
1,080
800
-

61,600

12,500

2,500

118,750

3,200

20,000

A N Prakash Construction Project Management Consultants Pvt. Ltd

Page : 111

B SCHOOL FOR PRESIDENCY UNIVERSITY


M/s Megatron
INSTALLATION
Amount
4,000

4,000

6,050
4,000
9,500
900

6,000

18,750

200

100
288,000
30,000
52,500
2,250

500,000

1,792,280

250,919
9,435,926

L3

A N Prakash Construction Project Management Consultants Pvt. Ltd

Page : 112

COMPARATIVE STATEMENT TECHNO COMMERCIAL


PROJECT : PRESIDENCY UNIVERSITY ' B' SCHOOL @ DIBBUR , BANGALORE.

PROJECT : PROPOSED PRESIDENCY UNIVERSITY B.SCHOOL


SUBJECT : TECHNO COMMERCIAL STATEMENT FOR EXTERNAL HT ELECTRICAL WORKS
Sl. #

Sub Heads

As per TENDER

M/s.Grid Electricals

M/s.Flutech Electricals

M/s.Veeresh Electricals

Item Rate

Item Rate

Item Rate

Item Rate

M/s.Megatron

COMMERCIAL
1

Type of Tender

Validity of tender

60 days from the date of submission

Period of completion

2 calender months from the date of


commencement of work

5% of the value of work done from


Retention money from each interim bill will be retained by
interim bills (interest client in cash. The Amount so retained
free)
shall not bear any interest for duration
retained.

Release of Retention

50% with the final bill. Balance 50%


on expiry of defects liability period of 2
years subject to deduction of amount
paid for rectification of any defects by
the client.

Contractor shall furnish performance


guarantee in the form of a bank
Performance guarantee guarantee of a value equal to 10% of
the contract value less the value of
materials supplied by the client.

Mobilization Advance

Mobilisation advance paid shall be


Recovery of Mobilization
recovered from 2nd RA bill on pro-rata
Advance
basis.

Defect Liability Period

10% of contract value will be paid as


mobilisation advance on production of
bank guarantee for the same amount.

12 (Twelve) months from the date of


issue of virtual completion certificate
from client.

10 Guarantee/Warranty

Where extended guarantee periods


are stipulated in the contract
documents for particular parts of the
works, the contractor shall furnish
appropriate guarantees in approved
formats for same before issuance of
the Final Completion Certificate.

11 Liquidated damages

1% of value of contract per week of


delay, subject to maximum of 5% of
the value of contract.

12 Milestone Penalty

5% of the value of work pending in the


milestone event shall be withheld
(interest free) from running bills

Site
offices
13 Godowns/Labour
campus

Item Rate
30 days from the date of
submission.

/
Vendor scope

A.N.Prakash CPMC Pvt. Ltd.

P: 113/11

Sl. #

Sub Heads

14 Power & water supply

As per TENDER

M/s.Grid Electricals

M/s.Flutech Electricals

M/s.Veeresh Electricals

M/s.Megatron

Power shall be provided by the Client


at one point on chargeable basis;
respective vendor has to do the
required cabling & metering for tap the
power supply from one point. The
contractor, if need be, shall install a
diesel generator set of required
capacity to augment or replace the
power obtained from electricity board
for construction and administrative
purposes. The cost of such installation
and running (including consumables
operational cost) the DG set shall be
entirely borne by the contractor.
*Contractor should inform client peak
load
requirement
before
the
commencement of work. Any delay in
the progress of work due to nonavailability of power shall not be
acceptable.

On award of work, the day of


Date of commencement commencement date shall be
15
of works
mutually discussed between Client &
contractor.
Contractor shall submit RA bills Once
16 Submission of RA bills
in a month.

17 Certification of bills

Interim
bill:
Advance
payment
certification of 50% of RA bill value
within 10 (Ten) days and full
certification within 21 (twenty one)
working days from the date of
complete bill submission and as per
the approved format will be done by
Engineer incharge/site incharge
Final bill: Within 90 (Ninty) days from
the submission of complete bill.

18 Payment terms

Interim bill: Advance payment within


10 (Ten) days from the receipt of
certificate of EIC/Site team and
balance payment shall be paid with all
recoveries within 21 (Twenty One)
days from the date of receipt of
payment certificate from the EIC/site
team and all statutory compliances
(like ESI,PF etc., details for specific
period.

19 Final Bill

Final bill: Within 90 (Ninty) days from


the date of receipt of payment
certificate from the Engineer In
Charge.

A.N.Prakash CPMC Pvt. Ltd.

P: 114/11

Sl. #

Sub Heads

20 Payment terms

21

Taxes
source

deduction

22 Price Validity
23
24
25
26
27
28
29
30

As per TENDER

M/s.Grid Electricals

M/s.Flutech Electricals

M/s.Veeresh Electricals

M/s.Megatron

A. Supply
60%against delivery of materials at
site.
30% against Erection.
10% against testing, commissioning
& Handing over
B. Installation.
* 90% against Installation
* 10% against testing,commissioing &
handing over
Tax shall be deducted at source in
accordance
with
the
statutory
at requirements from all payments made
to the contractor, including that in
respect of the mobilisation advance, if
paid.

Taxes are shown seperately,


Any increase in the taxation will
be implemented accordingly.

The quoted price in the tender is to be


held firm throughout, till the project is
completed.
As per Tender
Applicable
Contractor scope
Applicable

Extra works
Safety
Insurances / Policies
Taxes
Statutory Variations like
taxes, levies, etc.
ESI / PF
Contractor scope
Labour cess
Applicable
Makes of equipment
As per Tender

31 Test certificates.

Required test certificates from


manufacturer to be handed over to
client.

All relevant test certificates and


test reports issued by
manufacturers/ vendors and in
house testing pertaining to
materials will be handed over to
you as a part of project
document. Additional intensive
testing from external agencies
like CPRI, Civil Aid etc. has not
been included in this quote and
will be at an additional cost

32 Exclusions

All civil works are excluded from our


scope.

33 Others

A.N.Prakash CPMC Pvt. Ltd.

P: 115/11

PROJECT : PROPOSED PRESIDENCY UNIVERSITY B.SCHOOL


SUBJECT : LIST OF MAKES

S/L#
Material
1 Transformer

As per Tender - Make


: Kamath/Vijay/Universal

M/s Grid Electricals


: Kamath/Vijay/Universal

MCB & DB's

: LEGRAND/Schneider/ABB

: LEGRAND/Schneider/ABB

MCCB

: LEGRAND/Schneider /ABB

: LEGRAND/Schneider /ABB

LT/HT cable

: Unistar/ KEI/RPG/havells

: Unistar/ KEI/RPG/havells

Wires

: Anchor / RR /havells/Walna

: Anchor / RR /havells/Walna

HT Metering Cubical

: Bhanavathy

: Bhanavathy

Cable glands and lugs : Dowells/Multi

: Dowells/Multi

10

Meters

: MECO/RISHAB

: MECO/RISHAB

11

Indicating lamp

: Technic/Siemens

: Technic/Siemens

12

Selector switch

: Kaycee/Salzer

: Kaycee/Salzer

13

ELR

: Prok Device / Enercon

: Prok Device / Enercon

14

Capacitors

: Ducati / Epcos

: Ducati / Epcos

15

C.T & P.T

: Kalpa / Paras.

: Kalpa / Paras.

16

L.T Panel

: SB Enterprise (9448477089)
JMJ Switch Gears (8884569411)

: SB Enterprise (9448477089)
JMJ Switch Gears (8884569411)

17

HT Panel

: GE/ABB/Schneider

: GE/ABB/Schneider

18

Insulators

: BHEL/Jayashree

: BHEL/Jayashree

M/s Flutech Electricals


: Kamath/Vijay

M/s Veeresh Electricals


: Kamath

: Vijay

M/s Megatron

: LEGRAND/Schneider/ABB

: LEGRAND/Schneider/ABB

: LEGRAND/Schneider/ABB

: LEGRAND/Schneider /ABB

: LEGRAND/Schneider /ABB

: LEGRAND/Schneider /ABB

: KEI

: Havells

: KEI

: Anchor / RR /havells/Walna

: Anchor / RR /havells/Walna

: Anchor / RR /havells/Walna

: Bhanavathy

: Bhanavathy

: Bhanavathy

: Dowells/Multi

: Dowells

: Dowells/Multi

: MECO/RISHAB

: MECO/RISHAB

: MECO/RISHAB

: Technic/Siemens

: Technic/Siemens

: Technic/Siemens

: Kaycee/Salzer

: Kaycee/Salzer

: Kaycee/Salzer

: Prok Device / Enercon

: Prok Device / Enercon

: Prok Device / Enercon

: Ducati / Epcos

: Ducati / Epcos

: Ducati / Epcos

: Kalpa / Paras.

: Kalpa / Paras.

: Kalpa / Paras.

: SB Enterprise (9448477089)

: SB Enterprise (9448477089)

: SB Enterprise (9448477089)

: ABB

: ABB

: GE/ABB/Schneider

: BHEL/Jayashree

: BHEL/Jayashree

: BHEL/Jayashree

You might also like