Manual commissioning can be done only with a non-commissioned BTS. If the BTS to be
commissioned is already commissioned, you need to first run the Undo Commissioning procedure
in BTS Commissioning Wizard.
Summary
The BTS commissioning is done with BTS Commissioning Wizard. It is assumed here that the
LAPD links and the PCM port are activated at the BSC. The BCF is still in Locked state.
Note
BTS SW is loaded to the BTS by the manufacturer. There is usually no need to locally load SW to the
BTS during commissioning.
Steps
1. Open Nokia BTS Manager.
Select Nokia BTS Manager from the Nokia Applications submenu on the Start| Programs menu
in Windows.
2. Start BTS Commissioning Wizard
From the Commissioning menu, select Wizard. The BTS Commissioning Wizard window of Nokia
BTS Manager displays.
3. Select manual commissioning.
Select the Manual Commissioning option and click the Next button.
4. Enter initial settings for manual commissioning of Ultra-Site EDGE BTS.
5. Verify the BTS Commissioning Report.
6. Save the report and exit the Wizard.
Click the Finish button to save the report and exit the BTS Commissioning Wizard.
7. Exit the BTS Manager.
To quit BTS Manager, select Exit from the File menu.
8. Disconnect your laptop PC from the BTSs LMP port.
The commissioning parameters are stored in the BOIA memory.
Note
To start the BTS, it must be unlocked at the BSC.
. Site name
. Site ID
. BCF ID
. BSC ID
. IP Address
. Network ID
2. If there is a FC E1/T1 transmission unit in the BTS configuration, Then
Define LIF and synchronisation settings.
a. Click the LIF Settings button to define line interface (LIF) settings for manual commissioning of
FC E1/T1 units.
b. Click the Synchronisation button to define synchronisation settings formanual commissioning of
FC E1/T1 transmission unit.
c. When done, click Next to continue. The Transmission configuration window for FXC E1(/T1)
unit displays.
Note
If any transmission card other than an FC E1/T1 is used, then the LIF Settings and
Synchronisation buttons do not display in the Set Transmission Parameters window.
3. Send commissioning parameters to the BTS.
In the Transmission Configuration window, click the Start Commissioning button to send the
commissioning parameters to the BTS.
4. If there is an FC E1/T1 transmission unit in the configuration, Then
Allocate F(X)C transmission capacity.
The appearance of the Transmission Configuration Wizard window is different. Click the Traffic
Manager button to allocate FC transmission capacity. This will establish a transmission
connection between the BTS and the BSC.
Note
If the connection fails, see Trouble management of Ultra-Site EDGE BTS commissioning.
When you click OK in Traffic Manager, the Transmission Configuration window reappears. The Back
button is disabled, because the transmission parameters have already been sent to the BTS. If you
need to change any parameters you have specified prior to this point, you must run the Undo
Commissioning procedure and then re-commission the BTS.
b. When you have completed the testing (or verifying), or if you do not use these EAC inputs, click
the Next button.
13. Verify EAC outputs.
a. Verify the EAC outputs by changing the EAC states. Mark the required EACs as In Use.
b. When you have finished the EAC output settings, click the Set Outputs button to send the
information to the BTS.
c. After you have completed verifying, click the Next button.
Note
The Next button remains disabled until you select the checkbox for all outputs that are In Use.
EAC inputs and outputs windows are only for testing the lines. Recommissioning is not necessary
if new EAC lines are added later. EAC lines are defined at the BSC, which activates the lines into
use.The EAC names and polarities are defined at the BSC.
7.6.3 Defining Line Interface (LIF) settings of transmission (FC E1/T1) units of UltraSite
EDGE BTS
Before you start
Review Manual commissioning of Ultrasite EDGE BTS for procedure to start manual
commissioning.
Steps
1. Display the LIF settings.
a. Click the LIF Settings button in the Set Transmission Parameters window.
b. The LIF settings window displays.
2. Select the Interface in Use option.
3. Select the interface mode from the list.
4. If you selected the E1 750 ohm interface mode or the E1 120 ohm interface mode,
Then
Define the TS0 fixed bits in the LIF settings window for E1 120 ohm mode.
TS0 fixed bits 1 to 3 are reserved for CRC and frame locking. Bits 4 to 8 are used for alarms and
data transfer in national connections.
Select the CRC in Use option the way it is defined at the BSC.
5. If you selected the T1 100 ohm interface mode,
Then
Define the Framing Format, Line Code and T1 Interface Type settings in the LIF Settings
window for T1 100 ohm mode of UltraSite BTS Hub Manager.
6. Click OK to accept the changes.
Commissioning windows of UltraSite EDGE BTS
BTS HW Configurator/Create New Configuration windows
Configuration Wizard window of BTS HW Configurator
Unit settings with FXC RRI unit setting window of UltraSite BTS Hub Manager