Professional Documents
Culture Documents
Location
Description of hazard
and hazardous event
Bad
Housekeeping
(no waste
disposal no
cleaning )
Bad Ventilation
What risk
controls
are currently
in
place?
Who
might be
harmed?
All
people
in the
workstat
ion
All
people
in the
workstat
ion
Current
risk
rating*
C R
Un
controlled
waste
disposal
Unorganiz
ed
procedure
s to
cleaning
Using hoods
(not
effective )
(not
enough)
Are further
Controls needed?
1
5
Establish
housekeeping
procedures
and follow up
this
procedures
Safe waste
disposal
checking
,inspection
and
maintenance
of ventilators
Use ventilation
System
(hoods and
ventilators)
Residual
risk
rating*
Date to
be
complet
ed
C R
unspecif
ed
unspecif
ed
There is no
emergency exit
Activities
Description of hazard
and hazardous event
All
people
in the
workstat
ion
Who
might be
harmed?
Using one
door to
entry and
exit
What risk
controls
are currently
in
place?
1
6
Current
risk
rating*
Identify
emergency
exits
Make
emergency exit
far from places
of work
unspecif
ed
Are further
Controls needed?
Date to
be
complete
d
Residual
risk
rating*
Equipment
Description of hazard
and hazardous event
Who
might be
harmed?
What risk
controls
are currently
in
place?
Current
risk
rating*
Are further
Controls needed?
Date to
be
complete
d
Residual
risk
rating*
/hazardous Material
Risk Rating Calculator
Likelihood
Likelihood that hazardous event will
occur
1
2
very unlikely
unlikely
Description of likelihood
Will only occur in exceptional circumstances
(There is a 1 in a million chance of hazardous event
happening )
fairly likely
likely
very likely
Consequences
Consequence of hazardous event
Description of Consequences
insignifcant
minor
3
4
5
Risk matrix
Likelihood
Consequences
Insignifcant
(1)
5
4
3
2
1
Minor (2)
10
8
6
4
2
Moderate
(3)
15
12
9
6
3
Major (4)
20
16
12
8
Catastrophic
(5)
25
20
15
10
Risk Rating
2025
1516
812
36
12
Action
Stop stop activity and take immediate action
Urgent action take immediate action and stop activity if necessary,
maintain existing controls rigorously
Action improve within specified timescale
Monitor look to improve at next review or if there is a significant change
No action no further action but ensure controls are maintained and
reviewed