15.1 GENERAL

15.1

TNG QUT

15.1.1 DESCRIPTION

15.1.1 M T

The Sub-Contractor shall supply and install all

Nh thu c in cung cp v lp t ton b

cable trays, trunkings, conduits, underground

mang cp, trunking, ng, ng PVC chu lc, h

heavy duty uPVC pipes, Telecom manholes,


cable
sealing
facilities,
etc.
for
the

ko cp in thoi, b lm kn v.v cho h


thng thng tin lin lc nh th hin trn bn

telecommunication distribution installation as

v.

shown on the Sub-Contract Drawings.


15.1.2 STANDARDS

15.1.2 TIU CHUN

All equipment, materials and workmanship shall


comply with the appropriate Singapore or

Cc thit b, vt t v nhn cng theo tiu


chun ca Singapore hay Anh hoc tiu chun

British Standards or an acceptable equivalent

quc t tng ng cng nh quy nh php

international standard as well as all local


statutory obligations and regulations.

lut ca a phng.

All aspects of the installation shall be in

Tt c vic lp t s tun theo cc yu cu

accordance
with
the
requirements
of
Telecommunication Authority of Vit Nam and

ca Tng cng ty vin thng Vit Nam v tiu


chun Singapore v lp t v h thng thng

Singapore

tin lin lc trong to nh.

Code

of

Practice

for

Telecommunication Facilities in Building.


15.2 EQUIPMENT

15.2

THIT B

All cable trays, trunkings and conduits shall be of

Mng cp, trunking v ng loi vt liu xem

materials as specified in Section 8 of this

hng mc ng v ph kin, mng cp, ph

Specification.

kin ca ti liu k thut.

15.2.1 UNDERGROUND PIPEWORK

15.2.1 CNG VIC NG CHN NGM

Underground pipeworks and manholes shall be


provided as shown on the Sub-Contract

ng ngm v h thm cung cp theo bn v


d thu.

Drawings.
Pipeworks shall linked all Telecom manholes
and from manholes to MDF Room/ risers.

ng ngm s kt ni tt c cc h ko cp
in thoi v t cc h ko cpny n phng
MDF v hp thng tng k thut.

Pipeworks from the first manhole shall extend

ng ngm t h thm u cch 1m ngoi ng

one metre beyond the roadside drain.

x nc

All underground pipes shall be 110mm comply


with SS 272: 1983 Unplasticized PVC pipes

ng ngm ng knh 110mm theo tiu


chun SS 272: 1983 ng phi kim loi uPVC

below ground for drainlines and sewers. uPVC

m di t cho ng thot nc ma v

pipe and shall be encased in concrete.

cng rnh. uPVC se c bc trong b tng.

The English language version prevails


SECTION 15/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


15/1

J. Roger Preston Vietnam Co., Ltd


SECTION 15 TELECOMMUNICATION INSTALLATION

MC 15 H THNG THNG TIN LIN LC

Factory made bend shall be used when there is

Co ng lm t nh my s dng loi 90o

a 90o upturn, i.e. changing from the horizontal to

chuyn hng t ngang sang dc.

vertical plane.
15.2.2 H KO CP IN THOI

15.2.2 TELECOM MANHOLE


Telecom manholes shall be provided as shown
on the Sub-Contract Drawings.

H in thoi s c cung cp lp t nh
th hin trn bn v thu.

Manholes shall be constructed at a depth a allow


for a concrete shaft wall of varying height for

su ca h in thoi phi c thi cng


vi su cho nhng thay i cao ca

various sizes of manholes. Concrete for filling

trc b tng khi h in thoi thay i kch

the recess of the frame and cover shall be of

thc. B tng phi c trn theo t l

1:2:4 mix and shall be filled up to the ribs without


covering the ribs.

1:2:4 v y vo khung m khng c


trn ln khung.

Manhole walls shall be fair faced and not


rendered. Any projection shall be removed, and

Vch h in thoi khng cn t h. Ch li


lm s lm y bng xi-mng. Sn h in

cavities filled with cement mortar. The floor shall

thoi t dy 20mm. ng lin kt gia cc h

be given a 20mm render of cement mortar with

in thoi l uPVC vi ming loe, theo tiu

fall towards sumpholes from all direction. Pipes


linking manholes shall be cast on site uPVC

chun Singapore SS 272:1983 s dng vo


trong vch ca h thm.

pipes with a flare mouth at one, in accordance


with SS 272: 1983 shall be used for entry into the
wall of the manhole.
Pipes shall enter the manholes at such depth as
to ensure a minimum clearance of 450mm

ng t su bo m vic v sinh cch


y h l 450mm hoc 350 t np tr trng

above the floor level and/ or 350mm below the

hp ngoi l.

roof unless otherwise specified.


Manholes frames, covers and channel brackets

Khung h in thoi, np y v gi s

shall be purchased from authorised suppliers of

c mua t nh cung cp c y quyn

Vietnam Telecom. For manhole construction on


carriageway, heavy-duty manhole covers shall

ca Vin thng Vit Nam (Vietnam Telecom).


S dng loi np h thm kt cu cng, chu

be used. For manhole construction on turfed

lc phc v cho vic xy dng h thm

areas, medium duty manhole covers shall be

nm trn khu vc tuyn ng xe c i li.

used.

i vi cc khu vc t mm, t bn, s


dng loi np c kt cu chu lc trung bnh.

Completed manholes which are to be handed


over to Local Telecom shall be pumped clean of

Tt c cc h ko cp in thoi sau khi hon


thnh bn giao cho cng ty vin thng khu

water and made ready for inspection.

vc s c bm cn nc sn sang cho
cng tc kim tra.
15.2.3 T PHN PHI CHNH (MDFs)

15.2.3MAIN DISTRIBUTION FRAME (MDFs)


The MDF is sized to carry 1500 lines and shall
The English language version prevails
SECTION 15/VISTA VERDE SPECS/ELECT

MDF phi c kch thc cha c 1500


u tin s dng ting Anh khi c tranh chp

15/2

J. Roger Preston Vietnam Co., Ltd


SECTION 15 TELECOMMUNICATION INSTALLATION

MC 15 H THNG THNG TIN LIN LC

be either wall-mounted or floor-standing type. It

tuyn dy v phi l loi gn tng hay t

shall be arranged such that it can expand along

ng. MDF gn sao cho c th m rng

the length i.e. the longside of the room and away


from the incoming cable entry point.
The

dc theo chiu di v d nh chiu di dc


tng cn phng hay im u ni tuyn cp

incoming cables shall similarly be arranged so

vo. Tuyn cp vo c sp xp sao cho

that they will not criss-cross with the internal

khng c chng cho ln nhau vi tuyn

cabling.

cp bn trong.

The terminal blocks shall be 10 pairs type

B u ni phi l loi 10 cp gn vo khung.

mounted on the bank mount frame. Extension


line terminations shall be on terminals blocks

Vic m rng s gn thm mt hp ni ring


bit chiu ng.

mounted

on separate vertical from

those

containing terminal blocks for exchange and tie


lines.
The back mount frame shall be stainless steel

Mt sau ca khung phi l loi thp khng r

type with latches and holes to hold the terminal


blocks and wires.

c cc cht ng m v cc l gi khi u
ni v dy dn.

Adequate labelling of the vertical and the

Phi c nhn gn theo chiu dc v gn cc

terminal blocks shall be provided.

hp ni.

The terminations shall be of quick slip non-screw

u ni phi l loi trt khng vt v khng

and non-solder type. All terminations and


terminals for exchange lines on the terminal

hn. Tt c im ni chuyn ltuyn trn hp


u ni phi c trang b thit b chng st

blocks shall be equipped with gas discharge

v cu ch.

lightning protectors and fuse.


Unless otherwise mentioned, one no. insertion

Nu khng c qui nh no khc, phi cung

tool, 1 Nos 10 pairs disconnection plug, 10 no 1

cp theo MDF mt b dng c gi dy, mt b

pair disconnection plug, 10 no. marking caps, 1


no. 2 wire test cord, 10 no. dummy plug shall be

u cm c 10 i, 10 b u cm 1 i, 10
np y nh du, 1 b dy kim tra, 10 u

provided with the MDF.

cm gi.

A wall mounted box with door shall be provided

Hp ni gn tng vi ca s pji cung cp

to house the loose accessories.

cho cn nh d thao tc.

All ferrous metal works shall be precleaned by


an approved process and then coated with an

Cc cng trnh kim loi st phi c lm


sch theo quy trnh c duyt t trc v

approved anti-rust undercoat before painting. All

ph lp chng r trc khi sn. Cc c, vt,

nuts, screws, washers and bolts shall be nickel


or cadmium plated.

long-n v bu long phi l loi niken hoc m


catmi.
15.2.4 T PHN PHI TRUNG GIAN (IDFs)

15.2.4 INTERMEDIATE DIDTRIBUTION FRAME


(IDFs)
Unless other wise specified distribution box shall

Nu khng c quy nh no khc, t phn phi

be fabricated from mild steel sheet designed to

phi c lm bng thp mm c thit k

form a rigid construction and it shall be suitable

ch to kt cu cng v ph hp vi loi

The English language version prevails


SECTION 15/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


15/3

J. Roger Preston Vietnam Co., Ltd


SECTION 15 TELECOMMUNICATION INSTALLATION

MC 15 H THNG THNG TIN LIN LC

for wall mounting. The box shall be treated with

gn tng. T s c x l 2 lp sn chng

two layers of rust proof primer and finished with

g v ph hon thin bng hai lp sn men

another two layers of enamel white paint.

trng.

The doors and hinges shall be so constructed to

Ca v bng l phi c gn ngn s lch

prevent sagging and misalignment. Door shall be

hng. Ca c th m 180 . Cho php thao

able to be opened through - 180 deg. to permit


unobstructed access to the inside of the box. In

tc bn trong t. ng thi, ca phi thm mt


thit b kho n gin v chc chn.

addition, simple but strong fasteners are to be


fitted to the door.
A chart board for recording the circuit connection

Phi cung s u ni mch bn trong.

shall be provided.
The terminal blocks shall be 10 pair and of the

Khi u ni l loi 10 cp trt nhanh v

quick slip non screw and non-solder type.

khng hn.

Every IDFs shall have its own earth terminal.

Mi IDFs phi c cng tip t ring. Mi u

This earth terminal shall be connected to the

tip t phi c ni vi h thng ni t. T

earth terminal of the subscriber. Distribution

phn phi cng ni t. Nu khng c quy

Frame through an earthing lead. Unless


otherwise specified the earthing lead shall be

nh no khc, u tip t thng dng dy


cch in PVC 2.5mm2 - xanh. Khi u ni

2.5mm sq. green PVC insulated cable. Terminal

v hp phn phi phi l loi c cho php

blocks and distribution boxes shall be of the


standard local authority approved type.

theo tiu chun ca chnh quyn s ti.

15.3 INSTALLATION

15.3

LP T

15.3.1 GENERAL

15.3.1 TNG QUT

The Sub-Contractor shall supply labour and


material to install the Telecommunication

Nh thu ph cung cp nhn cng v vt t


cho cng tc lp t H Thng Phn Phi Vin

Distribution Installation as indicated in the Sub-

Thng nh c ch nh theo nh bn v

Contract Drawings.

hp ng.

15.3.2 UNDERGROUND PIPEWORK

15.3.2 CNG VIC NG CHN NGM

All underground pipework including joints and


bends shall be water-tight. Pipes shall be laid at

ng ngm bao gm mi ni v chuyn hng


phi l loi kn khng g. ng phi c t ti

a minimum 1 metre below the final ground level.

thiu di tng trt cui cng 1 m. ng c

Pipes shall be installed in straight run throughout


the whole pipe length. No S bend is allowed. In

lp t thng sut chiu di ng. Khng cho


php S chuyn hng.Trong trng hp b

the event of obstruction posed by other services

b nght do hng mc khc, hay cng ngm,

or under crossing deep culverts, the pipes shall

ng phi c t nm dc nhng khng qu

be laid in gradual gradient of not less than 1:6.

t l 1:6.

15.3.3 CABLE TRAYS, TRUNKINGS AND

15.3.3 MNG CP, TRUNKING V NG IN

CONDUITS
The English language version prevails
SECTION 15/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


15/4

J. Roger Preston Vietnam Co., Ltd


SECTION 15 TELECOMMUNICATION INSTALLATION

MC 15 H THNG THNG TIN LIN LC

A nylon/ polyethylene rope of 4-core or multi-

Cp 4 li hoc nhiu li bc nilon/ nha tng

strand type with overall diameter of 6mm shall be

hp ng knh ngoi 6mm t trong ng, d

provided in each pipe to facilitate cable pulling.


All ends of pipe shall be plugged with rubber

dng cho vic ko cp. u ca mi ng gn


np cao su ngn bi hoc xi-mng.

caps to prevent entry of earth debris or cement.


Mng cp ng lp trong ng thng tng gn
trn gi duyt.

Vertical cable trays where installed in the


telephone riser duct shall be mounted on an
approved support system.
Unless otherwise stated elsewhere in the

Ni khc theo bn v thu ph hoc ti liu k

Sub-Contract Drawings or Specification, ceiling

thut, mng cp trn trn lp nm ngang c

cable trays where installed horizontally shall be

gn gi loi L khong cch thp nht l

supported by open type 'L' or ' ' brackets and


shall be mounted at a minimum clearance of

300 cch sn hoc hng mc khc pha trn,


cho vic v sinh. Mng cp c th gn t

300mm from the ceiling slab or any other

15.3m t sn han thin, ngoi ra th theo bn

services above the cable tray. Under no


circumstances shall the horizontal cable tray

v thu hoc ti liu k thut.

mounted at more than 3.3m from the finished


floor level be allowed unless otherwise stated
elsewhere in the Sub-Contract Drawings or
Specification.
15.3.4 DY IN THOI

15.3.4 TELEPHONE WIRING


The

an

Nh thu ph s sp xp mt nh thu chuyn

profecssional contractor to carry out the


Telecommunication works and where specified,

Sub-Contractor

shall

engage

nghip thi cng cng tc lp t h thng


thng tin lin lc nh m t trong tiu

shall supply and pre-wire all telephone points as

chun k thut, s cung cp v ko dy sn

shown on the Sub-Contract Drawings. For

cho cc im cm in thoi nh th

internal works, the wiring shall be minimum 4pair multi-core twisted pair telephone cable

hin trn bng v d thu. Cc cng vic bn


trong, dy in thoi s c ti thiu l 4 i

approved by Vietnam Telecoms. The wirings

xon c chp thun bi Tng cng ty vin

shall run from approved type IDF (supplied and


installed by the Sub-Contractor) in the telephone

thng Vit Nam. Dy in thoi s chy t cc


t phn phi in thoi khu vc (IDF) (cung

riser to each of the telephone outlets or local

cp v lp t bi nh thu ph) trong cc hp

tenants distribution points as shown in the

thng tng k thut n mi cm in thoi

Sub-Contract Drawings.

hay cc im phn phi khu vc ca ngi


thu nh c th hin trn bn v d thu.

Where telephone wiring is required to run to


individual point, they shall be terminated in an

Nhng ni m dy in thoi c yu cu
chy n cc im ring l, chng s c

approved

u ni trong cc cm in thoi c chp

telephone

outlet

complete

with

recessed socket mounted on a flush face-plate.

thun cng vi cm in thoi m tng


trong cc mt n m.

For landed /strata landed houses, the Sub-

Cho khu vc nh bn ngoi, nh thu s cp

Contractor shall supply and install 1 no. 5 pair

v lp t cp in thoi 5 cp 0.5mm c tm

The English language version prevails


SECTION 15/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


15/5

J. Roger Preston Vietnam Co., Ltd


SECTION 15 TELECOMMUNICATION INSTALLATION

MC 15 H THNG THNG TIN LIN LC

0.5mm polyethyene fully filled cable in concrete

du trong ng 50mm uPVC bc b tng t

haunched 50mm uPVC pipe from the internal

hp u ni n ct ca Bu in.

Block Terminal to the Gate Pillar.

The English language version prevails


SECTION 15/VISTA VERDE SPECS/ELECT

u tin s dng ting Anh khi c tranh chp


15/6

You might also like