You are on page 1of 82

PAGE NO:

1
"
es & Services Company Limited,Jamshedpur"

Jamshedpur Utiliti
Ser

vice Long Text

xt

ARC NO
:
Line
Service Group
Long Text

4700008569

ARC LINE NO
:
10
ESCH01
INSTAL. TRF. UPTO 100 KVA ON POLE

Service Unit

20
081.D1.0122

NOS

Rate

Short Te

"4,375.00"
"INSTALL

ATION OF TRANSFORMER UPTO 100KVA ON POLE, COMPLETE WITH ALL"


ACCESSOR
IES. THIS INCLUDES ERECTION <(>&<)> FABRICATION OF CHANNELS
.TRANSPO
RTING OF TRANSFORMER FROM STORE TO SITE (Note :Crane should be
used for
loadng of breaker at store <(>&<)> unloading at site)
",NOMENC
LATURE WORK ALSO PART OF THE JOB.SUPPLY OF STEEL,POLE ERECTION,"
VIDING S
KILLED ASSISTANT DURING TESTING IS SCOPE OF VENDOR. SUPPLY OF N
"TOP-UP,
TOUCH PAINTING IF REQUIRED ALSO SCOPE OF VENDOR. OIL <(>&<)>"
PAINT WI
LL BE SUPPLIED BY JUSCO.
20
ESCH01
INSTAL. TRF. UPTO 100 KVA ON FDN.

081.D1.0123

NOS

"2,161.00"
"INSTALL

ATION OF TRANSFORMER UPTO 100KVA ON FOUNDATION/ INSIDE S/S,"


COMPLETE
WITH ALL ACCESSORIES. THIS INCLUDES ERECTION OF CHANNELS
<(>&<)>
STOPPER.TRANSPORTING OF TRANSFORMER FROM STORE TO SITE ALSO PAR
OF THE J
OB (Note :Crane should be used for loadng of breaker at store
"<(>&<)>
unloading at site).SUPPLY OF STEEL,CIVIL FOUNDATION, EARTHING"
<(>&<)>
CABLE CONNECTION IS NOT INCLUDED BUT PROVIDING SKILLED ASSISTAN
DURING T
ESTING IS SCOPE OF VENDOR. OIL TOP-UP IF REQUIRED ALSO SCOPE OF
VENDOR
30
ESCH01
081.D1.0124
DISMAN. TRF. UPTO 100 KVA ON POLE / FDN.

NOS

"1,787.00"
DISMANTL

ING OF TRANSFORMER UPTO 100KVA ON POLE / FOUNDATION/ INSIDE S/S


COMPLETE
WITH ALL ACCESSORIES. TRANSPORTING OF TRANSFORMER FROM SITE TO
STORE A
LSO PART OF THE JOB (Note :Crane should be used for loadng of

"breaker
at store <(>&<)> unloading at site).DISMANTLING OF EARTHING,"
CABLE ET
C. FOR COMPLETE DISMANTLING ALSO SCOPE OF VENDOR
40
ESCH01
081.D1.0125
INSTAL. TRF. 250 KVA to 500 KVA ON FDN.

NOS

"4,407.00"
INSTALLA

TION OF TRANSFORMER FROM 250KVA TO 500 KVA ON FOUNDATION/ INSID


"S/S, CO
MPLETE WITH ALL ACCESSORIES. THIS INCLUDES ERECTION OF CHANNELS"
<(>&<)>
STOPPER.TRANSPORTING OF TRANSFORMER FROM STORE TO SITE ALSO PAR
OF THE J
OB (Note :Crane should be used for loadng of breaker at store
"<(>&<)>
unloading at site).SUPPLY OF STEEL,CIVIL FOUNDATION, EARTHING"
<(>&<)>
CABLE CONNECTION IS NOT INCLUDED BUT PROVIDING SKILLED ASSISTAN
DURING T
ESTING IS SCOPE OF VENDOR. OIL TOP-UP IF REQUIRED ALSO SCOPE OF
VENDOR
50
ESCH01
081.D1.0126
DISMAN. TRF. 250 KVA to 500 KVA ON FDN.

NOS

"2,470.00"
DISMANTL

ING OF TRANSFORMER 250 KVA to 500 KVA ON FOUNDATION/ INSIDE S/S


COMPLETE
WITH ALL ACCESSORIES. TRANSPORTING OF TRANSFORMER FROM SITE TO
STORE A
LSO PART OF THE JOB (Note :Crane should be used for loadng of
"breaker
at site <(>&<)> unloading at store).DISMANTLING OF EARTHING,"
CABLE ET
C. FOR COMPLETE DISMANTLING ALSO SCOPE OF VENDOR
60
ESCH01
REPLACEMENT OF TRF.250 KVA to500 KVA

081.D1.0127

NOS

"7,336.00"
REPLACEM

ENT OF TRANSFORMER 250 KVA to 500 KVA ON FOUNDATION/ INSIDE S/S


COMPLETE
WITH ALL ACCESSORIES. TRANSPORTING OF TRANSFORMER FROM STORE T
SITE <(>
&<)> SITE TO STORE ALSO PART OF THE JOB (Note :Crane should be
used for
loadng of breaker at store <(>&<)> unloading at
"site).D
ISMANTLING <(>&<)> RETERMINATION OF EARTHING, CABLE ETC."
70
ESCH01
081.D1.0128
INSTAL.TRF. 630 KVA to 1000 KVA ON FDN.

NOS

"7,318.00"
INSTALLA

TION OF TRANSFORMER FROM 630 KVA to 1000 KVA ON FOUNDATION/


"INSIDE
S/S, COMPLETE WITH ALL ACCESSORIES. THIS INCLUDES ERECTION OF"
CHANNELS

<(>&<)> STOPPER.TRANSPORTING OF TRANSFORMER FROM STORE TO SITE


ALSO PAR
T OF THE JOB (Note :Crane should be used for loadng of breaker
"at stor
e <(>&<)> unloading at site).SUPPLY OF STEEL,CIVIL FOUNDATION,"
EARTHING
<(>&<)> CABLE CONNECTION IS NOT INCLUDED BUT PROVIDING SKILLED
ASSISTAN
T DURING TESTING IS SCOPE OF VENDOR. OIL TOP-UP IF REQUIRED ALS
SCOPE OF
VENDOR
80
ESCH01
081.D1.0129
DISMAN.TRF. 630 KVA to 1000 KVA ON FDN.

NOS

"2,963.00"
DISMANTL

ING OF TRANSFORMER 630 KVA to 1000 KVA ON FOUNDATION/ INSIDE


"S/S, CO
MPLETE WITH ALL ACCESSORIES. TRANSPORTING OF TRANSFORMER FROM"
SITE TO
STORE ALSO PART OF THE JOB (Note :Crane should be used for
loadng o
f breaker at site <(>&<)> unloading at store).DISMANTLING OF
"EARTHIN
G, CABLE ETC. FOR COMPLETE DISMANTLING ALSO SCOPE OF VENDOR"
90
ESCH01
081.D1.0130
REPLACEMENT TRF.630KVAto1000 KVA ON FDN.

NOS

"7,915.00"
REPLACEM

ENT OF TRANSFORMER 630 KVA to 1000 KVA ON FOUNDATION/ INSIDE


"S/S, CO
MPLETE WITH ALL ACCESSORIES. TRANSPORTING OF TRANSFORMER FROM"
STORE TO
SITE <(>&<)> SITE TO STORE ALSO PART OF THE JOB (Note :Crane
should b
e used for loadng <(>&<)> unloading of panel at store <(>&<)>
"unloadi
ng at site).DISMANTLING <(>&<)> RETERMINATION OF EARTHING, CABLE"
ETC.
100
ESCH01
SMANT6.6KV CT/PT IN INDOOR PANEL

081.D1.0131

NOS

372

EREC./DI
"ERECTIO

N OF CT/PT IN INDOOR PANEL, IT INCLUDES SHIFTING OF MATERIAL FRO"


STORE TO
SITE <(>&<)> TERMIANTION OF ALL CONTROL CABLES. (Note :Crane
should b
e used for loadng of panel at store <(>&<)> unloading at site)
110
ESCH01
ENT 6.6KV CT/PT IN INDOOR PANEL

081.D1.0132

NOS

372

REPLACEM
"REPLACE

MENT OF CT/PT IN INDOOR PANEL, IT INCLUDES SHIFTING OF MATERIAL"


FROM STO
RE TO SITE <(>&<)> BACK FROM SITE TO STORE. THIS ALSO INCLUDES
DISCONNE
CTION <(>&<)> TERMIANTION OF ALL CONTROL CABLES (Note :Crane

should b
e used for loadng of panel at store <(>&<)> unloading at site)
120
ESCH01
ERECTION/DISMANTLING OF6.6/11KV

081.D1.0133

NOS

"2,908.00"
ERECTION

OF INDOOR TYPE 6.6 / 11KV METERING UNIT ON BASE FRAME. THIS


DOES NOT
INCLUDE TERMINATION OF OUTGOING/INCOMING POWER AND CONTROL
CABLE AN
D EARTHING WORK.THIS ALSO INCLUDES MOUNTING AND CONNECTION OF
"METERS
SUPPLIED IN LOOSE WHENEVER NECESSARY, IF REQUIRED. TRANSPORTING"
FROM STO
RE TO SITE <(>&<)> PROVIDING SKILLED ASSISTANT DURING TESTING I
ALSO A P
ART OF JOB.THIS INCLUDES ERECTION <(>&<)> FEBRICATION WORK
REQURIED
FOR MAKING FRAME ERECTION BUT SUPPLY OF STEEL IS NOT
"INCLUDE
D"" (Note :Crane should be used for loadng of panel at store"
<(>&<)>
unloading at site)
130
ESCH01
081.D1.0134
REPLACEMENT OF 6.6/11 KV METERING UNIT

NOS

"3,753.00"
REPLACEM

ENT OF INDOOR TYPE 6.6 / 11KV METERING UNIT ON BASE FRAME. THI
INCLUDES
DISCONNECTION <(>&<)> RETERMINATION OF ALL POWER <(>&<)>
"CONTROL
CABLES, EARTHING CONNECTION ETC. REQUIRED FOR COMPLETE WORK,"
TRANSPOR
TING FROM STORE TO SITE <(>&<)> SITE TO STORE IS UNDER SCOPE OF
VENDOR.
PROVIDING SKILLED ASSISTANT DURING TESTING IS ALSO A PART OF
JOB. (No
te :Crane should be used for loadng of panel at store <(>&<)>
unloadin
g at site)
140
ESCH01
ERECTION / DISMANTLING OF 33 KV

081.D1.0135

NOS

"2,167.00"
ERECTION

OF OUTDOOR TYPE 33KV METERING UNIT ON STRUCTURE. THIS DOES NOT


INCLUDE
TERMINATION OF OUTGOING/INCOMING POWER AND CONTROL CABLE AND
EARTHING
WORK.THIS ALSO INCLUDES MOUNTING AND CONNECTION OF METERS
"SUPPLIE
D IN LOOSE WHENEVER NECESSARY, IF REQUIRED. TRANSPORTING FROM"
STORE TO
SITE <(>&<)> PROVIDING SKILLED ASSISTANT DURING TESTING IS ALS
A PART O
F JOB.THIS INCLUDES ERECTION <(>&<)> FEBRICATION WORK REQURIED
FOR MAKI
NG FRAME ERECTION ON STRUCTURE BUT SUPPLY OF STEEL IS NOT

"INCLUDE
D"" (Note :Crane should be used for loadng of panel at store"
<(>&<)>
unloading at site)
150
ESCH01
REPLACEMENT OF 33 KV METERING UNIT

081.D1.0136

NOS

"2,422.00"
REPLACEM

ENT OF OUTDOOR TYPE 33KV METERING UNIT ON STRUCTURE. THIS


INCLUDES
DISCONNECTION <(>&<)> RETERMINATION OF ALL POWER <(>&<)>
"CONTROL
CABLES, EARTHING CONNECTION ETC. REQUIRED FOR COMPLETE WORK,"
TRANSPOR
TING FROM STORE TO SITE <(>&<)> SITE TO STORE IS UNDER SCOPE OF
VENDOR.
PROVIDING SKILLED ASSISTANT DURING TESTING IS ALSO A PART OF
JOB.(Not
e :Crane should be used for loadng of panel at store <(>&<)>
unloadin
g at site)
160
ESCH01
ESCH010003
INSTAL. TRF. UPTO 100 KVA ON POLE Ex.Crn

NOS

"2,300.00"
"INSTALL

ATION OF TRANSFORMER UPTO 100KVA ON POLE, COMPLETE WITH ALL"


ACCESSOR
IES. THIS INCLUDES ERECTION <(>&<)> FABRICATION OF CHANNELS
.TRANSPO
RTING OF TRANSFORMER FROM STORE TO SITE (Note :Crane should be
"used fo
r loadng of breaker at store <(>&<)> unloading at site, but cran"
"will be
provided by JUSCO),NOMENCLATURE WORK ALSO PART OF THE JOB.SUPPL"
"OF STEE
L,POLE ERECTION, EARTHING <(>&<)> CABLE CONNECTION IS NOT"
INCLUDED
BUT PROVIDING SKILLED ASSISTANT DURING TESTING IS SCOPE OF
VENDOR.
SUPPLY OF NECESSARY HARDWARE FOR FIXING OF TRFO IS ALSO
"INCLUDE
D. OIL TOP-UP,TOUCH PAINTING IF REQUIRED ALSO SCOPE OF VENDOR."
OIL <(>&
<)> PAINT WILL BE SUPPLIED BY JUSCO.
170
ESCH01
ESCH010004
INSTAL. TRF. UPTO 100 KVA ON FDN. Ex.Crn

NOS

"1,281.00"
"INSTALL

ATION OF TRANSFORMER UPTO 100KVA ON FOUNDATION/ INSIDE S/S,"


COMPLETE
WITH ALL ACCESSORIES. THIS INCLUDES ERECTION OF CHANNELS
<(>&<)>
STOPPER.TRANSPORTING OF TRANSFORMER FROM STORE TO SITE ALSO PAR
OF THE J
OB (Note :Crane should be used for loadng of breaker at store
"<(>&<)>
unloading at site, but crane will be provided by JUSCO).SUPPLY"

"OF STEE
L,CIVIL FOUNDATION, EARTHING <(>&<)> CABLE CONNECTION IS NOT"
INCLUDED
BUT PROVIDING SKILLED ASSISTANT DURING TESTING IS SCOPE OF
VENDOR.
OIL TOP-UP IF REQUIRED ALSO SCOPE OF VENDOR
180
ESCH01
RFO >=100 KVA ON POLE/FDN Ex.Crn

ESCH010005

NOS

787

DSMNTL T
DISMANTL

ING OF TRANSFORMER UPTO 100KVA ON POLE / FOUNDATION/ INSIDE S/S


COMPLETE
WITH ALL ACCESSORIES. TRANSPORTING OF TRANSFORMER FROM SITE TO
STORE A
LSO PART OF THE JOB (Note :Crane should be used for loadng of
"breaker
at store <(>&<)> unloading at site, but crane will be provided"
"by JUSC
O).DISMANTLING OF EARTHING, CABLE ETC. FOR COMPLETE DISMANTLING"
ALSO SCO
PE OF VENDOR
190
ESCH01
ESCH010011
INSTL TRFO >250KVA-500KVA ON FDN Ex.Crn

NOS

"2,625.27"
INSTALLA

TION OF TRANSFORMER FROM 250KVA TO 500 KVA ON FOUNDATION/ INSID


"S/S, CO
MPLETE WITH ALL ACCESSORIES. THIS INCLUDES ERECTION OF CHANNELS"
<(>&<)>
STOPPER.TRANSPORTING OF TRANSFORMER FROM STORE TO SITE ALSO PAR
OF THE J
OB (Note :Crane should be used for loadng of breaker at store
"<(>&<)>
unloading at site, but crane will be provided by JUSCO).SUPPLY"
"OF STEE
L,CIVIL FOUNDATION, EARTHING <(>&<)> CABLE CONNECTION IS NOT"
INCLUDED
BUT PROVIDING SKILLED ASSISTANT DURING TESTING IS SCOPE OF
VENDOR.
OIL TOP-UP IF REQUIRED ALSO SCOPE OF VENDOR
200
ESCH01
DSMNTL TRFO >250-500KVA ON FDN Ex.Crn

ESCH010012

NOS

"1,225.96"
DISMANTL

ING OF TRANSFORMER 250 KVA to 500 KVA ON FOUNDATION/ INSIDE S/S


COMPLETE
WITH ALL ACCESSORIES. TRANSPORTING OF TRANSFORMER FROM SITE TO
STORE A
LSO PART OF THE JOB (Note :Crane should be used for loadng of
"breaker
at site <(>&<)> unloading at store, but crane will be provided"
"by JUSC
O).DISMANTLING OF EARTHING, CABLE ETC. FOR COMPLETE DISMANTLING"
ALSO SCO
PE OF VENDOR

210
ESCH01
REPL TRFO >250-500KVA ON FDN Ex.Crn

ESCH010013

NOS

"4,019.55"
REPLACEM

ENT OF TRANSFORMER 250 KVA to 500 KVA ON FOUNDATION/ INSIDE S/S


COMPLETE
WITH ALL ACCESSORIES. TRANSPORTING OF TRANSFORMER FROM STORE T
SITE <(>
&<)> SITE TO STORE ALSO PART OF THE JOB (Note :Crane should be
"used fo
r loadng of breaker at store <(>&<)> unloading at site, but cran"
will be
provided by JUSCO).DISMANTLING <(>&<)> RETERMINATION OF
"EARTHIN
G, CABLE ETC."
220
ESCH01
ESCH010014
INSTL TRFO 630KVA-1000KVA ON FDN Ex.Crn

NOS

"4,155.20"
INSTALLA

TION OF TRANSFORMER FROM 630 KVA to 1000 KVA ON FOUNDATION/


"INSIDE
S/S, COMPLETE WITH ALL ACCESSORIES. THIS INCLUDES ERECTION OF"
CHANNELS
<(>&<)> STOPPER.TRANSPORTING OF TRANSFORMER FROM STORE TO SITE
ALSO PAR
T OF THE JOB (Note :Crane should be used for loadng of breaker
"at stor
e <(>&<)> unloading at site, but crane will be provided by"
"JUSCO).
SUPPLY OF STEEL,CIVIL FOUNDATION, EARTHING <(>&<)> CABLE"
CONNECTI
ON IS NOT INCLUDED BUT PROVIDING SKILLED ASSISTANT DURING
TESTING
IS SCOPE OF VENDOR. OIL TOP-UP IF REQUIRED ALSO SCOPE OF VENDOR
230
ESCH01
ESCH010015
DSMNTL TRFO 630KVA-1000KVA ON FDN Ex.Crn

NOS

"1,380.56"
DISMANTL

ING OF TRANSFORMER 630 KVA to 1000 KVA ON FOUNDATION/ INSIDE


"S/S, CO
MPLETE WITH ALL ACCESSORIES. TRANSPORTING OF TRANSFORMER FROM"
SITE TO
STORE ALSO PART OF THE JOB (Note :Crane should be used for
"loadng
of breaker at site <(>&<)> unloading at store, but crane will be"
"provide
d by JUSCO).DISMANTLING OF EARTHING, CABLE ETC. FOR COMPLETE"
DISMANTL
ING ALSO SCOPE OF VENDOR
240
ESCH01
ESCH010016
REPL TRFO 630KVA-1000KVA ON FDN Ex.Crn

NOS

"4,414.04"
REPL

ACEMENT OF TRANSFORMER 630 KVA to 1000 KVA ON FOUNDATION/ INSID


"S/S, CO
MPLETE WITH ALL ACCESSORIES. TRANSPORTING OF TRANSFORMER FROM"
STORE TO
SITE <(>&<)> SITE TO STORE ALSO PART OF THE JOB (Note :Crane

should b
e used for loadng of breaker at store <(>&<)> unloading at site
but cran
e will be provided by JUSCO).DISMANTLING <(>&<)> RETERMINATION
"OF EART
HING, CABLE ETC."
250
ESCH01
ESCH010017
ERC/DSMNTL 6.6/11KV METERING UNIT Ex.Crn

NOS

"1,993.19"
ERECTION

OF INDOOR TYPE 6.6 / 11KV METERING UNIT ON BASE FRAME. THIS


DOES NOT
INCLUDE TERMINATION OF OUTGOING/INCOMING POWER AND CONTROL
CABLE AN
D EARTHING WORK.THIS ALSO INCLUDES MOUNTING AND CONNECTION OF
"METERS
SUPPLIED IN LOOSE WHENEVER NECESSARY, IF REQUIRED. TRANSPORTING"
FROM STO
RE TO SITE <(>&<)> PROVIDING SKILLED ASSISTANT DURING TESTING I
ALSO A P
ART OF JOB.THIS INCLUDES ERECTION <(>&<)> FEBRICATION WORK
REQURIED
FOR MAKING FRAME ERECTION BUT SUPPLY OF STEEL IS NOT
"INCLUDE
D. Crane shall be used for doing the job, but crane will be"
provided
by JUSCO
10
ESCH01
INST.SW.GR. (6.6 KV) with channel

081.D1.0137

NOS

"3,403.00"
"INSTALL

ATION OF HT SWITCHGEAR(6.6 KV/ 11KV) WITH CHANNELS . THIS ALSO


INCLUDES
MOUNTING AND CONNECTION OF RELAYS,METERS,CONTROL SWITCHES
RECEIVED
LOOSE WHENEVER NECESSARY, MECHANICAL <(>&<)> ELECTRICAL
COUPLING
WITH EXISTING PANEL, IF REQUIRED. TRANSPORTING BREAKER FROM
STORE TO
SITE (Note :Crane should be used for loadng of breaker at stor
<(>&<)>
unloading at site) <(>&<)> PROVIDING SKILLED ASSISTANT DURING
TESTING
IS ALSO A PART OF JOB.THIS INCLUDES ERECTION <(>&<)> FEBRICATIO
WORK REQ
URIED FOR MAKING FRAME FOR BREAKER ERECTION AS PER VENDOR
DRAWING
BUT SUPPLY OF STEEL IS NOT INCLUDED. THIS DOES NOT INCLUDE"
TERMINAT
ION OF OUTGOING/INCOMING POWER AND CONTROL CABLES AND
"FABRICA
TION OF TRUNKING WITH BUSBARS, EARTHING WORK."
20
ESCH01
081.D1.0138
INST.SW.GR. (6.6 KV) in extng. channel

NOS

"2,563.00"
"""INSTA

LLATION OF HT SWITCHGEAR(6.6 KV/11KV) WITHOUT CHANNELS . THIS

ALSO INC
LUDES MOUNTING AND CONNECTION OF RELAYS,METERS,CONTROL SWITCHES
RECEIVED
LOOSE WHENEVER NECESSARY, MECHANICAL <(>&<)> ELECTRICAL
COUPLING
WITH EXISTING PANEL, IF REQUIRED. TRANSPORTING BREAKER FROM
STORE TO
SITE (Note :Crane should be used for loadng of breaker at stor
<(>&<)>
unloading at site) <(>&<)> PROVIDING SKILLED ASSISTANT DURING
TESTING
IS ALSO A PART OF JOB.""THIS DOES NOT INCLUDE TERMINATION OF
OUTGOING
/INCOMING POWER AND CONTROL CABLES AND FABRICATION OF TRUNKING
WITH BUS
BARS, EARTHING WORK.
"
30
ESCH01
DISMANT.SW.GR. (6.6 KV)

081.D1.0139

NOS

"1,295.00"
The scop

e of work includes : (1) Dismantling of panel including


dismantl
ing of bus (2) Necessary Gas Cutting work (3) Dismatling of
earthing
(4) Dismatling of HT <(>&<)> Control Cables (5) Shfting <(>&<)
unloadin
g at store (Note :Crane should be used for loadng of breaker at
site <(>
&<)> unloading at store)
40
ESCH01
INST. / RE-INST. RMU

081.D1.0140

NOS

"2,929.00"
The scop

e of work includes : (1) Shfting from store to site <(>&<)>


providin
g skilled assistant during testing. crane should be used for
loadng o
f breaker at store <(>&<)> unloading at site. (2) Erection in
foundati
on / inside CPSS (3) INCLUDES MOUNTING AND CONNECTION OF RELAYS
",METERS
,CONTROL SWITCHES RECEIVED LOOSE , Note : THIS DOES NOT INCLUDE"
construc
tion of civil foundation AND EARTHING WORK.
50
DISMANT. RMU

ESCH01

081.D1.0141

NOS

"2,526.00"
The scop

e of work includes :

(1) Dismantling from foundation / insid


"CPSS (2

) INCLUDES DISCONNECTION OF RELAYS,METERS,CONTROL SWITCHES"


",CABLES
AND EARTHING WORK. (3) Shfting from site to store, crane shoul"
be used
for loadng of breaker at site <(>&<)> unloading at store

60
ESCH01
OSF / ISOLATOR

081.D1.0142

NOS

542

DISMANT.
The scop

e of work includes :

(1) Dismantling from foundation (2)


"Disconn

ection of all HT cables (3) Shfting from site to store, crane"


should b
e used for loadng of breaker at site <(>&<)> unloading at store
70
ESCH01
001.A2.015
INST.SIEMENS / SEIL Make Panel upto 11kV

NOS

"3,744.00"
"INSTALL

ATION OF SIEMENS / SEIL ETC. HT SWITCHGEAR(6.6 KV/ 11KV) WITH


CHANNELS
. THIS ALSO INCLUDES MOUNTING AND CONNECTION OF RELAYS,METERS
,CONTROL
SWITCHES RECEIVED LOOSE WHENEVER NECESSARY, MECHANICAL <(>&<)>
TRANSPO
RTING BREAKER FROM STORE TO SITE (Note :Crane should be used fo
loadng o
f breaker at store <(>&<)> unloading at site) <(>&<)> PROVIDING
SKILLED
ASSISTANT DURING TESTING IS ALSO A PART OF JOB.THIS INCLUDES
ERECTION
<(>&<)> FEBRICATION WORK REQURIED FOR MAKING FRAME FOR BREAKER
ERECTION
AS PER VENDOR DRAWING BUT SUPPLY OF STEEL IS NOT INCLUDED."
THIS DOE
S NOT INCLUDE TERMINATION OF OUTGOING/INCOMING POWER AND CONTRO
"CABLES
AND FABRICATION OF TRUNKING WITH BUSBARS, EARTHING WORK."
80
ESCH01
INST. RMU Ex.Crn.

ESCH010001

NOS

"2,129.00"
The scop

e of work includes : (1) Shfting from store to site <(>&<)>


providin
g skilled assistant during testing. crane should be used for
"loadng
of breaker at store <(>&<)> unloading at site, but crane will be"
provided
by JUSCO. (2) Erection in foundation / inside CPSS (3) INCLUDE
"MOUNTIN
G AND CONNECTION OF RELAYS,METERS,CONTROL SWITCHES RECEIVED LOOS"
", Note
: THIS DOES NOT INCLUDE TERMINATION OF OUTGOING/INCOMING POWER"
"AND CON
TROL CABLES, construction of civil foundation AND EARTHING WORK."
90
ESCH01
DISMANT. RMU Ex.Crn.

ESCH010002

NOS

"1,726.00"
The scop

e of work includes :

(1) Dismantling from foundation / insid


"CPSS (2

) INCLUDES DISCONNECTION OF RELAYS,METERS,CONTROL SWITCHES"


",CABLES

AND EARTHING WORK. (3) Shfting from site to store, crane shoul"
"be used
for loadng of breaker at site <(>&<)> unloading at store, but"
crane wi
ll be provided by JUSCO.
100
ESCH01
ESCH010018
INST.HT SW.GR. incl. base frame Ex.Crn.

NOS

"2,009.76"
INSTALLA

TION OF HT SWITCHGEAR(6.6 KV/ 11KV) WITH CHANNELS . THIS ALSO


"INCLUDE
S MOUNTING AND CONNECTION OF RELAYS,METERS,CONTROL SWITCHES"
"RECEIVE
D LOOSE WHENEVER NECESSARY, MECHANICAL <(>&<)> ELECTRICAL"
"COUPLIN
G WITH EXISTING PANEL, IF REQUIRED. TRANSPORTING BREAKER FROM"
STORE TO
SITE (Note :Crane should be used for loadng of breaker at stor
"<(>&<)>
unloading at site, but crane will be provided by JUSCO) <(>&<)>"
PROVIDIN
G SKILLED ASSISTANT DURING TESTING IS ALSO A PART OF JOB.THIS
INCLUDES
ERECTION <(>&<)> FEBRICATION WORK REQURIED FOR MAKING FRAME FO
BREAKER
ERECTION AS PER VENDOR DRAWING BUT SUPPLY OF STEEL IS NOT
"INCLUDE
D"". THIS DOES NOT INCLUDE TERMINATION OF OUTGOING/INCOMING POWER"
"AND CON
TROL CABLES AND FABRICATION OF TRUNKING WITH BUSBARS, EARTHING"
WORK.
110
ESCH01
ESCH010019
INST.HT SW.GR. excld.base frame Ex.Crn.

NOS

"1,869.12"
"INSTALL

ATION OF HT SWITCHGEAR(6.6 KV/11KV) WITHOUT CHANNELS . THIS ALS


INCLUDES
MOUNTING AND CONNECTION OF RELAYS,METERS,CONTROL SWITCHES
RECEIVED
LOOSE WHENEVER NECESSARY, MECHANICAL <(>&<)> ELECTRICAL
COUPLING
WITH EXISTING PANEL, IF REQUIRED. TRANSPORTING BREAKER FROM
STORE TO
SITE (Note :Crane should be used for loadng of breaker at stor
<(>&<)>
unloading at site, but crane will be provided by JUSCO) <(>&<)>
PROVIDIN
G SKILLED ASSISTANT DURING TESTING IS ALSO A PART OF JOB.""THIS
DOES NOT
INCLUDE TERMINATION OF OUTGOING/INCOMING POWER AND CONTROL
CABLES A
ND FABRICATION OF TRUNKING WITH BUSBARS, EARTHING WORK.
"
120
ESCH01
SW.GR. (6.6 KV) Ex.Crn.

ESCH010020

NOS

447.13 DISMANT.
The scop

e of work includes : (1) Dismantling of panel including


dismantl
ing of bus (2) Necessary Gas Cutting work (3) Dismatling of
earthing
(4) Dismatling of HT <(>&<)> Control Cables (5) Shfting <(>&<)
unloadin
g at store (Note :Crane should be used for loadng of breaker at
"site <(
>&<)> unloading at store, but crane will be provided by JUSCO)"
10
ESCH01
INST.ACB/OCB IND.SEP.UNIT.

081.D1.0185

EA

"1,361.04"
"""INSTA

LLATION OFM.T./L.T.ACB/OCB IND. SEP.UNIT WITHOUT CHANNELS . THI


DOES NOT
INCLUDE TERMINATION OF OUTGOING/INCOMING POWER AND CONTROL
CABLES A
ND FABRICATION , EARTHING WORK.THIS ALSO INCLUDES MOUNTING AND
CONNECTI
ON OF RELAYS,METERS,CONTROL SWITCHES RECEIVED LOOSE WHENEVER
NECESSAR
Y, MECHANICAL <(>&<)> ELECTRICAL COUPLING WITH EXISTING PANEL,
IF REQUI
RED. TRANSPORTING BREAKER FROM STORE TO SITE .THIS INCLUDES
ERECTION
<(>&<)> FEBRICATION WORK REQURIED FOR MAKING FRAME/CHAMBER FOR
MT/LT AC
B /OCB ERECTION AS PER VENDOR DRAWING ARE INCLUDE BUT SUPPLY O
STEEL I
S NOT INCLUDED""
"
20
ESCH01
B&ERC.FDN.CHNL.

081.D1.0143

NOS

281

INST. FA
INST.F

AB.<(>&<)> ERC.CHNL. WITH CUTTING OF FLOOREAND MESION JOB


INCLUDIN
G OF ALL MATERIAL EXCEPT STEEL
30
ESCH01
/OCB IND.SEP.UT.

081.D1.0144

NOS

367

DISM.ACB
The scop

e of work includes :

(1) Dismantling from foundation (2)


Disconne

ction of all MT/LT/Control cables (3) Shfting from site TO


store
40
ESCH01
ercing connectors

081.D1.0145

NOS

22

Erect Pi
ERRECTIO

N OF PIERCING CONNECTOR BETWEEN ABC TO CABLE /WHERE EVER


REQUIRED
inclduing all accessories
50

ESCH01

081.D1.0146

NOS

140

Erect LV

distri. box upto 10 connectors


ERRECTIO
N OF DIST.BOX ON RAIL POLE WITH SUTAIBLE ARRAGMENT ( ARRAGMENT
FAB.<(>&
<)> ERRECTED BY VENDOR).INCLUDING IN/OUT TERMINATION (JUMPER O
LEAD) B
UT ECSULIDING END TERMINATION OF JUMPER OR OUT GOING LEAD AND
ERRECTIO
N OF IPC. STEEL MATERIAL WIILL BE NOT INCLUDING.
60
ESCH01
Mid span jointing kits

081.D1.0147

NOS

20

Erection
ERRECTIO

N OF MID SPAN JOINTING KITS WITH PROPER TAPPING WITH ADICIVE


AND NON
ADCIVE INSULATING TAPE
70
Pole clamp

ESCH01

081.D1.0148

NOS

43

Erection
ERRECTIO

N OF POLE CLAMP
80
ESCH01
Stringing at Rail pole/PSC pole

081.D1.0150

39

LT A.B.C
STRINGIN

G OF O/H AB CONDUCTOR WITH FABRICATION AND ERRECTION OF POLE


CLAMP .T
HIS ARE ALSO INCLUDED ERRECTION OF ANCHORING CLAMP /SUSPENSION
CLAMP /
EYE HOOK. BUT NOT INCLUDED ERRECTION OF JN.BOX/P
CONNECTO
RS/IN/OUT GOING CONNECTION . STEEL MATERIAL SUPPLIED BY JUSCO.
90
ESCH01
nt of D.B for A.B.C

081.D1.0151

NOS

150

Replacme
"REPLACE

MENT OF DB AT EXSTING PLACE,INCLUDING DISMENTLING OF OLD DB AND"


RE CONNE
CTION OF ALL IN/OUT CONNECTION.
100
ESCH01
nt of Jumper cable for A.B.C

081.D1.0152

NOS

20

Replacme
REPLACEM

ENT OF JUMPER
110
ESCH01
of existing bare O/H lines

081.D1.0196

CMT

Removal
Dismantl

ing of existing O/H line with all accessories <(>&<)> return th


material
to store
10

ESCH01

081.D1.0153

NOS

"3,745.00"

Rail Pole Erection (12.8 Mtr)


"Rail Po
le Erection upto 12.8 Mtr crane should be used for erection
(# The P
CC foundation should be of size 45 cm x 45 cm x depth, where
depth is
equal to the 1/6th of the height of the respective pole. The
PCC shal
l be of 1:3:6 (M10 grade). Excavation size of the pit shall be
commensu
rate with the foundation size of PCC stated above. A PCC (grade
1:2:4) m
uffing of size 500 mm dia and 200 mm height shall provided abov
the grou
nd level for the rail pole.# For foundation of rail poles a MS
base pla
te of size 450x450x6mm shall be required to be welded at the
bottom o
f steel pole. Painting of ploe is also in scope of vendor. Pole
shall be
first painted with two coat of red oxide paint. The portion of
the pole
to be buried inside the ground shall be painted with two coats
""Rail P
ole Erection upto 12.8 Mtr
(# The P
CC foundation should be of size 45 cm x 45 cm x depth, where
depth is
equal to the 1/6th of the height of the respective pole. The
PCC shal
l be of 1:3:6 (M10 grade). Excavation size of the pit shall be
commensu
rate with the foundation size of PCC stated above. A PCC (grade
1:2:4) m
uffing of size 500 mm dia and 200 mm height shall provided abov
the grou
nd level for the rail pole.# For foundation of rail poles a MS
base pla
te of size 450x450x6mm shall be required to be welded at the
bottom o
f steel pole. Supply all necessary civil material,plate etc. is
in vendo
r scope. Painting of ploe is also in scope of vendor. Poles
shall be
first painted with two coat of red oxide paint. The portion of
the pole
to be buried inside the ground shall be painted with two coats
of bitum
en tar. After erection of pole, the external surface of pole
shall b
e painted with two coats of aluminium paint in an approved
manner.P
aints <(>&<)> painting materials will be provided by the vendor
# The po
le is to be erected in alignment with utmost care and the
excavate
d earth should be back filled properly by ramming or concreting
Transpor
tation of the materials from store to site is in vendor's
scope)""

of bitum
en tar. After erection of pole, the external surface of pole
shall b
e painted with two coats of aluminium paint in an approved
manner.P
aints <(>&<)> painting materials will be provided by the vendor
# The po
le is to be erected in alignment with utmost care and the
excavate
d earth should be back filled properly by ramming or concreting
Transpor
tation of the materials from store to site is in vendor's
scope)"
20
ESCH01
PSC pole Erection

081.D1.0154

NOS

"2,205.00"
"PSC pol

e Erection crane should be used for erection


(# The P
CC foundation should be of size 45 cm x 45 cm x depth, where
depth is
equal to the 1/6th of the height of the respective pole. The
PCC shal
l be of 1:3:6 (M10 grade). Excavation size of the pit shall be
commensu
rate with the foundation size of PCC stated above. A PCC (grade
1:2:4) m
uffing of size 500 mm dia and 200 mm height shall provided abov
the grou
nd level for the pole.
# The po
le is to be erected in alignment with utmost care and the
excavate
d earth should be back filled properly by ramming or concreting
Transpor
tation of the materials from store to site is in vendor's
scope)"
30
ESCH01
TopChannel3M Ea.100X50mm on rail

081.D1.0155

NOS

200

Erec.of
"Erectio

n of 100 x 50 x 3000 MM Top Channel on rail


(The fit
ting Top channel should be fixed on poles as per standard
practice
adopted. All nuts <(>&<)> bolts used shall be of GI / SS with
combinat
ion of plain and spring washer and machine made.
Transpor
tation of the materials from store to site is in vendor's
scope)"
40
ESCH01
of 33kV Disc Insulator (Strain)

081.D1.0156

SET

95

Erection
"Erectio

n of 33kV Disc Insulator (Strain)


(Strain

insulators shall be used on all angle <(>&<)> dead end poles.


Damaged
insulators and fittings, if any, shall not be used. Prior to
fixing,
all insulators shall be cleaned in a manner that shall not
spoil, i
njure or scratch the surface of the insulator, but in no case
shall an
y oil be used for that purpose.
The 33KV
strain hardware fitting of aluminium alloy suitable for Dog
Conducto
r
should b
e used conforming to IS-2486 (Part-II) 1989.
Transpor
tation of the materials from store to site is in vendor's
scope)"
50
ESCH01
CrossArm for double rail Pole

081.D1.0157

NOS

264

Erec.of
"Erectio

n of Cross Arm for double rail Pole


(The fit
ting Cross Arm should be fixed on poles as per standard practic
adopted.
All nuts <(>&<)> bolts used shall be of GI / SS with
combinat
ion of plain and spring washer and machine made.
Transpor
tation of the materials from store to site is in vendor's
scope)"
60
ESCH01
Erection of 33 KV Stay Set

081.D1.0158

NOS

"1,320.00"
"Erectio

n of 33 KV Stay Set
(# 7/2.5
mm G.I. Stay wire # 2nos type # C # Stay Insulator.
# Turn B
uckle# Clamps# Anchor rod <(>&<)> plate (Hot Dipped galvanised
(#This i
ncludes excavation of pit size 0.75 x 0.5 x 1.6 metre in all
kinds of
soil including laterite/hard rocks. Stay plate and rod (leavin
the top
10cm) shall be embedded in the pit with in the ratio
1:2:4(ce
ment, sand <(>&<)> aggreate). An angle between 30 to 45 degree
shall be
maintained between stay wire and the pole. The stay wire shal
be used
with a stay insulator at a height of 5 mts. above ground level
with G.I
. turn buckle. MS Stay plate will be of size 450 mm X 450 mm X
mm.
Transpor
tation of the materials from store to site is in vendor's

scope)"
70
ESCH01
of 33kV B.P. Insulator

081.D1.0159

NOS

221

Erection
"Erectio

n of B.P.I Insulator
(Damaged
BPI and fittings, if any, shall not be used. Prior to fixing,
all BPI
shall be cleaned in a manner that shall not spoil, injure or
scratch
the surface of the insulator, but in no case shall any oil be
used for
that purpose. Torque wrench shall be used for fixing various
line mat
erials and components, such as suspension clamp for conductor,
whenever
recommended by the manufacturer of the same.)"
80
ESCH01
of Danger Board on Rail Pole

081.D1.0160

NOS

22

Erection
"Erectio

n of Danger Board on Rail Pole


( Danger
Notice Plates shall comply with IS:2551-1982.
sizes of
Danger Notice Plates-250x200mm.
MATERIAL
AND FINISH
The pla
te shall be made from mild steel sheet of at least 1.6mm thick
and vitr
eous enameled white, with letters, figures and the conventional
skull an
d cross-bones in signal red colour (refer IS:5-1978) on the
front s
ide. The rear side of the plate shall also be enamelled. The
all mate
rial is under vendor scope
Transpor
tation of the materials from store to site is in vendor's scope
"
90
ESCH01
of Anti clambing Device

081.D1.0161

NOS

68

Erection
"Erectio

n of Anti clambing Device


(This sh
all be done with G.I. Barbed wire. The barbed wire shall confor
to IS-27
8 (Grade A1). The barbed wires shall be given chromating dip as
per proc
edure laid down in IS: 1340.
Barbed w
ire should be wrapped at a height of 3000 mm above ground level
stretchi
ng in 900 mm length. Both ends of barbed should be clamped

suitably
to avoid
coming d
own from its location. The all materials will be supplied by
JUSCO"
100
ESCH01
of L.A (33KV)

081.D1.0162

NOS

174

Erection
"Erectio

n of L.A (33KV Distribution Class)


(Damaged
LA and fittings, if any, shall not be used. Prior to fixing,
all LA s
hall be cleaned in a manner that shall not spoil, injure or
scratch
the surface of the insulator, but in no case shall any oil be
used for
that purpose. The febrication of all necessary support for
erection
of LA is under vendor scope excluding supply of steel. LA will
be free
supply by JUSCO"
110
ESCH01
of 33kV Pin Insulator

081.D1.0164

NOS

52.8

Erection
"Erectio

n of Pin Insulator
(Pin ins
ulators shall be used on all poles . Damaged insulators and
fittings
, if any, shall not be used. Prior to fixing, all insulators
shall be
cleaned in a manner that shall not spoil, injure or scratch th
surface
of the insulator, but in no case shall any oil be used for that
purpose.
The 33KV
galvanized steel pins made by process of forging suitable for
33KV pin
insulators having maximum failing load of 10 K.N. with small
steel he
ad as per fig IB of IS 2486 (ii)/1974 shall be used. The
dimensio
n of pin shall conform to ref L-306N fig 69IS-2486 (ii)/1974.
The pin
shall be provided with nut (hot dip galvanized) one plain washe
and one
spring washer (electro galvanized).
Transpor
tation of the materials from store to site is in vendor's
scope)"
120
of V Bracket

ESCH01

081.D1.0165

NOS

176

Erection
"Erectio

n of V Bracket
(The fit

ting V Bracket should be fixed on poles as per standard practic


adopted.
All nuts <(>&<)> bolts used shall be of M.S. with combination
of plain
and spring washer and machine made.
Transpor
tation of the materials from store to site is in vendor's
scope)"
130
ESCH01
of Top Bracket

081.D1.0166

NOS

44

Erection
"Erectio

n of Top Bracket
(The fit
ting Top Bracket should be fixed on poles as per standard
practice
adopted. All nuts <(>&<)> bolts used shall be of M.S. with
combinat
ion of plain and spring washer and machine made.
Transpor
tation of the materials from store to site is in vendor's
scope)"
140
ESCH01
of Pad Connector

081.D1.0167

NOS

25

Erection
"Erectio

n of Pad Connector
(The fit
ting Pad Connector should be fixed on poles as per standard
practice
adopted. All nuts <(>&<)> bolts used shall be of GI with
combinat
ion of plain and spring washer and machine made. The neessary
making o
f hole in pad for cable connection is under vendor scope
includin
g supply of necessary hardware
Transpor
tation of the materials from store to site is in vendor's
scope)"
150
of Pole

ESCH01

081.D1.0168

NOS

300

Painting
"Paintin

g in existing rail pole


(Poles s
hall be first painted with two coat of red oxide paint. The
external
surface of pole shall be painted with two coats of aluminium
paint in
an approved manner.Paints <(>&<)> painting materials will be
provided
by the vendor)
"
160

ESCH01

081.D1.0169

SET

95

Erection

of 11kV Disc Insulator (Strain)


Long te
xt not maintain
170
ESCH01
of Top Channel upto 2 M Each

081.D1.0170

NOS

44

Erection
Erection

of Top Channel upto 2 M Each 100 X 50mm on PSC pole


180
ESCH01
of 11kV B.P. Insulator

081.D1.0171

NOS

150

Erection
Long te

xt not maintain
190
ESCH01
Erection of 11 KV Stay Set

081.D1.0187

SET

"1,320.00"
Erection

of 11 KV Stay Set
200
ESCH01
Erection of AB Switch

081.D1.0188

SET

"1,174.20"
Erection

of AB Switch
210
of DO Fuse

ESCH01

081.D1.0189

SET

807.86 Erection
Erection

of DO Fuse
220
ESCH01
of 11KV Lightning Arestor

081.D1.0190

NOS

235.86 Erection
Erection

of 11KV Lightning Arestor


230
ESCH01
of 11kV Insulator

081.D1.0191

NOS

120

Erection
Erection

of 11kV Insulator
240
ESCH01
CrossArm for double PSC Pole

081.D1.0192

NOS

218

Erec.of
Erec.of

CrossArm for double PSC Pole


250
ESCH01
of SPIKE type Earthing

081.D1.0193

NOS

64

Erection
Erection

of SPIKE type Earthing


260
ESCH01
Dismantle of PSC Pole

081.D1.0194

NOS

"1,450.00"
Dismantl

e of PSC Pole

270
ESCH01
Dismantle of Rail Pole

081.D1.0195

NOS

"2,000.00"
Dismantl

e of Rail Pole
280
ESCH01
f 3Wire AAAC Dog Conductor

081.D1.0197

CMT

10.56

String o
"String

of 3Wire AAAC Dog Conductor


(STRINGI
NG OF CONDUCTOR: Conductor should be laid out from a rotating
wheel su
pported on jacks for easy unwinding of the conductor snatch
blocks s
hall be used for stringing the conductor and shall have groves
of a sha
pe and size to allow early flow of conductor and ensure damage
free ope
ration. Come along clamps should be used to grip the conductor
at the t
ime of stringing.
SAGGING
OF CONDUCTOR: All conductors sagging shall be preferred in
accordan
ce with the sag and tension tables. After the conductors have
been pul
led to the required sag, intermediate spans shall be checked to
determin
e the correct sag. The conductor shall be installed on
insulato
rs secured to it by means of 6 SWG
aluminiu
m binding wire. The jumpers at the tension locations should als
be bound
by 6 SWG aluminium binding wire. Before fixing the conductor o
insulato
r and strain hardware, aluminium tape should be wrapped on the
conducto
r. The crimping of hardware is included in vendor scope. The al
necessar
y tools <(>&<)> tackles shall be arranged by vendor. JUSCO will
supply o
nly conductor <(>&<)> hardware fittings
Transpor
tation of the materials from store to site is in vendor's scope
"
290
ESCH01
f 3Wire AAAC Rabbit Conductor 11

081.D1.0198

CMT

10.56

String o
String o

f 3Wire AAAC Rabbit Conductor 11


300
ESCH01
of 11kV Pin Insulator

081.D1.0199

NOS

53

Erection
Long te

xt not maintain
310
ESCH01
ESCH010006
Rail Pole Erection (12.8 Mtr) Ex.Crn.

NOS

"3,017.39"
"Rail Po

le Erection upto 12.8 Mtr crane should be used for erection,


but cran
e will be provided by JUSCO
(# The P
CC foundation should be of size 45 cm x 45 cm x depth, where
depth is
equal to the 1/6th of the height of the respective pole. The
PCC shal
l be of 1:3:6 (M10 grade). Excavation size of the pit shall be
commensu
rate with the foundation size of PCC stated above. A PCC (grade
1:2:4) m
uffing of size 500 mm dia and 200 mm height shall provided abov
the grou
nd level for the rail pole.# For foundation of rail poles a MS
base pla
te of size 450x450x6mm shall be required to be welded at the
bottom o
f steel pole. Painting of ploe is also in scope of vendor. Pole
shall be
first painted with two coat of red oxide paint. The portion of
the pole
to be buried inside the ground shall be painted with two coats
""Rail P
ole Erection upto 12.8 Mtr
(# The P
CC foundation should be of size 45 cm x 45 cm x depth, where
depth is
equal to the 1/6th of the height of the respective pole. The
PCC shal
l be of 1:3:6 (M10 grade). Excavation size of the pit shall be
commensu
rate with the foundation size of PCC stated above. A PCC (grade
1:2:4) m
uffing of size 500 mm dia and 200 mm height shall provided abov
the grou
nd level for the rail pole.# For foundation of rail poles a MS
base pla
te of size 450x450x6mm shall be required to be welded at the
bottom o
f steel pole. Supply all necessary civil material,plate etc. is
in vendo
r scope. Painting of ploe is also in scope of vendor. Poles
shall be
first painted with two coat of red oxide paint. The portion of
the pole
to be buried inside the ground shall be painted with two coats
of bitum
en tar. After erection of pole, the external surface of pole
shall b
e painted with two coats of aluminium paint in an approved
manner.P
aints <(>&<)> painting materials will be provided by the vendor
# The po
le is to be erected in alignment with utmost care and the

excavate
d earth should be back filled properly by ramming or concreting
Transpor
tation of the materials from store to site is in vendor's
scope)""
of bitum
en tar. After erection of pole, the external surface of pole
shall b
e painted with two coats of aluminium paint in an approved
manner.P
aints <(>&<)> painting materials will be provided by the vendor
# The po
le is to be erected in alignment with utmost care and the
excavate
d earth should be back filled properly by ramming or concreting
Transpor
tation of the materials from store to site is in vendor's
scope)"
320
ESCH01
PSC pole Erection Ex.Crn.

ESCH010007

NOS

"1,890.00"
"PSC pol

e Erection crane should be used for erection, but crane will be


provided
by JUSCO.
(# The P
CC foundation should be of size 45 cm x 45 cm x depth, where
depth is
equal to the 1/6th of the height of the respective pole. The
PCC shal
l be of 1:3:6 (M10 grade). Excavation size of the pit shall be
commensu
rate with the foundation size of PCC stated above. A PCC (grade
1:2:4) m
uffing of size 500 mm dia and 200 mm height shall provided abov
the grou
nd level for the pole.
# The po
le is to be erected in alignment with utmost care and the
excavate
d earth should be back filled properly by ramming or concreting
Transpor
tation of the materials from store to site is in vendor's
scope)"
330
ESCH01
of L.A (33KV) Ex.Crn.

ESCH010008

NOS

140.03 Erection
"Erectio

n of LA (33KV Distribution Class)


(Damaged
LA and fittings, if any, shall not be used. Prior to fixing,
all LA s
hall be cleaned in a manner that shall not spoil, injure or
scratch
the surface of the insulator, but in no case shall any oil be
used for
that purpose. The febrication of all necessary support for
erection

of LA is under vendor scope excluding supply of steel. LA will


be free
supply by JUSCO. Crane shall be used for loading/ unloading/
installa
tion, but crane will be provided by JUSCO"
340
ESCH01
Dismantle of PSC Pole Ex.Crn.

ESCH010009

NOS

"1,350.00"
"Dismant

ling of pole with help of crane without any damage, but crane
will be
provided by JUSCO.
Transpor
tation of the materials from site to store is in vendor's
scope)"
350
ESCH01
Dismantle of Rail Pole Ex.Crn.

ESCH010010

NOS

"1,800.00"
"Dismant

ling of rail pole with help of crane without any damage, but
crane wi
ll be provided by JUSCO.
Transpor
tation of the materials from site to store is in vendor's scope
10
ESCH01
Minor Service for Elect. Work

001.A2.012

EA

241.50
Service

with unskilled manpower


20
ESCH01
001.A2.013
Major Service for skilled E lect. Work

EA

256.80
Service

with skilled manpower


30
ESCH01
Service for control wiring work

001.A2.014

EA

299.60
Service

with electrician
10
ESCH01
081.D1.0107
INST.DB.100A,UP TO3/4 B/B UPTO 12 WAYS.

EA

1,064.24
Long te

xt not maintain
20
ESCH01
081.D1.0108
INST.ABOVE 300 - 800 A 3/4 BUS 6TO12WS.

EA

1,589.79
Long te

xt not maintain
30
ESCH01
081.D1.0109
INST.ABOVE 800ATO1600A,3/4 BUS 6TO12 WS.

EA

2,039.76
Long te

xt not maintain

40
ESCH01
INS.FEEDER PILLARS.upto 400 Amps

081.D1.0110

EA

2,863.35
INS.FEED

ER PILLARS.upto 400 Amps including foundation


50
ESCH01
081.D1.0111
TEMP.ER.DB UPTO 300A,2 TO 4 BUS. 6WAYS.

EA

475.78
Long te

xt not maintain
60
ESCH01
DISM.UPTO 300A,2 TO 4 BUS UPTO 6WAYS.

081.D1.0112

EA

311.77
Long te

xt not maintain
70
ESCH01
DISM.400 - 800 A 3/4 BUS UPTO 12WS.

081.D1.0113

EA

600.49
Long te

xt not maintain
80
ESCH01
DISM.ABOVE 800-1600A,3/4 BUS 6-12 WS.

081.D1.0114

EA

904.99
Long te

xt not maintain
90
ESCH01
DISM.FEEDER PILLER UPTO 400A.

081.D1.0115

EA

963.76
Long te

xt not maintain
100
ESCH01
FAB. UPTO 100A,2BUS UPTO 6WAYS.

081.D1.0116

EA

3,872.66
Long te

xt not maintain
110
ESCH01
FAB.UPTO 100A,3/4 BUS UPTO 6 WAYS.

081.D1.0117

EA

4,584.30
Long te

xt not maintain
120
ESCH01
081.D1.0118
FAB.UPTO 100A,ABOVE6TO12 WAYS&3/4 BUS.

EA

5,108.88
Long te

xt not maintain
130
ESCH01
081.D1.0119
FAB.ABOVE-100TO300 3/4 BUS UPTO 6 WAYS.

EA

4,600.00
Long te

xt not maintain
140
ESCH01
081.D1.0120
FABN.AE 300A,TO500A, 3/4 BSBS UO 6 WS.

EA

4,700.00
Long te

xt not maintain
150
ESCH01
081.D1.0121
FABN.AE 300A,TO 500A,3/4 BS. AE 6 -12WS.

EA

5,200.00
Long te

xt not maintain
10
ESCH67
SUP.LIGHT. ARR(SPIKE TYPE)3/45/8DIA

067.A1.001

SET

235.86
SUPPLY O

F SPIKE TYPE LIGHTNING ARRESTOR : SUPPLY OF TOTAL LENGTH OF


EARTHING
CONDUCTOR USED FOR EARTHING FROM EARTHING STATION WILL BE
PAID EXT
RA AGAINST NO -68 . SUPPLY OF SPIKE TYPE LIGHTENING ARRESTOR
FOR PROT
ECTION OF BUILDINGS AND CHIMNEYS AND ALLIED STRUCTURS
INCLUDIN
G NECESSARY SUPPORT .3/4 INCH OR 5/8 INCH DIA SPHERE TYPE WITH
MULTIPOI
NT G.I. AIR TERMINATION ABOUT 4 FT. LONG .
20
ESCH67
ERE.LIGHT. ARR(SPIKE TYPE)3/45/8DIA

067.A2.001

SET

86.75
ERECTION

OF SPIKE TYPE LIGHTNING ARRESTOR : ERECTION OF TOTAL


LENGTH O
F EARTHING CONDUCTOR USED FOR EARTHING FROM EARTHING STATION
WILL BE
PAID EXTRA AGAINST NO -68 . ERECTION OF SPIKE TYPE
LIGHTENI
NG ARRESTOR FOR PROTECTION OF BUILDINGS AND CHIMNEYS AND
ALLIED S
TRUCTURS INCLUDING NECESSARY SUPPORT . 3/4INCH OR 5/8INCH DIA.
SPHERE T
YPE WITH MULTIPOINT G.I. AIR TERMINATION ABOUT 4 FT. LONG .
30
ESCH67
067.D1.001
DISM.LIGHT.ARR.(SPIKE TYPE)3/45/8.4.FT

SET

31.18
DISMANTL

ING OF SPIKE TYPE LIGHTNING ARRESTOR FOR PROTECTION OF"


"BUILDIN
GS AND CHIMNEYS WITH ALLIED STRUCTURS """
40
ESCH68
SWG G.I. WIRE.

068.A0.007

5.42

ER. 7/16
ERECTION

OF EARTHING CONDUCTORS : ERECTION AND CONNECTION OF 7/ 16


SWG . G.
I WIRE.
50
ESCH68
SWG G.I. WIRE.

068.A0.011

5.42

ER. 7/8
ERECTION

OF EARTHING CONDUCTORS : ERECTION AND CONNECTION OF 7 / 8


SWG G.I
WIRE.
60
ESCH68
ECTION 8 SWG G.I. WIRE.

068.A0.012

5.42

ER.&CONN
ERECTION

OF EARTHING CONDUCTORS : ERECTION

AND CONNECTION OF 8 SWG


. G.I WI

RE.

70
ESCH68
THING COND. G.I.STRIP

068.D0.001

2.71

DISM.EAR
"DISMANT

LING OF EARTHING CONDUCTORS : DISMANTLING OF 25 X 6 MM OR


40X6 MM
OR 50X6 MM G.I .
STRIP ."
80
ESCH68
RTH COND 50X6 G.I. STRIP

068.D0.002

5.42

DISM. EA
DISMANTL

ING OF EARTHING CONDUCTORS : DISMANTLING OF 50 X 6 MM G.I .


STRIP.
90
ESCH68
RTH COND 40X6 G.I. STRIP

068.D0.003

5.42

DISM. EA
DISMANTL

ING OF EARTHING CONDUCTORS : DISMANTLING OF 40 X 6 MM G.I.


STRIP .
100
ESCH68
RTH COND 25X3 G.I. STRIP

068.D0.004

2.71

DISM. EA
DISMANTL

ING OF EARTHING CONDUCTORS : DISMANTLING OF25 X 3 MM G.I.


STRIP .
110
I. ROUND WIRE

ESCH68

068.D0.005

1.36

DISM. G.
DISMENTA

LING OF G.I.ROUND WIRE 4 OR 6 OR 8 SWG


120
ESCH01
of GI Flat up to 25 SQ MM

081.D1.0181

20

UG ERECT
Erection

of GI flat 25X3 or 25X6 underground as per TISCO standard. Thi


will inc
luded necessary welding <(>&<)> applying of bitumin compound
130
ESCH01
RECT of GI Flat up to 25 SQ MM

081.D1.0182

15

Ground E
Above Gr

ound ERECT of GI Flat up to 25 SQ MM


Erection
of 25X3 or 25X6 GI flat above ground or wall as per TISCO
"standar
d. This will included necessary, bending, clamping, welding"
<(>&<)>
applying of bitumin compound
140
ESCH01
of GI Flat 40 to 50 SQ MM

081.D1.0183

23

UG ERECT
Erection

of GI flat from 40 to 50 SQ MM underground as per TISCO

standard
. This will included necessary welding <(>&<)> applying of
bitumin
compound
150
ESCH01
ERECT of GI Flat 40 to 50 SQ MM

081.D1.0184

18

Ground
Above Gr

ound ERECT of GI Flat 40 to 50 SQ MM


Erection
of GI flat from 40 to 50 SQ MM above ground or wall as per
"TISCO s
tandard. This will included necessary, bending, clamping, weldin"
<(>&<)>
applying of bitumin compound
10
ESCH51
TATION( COMP.UNIT ).

051.A0.002

EA

127.42 ER P.B.S
"MISCELL

ANEOUS : ERRECTION OF THE FOLLOWING , THIS INCLUDES CUTTING"


"OF POCK
ETS , FABRICATION OF SUPPORT ETC BUT WITHOUT FABRICATION AND"
ERECTION
OF M.S. BOXES . PUSH BUTTON STATION (COMPOSITE UNIT ).
20
/ IND.LAMP.

ESCH51

051.A0.003

EA

40.67

ER. P.B
"MISCELL

ANEOUS : ERRECTION OF THE FOLLOWING , THIS INCLUDES CUTTING"


"OF POCK
ETS , FABRICATION OF SUPPORT ETC BUT WITHOUT FABRICATION AND"
ERECTION
OF M.S. BOXES . PUSH BUTTON / INDICATING LAMP WITH
ACCESSOR
IES .
30
ESCH51
ER / VOLT / SPEED.INDICATOR

051.A0.009

EA

65.06

ER.AMMET
"MISCELL

ANEOUS : ERRECTION OF THE FOLLOWING , THIS INCLUDES CUTTING"


"OF POCK
ETS , FABRICATION OF SUPPORT ETC BUT WITHOUT FABRICATION AND"
ERECTION
OF M.S. BOXES . AMMETER / VOLTMETER / SPEED INDICATOR .
40
ESCH51
Y METER. 1 - PHASE

051.A0.010

EA

96.24

ER ENERG
"Erectio

n of 1 phase energy meter and meter box, MCB including all"


"connect
ion . This includes supply of all necessory lugs, socket,"
"ferruls
of Dowells make & crimping with proper crimping , fixing of"
meter bo
x on wall / support and cutting of pockets if required for
fixing t
he meter and box .Meter Box has to be fixed up either half

conseale
d in the wall or by fixing MS Bracket on wall or by other
suitable
arrangement only after due approval of the site engineer.
"Energym
eter, MCB, and Meter Box will be given by the JUSCO. Rest all"
material
required to do the work has to be given by the party.
50
ESCH51
Y METER 3 PHASE/MAX.D.METER.

051.A0.011

EA

150.46 ER.ENERG
"Erectio

n of 3 phase energy meter and meter box, MCB including all"


"connect
ion . This includes supply of all necessory lugs, socket,"
"ferruls
of Dowells make & crimping with proper crimping , fixing of"
meter bo
x on wall / support and cutting of pockets if required for
fixing t
he meter and box .Meter Box has to be fixed up either half
conseale
d in the wall or by fixing MS Bracket on wall or by other
suitable
arrangement only after due approval of the site engineer.
"Energym
eter, MCB, and Meter Box will be given by the JUSCO. Rest all"
material
required to do the work has to be given by the party.
60
ESCH51
/AUX.RELAY/S.P.RELAY

051.A0.012

EA

65.06

ER TIMER
"MISCELL

ANEOUS : ERRECTION OF THE FOLLOWING , THIS INCLUDES CUTTING"


"OF POCK
ETS , FABRICATION OF SUPPORT ETC BUT WITHOUT FABRICATION AND"
ERECTION
OF M.S. BOXES . TIMER / AUXILIARY RELAY / SINGLE POLE RELAY.
70
ESCH51
E RELAY MAX D.INDICATOR

051.A0.013

EA

96.24

ER.3 POL
"MISCELL

ANEOUS : ERRECTION OF THE FOLLOWING , THIS INCLUDES CUTTING"


"OF POCK
ETS , FABRICATION OF SUPPORT ETC BUT WITHOUT FABRICATION AND"
ERECTION
OF M.S. BOXES . 3 POLE RELAYS / MAX . DEMAND INDICATOR .
80
ESCH51
SW CLOCK WIYH PROTECTION BOX.

051.A0.016

EA

241.28 ER TIMER
"MISCELL

ANEOUS : ERRECTION OF THE FOLLOWING , THIS INCLUDES CUTTING"


"OF POCK
ETS , FABRICATION OF SUPPORT ETC BUT WITHOUT FABRICATION AND"
"ERECTIO
N OF M.S. BOXES . TIME SWITCHES - CLOCK TYPE , PHOTO CELL TYPE"
", PNEUM
ATIC TYPE . THIS INCLUDES FABRICATION AND ERECTION OF"

PROTECTI
ON BOX HINGED TYPE WITH LOCKING LATCH .
90
ESCH51
SW CLOCK W/O PROT BOX

051.A0.017

EA

192.48 ER TIME
"MISCELL

ANEOUS : ERRECTION OF THE FOLLOWING , THIS INCLUDES CUTTING"


"OF POCK
ETS , FABRICATION OF SUPPORT ETC BUT WITHOUT FABRICATION AND"
"ERECTIO
N OF M.S. BOXES . TIME SICHES - CLOCK TYPE , PHOTO CELL TYPE ,"
PNEUMATI
C TYPE WITHOUT PROTECTIVE BOX.
100
OF BATTERY.

ESCH51

051.A0.021

EA

47.44

ER.BANK
"MISCELL

ANEOUS : ERRECTION OF THE FOLLOWING , THIS INCLUDES CUTTING"


"OF POCK
ETS , FABRICATION OF SUPPORT ETC BUT WITHOUT FABRICATION AND"
ERECTION
OF M.S. BOXES .BANK OF BATTERY WITH CONNECTIONS INCLUDING
ACID POU
RING . THIS ALSO INCLUDES ERECTION OF WOODEN STANDS WHEREVER
REQUIRD
. LABOUR FOR INITIAL CHARGING WILL BE EXTRA.
110
ESCH51
STATION IN EXTG . PIOCKET

051.A0.022

EA

76.45

ER.P.B.
"MISCELL

ANEOUS : ERECTING PUSH BUTTONS , INDICATING LAMPS , TIMER IN"


EXISTING
POCKET. PUSH BUTTON STATION . (COMPOSITE UNIT ).
120
ESCH51
/ IND LAMP IN EXTG POCKET

051.A0.023

EA

24.4

ER P.B.
"MISCELL

ANEOUS : ERECTING PUSH BUTTONS , INDICATING LAMPS , TIMER IN"


EXISTING
POCKET. PUSH BUTTON / INDICATING LAMP WITH ACCESSORIES .
130
ESCH51
ER / VOLT/SP.IND.IN EXTG.PKT

051.A0.025

EA

39.04

ER AMMET
"MISCELL

ANEOUS : ERECTING PUSH BUTTONS , INDICATING LAMPS , TIMER IN"


EXISTING
POCKET. AMMETER / VOLTMETER / SPEED INDICATOR .
140
ESCH51
GY MTR - 1PH IN EXTG PKT.

051.A0.026

EA

57.74

ER. ENER
"MISCELL

ANEOUS : ERECTING PUSH BUTTONS , INDICATING LAMPS , TIMER IN"


EXISTING
POCKET. ENERGY METER - 1 PHASE .
150
ESCH51
GY MTR - 3PH IN EXTG PKT.

051.A0.027

EA

90.28

ER. ENER
"MISCELL

ANEOUS : ERECTING PUSH BUTTONS , INDICATING LAMPS , TIMER IN"


EXISTING

POCKET. ENERGY METER - 3 PHASE / MAX . DEMAND METER .


160
ESCH51
R.AUX./ SP.RELAY IN EXTG PKT

051.A0.028

EA

39.04

ER. TIME
"MISCELL

ANEOUS : ERECTING PUSH BUTTONS , INDICATING LAMPS , TIMER IN"


EXISTING
POCKET. TIMER / AUXILIARY RELAY / SINGLE POLE RELAY.
170
ESCH51
E.RELAY/ M.D.IND.IN EXTG PKT

051.A0.029

EA

57.74

ER.3 POL
"MISCELL

ANEOUS : ERECTING PUSH BUTTONS , INDICATING LAMPS , TIMER IN"


EXISTING
POCKET. 3 POLE RELAYS / MAX . DEMAND INDICATOR .
180
ESCH51
SWITCHES IN EXISTING BOX.

051.A0.030

EA

144.77 ER. TIME


"MISCELL

ANEOUS : ERECTING PUSH BUTTONS , INDICATING LAMPS , TIMERS"


"ETC IN
EXISTING PROTECTION BOX. TIME SWITCHES - CLOCK TYPE , PHOTO"
"CELL TY
PE , PNEUMATIC TYPE IN EXISTING PROTECTION BOX."
190
B / IND.LAMP.

ESCH51

051.D0.003

EA

8.13

DISM. P.
MISCELLA

NEOUS : DISMANTLING OF PUSH BUTTON / INDICATING LAMP WITH


ACCESSOR
IES .
200
ESCH51
ETER / VOLT / SP.IND.

051.D0.009

EA

13.56

DISM.AMM
MISCELLA

NEOUS : DISMANTLING OF AMMETER / VOLTMETER / SPEED INDICATOR


210
ESCH51
ERGY METER. 1 - PHASE

051.D0.010

EA

17.62

DISM. EN
Dismantl

ing and removal of 1 Phase energy meter with all connection &
accessor
ies and shifting the same to store.
220
ESCH51
RGY METER 3 PHASE/MAX.D.METER.

051.D0.011

EA

27.11

DISM.ENE
Dismantl

ing and removal of 3 Phase energy meter with all connection &
accessor
ies and shifting the same to store.
230
ESCH51
MER/AUX.RELAY/SP POLE RELAY

051.D0.012

EA

13.56

DISM. TI
MISCELLA

NEOUS : DISMANTLING OF TIMER / AUXILIARY RELAY / SINGLE


POLE REL
AY.

240
ESCH51
OLE RELAYS / M.D.INDICATOR

051.D0.013

EA

27.11

DISM.3 P
MISCELLA

NEOUS : DISMANTLING OF 3 POLE RELAYS / MAX . DEMAND


INDICATO
R .
250
ESCH51
MER SW CLOCK WITH PROT. BOX.

051.D0.016

EA

67.78

DISM. TI
"MISCELL

ANEOUS : DISMANTLING OF TIME SWITCHES - CLOCK TYPE , PHOTO"


"CELL TY
PE , PNEUMATIC TYPE INCLUDING PROTECTION BOX HINGED TYPE WITH"
LOCKING
LATCH .
260
ESCH51
ME SW CLOCK W/O PROT BOX

051.D0.017

EA

33.89

DISM. TI
"MISCELL

ANEOUS : DISMANTLING OF TIME SICHES - CLOCK TYPE , PHOTO CELL"


"TYPE ,
PNEUMATIC TYPE WITHOUT PROTECTIVE BOX."
270
ESCH51
T.CH/MAG. PANEL

051.D0.020

EA

86.75

DISM.BAT
MISCELLA

NEOUS : DISMANTLING OF BATTERY CHARGER / MAGNET PANEL .


280
ESCH52
RITTING UPTO 1

052.B1.001

NOS

2.71

LETTER W
BONDING

OF POWER RAILS :LETTER WRITING WITH SUPPLY OF PAINT.UPTO 1INCH


290
ESCH52
RITING ABOVE 1 TO 3

052.B1.002

NOS

4.07

LETTER W
BONDING

OF POWER RAILS : LETTER WRITING WITH SUPPLY OF PAINT. ABOVE


1INCH TO
3INCH
300
ESCH52
RITING ABOVE 3 TO 5

052.B1.003

NOS

8.13

LETTER W
BONDING

OF POWER RAILS : LETTER WRITING WITH SUPPLY OF PAINT. ABOVE


3INCH TO
5INCH
310
ESCH56
L BOARD 10,ABOVE 6 WS."

056.A0.001

EA

52.86

"ER BAKE
ERECTION

OF TERMINAL BOX : ERECTION OF STANDARD BAKELITE TERMINAL


BLOCK BO
ARD POWER / CONTROL TYPE ( 10A.). ABOVE 6 WAYS.
320
ESCH56
BOARD 10A UPTO 6 WS.

056.A0.002

EA

24.4

ER BAKEL
ERECTION

OF TERMINAL BOX : ERECTION OF STANDARD BAKELITE TERMINAL


BLOCK BO
ARD POWER / CONTROL TYPE ( 10A.). UPTO 6 WAYS.

330
ESCH56
BOARD( 15/30A)ABOVE 6 WS.

056.A0.003

EA

52.86

ER BAKEL
ERECTION

OF TERMINAL BOX : ERECTION OF STANDARD BAKELITE TERMINAL


BLOCK BO
ARD POWER / CONTROL TYPE ( 15/30A).ABOVE 6 WAYS.
340
ESCH56
BOARD( 15/30A)UPTO 6 WS.

056.A0.004

EA

24.4

ER BAKEL
ERECTION

OF TERMINAL BOX : ERECTION OF STANDARD BAKELITE TERMINAL


BLOCK BO
ARD POWER / CONTROL TYPE ( 15/30A).UPTO 6 WAYS.
350
ESCH56
CONNECTOR UPTO 2.5SQ.MM

056.A0.005

EA

5.42

ER.ELMEX
"ERECTIO

N OF TERMINAL BOX : ERECTION OF ELMEX CONNECTOR , COMPLETE"


WITH CHA
NNEL END PLATE . UPTO 2.5 SQ.MM
360
ESCH56
CONNECTOR UPTO 6 SQ.MM

056.A0.006

EA

5.42

ER.ELMEX
"ERECTIO

N OF TERMINAL BOX : ERECTION OF ELMEX CONNECTOR , COMPLETE"


WITH CHA
NNEL END PLATE . UPTO 6 SQ.MM
370
ESCH56
CONNECTOR UPTO 10 SQ.MM

056.A0.007

EA

5.42

ER.ELMEX
"ERECTIO

N OF TERMINAL BOX : ERECTION OF ELMEX CONNECTOR , COMPLETE"


WITH CHA
NNEL END PLATE . UPTO 10 SQ.MM
380
ESCH56
EL TER.(10A&15/30A) ABOVE 6 WS

056.D0.001

EA

16.27

DISM.BAK
DISMANTL

ING OF TERMINAL BOX. DISMANTLING OF STANDARD BAKELITE


TERMINAL
BOCK BOARD POWER / CONTROLFOR (10A AND 15/30A.).ABOVE 6 WAYS.
390
ESCH56
KELITE TER.BOARD,10A,ABOVE 6WS"

056.S1.001

EA

79.97

"SUPP.BA
SUPPLY O

F TERMINAL BOX : SUPPLY OF STANDARD BAKELITE TERMINAL BLOCK


BOARD PO
WER / CONTROL TYPE ( 10A.). ABOVE 6 WAYS.
400
ESCH56
KELITE TER.BOARD,10A,UPTO 6WS"

056.S1.002

EA

42.02

"SUPP.BA
SUPPLY O

F TERMINAL BOX : SUPPLY OF STANDARD BAKELITE TERMINAL BLOCK


BOARD PO
WER / CONTROL TYPE ( 10A.). UPTO 6 WAYS.
410
ESCH56
ELITE TER.BOARD(15/30A)ABOVE 6WS

056.S1.003

EA

94.89

SUPP.BAK
SUPPLY O

F TERMINAL BOX : SUPPLY OF STANDARD BAKELITE TERMINAL BLOCK


BOARD PO
WER / CONTROL TYPE ( 15/30A).ABOVE 6 WAYS.
420
ESCH56
ELITE TER.BOARD(15/30A)UPTO 6WS

056.S1.004

EA

48.8

SUPP.BAK
SUPPLY O

F TERMINAL BOX : SUPPLY OF STANDARD BAKELITE TERMINAL BLOCK


BOARD PO
WER / CONTROL TYPE ( 15/30A).UPTO 6 WAYS.
430
ESCH56
X CONNECTOR UPTO 2.5SQ.MM

056.S2.001

EA

13.56

SUPP.ELM
"SUPPLY

OF TERMINAL BOX : SUPPLY OF ELMEX CONNECTOR , COMPLETE WITH"


CHANNEL
END PLATE . UPTO 2.5 SQ.MM
440
ESCH56
X CONNECTOR UPTO 6 SQ.MM

056.S2.002

EA

13.56

SUPP.ELM
"SUPPLY

OF TERMINAL BOX : SUPPLY OF ELMEX CONNECTOR , COMPLETE WITH"


CHANNEL
END PLATE . UPTO 6 SQ.MM
450
ESCH56
X CONNECTOR UPTO 10 SQ.MM

056.S2.003

EA

16.27

SUPP.ELM
"SUPPLY

OF TERMINAL BOX : SUPPLY OF ELMEX CONNECTOR , COMPLETE WITH"


CHANNEL
END PLATE . UPTO 10 SQ.MM
460
ESCH61
BELL/BUZZER.UPTO 220V(FLUSH)

061.A0.001

EA

116.57 ER.CALL
ERECTION

CALL BELL / BUZZER INCLUDING SUPPLY AND ERECTION OF MS BOX /


"WOODEN
BOARD , WHEREVER NECESSARY ( STEEL WILL BE SUPPLIED BY TISCO"
ERECTION
OF A.C. BUZZER / CALL BELL UPTO 220V.
470
ESCH61
BELL/BUZZER.UPTO 220V(SURFACE)

061.A1.001

EA

98.95

ER.CALL
ERECTION

ON SURFACE CALL BELL / BUZZER INCLUDING SUPPLY AND ERECTION


"OF MS B
OX / WOODEN BOARD , WHEREVER NECESSARY ( STEEL WILL BE"
SUPPLIED
BY TISCO . ERECTION ON SURFACE A.C. BUZZER / CALL BELL UPTO
220V.
480
ESCH61
L BELL/BUZZER.UPTO 220V

061.D0.001

EA

16.27

DISM.CAL
DISMANTL

ING OF CALL BELL / BUZZER INCLUDING SUPPLY AND ERECTION OF


"MS BOX
/ WOODEN BOARD , WHEREVER NECESSARY ( STEEL WILL BE SUPPLIED"
BY TISCO
. DISMANTLING OF

A.C. BUZZER / CALL BELL UPTO 220V.

490
ESCH62
X150X150X100 MM

062.A0.001

EA

31.18

ER.MS.BO
ERECTION

OF M.S. BOX. FOR SIZE OTHER THAN THOSE MENTIONED ABOVE THE
RATES FO
R THE NEAREST SIZE IS APPLICABLE . ERECTION 150 MM X 150 MM
X 100 MM
.
500
ESCH62
X 200X150X100 MM

062.A0.002

EA

31.18

ER.MS.BO
ERECTION

OF M.S. BOX. FOR SIZE OTHER THAN THOSE MENTIONED ABOVE THE
RATES FO
R THE NEAREST SIZE IS APPLICABLE . ERECTION 200 MM X 150 MM
X 100 MM
.
510
ESCH62
X 280X200X150 MM

062.A0.003

EA

43.38

ER.MS.BO
ERECTION

OF M.S. BOX. FOR SIZE OTHER THAN THOSE MENTIONED ABOVE THE
RATES FO
R THE NEAREST SIZE IS APPLICABLE . ERECTION 280 MM X 200 MM X
150 MM .
520
ESCH62
X. 410X280X150 MM

062.A0.004

EA

73.2

ER.MS.BO
ERECTION

OF M.S. BOX. FOR SIZE OTHER THAN THOSE MENTIONED ABOVE THE
RATES FO
R THE NEAREST SIZE IS APPLICABLE . ERECTION 410 MM X 280 MM
X 150 MM
.
530
ESCH62
X 460X360X230 MM

062.A0.005

EA

73.2

ER.MS.BO
ERECTION

OF M.S. BOX. FOR SIZE OTHER THAN THOSE MENTIONED ABOVE THE
RATES FO
R THE NEAREST SIZE IS APPLICABLE . ERECTION 460 MM X 360 MM X
230 MM
540
ESCH62
OX W/O HINGES 600X460X260 MM

062.A0.006

EA

101.66 ER.M.S.B
ERECTION

OF M.S. BOX. FOR SIZE OTHER THAN THOSE MENTIONED ABOVE THE
RATES FO
R THE NEAREST SIZE IS APPLICABLE . ERECTION 600 MM X 460 MM X
260 MM .
550
ESCH62
BOX150X150X100 MM

062.D0.001

EA

9.49

DISM.MS.
DISMANTL

ING OF M.S. BOX. FOR SIZE OTHER THAN THOSE MENTIONED ABOVE
THE RATE
S FOR THE NEAREST SIZE IS APPLICABLE . DISMANTLING 150 MM X
150 MM X
100 MM .

560
ESCH62
BOX 200X150X100 MM

062.D0.002

EA

9.49

DISM.MS.
DISMANTL

ING OF M.S. BOX. FOR SIZE OTHER THAN THOSE MENTIONED ABOVE
THE RATE
S FOR THE NEAREST SIZE IS APPLICABLE . DISMANTLING 200 MM X
150 MM X
100 MM .
570
ESCH62
BOX 280X200X150 MM

062.D0.003

EA

9.49

DISM.MS.
DISMANTL

ING OF M.S. BOX. FOR SIZE OTHER THAN THOSE MENTIONED ABOVE
THE RATE
S FOR THE NEAREST SIZE IS APPLICABLE . DISMANTLING 280 MM X
200 MM X
150 MM .
580
ESCH62
BOX410X280X150 MM

062.D0.004

EA

12.2

DISM.MS.
DISMANTL

ING OF M.S. BOX. FOR SIZE OTHER THAN THOSE MENTIONED ABOVE
THE RATE
S FOR THE NEAREST SIZE IS APPLICABLE . DISMANTLING

410 MM X
280 MM X

150 MM.
590
ESCH62
BOX 460X360X230 MM

062.D0.005

EA

12.2

DISM.MS.
DISMANTL

ING OF M.S. BOX. FOR SIZE OTHER THAN THOSE MENTIONED ABOVE
THE RATE
S FOR THE NEAREST SIZE IS APPLICABLE . DISMANTLING 460 MM X
360 MM X
230 MM
600
ESCH62
BOX 600X460X260 MM

062.D0.006

EA

17.62

DIS.M.S.
DISMANTL

ING OF M.S. BOX. FOR SIZE OTHER THAN THOSE MENTIONED ABOVE
THE RATE
S FOR THE NEAREST SIZE IS APPLICABLE . DISMANTLING 600 MM X
460 MM X
260 MM .
610
ESCH62
BOX WITH HINGES 150X150X100 MM

062.F0.001

EA

101.66 FAB.M.S.
"FABRICA

TION , ERECTION AND DISMANTLING OF THE FOLLOWING M.S. BOX. FOR"


SIZE OTH
ER THAN THOSE MENTIONED ABOVE THE RATES FOR THE NEAREST SIZE
IS APPLI
CABLE . A. FABRICATION WITH HINGES.150 MM X 150 MM X 100 MM .
620
ESCH62
BOX WITH HINGES 200X150X100 MM

062.F0.002

EA

115.22 F&E M.S.


FABRICAT

ION & ERECTION OF M.S.BOX WITH HINGE & NECESSARY CONNECTION


",SIZE A
S MENTIONED IN SHORT TEXT."

630
ESCH62
BOX WITH HINGES 280X200X150 MM

062.F0.003

EA

128.77 F&E.M.S.
FABRICAT

ION & ERECTION OF M.S.BOX WITH HINGE & NECESSARY CONNECTION


",SIZE A
S MENTIONED IN SHORT TEXT."
640
ESCH62
BOX WITH HINGES 410X280X150 MM

062.F0.004

EA

207.39 F&E.M.S.
FABRICAT

ION & ERECTION OF M.S.BOX WITH HINGE & NECESSARY CONNECTION


",SIZE A
S MENTIONED IN SHORT TEXT."
650
ESCH62
BOX WITH HINGES 460X360X230 MM

062.F0.005

EA

265.68 F&E.M.S.
FABRICAT

ION & ERECTION OF M.S.BOX WITH HINGE & NECESSARY CONNECTION


",SIZE A
S MENTIONED IN SHORT TEXT."
660
ESCH62
BOX WITH HINGES 600X460X260 MM

062.F0.006

EA

315.83 F&E.M.S.
FABRICAT

ION & ERECTION OF M.S.BOX WITH HINGE & NECESSARY CONNECTION


",SIZE A
S MENTIONED IN SHORT TEXT."
670
ESCH62
BOX W/O HINGES 150X150X100 MM

062.F1.001

EA

84.04

F&E.M.S.
FABRICAT

ION & ERECTION OF M.S.BOX WITHOUT HINGE & NECESSARY CONNECTION


",SIZE A
S MENTIONED IN SHORT TEXT."
680
ESCH62
BOX W/O HINGES 200X150X100 MM

062.F1.002

EA

101.66 F&E.M.S.
FABRICAT

ION & ERECTION OF M.S.BOX WITHOUT HINGE & NECESSARY CONNECTION


",SIZE A
S MENTIONED IN SHORT TEXT."
690
ESCH62
BOX W/O HINGES 280X200X150 MM

062.F1.003

EA

113.86 F&E.M.S.
FABRICAT

ION & ERECTION OF M.S.BOX WITHOUT HINGE & NECESSARY CONNECTION


",SIZE A
S MENTIONED IN SHORT TEXT."
700
ESCH62
BOX W/O HINGES 410X280X150 MM

062.F1.004

EA

182.99 F&E.M.S.

FABRICAT
ION & ERECTION OF M.S.BOX WITHOUT HINGE & NECESSARY CONNECTION
",SIZE A
S MENTIONED IN SHORT TEXT."
710
ESCH62
BOX W/O HINGES 460X360X230 MM

062.F1.005

EA

242.63 F&E.M.S.
FABRICAT

ION & ERECTION OF M.S.BOX WITHOUT HINGE & NECESSARY CONNECTION


",SIZE A
S MENTIONED IN SHORT TEXT."
720
ESCH62
BOX W/O HINGES 600X460X260 MM

062.F1.006

EA

307.7

F&E.M.S.
FABRICAT

ION & ERECTION OF M.S.BOX WITHOUT HINGE & NECESSARY CONNECTION


",SIZE A
S MENTIONED IN SHORT TEXT."
730
ESCH63
RAY UPTO 300 MM

063.A0.001.C

33.89

ERE.MS.T
ERECTION

OF MS TRAYS :
M.S.TRAY
S OFAPPROX. SIZE AS PER TISCO STD.NO. OIO36.UPTO 300 MM WIDE
740
ESCH63
RAY ABOVE 300-500 MM WIDE

063.A0.002.C

39.31

ERE.MS.T
ERECTION

OF MS TRAYS :

M.S. TRAYS OF APPROX. SIZE AS PER TISCO


STD. NO.

OIO36. ABOVE 300 MM TO 500 MM WIDE .


750
ESCH63
RAY ABOVE 500-800 MM WIDE

063.A0.003.C

47.44

ERE.MS.T
ERECTION

OF MS TRAYS : M.S. TRAYS OF APPROX. SIZE AS PER TISCO STD.


NO. OIO3
6. ABOVE 500 MM TO 800 MM WIDE .
760
ESCH63
TRAY UPTO 300 SQ.MM

063.D0.001.C

8.13

DISM.MS.
DISMANTL

ING

OF MS TRAYS : M.S. TRAYS OF APPROX. SIZE AS PER TISCO


STD. NO.

OIO36. UPTO 300 MM WIDE MTR .


770
ESCH63
TRAY ABOVE 300-500 MM WIDE

063.D0.002.C

10.84

DISM.MS.
DISMANTL

ING

OF MS TRAYS : M.S. TRAYS OF APPROX. SIZE AS PER TISCO


STD. NO.

OIO36. ABOVE 300 MM TO 500 MM WIDE .


780
ESCH63
TRAY ABOVE 500-800 MM WIDE

063.D0.003.C

16.27

DISM.MS.
DISMANTL

ING

OF MS TRAYS : M.S. TRAYS OF APPROX. SIZE AS PER TISCO


STD. NO.

OIO36. ABOVE 500 MM TO 800 MM WIDE .


790
ESCH63
RAY UPTO 300 SQ.MM

063.F0.001

EA

73.2

FAB.MS.T
FABRICAT

ION OF MS TRAYS :
M.S.TRAY
S OF APPROX. SIZE AS PER TISCO STD. NO.OIO36.UPTO 300 MM WIDE
800
ESCH63
RAY ABOVE 300-500 MM WIDE

063.F0.002.C

86.75

FAB.MS.T
FABRICAT

ION OF MS TRAYS : M.S. TRAYS OF APPROX. SIZE AS PER TISCO


STD. NO.
OIO36. ABOVE 300 MM TO 500 MM WIDE .
810
ESCH63
RAY ABOVE 500-800 MM WIDE

063.F0.003.C

105.73 FAB.MS.T
FABRICAT

ION OF MS TRAYS : M.S. TRAYS OF APPROX. SIZE AS PER TISCO


STD. NO.
OIO36. ABOVE 500 MM TO 800 MM WIDE .
820
ESCH64
CAUTION BOARD.

064.A0.001

EA

16.27

ERE.H.T.
ERECTION

OF CAUTION BOARD AS PER TISCO STANDARD : H.T .CAUTION BOARD


830
ESCH64
CAUTION BOARD.

064.A0.002

EA

16.27

ERE.M.T.
ERECTION

OF CAUTION BOARD AS PER TISCO STANDARD : M.T. CAUTION BOARD.


840
ESCH64
E MARKER (CI/PRECAST.CC)

064.A0.003

EA

28.47

ERE.CABL
ERECTION

OF CAUTION BOARD AS PER TISCO STANDARD : CABLE MARKER ( CI


/ PRECAS
T CEMENT CONCRETE OF 1:4:6 )
850
ESCH64
ER.MAT (2 MX 1M)

064.A0.004

EA

31.18

ERE.RUBB
ERECTION

OF CAUTION BOARD AS PER TISCO STANDARD : RUBBER MAT 2 MT X


1 MT .
860
ESCH64
EXTINGUISHER.

064.A0.005

EA

47.44

ERE FIRE
ERECTION

OF CAUTION BOARD AS PER TISCO STANDARD : FIRE EXTINGUISHER


INCLUDIN
G ERECTION OF BRACKET.
870
BUCKET.

ESCH64

064.A0.006

EA

47.44

ERE.FIRE
ERECTION

OF CAUTION BOARD AS PER TISCO STANDARD : FIRE BUCKET WITH


FAB . AN

D ERECTION OF BRACKETS .
880
ESCH64
.H.T.CAUTION BOARD.

064.S0.001

EA

67.78

SUP.& ER
"Supply

& Erection of H.T caution/Danger board


includi
ng finxing material (clamp, Nut & bolt ) "
890
ESCH64
M.T.CAUTION BOARD.

064.S0.002

EA

54.22

SUP& ER.
Supply &

Erction of LT caution/Danger board including finxing material


"(clamp,
Nut & bolt )"
900
ESCH64
E MARKER (CI/PRECAST.CC)

064.S0.003

EA

74.55

SUP.CABL
SUPPLY O

F CAUTION BOARD AS PER TISCO STANDARD : CABLE MARKER ( CI /


PRECAST
CEMENT CONCRETE OF 1:4:6 )
910
ESCH64
LATE FOR H.T.POWER/POST

064.S0.004

EA

62.35

SUP.NO.P
SUPPLY O

F CAUTION BOARD AS PER TISCO STANDARD : SUPPLY AND ERECTION


OF NUMBE
R PLATE FOR H.T. TOWER / POST .
920
ESCH66
SUP&ER 6MM BAKELITE SHEET.

066.S0.001

M2

"2,824.86"
SUPPLY A

ND ERECTION OF BAKELITE SHEET : SUPPLY AND ERECTION OF 6 MM


THICK BA
KELITE SHEETS . THIS INCLUDES CUTTING OF SLOTS / HOLES .
930
ESCH85
TRANS.CABLE DRUM HT/MT UPTO 400

085.T0.001

EA

"1,032.89"
CABLE TR

ANSPORTING : TRANSPORTING FULL CABLE DRUM HT/MT UPTO 400


SQ.MM. F
ROM IM SECTION / STORES / IM SECTION
940
ESCH85
EMPTY STEEL DRUM TOWN TO WORKS

085.T0.002

EA

820.08 SHIFTING
CABLE TR

ANSPORTING : SHIFTING OF EMPTY STEEL DRUM FROM ANY PLACE IN


TOWN TO
ANY PLACE INSIDE TISCO WORKS .
950
ESCH75
075.C0.001
2 PEG EARTH STATION.WITH.BRICK.CHAMBER

EA

"5,324.40"
Making

of earthing station with supply of all materials as per TISCO


DRAWING
NO . EDA - 5980. FIG .1. ( 2 PEG ) WITH BRICK CHAMBER
"includi

ng the following details. Pit should be 3 x 1 x1 meter,"


distance
between two earth chamber not less then 3 meter. Upto 1.5
meter of
depth should be filled with layer of salt & charkol
alternat
ively. Rest part should be filled with good earth (if required
by takin
g the same from place) .10 Inch brick chamber with 150 mm
height u
nder GL with plastaring of wall to be made . Name plate to be
fixed an
d value to be written by letter writting.
960
ESCH75
075.C0.002
2 PEG EARTH STATION.WITHOUT.BRICK.CHAM.

EA

"3,442.97"
Making

of earthing station with supply of all materials as per TISCO


DRAWING
NO . EDA - 5980. FIG .1. ( 2 PEG ) including the following
"details
. Pit should be 3 x 1 x1 meter, distance between two earth"
chamber
not less then 3 meter. Upto 1.5 meter of depth should be
filled w
ith layer of salt & charkol alternatively. Rest part should be
filled w
ith good earth (if required by taking the same from place) .
Name Pla
te is not required to be fixed but the numbering and value of
"the ear
th pit should be written on the nearest post, pillar, pole etc."
970
ESCH75
1.PEG EARTH.STN.WITH BRICK CHAMBER.

075.C0.003

EA

"2,536.14"
Making

of earthing station with supply of all materials as per TISCO


DRAWING
NO . EDA - 5980. FIG .2. ( 2 PEG ) WITH BRICK CHAMBER
"includi
ng the following details. Pit should be 3 x 1 x1 meter,"
distance
between two earth chamber not less then 3 meter. Upto 1.5
meter of
depth should be filled with layer of salt & charkol
alternat
ively. Rest part should be filled with good earth (if required
by takin
g the same from place) .10 Inch brick chamber with 150 mm
height u
nder GL with plastaring of wall to be made . Name plate to be
fixed an
d value to be written by letter writting.
980
ESCH75
075.C0.004
1.PEG EARTH.STN.WITHOUT BRICK CHAMBER.

EA

"1,636.09"
Making

of earthing station with supply of all materials as per TISCO


DRAWING
NO . EDA - 5980. FIG .2. ( 2 PEG ) including the following
"details
. Pit should be 3 x 1 x1 meter, distance between two earth"
chamber
not less then 3 meter. Upto 1.5 meter of depth should be
filled w
ith layer of salt & charkol alternatively. Rest part should be
filled w
ith good earth (if required by taking the same from place)
.Name Pl
ate is not required to be fixed but the numbering and value of
"the ear
th pit should be written on the nearest post, pillar, pole etc."
990
ESCH75
MAKING BRICK CHAMBER EARTH.STN.

075.C0.005

EA

"1,015.27"
Making t

he new brick chamber for the earthing pit as per the TISCO
DRAWING
NO> EDA-5980.
100
ESCH75
ING OF EARTH PIT.

075.C0.009

EA

437.83 BARRICAD
"ERECTIO

N , MAKING OF EARTHING STATION WITH SUPPLY OF ALL MATERIALS AS"


PER TISC
O DRAWING NO . EDA - 5980. BARRICADING OF EARTH PIT.
101
ESCH01
of Hi Pot Kit from store to sit

081.D1.0172

TRP

315

Shifting
Long te

xt not maintain
102
ESCH01
DIA HDPE PIPE

081.D1.0173

142.33 S/E OF 4
Supply <

(>&<)> erection of 4 inch dia HDPE pipe above ground for


protecti
on of cable
103
ESCH01
DIA HDPE PIPE

081.D1.0174

158.59 S/E OF 6
Supply <

(>&<)> erection of 6 inch dia HDPE pipe above ground for


protecti
on of cable
104
ESCH01
DIA HDPE PIPE

081.D1.0175

750

S/E OF 9
Supply <

(>&<)> erection of 9 inch dia HDPE pipe above ground for


protecti
on of cable

105
ESCH01
S Box for installation of LT M.

081.D1.0179

NOS

170

F&E of M
Febricat

ion <(>&<)> Erection of Box for installation of LT Meters upto


16 Nos.
106
ESCH01
MS Box for ins.of LT m.,>16,<30"

081.D1.0180

NOS

170

"F&E of
Febricat

ion <(>&<)> Erection of Box for installation of LT Meters more


than 16
Nos but less than 30 Nos.
107
ESCH01
SUPP&ER.3MM PERSPEX / HYLAM SHEET.

001.A2.016

M2

"1,111.51"
Supply <

(>&<)> Erection of 3MM PERSPEX / HYLAM SHEET


108
ESCH01
SUP&ER 3MM BAKELITE SHEET.

001.A2.017

M2

"1,412.43"
Supply <

(>&<)> Erectin of 3MM Bakelite Sheet

ERECT.

109
ESCH04
OF TRUKLING CHAMBER 11 KVA.

004.A0.001

"2,200.00"
ERECTION

OF TRUNKING CHAMBER WITH THREE BUSBARS AND INSULATORS (IF


REQUIRED
) INCLUDING FULL VOLTAGE TAPING WITH SUPPLY OF TAPE BY THE
CONTRACT
OR WITHOUNT ANY EXTRA COST. BUSBARS AND INSULATORS INCLUDING
JUMPER C
ONNECTIONS TO BE SUPPLIED BY TISCO (AVERAGE LENGTH OF BUSBAR
TO BE CO
NSIDERED FOR PAYMENT).ERECTION OF TRUCKING CHAMBER 11 KV.
110
ESCH04
004.A0.002
ERECTN TRUCKLING CHAMBER 6.6KV & 3.3KV

"1,951.00"
ERECTION

OF TRUNKING CHAMBER WITH THREE BUSBARS AND INSULATORS (IF


REQUIRED
) INCLUDING FULL VOLTAGE TAPING WITH SUPPLY OF TAPE BY THE
CONTRACT
OR WITHOUNT ANY EXTRA COST. BUSBARS AND INSULATORS INCLUDING
JUMPER C
ONNECTIONS TO BE SUPPLIED BY TISCO (AVERAGE LENGTH OF BUSBAR
TO BE CO
NSIDERED FOR PAYMENT). ERECTION 6.6KV AND 3.3KV.
111
ESCH04
004.A0.003
ERECT. OF TRUCKLING CHAMBER. MT AND LT.

"1,221.00"
ERECTION

OF TRUNKING CHAMBER WITH THREE BUSBARS AND INSULATORS (IF


REQUIRED
) INCLUDING FULL VOLTAGE TAPING WITH SUPPLY OF TAPE BY THE

CONTRACT
OR WITHOUNT ANY EXTRA COST. BUSBARS AND INSULATORS INCLUDING
JUMPER C
ONNECTIONS TO BE SUPPLIED BY TISCO (AVERAGE LENGTH OF BUSBAR
TO BE CO
NSIDERED FOR PAYMENT). ERECTION MT AND LT.
112
ESCH04
TRUCKLING CHAMBER. 11 KVA.

004.D0.001

303

DISM. OF
DISMANTL

ING OF TRUNKING CHAMBER WITH THREE BUSBARS AND INSULATORS


OF 11 K
V.
113
ESCH04
RUCKLING CHAMBER 6.6KV & 3.3KV

004.D0.002

199

DISM'G T
DISMANTL

ING OF TRUNKING CHAMBER WITH THREE BUSBARS AND INSULATORS


6.6KV AN
D 3.3KV.
114
ESCH04
TRUCKLING CHAMBER MT AND LT.

004.D0.003

111

DISM. OF
DISMANTL

ING OF TRUNKING CHAMBER WITH THREE BUSBARS AND INSULATORS .


MT AND L
T.
115
ESCN18
D ERECTION OF FRP BUS SUPPORT

ESCN18531

NOS

71

SUPP. AN
SUPP. AN

D ERECTION OF FRP BUS SUPPORT


116
ESCH92
BASE CARRIER.16A

092.A0.001

EA

25

ER.FUSE
ERECTION

OF PORCELAIN FUSE BASE AND CARRIER GEC / ANCHOR / CROMPTION


OR ANY O
THER MAKE . ERECTION 16A
117
ESCH92
BASE CARRIER.32A

092.A0.002

EA

39

ER.FUSE
ERECTION

OF PORCELAIN FUSE BASE AND CARRIER GEC / ANCHOR / CROMPTION


OR ANY O
THER MAKE . ERECTION 32A
118
ESCH92
BASE CARRIER.63A

092.A0.003

EA

39

ER.FUSE
ERECTION

OF PORCELAIN FUSE BASE AND CARRIER GEC / ANCHOR / CROMPTION


OR ANY O
THER MAKE . ERECTION 63A
119
ESCH92
BASE CARRIER.100A

092.A0.004

EA

39

ER.FUSE
ERECTION

OF PORCELAIN FUSE BASE AND CARRIER GEC / ANCHOR / CROMPTION


OR ANY O
THER MAKE . ERECTION 100A

120
ESCH92
BASE CARRIER.200A

092.A0.005

EA

45

ER.FUSE
ERECTION

OF PORCELAIN FUSE BASE AND CARRIER GEC / ANCHOR / CROMPTION


OR ANY O
THER MAKE . ERECTION 200A
121
ESCH92
BASE CARRIER.16A

092.A0.001

EA

25

ER.FUSE
ERECTION

OF PORCELAIN FUSE BASE AND CARRIER GEC / ANCHOR / CROMPTION


OR ANY O
THER MAKE . ERECTION 16A
122
ESCH92
BASE CARRIER.32A

092.A0.002

EA

39

ER.FUSE
ERECTION

OF PORCELAIN FUSE BASE AND CARRIER GEC / ANCHOR / CROMPTION


OR ANY O
THER MAKE . ERECTION 32A
123
ESCH92
BASE CARRIER.63A

092.A0.003

EA

39

ER.FUSE
ERECTION

OF PORCELAIN FUSE BASE AND CARRIER GEC / ANCHOR / CROMPTION


OR ANY O
THER MAKE . ERECTION 63A
124
ESCH92
BASE CARRIER.100A

092.A0.004

EA

39

ER.FUSE
ERECTION

OF PORCELAIN FUSE BASE AND CARRIER GEC / ANCHOR / CROMPTION


OR ANY O
THER MAKE . ERECTION 100A
125
ESCH92
BASE CARRIER.200A

092.A0.005

EA

45

ER.FUSE
ERECTION

OF PORCELAIN FUSE BASE AND CARRIER GEC / ANCHOR / CROMPTION


OR ANY O
THER MAKE . ERECTION 200A
126
0A TO 500A

ESCH10

010.A0.001

EA

800

INST.100
INSTALLA

TION OF TPN/TP/DP/SPN/SWITCHES/ISOLATER/MCCBS UPTO 650


"VOLTS,S
INGLE THROW/ DOUBLE THROW TYPE AS FOLLOWS : A. ERECTION."
1000A TO
500 A
127
ESCH10
OW 500A TO 3OOA

010.A0.002

EA

499

INST BEL
INSTALLA

TION / OF TPN/TP/DP/SPN/SWITCHES/ISOLATER/MCCBS UPTO 650


"VOLTS,S
INGLE THROW/ DOUBLE THROW TYPE AS FOLLOWS : A. ERECTION BELOW"
500A TO
300A .

128
ESCH10
LOW 300A TO 100A

010.A0.003

EA

469

INST. BE
INSTALLA

TION / OF TPN/TP/DP/SPN/SWITCHES/ISOLATER/MCCBS UPTO 650


"VOLTS,S
INGLE THROW/ DOUBLE THROW TYPE AS FOLLOWS : A. ERECTION"
BELOW 30
0A TO 100A.
129
ESCH10
LOW 100A TO 30/32A

010.A0.004

EA

275

INST. BE
INSTALLA

TION / OF TPN/TP/DP/SPN/SWITCHES/ISOLATER/MCCBS UPTO 650


"VOLTS,S
INGLE THROW/ DOUBLE THROW TYPE AS FOLLOWS : A. ERECTION"
BELOW 10
0A TO 30/ 32A.
130
LOW 30/32A

ESCH10

010.A0.005

EA

132

INST. BE
INSTALLA

TION / OF TPN/TP/DP/SPN/SWITCHES/ISOLATER/MCCBS UPTO 650


"VOLTS,S
INGLE THROW/ DOUBLE THROW TYPE AS FOLLOWS : A. ERECTION BELOW"
30/ 32A.
131
A TO 500A

ESCH10

010.D0.001

EA

192

DIS.1000
DISMANTA

LING OF SWITCH WITH ALL CONNECTIONS


132
ESCH10
ELOW 500A TO 3OOA

010.D0.002

EA

149

DIS . B
DISMANTA

LING OF SWITCH WITH ALL CONNECTIONS


133
ESCH10
OW 300A TO 100A

010.D0.003

EA

110

DIS .BEL
DISMANTA

LING OF SWITCH WITH ALL CONNECTIONS


134
ESCH10
ELOW 100A TO 30/32A

010.D0.004

EA

73

DIS . B
DISMANTA

LING OF SWITCH WITH ALL CONNECTIONS


135
ELOW 30/32A

ESCH10

010.D0.005

EA

39

DIS . B
DISMANTA

LING OF SWITCH WITH ALL CONNECTIONS


10
ESCH73
SUPP.OF CEMENT CONCRETE MAT(1:3:6)

073.M0.003

M3

"1,252.48"
Supply a

nd casting of M20 Concrete including excavation of earth any


type for
making yard foundations and other repair work.
20
ESCH73
ORK ABOVE PLINTH LEVEL

073.M0.004

M3

941.3

BRICK W
Brick w

orks with brick & Concrete above plinth level. This includes
"supply
of all material like brick, cement, sand etc. required for the"
job.
30
ESCH73
ORK BELOW FDN.& PLINTH.

073.M0.005

M3

862.1

BRICK W
Brick w

orks with brick & Concrete below plinth level. This includes
"supply
of all material like brick, cement, sand etc. required for the"
job.
40
PLASTERING.

ESCH01

001.A2.018

M2

42.06

CEMENT
"Cement

plastering on the surface of PCC, RCC, Brick work inside the Sub"
Station
50
ESCH01
ILING & TOP PLASTERING.

001.A2.019

M2

115.29 BRICK SO
Brick so

iling <(>&<)> Cement plastering inside Sub Station


10
ESCH14
1/L 3C240-300SQMM CABLE LAYING

014.L6.006

300.11 U/G 33KV


UNDERGRO

UND CABLE LAYING-33KV SINGLE PER LEG 3CX240-300 SQMM 3C


20
ESCH14
2/L 3C240-300SQMM CABLE LAYING

014.L6.007

411

U/G 33KV
UNDERGRO

UND CABLE LAYING-33KV TWO PER LEG 3CX240-300 SQMM 3C


30
ESCH14
3/L 1C300-500SQMM CABLE LAYING

014.L6.008

284

U/G 33KV
"LAY U/G

.THREE PER LEG,33KV 1C*300-500 SQ.MM with Trefoil"


40
ESCH14
3/L 1C150-240SQMM CABLE LAYING

014.L6.009

268

U/G 33KV
"LAY U/G

.THREE PER LEG,33KV 1C*150-240 SQ.MM with Trefoil"

50
ESCH14
RAY.33KV.1/L.3C240-300 SQMM

014.L6.012

72

LAY.ON.T
LAYING O

N CABLE-TRAY 33KV SINGLE PER LEG 3CX240-300SQMM


60
ESCH14
RAY.33KV.2/L.3C240-300 SQMM

014.L6.013

112

LAY.ON.T
LAYING O

N CABLE-TRAY 33KV TWO PER LEG 3CX240-300SQMM


70
ESCH14
RAY.33KV.3/L.3C300-500SQMM

014.L6.014

79.2

LAY.ON.T
LAYING O

N CABLE-TRAY 33KV THREE PER LEG 1CX300-500SQMM WITH TREFOIL


80
ESCH14
RAY.33KV.3/L.3C150-240SQMM

014.L6.015

72

LAY.ON.T
LAYING O

N CABLE-TRAY 33KV THREE PER LEG 1CX150-240SQMM WITH TREFOIL


90
ESCH14
RENCH.33KV.1/L.3C240-300 SQMM

014.L6.018

52

LAY.IN.T
LAYING I

N MASONARY TRENCH 33KV SINGLE PER LEG 3CX240-300SQMM


100
ESCH14
RENCH.33KV.2/L.3C240-300 SQMM

014.L6.019

74

LAY.IN.T
LAYING I

N MASONARY TRENCH 33KV TWO PER LEG 3CX240-300SQMM


110
ESCH14
RENCH.33KV.3/L.3C300-500SQMM

014.L6.020

61.2

LAY.IN.T
LAYING I

N MASONARY TRENCH 33KV THREE PER LEG 1CX300-500SQMM WITH TREFOI


120
ESCH14
RENCH.33KV.3/L.3C150-240SQMM

014.L6.021

54

LAY.IN.T
LAYING I

N MASONARY TRENCH 33KV THREE PER LEG 1CX150-240SQMM WITH TREFOI


130
ESCH14
DIA HUME PIPE

014.L6.027

187.43 S/E OF 4
"SUPPLY

<(>&<)> INSTALLATION OF 4"" DIA HUME PIPE"


140
ESCH14
DIA HUME PIPE

014.L6.028

225

S/E OF 6
"SUPPLY

<(>&<)> INSTALLATION OF 6"" DIA HUME PIPE"

150
ESCH14
DIA HUME PIPE

014.L6.029

348.29 S/E OF 9
"SUPPLY

<(>&<)> INSTALLATION OF 9"" DIA HUME PIPE"


160
ESCH14
of 1/L, 3C X 300 SQ MM, 33kV Cab"

014.L6.068

71

" DISMN.
"The sco

pe of work includes :
Dismantl
ing of Single Per leg laid underground 33kV Cable:
1)Rollin
g into the steel drum
2) Both
End sealing as per procedure : Fill the cut section with lump o
Mastic c
ompound of M-seal. Suitable size of heat shrink cap shall be pu
over the
cable and shrunk in position by heating with either gas torch
or blow
lamp. Only Raychem/REPL (XICON make) heat shrink caps shall be
used. Th
e cap shall fully shrunk by uniform heating till a small
quantity
of adhesive compound flows outside all around the edge of the
cap to f
orm effective water seal.
3)Return
ing the cable to the store with proper tag marking mentioning
the cabl
e size <(>&<)> cable length
General
Notes :
The stee
l will drum will be provided by JUSCO
The tran
sportation of drum from store to site is in Vendor Scope
The arra
ngement of necessary crane , truck etc. for completion of work
is in ve
ndor scope
Vendor h
as to ensure for safe dismantling <(>&<)> transporation of
cable. I
f any damage is observed, vendor will be penalized.
Vendor h
as to follow all safety norms as per JUSCO
"
170
ESCH14
of 2/L, 3C X 300 SQ MM, 33kV Cab"

014.L6.069

114

" DISMN.
"The sco

pe of work includes :
Dismantl

ing of Two Per leg laid underground 33kV Cable:


1)Rollin
g into the steel drum
2) Both
End sealing as per procedure : Fill the cut section with lump o
Mastic c
ompound of M-seal. Suitable size of heat shrink cap shall be pu
over the
cable and shrunk in position by heating with either gas torch
or blow
lamp. Only Raychem/REPL (XICON make) heat shrink caps shall be
used. Th
e cap shall fully shrunk by uniform heating till a small
quantity
of adhesive compound flows outside all around the edge of the
cap to f
orm effective water seal.
3)Return
ing the cable to the store with proper tag marking mentioning
the cabl
e size <(>&<)> cable length
General
Notes :
The stee
l will drum will be provided by JUSCO
The tran
sportation of drum from store to site is in Vendor Scope
The arra
ngement of necessary crane , truck etc. for completion of work
is in ve
ndor scope
Vendor h
as to ensure for safe dismantling <(>&<)> transporation of
cable. I
f any damage is observed, vendor will be penalized.
Vendor h
as to follow all safety norms as per JUSCO
"
180
ESCH14
ENCH CUTTING & BACKFILLING

014.L6.074

M3

139.5

CABLE TR
CABLE TR

ENCH CUTTING <(>&<)> BACKFILLING FOR UNDERGROUND CABLE LAYING


190
ESCH14
OF PCC FOR CABLE LAYING

014.L6.075

M3

542.7

CUTTING
CUTTING

OF PCC ON CABLE ROUTE FOR UNDERGROUND CABLE LAYING


200
ESCH14
3Cx300 cable laying@1.5m depth

014.L6.076

410

2/L 33kV
Laying o

f 2 per leg 11kV HT cable of 3C; XLPE; Al cables to be laid


mainly u
nderground at 1.5 meter depth; through any type of soil; partly
through

Hume/GI pipe/mansonary trench as per TATA DRG # 5761 with good


quality
roller ensuring no rubbing of cable on ground during pulling.
Baricadi
ng standards by JUSCO for U/G cable laying has to be strictly
followed
. Loading <(>&<)> Transportation of cable from store to site an
unloadin
g at site with proper arrangement is included in this scope.
return o
f empty cable drum/ excess cable to store is also included.
Cable ta
g to be provided as per SPN-8.
This rat
e is applicable for upto 11kV HT cable and therefore 6.6kV and
11kV bot
h.
Job to b
e executed as per Quality Standards of JUSCO.
210
ESCH14
RAY.33KV1/L3C 185SQMM CAB.LAYING

014.L6.047

63

LAY.ON.T
LAY.ON.T

RAY. 33KV 1/L 3C 185SQMM CABLE LAYING


220
ESCH14
RAY 33KV 2/L 3C 185SQMM CAB.LAY.

014.L6.048

101

LAY.ON.T
LAY.ON.T

RAY 33KV . 2/L 3C 185SQMM CABLE LAYING


230
ESCH14
RAY.33KV 1/L 3C 300-400SQMM C.L.

014.L6.050

88

LAY.ON.T
LAY.ON.T

RAY.33KV 1/L 3C 300-400SQMM CABLE LAYING


240
ESCH14
/G 33KV1/L 3C 185SQMM CAB.LA

014.L6.053

246

LAY ON U
LAY.ON.T

RENCH. 33KV 1/L 3C 185SQMM CABLE LAYING


250
ESCH14
U/G 33KV2/L 3C 185SQMM CAB

014.L6.054

350

LAY.ON.
LAY.ON.T

RENCH 33KV . 2/L 3C 185SQMM CABLE LAYING


260
ESCH14
/G 33KV1/L3C300-400SQMM CAB.L

014.L6.056

267.12 LAY.ON U
LAY.ON.T

RENCH.33KV 1/L 3C 300-400SQMM CABLE LAYING


270
ESCH14
/G 33KV2/L 3C 300-400SQMM CAB.L

014.L6.057

432.3

LAY.ON U
LAY.ON.T

RENCH. 33KV 2/L 3C 300-400SQMM CABLE LAYING


280
ESCH14
3KV 1/L 3C Upto 400SQMM CAB.LAY.

014.L6.059

70

Dis.of 3
Dismantl

ing of 33KV 1/L 3C Upto 400SQMM CABLE LAYING


290
ESCH14
3KV 1/L 3C Upto 400SQMM CAB.LAY.

014.L6.062

190

DIV of 3
DIV of 3

3KV 1/L 3C Upto 400SQMM CABLE LAYING


300
EMNT09
Straight Through Joint Of 300mm2 33kv

EMNT09208

NOS

"2,379.00"
Making o

f Styraight through join Of 300mm2; 3/c 33kv XLEP Cable by Heat


shrink.
aAl lmaterial except jointing kit under scope of work
310
EMNT09
EMNT09207
Insallation of heat shrinkable out door

NOS

"1,731.00"
Insallat

ion of heat shrinkable out door termination kit sutaible for 3/


300mm2 3
3kv XLEP Cable
320
ature jobs (S-K Prj,O&M)"

M3

300

"PSD's project n
Long te

xt not maintain
10
ESCH14
U/G 11KV UPTO.120-SQMM 3x1C-3C

014.L0.001

220.37 LAY.H.T.
"Laying

of HT cable of 3 X 1C or 3C, XLPE, Al cables to be laid mainly"


"undergr
ound through any type of soil, partly through Hume/GI"
pipe/man
sonary trench as per TATA DRG # 5761 with good quality roller
ensuring
no rubbing of cable on ground during pulling. Baricading
standard
s by JUSCO for U/G cable laying has to be strictly followed.
Loading
& Transportation of cable from store to site and unloading at
site wit
h proper arrangement is included in this scope. return of
empty ca
ble drum/ excess cable to store is also included. Cable tag to
be provi
ded as per SPN-8.
20
ESCH14
U/G 11KV .150-240SQM. 3x1C-3C

014.L0.002

230.24 LAY.H.T.
"Laying

of HT cable of 3 X 1C or 3C, XLPE, Al cables to be laid mainly"

"undergr
ound through any type of soil, partly through Hume/GI"
pipe/man
sonary trench as per TATA DRG # 5761 with good quality roller
ensuring
no rubbing of cable on ground during pulling. Baricading
standard
s by JUSCO for U/G cable laying has to be strictly followed.
Loading
& Transportation of cable from store to site and unloading at
site wit
h proper arrangement is included in this scope. return of
empty ca
ble drum/ excess cable to store is also included. Cable tag to
be provi
ded as per SPN-8.
30
ESCH14
/G 2/L.11KV UPTO 120 SQMM3X1C/3C

014.L2.001

340

LAY.ON.U
"Laying

of 2 per leg HT cable of 3 X 1C or 3C, XLPE, Al cables to be"


"laid ma
inly underground through any type of soil, partly through"
Hume/GI
pipe/mansonary trench as per TATA DRG # 5761 with good quality
roller e
nsuring no rubbing of cable on ground during pulling.
Baricadi
ng standards by JUSCO for U/G cable laying has to be strictly
followed
. Loading & Transportation of cable from store to site and
unloadin
g at site with proper arrangement is included in this scope.
return o
f empty cable drum/ excess cable to store is also included.
Cable ta
g to be provided as per SPN-8.
40
ESCH14
/G 2/L.11KV150-240 SQ.MM 3X1C/3C

014.L2.002

358

LAY.ON.U
"Laying

of 2 per leg HT cable of 3 X 1C or 3C, XLPE, Al cables to be"


"laid ma
inly underground through any type of soil, partly through"
Hume/GI
pipe/mansonary trench as per TATA DRG # 5761 with good quality
roller e
nsuring no rubbing of cable on ground during pulling.
Baricadi
ng standards by JUSCO for U/G cable laying has to be strictly
followed
. Loading & Transportation of cable from store to site and
unloadin
g at site with proper arrangement is included in this scope.
return o
f empty cable drum/ excess cable to store is also included.
Cable ta
g to be provided as per SPN-8.

50
ESCH14
/G 3/L.11KV 150-240 SQ.MM3X1C/3C

014.L3.002

462.24 LAY.ON.U
"Laying

of 3 per leg HT cable of 3 X 1C or 3C, XLPE, Al cables to be"


"laid ma
inly underground through any type of soil, partly through"
Hume/GI
pipe/mansonary trench as per TATA DRG # 5761 with good quality
roller e
nsuring no rubbing of cable on ground during pulling.
Baricadi
ng standards by JUSCO for U/G cable laying has to be strictly
followed
. Loading & Transportation of cable from store to site and
unloadin
g at site with proper arrangement is included in this scope.
return o
f empty cable drum/ excess cable to store is also included.
Cable ta
g to be provided as per SPN-8.
60
ESCH14
/G 4/L.11KV UPTO 120 SQMM3X1C/3C

014.L4.001

492.2

LAY.ON.U
"Laying

of 4 per leg HT cable of 3 X 1C or 3C, XLPE, Al cables to be"


"laid ma
inly underground through any type of soil, partly through"
Hume/GI
pipe/mansonary trench as per TATA DRG # 5761 with good quality
roller e
nsuring no rubbing of cable on ground during pulling.
Baricadi
ng standards by JUSCO for U/G cable laying has to be strictly
followed
. Loading & Transportation of cable from store to site and
unloadin
g at site with proper arrangement is included in this scope.
return o
f empty cable drum/ excess cable to store is also included.
Cable ta
g to be provided as per SPN-8.
70
ESCH14
/G 4/L.11KV150-240 SQ.MM 3X1C/3C

014.L4.002

593.85 LAY.ON.U
"Laying

of 4 per leg HT cable of 3 X 1C or 3C, XLPE, Al cables to be"


"laid ma
inly underground through any type of soil, partly through"
Hume/GI
pipe/mansonary trench as per TATA DRG # 5761 with good quality
roller e
nsuring no rubbing of cable on ground during pulling.
Baricadi
ng standards by JUSCO for U/G cable laying has to be strictly
followed
. Loading & Transportation of cable from store to site and

unloadin
g at site with proper arrangement is included in this scope.
return o
f empty cable drum/ excess cable to store is also included.
Cable ta
g to be provided as per SPN-8.
80
ESCH14
N TRAY 11.KV 150-240SQM. 3x1C-3C

014.L1.002

45.9

LAYING O
Laying H

.T upto 11 KV of 3 X 1C or 3C 150-240 Sqmm


"XLPE/PV
C/HRPVC/SCREENSD/UNSCREENED/ ARMOURED/ UNARMOURED , COPPER/"
ALUMINIU
M CABLES UPTO 11KV GRADE TO BE LAID MAINLY TRAY/ BRACKETS /
MANSONAR
YTRENCH ETC .THIS EXCLUDES THE FABRICATION AND ERECTION OF
TRAYS BU
T INCLUDE ERECTION/FABRICATION OF BRACKET.
90
ESCH14
.HT U/G11KV UPTO120-SQMM 3x1C-3C

014.L0.009

51.3

TEMP LAY
Temporar

y laying of cable during breakdown/ emergencies to restore


power su
pply by fixing the cable with support or burried at least
400mm be
low the ground as per site condition as per the advice of site
engineer
.
100
ESCH29
VC.U/G.UPTO 70SQ.MM

029.D0.001

151.02 DIV.HT.P
DIVERSIO

N OF MULTICORE CABLES : DIVERSION OF FOLLOWING MULTICORE


ARMOUNED
/UNARMOUNED CABLES INCLUDING DISMANTLING OF END BOX (WHEREVER
REQUIRED
) LAID UNDERGROUND THIS INCLUDES DISCONNECTION. A.

SINGLE
CABLE U/

G. H.T.CABLE PVC/HRPVC/VC/BUYTL/XLPE UPTO 70 SQ.MM.


110
ESCH29
VC.U/G-ABOVE 70TO300SQ.MM

029.D0.002

216

DIV.HT.P
"Diversi

on of 3 C HT cable upto 11kV, from 70 sqmm to 300 sqmm for


fixing o
f RMUs in between, CSS, extending the network. The job
involves
excavation and removal of cable and excavation and laying of
cable to
diverted route, backfilling of cable trench, putting slabs
and sand
as required in the new route.
"

120
ESCH29
2/L.HT.PVC-ABOVE70-300

029.D2.002

264

DIV.U/G.
"DIVERSI

ON OF MULTICORE CABLES : DIVERSION OF FOLLOWING MULTICORE


ARMOUNED
/UNARMOUNED CABLES INCLUDING DISMANTLING OF END BOX (WHEREVER
REQUIRED
) LAID UNDERGROUND .THIS INCLUDES DISCONNECTION. C.

2/LEG
U/G CABL

E. H.T.CABLE PVC/HRPVC/VC/BUYTL/XLPE ABOVE 70 SQ.MM. TO 300


SQ.MM.Ba
ricading standards by JUSCO for U/G cable laying has to be
strictly
followed."
130
ESCH29
ILCA.U/G.UPTO 70SQ.MM

029.D0.004

183.15 DIV.HT.P
DIVERSIO

N OF MULTICORE CABLES : DIVERSION OF FOLLOWING MULTICORE


ARMOUNED
/UNARMOUNED CABLES INCLUDING DISMANTLING OF END BOX (WHEREVER
REQUIRED
) LAID UNDERGROUND THIS INCLUDES DISCONNECTION. A.
SINGLE C
ABLE U/G. H.T.CABLE PILCA UPTO 70 SQ.MM.
140
ESCH29
ILCA.U/G.ABOVE 70SQ.MM

029.D0.005

191.7

DIV.HT.P
DIVERSIO

N OF MULTICORE CABLES : DIVERSION OF FOLLOWING MULTICORE


ARMOUNED
/UNARMOUNED CABLES INCLUDING DISMANTLING OF END BOX (WHEREVER
REQUIRED
) LAID UNDERGROUND THIS INCLUDES DISCONNECTION. A.

SINGLE
CABLE U/

G. H.T.CABLE PILCA ABOVE 70 SQ.MM.


150
ESCH26
RAY/BKT/LT-1C-UPTO 25 SQ.MM.

026.L1.001

22

LAY.ON.T
ERECTION

OF M.T./L.T. SINGLE CORECABLE : ERECTION OF M.T./L.T.


PVC/HRPV
C/BUTYL SINGLE CORE COPPER/ALUMINIUM CABLE ( 1.1 KV GRADE )
AS FOLLO
WS: B. MAINLY ON TRAYS/BRACKET/PIPE/CONDUIT ETC. THIS
INCLUDES
SUPPLY OF ACESSORIES FORPIPE/CONDUIT AND OTHER MATERIALS
REQUIRED
( EXCEPT SUPPLY OF CABLES PIPE/CONDUIT AND
FABRICAT
ION/ERECTION OF TRAYS ). UPTO 25 SQ.MM.
160
ESCH14
RAY-1.1KV.1/L.1Cx400SQMM

014.L6.043

40.45

LAY.ON.T
Cable la

ying on tray - 1.1KV grade 1C*400sq.mm


170

ESCH14

014.L6.044

100

U/G1.1KV

.1/L.1Cx300-400SQMM CABLE LAYING


Under gr
ound cable laying - 1.1KV grade 1C*300 /400 sq.mm
180
ESCH22
/G M.T/L.T UPTO6SQ.MM.UPTO12C

022.L0.001

122

LAY.ON U
"ERECTIO

N OF MT/LT , PVC/ HRPVC/ARMOURED/UNAROURED ,


COPPER/A
LUMINIUM CABLE (UPTO 1.1 KV GRADE ) AS FOLLOWS
A. MAINL
Y UNDERGOUND AND PARTLY THROUGH PIPE / CONDUIT/ HUME PIPE/
MANSONAR
Y TRENCH ETC AS PER TATA DRG # 5761. IT INCLUDES ERECTION OF
PIPE /
CONDUIT/
HUME PIPE AND OTHER MATERIALS REQUIRED EXCEPT SUPPLY OF CABLES
AND PIPE
S ,
.UPTO 6
SQ.MM . UPTO 12C."
190
ESCH22
/G M.T/L.TABOVE6 TO50SQ.MM2/3/4

022.L0.003

137.03 LAY.ON U
"ERECTIO

N OF MT/LT CABLE ABOVE 6 TO 50 SQMM,2 TO 4 CORE , PVC/


HRPVC/AR
MOURED/UNAROURED ,
COPPER/A
LUMINIUM CABLE (UPTO 1.1 KV GRADE ) AS FOLLOWS
A. MAINL
Y UNDERGOUND AND PARTLY THROUGH PIPE / CONDUIT/ HUME PIPE/
MANSONAR
Y TRENCH ETC AS PER TATA DRG # 5761. IT INCLUDES ERECTION OF
PIPE /
CONDUIT/
HUME PIPE AND OTHER MATERIALS REQUIRED EXCEPT SUPPLY OF CABLES
AND PIPE
S."
200
ESCH22
/G MT/LTABOVE 50-120SQ.MM 2/3/4C

022.L0.004

140.7

LAY.ON U
"ERECTIO

N OF MT/LT CABLE ABOVE 50 TO 120 SQMM,2 TO 4 CORE , PVC/


HRPVC/AR
MOURED/UNAROURED ,
COPPER/A
LUMINIUM CABLE (UPTO 1.1 KV GRADE ) AS FOLLOWS
A. MAINL
Y UNDERGOUND AND PARTLY THROUGH PIPE / CONDUIT/ HUME PIPE/
MANSONAR
Y TRENCH ETC AS PER TATA DRG # 5761. IT INCLUDES ERECTION OF
PIPE /
CONDUIT/
HUME PIPE AND OTHER MATERIALS REQUIRED EXCEPT SUPPLY OF CABLES
AND PIPE
S."

210
ESCH22
/G MT/LTABOVE120-240SQ.MM2/3/4C

022.L0.005

146.48 LAY.ON U
"ERECTIO

N OF MT/LT CABLE ABOVE 120 TO 240 SQMM,2 TO 4 CORE , PVC/


HRPVC/AR
MOURED/UNAROURED ,
COPPER/A
LUMINIUM CABLE (UPTO 1.1 KV GRADE ) AS FOLLOWS
A. MAINL
Y UNDERGOUND AND PARTLY THROUGH PIPE / CONDUIT/ HUME PIPE/
MANSONAR
Y TRENCH ETC AS PER TATA DRG # 5761. IT INCLUDES ERECTION OF
PIPE /
CONDUIT/
HUME PIPE AND OTHER MATERIALS REQUIRED EXCEPT SUPPLY OF CABLES
AND PIPE
S."
220
ESCH22
/G MT/LTABOVE240-400SQ.MM2/3/4C

022.L0.006

150.26 LAY.ON U
"ERECTIO

N OF MT/LT , PVC/ HRPVC/BUTYL/ARMOURED/UNAROURED ,"


COPPER/A
LUMINIUM CABLE (UPTO 1.1 KV GRADE ) AS FOLLOWS
A. MAIN
LY UNDERGOUND AND PARTLY THROUGH PIPE / CONDUIT/ HUME PIPE/
"MANSONA
RY TRENCH, FOR CABLE LAID MAINLY IN MILL /SHOP FLOOR BY CUTTING"
CHASE. E
TC . INCLUDING SUPPLY AND ERECTION OF ACCESSORIES FOR PIPE /
"CONDUIT
& OTHER MATERIALS REQUIRED EXCEPT SUPPLY OF CABLES , PIPES &"
CONDUIT
/ HUME PIPE. ABOVE 240 SQ.MM TO 400 SQ.MM 2/4 OR 4 C.
230
ESCH22
KT.MT/LT UPTO 6SQ.MM.UPTO12C

022.L1.001

35.1

LAY.ON.B
"ERECTIO

N OF MT/LT , PVC/ HRPVC/BUTYL/ARMOURED/UNAROURED ,


COPPER/A
LUMINIUM CABLE (UPTO 1.1 KV GRADE ) AS FOLLOWS :
B.MAINLY
ON BRACKET / FESTOON / MASONARY TRENCH ETC. INCLUDING SUPPLY
AND
ERECTION
OF INSULATORS FOR FESTOON ACCEESSORIES,G.I. WIRE AND OTHER
MATERIAL
S REQUIRED EXCEPT SUPPLY OF
CABLE. U
PTO 6 SQ.MM.UPTO 12C."
240
ESCH22
KT.MT/LTABOVE 6-50SQ.MM.2/3/4C

022.L1.003

49.5

LAY.ON.B
"ERECTIO

N OF MT/LT , PVC/ HRPVC/BUTYL/ARMOURED/UNAROURED ,


COPPER/A

LUMINIUM CABLE (UPTO 1.1 KV GRADE ) AS FOLLOWS :


B.MAINLY
ON BRACKET / FESTOON / MASONARY TRENCH ETC. INCLUDING
SUPPLY A
ND
ERECTION
OF INSULATORS FOR FESTOON ACCEESSORIES,G.I. WIRE AND OTHER
MATERIAL
S REQUIRED EXCEPT SUPPLY OF
CABLE. A
BOVE 6 SQ.MM TO 50SQMM.2/3/4C."
250
ESCH22
KT.MT/LTABOVE50-120SQ.MM 2/3/4C

022.L1.004

54

LAY.ON.B
"ERECTIO

N OF MT/LT , PVC/ HRPVC/BUTYL/ARMOURED/UNAROURED ,


COPPER/A
LUMINIUM CABLE (UPTO 1.1 KV GRADE ) AS FOLLOWS :
B.MAINLY
ON BRACKET / FESTOON / MASONARY TRENCH ETC. INCLUDING SUPPLY
AND
ERECTION
OF INSULATORS FOR FESTOON ACCEESSORIES,G.I. WIRE AND OTHER
MATERIAL
S REQUIRED EXCEPT SUPPLY OF
CABLE. A
BOVE 50 SQ.MM TO 120SQMM.2/3/4C."
260
ESCH22
.MT/LT ABOVE120-240SQ.MM 2/3/4C

022.L1.005

65.7

LAY..BKT
"ERECTIO

N OF MT/LT , PVC/ HRPVC/BUTYL/ARMOURED/UNAROURED ,


COPPER/A
LUMINIUM CABLE (UPTO 1.1 KV GRADE ) AS FOLLOWS :
B.MAINLY
ON BRACKET / FESTOON / MASONARY TRENCH ETC. INCLUDING SUPPLY
AND
ERECTION
OF INSULATORS FOR FESTOON ACCEESSORIES,G.I. WIRE AND OTHER
MATERIAL
S REQUIRED EXCEPT SUPPLY OF
CABLE. A
BOVE 120 SQ.MM TO 240SQMM.2/3/4C."
270
ESCH22
MT/LTABOVE 240-400SQ.MM2/3/4C

022.L1.006

74

LAY.BKT.
"ERECTIO

N OF MT/LT , PVC/ HRPVC/BUTYL/ARMOURED/UNAROURED ,


COPPER/A
LUMINIUM CABLE (UPTO 1.1 KV GRADE ) AS FOLLOWS :
B.MAINLY
ON BRACKET / FESTOON / MASONARY TRENCH ETC. INCLUDING
SUPPLY A
ND
ERECTION
OF INSULATORS FOR FESTOON ACCEESSORIES,G.I. WIRE AND OTHER
MATERIAL

S REQUIRED EXCEPT SUPPLY OF


CABLE. A
BOVE 240 SQ.MM TO 400SQMM.2/3/4C."
280
ESCH22
.MT/LT UPTO 6SQ.MM UPTO12C

022.L2.001

16.2

LAY.TRAY
"ERECTIO

N OF MT/LT , PVC/ HRPVC/BUTYL/ARMOURED/UNAROURED ,


COPPER/A
LUMINIUM CABLE (UPTO 1.1 KV GRADE ) AS FOLLOWS :
C. MAIN
LY ON TRAY/CATENARY/MASONARY TRENCH ETC. IT EXCLUDES SUPPLY OF
CABLES A
ND ALSO FABRICATION AND
ERECTION
OF TRAYS BUT INCLUDES SUPPLY & ERECTION OF EYE BOLTS, G.I.
WIRE FOR
CATENARY
AND OTHE
R MATERIALS WITH ACCESSARIES.UPTO 6 SQ.MM . UPTO 12C."
290
ESCH22
.MT/LT ABOVE 6-50SQ.MM 2/3/4C

022.L2.003

21.6

LAY.TRAY
"ERECTIO

N OF MT/LT , PVC/ HRPVC/BUTYL/ARMOURED/UNAROURED ,


COPPER/A
LUMINIUM CABLE (UPTO 1.1 KV GRADE ) AS FOLLOWS :
C. MAIN
LY ON TRAY/CATENARY/MASONARY TRENCH ETC. IT EXCLUDES SUPPLY OF
CABLES A
ND ALSO FABRICATION AND
ERECTION
OF TRAYS BUT INCLUDES SUPPLY & ERECTION OF EYE BOLTS, G.I.
WIRE FOR
CATENARY
AND OTHE
R MATERIALS WITH ACCESSARIES.ABOVE 6 SQ.MM TO 50SQMM 2/3/4C."
300
ESCH22
2/L.MT/LT. UPTO 6SQ.MM UPTO12C

022.L3.001

154

LAY.U/G
"ERECTIO

N OF MT/LT , PVC/ HRPVC/BUTYL/ARMOURED/UNAROURED ,


COPPER/A
LUMINIUMCABLE (UPTO 1.1 KV GRADE ) AS FOLLOWS : 2/LEG
UNDERGRO
UND LAYING AND PARTLY THROUGH PIPE / CONDUIT/ HUME PIPE/
MANSONAR
Y TRENCH ETC AS PER TATA DRG # 5761.IT INCLUDES ERECTION OF
PIPE /
CONDUIT/
HUME PIPE AND OTHER MATERIALS REQUIRED EXCEPT SUPPLY OF
CABLES."
310
ESCH22
2/L.MT/LT,ABOVE 6-50SQ.MM 2/3/4C"

022.L3.003

182.39 "LAY.U/G
"ERECTIO

N OF MT/LT , PVC/ HRPVC/BUTYL/ARMOURED/UNAROURED ,


COPPER/A
LUMINIUMCABLE (UPTO 1.1 KV GRADE ) AS FOLLOWS : 2/LEG
UNDERGRO
UND LAYING AND PARTLY THROUGH PIPE / CONDUIT/ HUME PIPE/
MANSONAR
Y TRENCH ETC AS PER TATA DRG # 5761.IT INCLUDES ERECTION OF
PIPE /
CONDUIT/
HUME PIPE AND OTHER MATERIALS REQUIRED EXCEPT SUPPLY OF
CABLES."
320
ESCH22
2/L.MT/LT.ABOVE50-120SQMM 2/3/4C

022.L3.004

207.05 LAY.U/G
"ERECTIO

N OF MT/LT , PVC/ HRPVC/BUTYL/ARMOURED/UNAROURED ,


COPPER/A
LUMINIUMCABLE (UPTO 1.1 KV GRADE ) AS FOLLOWS : 2/LEG
UNDERGRO
UND LAYING AND PARTLY THROUGH PIPE / CONDUIT/ HUME PIPE/
MANSONAR
Y TRENCH ETC AS PER TATA DRG # 5761.IT INCLUDES ERECTION OF
PIPE /
CONDUIT/
HUME PIPE AND OTHER MATERIALS REQUIRED EXCEPT SUPPLY OF
CABLES."
330
ESCH22
2/L.MT/LT.ABOVE120-240SQMM2/3/4C

022.L3.005

251.45 LAY.U/G
"ERECTIO

N OF MT/LT , PVC/ HRPVC/BUTYL/ARMOURED/UNAROURED ,


COPPER/A
LUMINIUMCABLE (UPTO 1.1 KV GRADE ) AS FOLLOWS : 2/LEG
UNDERGRO
UND LAYING AND PARTLY THROUGH PIPE / CONDUIT/ HUME PIPE/
MANSONAR
Y TRENCH ETC AS PER TATA DRG # 5761.IT INCLUDES ERECTION OF
PIPE /
CONDUIT/
HUME PIPE AND OTHER MATERIALS REQUIRED EXCEPT SUPPLY OF
CABLES."
340
ESCH22
2/L.MT/LTABOVE 240-400SQMM2/3/4C

022.L3.006

252

LAY.U/G
"ERECTIO

N OF MT/LT , PVC/ HRPVC/BUTYL/ARMOURED/UNAROURED ,


COPPER/A
LUMINIUMCABLE (UPTO 1.1 KV GRADE ) AS FOLLOWS : 2/LEG
UNDERGRO
UND LAYING AND PARTLY THROUGH PIPE / CONDUIT/ HUME PIPE/
MANSONAR
Y TRENCH ETC AS PER TATA DRG # 5761.IT INCLUDES ERECTION OF
PIPE /
CONDUIT/
HUME PIPE AND OTHER MATERIALS REQUIRED EXCEPT SUPPLY OF
CABLES."

350
ESCH22
3/L.MT/LT.ABOVE 6-50SQ.MM 2/3/4C

022.L4.003

228

LAY.U/G
"ERECTIO

N OF MT/LT , PVC/ HRPVC/BUTYL/ARMOURED/UNAROURED ,


COPPER/A
LUMINIUMCABLE (UPTO 1.1 KV GRADE ) AS FOLLOWS : E. 3/LEG
UNDERGRO
UND LAYING AND PARTLY THROUGH PIPE / CONDUIT/ HUME PIPE/
MANSONAR
Y TRENCH ETC AS PER TATA DRG # 5761.IT INCLUDS SUPPLY &
ERECTION
OF PIPE /
CONDUIT/
HUME PIPE AND OTHER MATERIALS REQUIRED EXCEPT SUPPLY OF
CABLES.B
aricading standards by JUSCO for U/G cable laying has to be
strictly
followed."
360
ESCH22
3/L.MT/LT.ABOVE 50-120SQMM2/3/4C

022.L4.004

244

LAY.U/G
"ERECTIO

N OF MT/LT , PVC/ HRPVC/BUTYL/ARMOURED/UNAROURED ,


COPPER/A
LUMINIUMCABLE (UPTO 1.1 KV GRADE ) AS FOLLOWS : E. 3/LEG
UNDERGRO
UND LAYING AND PARTLY THROUGH PIPE / CONDUIT/ HUME PIPE/
MANSONAR
Y TRENCH ETC AS PER TATA DRG # 5761.IT INCLUDS SUPPLY &
ERECTION
OF PIPE /
CONDUIT/
HUME PIPE AND OTHER MATERIALS REQUIRED EXCEPT SUPPLY OF
CABLES.B
aricading standards by JUSCO for U/G cable laying has to be
strictly
followed."
370
ESCH22
3/L.MT/LT.ABOVE120-240SQMM2/3/4C

022.L4.005

274.5

LAY.U/G
"ERECTIO

N OF MT/LT , PVC/ HRPVC/BUTYL/ARMOURED/UNAROURED ,


COPPER/A
LUMINIUMCABLE (UPTO 1.1 KV GRADE ) AS FOLLOWS : E. 3/LEG
UNDERGRO
UND LAYING AND PARTLY THROUGH PIPE / CONDUIT/ HUME PIPE/
MANSONAR
Y TRENCH ETC AS PER TATA DRG # 5761.IT INCLUDS SUPPLY &
ERECTION
OF PIPE /
CONDUIT/
HUME PIPE AND OTHER MATERIALS REQUIRED EXCEPT SUPPLY OF
CABLES.B
aricading standards by JUSCO for U/G cable laying has to be
strictly
followed."

380
ESCH22
4/L.MT/LT.ABOVE 6-50SQ.MM 2/3/4C

022.L5.003

286

LAY.U/G
"ERECTIO

N OF MT/LT , PVC/ HRPVC/BUTYL/ARMOURED/UNAROURED ,


COPPER/A
LUMINIUMCABLE (UPTO 1.1 KV GRADE ) AS FOLLOWS : F. 4/LEG
UNDERGRO
UND LAYING AND PARTLY THROUGH PIPE / CONDUIT/ HUME PIPE/
MANSONAR
Y TRENCH ETC AS PER TATA DRG # 5761.IT INCLUDS SUPPLY &
ERECTION
OF PIPE /
CONDUIT/
HUME PIPE AND OTHER MATERIALS REQUIRED EXCEPT SUPPLY OF
CABLES."
390
ESCH22
4/L.MT/LT.ABOVE120-240SQMM2/3/4C

022.L5.005

334

LAY.U/G
"ERECTIO

N OF MT/LT , PVC/ HRPVC/BUTYL/ARMOURED/UNAROURED ,


COPPER/A
LUMINIUMCABLE (UPTO 1.1 KV GRADE ) AS FOLLOWS : F. 4/LEG
UNDERGRO
UND LAYING AND PARTLY THROUGH PIPE / CONDUIT/ HUME PIPE/
MANSONAR
Y TRENCH ETC AS PER TATA DRG # 5761.IT INCLUDS SUPPLY &
ERECTION
OF PIPE /
CONDUIT/
HUME PIPE AND OTHER MATERIALS REQUIRED EXCEPT SUPPLY OF
CABLES.B
aricading standards by JUSCO for U/G cable laying has to be
strictly
followed."
400
ESCH27
AT/FEST-UPTO 25SQ.MM 2/3/4-1C

027.L0.001

29

LAY.ON.C
ERECTIO

N OF AL/CU CABLES MAINLY BY CATENARY SYSTEM FESTOON AND PARTLY


"THROUGH
PIPE,CONDUIT,ETC.INCLUDING SUPPLYAND ERECTION OF NECESSARY"
"G.I. WI
RE,CLAMP CLIPS,EYE BOLTS, FABRICATION AND ERECTION OF NECESSARY"
BRACKETS
AND ALL OTHER MATERIALS REQUIRED EXCEPT SUPPLY OF CABLES
410
ESCH27
AT/FEST-ABOVE 25TO120- 2/3/4-1C

027.L0.002

39

LAY.ON.C
ERECTIO

N OF AL/CU CABLES MAINLY BY CATENARY SYSTEM FESTOON AND PARTLY


"THROUGH
PIPE,CONDUIT,ETC.INCLUDING SUPPLYAND ERECTION OF NECESSARY"
"G.I. WI
RE,CLAMP CLIPS,EYE BOLTS, FABRICATION AND ERECTION OF NECESSARY"
BRACKETS
AND ALL OTHER MATERIALS REQUIRED EXCEPT SUPPLY OF CABLES

420
ESCH86
CAB.EXTG TRENCH ABOVE 185 TO 400

086.L0.002

EA

21.6

LAY S/C
ERECTION

OF S/C CABLE LAYING IN EXISTING TRENCH : LAYING OF S/C ABOVE


185 SQ.M
M TO 400 SQ.MM . CABLE IN EXISTING TRENCH / UNDERGROUND FOR
TRANSFOR
MER NEUTRAL WITHOUT BRICK AND SAND IN CASE OF U/G .
430
ESCH22
ON U/G MT/LT > 6-50SQ MM 2/3/4

022.L0.009

35.63

TEMP LAY
Temporar

y laying of cable during breakdown/ emergencies to restore


power su
pply by fixing the cable with support or burried at least
200mm be
low the ground as per site condition as per the advice of site
engineer
.
440
ESCH22
ON U/G MT/LT ABOVE 120-240 SQMM

022.L0.011

41.4

TEMP LAY
Temporar

y laying of cable during breakdown/ emergencies to restore


power su
pply by fixing the cable with support or burried at least
200mm be
low the ground as per site condition as per the advice of site
engineer
.
450
ESCH29
T/PVC/PILCA/U/G.UPTO70SQ.MM

029.D0.007

155.7

DIV.MT/L
"Diversi

on of 2 to 4 Core, cable . The job involves excavation and


removal
of cable and excavation and laying of cable to diverted route,
backfill
ing of cable trench, putting slabs and sand as required in the
new rout
e.
"
460
ESCH29
T/PVC/PILCA/U/G.ABOVE 70TO 300

029.D0.008

126

DIV.MT/L
"Diversi

on of 2 to 4 Core, cable . The job involves excavation and


removal
of cable and excavation and laying of cable to diverted route,
backfill
ing of cable trench, putting slabs and sand as required in the
new rout
e.
"

470
ESCH29
2/L.MT.LT-ABOVE 70-UPTO300

029.D2.008

162.9

DIV.U/G.
"Diversi

on of 2 to 4 Core, cable . The job involves excavation and


removal
of cable and excavation and laying of cable to diverted route,
backfill
ing of cable trench, putting slabs and sand as required in the
new rout
e.
"
480
ESCH18
ET.XLPEL.H.T.PVC(AL)SOCKUPTO120

018.E2.001

EA

"1,070.00"
End Term

ination of 11kV XLPE cables as per the existing practices/


standard
s .This includes making of the pit after doing necessary
"excavat
ion of jointing pit, protecting the site from dust, water by"
"keeping
proper tarpoline arrangement at site, Supply of sand and"
"slabs,
precasted joint marker,jointer and all other material required"
to compl
ete the jointing activity except the jointing kit. Jointing
kit M SE
AL / HEAT SHRINK / TAPEX / PUSH ON will be supplied by JUSCO
.Kerosin
e blow lamp is not acceptable and party should use only
commerci
al GAS and GAS torch for jointing. . One year warranty for
terminat
ion should be given by vendor.
490
ESCH18
ET.XLPEL.H.T.PVC(AL)SOCKABOVE120-240

018.E2.002

EA

"1,391.00"
End Term

ination of 11kV XLPE cables as per the existing practices/


standard
s .This includes making of the pit after doing necessary
"excavat
ion of jointing pit, protecting the site from dust, water by"
"keeping
proper tarpoline arrangement at site, Supply of sand and"
"slabs,
precasted joint marker,jointer and all other material required"
to compl
ete the jointing activity except the jointing kit. Jointing
kit M SE
AL / HEAT SHRINK / TAPEX / PUSH ON will be supplied by JUSCO
.Kerosin
e blow lamp is not acceptable and party should use only
commerci
al GAS and GAS torch for jointing. . One year warranty for
terminat
ion should be given by vendor.

500
ESCH19
ST.TH.JT.HT.XLPE.AL FERRULE-UPTO120

019.J1.001

EA

"2,140.00"
Straight

through jointing of 11kV XLPE cables as per the existing


practice
s/ standards .This includes making of the pit after doing
"necessa
ry excavation of jointing pit, protecting the site from dust,"
"water b
y keeping proper tarpoline arrangement at site, Supply of sand"
"and sla
bs, precasted joint marker,jointer and all other material"
required
to complete the jointing activity except the jointing kit.
Jointing
kit M SEAL / HEAT SHRINK / TAPEX / PUSH ON will be supplied
by JUSCO
.Kerosine blow lamp is not acceptable and party should use
only com
mercial GAS and GAS torch for jointing. . One year warranty
for term
ination should be given by vendor.
510
ESCH19
019.J0.002
ST.TH.JT.HT.PVC.AL FERRULE150-240 SQ.MM

EA

"2,140.00"
H.T. CAB

LE STRAIGHT THROUGH JOINTS. MAKING OF STRAIGHT THROUGH JOINT


OF H.T.
PVC / HRPVC/ XLPE ARMOURED / UNARMOURED SCREENED CABLE M SEAL / T
ROPOLIN / HEAT SHRINK THIS INCLUDES SUPPLY OF ALL JOINTING
MATERIAL
S EXCLUDING JOINTING KITS. A. PVC / HRPVC / BUYTL
1-AL FER
RULE. UPTO 150 SQ.MM TO 240 SQ.MM.
520
ESCH19
ST.TH.JT.HT.XLPE.AL FERRULE- UPTO 300

019.J1.003

EA

"2,140.00"
H.T. CAB

LE STRAIGHT THROUGH JOINTS. MAKING OF STRAIGHT THROUGH JOINT


OF H.T.
PVC / HRPVC/ XLPE ARMOURED / UNARMOURED SCREENED CABLE M SEAL / T
ROPOLIN / HEAT SHRINK THIS INCLUDES SUPPLY OF ALL JOINTING
MATERIAL
S EXCLUDING JOINTING KITS. A. PVC / HRPVC / BUYTL
1. AL-FE
RRULE. UPTO 300 SQ.MM 3 X 1C OR 3C.
530
ESCH24
/IN/OUTDR ALSOCK-UPTO10SQMM2,3,4C"

024.E0.001

EA

110.7

"ETMT/LT
END TERM

INATION OF M.T. /L.T. MULTICORE CABLE ( UPTO 1.1 KV GRADE)


" PVC/HR
PVC/XLPE CABLES INCLUDING SUPPLY OF ALL CONNECTING MATERIALS ,"
"NUT & B
OLT, AL LUGS,DOUBLE COMPRESSION GLAND , INSTALLATION OF"

"JUNCTIO
N/PULL OUT BOXES IF ANY, ARMOURED EARTHING INCLUDING CONNECTION"
", SEALI
NG OF EXTRA HOLE IF ANY."
540
ESCH14
T/I/D,O/D ALSOCK >10-25SQMM2,3,4C"

014.L6.037

165.85 "ET.MT/L
"ET.MT/L

T/IN/OUTDR ALSOCK >10-25SQMM2,3,4C"


550
ESCH14
T/IN/OUTDR ALSOCK>25-50SQMM2,3,4C"

014.L6.038

270

"ET.MT/L
"ET.MT/L

T/IN/OUTDR ALSOCK>25-50SQMM2,3,4C"
560
ESCH24
T/IN/OUTDRALSOCK>50-120SQMM2,3,4C"

024.E0.003

EA

364.5

"ET.MT/L
END TERM

INATION OF M.T. /L.T. MULTICORE CABLE ( UPTO 1.1 KV GRADE)


" PVC/HR
PVC/XLPE CABLES INCLUDING SUPPLY OF ALL CONNECTING MATERIALS ,"
"NUT & B
OLT, AL LUGS,DOUBLE COMPRESSION GLAND , INSTALLATION OF"
"JUNCTIO
N/PULL OUT BOXES IF ANY, ARMOURED EARTHING INCLUDING CONNECTION"
", SEALI
NG OF EXTRA HOLE IF ANY."
570
ESCH24
/IN/OUTDR ALSOCK150-185SQMM2,3,4C"

024.E0.004

EA

722.25 "ETMT/LT
END TERM

INATION OF M.T. /L.T. MULTICORE CABLE ( UPTO 1.1 KV GRADE)


" PVC/HR
PVC/XLPE CABLES INCLUDING SUPPLY OF ALL CONNECTING MATERIALS ,"
"NUT & B
OLT, AL LUGS,DOUBLE COMPRESSION GLAND , INSTALLATION OF"
"JUNCTIO
N/PULL OUT BOXES IF ANY, ARMOURED EARTHING INCLUDING CONNECTION"
", SEALI
NG OF EXTRA HOLE IF ANY."
580
ESCH24
024.E0.005
"ETMT/LT/IN/OUTDR ALSOCK240&300SQMM2,3,4C"

EA

"1,011.15"
END TERM

INATION OF M.T. /L.T. MULTICORE CABLE ( UPTO 1.1 KV GRADE)


" PVC/HR
PVC/XLPE CABLES INCLUDING SUPPLY OF ALL CONNECTING MATERIALS ,"
"NUT & B
OLT, AL LUGS,DOUBLE COMPRESSION GLAND , INSTALLATION OF"
"JUNCTIO
N/PULL OUT BOXES IF ANY, ARMOURED EARTHING INCLUDING CONNECTION"
", SEALI
NG OF EXTRA HOLE IF ANY."

590
ESCH24
IN/OUTDR AL BTL SOCK-UPTO10SQMM

024.E0.021

EA

118.8

ETMT/LT/
END TERM

INATION OF M.T. /L.T. MULTICORE CABLE ( UPTO 1.1 KV GRADE)


" PVC/HR
PVC/XLPE CABLES INCLUDING SUPPLY OF ALL CONNECTING MATERIALS ,"
"NUT & B
OLT, AL BOTTLE LUGS,DOUBLE COMPRESSION GLAND , INSTALLATION OF"
"JUNCTIO
N/PULL OUT BOXES IF ANY, ARMOURED EARTHING INCLUDING CONNECTION"
", SEALI
NG OF EXTRA HOLE IF ANY."
600
ESCH14
/IN/OUTDR ALBTLSOCK>10-25SQMM

014.L6.039

160.2

ET.MT/LT
ET.MT/LT

/IN/OUTDR ALBTLSOCK>10-25SQMM
610
ESCH14
/IN/OUTDR ALBTLSOCK>25-50SQMM

014.L6.040

277.2

ET.MT/LT
ET.MT/LT

/IN/OUTDR ALBTLSOCK>25-50SQMM
620
ESCH24
/IN/OUTDR AL BTL SOCK>50-120SQMM

024.E0.023

EA

443.7

ET.MT/LT
END TERM

INATION OF M.T. /L.T. MULTICORE CABLE ( UPTO 1.1 KV GRADE)


END TERM
INATION OF PVC/HRPVC/BUTYL M.T./L.T. CABLES INCLUDING
SUPPLY O
F ALL CONNECTING MATERIALS AND FABRICATION AND ERECTION OF
TERMINAL
/ JUNCTION/PULL OUT BOXES WHEREVER REQUIRED . A.
INDOOR/O
UTDOOR TYPE GLAND FINISH. 1. - ALU BOTTLE SOCKET.

ABOVE
50 TO 12

0 SQ.MM 2/3 OR 4C.


630
ESCH24
IN/OUTDR ALBTL SOCK150-185SQMM

024.E0.024

EA

920

ETMT/LT/
END TERM

INATION OF M.T. /L.T. MULTICORE CABLE ( UPTO 1.1 KV GRADE)


END TERM
INATION OF PVC/HRPVC/BUTYL M.T./L.T. CABLES INCLUDING
SUPPLY O
F ALL CONNECTING MATERIALS AND FABRICATION AND ERECTION OF
TERMINAL
/ JUNCTION/PULL OUT BOXES WHEREVER REQUIRED . A.
INDOOR/O
UTDOOR TYPE GLAND FINISH. 1. - ALUBOTTLE SOCKET.

150 AND
185 SQ.M

M 2/3 OR 4C.
640
ESCH24
-M.SEAL.AL.ABOVE10-50SQ.MM2/3/4C

024.E1.002

EA

619.04 ET.MT/LT
END TERM

INATION OF M.T. /L.T. MULTICORE CABLE ( UPTO 1.1 KV GRADE)

" PVC/HR
PVC/XLPE CABLES INCLUDING SUPPLY OF ALL CONNECTING MATERIALS ,"
"NUT & B
OLT, AL LUG/SOCKET,ET KIT (M-SEAL COMPOUND/HEAT SHRINK),"
"INSTALL
ATION OF JUNCTION/PULL OUT BOXES IF ANY, ARMOURED EARTHING"
"INCLUDI
NG CONNECTION , SEALING OF EXTRA HOLE IF ANY."
650
ESCH24
T-M.SEAL.AL.ABOVE50-120SQMM2,3,4C"

024.E1.003

EA

842.7

"ET.MT/L
END TERM

INATION OF M.T. /L.T. MULTICORE CABLE ( UPTO 1.1 KV GRADE)


" PVC/HR
PVC/XLPE CABLES INCLUDING SUPPLY OF ALL CONNECTING MATERIALS ,"
"NUT & B
OLT, AL LUG/SOCKET,ET KIT (M-SEAL COMPOUND/HEAT SHRINK),"
"INSTALL
ATION OF JUNCTION/PULL OUT BOXES IF ANY, ARMOURED EARTHING"
"INCLUDI
NG CONNECTION , SEALING OF EXTRA HOLE IF ANY."
660
ESCH24
024.E1.004
"ET.MT/LT-M.SEAL.AL-150&185 SQ.MM 2,3,4C"

EA

"1,159.15"
END TERM

INATION OF M.T. /L.T. MULTICORE CABLE ( UPTO 1.1 KV GRADE)


" PVC/HR
PVC/XLPE CABLES INCLUDING SUPPLY OF ALL CONNECTING MATERIALS ,"
"NUT & B
OLT, AL LUG/SOCKET,ET KIT (M-SEAL COMPOUND/HEAT SHRINK),"
"INSTALL
ATION OF JUNCTION/PULL OUT BOXES IF ANY, ARMOURED EARTHING"
"INCLUDI
NG CONNECTION , SEALING OF EXTRA HOLE IF ANY."
670
ESCH24
024.E1.005
"ET.MT/LT-M.SEAL.AL-240&300SQ.MM 2,3,4C"

EA

"1,543.65"
END TERM

INATION OF M.T. /L.T. MULTICORE CABLE ( UPTO 1.1 KV GRADE)


" PVC/HR
PVC/XLPE CABLES INCLUDING SUPPLY OF ALL CONNECTING MATERIALS ,"
"NUT & B
OLT, AL LUG/SOCKET,ET KIT (M-SEAL COMPOUND/HEAT SHRINK),"
"INSTALL
ATION OF JUNCTION/PULL OUT BOXES IF ANY, ARMOURED EARTHING"
"INCLUDI
NG CONNECTION , SEALING OF EXTRA HOLE IF ANY."
680
ESCH24
-M.SEAL AL BTL ABOVE 10-50 SQ.MM

024.E7.002

EA

705.47 ET.MT/LT
END TERM

INATION OF M.T. /L.T. MULTICORE CABLE ( UPTO 1.1 KV GRADE


): END T
ERMINATION OF PVC/HRPVC/BUTYL M.T./L.T. CABLES INCLUDING
SUPPLY O
F ALL CONNECTING MATERIALS AND FABRICATION AND ERECTION OF

TERMINAL
/ JUNCTION/PULL OUT BOXES WHEREVER REQUIRED . B.

M SEAL TYP

E ( WITH SUPPLY OF KITS BY CONTRACTOR ). 1. - ALU


BOTTLE/H
EAVY DUTY SOCKET. ABOVE 10 TO 50 SQ.MM 2/3 OR 4C.
690
ESCH24
024.E7.003
ET.MT/LT-M.SEAL AL BTL ABOVE 50-120 SQMM

EA

"1,262.36"
END TERM

INATION OF M.T. /L.T. MULTICORE CABLE ( UPTO 1.1 KV GRADE


): END T
ERMINATION OF PVC/HRPVC/BUTYL M.T./L.T. CABLES INCLUDING
SUPPLY O
F ALL CONNECTING MATERIALS AND FABRICATION AND ERECTION OF
TERMINAL
/ JUNCTION/PULL OUT BOXES WHEREVER REQUIRED . B.

M SEAL TYP

E ( WITH SUPPLY OF KITS BY CONTRACTOR ). 1. - ALU


BOTTLE/H
EAVY SOCKET. ABOVE 50 TO 120 SQ.MM 2/3 OR 4C.
700
ESCH24
ET.MT/LT-M.SEAL AL BTL -150&185 SQ.MM

024.E7.004

EA

"1,481.27"
END TERM

INATION OF M.T. /L.T. MULTICORE CABLE ( UPTO 1.1 KV GRADE


): END T
ERMINATION OF PVC/HRPVC/BUTYL M.T./L.T. CABLES INCLUDING
SUPPLY O
F ALL CONNECTING MATERIALS AND FABRICATION AND ERECTION OF
TERMINAL
/ JUNCTION/PULL OUT BOXES WHEREVER REQUIRED . B.

M SEAL TYP

E ( WITH SUPPLY OF KITS BY CONTRACTOR ). 1. - ALU


BOTTLE/H
EAVY SOCKET. 150 AND 185 SQ.MM 2/3 OR 4C.
710
ESCH28
-1C.AL.SOCK-ABOVE2.5TO10 SQ.MM

028.E0.002

EA

12

ET.MT/LT
ET WITH

SUPPLY OF AL LUGS & CONNECTION


720
ESCH28
-1C.AL.SOCK-ABOVE 10TO 50SQ.MM

028.E0.003

EA

22.5

ET.MT/LT
ET WITH

SUPPLY OF AL LUGS & CONNECTION


730
ESCH28
-1C.AL.SOCK-ABOVE 50TO120SQ.MM

028.E0.004

EA

48.6

ET.MT/LT
ET WITH

SUPPLY OF AL LUGS & CONNECTION


740
ESCH28
-1C.AL.SOCK-300SQ.MM

028.E0.006

EA

115

ET.MT/LT
ET WITH

SUPPLY OF AL LUGS & CONNECTION

750
ESCH28
-1C.AL.SOCK-400SQ.MM

028.E0.007

EA

130

ET.MT/LT
ET WITH

SUPPLY OF AL LUGS & CONNECTION


760
ESCH28
-1C.AL.BTL SOCK-ABOVE 2.5-10SQMM

028.E0.026

EA

15.4

ET.MT/LT
ET WITH

SUPPLY OF AL LUGS & CONNECTION


770
ESCH28
-1C.AL.BTL SOCK-ABOVE 10-50SQ.MM

028.E0.027

EA

26

ET.MT/LT
ET WITH

SUPPLY OF AL LUGS & CONNECTION


780
ESCH24
/IN/OUTDR CUSOCK-UPTO10SQMM2,3,4C"

024.E0.009

EA

162

"ETMT/LT
END TERM

INATION OF M.T. /L.T. MULTICORE CABLE ( UPTO 1.1 KV GRADE)


" PVC/HR
PVC/XLPE CABLES INCLUDING SUPPLY OF ALL CONNECTING MATERIALS ,"
"NUT & B
OLT, CU LUGS,DOUBLE COMPRESSION GLAND , INSTALLATION OF"
"JUNCTIO
N/PULL OUT BOXES IF ANY, ARMOURED EARTHING INCLUDING CONNECTION"
", SEALI
NG OF EXTRA HOLE IF ANY."
790
ESCH24
/IN/OUTDOOR CUSOCK-UPTO 2.5&10C

024.E0.007

EA

140

ET.MT/LT
END TERM

INATION OF M.T. /L.T. MULTICORE CABLE ( UPTO 1.1 KV GRADE)


" PVC/HR
PVC/XLPE CABLES INCLUDING SUPPLY OF ALL CONNECTING MATERIALS ,"
"NUT & B
OLT, CU LUGS,DOUBLE COMPRESSION GLAND , INSTALLATION OF"
"JUNCTIO
N/PULL OUT BOXES IF ANY, ARMOURED EARTHING INCLUDING CONNECTION"
", SEALI
NG OF EXTRA HOLE IF ANY."
800
ESCH24
IN/OUTDR CUSOCK UPTO 2.5&>10-31C

024.E0.008

EA

198

ETMT/LT/
END TERM

INATION OF M.T. /L.T. MULTICORE CABLE ( UPTO 1.1 KV GRADE)


" PVC/HR
PVC/XLPE CABLES INCLUDING SUPPLY OF ALL CONNECTING MATERIALS ,"
"NUT & B
OLT, CU LUGS,DOUBLE COMPRESSION GLAND , INSTALLATION OF"
"JUNCTIO
N/PULL OUT BOXES IF ANY, ARMOURED EARTHING INCLUDING CONNECTION"
", SEALI
NG OF EXTRA HOLE IF ANY."

810
ESCH14
TRNCH 11KV UPTO240SQMM 3x1C-3C

014.L6.070

75

LAY-MAS.
"Scope :

Laying of HT cable of 3 X 1C or 3C, XLPE, Al cables to be laid"


in manso
nary trench as per TATA DRG # 5761 with good quality roller
ensuring
no rubbing of cable on ground during pulling. Loading <(>&<)>
Transpor
tation of cable from store to site and unloading at site with
proper a
rrangement is included in this scope. return of empty cable
drum/ ex
cess cable to store is also included. Cable tag to be provided
as per S
PN-8
820
ESCH14
MAS.TRNCH 11KV UPT240MM2 3x1C-3C

014.L6.071

93

2/L-LAY"Scope :

Laying of HT cable of 3 X 1C or 3C, XLPE, Al cables to be laid"


in manso
nary trench as per TATA DRG # 5761 with good quality roller
ensuring
no rubbing of cable on ground during pulling. Loading <(>&<)>
Transpor
tation of cable from store to site and unloading at site with
proper a
rrangement is included in this scope. return of empty cable
drum/ ex
cess cable to store is also included. Cable tag to be provided
as per S
PN-8
830
ESCH14
-11KV UPTO240SQMM IN MAS.TRNCH

014.L6.072

31

1/L DISM
"Scope:

1.Dismantling of HT cable from masonary trench, disconnection,


rerollin
g on drum supplied , and transporting the cable to store .
2.Both E
nd sealing as per procedure : Fill the cut section with lump of
Mastic c
ompound of M-seal. Suitable size of heat shrink cap shall be pu
over the
cable and shrunk in position by heating with either gas torch
or blow
lamp. Only Raychem/REPL (XICON make) heat shrink caps shall be
used. Th
e cap shall fully shrunk by uniform heating till a small
quantity
of adhesive compound flows outside all around the edge of the
cap to f
orm effective water seal.
Returnin
g the cable to the store with proper tag marking mentioning the

cable si
ze <(>&<)> cable length
General
Notes :
The stee
l will drum will be provided by JUSCO
The tran
sportation of drum from store to site is in Vendor Scope
The arra
ngement of necessary crane , truck etc. for completion of work
is in ve
ndor scope
Vendor h
as to ensure for safe dismantling <(>&<)> transporation of
cable. I
f any damage is observed, vendor will be penalized.
Vendor h
as to follow all safety norms as per JUSCO
"
840
ESCH14
-11KV UPTO240SQMM IN MAS.TRNCH

014.L6.073

50

2/L DISM
"
Scope: 1

.Dismantling of HT cable from masonary trench, disconnection,


rerollin
g on drum supplied , and transporting the cable to store .
2.Both E
nd sealing as per procedure : Fill the cut section with lump of
Mastic c
ompound of M-seal. Suitable size of heat shrink cap shall be pu
over the
cable and shrunk in position by heating with either gas torch
or blow
lamp. Only Raychem/REPL (XICON make) heat shrink caps shall be
used. Th
e cap shall fully shrunk by uniform heating till a small
quantity
of adhesive compound flows outside all around the edge of the
cap to f
orm effective water seal.
Returnin
g the cable to the store with proper tag marking mentioning the
cable si
ze <(>&<)> cable length
General
Notes :
The stee
l will drum will be provided by JUSCO
The tran
sportation of drum from store to site is in Vendor Scope
The arra
ngement of necessary crane , truck etc. for completion of work
is in ve
ndor scope
Vendor h

as to ensure for safe dismantling <(>&<)> transporation of


cable. I
f any damage is observed, vendor will be penalized.
Vendor h
as to follow all safety norms as per JUSCO
"
850
ature jobs (S-K Prj,O&M)"

NOS

610

"PSD's project n
Long te

xt not maintain
860
ESCH14
6KV 1/L 3C Upto 240SQMM CAB.LAY.

014.L6.065

69

D.U/g 6.
Dis U/g

6.6KV 1/L 3C Upto 240SQMM CABLE LAYING


870
ESCH14
6KV 2/L 3C Upto 240SQMM CAB.LAY.

014.L6.066

104

D.U/g 6.
Dis U/g

6.6KV 2/L 3C Upto 240SQMM CABLE LAYING


880
ESCH14
6KV 3/L 3C Upto 240SQMM CAB.LAY.

014.L6.067

139

D.U/g 6.
Dis U/g

6.6KV 3/L 3C Upto 240SQMM CABLE LAYING


10
ESCN18
.DRILLING WITH S&E OF HDC/DWC PIPE"

ESCN18768

510

"2"" DIA
"2"" DIA

. HORIZONTAL DRILLING ACROSS THE ROAD AT 1M DEPTH WITH SUPPLY"


AND EREC
TION OF HDC/DWC PIPE .
The thic
kness of HDC/DWC PIPE should be 4 millimeter.
20
ESCN18
.DRILLING WITH S&E OF HDC/DWC PIPE"

ESCN18769

903

"4"" DIA
"4"" DIA

. HORIZONTAL DRILLING ACROSS THE ROAD AT 1M DEPTH WITH SUPPLY"


AND EREC
TION OF HDC/DWC PIPE .
The thic
kness of HDC/DWC PIPE should be 4 millimeter.
30
ESCN18
ESCN18770
"6"" DIA.DRILLING WITH S&E OF HDC/DWC PIPE"

"1,091.08"
"6"" DIA

. HORIZONTAL DRILLING ACROSS THE ROAD AT 1M DEPTH WITH SUPPLY"


AND EREC
TION OF HDC/DWC PIPE .
The thic
kness of HDC/DWC PIPE should be 4 millimeter
40
ESCN18
ESCN18771
"8"" DIA.DRILLING WITH S&E OF HDC/DWC PIPE"

"1,050.00"

"8"" DIA
. HORIZONTAL DRILLING ACROSS THE ROAD AT 1M DEPTH WITH SUPPLY"
AND EREC
TION OF HDC/DWC PIPE .
The thic
kness of HDC/DWC PIPE should be 4 millimeter.
ARC LINE NO
:
10
ESCH25
ST.TH.MT/LT.AL.FER-10SQ.MM 2/3/4C

40
025.J0.002

EA

"1,850.00"
Straight

through jointing of 1.1kV(MT/LT) XLPE/PVC cables as per the


existing
practices/ standards .This includes making of the pit after
"doing n
ecessary excavation of jointing pit, protecting the site from"
"dust, w
ater by keeping proper tarpoline arrangement at site, Supply of"
"sand an
d Bricks, precasted joint marker,jointer and all other material"
required
to complete the jointing activity and including supply of
Jointing
kit (M SEAL / HEAT SHRINK / TAPEX / PUSH ON) . One year
warranty
for termination should be given by vendor.
20
ESCH25
025.J0.003
ST.TH.MT/LT.AL.FER-ABOVE10SQ.MM 2/3/4C

EA

"2,382.80"
Straight

through jointing of 1.1kV(MT/LT) XLPE/PVC cables as per the


existing
practices/ standards .This includes making of the pit after
"doing n
ecessary excavation of jointing pit, protecting the site from"
"dust, w
ater by keeping proper tarpoline arrangement at site, Supply of"
"sand an
d Bricks, precasted joint marker,jointer and all other material"
required
to complete the jointing activity and including supply of
Jointing
kit (M SEAL / HEAT SHRINK / TAPEX / PUSH ON) . One year
warranty
for termination should be given by vendor.
30
ESCH25
ST.TH.MT/LT.AL.FER-ABOVE50-120-2/3/4C

025.J0.004

EA

"3,106.00"
Straight

through jointing of 1.1kV(MT/LT) XLPE/PVC cables as per the


existing
practices/ standards .This includes making of the pit after
"doing n
ecessary excavation of jointing pit, protecting the site from"
"dust, w
ater by keeping proper tarpoline arrangement at site, Supply of"
"sand an

d Bricks, precasted joint marker,jointer and all other material"


required
to complete the jointing activity and including supply of
Jointing
kit (M SEAL / HEAT SHRINK / TAPEX / PUSH ON) . One year
warranty
for termination should be given by vendor.
40
ESCH25
025.J0.005
ST.TH.MT/LT.AL.FER-ABOVE120-185-2/3/4C

EA

"3,160.20"
Straight

through jointing of 1.1kV(MT/LT) XLPE/PVC cables as per the


existing
practices/ standards .This includes making of the pit after
"doing n
ecessary excavation of jointing pit, protecting the site from"
"dust, w
ater by keeping proper tarpoline arrangement at site, Supply of"
"sand an
d Bricks, precasted joint marker,jointer and all other material"
required
to complete the jointing activity and including supply of
Jointing
kit (M SEAL / HEAT SHRINK / TAPEX / PUSH ON) . One year
warranty
for termination should be given by vendor.
50
ESCH25
025.J0.006
ST.TH.MT/LT.AL.FER-ABOVE185-300 2/3/4C

EA

"4,080.00"
Straight

through jointing of 1.1kV(MT/LT) XLPE/PVC cables as per the


existing
practices/ standards .This includes making of the pit after
"doing n
ecessary excavation of jointing pit, protecting the site from"
"dust, w
ater by keeping proper tarpoline arrangement at site, Supply of"
"sand an
d Bricks, precasted joint marker,jointer and all other material"
required
to complete the jointing activity and including supply of
Jointing
kit (M SEAL / HEAT SHRINK / TAPEX / PUSH ON) . One year
warranty
for termination should be given by vendor.
60
ESCH25
ST.TH.MT/LT.AL.FER 400SQ.MM 2/3/4C

025.J0.007

EA

"5,300.00"
Straight

through jointing of 1.1kV(MT/LT) XLPE/PVC cables as per the


existing
practices/ standards .This includes making of the pit after
"doing n
ecessary excavation of jointing pit, protecting the site from"
"dust, w
ater by keeping proper tarpoline arrangement at site, Supply of"
"sand an

d Bricks, precasted joint marker,jointer and all other material"


required
to complete the jointing activity and including supply of
Jointing
kit (M SEAL / HEAT SHRINK / TAPEX / PUSH ON) . One year
warranty
for termination should be given by vendor.
70
ESCH24
IN/OUTDR AL BTL SOCK-UPTO10SQMM

024.E0.021

EA

118.8

ETMT/LT/
END TERM

INATION OF M.T. /L.T. MULTICORE CABLE ( UPTO 1.1 KV GRADE)


" PVC/HR
PVC/XLPE CABLES INCLUDING SUPPLY OF ALL CONNECTING MATERIALS ,"
"NUT & B
OLT, AL BOTTLE LUGS,DOUBLE COMPRESSION GLAND , INSTALLATION OF"
"JUNCTIO
N/PULL OUT BOXES IF ANY, ARMOURED EARTHING INCLUDING CONNECTION"
", SEALI
NG OF EXTRA HOLE IF ANY."
80
ESCH24
/IN/OUTDR ALBTLSOCK>10-50SQMM

024.E0.022

EA

279

ET.MT/LT
END TERM

INATION OF M.T. /L.T. MULTICORE CABLE ( UPTO 1.1 KV GRADE)


" PVC/HR
PVC/XLPE CABLES INCLUDING SUPPLY OF ALL CONNECTING MATERIALS ,"
"NUT & B
OLT, AL BOTTLE LUGS,DOUBLE COMPRESSION GLAND , INSTALLATION OF"
"JUNCTIO
N/PULL OUT BOXES IF ANY, ARMOURED EARTHING INCLUDING CONNECTION"
", SEALI
NG OF EXTRA HOLE IF ANY."
90
ESCH24
/IN/OUTDR AL BTL SOCK>50-120SQMM

024.E0.023

EA

443.7

ET.MT/LT
END TERM

INATION OF M.T. /L.T. MULTICORE CABLE ( UPTO 1.1 KV GRADE)


END TERM
INATION OF PVC/HRPVC/BUTYL M.T./L.T. CABLES INCLUDING
SUPPLY O
F ALL CONNECTING MATERIALS AND FABRICATION AND ERECTION OF
TERMINAL
/ JUNCTION/PULL OUT BOXES WHEREVER REQUIRED . A.
INDOOR/O
UTDOOR TYPE GLAND FINISH. 1. - ALU BOTTLE SOCKET.

ABOVE
50 TO 12

0 SQ.MM 2/3 OR 4C.


100
ESCH24
IN/OUTDR ALBTL SOCK150-185SQMM

024.E0.024

EA

748

ETMT/LT/
END TERM

INATION OF M.T. /L.T. MULTICORE CABLE ( UPTO 1.1 KV GRADE)


END TERM
INATION OF PVC/HRPVC/BUTYL M.T./L.T. CABLES INCLUDING
SUPPLY O
F ALL CONNECTING MATERIALS AND FABRICATION AND ERECTION OF

TERMINAL
/ JUNCTION/PULL OUT BOXES WHEREVER REQUIRED . A.
INDOOR/O
UTDOOR TYPE GLAND FINISH. 1. - ALUBOTTLE SOCKET.

150 AND
185 SQ.M

M 2/3 OR 4C.
110
ESCH24
IN/OUTDR ALBTL SOCK240&300SQMM

024.E0.025

EA

945

ETMT/LT/
END TERM

INATION OF M.T. /L.T. MULTICORE CABLE ( UPTO 1.1 KV GRADE)


END TERM
INATION OF PVC/HRPVC/BUTYL M.T./L.T. CABLES INCLUDING
SUPPLY O
F ALL CONNECTING MATERIALS AND FABRICATION AND ERECTION OF
TERMINAL
/ JUNCTION/PULL OUT BOXES WHEREVER REQUIRED A.
INDOOR/O
UTDOOR TYPE GLAND FINISH. 1. - ALU BOTTLE SOCKET.

240
AND 300

SQ.MM 2/3 OR 4C..


120
ESCH24
ET.MT/LT/IN/OUTDOOR ALBTL SOCK400SQMM

024.E0.026

EA

"1,200.00"
END TERM

INATION OF M.T. /L.T. MULTICORE CABLE ( UPTO 1.1 KV GRADE)


END TERM
INATION OF PVC/HRPVC/BUTYL M.T./L.T. CABLES INCLUDING
SUPPLY O
F ALL CONNECTING MATERIALS AND FABRICATION AND ERECTION OF
TERMINAL
/ JUNCTION/PULL OUT BOXES WHEREVER REQUIRED . A.
INDOOR/O
UTDOOR TYPE GLAND FINISH. 1. - ALU BOTTLET SOCKET.

400
SQ.MM 2/

3 0R 4C.
130
ESCH23
/G MT/LT UPTO 6SQ.MM UPTO 27C

023.D0.001

40

DIS.ON.U
"DISMANT

LING ( INCLUDING DISCONNECTION OF CABLES , IF REQUIRED .)OF"


"M.T, /
L.T . MULTICORE CABLES.

A.

CABLE LAID MAINLY UNDERGROUND"


. UPTO 6

SQ.MM UPTO 27C.


140
ESCH23
/G MT/LT ABOVE 6 SQ.MM 2/3/4C

023.D0.002

42

DIS.ON.U
"DISMANT

LING ( INCLUDING DISCONNECTION OF CABLES , IF REQUIRED .)OF"


"M.T, /
L.T . MULTICORE CABLES . A.

CABLE LAID MAINLY UNDERGROUND"


. ABOVE

6 SQ.MM. 2/3 OR 4C.


150
ESCH23
/G MT/LTABOVE 50-120SQ.MM 2/3/4C

023.D0.003

44

DIS.ON.U
"DISMANT

LING ( INCLUDING DISCONNECTION OF CABLES , IF REQUIRED .)OF"


"M.T, /

L.T . MULTICORE CABLES.

A.

CABLE LAID MAINLY UNDERGROUND"


. ABOVE

50 SQ.MM. TO 120 SQ.MM. 2/3 OR 4C.


160
ESCH23
/G MT/LTABOVE 120-240SQ.MM2/3/4C

023.D0.004

50.5

DIS.ON.U
"DISMANT

LING ( INCLUDING DISCONNECTION OF CABLES , IF REQUIRED .)OF"


"M.T, /
L.T . MULTICORE CABLES.

A.

CABLE LAID MAINLY UNDERGROUND"


. ABOVE

120 SQ.MM. TO 240 SQ.MM. 2/3 OR 4C.


170
ESCH23
/G MT/LT ABOVE 240-400SQMM2/3/4C

023.D0.005

54

DIS.ON.U
"DISMANT

LING ( INCLUDING DISCONNECTION OF CABLES , IF REQUIRED .)OF"


"M.T, /
L.T . MULTICORE CABLES.

A.

CABLE LAID MAINLY UNDERGROUND"


. ABOVE

240 SQ.MM. TO 400 SQ.MM. 2/3 OR 4C.


180
ESCH23
BKT. MT/LT UPTO 6SQ.MM UPTO 27C

023.D1.001

24

DIS.CAT/
"DISMANT

LING ( INCLUDING DISCONNECTION OF CABLES , IF REQUIRED .)OF"


"M.T, /
L.T . MULTICORE CABLE. CABLE LAID MAINLY ON CATENARY / BRACKET"
. UPTO 6
SQ.MM UPTO 27C.
190
ESCH23
BKT. MT/LT ABOVE 6 SQ.MM 2/3/4C

023.D1.002

25

DIS.CAT/
"DISMANT

LING ( INCLUDING DISCONNECTION OF CABLES , IF REQUIRED .)OF"


"M.T, /
L.T . MULTICORE CABLE. CABLE LAID MAINLY ON CATENARY / BRACKET"
. ABOVE
6 SQ.MM. 2/3 OR 4C.
200
ESCH23
BKT. MT/LTABOVE 50-120SQMM2/3/4C

023.D1.003

29.3

DIS.CAT/
"DISMANT

LING ( INCLUDING DISCONNECTION OF CABLES , IF REQUIRED .)OF"


"M.T, /
L.T . MULTICORE CABLE. CABLE LAID MAINLY ON CATENARY / BRACKET"
. ABOVE
50 SQ.MM. TO 120 SQ.MM. 2/3 OR 4C.
210
ESCH23
BKT.MT/LT ABOVE120-240SQMM2/3/4C

023.D1.004

36.75

DIS.CAT/
"DISMANT

LING ( INCLUDING DISCONNECTION OF CABLES , IF REQUIRED .)OF"


"M.T, /
L.T . MULTICORE CABLE. CABLE LAID MAINLY ON CATENARY / BRACKET"
. ABOVE
120 SQ.MM. TO 240 SQ.MM. 2/3 OR 4C.
220
ESCH23
BKT. MT/LTABOVE240-400SQMM2/3/4C

023.D1.005

37.5

DIS.CAT/

"DISMANT
LING ( INCLUDING DISCONNECTION OF CABLES , IF REQUIRED .)OF"
"M.T, /
L.T .

MULTICORE CABLE. CABLE LAID MAINLY ON CATENARY /"


BRACKET

. ABOVE 240 SQ.MM. TO 400 SQ.MM. 2/3 OR 4C.


230
ESCH23
RAY. MT/LT UPTO 6SQ.MM UPTO 27C

023.D2.001

9.2

DIS.ON.T
"DISMANT

LING ( INCLUDING DISCONNECTION OF CABLES , IF REQUIRED .)OF"


"M.T, /
L.T . MULTICORE CABLE. MAINLY ON TRAY. UPTO 6 SQ.MM UPTO 27C."
240
ESCH23
RAY. MT/LT ABOVE 6 SQ.MM 2/3/4C

023.D2.002

10.75

DIS.ON.T
"DISMANT

LING ( INCLUDING DISCONNECTION OF CABLES , IF REQUIRED ) OF"


"M.T, /
L.T. MULTICORE CABLE. MAINLY ON TRAY ABOVE 6 SQ.MM. 2/3 OR 4C."
250
ESCH23
RAY. MT/LTABOVE 50-120SQMM2/3/4C

023.D2.003

14.95

DIS.ON.T
"DISMANT

LING ( INCLUDING DISCONNECTION OF CABLES , IF REQUIRED .)OF"


"M.T, /
L.T . MULTICORE CABLE.

MAINLY ON TRAY. ABOVE 50 SQ.MM. TO"


120 SQ.M

M. 2/3 OR 4C.
260
ESCH23
RAY. MT/LTABOVE120-240SQMM2/3/4C

023.D2.004

17.25

DIS.ON.T
"DISMANT

LING ( INCLUDING DISCONNECTION OF CABLES , IF REQUIRED .)OF"


"M.T, /
L.T .

MULTICORE CABLE. MAINLY ON TRAY. ABOVE 120 SQ.MM. TO"


240 SQ.M

M. 2/3 OR 4C.
270
ESCH23
RAY. MT/LTABOVE240-400SQMM2/3/4C

023.D2.005

21.7

DIS.ON.T
"DISMANT

LING ( INCLUDING DISCONNECTION OF CABLES , IF REQUIRED .)OF"


"M.T, /
L.T . MULTICORE CABLE. MAINLY ON TRAY. ABOVE 240 SQ.MM. TO"
400 SQ.M
M. 2/3 OR 4C.
280
ESCH23
2/L.MT./LT UPTO 6SQ.MM UPTO27C

023.D3.001

50

DIS.U/G
"DISMANT

LING ( INCLUDING DISCONNECTION OF CABLES , IF REQUIRED .)OF"


"M.T, /
L.T .

MULTICORE CABLE. CABLE LAID MAINLY UNDERGROUND 2/LEG"


. UPTO 6

SQ.MM UPTO 27CORE.


290
ESCH23
2/L.MT./LT ABOVE 6 SQ.MM 2/3/4C

023.D3.002

60

DIS.U/G
"DISMANT

LING ( INCLUDING DISCONNECTION OF CABLES , IF REQUIRED .)OF"


"M.T, /
L.T .

MULTICORE CABLE. CABLE LAID MAINLY UNDERGROUND 2/LEG"


. ABOVE

6 SQ.MM. 2/3 OR 4C.


300
ESCH23
2/L.MT./LTABOVE 50-120SQMM2/3/4C

023.D3.003

70

DIS.U/G
"DISMANT

LING ( INCLUDING DISCONNECTION OF CABLES , IF REQUIRED .)OF"


"M.T, /
L.T .

MULTICORE CABLE. CABLE LAID MAINLY UNDERGROUND 2/LEG"


. ABOVE

50 SQ.MM TO 120 SQ.MM 2/3 OR 4C.


310
ESCH23
2/L.MT/LTABOVE 120-240SQMM2/3/4C

023.D3.004

80

DIS.U/G
"DISMANT

LING ( INCLUDING DISCONNECTION OF CABLES , IF REQUIRED .)OF"


"M.T, /
L.T .

MULTICORE CABLE. CABLE LAID MAINLY UNDERGROUND 2/LEG"


. ABOVE

120 SQ.MM. TO 240 SQ.MM. 2/3 OR 4C.


320
ESCH23
2/L.MT/LTABOVE 240-400SQMM2/3/4C

023.D3.005

90

DIS.U/G
"DISMANT

LING ( INCLUDING DISCONNECTION OF CABLES , IF REQUIRED .)OF"


"M.T, /
L.T .

MULTICORE CABLE. CABLE LAID MAINLY UNDERGROUND 2/LEG"


. ABOVE

240 SQ.MM. TO 400 SQ.MM. 2/3 OR 4C.


330
ature jobs (S-K Prj,O&M)"

NOS

850

"PSD's project n
Long te

xt not maintain
340
roject nature jobs (S-K Prj,O&M)"

NOS

"1,050.00"

"PSD's p
Long te

xt not maintain
350
roject nature jobs (S-K Prj,O&M)"

NOS

"1,250.00"

"PSD's p
Long te

xt not maintain
360
roject nature jobs (S-K Prj,O&M)"

NOS

"1,500.00"

"PSD's p
Long te

xt not maintain
370
roject nature jobs (S-K Prj,O&M)"

NOS

"1,600.00"

"PSD's p
Long te

xt not maintain
380
roject nature jobs (S-K Prj,O&M)"

NOS

"1,800.00"

"PSD's p

Long te
xt not maintain