Activities in Brief
Tam Grouting shall be carried out prior to TBM activity to Strength the
ground/Soil strata as per the design requirement
1.
2.
3.
4.
5.
6.
I.
II.
III.
IV.
V.
VI.
VII.
All utilities diversions over heads and below ground shall be checked for
any obstructions.
Proper Plat-form for cement stacking min 50 bags shall be done.
Survey and marking of points
The working platform shall be mark as per survey coordinates, the
location of drilling grout holes shall be marked as coordinates
mentioned in the drawing.
The hole of TAM grout shall be arranged in staggered pattern.
Drilling to required depth as per drawing
The drilling of TAM grouting Holes shall be carried out using 90-110 drilling
bit with air flushing arrangement the drilling depth should maintained as
the attached drawing.
The drilling rig shall be setup at survey marked points .the drilling
activates shall be dry drilling with compressed air to remove the soil
and muck from drilled hole
After each drill hole location TAM grout pipe is installed the rig shall
be taken to another location point at least one hole from each bore
location.
Minimum 3 hours time is required for each drilling hole activity and
shall not be stopped during the period, as is susceptible to collapse.
Fabrication and lowering of TAM Pipes
The TAM grouting Pipe used for grouting in stages shall be made of
PVC. The full length of PVC Pipe shall be drilled with 5 to 10 mm slot
holes with spacing of 05 meter hole interval
The each Length of TAM grouting of PVC pipe is 6 m Length with
threads both end and connected socket and glow
The PVC tam pipe allow the Injection of grout from individual
sleeve
The annuals surrounding the PVC pipe shall packed with good
cement mortar.
TAM grouting
Grouting is the process of filling voids, cavities and pore spaces of soil with
grout by replacement of water or air penetrated in ground soil.
Grout Mix Design
The proposed grout mix design shall be
Cement (OPC 53) -50 kg,
Water -40 - 50 kg (W/C-0.8 to 1.0)
Admixture 0.5 % BWOC
NCG 225 grams per cement bag
The grout Shall be pumped to required pressure 5 to 6 kg /cm 2
the grout pressure required for cracking of TAM sleeve shall be
higher than the specified limits mentioned above