You are on page 1of 46

EXCEDENTE EXPORTABLE PECUARIO SIN PROYECTO (MILES DE S/.

ESPECIE

AOS
2010

PRODUCCION DE CARNE
Ave
Vacuno
Ovino
Porcino
Caprino
Alpaca
Cuy
PRODUCCION DE LECHE
Vacuno
Caprino
PRODUCCION DE LANA Y ESQUILA
Alpaca
Ovino
Total

2011

2012

2013

2014

2015

4.74
28.39
8.12
24.45
2.59
0.10
23.43

4.78
28.37
8.22
24.62
2.58
0.09
23.66

4.78
28.35
8.19
24.60
2.58
0.09
23.62

4.77
28.32
8.14
24.57
2.57
0.08
23.55

4.77
28.31
8.10
24.55
2.57
0.08
23.51

4.76
28.29
8.07
24.53
2.56
0.08
23.47

44.56
0.36

45.80
0.35

45.78
0.35

45.74
0.35

45.72
0.35

45.70
0.35

0.09
2.66
139.48

0.09
2.69
141.26

0.09
2.68
141.10

0.09
2.67
140.87

0.09
2.67
140.71

0.09
2.67
140.56

EXCEDENTE EXPORTABLE PECUARIO CON PROYECTO (MILES DE S/.)

ESPECIE

AOS
2010

PRODUCCION DE CARNE
Ave
Vacuno
Ovino
Porcino
Caprino
Alpaca
Cuy
PRODUCCION DE LECHE

4.74
28.39
8.12
24.45
2.59
0.10
23.43

2011

4.89
29.18
8.44
25.18
2.69
0.09
24.20

2012

4.89
29.16
8.40
25.16
2.68
0.09
24.16

2013

4.88
29.14
8.35
25.13
2.68
0.08
24.10

2014

4.88
29.12
8.32
25.11
2.67
0.08
24.06

2015

4.87
29.10
8.28
25.09
2.67
0.08
24.02

Vacuno
Caprino
PRODUCCION DE LANA Y ESQUILA
Alpaca
Ovino
Total

44.56
0.36

45.80
0.35

45.78
0.35

45.74
0.35

45.72
0.35

45.70
0.35

0.09
2.66
139.48

0.09
2.75
143.67

0.09
2.75
143.51

0.09
2.74
143.28

0.09
2.73
143.12

0.09
2.73
142.97

AOS
2016

2017

2018

2019

2020

4.76
28.27
8.04
24.51
2.56
0.07
23.43

4.75
28.24
7.98
24.47
2.55
0.07
23.37

4.74
28.22
7.95
24.45
2.54
0.06
23.33

4.74
28.21
7.91
24.43
2.54
0.06
23.29

4.73
28.18
7.86
24.40
2.53
0.05
23.22

45.68
0.35

45.65
0.34

45.62
0.34

45.60
0.34

45.57
0.34

0.09
2.66
140.40

0.09
2.65
140.16

0.09
2.65
140.01

0.09
2.65
139.85

0.09
2.64
139.62

AOS
2016

4.86
29.08
8.25
25.07
2.66
0.07
23.97

2017

4.86
29.05
8.20
25.04
2.65
0.07
23.91

2018

4.85
29.04
8.16
25.02
2.65
0.06
23.87

2019

4.85
29.02
8.13
25.00
2.64
0.06
23.83

2020

4.84
28.99
8.08
24.97
2.64
0.05
23.77

45.68
0.35

45.65
0.34

45.62
0.34

45.60
0.34

45.57
0.34

0.09
2.73
142.81

0.09
2.72
142.58

0.09
2.71
142.42

0.09
2.71
142.26

0.09
2.70
142.03

Costos de mantenimiento rutinario con proyecto


Alternativa I
N

DESCRIPCION

UND

METRADO

1 ACTIVIDADES COMPLEMENTARIAS
1.1 Limpieza General de Plataforma

Has

1.75

1.2 Almacenaje, Cargado, Traslado de


Material

M3

4.9

2.1 Bacheo

M3

4.25

2.2 Limp. de Derrumbes y Huaycos Menores

M3

1.75

2.3 Desencalaminado

Km.

2.85

ML

1000

2 CALZADA

3 DRENAJE
3.1 Limpieza de Cunetas
3.2 Limpieza de Alcantarillas y Tajeas.

UND

3.3 Limpieza de Badn

M3

3.4 Encausamineto de Pequeos Cursos de


Agua

M3

1.45

4 ESTRUCTURAS
4.1 Conservacin de Seales

UND

COSTOS DIRECTOS (Incluido IGV)


GASTOS GENERALES (10%)
MONTO TOTAL

Costos de mantenimiento periodico con proyecto


Alternativa I
N

DESCRIPCION

UND

METRADO

1 ACTIVIDADES COMPLEMENTARIAS
1.1 Limpieza General de Plataforma

Has

2.75

1.2 Almacenaje, Cargado, Traslado de


Material

M3

7.5

2.1 Bacheo

M3

2.2 Limp. de Derrumbes y Huaycos Menores

M3

2.3 Desencalaminado

Km.

4.19

2 CALZADA

3 DRENAJE
3.1 Limpieza de Cunetas
3.2 Limpieza de Alcantarillas y Tajeas.

ML

4.19

UND

12

3.3 Limpieza de Badn

M3

3.4 Encausamineto de Pequeos Cursos de


Agua

M3

UND

15

4 ESTRUCTURAS
4.1 Conservacin de Seales

COSTOS DIRECTOS (Incluido IGV)


GASTOS GENERALES (10%)
MONTO TOTAL

Costos de mantenimiento rutinario con proyecto


Alternativa II
N

DESCRIPCION

UND

METRADO

1 ACTIVIDADES COMPLEMENTARIAS
1.1 Limpieza General de Plataforma

Has

1.75

1.2 Almacenaje, Cargado, Traslado de


Material

M3

4.9

2.1 Bacheo

M3

7.2

2.2 Limp. de Derrumbes y Huaycos Menores

M3

1.75

2.3 Desencalaminado

Km.

2.85

ML

1000

2 CALZADA

3 DRENAJE
3.1 Limpieza de Cunetas
3.2 Limpieza de Alcantarillas y Tajeas.

UND

3.3 Limpieza de Badn

M3

3.4 Encausamineto de Pequeos Cursos de


Agua

M3

1.45

4 ESTRUCTURAS
4.1 Conservacin de Seales

UND

COSTOS DIRECTOS (Incluido IGV)


GASTOS GENERALES (10%)
MONTO TOTAL

Costos de mantenimiento periodico con proyecto


Alternativa II
N

DESCRIPCION

UND

METRADO

1 ACTIVIDADES COMPLEMENTARIAS
1.1 Limpieza General de Plataforma

Has

2.75

1.2 Almacenaje, Cargado, Traslado de


Material

M3

7.5

2.1 Bacheo

M3

10

2.2 Limp. de Derrumbes y Huaycos Menores

M3

2.3 Desencalaminado

Km.

4.19

ML

4.19

2 CALZADA

3 DRENAJE
3.1 Limpieza de Cunetas
3.2 Limpieza de Alcantarillas y Tajeas.

UND

12

3.3 Limpieza de Badn

M3

3.4 Encausamineto de Pequeos Cursos de


Agua

M3

UND

15

4 ESTRUCTURAS
4.1 Conservacin de Seales

COSTOS DIRECTOS (Incluido IGV)


GASTOS GENERALES (10%)
MONTO TOTAL

Costos de Mitigacion Ambiental Alternativa I


PRECIO
UNITARIO

PRECIO
PARCIAL

PRECIO TOTAL
418.99

225.7

394.975

4.9

24.01

555.11
17

72.25

16

28

159.6

454.86

DESCRIPCIN

U.M.

MEDIO AMBIENTE
Acondicionamiento de
botaderos

M3

Acondicionamiento de
rea ocupada por
campamento
Reacondicionamiento de
rea ocupada por
mquinas pesadas

M2

Revegetacin de taludes

Ha

M2

COSTO DIRECTO (INCLUYE I.G.V.)


GASTOS GENERALES + UTILIDAD (6%+4%)
PRESUPUESTO TOTAL

Costos de Mitigacion Ambiental Alternativa II


1,085.85
0.55

550

265.35

530.7

16.05

3.55

5.1475

DESCRIPCIN
MEDIO AMBIENTE
Acondicionamiento de
botaderos

M3

Acondicionamiento de
rea
ocupada por
Reacondicionamiento
de
campamento
rea ocupada por

M2

mquinas pesadas
Revegetacin de taludes
173.95
24.85

173.95

PRECIO
UNITARIO

2,233.89

S/.

223.39

S/.

2,457.28

PRECIO TOTAL
657.43

225.7

620.675

4.9

36.75

801.72
17

85

16

48

159.6

668.724

Ha

GASTOS GENERALES + UTILIDAD (6%+4%)

S/.

PRECIO
PARCIAL

M2

COSTO DIRECTO (INCLUYE I.G.V.)


PRESUPUESTO TOTAL

ncluido IGV)

U.M.

3,197.15
0.55

2.3045

265.35

3184.2

16.05

3.55

10.65

372.75
24.85

372.75

ncluido IGV)

PRECIO
UNITARIO

S/.

5,029.05

S/.

502.91

S/.

5,531.96

PRECIO
PARCIAL

PRECIO TOTAL
418.99

225.7

394.975

4.9

24.01

17

122.4

16

28

159.6

454.86

0.55

550

265.35

530.7

16.05

3.55

5.1475

605.26

1,085.85

173.95
24.85

173.95

ncluido IGV)

PRECIO
UNITARIO

PRECIO
PARCIAL

S/.

2,284.04

S/.

228.40

S/.

2,512.45

PRECIO TOTAL

ncluido IGV)

657.43
225.7

620.675

4.9

36.75

886.72
17

170

16

48

159.6

668.724
3,197.15

0.55

2.3045

265.35

3184.2

16.05

3.55

10.65

372.75
24.85

372.75
S/.

5,114.05

S/.

511.41

S/.

5,625.46

mbiental Alternativa I
CANTIDAD

P.U.

P.P.

TOTAL
8,753.70

740.00

0.53

392.20

180

1.8

324.00

250.00

2.15

537.50

1,500.00

7,500.00

G.V.)

8,753.70

DAD (6%+4%)

875.37
9,629.07

mbiental Alternativa II

G.V.)

DAD (6%+4%)

CANTIDAD

P.U.

P.P.

TOTAL
10,551.10

820.00

0.53

434.60

250

1.8

450.00

310.00

2.15

666.50

1,500.00

9,000.00
10,551.10
1,055.11
11,606.21

Costo de Inversion Alternativa I


COSTOS DE INVERSION ALTERNATIVA I
(en Nuevos Soles)
A Precios Privados

F.C.

Costos Intangibles

11,704.00

Expediente Tecnico

11,704.00

A Precios Sociales
10,533.60
0.9

10533.6

Costos de Inversion de Activos Fijos

664,486.54

Costo Directo

494,152.26

0.79

390,380.29

Gastos Generales (6%)

29,649.14

0.79

23,422.82

Utilidad(4%)

19,766.09

0.79

15,615.21

Supervision (3%)

441,129.72

14,824.57

0.79

11,711.41

IGV

106,094.49

0.00

Total Costo de Inversion

676,190.54

451,663.32

Costo de Inversion Alternativa II


COSTOS DE INVERSION ALTERNATIVA I
(en Nuevos Soles)
A Precios Privados

F.C.

Costos Intangibles

11,704.00

Expediente Tecnico

11,704.00

A Precios Sociales
10,533.60
0.9

10533.6

Costos de Inversion de Activos Fijos

675,000.14

Costo Directo

501,970.80

0.79

396,556.93

Gastos Generales (6%)

30,118.25

0.79

23,793.42

Utilidad(4%)

20,078.83

0.79

15,862.28

Supervision (3%)

448,109.33

15,059.12

0.79

11,896.71

IGV

107,773.13

0.00

Total Costo de Inversion

686,704.14

458,642.93

Evaluacion Economica por excedente del productor


EVALUACION ECONOMICA - ALTERNATIVA - I
VALOR ACTUAL DE LOS BENEFICIOS NETOS

( En miles de Soles a Precios Privados )


AOS

2,011
2,012
2,013
2,014
2,015
2,016
2,017
2,018
2,019
2,020
2,021

INVERSION

FLUJO

COSTO DE
MANTENIMIENTO

TOTAL

676,190.54

2,457.28
2,457.28
5,531.96
2,457.28
2,457.28
5,531.96
2,457.28
2,457.28
5,531.96
-65,161.77
TASA DE DESCUENTO: 11%

14,209.00
28,656.70
44,777.01
62,685.32
82,518.89
104,490.96
128,708.77
155,406.85
184,717.62
216,868.60
VAN
TIR
B/C

NETO

-676,190.54
11,751.72
26,199.42
39,245.06
60,228.04
80,061.61
98,959.00
126,251.49
152,949.56
179,185.66
282,030.37
(178,995.66)
6.26%
0.73

EVALUACION ECONOMICA - ALTERNATIVA - I


VALOR ACTUAL DE LOS BENEFICIOS NETOS

( En miles de Soles a Precios Sociales )


AOS

2,011
2,012
2,013
2,014
2,015
2,016
2,017
2,018
2,019
2,020

INVERSION

FLUJO

COSTO DE
MANTENIMIENTO

TOTAL

451,663.32

1,842.96
1,842.96
4,148.97
1,842.96
1,842.96
4,148.97
1,842.96
1,842.96
4,148.97

19,978.39
40,487.82
63,371.53
88,796.84
116,957.43
148,143.97
182,514.94
220,413.65
262,022.98

NETO

-451,663.32
18,135.42
38,644.86
59,222.56
86,953.87
115,114.46
143,995.00
180,671.97
218,570.69
257,874.01

2,021

-43,323.37
TASA DE DESCUENTO: 11%

307,663.44
VAN
TIR
B/C

350,986.81
248,209.84
18.65%
1.55

EVALUACION ECONOMICA - ALTERNATIVA - II


VALOR ACTUAL DE LOS BENEFICIOS NETOS

( En miles de Soles a Precios Privados )


AOS

2,011
2,012
2,013
2,014
2,015
2,016
2,017
2,018
2,019
2,020
2,021

INVERSION

FLUJO

COSTO DE
MANTENIMIENTO

TOTAL

686,704.14

2,512.45
2,512.45
5,625.46
2,512.45
2,512.45
5,625.46
2,512.45
2,512.45
5,625.46
-66,157.97
TASA DE DESCUENTO: 11%

14,209.00
28,656.70
44,777.01
62,685.32
82,518.89
104,490.96
128,708.77
155,406.85
184,717.62
216,868.60
VAN
TIR
B/C

NETO

-686,704.14
11,696.56
26,144.26
39,151.56
60,172.87
80,006.45
98,865.50
126,196.32
152,894.40
179,092.16
283,026.56
(189,527.37)
6.03%
0.72

EVALUACION ECONOMICA - ALTERNATIVA - II


VALOR ACTUAL DE LOS BENEFICIOS NETOS

( En miles de Soles a Precios Sociales )


AOS

2,011
2,012
2,013

INVERSION

FLUJO

COSTO DE
MANTENIMIENTO

TOTAL

458,642.93

1,884.34
1,884.34

19,978.39
40,487.82

NETO

-458,642.93
18,094.05
38,603.48

2,014
2,015
2,016
2,017
2,018
2,019
2,020
2,021

4,219.09
1,884.34
1,884.34
4,219.09
1,884.34
1,884.34
4,219.09
-43,979.96
TASA DE DESCUENTO: 11%

63,371.53
88,796.84
116,957.43
148,143.97
182,514.94
220,413.65
262,022.98
307,663.44
VAN
TIR
B/C

59,152.44
86,912.50
115,073.09
143,924.88
180,630.60
218,529.32
257,803.88
351,643.40
241,184.75
18.36%
1.53

0
1
2
3
4
5
6
7
8
9
10

0
1
2
3
4
5
6
7
8
9

Costos
Beneficios
1 676190.544
0
0.90 2213.76734 12800.9036
0.81 1994.38499 23258.4225
0.73 4044.92063 32740.5672
1618.6876 41292.7626
0.66
0.59 1458.27712 48970.946
2957.6111 55865.1358
0.53
0.48 1183.57042 61993.6617
0.43 1066.27966 67435.1484
0.39 2162.57975 72210.6926
0.35 -22948.9649 76377.7531
671941.658 492945.994

Costos
Beneficios
1 451663.323
0
0.90 1660.32551 17998.5452
0.81 1495.78874 32860.8221
0.73 3033.69047 46336.7181
1214.0157 58493.2259
0.66
0.59 1093.70784 69408.5395
0.53 2218.20833 79203.8179
0.48 887.677817 87909.8536
0.43 799.709745 95643.3231
0.39 1621.93481 102431.273

10

0.35 -15257.8188 108354.287

450430.563 698640.406

0
1
2
3
4
5
6
7
8
9
10

0
1
2

Costos
Beneficios
1 686704.135
0
0.90 2263.46554 12800.9036
0.81 2039.15814 23258.4225
0.73 4113.28703 32740.5672
1655.0265 41292.7626
0.66
0.59 1491.01486 48970.946
0.53 3007.60002 55865.1358
0.48 1210.14111 61993.6617
0.43 1090.21722 67435.1484
0.39 2199.13122 72210.6926
0.35 -23299.809 76377.7531
682473.368 492945.994

Costos
Beneficios
1 458642.933
0
0.90 1697.59916 17998.5452
0.81 1529.36861 32860.8221

3
4
5
6
7
8
9
10

3084.96527
1241.26987
1118.26115
2255.70002
907.605832
817.662912
1649.34841
0.35 -15489.0587
457455.656
0.73
0.66
0.59
0.53
0.48
0.43
0.39

46336.7181
58493.2259
69408.5395
79203.8179
87909.8536
95643.3231
102431.273
108354.287
698640.406

130% INVERSION
EVALUACION ECONOMICA - ALTERNATIVA - I
VALOR ACTUAL DE LOS BENEFICIOS NETOS

( En miles de Soles a Precios Sociales )


AOS

2,011
2,012
2,013
2,014
2,015
2,016
2,017
2,018
2,019
2,020

INVERSION

FLUJO

COSTO DE
MANTENIMIENTO

TOTAL

587,162.32

1,842.96
1,842.96
4,148.97
1,842.96
1,842.96
4,148.97
1,842.96
1,842.96
4,148.97

19,978.39
40,487.82
63,371.53
88,796.84
116,957.43
148,143.97
182,514.94
220,413.65
262,022.98

NETO

-587,162.32
18,135.42
38,644.86
59,222.56
86,953.87
115,114.46
143,995.00
180,671.97
218,570.69
257,874.01

2,021

-56,873.27

TASA DE DESCUENTO: 11%

307,663.44
VAN
TIR
B/C

364,536.71
117,482.91
14.05%
1.20

0
1
2
3
4
5
6
7
8
9

Costos
Beneficios
1 587162.319
0
0.90 1660.32551 17998.5452
0.81 1495.78874 32860.8221
0.73 3033.69047 46336.7181
1214.0157 58493.2259
0.66
0.59 1093.70784 69408.5395
0.53 2218.20833 79203.8179
0.48 887.677817 87909.8536
0.43 799.709745 95643.3231
0.39 1621.93481 102431.273

10

0.35 -20029.8832 108354.287

581157.495 698640.406

90% BENEFICIOS
EVALUACION ECONOMICA - ALTERNATIVA - I
VALOR ACTUAL DE LOS BENEFICIOS NETOS

( En miles de Soles a Precios Sociales )


AOS

2,011
2,012
2,013
2,014
2,015
2,016
2,017
2,018
2,019
2,020

INVERSION

FLUJO

COSTO DE
MANTENIMIENTO

TOTAL

451,663.32

1,842.96
1,842.96
4,148.97
1,842.96
1,842.96
4,148.97
1,842.96
1,842.96
4,148.97

17,980.55
36,439.04
57,034.38
79,917.15
105,261.68
133,329.58
164,263.44
198,372.29
235,820.68

NETO

-451,663.32
16,137.59
34,596.08
52,885.41
78,074.19
103,418.72
129,180.61
162,420.48
196,529.32
231,671.71

2,021

-43,323.37

TASA DE DESCUENTO: 11%

276,897.09
VAN
TIR
B/C

320,220.46
178,345.80
16.71%
1.40

0
1
2
3
4
5
6
7
8
9

Costos
Beneficios
1 451663.323
0
0.90 1660.32551 16198.6907
0.81 1495.78874 29574.7398
0.73 3033.69047 41703.0462
1214.0157 52643.9033
0.66
0.59 1093.70784 62467.6856
0.53 2218.20833 71283.4361
0.48 887.677817 79118.8683
0.43 799.709745 86078.9908
0.39 1621.93481 92188.1457

10

0.35 -15257.8188 97518.8586

450430.563 628776.365

90% BENEFICIOS

110% INVERSION

EVALUACION ECONOMICA - ALTERNATIVA - I


VALOR ACTUAL DE LOS BENEFICIOS NETOS

( En miles de Soles a Precios Sociales )


AOS

2,011
2,012
2,013
2,014
2,015
2,016
2,017
2,018
2,019
2,020

INVERSION

FLUJO

COSTO DE
MANTENIMIENTO

TOTAL

496,829.65

1,842.96
1,842.96
4,148.97
1,842.96
1,842.96
4,148.97
1,842.96
1,842.96
4,148.97

16,182.49
32,795.13
51,330.94
71,925.44
94,735.51
119,996.62
147,837.10
178,535.06
212,238.61

NETO

-496,829.65
14,339.53
30,952.17
47,181.97
70,082.48
92,892.55
115,847.65
145,994.14
176,692.10
208,089.64

2,021

-47,840.00

TASA DE DESCUENTO: 11%

249,207.38
VAN
TIR
B/C

297,047.39
71,892.52
13.24%
1.15

0
1
2
3
4
5
6
7
8
9

Costos
Beneficios
1 496829.655
0
0.90 1660.32551 14578.8216
0.81 1495.78874 26617.2659
0.73 3033.69047 37532.7416
1214.0157 47379.5129
0.66
0.59 1093.70784 56220.917
0.53 2218.20833 64155.0925
0.48 887.677817 71206.9814
0.43 799.709745 77471.0917
0.39 1621.93481 82969.3311

10

0.35 -16848.5069 87766.9727

494006.207 565898.728

COSTOS INCREMENTALES ALTERNATIVA I


(En Soles a Precios de Mercado)
DESCRIPCION
A) COSTOS DE INVERSION
1. Intangibles

2011

2012

676,190.54
11,704.00

2. Inversion de activos fijos

664,486.54

3. Capital de Trabajo inicial


4. Valor Residual (-)
B) COSTOS DE OPERACIN Y MANTENIMIENTO
C) TOTAL COSTOS CON PROYECTO
D) COSTO SIN PROYECTO
COSTO INCREMENTAL

2,457.28
676,190.54
-

2,457.28
###

676,190.54

2,457.28

2011

2012

COSTOS INCREMENTALES ALTERNATIVA I


(En Soles a Precios Sociales)
DESCRIPCION
A) COSTOS DE INVERSION
1. Intangibles

451,663.32
10,533.60

2. Inversion de activos fijos

441,129.72

3. Capital de Trabajo inicial


4. Valor Residual (-)
B) COSTOS DE OPERACIN Y MANTENIMIENTO
C) TOTAL COSTOS CON PROYECTO
D) COSTO SIN PROYECTO
COSTO INCREMENTAL

1,842.96
451,663.32
-

1,842.96
###

451,663.32

1,842.96

2011

2012

COSTOS INCREMENTALES ALTERNATIVA II


(En Soles a Precios de Mercado)
DESCRIPCION
A) COSTOS DE INVERSION
1. Intangibles
2. Inversion de activos fijos

686,704.14
11,704.00
675,000.14

3. Capital de Trabajo inicial


4. Valor Residual (-)
B) COSTOS DE OPERACIN Y MANTENIMIENTO
C) TOTAL COSTOS CON PROYECTO
D) COSTO SIN PROYECTO

2,512.45
686,704.14
-

2,512.45
###

COSTO INCREMENTAL

686,704.14

2,512.45

2011

2012

COSTOS INCREMENTALES ALTERNATIVA II


(En Soles a Precios Sociales)
DESCRIPCION
A) COSTOS DE INVERSION
1. Intangibles
2. Inversion de activos fijos

458,642.93
9,363.20
449,279.73

3. Capital de Trabajo inicial


4. Valor Residual (-)
B) COSTOS DE OPERACIN Y MANTENIMIENTO
C) TOTAL COSTOS CON PROYECTO
D) COSTO SIN PROYECTO
COSTO INCREMENTAL

1,884.34
458,642.93
458,642.93

1,884.34
###
1,884.34

AOS
2013

2014

2015

2016

2017

2018

2019

2,457.28

5,531.96

2,457.28

2,457.28

5,531.96

2,457.28

2,457.28

2,457.28

5,531.96

2,457.28

2,457.28

5,531.96

2,457.28

2,457.28

2,457.28

###
5,531.96

2,457.28

###
2,457.28

###

5,531.96

2,457.28

2,457.28

AOS
2013

2014

2015

2016

2017

2018

2019

1,842.96

4,148.97

1,842.96

1,842.96

4,148.97

1,842.96

1,842.96

1,842.96

4,148.97

1,842.96

1,842.96

4,148.97

1,842.96

1,842.96

1,842.96

###
4,148.97

1,842.96

###
1,842.96

###

4,148.97

1,842.96

1,842.96

AOS
2013

2014

2015

2016

2017

2018

2019

2,512.45

5,625.46

2,512.45

2,512.45

5,625.46

2,512.45

2,512.45

5,625.46

2,512.45

2,512.45

5,625.46

2,512.45

2,512.45

2,512.45
-

###

###

###

2,512.45

5,625.46

2,512.45

2,512.45

5,625.46

2,512.45

2,512.45

AOS
2013

2014

2015

2016

2017

2018

2019

1,884.34

4,219.09

1,884.34

1,884.34

4,219.09

1,884.34

1,884.34

4,219.09

1,884.34

1,884.34

4,219.09

1,884.34

1,884.34

1,884.34
1,884.34

###
4,219.09

1,884.34

###
1,884.34

4,219.09

###
1,884.34

1,884.34

2020

2021
(67,619.05)

(67,619.05)
5,531.96

2,457.28

5,531.96

-65,161.77

5,531.96

-65,161.77

2020

2021
(45,166.33)

(45,166.33)
4,148.97

1,842.96

4,148.97

-43,323.37

4,148.97

-43,323.37

2020

2021
(68,670.41)

(68,670.41)
5,625.46

2,512.45

5,625.46

-66,157.97

5,625.46

-66,157.97

2020

2021
(45,864.29)

(45,864.29)
4,219.09

1,884.34

4,219.09

-43,979.96

4,219.09

-43,979.96

DESCRIPCIN

U.M.

CANTIDAD

P.U.

P.P.

MEDIO
AMBIENTE
Reacondicionami
ento de rea de
almacn y Patio
de Maquinas
M2

620

9.44

5,852.80

1,500.00

8.31

12,465.00

Reforestacin y
revegetacin con
plantas nativas
del lugar
M2
COSTO DIRECTO (INCLUYE I.G.V.)
GASTOS GENERALES + UTILIDAD (10%)
IGV (19%)
PRESUPUESTO TOTAL

TOTAL

18,317.80

21,967.60
2,196.76
4,591.23
28,755.59