14.1 GENERAL

14.1 TNG QUT

14.1.1 DESCRIPTION

14.1.1 M T

The Sub-Contractor shall supply, install and

Nh thu s cung cp, lp t v gim nh my

commission

generator

pht in, t iu khin, bn cha nhin liu, bm

control panel, fuel tanks, fuel pumps and fuel


pipes which shall form part of the Works as

nhin liu v h thng ng nhin liu, v nhng


cng vic c th hin trn bn v.

the

generator

set,

shown on the Sub-Contract Drawings.


The Sub-Contractor shall be responsible for
moving the generator set into position, installing

Nh thu c trch nhim vn chuyn my pht vo


v tr lp t, lp t h thng ng khi, b gim m,

the

making all

lm tt c s u ni cn thit cho t iu khin

necessary connection to the generator control


panel, fuel tank pipework, batteries, etc. and all

my pht, h thng ng dn nhin liu, bnh c


qui,v.v,v tt c cc trang thit b cn thit a

necessary equipment for putting the set into

my pht vo hot ng.

exhaust

pipes, silencers,

operation.
Each generator shall have a total continuous

Mi my pht phi c tng cng sut pht ra lin tc

output rating as shown on the Sub-Contract

nh c thit k trong bn v.

Drawings.
The system shall automatically be started upon

H thng s t ng khi ng khi ngun chnh b

the receipt of a mains failure indication and shall


be in a position to deliver its total output in 15

mt v s sn sng pht ra cng sut trong 15 giy


hay t hn cho t in d phng.

seconds or less directly to the emergency


switchboard.
Upon the restoration of the mains and the

Khi ngun chnh khi phc li v sau khi ti c

consequent loss of electrical demand on the

ng tr li vo ngun chnh, my pht vn s duy

generation system the diesel generator set shall


remain running for a period of not less than ten

tr chy trong mt thi gian khng di 10 pht


cho php cn bng c tnh nhit ca ng c ri

minutes to allow stabilising of the thermal

t ng dng my.

characteristics

of

the

engine

and

then

automatically shut down.


14.1.2 STANDARD

14.1.2 TIU CHUN

All equipment, materials and workmanship

Tt c trang thit b, vt t v nhn cng phi tun

shall comply with the appropriate Singapore or

theo tiu chun Singapore hay British Standards

British Standards or an acceptable equivalent

hay mt tiu chun quc t tng ng cng

international standard as well as all local


statutory obligations and regulations.

nh cc quy nh v php l v quy nh ca


nc s ti.

All aspects of the installation shall be in


accordance with the requirements of the

Tt c cc tiu ch lp t phi ph hp theo yu


cu ca Singapore Standard Code of Practice

Singapore Standard Code of Practice CP 31:

CP 31: 1985 - The installation, operation,

The English language version prevails


SECTION 14/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


14/1

J. Roger Preston Vietnam Co., Ltd


SECTION 14 STANDBY GENERATOR INSTALLATION

MC 14 MY PHY IN D PHNG

1985 - The installation, operation, maintenance,

maintenance, performance and constructional

performance and constructional requirements of

requirements

mains failure standby generating systems.

generating systems.

14.1.3 MANUFACTURE

of

mains

failure

standby

14.1.3 NH SN XUT

All equipment and materials shall be supplied


by a single manufacturer to ensure uniformity of

Tt c trang thit b v vt t s c cung cp bi


mt nh sn xut m bo v ng b v tiu

standards and composition.

chun v cht lng.

All equipment and accessories shall be new


and shall be clearly marked to identify different

Tt c thit b v ph kin phi m bo mi v c


nh du r rng phn bit cc b phn, vt liu

components, materials and manufacturers.

v nh sn xut khc nhau.

14.1.4 SUBMISSIONS

14.1.4 S TRNH

The Sub-Contractor shall submit the following

Nh thu s trnh ln cho Qun l K thut nhng

information to the Engineer at the time stated:

thng tin nh sau:

During tender, all information in accordance

Trong sut thi gian b thu, tt c thng tin phi

with the Form of Tender.

ph hp vi mu d thu.

Before assembly of the generator set,

Trc khi lp rp my pht:

An outline drawing of the generating set


with

dimensions,

weights

and

all

Mt bn v phc tho ca my pht v kch c,


trng lng v chi tit ca s thnh lp.

foundation details


Requirements for fuel pipe connections,

exhaust pipe connections, and oil and

Th tc lp rp ng dn du, ng khi v ng
x ng nc.

water drains


Requirements for installation of valves,

Th tc lp rp cc van, bm,v.v.

Ton b bn v dy dn v biu ca h thng

pumps, etc.


Complete schematic and wiring diagram


of the electrical system

in.

Before delivery of the equipment to site, a draft

Trc khi giao cc thit b n ni, mt bn d tho

copy of his proposed commissioning and

copy xut th tc kim nh v kim tra phi

testing procedures for approval.

c trnh ln xem xt v chp thun.

After commissioning, 4 sets of installation,


operation
and maintenance
instructions

Sau khi thm nh, 4 b ti liu v lp rp, vn


hnh, v hng dn bo tr ton b vi bin bn

complete commissioning and testing reports to

kim nh, kim tra s c trnh ln Qun l K

the Engineer.

thut.

14.2 EQUIPMENT
The English language version prevails
SECTION 14/VISTA VERDE SPECS/ELECT

14.2 THIT B
u tin s dng ting Anh khi c tranh chp
14/2

J. Roger Preston Vietnam Co., Ltd


SECTION 14 STANDBY GENERATOR INSTALLATION

14.2.1 GENERAL

MC 14 MY PHY IN D PHNG

14.2.1 TNG QUT

The Sub-Contractor shall supply, install and put

Nh thu s cung cp, lp t v a vo hot

into operation an automatic standby diesel

ng mt my pht d phng t ng cng vi mt

generating set complete with a combined


generator and mains failure control panel.

my lin kt v t iu khin t ng. Bao gm t


kim sot ha ng b t ng v chia ti nh

Auto-synchronisation and load shedding control

c th hin trn bn v.

panel where indicated on the Sub-Contract


Drawings shall also be included.
The generator shall be fully equipped for radio

My pht c trang b y vi b kh nhiu

interference suppression to BS EN 800: 1988 Specification for limits and methods of

sng v tuyn theo BS EN 800: 1988 - Specification


for limits and methods of measurement of radio

measurement

interference

interference characteristic of household electrical

characteristic
of
household
electrical
appliances, portable tools and similar electrical

appliances, portable tools and similar electrical


apparatus.

of

radio

apparatus.
14.2.2 GENERATOR SET

14.2.2 MY PHT

The generating set shall be suitable for cold or

My pht c kh nng khi ng lc ang nng hay

hot starting and for the acceptance of an


instantaneous load of 60% full rated load

ngui v nhn 60% ti nh mc tc th ngay sau


khi my t c in p v tn s ci t. Tt c

immediately after attaining normal voltage and

cc trang thit b phi ph hp hot ng trong

frequency. All equipment shall be suitable for


tropical climatic operation.

iu kin kh hu nhit i.

The generating set shall comprise a diesel

My pht gm c mt ng c chy du diesel ni

engine directly coupled to an alternator through


a flexible coupling and mounted in line on a

trc tip vo mt my pht in bng mt khp ni


mm v c gn thng hng trn mt tm chn

common skid type bedplate complete with

chung nh tm m c chng rung ng ton

anti-vibration mountings so that the complete


unit can be located on a solid concrete floor

b my c th t trn sn btng cng m khng


truyn rung ng sang nhng thit b k cn hay bt

without

k phn no khc ca to nh.

transmitting

vibration

to

adjacent

apparatus or any part of the Building.


All exposed ferrous metal surfaces of the

Tt c b mt kim loi bn ngoi ca my, khung

machines, underframe, enclosures and auxiliary

, che chn bn ngoi, v cc thit b khc, khi c

equipment shall, where applicable, be treated


with rust-inhibiting primer paint, undercoat and

lp t, phi c sn lp sn chng r st, sn lt


v lp sn cui theo mu ca nh sn xut hay

finishing coat of the manufacturer's colour or as

c chn la bi Qun l K thut.

selected by the Engineer.


Where all-weather enclosure self-contained

Khi my pht t c lp ngoi tri c tng ro

generator sets are specified, the enclosure shall

quy xung quanh, tng ro phi phi c lm t

be fabricated from 2.0 mm sheet steel and


sound insulated to meet the noise level

tm thp dy 2.0mm v c cch m ph hp


c n nh yu cu y. B gim m ng

requirement as specified herein. Intake and

vo v ng x v ca chng n s c lp t

The English language version prevails


SECTION 14/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


14/3

J. Roger Preston Vietnam Co., Ltd


SECTION 14 STANDBY GENERATOR INSTALLATION

discharge sound attenuators and acoustic


doors

shall

be

provided

to

meet

MC 14 MY PHY IN D PHNG

ph hp vi yu cu ny.

this

requirement.
The noise level of the complete generator set

n ca my pht o c cch xa 1m t phng

measured at 1 metre from the generator room

my hay v cch m khng c vt qu 70 dBA

or enclosure shall not exceed 70 dBA.


14.2.3 DIESEL ENGINE

14.2.3 NG C DU DIESEL

The diesel engine shall be a high speed,


water-cooled, mechanical injection, four stroke

ng c diesel s l loi tc cao, gii nhit bng


nc, phun du c kh, loi 4 th ph hp vi BS

single

type

5514 - Reciprocating internal combustion engines:

complying with BS 5514 - Reciprocating internal


combustion engines: performance, de-rated to

performance, c tc thay i ph hp vi iu
kin ca ti. ng c c kh nng chu qu ti

acting

compression

ignition

suit local conditions. The engine shall have an

110% khng lin tc hay 10% ti lin tc trong mt

overload capacity of 110% for an intermittent

gi v s c cung cp cng vi nhng thit b h

duty or 10% continuous load for one hour and


shall be supplied complete with the appropriate

tr thch hp khc.

accessories.
Only enclosed forced feed lubricating system by

H thng bm du cho my c chp nhn ch l

gear type oil pump suction strainer and large

loi bm bnh rng c lc du ng ht v bm

capacity oil pump will be accepted.

c dung lng ln.

Dust-proof, multi-cylinder fuel injection pump,

Chng bi, bm phun nhin liu cho cc u xi

fuel lift pump and mechanical governor shall be

lanh, bm du v my iu tc s c lp t ph

provided in accordance with BS 5514.

hp vi BS 5514.

Starting shall be achieved by a 24V electric

S khi ng s bt u bng mt m t khi ng

starter motor and dynamo complete with cutout


and control box.

din 24V v dynamo c hp iu khin v cut out.

Instrument

T kim sot my pht c lp mt ng h o tc

tachometer and hour-run meter, oil pressure


and temperature gauge and water temperature

, v ng h hin th thi gian my hot ng, o


p lc du v nhit , ng h o nhit nc,

gauge, battery charger, ammeter and push

dng sc bnh v cng tc nhn kh ng.

panel

shall

be

fitted

with

button start switch.


The engine shall be fitted with high water

ng c lp bo v dng khi nhit nc gii

temperature, over speed, low oil pressure

nhit cao, vt tc, cng tc p lc du ct khi

switch and a fuel shut down solenoid.

p lc du thp v van solenoid ct du khi ng


c shut down.

14.2.4 ALTERNATOR

14.2.4 MY PHT IN

The alternator shall have a continuous rated


The English language version prevails
SECTION 14/VISTA VERDE SPECS/ELECT

B pht in s c cng sut ng ra lin tc nh


u tin s dng ting Anh khi c tranh chp

14/4

J. Roger Preston Vietnam Co., Ltd


SECTION 14 STANDBY GENERATOR INSTALLATION

MC 14 MY PHY IN D PHNG

output as shown on the Sub-Contract Drawings

c th hin trn bn v v c kh nng hot

and shall be capable of operating without

ng m khng b h hng khi ng c vn hnh

damage when the engine is operating at the full

y ti nh m t trn.

load as specified above.


The alternator shall be de-rated to suit local

My pht s c gim nh mc ti ph hp

conditions and
tropical duty.

for

vi iu kin thc t v c bit l vI cng sut


nhit.

The alternator shall be of the brushless,

My pht l loi khng c chi than, t trng quay,

revolving field, screen protected, salient pole,


horizontal foot mounting type provided with a

mn hnh bo v, cc li, chn nm ngang, vi


mt rto kch t u trc i, trc c gn b diode

direct coupled overhung exciter armature, shaft

quay nn dng, cnh c gn nam chm kch t,

mounted rotating fused diode rectifier assembly,


flange mounted exciter magnet shaft with bare

trc c trc trn ko di ph hp nhn mt khp


ni mm. Hai u cui s c gn u bm m bi

shaft extension suitable for receiving a flexible

trn cho bc n.

specially

impregnated

coupling. Two-end frame mounted grease


lubricated bole and/ or roller bearing shall be
provided.
The alternator shall be suitable for parallel
operation and shall be equipped with inter-

My pht phi ph hp chy song song v s


c trang b dy dn kt nI vo b kch t v

connected damper windings and quad droop

mch h mt dng.

circuit.
The alternator shall comply with BS 4999 -

My pht phi theo tiu chun BS 4999 - General

General requirements for rotating electrical

requirements for rotating electrical machines c

machines having Class H insulation or better.

cch in loi Class H hay cao hn.

The

with

My pht cng s c hp u dy gn bn hng

termination box mounted on the side of the


stator designed to accept flexible cables from

ca stator, c thit k dy cp mm i vo t
pha di v c ra dy trung tnh.

alternator

shall

be

complete

below and with the neutral brought out.


Terminal identification shall comply with the
requirements of BS 822: Part 6: 1988 - Terminal

S nhn dng cc u u dy phi theo tiu


chun ca BS 822: Part 6: 1988 - Terminal

markings for rotating electrical machinery.

markings for rotating electrical machinery. Trm u

Terminals shall be fitted with compression type


cable sockets and shall be housed in a suitably

dy s c lp loi c l ghim p dy v s c
t trong hp kim loi c ni t v thch hp cho

earthed metal enclosure having provision for

s u dy cp mm bn ngoi. Long n kha s

external flexible cable connections. Locking

c lp tt c cc u trm u dy m bo

washers shall be provided on all terminals to


ensure that connections will not loosen under

chng khng b lng ra dui iu kin hot ng


bnh thng.

normal working conditions.


Adjustment shall be provided on the control

S cn chnh c lp t trn t iu khin ci

panel for pre-setting the alternator voltage

t in p ra ca my pht t 360V n 420V. mt

The English language version prevails


SECTION 14/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


14/5

J. Roger Preston Vietnam Co., Ltd


SECTION 14 STANDBY GENERATOR INSTALLATION

MC 14 MY PHY IN D PHNG

between 360V to 420V. An automatic electronic

b n p in t c lp t kim sot in p

voltage regulator shall be provided to control the

gia + 1 1/2% t trng thi khng ti n y ti vi

voltage between + 1 1/2% from no-load to full

h s cng sut 0.8 tr n ng nht.

load steady state with a power factor at 0.8


lagging to unity.
Adjustment shall be provided at the control
panel for pre-setting the speed frequency of the

S cn chnh c lp trn t iu khin ci t


tn s ca my sao cho duy tr tn s 50 Hz t lc

unit which thereafter shall maintain a frequency

khng ti cho n y ti trong iu kin trng thi

of 50 Hz from no load to full load under steady

n nh.

state conditions.
Third harmonics shall be effectively suppressed

Sng iu ha bc ba phi c kh han ton

to the satisfaction of the Engineer.

tha mn theo yu cu ca Qun l K thut.

14.2.5 COOLING SYSTEM

14.2.5 H THNG GII NHIT

The cooling system shall comprise a tropical

H thng gii nhit gm b gii nhit chu p lc c

duty pressurized radiator with thermostatic

nhit tnh kim sot chu k lm mt ca nc gii

control of engine cooling water circuit and


bypass to suction side of water pump, complete

nhit v bypass sang phn ht ca bm nc, c


qut gii nhit, np che my v li che bo v.

with fan, cowl and hand protection guard. The

Khng kh nng t b gii nhit s c dn ng ra

hot air from the radiator shall be ducted out of


the engine room through a louvred panel. The

khi phng my thng qua mt tm mi che


(lourve). Nh thu s phi cung cp tm ni mm

necessary ductwork complete with anti-vibration

chng rung cho nhng ng ng dn cn thit.

flexible

Phng php lp t ng dn phi c s ng

joint

shall

be

provided

by

the

Sub-Contractor. The method of fixing the duct


shall be agreed by the Engineer.
14.2.6 EXHAUST SYSTEM

ca Qun l K thut.

14.2.6 H THNG KH THI

A complete exhaust system comprising the

Mt h thng kh thi hon chnh gm c nh sau:

following shall be provided:a) EXHAUST PIPEWORK

a) NG NG KH THI

Exhaust pipe shall be constructed from medium


weight black steel piping of welded construction.

ng ng kh thi s c lm t thp en c
trong lng trung bnh ng c cu trc hn. Ton

The entire exhaust pipe shall be adequately

b ng ng kh thi phi c gi mt cch ph

supported and a cowl shall be provided at the

hp v mt ci chp ng khi s c lp cui

end of the exhaust pipe to prevent ingress of


rain water.

ng ng ngn khng cho nc ma vo..

Exhaust pipe shall be terminated with an insect


screen in the form of a cylinder constructed

ng kh thi s kt thc bng mt ci mng chng


cn trng c kiu dng hnh tr c lm t dy

from corrosion resistant metal wire netting. A

li kim loi khng r st. Mt khp ni mm gia

The English language version prevails


SECTION 14/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


14/6

J. Roger Preston Vietnam Co., Ltd


SECTION 14 STANDBY GENERATOR INSTALLATION

MC 14 MY PHY IN D PHNG

flexible coupling between the manifold and the

hp kh x trn u my pht v ng ng x s

exhaust pipe shall be provided inside the

c lp t trong phng my.

generator room.
All exhaust piping, flexible couplings, flange

Tt c cc ng ng, ch ni mm, cc u ni,

joints, etc. shall be externally lagged with

v.v, s c bc bng si len cng chu nhit

minimum 75mm thick high temperature


rockwool and cladded with minimum 18g sheet

cao vi b dy ti thi l 75mm v c bao trm


bng mt tm thp vi b dy ti thiu l 18g

steel to prevent seepage of exhaust fumes and

ngn cn s r r khi v lm gim nhit trong

reducing heat in the generator room or

phng my pht v nhng phn khc ca to nh .

enclosure and the rest of the building.


All penetrations through the exterior walls for

Tt c ng ng x i qua tng b ngoi cng

exhaust pipework shall also be isolated with


high temperature rockwool rope insulation or

s c bc cch nhit bng dy thng chu nhit


cao hay vt liu tng ng v bt kn gi bng

equivalent and sealed airtight with a resilient

mt hp cht c tnh gin n. Tt c nhng ch

non-setting compound. All other penetrations

tng khc ca to nh m chng i xuyn qua

through building walls must be similarly sealed.

cng phi c lm tng t.

Special treatment of the exhaust discharge shall

ng khi thi s c x l c bit khi phng

be provided in areas where residential


accommodation is in close proximity to the

my pht trong khu vc gn vi khu dn c


m bo c n cho php ti ng ranh gii

generator room in order to ensure that statutory

theo lut nh.

noise levels are achieved at site boundaries.


b) EXHAUST SILENCERS

b) B GIM THANH

Two series exhaust silencers incorporating


moisture traps shall be provided.

Hai b gim thanh ca ng khi cng vi nhng


by hi s c lp t.

A primary reactive type exhaust silencer shall


be installed within the room as close as

B gim thanh u tin s c lp trong phng


my gn nht vi ch x khi ra ca ng c. B

practicable to the exhaust outlets of the diesel

gim thanh l loi c nhiu ngn c thit k

engine. The silencer shall be of the multiple

cho n c tn s thp v kim sot ting rung

chamber reactive type designed for low


frequency noise and exhausted pulsation

ng.

control.
A secondary absorptive type exhaust silencers

B gim thanh th hai l loi hp thu s c lp

shall be installed in series with the primary

cng mt dy vi ci th nht v lp ngay sau ci

exhaust silencer and shall be mounted after the

th nht trc khi ng ng x i ra ngoi. B

primary silencer immediately before the exhaust


pipework exit penetration. The secondary

gim thanh th hai l loi hp thu i xuyn thng c


tc dng lm gim m thanh c tn s trung bnh v

exhaust silencer shall be a straight-through

cao.

absorption type for mid to high frequency sound


attenuation.

The English language version prevails


SECTION 14/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


14/7

J. Roger Preston Vietnam Co., Ltd


SECTION 14 STANDBY GENERATOR INSTALLATION

MC 14 MY PHY IN D PHNG

All silencers shall be of welded sheet steel

Tt c cc b gim thanh phi l loi c lm t

construction. All components shall be stiffened

tm thp hn. Tt c s c gia c v gi gim

and braced to minimise vibration and shall be

thiu s rung ng v c sn bng sn c chu

finished with high quality heat resistant paint for


surface temperature of up to 540oC. All

nhit c cht lng cao cho b mt c nhit ln


n 540oC. Cc b gim m c bc cch nhit

silencers are to be thermally insulated to

gim s mt nhit.

minimise heat losses.


The total system back pressure of both the

Tng p sut pha sau ca b gim thanh th nht

primary and

silencers

v th hai cng vi h thng ng s c quyt

together with all exhaust pipework shall be


determined by the exhaust silencer supplier and

nh bi nh cung cp v khng c qu p sut


sau ln nht cho php ca ng c nh yu cu.

secondary exhaust

shall not exceed the maximum back pressure


allowable for the diesel engine offered.
14.2.7 SOUND ATTENUATORS

14.2.7 B CCH M

Sound attenuators shall be of the dissipative


type consisting of an outer casing, sound

B gim m l loi kh ting n gm mt v bc


bn ngoi, vt liu hp thu m thanh v cc vch

absorbing material and internal baffles, splitters

ngn bn trong, b chia v gi . V l loi thp

and supports. Casings shall be of galvanized


steel of not less than 1.2mm thickness.

trng km dy hn 1.2mm.

Sound absorbing material shall be high density


fibreglass or mineral wool, faced with perforated

Vt liu hp thu m thanh l loi si thu tinh lin


kt hay si len v c, c bc bng tm thp m

galvanized sheet metal of minimum 20% open

km c l vi h ti thiu 20% din tch.

area.
The attenuators cross sectional dimensions

Kch thc din tch mt ct ca b thu m (rng x

(width x height) shall be sized such that the total

cao) s c xc nh sao cho tng p sut gim

pressure drop shall not be greater than 60


Pascal.

khng ln hn 60 Pascal.

The noise level measured at 1 m from the

n c o cch xa phng my pht 1m khng

generator room shall not exceed 70 dBA.

c vt qu 70 dBA.

14.2.8 BATTERIES AND CHARGERS

14.2.8 BNH C QUY V B SC

Starter batteries of the heavy duty Nickel-

Ac quy khi ng l loi Nickel-Cadmium cng sut

Cadmium type or maintenance-free lead-acid

ln hay loi axit ch kh, loi ph hp vi tt c

type

complying in

all respects with the

nhng yu cu ca of BS 6290 - Lead-acid

requirements of BS 6290 - Lead-acid stationary


cells and batteries shall be provided.

stationary cells and batteries

The battery shall be capable of providing a


minimum of six starts of 10 sec. duration with 3

Ac quy l loi c kh nng cung cp t nht cho su


ln khi ng 10 giy trong khong thi gian l 3

consecutive

ln lin tip cho mi chu k (m khng phi sc li)

starts

per

cycle

The English language version prevails


SECTION 14/VISTA VERDE SPECS/ELECT

(without

u tin s dng ting Anh khi c tranh chp


14/8

J. Roger Preston Vietnam Co., Ltd


SECTION 14 STANDBY GENERATOR INSTALLATION

MC 14 MY PHY IN D PHNG

recharging). The battery shall be sized so that

Ac quy phi c tnh ton sao cho trong thi im

during periods of locked rotor current, the

c dng in locked rto, in p khng xung di

voltage does not fall below 0.65V per cell and

0.65V mi ngn v 0.85V mi ngn trong sut thi

0.85V during periods of cranking current per


cell.

gian c dng in lm quay rto.

The batteries supplied for use with the


generator sets shall not be used for

Acqui c cung cp s dng cho h thng my


pht in nh sn xut khng c dng kim tra

manufacturers own checks and testing but

v th nghim nhng c dng y nhim v xc

shall

and

nhn. Ac quy s c t trong mt gi bng thp

commissioning. Batteries shall be housed in a


steel rack of approved type and shall be

loi c cho php v s lp k khung ca my


pht.

be

used

for

witness

tests

mounted adjacent to the underbase of the


diesel generator set.
The battery charger shall be of the current

B sc bnh l loi hn dng c in p khng i,

limiting constant potential type, complete with

cng vi b iu khin, cng tc chn sc nhanh hay

controls, float and boost charging selection,


protection and indication, charger failure alarm,

chm, bo li b sc, ng h o p v dng.

ammeter and voltmeter.


14.2.9 FUEL DAY TANK & BULK FUEL STORAGE

14.2.9 BN DU NH V BN CHA DU CHNH

TANK
A fuel day tank and bulk fuel storage tank,

Bn du nh v bn cha chnh c hin th mc du

where specified, complete with oil level indicator

v b kim sot mc du cao v thp s c lp

and high and low level controllers shall be

t cho my pht c dung lng nh c th hin

provided for the generator set with capacities as


specified in the Sub-Contract Drawings. Control

trn bn v. Cc van iu khin, ng x kh v tt c


nhng thit b cn thit s c lp t cho bn nh

valves, vents and all necessary accessories

trong bn v.

shall be provided for the tank(s) as shown on


the Sub-Contract Drawings.
The tank(s) shall be suitably earthed to

Bn du phi c ni t ph hp kh tnh in.

discharge static electricity.


Before each tank is installed, all rust and scale

Trc khi lp t bn du, tt c lp cu cn v r

shall be removed from the external surface


immediately before applying the protective

st phi c lm sch khi mt ngoi ngay trc


khi sn bo v, s c mt lp sn xt ch mu

finish, which shall consist of one coat of red

theo tiu chun BS 2523 : 1983 - Specification for

lead-based

lead-based priming paints loi 'B', sau sn thm

Specification for lead-based priming paints Type


'B', followed by two coats of bituminous paint.

paint

to

hai lp sn c nha ng. Nhng ch h hng


c duy tr bi lp bo v do qu trnh s l, v.v,

Where damage is sustained to the protective

lp sn nh vy s gii quyt tt ti ch.

BS

2523:

1983

coating due to handling, etc., such coating shall


be made good on site.

The English language version prevails


SECTION 14/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


14/9

J. Roger Preston Vietnam Co., Ltd


SECTION 14 STANDBY GENERATOR INSTALLATION

MC 14 MY PHY IN D PHNG

Each fuel tank shall be provided with a means

Mi bn du s c trang b o lng khi lng du

of measuring the quantity of the contents. Every

bn trong. Mi thit b o lng phi c cn chnh

measuring device shall be accurately calibrated

mt cch chnh xc v c anh1 du mt cch r

and should be clearly marked so as to be


readily identifiable with its respective tank.

rng sao cho c th d dng nhn bit cho tng bn


tng ng.

There shall be no openings to the tank(s) other


than those necessary for filling and ventilating

Bn khng c c nhng ch h ngoi tr nhng


ch cn thit cho bm du vo v ch ni ng thng

pipe connections, main access (sealed) and

hi, ng vo chnh (c bt kn) v cho php cho

allowance for remote indication of stored

s hin th t xa tng khi lng du cha trong

quantity. The tank(s) shall be filled by means of


off-set filling pipes terminating in liquid and

bn. Bn du s c lm y bng ng bm du
vi u ng nm trong cht lng v np chng hi

vapour proof screwed caps fitted with locks.

c lp kho.

The tank(s) shall comply to Fire Services

Bn du phi theo ng yu cu ca S PCCC trn

Bureau's requirements in every respect and be

mi kha cnh v c lm bng thp nh c b dy

constructed of mild steel not less than 2mm

khng nh hn 2mm theo tiu chun BS 2654: 1989

thick to BS 2654: 1989 - Specification for


maintenance of vertical steel welded non-

- Specification for maintenance of vertical steel


welded non-refrigerated storage tanks with butt-

refrigerated storage tanks with butt-welded

welded shells for the petroleum industry. Tt c cc

shells for the petroleum industry. All necessary


fixing bolts and brackets for supporting the

bulong, gi cn thit cho bn du c tnh


chung trong bn Hp ng ny.

tank(s) shall be included in this Sub-Contract.


A fill point with fill cabinet, automatic electric

Nhng ch t bn du, bm du thng trc v

duty and standby fuel pumps and all related

bm d phng v tt c t iu khiin lin quan s

control panels shall be provided and located

c cung cp v lp t nhng ni c th hin

where shown on the sub-contract drawings. An


alarm shall sound on high level being reached

trn bn v. Tn hiu bo s pht ra khi du trong


bn t ti mc cao.

in the fuel tank(s).


In addition, for emergency use, a semi-rotary

Thm vo , s dng trong trng hp khn

hand operated fuel transfer pump shall be

cp, mt bm du bng tay s c cung cp v lp

supplied and installed by the Sub-Contractor,

t bi nh thu, vi ng mm c di ph hp lp

complete with an adequate length of input


flexible hose at the inlet position.

vo ti v tr bm du vo bn cha.

Fuel leakage sensors shall be provided for the


fuel tank(s). Warning siren for leakage sensors

Bn du s c lp t cm bin d tm s r r
du. Ci bo ng cho cm bin s c lp t

shall be installed in the generator room or

trong phng my pht hay trong t kim sot t xa.

enclosure and remote monitored.


Bulk fuel storage tanks chambers shall be

Hm chn bn du chnh s c lp y ct hon

completely sand-filled after installation.

ton sau khi lp t.

All fuel pipework between pumps, tanks and

Tt c ng ng dn du gia bm, bn du v

generators shall be black mild steel seamless

my pht phi l ng thp nh en khng c ni vi

The English language version prevails


SECTION 14/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


14/10

J. Roger Preston Vietnam Co., Ltd


SECTION 14 STANDBY GENERATOR INSTALLATION

MC 14 MY PHY IN D PHNG

tube with minimum wall thickness of 6.3mm.

b dy ti thiu l 6.3mm.
14.2.10 KHUNG

14.2.10 UNDERBASE
The engine and alternator shall be mounted on

ng c v my pht s c gn trn cng mt

a common industrial type fabricated mild steel

khung thp nh loi c sn xut theo cng

baseplate of sturdy construction. Mounting


faces for the machines shall be accurately

nghip c cu trc vng chc. B mt lp my phi


chnh xc vi my.

machined.
The underbase shall be mounted on a suitable
number of anti-vibration mountings, the floor

Khung phi c lp trn nhng b chng rung


vi s lng thch hp, phn mt sn c lp nhng

section of which shall be provided with holding

blong cho cch ly s rung ng cn thit sao

down bolts to provide the vibration isolation


necessary to meet the acoustic requirements

cho ph hp vi n nh yu cu nh.

specified.
The generator set shall be constructed so that it
can be conveniently dismounted into units of

My pht phi c lp dng sao cho n c th


thun tin trong vic bc d nhng b phn c kch

moderate size and weight for installation, major

thc v khi lng ln vo v tr lp t, cng nh

maintenance and repair purposes.

trong cng tc bo tr v sa cha.

14.2.11GUARDS

14.2.11 NP V LNG CHE BO V

Galvanized wire guards shall be provided over

Lng bo v bng dy m km s c lp t ln

all belt drives, flexible couplings and other

trn ton b cc dy cua roa, nhng khp ni mm

exposed moving parts of the generator set. The

v nhng phn chuyn ng khc bn ngoi ca

guards shall be of sturdy construction and shall


be fixed to the approval of the Engineer. All

my pht. Thit b bo v phi c cu trc chc chn


v s c lp theo s ng ca Qun l K thut.

guards shall be easily removable.

Tt c chng phi c th tho ra c mt cch d


dng.

14.2.12 CONTROL PANEL & OPERATION OF THE

14.2.12 T IU KHIN V VN HNH MY PHT

DIESEL GENERATING SET

IN

a) AUTOMATIC MAINS FAILURE CONTROL


PANEL

a) T KIM SOT S C NGUN CHNH T


NG

The generator control equipment shall be

Thit b iu khin my pht c thit k my

designed to provide a back up power supply in

pht cung cp ngun khi mt phn hay ton b

the event of partial or complete failure of the

ngun in chnh khng hot ng, tn hiu iu

mains supply, signaled by the mains failure


relay in the main supply switch board.

khin c xut ra t nhng r le kim sot trong t


ngun chnh.

The generator control equipment shall operate


in the following sequence:-

Thit b b iu khin my pht s hot ng theo


trnh t sau:

The English language version prevails


SECTION 14/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


14/11

J. Roger Preston Vietnam Co., Ltd


SECTION 14 STANDBY GENERATOR INSTALLATION

i)

MC 14 MY PHY IN D PHNG

On mains failure, the diesel engine shall

i) Khi ngun chnh b li, ng c s khi ng

start and within 10 seconds transfer the

trong vng 10 giy v chuyn ti bng cu CB

load by the changeover switch to the

o t ng qua my pht.

generator.
ii)

On mains supply available, a suitable time

ii) Khi c ngun chnh, sau mt thi gian tr thch

delay (adjustable 0 - 5 minutes) shall


transfer the load back to the mains.

hp (c th iu chnh t 0 5 pht) s chuyn


ti tr li ngun chnh.

iii) The generator set shall continue to run off

iii) My pht s vn tip tc chy khng ti trong mt

load for a further time period (adjustable 0


- 15 minutes) and automatically shut down

thi gian (c th iu chnh t 0-15 pht)v t


ng ngng nu ngun chnh duy tr n nh.

if the mains supply is maintained. During

Trong sut thi gian ny, nu ngun chnh b li

this time, a further mains supply failure


shall effect an immediate transfer of load

tr li s khin ti chuyn sang my pht ngay lp


tc v trnh t (2) v (3) c lp li.

back to the generator and sequences (2)


and (3) are repeated.
The diesel generator control panel shall be of

T iu khin my pht l loi bung ngn, lp ng

the cubicle, floor mounting type, installed

trn sn, c lp trong phng my pht hay khu

within the generator room or enclosure.

vc tng ro.

The control panel shall be complete with all

T iu khin phi c nhng nhn dn cho cu ch

labels, fuses, indicating lamps, fire-resistant


type internal wiring and shall include the

n hin th, dy ni bn trong l loi chng chy v


gm nhng thit b sau cho mi my pht ( thm cc

following

(in

addition

to

the

items

of

equipment and controls specified elsewhere)

thit b v b iu khin c m t) cho mi my


pht in :-

for each generator:-

Four pole air circuit breaker.

Instrument and control fuses.

- ACB bn cc.
- Cu ch o lng v iu khin.

"Engine Fault" automatic shut down


control, indicating
devices.

lamps

and

- "Engine Fault" iu khin ng my t ng, n


hin th v thit b reset.

reset
-

Audible alarm and reset device.

Automatic

Thit b bo ng v reset.

- Thit b sc bnh t ng hai mc (2-rate), c


2-rate

battery

i dy n trm ni ngun cung cp 230V bn

charging

equipment, wired to terminals for external

ngoi. B sc s c lp bn trong t iu

230V A.C. supply. Charging unit shall be


provided within the panel.

khin.
- iu khin kch t v n p t ng.

Automatic voltage regulation unit and


excitation control
-

The English language version prevails


SECTION 14/VISTA VERDE SPECS/ELECT

Trm u dy c cch in v lp v tr
u tin s dng ting Anh khi c tranh chp

14/12

J. Roger Preston Vietnam Co., Ltd


SECTION 14 STANDBY GENERATOR INSTALLATION

MC 14 MY PHY IN D PHNG

Suitably mounted and insulated cable

thch hp cho dy i vo t y ca t iu khin.

terminal blocks for cables entering from


the bottom of the control board
-

Overload and single phase prevention

B bo v qu ti v mt pha.

Mt cng tc xoay iu khin Auto/Man.

shall be provided
-

One manual/ auto rotary pattern control


switch.

One engine start push button

Mt nt nhn khi ng my pht.

One engine stop push button

Mt nt nhn dng my pht.

One re-set push button

Mt nt nhn reset.

One lamps test push button

Mt nt nhn kim tra n hin th.

One alarm mute push button

Mt nt nhn lm tt ci bo ng.

INDICATOR LAMPS:

CC N HIN TH:

Failed to start

Red

Bt u bo li

Low oil pressure trip

Red

Ngt p lc du mc thp

High water temperature trip Red

Ngt khi nc nhit cao

Overspeed trip

Red

Ngt qu tc

Low fuel level

Red

Du mc thp

Protection healthy

Green

Bo v

Xanh

Engine running

Green

Vn hnh ng c

Xanh

Fault shutdown

Red

Ngng

Intake air fan running

Green

Qut ly gi vo (nu thch hp)

Xanh

Mains supply available

Green

Ngun chnh cp in

Xanh

Failure to start

Red

Bt u bo li

(if applicable)

- Power Factor Meter

The English language version prevails


SECTION 14/VISTA VERDE SPECS/ELECT

ng h o h s cng sut

u tin s dng ting Anh khi c tranh chp


14/13

J. Roger Preston Vietnam Co., Ltd


SECTION 14 STANDBY GENERATOR INSTALLATION

MC 14 MY PHY IN D PHNG

- Frequency Meter

ng h o tn s

- One ammeter with selector switch for

Mt ng h o dng vi cng tt xoay xem


dng in ra ca my pht.

reading generator current output.


- One voltmeter with selector switch to

read generator voltage.

Mt ng h o in p vi cng tc xoay xem


in p ra ca my pht.

- One ammeter for reading charging

Mt ng h o dng sc cho bnh c qui.

Mt b 3 n hin th pha cho c my pht v n

current to starting batteries.


- One set of 3 phase indication lights for
both generator and emergency busbar

hin th cho thanh ci.

indicator.
- One voltage adjusting device.

All control circuit fuses shall be of the H.R.C.


cartridge fuse pattern.
b) AUTO-SYNCHRONISING PANEL

Mt nt iu chnh in p.

Tt c cu ch iu khin s l loi v kiu H.R.C.

b) T HO NG B T NG

Incorporated with the generator control panels

Lin kt vi t iu khin my pht l t ho ng

shall be a synchronising panel which shall


automatically operate the breakers to allow the

b, chng s t ng ng CB cho my pht


vn hnh song song, my ct s dng cho ho

generator sets to operate in parallel, Breakers

ng b my pht phi c lp m t.

used for synchronising of generator sets shall


be motorised.
The following facilities shall be provided at the

Nhng thit b sau s c lp t trong t ho ng

synchronising panels:

b:

- Automatic synchronising circuits

Mch iu khin ho ng b.

- Generator busbars voltage and fequency


monitor

B kim sot tn s v in p ca thanh ci v


my pht.

- Generator voltage and frequency monitor with


time delays

B kim sot in p v tn s ca my pht c


thi gian tr.

- Automatic frequency control

- Relays to connect synchroniser to generator

- R le ni b ho ng b my pht vo h

and busbar systems

Kim sot tn s t ng

thng thanh ci.

- Relays to trip and close generator breakers

- Rle ng, ct CB ca my pht v cng tc t

and neutral contactors and logic to ensure

trung tnh v kim sot m bo ch c mt

The English language version prevails


SECTION 14/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


14/14

J. Roger Preston Vietnam Co., Ltd


SECTION 14 STANDBY GENERATOR INSTALLATION

MC 14 MY PHY IN D PHNG

that only one generator is closed when two or

my pht c ng vo khi hai hay nhiu my

more sets are running.

pht ang chy.

- Relays to control governors during the


synchronising sequence.

Rle kim sot b iu tc trong sut qu trinh


ho ng b.

- Failed
to
synchornise
alarm
and
synchronising attempt lock-out after a period

Rle bo li ho ng b v s ho ng b b s
b ct sau thi gian hai pht ho ng b .

- One incoming voltmeter.

Mt ng h o in p n

- One system voltmeter.

Mt ng h o in p h thng

- Two voltmeter selector switches.

Hai cng tc xoay chn xem mc in p

- One rotary synchronoscope.

Mt b m xoay ho ng b

- Two frequency meters

Hai ng h o tn s

- One synchronising selector switch.

Mt cng tc xoay chn ho ng b

- One set of potential fuses.

Mt b cu ch in th

of two minutes.

- One 3-Phase busbar voltage transformer for

Mt bin p 3-Pha trn thanh ci cho ho ng b


v h thng iu khin.

synchronising and control systems.

c) T IU KHIN CHIA CT TI

c) LOAD SHEDDING CONTROL PANEL


This panel shall comprise the necessary circuits

T ny s gm c nhng mch cn thit to mt

to provide a basic closed loop control of the


standby generation system and shall include the

mch iu khin vng kn c bn cho h thng my


pht d phng v gm c nhng mc sau:

following:
1)

Electrical load sharing and shedding


features

1) Tnh nng chia v ct ti in.

2)

On demand starting and stopping of the


standby set with time delays

2)

3)

Tripping initiation circuitry to trip the


supplies to low-priority emergency loads
by means of control of the emergency
switchboard feeder circuit breakers.

Duy tr khi ng v dng my pht d phng


vi thi gian tr.

3) C cu ng ngt bt u nh khi cung cp


ngun tI khn cp dI mc u tin bng vic
iu khin cc mch ngun vo.

Upon the receipt of a mains failure signal, all the

Khi nhn c tn hiu s c, tt c cc my pht s

generators shall start and synchronise onto the

khi ng v ho ng b vo thanh ci. Tn hiu

The English language version prevails


SECTION 14/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


14/15

J. Roger Preston Vietnam Co., Ltd


SECTION 14 STANDBY GENERATOR INSTALLATION

MC 14 MY PHY IN D PHNG

bars. The signals of KW demand and number

cng sut ti yu cu v s cc my pht sn sng

of sets operational shall be sent to the loading

cho s dng s gi n t kim sot ti ri chng s

control panel which shall then allow sequential

tun t cho php ng ti vi nhng ti ch yu v

loading of the essential loads and the


commissioning of the load sharing circuits to

so snh vi mch chia ti bo m s phn b ti


bng vi cng sut ti pht ra ca my.

ensure equal distribution of the loads between


the generating sets.
Should the demand increase to beyond the

Khi ti tng cao hn so vi b iu chnh chn nh

spinning reserve, the load control panel shall

mc ti, t kim sot ti s bt u gi thm cng

initiate a start of any reserve generating


capacity should an overload persist, then

sut pht ra trnh khng b qu ti, sau s ct


bt ti khng u tin s c pht ra. Ti b ct s

shedding of low priority emergency loads shall

c ng tr li khi c thm my pht chy v sn

be initiated. The shed load shall be restored


when additional generator power becomes

sng cho ng ti.

available.
Should one of the generators fail to start, then
the load shall be limited to the capacity of the

Khi mt my pht khng khi ng c, ti s b


gii hn n cng sut ca h thng bng t kim

system by the loading control panel.

sot ti.

The loading control panel shall also be

T kim sot ti cng s c lp t mt cng tc

equipped with an auto/ manual switch which

auto/manual v n vn hnh nh trn khi v tr

shall operate as above in auto selection and


shall, on change over to the manual position,

auto v c th thay i qua v tr mannual, khng cho


tt c cc iu khin t ng hot ng v lm t lit

stop all auto controls and freeze any existing

cc trng thi ang tn ti ca h thng cho n khi

status of the system until manual control

ch manual cn hiu lc. iu khin Manual gm

effected. Manual controls shall comprise


illuminated push buttons for controlling all

c nt nhn c n kim sot tt c cc tuyn u


tin v s vn hnh ca my pht. Lnh t mhng

priority circuits and generator operation. The

ci iu khi ny s c a trc tip n t kim

commands from these control shall be fed


directly to the loading control panel which shall

sot ti ri s thi hnh theo mnh lnh .

act on the command.


14.2.13 CC THIT B O LNG

14.2.13 MEASURING INSTRUMENTS


All ammeters and voltmeters for use in

Tt c ng h o dng v p s dng chung cho

conjunction with switchgear are to comply with


BS 89 - Direct acting indicating analogue

my ct l loi theo tiu chun BS 89 - Direct acting


indicating analogue electrical measuring instruments

electrical measuring instruments and their

and their accessories cho tnh chnh xc cng

accessories for industrial accuracy.

nghip.

Unless otherwise specified, all meters are to be

Tr phi c nhng ch nh khc, tt c cc ng h

100mm, 240 scale dials with external zero

o l 100mm, c vch chia 240 vi cn chnh zero

adjustment.

bn ngoi.

Current transformers shall be of the epoxy resin

Bin dng l loi bc nha resin v c kh nng pht

The English language version prevails


SECTION 14/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


14/16

J. Roger Preston Vietnam Co., Ltd


SECTION 14 STANDBY GENERATOR INSTALLATION

MC 14 MY PHY IN D PHNG

encapsulated type and shall be capable of

ra cng sut cn thit ni n cc thit b hay

providing the necessary output to operate the

dng c bo v.

connected protective devices or instruments.


Current transformers with adjustable primary

Khng c s dng loi bin dng c nm chnh

turns will not be accepted.

ban u.

For dual ratio current transformers, all ratio

i vi bin dng t ngu, tt c cc u ni dy s

terminals shall be terminated at a terminal

c u trn trm u dy v c nh du mt

board and be clearly marked with connections

cch r rng cho tng u dy tng ng vi s

corresponding to the wiring diagrams.

u dy.

The secondary circuit of each set (R-Y-B and N)

Mch th cp ca mi b(R-Y-B v N) ca bin dng

of current transformers shall be earthed at one


point only. Means shall be provided for these

phi c ni t ch c ni t ti mt im.
Nhng ch ni t ny s c tho ra bng nhng

earth connections to be disconnected by bolted

thanh ni bng ng c bt b long tai nhng v tr

copper link at a readily accessible position for

c th tip cn mt cch d dng kim tra.

testing.
Current transformers provided in plastic casings

Bin dng loi bc trong hp nha plastic v loi

and of the split core type will not be accepted.

nhiu si s khng c chp nhn.

14.3 INSTALLATION

14.3 LP T

14.3.1 GENERAL

14.3.1 TNG QUT

The Sub-Contractor shall be responsible for


installing the generator set, exhaust pipes,

Nh thu s chu trch nhim lp t my pht,


ng ng kh thi, b gim m v lm nhng cng

silencers and making all necessary connection

vic u ni cn thit cho t iu khin my pht,

to the generator control panel, fuel tank,


pipework, batteries, etc. and all necessary

bn du, ng ng dn, bnh c qui,v.v, v tt c


nhng thit b cn thit a my pht vo vn

equipment for putting the set into operation.

hnh.

The Sub-Contractor shall provide enough fuel


and lubricating oil to carry out all the tests as

Nh thu s cung p nhin liu v du bi trn


thc hin kim tra nh c quy nh trong

specified in this Section.

phn ny.

On the date of hand-over of the generator set,

Ngy bn giao my pht, nh thu s bm du

the Sub-Contractor shall fill up the fuel tank in

diesel y bn nhin liu m khng tnh thm chi

full with diesel fuel at no extra cost to the

ph.

Employer.
14.3.2 FUEL PIPEWORK

14.3.2 NG NG DU

Pipelines shall only be joined where necessary

Cc ng ng ch c ni nhng ch cn thit

and shall have a fall back towards the tank.

v c mt dc nghing v pha bn du.

The English language version prevails


SECTION 14/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


14/17

J. Roger Preston Vietnam Co., Ltd


SECTION 14 STANDBY GENERATOR INSTALLATION

MC 14 MY PHY IN D PHNG

All pipework under floors and any other

Tt c ng ng di sn v bt k ng ng

pipework likely to be in direct contact with

no tip xc trc tip vi b tng s c ph mt

concrete shall be coated with a bitumen


compound and wrapped in Polythene before

lp hn hp nha ng v c bc trong
Polythene trc khi c xy kn.

being concealed.
All pipework shall be free from burrs, rust and

Tt c ng ng phi c lm sch khi cc

scale and shall be thoroughly cleaned before

cnh sc, r st v cu cn v phi c lm sch

installation. Open ends during the progress of

mt cch trit trc khi lp t. Nhng u ng

the Works shall be blanked-off with


purpose-made metal or plastic caps. The use of

ch trong qu trnh lp t s c bt kn bng


nhng np kim loi hay nha. Nhng nt g, giy,

wooden plugs, paper, cotton waste, etc. is

thng cc tng, v.v, th khng c s dng.

forbidden.
Suspended pipework must be positioned as

ng ng treo phi c t st vi mt di sn

close

nht v vn phi duy tr dc nh yu cu.

to

slab

soffits

as

possible

whilst

maintaining the required falls.


Vertical stacks must be positioned as close as

ng ng thng phi c t da st vo

possible against walls, columns and fins.

tng, ct v nhng cnh bn.

All pipes shall be rigidly fixed with suitable

Tt c cc ng ng phi c lp mt cch chc

brackets at 1.5m interval.

chn bng nhng gi thch hp vi khang cch


1.5m.

All pipes shall be properly painted with two

Tt c cc ng ng phi c sn bng hai lp

coats of lead primer paint and two coats of final


finish paint with colours to be approved.

sn lt ch v hai lp sn han thin vi mu sn


c chp thun.

A quick closing valve, labeled and painted red,


shall be installed in the fuel supply pipe of the

Mt van ng nhanh, c dn nhn v sn mu


s c lp t trn ng ng du cung cp ca

generator set. The valve shall be located in an

my pht. Van s c t v tr d dng tip cn.

easily accessible location.


14.3.3 TESTING

14.3.3 KIM TRA

All fuel pipework and connections to the fuel


tank shall be tested under the supervision of the

Tt c ng ng du v ch ni s c kim tra
di s gim st ca Qun l K thut bng cch

Engineer by subjecting them to an internal

nn mt p sut bn trong l 200 kPa trong thi

pressure of 200 kPa for a sufficient time to test

gian quy nh kim tra s r r nhng ch ni.

all joints for leakage.


Tests shall be carried out on the major

Cng vic kim tra s c thc hin trn nhng

components of the plant during manufacture.


Certified records in quadruplicate of all such

thit b chuyn dng. Chng nhn t cht lng


ghi nhn tt c nhng kim tra nh vy trong bn

tests shall be submitted. The completed and

bn v phi c trnh. Tt c cc thit b s

The English language version prevails


SECTION 14/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


14/18

J. Roger Preston Vietnam Co., Ltd


SECTION 14 STANDBY GENERATOR INSTALLATION

MC 14 MY PHY IN D PHNG

fully assembled set shall be tested at the

c kim tra ti nh sn xut hay nh cung cp

manufacturers or Supplier's factory before

trc khi giao n ni v c lm chng bi

delivery to site and witnessed by the Engineer.

Qun l K thut. Cng vic kim tra theo ti v thi

Tests shall include running for the following load


and periods:-

gian vn hnh nh sau:

a)
b)

15 minutes
15 minutes

a) Khng ti
b) 25% ti

:
:

15 pht
15 pht

No load
25% load

:
:

c)

50% load

15 minutes

c) 50% ti

15 pht

d)

75% load

15 minutes

d) 75% ti

15 pht

d)
e)

100% load :
110% load :

1 hour
1 hour

d) 100% ti
e) 110% ti

:
:

1 gi
1 gi

Superimposed load test from 0% to 100% (up


to 60% for turbo-charged engines) and drop-

Kim tra s n ti t 0% to 100% (ln n 60%


i vi ng c tuabin)v kim tra s nh ti v

off test to 0% from 100% (60% for turbo-

0% t 100% (60% i vi ng c tuabin) cng s

charged engines) shall also be conducted after

c kim sot sau khi chy kim tra ti .

the running load test.


Governor trials and fuel consumption tests, in

Th nghim b iu tc v kim tra lng du tiu

accordance with BS 5514 and BS 5000: Part

th ph hp theo yu cu BS 5514 and BS 5000:

99: 1986 - Machines for miscellaneous


applications, shall also be carried out and

Part 99: 1986 - Machines for miscellaneous


applications, thc hin kim tra v ghi nhn kt qu

certified records of the tests shall be submitted

sau cng cng s trnh trong bn bn ging

in quadruplicate upon completion of the tests.

nhau.

On completion of the installation of the

Cng vic lp t hon tt ti ch cng vi tt c

completed plant on site and with all cabling and

vic ni cp v ng, kim tra ti ch s c thc

piping connected, site tests shall be carried out


and shall include the following:-

hin v gm nhng mc sau:

- Series of test starts and checks on ability to


take up the load within the specified time.

Th cc mch in v bt u kim tra trn kh


nng tI lin tc trong thI gian cho php trong
tiu chan k thut.

- Check that speed variation is within specified


limits

Kim tra s giao ng tc trong phm vi cho


php.

- Full load run and fuel consumption check

Kim tra chy y ti v lng du tiu th.

- One hour overload test

Kim tra qu ti trong mt gi.

- Temperature rise

Kim tra s gia tng nhit .

- Voltage regulation

Kim tra s iu p.

The Sub-Contractor shall provide dummy load

Nh thu s cung cp ti gi v my pht cn thit

and any necessary generator for auxiliary power

bt k cho ngun ph thc hin cng vic kim

The English language version prevails


SECTION 14/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


14/19

J. Roger Preston Vietnam Co., Ltd


SECTION 14 STANDBY GENERATOR INSTALLATION

MC 14 MY PHY IN D PHNG

to carry out the above-mentioned tests at site.


14.3.4 SINGLE-LINE DIAGRAM, RUBBER MAT ETC.

tra trn ti ch.


14.3.4 S DY, THM CAO SU ,v.v.

The Sub-Contractor shall supply the following in

Nh thu s cung cp thm mt s mc sau trong

the generator room or enclosure:-

phng my pht nh:

a) A frame electrical single-line diagram.

a) Mt s in n tuyn lp trong khung.

b) A framed brief instruction diagram on the

b) Mt bng hng dn vn hnh v bo tr my

operating and
generator set(s).

maintenance

of

the

pht c t trong khung.

c) A First Aid diagram and fire extinguisher.

c) Mt bng hng dn s cp cu v ch chy.

d) Danger sign in the four official languages

d) Bng bo nguy him bng 4 ngn ng c

mounted on the door entrance.

lp trn li ca ra vo.

e) Rubber mat of 2mm thick x 600mm wide

e) Thm cao su dy 2mm x 600mm rng tri di

extending the full length of the control

dc theo ton b t iu khin.

panels.
14.3.5 ACCESSORIES

14.3.5

Each diesel generator set shall be provided

CC PH KIN

Mi my pht diesel s c trang b:

with:-

Tool kit adequate


maintenance operation

Operating
including:-

normal

B ngh thch hp thc hin tt c cc


cng tc bo tr cn thit.

manuals

S vn hnh v bo dng gm c :

Test results

Kt qu kim tra

Instruction books for the generator set(s)

Ti liu ca ton b my pht (ng c diesel,

and

for

all

maintenance

(diesel engine, alternator, control panels

b pht in, tiu khin v.v).

etc.)
-

Electrical schematic diagrams

S u dy

Outline drawings of all equipment

Bn v phc tho tt c cc thit b .

Illustrated spare parts list

Bng danh sch cc thit b d phng.

The Operating and Maintenance manual and

Ti liu hng dn vn hnh v bo tr v bng

the illustrated spare parts lists shall be clearly

danh sch cc thit b d phng phi c lit k

The English language version prevails


SECTION 14/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


14/20

J. Roger Preston Vietnam Co., Ltd


SECTION 14 STANDBY GENERATOR INSTALLATION

marked

with

the

scheme

title

and

MC 14 MY PHY IN D PHNG

site

mt cch r rng bng cc tiu v v tr tm kim

identification and shall be forwarded to the

v c chuyn n Qun l K thut.

Engineer.
14.3.6 SPARES PARTS

14.3.6 CC B PHN D PHNG

In addition to any spares referred to elsewhere


in the Specification, the Sub-Contractor shall

Bt k cc b phn d phng no c tham kho


trong phn c im k thut, nh thu s cung

provide a complete set of manufacturer's

cp mt b cc b phn d phng hot ng

recommended spare parts for 1-year operation.

trong vng mt nm nh hng dn ca nh sn

The spare parts inventory shall be complete at


the end of the defects liability period.

xut. Bng danh sch cc thit b d phng s


c hon tt sau thi im khc phc cc khuyt
im ban u.

The Sub-Contractor shall also propose a list of

Nh thu cng s cung cp mt danh sch cc

spare parts (and their unit prices) for all other

thit b d phng (v gi thnh ca chng) i vi

major equipment as recommended by the

cc thit b chnh nh li ngh ca nh sn xut

manufacturer sufficient for two years operation.

s dng trong vng hai nm.

Spare parts shall be individually packed and

Cc b phn d phng phi c ng gi ring

protected against dust and damage. They shall


be clearly labeled with function and part

r v c bo v khi bi bm v h hng.
Chng phi c ghi r cho bit chc nng v s

number.

nhn dng part number.

14.3.7 B.A.S. INTERFACE

14.3.7 GIAO DIN VI B.A.S.

The Sub-Contractor shall be responsible under

Nh thu chu trch nhim thc hin theo hp

the Sub-Contract for providing the B.A.S.


signals (including current transformers, dry

ng l cung cp cc tn hiu B.A.S.(bao gm


cc bin dng, cc tip im t do, b chuyn i

contracts, current/ voltage transducers, etc.) to

p/ dng, v.v.) cho php hin th v trung tm

allow the central logging of the status of the


system where specified. The Sub-Contractor

cc trng thi ca h thng. Nh thu s cho dn


nhn cc trm u dy trong t tp trung c

shall bring out to a labeled terminal strip in a

t trong AMP Board nhng s hin th c

centralised panels located within AMP Board

cp di y cho php nh thu B.A.S thc

the indications mentioned hereunder in a


manner that allows the B.A.S Sub-Contractor

hin cng vic du ni vo h thng:

to make connections:a)

b)

Indications for voltage, current, and trip

a)

ngng my cho tng my pht d phng

during operation.

trong sut qu trnh vn hnh.

Indications of the generator main circuit

b)

breaker status
c)

Hin th v in p, dng in v bo li

alarm of each standby power generator

pht.

Hour run totalisation of each generator for


maintenance purpose

The English language version prevails


SECTION 14/VISTA VERDE SPECS/ELECT

Hin th trng thi my ct chnh ca my

c)

Tng s gi chy ca tng my pht nhm


mc ch bo dng.
u tin s dng ting Anh khi c tranh chp

14/21

J. Roger Preston Vietnam Co., Ltd


SECTION 14 STANDBY GENERATOR INSTALLATION

d)

Trend logging capability for random

MC 14 MY PHY IN D PHNG

d)

selected points

Trend logging tnh nng hin th nhng


im chn bt k.

e)

High fuel level and leakage alarm of each


fuel tank

e)

Tn hiu bo mc du cao v r r cho tng


bn du.

f)

Load shedding on detection of maximum


demand being exceeded

f)

S chia ct ti theo tn hin d tm ti yu


cu ln nht khi b vt qu.

The Sub-Contractor shall co-ordinate with the

Nh thu s kt hp vi nh thu B.A.S cho s

B.A.S Sub-Contractor for the above interface.

giao din nh trn.

The English language version prevails