You are on page 1of 24

Page 1

B26 F - B26XL F BOOM

MAINTENANCE MANUAL

SANDVIK TAMROCK SECOMA S.A.S


19 avenue De Lattre-de-Tassigny - ZI
B.P. 46 - 69881 MEYZIEU Cedex
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80

Page 2

B26 F - B26XL F BOOM

E-04-07-2005 SR-MC-FL

PRELIMINARY REMARKS

1/1

SAFETY

1/2

ABOUT THIS BOOKLET

DESCRIPTION

2/1

EXPLANATION

2/2

FEATURES

2/3

MAIN COMPONENTS

MAINTENANCE OPERATIONS

3/1

FIRST ENTRY INTO SERVICE

3/2

OPERATIONS AT EACH SHIFT

3/3

50-HOURS OR WEEKLY OPERATIONS

3/4

200-HOURS OPERATIONS

3/5

1200-HOURS OR ANNUAL OPERATIONS

3/6

3600-HOURS OPERATIONS OVERALL INSPECTION AND RECONDITIONING

TIGHTENING TORQUES

10

LUBRICATION

11

OPERATING METHODS

12

6/1

REMOVING AND REFITTING A EXPENDABLE PIN SET.

12

6/2

CHECKING CYLINDER EXPENDABLE PIN

13

6/3

REMOVING AND REFITTING A CYLINDER

14

6/4

REMOVING AND REFITTING A BOOM ASSEMBLY

14

6/5

REMOVING AND REFITTING ROTARY ACTUATOR

15

CHECK AND ADJUSTMENT

15

7/1

HOSE CONDITION CHECK

15

7/2

CHECK WELDING CONDITION USING CRACK DETECTOR PRODUCTS

15

7/3

CONTROL/ADJUSTMENT OF CLEARANCE BETWEEN ARMATURE AND EXTENSION TUBE 16

7/4

CONTROL THE WEAR OF THE EXTENSION TUBE

17

7/5

DISMANTLE THE BOOM EXTENSION CYLINDER

17

LIFTING - HANDLING

18

PERIODIC MAINTENANCE TABLE - B26 F AND B26XL F BOOM

19

SANDVIK TAMROCK SECOMA S.A.S


19 avenue De Lattre-de-Tassigny - ZI
B.P. 46 - 69881 MEYZIEU Cedex
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80

E-04-07-2005 SR-MC-FL

B26 F - B26XL F BOOM

Page 3

1 PRELIMINARY REMARKS
1/1 SAFETY
The informations contained in this manual must be studied and thoroughly assimilated before
undertaking any maintenance work on the equipment

Remember: SAFETY FIRST!


Always observe the warnings accompanied by the following symbols.
WARNING Operation, maintenance and adjustments are only allowed to persons with
specific training in operation and maintenance of the equipment. Read the operating
and maintenance instructions before using or servicing the equipment.
WARNING: Before starting any maintenance operation ensure that the machine is in a
safe location with good safety, ventilation and lighting conditions. Ensure that lifting
equipments and pedestals are compatible with elements weight. Follow all the safety
instructions and ware safety protections as gloves, goggle, helmet, safety boots, ear
protectors.
WARNING: Before any operation stabilize and fix steadily all the elements on suitable
pedestals. Stop the power packs, switch the general power breaker. Place a tag or a
board to warn other members of the personnel that maintenance work on the machine
WARNING is in progress.

WARNING

WARNING: Pressurized oil jets could cause severe injuries. Before any operation on
hydraulic circuit, STOP the power packs and release remaining pressure in
components by operating hydraulic control levers several times. Always release the
static pressure in cylinders before disassemble them.
NEVER WORK ON AN OPERATING CIRCUIT.
WARNING: While tests are in progress, do not allow any other member of the
personnel to stand in the area surrounding the machine. Stay at the control station to
be able to stop the movement and switch off the power pack.

WARNING

WARNING: Maintenance, adjustment and repairs are restricted to qualified personnel


with special training for the particular equipment. Always read the instructions carefully
before starting any maintenance work.
WARNING

CAUTION: Always use suitable tools and work in a clean place when dismantling and
assembling hydraulic components. After removing cylinders the hydraulic inlet/outlet
ports must be plugged to prevent dirt and air intrusion during operation.
WARNING: The operator must always wear required personal protection, such as safety
helmet, protective overall, safety boots, hearing protectors, safety goggles etc.

WARNING

WARNING: Danger of high pressure oil jets.


High pressure oil jets can cause serious personal injuries.
Release the pressure in the hydraulic circuits before opening caps or connections.
(Accumulator, Cylinder and Hydraulic circuit)
SANDVIK TAMROCK SECOMA S.A.S
19 avenue De Lattre-de-Tassigny - ZI
B.P. 46 - 69881 MEYZIEU Cedex
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80

Page 4

B26 F - B26XL F BOOM

E-04-07-2005 SR-MC-FL

WARNING: Danger of hot surface.


Hot surface can cause serious injuries.
Components rod, shank or hydraulic component can be hot and before
starting a maintenance work, please let them cool off.
The operator must have adequate wears as gloves.
WARNING: Crushing hazard : do not stay in dangerous area, for instance: central
articulation, front chassis and rear chassis.
WARNING

SAFETY

Always follow the


marked safety instructions, and
observe caution while working.
The following safety instructions are general rules.
Keep tools and drilling
equipment clean.

Do not attempt any such repairs or adjustments that you do not fully
understand.

ABOUT THE SAFETY OF REPAIRS

Certain workstages require the use of the feed mechanism during the repair.
Make sure then that:
- no danger is caused to anybody.
- the machine can be immediately stopped when necessary.
- the powerpack is stopped again before the repair-work is continued.
Before starting any repair-work move away from the area where you have just
drilled.
Use proper tools.

Always wear protective clothing, eye protection, earmuffs, safety footwear, and
other safety equipment required by the work.

SANDVIK TAMROCK SECOMA S.A.S


19 avenue De Lattre-de-Tassigny - ZI
B.P. 46 - 69881 MEYZIEU Cedex
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80

E-04-07-2005 SR-MC-FL

B26 F - B26XL F BOOM

Page 5

1/2 ABOUT THIS BOOKLET


The present manual is destined for the use of personnel in charge of carrying out, servicing and
maintenance operations on Jumbos.
It contains maintenance operations schedule and operating methods concerning the main elements of
the B26 F - B26XL F BOOM.
Note that servicing and maintenance operations must be carried out by personnel with the required
qualifications, technical knowledge, and proper training on the machine.

SANDVIK TAMROCK SECOMA S.A.S


19 avenue De Lattre-de-Tassigny - ZI
B.P. 46 - 69881 MEYZIEU Cedex
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80

Page 6

B26 F - B26XL F BOOM

E-04-07-2005 SR-MC-FL

2 DESCRIPTION
2/1 EXPLANATION
B26 F - B26XL F BOOM are multidirectional and telescopic booms fitted with an hydraulic parallelism
system. They can be used for face, wall, roof or floor drilling and for initiating cross-cuts, by swinging
the drill feed through a combination of 8 movements.
B26 F boom can extend with a 1200mm translation ( motion 3 ).
B26XL F boom can extend with a 1700mm translation ( motion 3 ).

5
3

2/2 FEATURES

SEE ENCLOSED TECHNICAL DATA SHEET.

SANDVIK TAMROCK SECOMA S.A.S


19 avenue De Lattre-de-Tassigny - ZI
B.P. 46 - 69881 MEYZIEU Cedex
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80

B26 F - B26XL F BOOM

E-04-07-2005 SR-MC-FL

Page 7

2/3 MAIN COMPONENTS


The boom is fixed to the chassis by the boom swing cradle 1.
The extension tube 8 slides in the armature tube 4 driven by the cylinder situated inside the armature.
The boom movements are controlled by the cylinders 2 and 3.
The rotation of the drill feed in relation to the booms axis is make wiht the rotary actuator 5 allows 360..
The drill feed support 7 is fitted with a feed cylinder 6. The cylinder 9 makes the divergency movement.
Hydraulic parallelism system enable to keep a constant drill feeds direction while swinging the boom
on both vertical and horizontal motions. Parallelism by a vertical plane is obtained with an hydraulic link
between the master lifting cylinder 3 and the slave cylinder 10.
Parallelism by a horizontal plane is obtained with an hydraulic link between the master cylinder 11 and
the slave cylinder 12.
NOTE: The master cylinder 11 is not powered, its purpose is only to acquire boom swinging
movements and keep parallelism.
The articulations are featured with adjustable expendable pin sets.

10

12
8

1
2

6
7

11

SANDVIK TAMROCK SECOMA S.A.S


19 avenue De Lattre-de-Tassigny - ZI
B.P. 46 - 69881 MEYZIEU Cedex
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80

Page 8

B26 F - B26XL F BOOM

E-04-07-2005 SR-MC-FL

3 MAINTENANCE OPERATIONS
CAUTION: The safety of users and the reliability of the boom depend on the maintenance operations
and imply the use of genuine SANDVICK TAMROCK SECOMA spare parts.
All defective parts must be immediately replaced.
WARNING: Maintenance, adjustment and repairs are restricted to qualified personnel
with special training for the particular equipment. Always read the instructions carefully
before starting any maintenance work.
WARNING

WARNING: While tests are in progress, do not allow any other member of the personnel
to stand in the area surrounding the machine. Stay at the control station to be able to
stop the movement and switch off the power pack.
WARNING

3/1 FIRST ENTRY INTO SERVICE


After 20 working hours or 1 week of service, check all the screws and tighten all the expendable pin.

3/2 OPERATIONS AT EACH SHIFT


Before starting up:
Check that there is no obstruction to hinder the movement of the boom.
Check the overall condition of the equipment (cylinders, hoses, tube, hydraulic unions,...).
Search for leaks.
Check the extension tube.
Lubricate all the grease points. It is important to check that the rotary actuators grease discharge
valves are working properly.
After starting up:
Move on handle the boom to check that it moves freely and operates correctly. Movement should be
regular and smooth.

3/3 50-HOURS OR WEEKLY OPERATIONS


Check that there is no obstruction to hinder the movement of the boom.
Check the overall condition of the equipment (cylinders, hoses, tube, hydraulic unions,...).
Search for leaks.
Check the extension tube.
Lubricate all the grease points.It is important to check that the rotary actuator grease discharge
valves are working properly.
Check the tightening torque of the cylinders and articulations expendable pin.

SANDVIK TAMROCK SECOMA S.A.S


19 avenue De Lattre-de-Tassigny - ZI
B.P. 46 - 69881 MEYZIEU Cedex
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80

E-04-07-2005 SR-MC-FL

B26 F - B26XL F BOOM

Page 9

3/4 200-HOURS OPERATIONS


Carry out the 50-hours operations again.
Check clearance between the boom extension tube and armature. Check the condition of the plastic
skids.

3/5 1200-HOURS OR ANNUAL OPERATIONS


Check the overall condition of the equipment.
CAUTION: Check welding condition using crack detector products.
Search for leaks.
Check the condition of the hydraulic equipments (cylinders, hoses, hydraulic unions,...).
Check the extension tube. Lubricate it.
Lubricate all the grease points.It is important to check that the rotary actuator grease discharge
valves are working properly.
Check the tightening torque of the cylinders and articulations expendable pin.

3/6 3600-HOURS OPERATIONS OVERALL INSPECTION AND RECONDITIONING


Remove the boom assembly.
Remove, dismantle and check the different parts. Remove all worn or defective parts.
Change the seals, (bronze washers),washers and extension tube guide skids.
Reassemble the boom.
Test for correct operation.
NB: You can recover all these operations in the periodic maintenance table (last page of this manual)
we invite you to use this document.

SANDVIK TAMROCK SECOMA S.A.S


19 avenue De Lattre-de-Tassigny - ZI
B.P. 46 - 69881 MEYZIEU Cedex
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80

Page 10

B26 F - B26XL F BOOM

E-04-07-2005 SR-MC-FL

4 TIGHTENING TORQUES
For basic genuine SANDVIK TAMROCK SECOMA screws and nut use the following tightening
torque:

metric dimension

M6
M8
M10
M12
M14
M16
M18
M20
M22
M24
M27
M33
M36
M39
M42

torque in Nm

torque in Nm

HEX BOLTS
GRADE 8.8

SIX CUT HOLLOW


BOLTS
GRADE 12.9

10
25
50
85
130
200
280
400
530
670
1000
1780
2300
3000
3700

16
40
80
140
210
330
460
650
880
1130
1650
2200
3850
5050
6250

800

600

800

800

400

Tightenning torques of expendable pins, see page 13


SANDVIK TAMROCK SECOMA S.A.S
19 avenue De Lattre-de-Tassigny - ZI
B.P. 46 - 69881 MEYZIEU Cedex
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80

E-04-07-2005 SR-MC-FL

B26 F - B26XL F BOOM

Page 11

5 LUBRICATION
Use Mobilith SHC 220, Mobilgrease HP 222 or equivalent.
GREASE POINTS
There is a grease nipple on any expendable pin. There is two grease nipples at each end of any rotary
actuator.
CAUTION: Check that the rotary actuator grease discharge valves are working properly. They are
situated at the opposite side of each grease nipple. Those valves must release excess grease to
avoid over-pressure and over-stress on actuators seals and flanges.
.Remove fautly valves

SANDVIK TAMROCK SECOMA S.A.S


19 avenue De Lattre-de-Tassigny - ZI
B.P. 46 - 69881 MEYZIEU Cedex
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80

Page 12

B26 F - B26XL F BOOM

E-04-07-2005 SR-MC-FL

6 OPERATING METHODS
WARNING: Before starting any maintenance operation ensure that the machine is in a
safe location with good safety, ventilation and lighting conditions. Ensure that lifting
equipments and pedestals are compatible with elements weight. Follow all the safety
instructions and ware safety protections as gloves, goggle, helmet, safety boots, ear
protectors.
WARNING: Maintenance, adjustment and repairs are restricted to qualified personnel
with special training for the particular equipment. Always read the instructions carefully
before starting any maintenance work.
WARNING

6.1 REMOVING AND REFITTING ARTICULATION EXPENDABLE PIN SET.


Before removal :
Lift or stand parts with adapted devices.
Release static pressure in hydraulic circuit and cylinders.
NOTE : Expendable blocking cones are not re-usable then you must manage their exchange
before removing them.

Grease all parts.


Centre the expendable pin in its housing
Position spacers, expendable blocking cone and caps.
Torque tighten the screw according to the diameter
(See specific tightening torques).
Operate several movement cycles and retighten the screw.
Check an retighten at weekly operation maintenance
session.

SANDVIK TAMROCK SECOMA S.A.S


19 avenue De Lattre-de-Tassigny - ZI
B.P. 46 - 69881 MEYZIEU Cedex
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80

B26 F - B26XL F BOOM

E-04-07-2005 SR-MC-FL

Page 13

6/2 CHECKING CYLINDER EXPENDABLE PIN

BRACKET

CYLINDER
EAR

BRACKET

The cylinder axis are expendable pin that are tightened without clearance to the bracket.
Check the tightening torque. The correct values are as follows :

TIGHTENING TORQUE OF THE CYLINDER EXPENDABLE PIN


SIZE OF CYLINDER AXIS

USING TORQUE WRENCH USING PNEUMATIC TOOL

M 12

60 Nm

55 Nm

M 16

150 Nm

135 Nm

M 20

290 Nm

270 Nm

M 24

530 Nm

490 NM

Check the position of the cut in the expendable pin. the cut must be at 90 to the cylinders direction of
movement, see if the expendable pin is carfully lubricate before installing.

When a cylinder is removed, make sure that no part of the boom is left
unsuported

SANDVIK TAMROCK SECOMA S.A.S


19 avenue De Lattre-de-Tassigny - ZI
B.P. 46 - 69881 MEYZIEU Cedex
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80

Page 14

B26 F - B26XL F BOOM

E-04-07-2005 SR-MC-FL

6/3 REMOVING AND REFITTING A CYLINDER


Removal:
Lift or stand the boom with adapted devices to prevent a sudden fall of moving parts when operating
decompression.
WARNING: Stop power packs and proceed an hydraulic circuit decompression.
Disconnect hydraulic hoses and plug the inlet/outlet ports of the cylinder.
Fasten the cylinder to prevent its fall.
Remove expendable pin sets.
Refitting:
Place the cylinders rear knuckle in the yoke, insert the expendable pin set and screw. Do not fully
tighten.
Adjust rod extension to place the front knuckle on the other yoke. Insert axis set. Tighten both of them
(See "tightening torques" page 10).
Reconnect hoses.
Pressurize the circuit, bleed and test.
WARNING: While tests are in progress, do not allow any other member of the personnel
to stand in the area surrounding the machine. Stay at the control station to be able to
stop the movement and switch off the power pack.
WARNING

For more informations about the cylinders mounting, see the cylinder
maintenance manual in SECTION 1.
6/4 REMOVING AND REFITTING A BOOM ASSEMBLY
Removal :
Line up the boom horizontally and align it with expendable pin.
Remove the drill feed assembly.
Sling boom.
Stop the power pack and release remaining pressure in hydraulic components and hoses by
operating control levers several times.
Disconnect hydraulic hoses and plug the inlet/outlet ports.
Remove the boom swing cylinder.
Extract swinging expendable pin set and remove the boom.
Refitting :
Check elements condition, replace if necessary.
Assemble and lubricate elements.
Connect hoses.
Bleed and breeze hydraulic circuit.
Proceed tests.
SANDVIK TAMROCK SECOMA S.A.S
19 avenue De Lattre-de-Tassigny - ZI
B.P. 46 - 69881 MEYZIEU Cedex
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80

E-04-07-2005 SR-MC-FL

B26 F - B26XL F BOOM

Page 15

6/5 REMOVING AND REFITTING ROTARY ACTUATOR


Removal:
WARNING: Stop the power packs and proceed an hydraulic circuit decompression.
Before removal mark the relative position of booms elements with actuators flanges.
Sling or stand the elements with adapted devices to prevent a sudden fall of moving parts.
Disconnect hydraulic hoses and plug the inlet/outlet ports.
Secure an fasten the rotary actuator to prevent its fall.
Remove it.
Refitting:
Check expendable pin play, and adjust if necessary.
Exchange all flanges screws.
Apply LOCTITE ADHESIVE 317 on surfaces.
Torque tighten flanging screws.

For more informations about the cylinders mounting, see the cylinder
maintenance manual in SECTION 1.

7 CHECK AND ADJUSTMENT


7/1 HOSE CONDITION CHECK
Oil leakages may involve reliability and safety problems, it is imperative to exchange leaking
elements immediately.

WARNING

WARNING: Pressurized oil jets could cause severe injuries. Before any operation on
hydraulic circuit, STOP the power packs and release remaining pressure in
components by operating hydraulic control levers several times. Always release the
static pressure in cylinders before disassemble them.
NEVER WORK ON AN OPERATING CIRCUIT.

7/2 CHECK WELDING CONDITION USING CRACK DETECTOR PRODUCTS


Stress, vibrations, impacts, corrosive agents could cause invisible cracks in weldings.Then it is
extremely important to checks them in order to prevent breakdowns, accidents and injuries risks.

SANDVIK TAMROCK SECOMA S.A.S


19 avenue De Lattre-de-Tassigny - ZI
B.P. 46 - 69881 MEYZIEU Cedex
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80

Page 16

B26 F - B26XL F BOOM

E-04-07-2005 SR-MC-FL

7/3 CONTROL/ADJUSTMENT OF CLEARANCE BETWEEN ARMATURE AND EXTENSION


TUBE
UPPER1
UPPER2

LEFT2
LEFT1

2
1

RIGHT2

LOWER1
LOWER2

RIGHT1

Gap check
Line up the boom horizontally and align it with jumbos axis.
remove plate 1 and dust seal 2.
Fully extend the tube and clean it.
Gauge the gap A between tube and armature.
Sling the end of the tube and raise it.
Gauge the gap B between tube and armature.

GAP A
Jeu
A

The clearance between the tube and the armature is


estimated as following:
Skidss clearance: J= A - B
CAUTION:
MAXIMUM CLEARANCE J= 2mm

GAPBB
Jeu

Clearance adjustment
Untie and let the boom rest by its own weight then
remove plate, shims and skids LOWER2 and UPPER1.
Measure the skids thickness, it must be above 27 mm.
Measure the shims + skid stack, it must be above 37 mm
Minimum thickness of all the skids = 27mm
Minimum thickness of shims + skid stack = 37mm
Replace all the 16 skids if one reaches the minimum thickness.
It will be helpful to note for the next step: the thickness value of LOWER2 and UPPER1 stacks.
Maximum thickness difference between LOWER2 & UPPER1 stacks must not exceed 3mm.
SANDVIK TAMROCK SECOMA S.A.S
19 avenue De Lattre-de-Tassigny - ZI
B.P. 46 - 69881 MEYZIEU Cedex
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80

B26 F - B26XL F BOOM

E-04-07-2005 SR-MC-FL

Page 17

Reassemble LOWER2 & UPPER1 shims and skids and affix plates.
Sling the end of the tube and raise it. Remove LOWER1 & UPPER2 skids.
Check skids condition and replace if they are beyond limits.
Adjust shim stack in order to have the same thickness for LOWER1 & LOWER2. Then Adjust shim
stack in order to have the same thickness for UPPER1 & UPPER2.
This levelling ensure a good parallelism between tube and armature axis.
Refit all parts and check J clearance, if it stays beyond limit value put shims on UPPER1 & UPPER2
stacks. (there are two type of shims: 0.5mm and 1mm).
NOTE: Tighten plates screws at 150Nm torque.
Lubricate tube and proceed following tests:
Extend and retract tube in horizontal position. Gauge hydraulic operating pressure needed in cylinder
while operating backward and forward movements.
Max. pressure for forward translation: 120bar
Max. pressure for backward translation: 180bar
In overpressure situation, free the tube translation by removing a 0.5mm shim in UPPER1 & UPPER2
stacks.
Proceed similar operations for lateral clearance adjustment.

7/4 CONTROL THE WEAR OF THE EXTENSION TUBE


Check the extension tube wear on the
contact area with skids. Wear must not
be superior to 1,5 mn.

SECTION A-A

1,5mn

1,5mn

7/5 DISMANTLE THE BOOM EXTENSION CYLINDER


The boom extension cylinder is inside the armature tube, and is fixed to the armature tube and to the
extension tube. To remove is cylinder you must have to take off the boom from the machines frame.
The figure show you the lay-out of the screws used to fixe the cylinder to the armature tube (Detail A).

DETAIL A

SANDVIK TAMROCK SECOMA S.A.S


19 avenue De Lattre-de-Tassigny - ZI
B.P. 46 - 69881 MEYZIEU Cedex
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80

Page 18

B26 F - B26XL F BOOM

E-04-07-2005 SR-MC-FL

8 LIFTING - HANDLING
LIFTING POINTS.
WARNING: WARNING: Before starting any maintenance operation ensure
that the machine is in a safe location with good safety, ventilation and
lighting conditions. Ensure that lifting equipments and pedestals are
compatible with elements weight. Follow all the safety instructions and
ware safety protections as gloves, goggle, helmet, safety boots, ear
protectors.

WARNING: Check ties you use, they must be in good condition and fit the weight of the assembly
you are going to lift.
Fasten correctly the elements before starting operations.

YES

NO
YES

NO

SANDVIK TAMROCK SECOMA S.A.S


19 avenue De Lattre-de-Tassigny - ZI
B.P. 46 - 69881 MEYZIEU Cedex
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80

B26 F - B26XL F BOOM

E-04-07-2005 SR-MC-FL

Page 19

9 PERIODIC MAINTENANCE TABLE - B26 F - B26XL F BOOM

CHECK
TEST

LUBRICATE

CLEAN
FLUSH

CHANGE
REPLACE

When
completed
Y
N
600 1200 1800 2400 3600
yes
no

FREQUENCY (PERCUSSION HOURS)

BOOM
Daily

50

200

SERVICE

All tightenning torques


All grease points
All weldings
Leakage
All equipments condition
Freedom and condition of moooving parts
Hoses / Union / Fitting
Extension tube
Dust seal
Skids (clearence between skids and tube)
Rotary actuator discharge valves
Rotary actuator flanges screw (tightening torque
and axial play)

Overal inspection :
Remove the boom from the machine / Wash and
check all the assembly / Exchange all worn out
parts / Test the boom.

SANDVIK TAMROCK SECOMA S.A.S


19 avenue De Lattre-de-Tassigny - ZI
B.P. 46 - 69881 MEYZIEU Cedex
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80

Page 20

B26 F - B26XL F BOOM

Technical Specification
4-200 S-C

E-04-07-2005 SR-MC-FL

B 26 F Boom

2003-10-21

Boom Swing
Boom Extension
Divergence

Feed Extension

Boom Lift

Feed Swing
(main)

Feed Swing
(slave)

Feed Tilt

Feed Roll-over
Ensure horizontal //
Ensure vertical //

APPLICATION

DESCRIPTION

B 26 F boom is designed for Tamrock Axera D05, Axera


D06 and Axera LP jumbos.

The x-y coordinated boom movements together with


360 actuator roll-over make the use of the boom simple
and logical. Accurate automatic parallel holding both in
vertical and horizontal plane improves the drilling
performance and accuracy.

B 26 F boom is a hydraulic universal roll-over boom for


mechanized tunnelling, drifting, cross-cutting and bolthole drilling in medium sections. It can also be used for
production drilling with cut-and-fill and room-and-pillar
methods.
This parallel holding telescopic boom offer large true
rectangular face coverage area.

Large dimensioned rectangular profile,adjustable and


sealed boom extension wear-pieces, large diameter
bearings, sealed main joints, expanding pins in cylinder
joints and use of super strong cast pieces in most
stressed areas are some of the features that are
included to the boom design for improved reliability.

TECHNICAL DATA
Coverage with parallelism holding
Coverage with manual override
Weight, without hoses
Weight allowed
Boom telescopic extension
Boom lift, up and down
Boom swing, symmetric
Feed tilt, up and down
Feed swing, symmetric
Divergence, up and down
Feed extension
Feed roll-over

29,2 m
38,9 m
1 850 kg
1 050 kg
1 200 mm
45 and 16
45
25 and 50
50
3 and 90
1 600 mm
360

SANDVIK TAMROCK SECOMA S.A.S


19 avenue De Lattre-de-Tassigny - ZI
B.P. 46 - 69881 MEYZIEU Cedex
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80

B26 F - B26XL F BOOM

E-04-07-2005 SR-MC-FL

Page 21

Technical Specification
4-200 S-C

B 26 F Boom

2003-10-21

COVERAGE AREA

6000

5300

1870

5510
6490

GENERAL DIMENSIONS

1253

2600

3
45

1600

90

356

360
572

16
25

50

1200

50

50

31
(45)

26
(45)

www.tamrock.sandvik.com
Sandvik Tamrock reserve the right to change this specificationwithout further notice

SANDVIK TAMROCK SECOMA S.A.S


19 avenue De Lattre-de-Tassigny - ZI
B.P. 46 - 69881 MEYZIEU Cedex
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80

Page 22

B26 F - B26XL F BOOM

Technical Specification
4-300 S-C

E-04-07-2005 SR-MC-FL

B 26 XL F Boom

2003-10-21

Divergence

Feed Swing
(slave)

Boom Extension

Feed Extension

Boom Swing

Feed Roll-over

Feed Tilt
Boom Lift

Ensure horizontal //
Ensure vertical //

Feed Swing
(main)

APPLICATION

DESCRIPTION

B 26 XL F boom is designed for Tamrock Axera D05,


Axera D06 and Axera LP jumbos.

The x-y coordinated boom movements together with


360 actuator roll-over make the use of the boom simple
and logical. Accurate automatic parallel holding both in
vertical and horizontal plane improves the drilling
performance and accuracy.

B 26 XL F boom is a hydraulic universal roll-over boom


for mechanized tunnelling, drifting, cross-cutting and
bolt-hole drilling in medium sections. It can also be used
for production drilling with cut-and-fill and room-andpillar methods.
This parallel holding telescopic boom offer large true
rectangular face coverage area.

Large dimensioned rectangular profile,adjustable and


sealed boom extension wear-pieces, large diameter
bearings, sealed main joints, expanding pins in cylinder
joints and use of super strong cast pieces in most
stressed areas are some of the features that are
included to the boom design for improved reliability.

TECHNICAL DATA
Coverage with parallelism holding
Coverage with manual override
Weight, without hoses
Weight allowed
Boom telescopic extension
Boom lift, up and down
Boom swing, symmetric
Feed tilt, up and down
Feed swing, symmetric
Divergence, up and down
Feed extension
Feed roll-over

41,4 m
52,7 m
1 960 kg
850 kg
1 700 mm
45 and 16
45
25 and 50
50
3 and 90
1 600 mm
360

SANDVIK TAMROCK SECOMA S.A.S


19 avenue De Lattre-de-Tassigny - ZI
B.P. 46 - 69881 MEYZIEU Cedex
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80

B26 F - B26XL F BOOM

E-04-07-2005 SR-MC-FL

Page 23

Technical Specification
4-300 S-C

B 26 XL F Boom

2003-10-21

COVERAGE AREA

7040

6340

2160

6530
7490

GENERAL DIMENSIONS

1253

3170

3
45

1600

90

356

360
572

16
25

50

1700

50

50

31
(45)

26
(45)

SANDVIK TAMROCK SECOMA S.A.S


19 avenue De Lattre-de-Tassigny - ZI
B.P. 46 - 69881 MEYZIEU Cedex
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80

Page 24

B26 F - B26XL F BOOM

SANDVIK TAMROCK SECOMA S.A.S


19 avenue De Lattre-de-Tassigny - ZI
B.P. 46 - 69881 MEYZIEU Cedex
Tel : (33) 472 45 22 00 Fax : (33) 478 31 79 80

E-04-07-2005 SR-MC-FL

You might also like