G&P GEOTECHNICS SDN. BHD.

Project

Project No.

(GEOTECHNICAL CONSULTANTS)
Company No. 490887A

Work Ref.

Sheet No.

Rev.

DESIGN SHEET
TITLE

Design

Piles Setting Out Diagram

y (+ve)

Pile

Check

column
position
(0,0)

Review

y (+ve)
My (+ve)

x
(+ve)

y (deviation):
(+ve)

Date

column position
(0,0)

x (deviation):
(+ve)

Mx (+ve)

x
(+ve)

Consider column position at coordinates (0,0)


X and Y (Original) refer to the original pile location with respect to column position.
X and Y (deviations) refer to the shifting of the pile head after installation.
Grid Line :
F/3B
Pilecap Ref : 2P2
No. of Piles :
40
Total Column Load :

Allowable

Pile No W.Load
(kN)

1
2
3

500
500
500

nos.
1500

kN

Moment about x-direction, Mx=


Moment about y-direction, My=

0
0

exx
Fcu
x
y
dx
dy Asbuilt Asbuilt eyy
Lengt
h (m) (kN/mm2) (mm) (mm) (mm) (mm) x (mm) y (mm) (mm) (mm)
6
6
6

25
25
25

-375 -217
375 -217
0
433.3

-44
-64
-58

5
-73
-31

-419 -212
311 -290
-58 402.3

###

###

kNm
kNm

P1
(kN)

Mxx
(kN)

Myy Reaction
(kN)
(kN)

500

###

###

500

###

###

500

###

###

#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!

Status

Overstressing
#VALUE!
#VALUE!
#VALUE!
-

GUE & PARTNERS SDN. BHD.

Project Title

Job No.

Work Ref.

Sheet No.

(GEOTECHNICAL CONSULTANTS)

Company No. 490887A

DESIGN SHEET
Design

TITLE

REF.

Check

Review

Date

F/3B

Pilecap ref:

CALCULATIONS

OUTPUT

Calculation For Load Distribution in Pile Group


Number of Pile =

40

Total Column Load =

1500

Gridline:

Less Than Total Working Load, OK

y (+ve)

Moment about X direction, Mx =

Moment about y direction, My =

y (+ve)

column position
(0,0)

Pile

My (+ve)
x (+ve)
y (deviation):
(+ve)

x (+ve)
Mx (+ve)
column position
(0,0)

x (deviation): (+ve)

Consider column position at coordinates (0,0)


X and Y (Original) refer to the original pile location with respect to column position.
X and Y (deviations) refer to the shifting of the pile head after installation.

No. Pile

Working
Load, A

Pile
Length, L

Concrete
Grade, fcu

Young
Modulus, Ecs

(kN)

(m)

(kN/mm2)

(kN/mm2)

Vertical
Stiffness

Stiffness
Ratio

500

25

25

2.0833

0.3333

500

25

25

2.0833

0.3333

500

25

25

2.0833

0.3333

Total Vertical
Stiffness

6.2500

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Total
Working
Load

1500

2P2

kNm
kNm

GUE & PARTNERS SDN. BHD.

Project Title

Job No.

Serial No.

Sheet No.

(GEOTECHNICAL CONSULTANTS)

Company No. 490887A

DESIGN SHEET

2
Design

TITLE

REF.

Check

CALCULATIONS

No. Pile

original

deviations

Review

Date

OUTPUT

original - deviations

x (mm)

y (mm)

x (mm)

y (mm)

x (mm)

-375

-216.7

-44

-419

y (mm)

-211.7

2
3

375
0

-216.7
433.3

-64
-58

-73
-31

311
-58

-289.7
402.3

GUE & PARTNERS SDN. BHD.

Project Title

Job No.

Serial No.

Sheet No.

(GEOTECHNICAL CONSULTANTS)

Company No. 490887A

DESIGN SHEET

3
Design

TITLE

REF.

Check

Review

Date

CALCULATIONS

No. Pile

X (mm)

Y (mm)

-419

-211.7

2
3

311
-58

-289.7
402.3

resultant eyy
(xdirection)

#VALUE!

resultant exx
(y-direction)

OUTPUT

Xn (mm)

Yn (mm)

Ixx
(=AnYn2)

Iyy
(=Anxn2)

#VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!

Total

#VALUE!

#VALUE!

GUE & PARTNERS SDN. BHD.

Project Title

Job No.

Serial No.

Sheet No.

(GEOTECHNICAL CONSULTANTS)

Company No. 490887A

DESIGN SHEET

4
Design

TITLE

REF.

Check

Review

CALCULATIONS

Date

OUTPUT

No. Pile

P1 (kN)

(Nexx+Mx)YnAi/Ixx (kN)

(Neyy+My)XnAi/Iyy(kN)

Final Load (kN)

500

#VALUE!

#VALUE!

#VALUE!

###

2
3

500
500

#VALUE!
#VALUE!

#VALUE!
#VALUE!

#VALUE!
#VALUE!

###
###

Total

#VALUE!

GUE & PARTNERS SDN. BHD.

Project

Project No.

Work Ref.

Sheet No.

(GEOTECHNICAL CONSULTANTS)
Company No. 490887A

Rev.

DESIGN SHEET
TITLE

Design

REF.

Check

Review

DESIGN

Date
OUTPUT

DETERMINATION OF CENTER GRAVITY FOR COMBINED COLUMN LOADING

GridLine :

F/3B

Pilecap Ref:

2P2

Methodology

Column 1
y

yi

(x,y)

Column
2

Center of
Gravity
x
CG

Datum

xi

Column

Load (kN)

Distance xi

Distance yi

From Datum

From Datum

(mm)

(mm)

Load * Distance

Total

Gue & Partners Sdn Bhd - 296439294.xls

Centroid ,

Centroid ,

y =

#DIV/0!
#DIV/0!

Quality Service - Our Commitment

Explanatory Notes: Title :

AD015 - Pile Eccentricity Analysis

Revision :

R0

Objective :

1. To compute each pile reaction due to column loading

Notes :

1. Key in the following details for the pile eccentricity analysis:


a.) Number of piles
b.) Total Column Loading
c.) Moment at x & y directions
d.) Each Pile Allowable Working Load
e.) Pile Length after cut off
d.) Pile Characteristic Strength, Fcu
f.) Pile Eccentricity

Concept & Method:

1. Loading on piles (considering column loading only)


P = Pile Stiffness Ratio x Total Column Loading
Pile Stiffness Ratio =

Pile Vertical Stiffness , (Ecs x A) / L


Total Pile Vertical Stiffness , (Ecs x A) / L

Where

Ecs = Pile's Young Modulus (based on BS8110 Part 2:1985, Eq.17)


A = Pile Allowable Working Load
L = Pile Length after cut off

2. Additional loading on piles (considering pile deviation and moment)


Padd = (Nexx/yy + Mx/y) x Yn x Ai
Ixx/yy
Where

N
= Total Column Loading
exx/yy = Resultant eccentricity, exx (in y direction) , eyy (in x direction)
Mx/y = Moment at x / y direction
Yn = Resultant Y - coordinate for pile n
Ai = Allowable Pile Working Load for pile i
Ixx/yy = Total Moment Inertia in x / y direction

Limitation:

1. Limited to only three (3) to forty (40) nos. of piles.


2. Column position is always consider located at position 0,0.
3. X and Y (Original) refer to the original pile location
with respect to column position.
4. Use worksheet "Determination of C.G" to compute the
centroid of combined column.