Hazard
Damage of
Underground utilities
Cause of Hazard
Consequences/Imp
act
Suspension of work
Property Damage
Penalties from local
authorities
Fire and explosion
Risk Evaluation
(Before)
Risk
Level
(H,M,L)
S
4
(H,M,L)
Risk
Evaluatio
n
(After)
P S
Risk
Level
Collapse of trench
Toppling machinery
Uneven ground
Over speed of machinery
Unauthorized operation of
machinery
Property Damage
Serious Injury
Hazard/ Aspect Identification, Risk/ Impact Assessment and Risk /Impact Control
For water tank base construction
Project: Incompetent person
Uneven grounds will be compacted and
levelled.
The machinery speed will be controlled by
regular monitoring of machinery and
disciplinary action for violators.
Fall of materials
Unprotected edge
Near miss
Keeping excavated materials at Injury
Property damage
the edge
In attention to known hazards
Fall of persons
Injury
Fracture
Public
Dust / Noise /
vibration
Machinery
Health illness /
hearing loss / white
finger
Hazard/ Aspect Identification, Risk/ Impact Assessment and Risk /Impact Control
For water tank base construction
Project:Activity: Lifting Operation
Sl NO
Hazard
Cause of Hazard
Crane toppling
Dropping of load
Swinging load
Adjacent work
Faulty Equipment
Damaged lifting
gears
Failure of lifting
tackles.
Consequences/Imp
act
Cuts,
bruise,
abrasions
Fatality,
damage to
equipment
Serious Injury
Fatality
Property
damage
Risk Evaluation
(Before)
Risk
Level
(H,M,L)
S
2
Incompetent rigger
Improper maintenance
Consequences/Imp
act
Risk Evaluation
(Before)
Risk
Level
PTW Control
Competent operator
Method statement , TRA
Lifting gears to be certified and colour
coded according to ADCO GASCO /
ADDC standards.
Planned lifting
Firm and even ground
Crane should be positioned
horizontally (wooden supports under
the outriggers to be provided)
Barricade around lifting radius and
limited the access only to essential
personnel.
Use approved 3rd party certified
crane / Hiab, / Operator, Riggers &
lifting tools & tackles.
All lifting gears or equipment shall be
inspected prior to each lift.
Crane safe working load clearly
marked on the crane.
Ensure Centre of Gravity (balancing) of
load while slinging (Trained rigger).
Use tag lines at both ends to control
the load from swinging.
Close supervision to monitor someone
not standing underneath or pass
through the suspended load.
Wind speed shall be monitored
(Suspend operation if wind speed
exceeds 17 knots)
Recommended Control Measures
Risk
Evaluatio
n
(After)
P S
Risk Level
(H,M,L)
Risk
Evaluatio
n
(After)
Risk Level
Hazard/ Aspect Identification, Risk/ Impact Assessment and Risk /Impact Control
For water tank base construction
Project:P
1
Stress, strain
Personal injury
S
2
(H,M,L)
2
Steel bars
Sharp edges
(H,M,L)
Activity: Concreting
Sl NO
Hazard
Cause of Hazard
Consequences/Imp
act
Machine operation
(mixer machine)
Cement dust
Chemical
Rotating
parts
machines
Loose clothing
Inhalation of dust
Chemical exposure
of
the
Injury to
personnel.
Health hazards
Personnel injury
Skin irritation
Occupational
disease
(Breathing
disorder)
Environmental
impact
Risk Evaluation
(Before)
Risk
Level
(H,M,L)
S
2
PTW Control
Competent operator
Method statement , RA
All rotating parts of the machine should
be in place.
Avoid long time exposure to dust /
vibration
Employ a minimum handgrip to observe
less vibration.
EPTW Control
Method statement & TRA
Loose clothing should not be worn whilst
doing the machine operation.
Keep unauthorized personnel away from
the operation.
Rotate the workers to minimize long time
exposure by an individual to dust.
Dust mask to be used.
Use of MSDS
To assigned area for cleaning mixer chute
Contaminated concrete to be removed
according to the procedure
Risk
Evaluatio
n
(After)
P S
Risk
Level
(H,M,L)
Hazard/ Aspect Identification, Risk/ Impact Assessment and Risk /Impact Control
For water tank base construction
Project:
Traffic control of
concrete
equipments
P- Probability ,
S- Severity,
H-Health,
S- Safety,
E- Environment.
Moving equipments
Fatality
Injury
Property
damage