You are on page 1of 6

PROFESSIONAL PRACTICE

Course Outline

Architect

Professionally and Academically qualified to practice architecture


A. Academically (Technicality)

I. Administering the Regular Services of Architecture

a. Definition Of The Architects Role In The Building Industry


b. The Architects Responsibility and Liability
c.

BS Architecture (5 years)
Recognize Reputable School
Diversified Training Experience (2 Years)
PRC Board Passer

B. Professionally (Legality)

Method of Selecting an Architect

d. The Professional Fee

21 year of legal age


Registered
SEC/ DTI

e. Inter-Professional Relationship
CODE OF ETHICS

II. The Spectrum of the Architects Services


a. Pre-Design Services
b. Regular Design Services
c.

Specialized Allied Services

d. Construction Services
e. Post Construction Services
f.

Comprehensive Architectural Services

g. Design Build Services

III. The Building Laws

1. General Objectives
2. Ideals
3. Success
4. Remuneration
5. Interest of the Client
6. Professional Prerogative
7. Business Venture
8. Behavior
9. Criticism
10. Creative Endeavour
BONDS
Performance Bond

a. The Law that Regulates the Practice of Architecture


b. The Law Affecting Real Estate, Design, Gen Const,
c.

General Condition of a Contract

ARCHITECT DEFINED

15 % of contract amount

Payment Bond

15% of Contract amount


valid until replacement of Guarantee Bond

Guarantee Bond

30% of contract amount


valid up to 1 yr from date of acceptance

UNITED ARCHITECTS OF THE PHILIPPINES


OBJECTIVES:

To unite all registered architects in the Philippines.

To established and promote the highest standards of ethical conduct and


excellence in the practice and service of the architectural profession.

To uplift the standards of the architectural education, conduct


researchers, accumulate and disseminate information and ideas in
architecture, environmental design, ecology, technology, culture and
other related fields.

To cooperate and coordinate with other allied profession, trades and


industry.

To participate in matters concerning national development of the country.

To cooperate with the board of architecture and other government


agencies.

To cooperate and coordinate with international organizations in the field


of architecture, environmental design and other fields of arts, science
and technology

To render any lawful and appropriate assistance to any of its members.

Hoping to find in the fulfillment of these aims its modest contributions


towards the making of a better and happier world to live in.

201 PRE-DESIGN SERVICES

Economic Feasibility Studies


Project Financing
Architectural Programming
Site Selection and Analysis
Site Utilization and Land-Use Studies
Space Management Studies
Promotional Services

202 DESIGN SERVICES


REGULAR SERVICES
1. Schematic Design Phase
2. Design Development Phase
3. Contract Document Phase
General Conditions
Agreement
Specifications
Sol Provision
Drawings
4. Construction Phase
CONSTRUCTION MILE STONE
1. References
a. Horizontal References
b. Vertical References
2.
3.
4.
5.

Excavation
Rebar
Concreting
Finishing

ARCHITECTS FEE
Group 1

SIMPLE .. 6%

Group 2

MODERATE .. 7%

Group 3

EXEPTIONAL 8%

Group 4

RESIDENTIAL .. 10%

Group 5

MONUMENTAL 12%

Group 6

REPITITIVE 80%

Group 7

HOUSING . 60% 30%

Group 8

EXTENSIVE RETAILING 15%

Group 9

ALTERATIONS / RNOVATION . 150%

Group 10

CONSULTATION ARBRITATION .P200/ 500

60% 40%

PAYMENT SCHEDULE
a. Upon Singing

5%

b. Schematic Design Phase

15%

c. Design Development Phase

35%

d. Contract Documents

85%

e. Retention Fee
Architects Liability
Supervision

15%
10%
5%

203 SPECIALIZED ALLIED SERVICES


1. Physical Planning
2. Interior Design
with consultant

12% - 20%
5%

with consultant

10% - 15%
5%

3. Landscaping
4. Acoustics, Comm, Elec, Eng
with consultant

5. Comprehensive Planning
Physical
Economic
Socio-Cultural
Transport
Legal & Administrative

10% - 15%
5%

204 CONSTRUCTION SERVICES


FULL TIME SUPERVISION
Percentage Method 1 1 1/2%
MDPE (Multiple Direct Personnel Expense)
CONSTRUCTION MANAGER
Percentage Method 1 - 1 1/2%
PROJECT MANAGER

Percentage Method 2 - 5%

Percentage Method 4 6% of gross rentals

206 COMPREHENSIVE ARCHITECTURAL SERVICES

All services (UAP DOC 201-205)


Equivalent to Project Manager

COMPENSATION
Percentage Method
Compensation
Combination

207 DESIGN-BUILD SERVICES

205 POST CONSTRCUTION SERVICES

DESIGN BUILD SERVICES

BUILDING & EQUIPMENT MAINTENANCE


Maintenance of building systems and building equipments

DESIGN BUILD SERVICES


BY ADMINISTRATION

BUILDING & GROUNDS ADMINISTRATION


Billing of tenants
Monitoring of Security and Janitorial services
Update of local ordinances and building regulations
POST-CONSTRUCTION EVALUATION
Evaluate use of Facility
Determine effectiveness of building systems and materials
Functionality of the building plans
Study of functionality and effectiveness of the design
COMPENSATION
Salary Basis

Handling projects at the shortest time, at lowest cost with quality and performance

Project constructed under the direct and sole responsibility of the Architect
7% Fee as Compensation separate Architects Fee for regular design services

DESIGN BUILD SERVICES


ON A GUARANTEED MAXIMUM COST

Client given a guaranteed maximum cost for the construction of the project
10% Fee as Compensation separate Architects Fee for regular design services

208-a SELECTION OF THE ARCHITECT


DIRECT SELECTION

Clients Personal selection of architect

COMPARATIVE SELECTION

Clients choose between other architects for the best suited for the project

DESIGN COMPETITION

For monumental, civic, and prestigious private building projects

208-b METHODS OF COMPENSATION


1. Percentage of Construction
2. Multiple of Direct Personnel Expenses
3. Professional Fee plus Expenses
4. Lump Sum or Fixed Fee
5. Per Diem Reimbursable Expense
6. Mixed Method of Compensation

UAP DOCUMENTS

LAWS

PD 1185
PD 1096
PD 957
PD 23
PD 49

Fire Code
Building Code
Condominium & Subdivision,
Bridges Protective Law
Law that Created the PRC
Intellectual Property Law

RA 545

The Architects Law

BP 344
BP 220

The Law Enhancing the Mobility of Disabled


The Socialized Housing Law

5 days
7 days
10 days

- immediately
- from receipt of NOTICE TO PROCEED
-notice to stop, resume before beginning or suspending,
resuming
- request on drwn & matrls from date needed

15 days

Sole power of interpreting the provisions of the code:


National Board of Directors of the United Architects of the Philippines Board of Professional
Regulation Commission

201
202
203
204
205
206
207
208

Pre- design Services


Design services
Specialized Allied Services
Construction Services

30 days

- arbitration
- certificate of occupancy

60 days

- to make good of known defects after issuance of certificate of


completion (expiration
of performance &
payment bond)
- work stoppage ordered by the court
- retention (3 months after acceptance of work)

Post- Construction Services


Comprehensive Architectural Services
Design- Build Services
Selection of Architects & Methods of Compensation

- request for payment by contractor


- change of order
- certificate of payment by the architect
- for owner to pay the contractor from issuance of certificate of
payment
- reqst of extension frm occurrence of delay
- notice of termination upon written notice
- contract sum & breakdown

90 days

120 days
365 days

- building permit validity


- guarantee bond effectivity
- building permit validity if there was no Construction

You might also like