Professional Documents
Culture Documents
- Informacin Bsica :
CUADRO
DE NIVELES
Y AREAS
PARCIALES
EN LA ZONA
DE EMBALSE
ELEVACIN (msnm)
AREAS PARCIALES (K
0.000
0.010
0.020
0.050
0.100
0.220
0.380
0.680
1.164
1.492
2.020
2.780
3.180
3.650
4.085
4.320
5.360
5.958
6.620
7.268
7.810
2450.00
0.0000
2455.00
2460.00
25000.00
75000.00
2465.00
175000.00
2470.00
375000.00
2475.00
800000.00
2480.00
1500000.00
2485.00
2650000.00
2490.00
4610000.00
2495.00
6640000.00
2500.00
8780000.00
2505.00
12000000.00
2510.00
14900000.00
2515.00
17075000.00
2520.00
19337500.00
2525.00
21012500.00
2530.00
24200000.00
2535.00
28295000.00
2540.00
31445000.00
2545.00
34720000.00
2550.00
37695000.00
165.00
50.00
0.30
GC, GM y GP (material r
1.10
1.55
0.443
21.60
15.00
20.00
26.56
40.00
1880.00
Volumen acumulado (
0.0000
2455.00
0.0250
0.0250
2460.00
0.0750
0.1000
2465.00
0.1750
0.2750
2470.00
0.3750
0.6500
2475.00
0.8000
1.4500
2480.00
1.5000
2.9500
2485.00
2.6500
5.6000
2490.00
4.6100
10.2100
2495.00
6.6400
16.8500
2500.00
8.7800
25.6300
2505.00
12.0000
37.6300
2510.00
14.9000
52.5300
2515.00
17.0750
69.6050
2520.00
19.3375
88.9425
2525.00
21.0125
109.9550
2530.00
24.2000
134.1550
2535.00
28.2950
162.4500
2540.00
31.4450
193.8950
2545.00
34.7200
228.6150
2550.00
37.6950
266.3100
msnm
2560.00
2540.00
2520.00
VOLUMEN TIL =
165 MMC
(2493.607 - 2535.405
msnm)
2500.00
2480.00
VOLUM. MAX.
MAXIMORUM =
200 MMC
(2540.879 msnm)
VOLUM. MAX.
DE OPERACION = 180
MMC
2460.00
VOLUMEN MUERTO =
15 MMC (2493.607 msnm)
2440.00
2420.00
2400.00
0
50
100
150
VOLUMEN (MMC)
200
250
165.00
15.00
180.00
20.00
200.00
MMC
MMC
MMC
MMC
MMC
2549.88 msnm
b (ancho de coro
Nivel de corona
h4
h3
2535.405 msnm
SUPERALMAC.
h2
h1
2540.879 msnm
N.A.M.E
VOLUMEN
UTIL
VOLUMEN
MUERTO
2493.607 msnm
2450.0 msnm
h4 = Hm + Hc + H + Hsg
Donde:
Hm =
Hc =
H =
Hsg =
Altura de Marea
Altura de Superficie inclinada
Asentamiento de Corona
Altura de Seguridad
Hm
V 2 W * F * cos
2600 * D
Vw =
F=
ang. =
D=
6.00 km/h
0.30 km
15.00
85.41 m
Hm =
0.00005 m
3.2.- Clculo de Hs :
Calcularemos para Paramento Vertical :
0.75 m
Hs =
1.21 m
HS
H
0.624
H c 0 .4 * T *
g * H s * Tg ( )
Hc =
1.07 m
3.3.- Clculo de H :
H = K*H
K = 8.00E-06
H = 85.41
H =
5.84 m
1.825 m
Hsg =
1.066 m
Hsg mnima =
0.60 m
Finalmente :
Hsg =
1.825 m
H4=
8.726 m
H4 =
9.000
HE = h1+h2+h3+h4
Finalmente :
h1
h2
h3
h4
(m) =
(m) =
(m) =
(m) =
43.61
41.80
5.47
9.00
HE
(m) =
100.00
2550.00
bco r C * H
1/ 2
11.0
bco r C * H 1 / 2
b cor =
12.00
z1
4394* D
1
2 * C D * W * tan
Entonces :
Finalmente :
z1 =
2.785
z1 =
3.00
1
H E * (2 * C H E * W * tg )
Entonces :
Finalmente :
z2 =
1.828
z2 =
2.00
3.00
1
2.00
N PARCIAL (m3)
AREAS (m2)
0.00
50000.00
100000.00
250000.00
500000.00
1100000.00
1900000.00
3400000.00
5820000.00
7460000.00
10100000.00
13900000.00
15900000.00
18250000.00
20425000.00
21600000.00
26800000.00
29790000.00
33100000.00
36340000.00
39050000.00
MMC
aos
MMC
GC, GM y GP (material rocoso)
sg
Km
Km/hora
MMC
Kg/m3
ULADOS
200
VOLUM. MAX.
MAXIMORUM =
200 MMC
(2540.879 msnm)
250
300
b (ancho de corona)
* H s * Tg ( )
Ht
6.00
43.6
0.97
41.8
85.4
00E-06
.41
l de Superalmacenamiento)
99.88
0.8390996298
H E * W * tg )
W * tg )
He (m) = 100.00
1.00