Professional Documents
Culture Documents
HYDRAULIC EXCAVATOR
Model Code: ZX40U-2 / ZX50U-2
Engine Rated Power: 29.8 kW (39.9 HP)
Operating Weight: 4 610 - 4 830 kg / 4 950 - 5 170 kg
Backhoe Bucket: 0.10 - 0.17 m3
Note: Some pictures show the machine without the standard additional counterweight.
Job-Proven HN Bushings
A single large swing pin is used to
eliminate jerking.
HN Bushing
Pin
Oil
Box-section frame
D-section frame
Enlarged counterweight
Rubber
Curb
New structure
Steel core
Force
Rubber
Curb
Acting force is diverted to reduce crack.
Easy-to-Read Monitor
The operator can always check machine
conditions at a glance. Fuel level, coolant
temperature and the status of various
other indicators are clearly displayed
on the large LCD monitor placed in the
front right position.
Miscellaneous Devices
Drink holder
Seat belt
Ashtray (cabin)
Skid-resistant plate
Tool box (canopy)
Side Toolbox
*Operator's seat [Cabin: fabric covered type, Canopy: Vinyl covered type]
Easy Maintenance
Tilt-Up Floor
The cabin floor can be tilted up for easy,
quick servicing even in the case of an
emergency. The floor can be tilted up
to 50 to allow the operator to work
under the cabin floor. It also gives direct
access to the swing mechanism and
starter motor behind the engine located
under the cabin floor. This design reduces
inspection and maintenance time.
Swing motor
Fuel tank
Control valve
Alternator
Pilot filter
Pump
Muffler
Reserve tank
Radiator
Engine
Fuel filter
Water separator
The ZX40U-2 and ZX50U-2 share the same device layout for easy, efficient inspection and replacement. Inspection points are concentrated for quick daily
maintenance.
EQUIPMENT
Engine
Undercarriage
Tracks
Tractor-type undercarriage. Welded track frame using carefully
selected materials. Side frame welded to track frame.
TraVEL Device
Each track driven by a high-torque, 2-speed axial piston motor
through planetary reduction gear, allowing counter-rotation of
the tracks. Travel shockless relief valve built in travel motor absorbs
shocks when stopping travel, ensuring smooth stops.
Travel speeds (rubber shoes). . . . . . . . . . . . . . . . . . High: 0 - 4.5 km/h
Low: 0 - 2.8 km/h
Travel speeds (grouser shoes). . . . . . . . . . . . . . . . . High: 0 - 4.2 km/h
Low: 0 - 2.6 km/h
Gradeability. . . . . . . . . . . . . . . . . . . . . . 30 degrees (58%) continuous
Hydraulic system
The ZX40U-2 and ZX50U-2 are equipped with the Hitachi
High-performance Hydraulic system (HHH) for job efficiency and
smooth operations.
ZX40U-2
Equipped with 1.38 m arm, 0.14 m (ISO 7451 capacity) bucket and
extra counterweight (220 kg).
Operating weight
Canopy version
400 mm rubber shoes
400 mm grouser shoes
Cabin version
400 mm rubber shoes
400 mm grouser shoes
Hydraulic Cylinders
High-strength piston rods and tubes. Cylinder cushion mechanisms
provided in boom raise, arm roll-in and roll-out circuits to absorb
shocks at stroke ends.
Rod diameter
55 mm
55 mm
50 mm
40 mm
50 mm
50 mm
4 610 kg
4 680 kg
28 kPa
29 kPa
4 760 kg
4 830 kg
29 kPa
30 kPa
ZX50U-2
Dimensions
Quantity
Bore
Boom Canopy
1
90 mm
Boom Cabin
1
90 mm
Arm
1
80 mm
Bucket
1
70 mm
Boom swing
1
90 mm
Blade
1
105 mm
Ground pressure
Equipped with 1.38 m arm, 0.16 m (ISO 7451 capacity) bucket and
extra counterweight (220 kg).
Stroke
702 mm
691 mm
698 mm
551 mm
664 mm
140 mm
Operating weight
Canopy version
400 mm rubber shoes
400 mm grouser shoes
Cabin version
400 mm rubber shoes
400 mm grouser shoes
Controls
Ground pressure
4 950 kg
5 020 kg
30 kPa
31 kPa
5 100 kg
5 170 kg
31 kPa
32 kPa
Swing mechanism
High-torque, axial piston motor with planetary reduction gear.
Swing circle is single-row, shear-type ball bearing with inductionhardened internal gear. Internal gear and pinion are immersed in
lubricant. Swing parking brake is spring-set/hydraulic-released disc
type. Swing shockless valve built in swing motor absorbs shocks
when stopping swing, ensuring smooth stops.
Swing speed. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9.3 min- (9.3 rpm)
EQUIPMENT
Front attachments
ZX40U-2 Backhoe Buckets
ISO 7451
Width
capacity
Without side cutters
With side cutters
0.10 m
400 mm
450 mm
0.11 m
450 mm
500 mm
0.13 m
500 mm
550 mm
0.14 m
550 mm
600 mm
0.16 m
600 mm
650 mm
0.17 m
650 mm
700 mm
Arm crowd force
Bucket digging force
A: General digging
B: Light-duty digging
No. of teeth
3
3
4
4
4
4
Weight
92 kg
96 kg
104 kg
109 kg
113 kg
120 kg
C: Loading
B: Light-duty digging
No. of teeth
3
3
4
4
4
4
C: Loading
Weight
92 kg
96 kg
104 kg
109 kg
113 kg
120 kg
SPECIFICATIONS
Dimensions
H
A
K
C
B
F
D
J
I
H
ZX40U-2
Note:
The illustration shows the canopy version equipped with 1.38 m arm and 400 mm rubber shoes.
The canopy and cabin conform to ROPS (ISO 3471) and FOPS (ISO 10262, Level 1) requirements.
Unit: mm
A
B
C
D
E
F
G
H
I
J
K
Overall width
Overall height
Rear-end swing radius (Without extra counterweight)
Minimum ground clearance
Counterweight clearance
Engine cover height
Undercarriage length
Undercarriage width
Sprocket centre to idler centre
Track shoe width
Maximum transport length (1.38 m arm / 1.69 m arm)
Canopy
1 960
2 510
1 060 (980)
335
605
1 510
2 540
1 960
2 000
400
5 340 / 5 380
Cabin
1 960
2 600
1 060 (980)
335
605
1 510
2 540
1 960
2 000
400
5 340 / 5 380
ZX50U-2
Note:
The illustration shows the canopy version equipped with 1.38 m arm and 400 mm rubber shoes.
The canopy and cabin conform to ROPS (ISO 3471) and FOPS (ISO 10262, Level 1) requirements.
Unit: mm
A
B
C
D
E
F
G
H
I
J
K
Overall width
Overall height
Rear-end swing radius (Without extra counterweight)
Minimum ground clearance
Counterweight clearance
Engine cover height
Undercarriage length
Undercarriage width
Sprocket centre to idler centre
Track shoe width
Maximum transport length (1.38 m arm / 1.69 m arm)
Canopy
2 000
2 510
1 080 (1 000)
335
605
1 510
2 540
2 000
2 000
400
5 460 / 5 520
10
Cabin
2 000
2 600
1 080 (1 000)
335
605
1 510
2 540
2 000
2 000
400
5 460 / 5 520
SPECIFICATIONS
Working ranges
E
I'
100
C
D
F
G
A
B
ZX40U-2
Note:
The illustration shows the canopy version equipped with 0.14 m bucket, 1.38 m arm and 400 mm rubber shoes.
Unit: mm
A
B
C
D
E
F
G
H
I / I
Maximum digging reach
Maximum digging depth
Maximum cutting height
Maximum dumping height
Minimum swing radius (At maximum boom swing)
Blade bottom highest position above ground line
Blade bottom lowest position below ground line
Maximum vertical wall
Offset distance (Maximum boom-swing angle)
Canopy
1.38 m arm
1.69 m arm
5 750
6 050
3 350
3 660
5 600
5 840
3 920
4 160
2 190 (1 710)
2 340 (1 820)
425
335
2 550
2 910
L 695 (80) / R 860 (60)
Cabin
1.38 m arm
5 750
3 350
5 480
3 810
2 270 (1 780)
1.69 m arm
6 050
3 660
5 710
4 040
2 390 (1 860)
425
335
2 550
2 910
L 695 (80) / R 860 (60)
ZX50U-2
Note:
The illustration shows the canopy version equipped with 0.16 m bucket, 1.38 m arm and 400 mm rubber shoes.
Unit: mm
A
B
C
D
E
F
G
H
I / I
Maximum digging reach
Maximum digging depth
Maximum cutting height
Maximum dumping height
Minimum swing radius (At maximum boom swing)
Blade bottom highest position above ground line
Blade bottom lowest position below ground line
Maximum vertical wall
Offset distance (Maximum boom-swing angle)
Canopy
1.38 m arm
1.69 m arm
6 000
6 250
3 600
3 860
5 770
6 020
4 100
4 330
2 150 (1 680)
2 260 (1 760)
425
335
2 820
3 160
L 695 (80) / R 860 (60)
11
Cabin
1.38 m arm
6 000
3 600
5 640
4 000
2 300 (1 790)
1.69 m arm
6 250
3 860
5 870
4 200
2 340 (1 820)
425
335
2 820
3 160
L 695 (80) / R 860 (60)
SPECIFICATIONS
Lifting capacities
A: Load radius
B: Load point height
C: Lifting capacity
B
C
Conditions
Arm
1.38 m
Rubber shoes
400 mm
Extra counterweight
220 kg
Arm
1.69 m
Rubber shoes
400 mm
Extra counterweight
220 kg
Load radius
Load
point
height
3
2
1
0
-1
3
2
1
0
-1
m
m
m
m
m
m
m
m
m
m
2m
3m
4m
At max. reach
5m
meter
2.76
*2.60
2.06
*1.19
1.46
1.38
1.34
1.34
*1.19
1.18
1.10
1.07
1.07
2.00
*1.43
1.38
1.32
1.31
1.19
1.10
1.05
1.04
0.96
0.93
0.90
0.88
0.88
0.96
0.93
0.89
0.86
0.86
0.79
0.77
0.74
0.72
0.72
0.80
0.77
0.73
0.70
0.70
0.65
0.64
0.63
0.54
0.53
0.52
0.81
0.70
0.67
0.70
0.81
0.72
0.63
0.61
0.63
0.71
Conditions
Arm
1.38 m
Rubber shoes
400 mm
Extra counterweight
220 kg
Arm
1.69 m
Rubber shoes
400 mm
Extra counterweight
220 kg
3
2
1
0
-1
3
2
1
0
-1
m
m
m
m
m
m
m
m
m
m
2m
3m
4m
At max. reach
5m
meter
*3.06
*2.60
2.06
*1.19
*1.64
*2.14
*2.26
*2.03
*1.19
1.18
1.10
1.07
1.07
2.00
*1.43
*1.99
*2.24
*2.12
1.19
1.10
1.05
1.04
*1.12
*1.25
*1.43
*1.50
*1.35
*0.99
*1.15
*1.35
*1.47
*1.41
0.79
0.77
0.74
0.72
0.72
0.80
0.77
0.73
0.70
0.70
*1.02
*1.08
*1.08
0.54
0.53
0.52
*1.07
*1.08
*1.15
*1.18
*1.20
*0.86
*0.86
*0.92
*1.06
*1.10
Conditions
Arm
1.38 m
Rubber shoes
400 mm
Extra counterweight
220 kg
Arm
1.69 m
Rubber shoes
400 mm
Extra counterweight
220 kg
m
m
m
m
m
m
m
m
m
m
2m
3m
4m
Arm
1.38 m
Rubber shoes
400 mm
Extra counterweight
220 kg
meter
2.85
*2.60
2.12
*1.19
1.51
1.42
1.39
1.39
*1.19
1.22
1.14
1.11
1.11
2.07
*1.43
1.43
1.37
1.36
1.23
1.14
1.09
1.08
0.99
0.97
0.93
0.91
0.91
0.99
0.96
0.93
0.90
0.89
0.82
0.80
0.76
0.74
0.74
0.82
0.79
0.76
0.73
0.72
0.68
0.66
0.65
0.56
0.55
0.54
0.84
0.73
0.70
0.73
0.84
0.74
0.66
0.63
0.65
0.74
Arm
1.69 m
Rubber shoes
400 mm
Extra counterweight
220 kg
m
m
m
m
m
m
m
m
m
m
0.69
0.60
0.58
0.60
0.69
0.61
0.54
0.52
0.53
0.60
4.43
4.80
4.89
4.71
4.24
4.77
5.10
5.18
5.02
4.59
Unit: 1 000 kg
Load radius
Load
point
height
3
2
1
0
-1
3
2
1
0
-1
4.43
4.80
4.89
4.71
4.24
4.77
5.10
5.18
5.02
4.59
At max. reach
5m
Conditions
0.67
0.58
0.56
0.58
0.67
0.59
0.52
0.50
0.51
0.58
Unit: 1 000 kg
Load radius
Load
point
height
3
2
1
0
-1
3
2
1
0
-1
4.43
4.80
4.89
4.71
4.24
4.77
5.10
5.18
5.02
4.59
Unit: 1 000 kg
Load radius
Load
point
height
0.67
0.58
0.56
0.58
0.67
0.59
0.52
0.50
0.51
0.58
2m
3m
4m
At max. reach
5m
meter
*3.06
*2.60
2.12
*1.19
*1.64
*2.14
*2.26
*2.03
*1.19
1.22
1.14
1.11
1.11
2.07
*1.43
*1.99
*2.24
*2.12
1.23
1.14
1.09
1.08
*1.12
*1.25
*1.43
*1.50
*1.35
*0.99
*1.15
*1.35
*1.47
*1.41
0.82
0.80
0.76
0.74
0.74
0.82
0.79
0.76
0.73
0.72
*1.02
*1.08
*1.08
Notes:
2. Lifting capacity does not exceed 75% of tipping load with the machine on firm, level ground or 87% full hydraulic capacity.
3. The load point is the center-line of the bucket pivot mounting pin on the arm.
12
0.56
0.55
0.54
*1.07
*1.08
*1.15
*1.18
*1.20
*0.86
*0.86
*0.92
*1.06
*1.10
0.69
0.60
0.58
0.60
0.69
0.61
0.54
0.52
0.53
0.60
4.43
4.80
4.89
4.71
4.24
4.77
5.10
5.18
5.02
4.59
SPECIFICATIONS
Lifting capacities
A: Load radius
B: Load point height
C: Lifting capacity
B
C
Conditions
Arm
1.38 m
Rubber shoes
400 mm
Extra counterweight
220 kg
Arm
1.69 m
Rubber shoes
400 mm
Extra counterweight
220 kg
Load radius
Load
point
height
3
2
1
0
-1
3
2
1
0
-1
m
m
m
m
m
m
m
m
m
m
2m
3m
4m
At max. reach
5m
meter
*2.68
*2.29
2.47
*1.26
1.66
1.57
1.54
1.54
*1.26
1.39
1.31
1.28
1.28
*2.29
*1.59
1.57
1.52
1.51
1.41
1.31
1.26
1.25
1.10
1.07
1.03
1.01
1.01
*1.03
1.07
1.03
1.00
0.99
0.95
0.92
0.88
0.86
0.86
0.95
0.91
0.87
0.84
0.83
0.76
0.75
0.66
0.65
0.76
0.74
0.73
0.65
0.64
0.62
0.86
0.76
0.73
0.76
0.87
*0.73
0.69
0.66
0.68
0.76
Conditions
Arm
1.38 m
Rubber shoes
400 mm
Extra counterweight
220 kg
Arm
1.69 m
Rubber shoes
400 mm
Extra counterweight
220 kg
3
2
1
0
-1
3
2
1
0
-1
m
m
m
m
m
m
m
m
m
m
2m
3m
4m
At max. reach
5m
meter
*2.68
*2.29
2.47
*1.26
*1.83
*2.40
*2.53
*2.33
*1.26
1.39
1.31
1.28
1.28
*2.29
*1.59
*2.23
*2.50
*2.41
1.41
1.31
1.26
1.25
*1.17
*1.35
*1.57
*1.68
*1.57
*1.03
*1.24
*1.48
*1.64
*1.61
0.95
0.92
0.88
0.86
0.86
0.95
0.91
0.87
0.84
0.83
*0.93
*1.24
0.66
0.65
*1.10
*1.18
*1.23
0.65
0.64
0.62
*0.91
*0.91
*0.97
*1.12
*1.29
*0.73
*0.73
*0.77
*0.87
*1.08
Conditions
Arm
1.38 m
Rubber shoes
400 mm
Extra counterweight
220 kg
Arm
1.69 m
Rubber shoes
400 mm
Extra counterweight
220 kg
m
m
m
m
m
m
m
m
m
m
2m
3m
4m
Arm
1.38 m
Rubber shoes
400 mm
Extra counterweight
220 kg
meter
*2.68
*2.29
2.55
*1.26
1.71
1.62
1.58
1.59
*1.26
1.43
1.35
1.31
1.32
*2.29
*1.59
1.62
1.57
1.56
1.45
1.35
1.30
1.29
1.14
1.10
1.07
1.04
1.04
*1.03
1.10
1.06
1.03
1.02
0.97
0.94
0.91
0.88
0.88
0.97
0.94
0.90
0.87
0.86
0.79
0.78
0.68
0.66
0.78
0.77
0.75
0.67
0.66
0.64
0.89
0.79
0.76
0.79
0.90
*0.73
0.71
0.69
0.71
0.79
Arm
1.69 m
Rubber shoes
400 mm
Extra counterweight
220 kg
m
m
m
m
m
m
m
m
m
m
0.77
0.68
0.65
0.67
0.76
0.68
0.61
0.59
0.60
0.67
4.66
5.00
5.09
4.92
4.48
4.99
5.31
5.39
5.24
4.83
Unit: 1 000 kg
Load radius
Load
point
height
3
2
1
0
-1
3
2
1
0
-1
4.66
5.00
5.09
4.92
4.48
4.99
5.31
5.39
5.24
4.83
At max. reach
5m
Conditions
0.74
0.66
0.63
0.65
0.74
0.66
0.59
0.57
0.59
0.65
Unit: 1 000 kg
Load radius
Load
point
height
3
2
1
0
-1
3
2
1
0
-1
4.66
5.00
5.09
4.92
4.48
4.99
5.31
5.39
5.24
4.83
Unit: 1 000 kg
Load radius
Load
point
height
0.74
0.66
0.63
0.65
0.74
0.66
0.59
0.57
0.59
0.65
2m
3m
4m
At max. reach
5m
meter
*2.68
*2.29
2.55
*1.26
*1.83
*2.40
*2.53
*2.33
*1.26
1.43
1.35
1.31
1.32
*2.29
*1.59
*2.23
*2.50
*2.41
1.45
1.35
1.30
1.29
*1.17
*1.35
*1.57
*1.68
*1.57
*1.03
*1.24
*1.48
*1.64
*1.61
0.97
0.94
0.91
0.88
0.88
0.97
0.94
0.90
0.87
0.86
*0.93
*1.24
0.68
0.66
*1.10
*1.18
*1.23
0.67
0.66
0.64
Notes:
2. Lifting capacity does not exceed 75% of tipping load with the machine on firm, level ground or 87% full hydraulic capacity.
3. The load point is the center-line of the bucket pivot mounting pin on the arm.
13
*0.91
*0.91
*0.97
*1.12
*1.29
*0.73
*1.73
*0.77
*0.87
*1.08
0.77
0.68
0.65
0.67
0.76
0.68
0.61
0.59
0.60
0.67
4.66
5.00
5.09
4.92
4.48
4.99
5.31
5.39
5.24
4.83
EQUIPMENT
ZX40U-2 Standard equipment
Standard equipment may vary by country, so please consult your Hitachi dealer for details.
ENGINE
CANOPY (CABin)
UNDERCARRIAGE
Maintenance
Tilt-up cabin/canopy
Longitudinal sliding engine
cover
Right side maintenance cover
HYDRAULIC SYSTEM
Hydraulic pilot type control
levers
Pilot control shut-off levers
Anti-drift valve for front
attachment (Boom)
Two-speed travel system
Swing parking brake
Travel parking brake
Hydraulic piping for
attachments
FRONT ATTACHMENTS
2.68 m boom
1.38 m arm
HN bushing
WC spraying
OTHERS
Additional counterweight
Optional equipment
Optional equipment may vary by country, so please consult your Hitachi dealer for details.
enginE
UNDERCARRIAGE
Front Attachments
1.69 m arm
Backhoe buckets
Arm for quick-hitch
14
EQUIPMENT
ZX50U-2 Standard equipment
Standard equipment may vary by country, so please consult your Hitachi dealer for details.
ENGINE
CANOPY (CABin)
UNDERCARRIAGE
Maintenance
Tilt-up cabin/canopy
Longitudinal sliding engine
cover
Right side maintenance cover
HYDRAULIC SYSTEM
Hydraulic pilot type control
levers
Pilot control shut-off levers
Anti-drift valve for front
attachment (Boom)
Two-speed travel system
Swing parking brake
Travel parking brake
Hydraulic piping for
attachments
FRONT ATTACHMENTS
2.85 m boom
1.38 m arm
HN bushing
WC spraying
OTHERS
Additional counterweight
Optional equipment
Optional equipment may vary by country, so please consult your Hitachi dealer for details.
enginE
UNDERCARRIAGE
Front Attachments
1.69 m arm
Backhoe buckets
Arm for quick-hitch
15
KS-EN129EU