Introduction to
G
Geotechnical
h i l Engineering
E i
i Profession
P f i
Prof K. Rajagopal
Department of Civil Engineering
IIT Madras
e-mail: gopalkr@iitm.ac.in
Taj Mahal, Agra one of the most visited places in the World
O
l
d
M
a
h
a
b
a
L
I
P
ur
a
m
R
o
a
d
1 and 2
storey
t
Residential
Buildings
Secant piles to
support vertical
excavation (act
like sheet pile
walls)
Water table
approx. 12m
Cross-Sectional view of
proposed construction
Close-up view of excavation notice the secant piles on left side on right side
hollow steel pipes and 13m long soil nails driven to stabilize excavation
Narrow stretch
of road
CONSTRUCTION PROCESS
Three main stages of the island construction
Remediation (strengthening) of the seabed,
Placement of a seawall,
seawall
Fill to construct the island
While the fill is p
placed, airport
p buildings
g started coming
g up.
p
Pre-consolidation Methods
Sand drains
Pre-fabricated
Pre
fabricated vertical drains
Vacuum assisted pre-consolidation
Sand Drains
surcharge fill
sand columns
Geotextile filter