DEPARTMENT OF INFRASTRUCTURE AND
GEOMATIC ENGINEERING
LABORATORY SHEET
SUBJECT CODE
BFC 20703
PARTIAL CODE
MG 03
PRACTICAL NAME
COURSE CODE
BFC 20703
Lecturers name/
Instructor/ Tutor
Marks
BFC 20703
TRAVERSE ( HORIZONTAL CONTROL )
BFC 20703
6
Faizzatul Aqma binti Md. Noor ( AF130096 )
1. Fasha Farhana binti Karim ( AF130140 )
2. Hanif bin Kormain ( CF130177 )
3. Sharifah Shahida binti Syed Idrus ( AF130140 )
4. Wahyu Hidayat bin Usman ( AF130083 )
Dr. Mustaffa bin Anjang Ahmad
Introduction
Objective
Theory
Instrument
Procedure
Data / Table
Data Analysis
Discussion
Presentation / Ploting
Calculation /
Recommendation
Reference
Total Mark
Comments by Examiner
Received
/ 5%
/ 5%
/ 10%
/ 5%
/ 5%
/ 10%
/ 20%
/ 15%
/ 10%
/ 10%
/ 5%
/ 100%
1.0 INTRODUCTION
Horizontal control is a form of a control survey that requires the establishment of a series of
stations that are linked together by angles and distances. The used of horizontal control is
very fundamental and has become one of the most common methods in civil engineering
work.
2.0 OBJECTIVE
To expose students in field work procedures of establishing horizontal control network.
3.0 THEORY
In survey, traverse is defined as the field operation of measuring the lengths and directions of
a series of straight lines connecting a series of points on the earth. Each of these straight lines
is called a traverse line, and each point is called a traverse station. Traverse stations are
commonly marked with wooden peg, stake, nail or iron pipe.
Traverse lines are measured using the total station. Traversing need to start from reference
datum (coordinate, bearing and distance are known). At each traverse station, a horizontal
angle is measured and used to determine the bearing and bearing of the next traverse line.
These measurements are used to compute the relative horizontal position of each unknown
traverse station. The main purposes of traverse are:
public works
4.0 PRACTICE EQUIPMENTS
All groups will be issued with the following equipment:
No.
1.
2.
3.
4.
5.
6.
Items
Total Station
Prisms
Pegs
Nails
Tripod
Hammer
Quantity
1
2
3
1
I.
Planning and Reconnaissance: Walked over the area in the field and the suitable
II.
III.
distance were measured to the nearest 10 mm and the angle were measured to the
nearest 10. If the measurements differ by more than 30 mm / 20, the survey
IV.
DISCUSSION
Our group has been given a site to observe the area to measure the length and direction of
series of a straight line connecting of point on the earth. We start the fieldwork with
observation and making decision of picking point. Four station point has been establishes
with marked pickets. The location of each point pick must be free from the disturbance and
safe. Traverse station should be numbered continuously clockwise. There are a few factor
which might influenced the reading that obtained. There are :
1) Human factor
2) Environment factor
3) Equipment factor
CONCLUSION
Based on the work that we done, we achieved to perform one horizontal traverse
control fieldwork. From the booking analysis and calculation, we obtained our linear
misclosure is 0.5 with four station point. Therefore, the correction for each point is 1 .
Futhermore our precision is 1:4228.48 . After process the data that we obtained by
2
coordinates and Bowditch rule , we determined that the area of our site that is 922 m