You are on page 1of 275

STANDARD SCHEDULE OF RATES

FOR THE YEAR 2014-2015

PROCEEDING OF THE MANAGING DIRECTOR, TWAD BOARD,


HEAD OFFICE, CHEPAUK, CHENNAI-5
PRESENT: THIRU C.VIJAYARAJ KUMAR, I.A.S.,
MANAGING DIRECTOR
Proc.No. 6682/SDO.4/COM/2014/dt. 30.10.2014

Sub

: TWAD Board-Schedule of Rates for 2014-15 State Level


Technical Committee-Rates finalized Communicated reg.

Ref

: 1. Managing Director, TWAD Board, Chennai-5 Proc.No.3397/


SDO.4 / COM / 2014 / dt. 09.07.2013.
2. The Secretary to Govt. (Expenditure), Finance
Department, Secretariat, Chennai.9 Lr.No.178/ Secy (Exp)/
2014-3 dt. 08.09.2014 communicated vide Deputy
Secretary to Government, MA & WS Department,
Secretariat, Chennai.9 Lr. No. 19308/WS.4/2014-3 dt.
16.09.2014.
3. Minutes of the Special Committee meeting held on
21.10.2014.
4. Minutes of the State Level Technical Committee meeting
held on 27.10.2014 at TWAD Board, Head Office, Chennai.5
****

In the reference first cited, a copy of the approved Schedule of Rates of TWAD Board
for the year 2013-14 was communicated to all the Chief Engineers, Superintending Engineers,
Executive Engineers of TWAD Board for adoption.
Necessary proposals were called for, for the revision of rates for adoption during
2014-15. In the minutes of the meeting held under the Chairmanship of Principal Secretary
to Government, Finance Department on 03.09.2014, communicated in the ref 2nd cited, a
Special Committee of Govt. to finalise Schedule of Rates for TWAD Board and CMWSS Board
was formulated. The Special Committee reviewed the proposals of TWAD Board Schedule of
Rates, analysed and after detailed deliberations recommended the rates in the reference 3rd

cited for adoption of the Schedule of Rates for the year 2014-15 for TWAD Board. The
proposals recommended by Special Committee of Government were placed before the State
Level Technical Committee meeting held on 27.10.2014 at TWAD Board, Head Office for
discussion and taking decision. The State Level Technical Committee after detailed discussion
approved the proposals with certain recommendations.
Based on the recommendations of State Level Technical Committee a draft Schedule of
Rates for 2014-15 were prepared and approved by the Committee.
The copy of the approved Schedule of Rates of TWAD Board for the year 2014-15 is
communicated to all the Chief Engineers, Superintending Engineers and Executive Engineers
of TWAD Board for adoption with effect from 01.07.2014 onwards.
The Chief Engineers, Superintending Engineers and Executive Engineers are requested
to acknowledge the receipt of this proceeding along with the enclosures.
Encl. : One booklet of TWAD Board
Schedule of Rates for 2014-15

Sd./Managing Director
TWAD Board, Chennai.5.

To
All the Chief Engineers/Superintending Engineers/Executive Engineers of TWAD Board.
All the Joint Chief Engineers of Head Office, TWAD Board, Chennai.5

TAMILNADU WATER SUPPLY AND DRAINAGE BOARD STANDARD


SCHEDULE OF RATES FOR THE YEAR 20142015
INDEX
Sl.
No.

CONTENTS

PAGE NO

General Notes

II

Rates for Labour

III

Rates for Materials

IV

Rates for pump sets

Rates for Building Materials

127-136

VI

Rates for other Construction Materials

137-152

VII

Rates for Electrical Items

153-172

VIII

Rates for work

173-202

IX

Rates for Conveyance of Materials

203-214

Rates for Miscellaneous items

215-228

XI

Rates for Earth work Excavation for pipe laying works

229-232

XII

Rates for Earth works Excavation and


Refilling for pipe line works on Linear Measurement Basis

XIII

1-8
9-14
15-91
93-125

233-235

Rates for Earth work Excavation other than


pipe laying and wells

237-250

GENERAL NOTES

I. GENERAL NOTES

1.

For items not covered in the schedule of rates, the Superintending Engineer
can fix the rates based on the lowest sealed quotations duly observing all the
departmental formalities under intimation to the concerned Chief Engineer
and Head Office.

2.

For special nature of works, for which rates are not covered in the Schedule
of Rates, such as Road works, Water Supply, Drainage etc., separate schedule
of rates issued by the respective Officers/Department / Board are to be
followed.

3.

Extra percentage other than those for the specified areas noted below, shall
not be allowed.

1.

Corporation Limits.
An extra 10% on the Rates of Labour, Rates of Works and for Head Load
shall be allowed for the works in Chennai Corporation limit & belt area of
32 km around Chennai Corporation, Madurai Corporation limits, Coimbatore
Corporation limits and also for works in Hosur Taluk.

2.

An extra 5% on the Rates of Labour, Rates of Works and for Head Load
shall be allowed for the works in Trichy, Salem, Tirunelveli, Tiruppur, Erode,
Thoothukudi and Vellore Corporation limits.

3.

Restricted areas:
I.

An extra 10% on the Rates of Labour and Rates of Works shall be


allowed for sewer works under unhygienic condition.

II.

An extra 10% on the Rates of Labour, Rates of Works and Conveyance


charges shall be allowed for works in the campus of Central Jails.

III. An extra 5% on the Rates of Labour, Rates of Works and Conveyance


charges shall be allowed for works in the campus of Sub-Jails.
IV. An extra 20% on the Rates of Labour, Rates of Materials, Rates of
Works, Conveyance Charges and Head Load shall be allowed for works
in Reserve Forest Areas.
4.

Special Nature of Works


I.

i.

5 times over the basic rates for earthwork excavation for both
rural and urban areas is allowed for putting trial pits.

ii.

5 times over the basic rates for earthwork excavation for leak
rectification works is allowed.

iii.

If the works are done (leak rectification works) in odd hours


(i.e) 8.00PM to 8.00AM of the next day, 7.50 times over the
basic rate is allowed.

II.

For individual footings of the service reservoirs, valve pits double


the relevant rate for earthwork excavation is allowed.

III.

An extra 5% is allowed for laying of sewers under UGSS for earthwork


excavation alone below 4m depth.

5.

For Works in Hills:


As the transport facilities in most of the Hilly Areas are now considerably
improved and as there is no necessity for allowing extra percentage as hitherto
followed, the Hilly Areas are now again regrouped as detailed hereunder and
the extra percentage allowable has been revised accordingly and fixed.
The conveyance table approved and furnished in the Schedule of Rates
under the Head Conveyance table, Conveyance of materials by Road
on hills shall be adopted for all works in hills.

i.

For works in Nilgiris District an extra 40% on the rates of labour, rates of
work, head load and an extra 25 % on the rates of materials shall be
allowed.

ii.

For works in Mudumalai Sanctuary, Shandy Nallah Sheep Farm,


Dansandle areas, an extra 40% over rates of labour, rates of work and
head load and an extra 25% on the rates of materials shall be allowed.

iii.

works in Valparai Area an extra 40% on the rates of labour, rates of


work, head load and an extra 25% on the rates of materials shall be allowed.

iv.

For works in Gudiyalathur, Siruvani, Thavalamalai Hills, Talavadi Hills,


Bargur Hills, Anamalai, Chennimalai and Sivanmalai Hills an extra 20%
on the Rates of Labour, Rates of Materials, Rates of Works and Head Load
shall be allowed.

v.

For works in Western Ghats of Virudhunagar, Coimbatore, Tirunelveli &


Kanyakumari Districts an extra 20% on the Rates of Labour, Rates of
Materials, Rates of Works and Head Load shall be allowed.

vi.

(a) An Extra 50% on the Rates of Labour for works in Thekkady shall be
allowed.
(b) Add 25% extra shall be allowable on the Rates of Materials which are
to be supplied at Thekkady, subject to the condition that there shall not be
any extra on conveyance, tollgate fee, interstate allowance,

etc. The

conveyance charge as applicable for Ghat Road, Cart Track, etc., as per
schedule of rates is only applicable.
vii. An extra 60% shall be allowable on the Rates of Materials to be supplied
for Periyar Dam Site subject to the condition that there shall not be any
extra on conveyance, tollgate fee, interstate allowance, etc. The conveyance
charge as applicable for Ghat Road, Cart Track, etc., as per Schedule of Rates
is only applicable.
viii. An extra 100% on the Rates of Labour for works in Periyar Dam Site under
normal condition shall be allowed.
ix.

An extra 150% on the Rates of Labour for works in Periyar Dam Site under
hanging condition shall be allowed

x.

An extra 50% on the Rates of Labour, Rates of Materials, Rates of Works


and Head Load shall be allowed for works at Lower Camp above Kuruvanthu
Bridge, Bodi Hills, Cumbam mettu, Sirumalai, Pachai Kamatchi Hills, Palani
Hills, Thiruparankundram Hills, Idumban Hills, Megamalai Panchayat and
Thummakundu Panchayat.

xi.

An extra 40% on the Rates of Labour, Rates of Works and Head Load and
an extra 25% over the rates of materials shall be allowed for the works at
Kodaikanal.

xii. An extra 25% on the Rates of Labour, Rates of Materials, Rates of Works
and Head Load shall be allowed for works in Yercaud, Yercaud Sub-Taluk,
Boothamalai, Aranuthumalai, Sarugumalai and Thiruchengode Hills in Salem
& Namakkal District.
xiii. An extra 40% on the Rates of Labour, Rates of Works and Head Load and
an extra 25% over the Rates of Materials shall be allowed for works in
Kalrayan Hills, Pachamalai Hills and Kolli Hills in Salem & Namakkal Districts.
xiv. An extra 40% on the Rates of Labour, Rates of Works and Head Load and
an extra 25% over the Rates of Materials shall be allowed for works in
Jawadhu Hills, Elagiri Hills, Kalrayan Hills, Nakkanamalai Hills, Naickerneri Hills
in Thiruvannamalai and Vellore Districts.
xv. An extra 40% on the Rates of Labour, Rates of works and Head Load and
an extra 25% over the Rates of Materials shall be allowed for works in
Piranmalai covering Oduvarpatti, Kattugudipatti, Ponnadaipattu, V.Pudur Village,
Mamalai covering Vannar Irruppu, Nagamangalam Villages, Usilamalai covering
Poolankurichi Village, Hillocks at Musundapatti, Usilam, Ammapatti and
Thuthampatti in Sivagangai District.

xvi. An extra 40% on the Rates of Labour, Rates of Works and Head Load and
an extra 25% over the Rates of Materials
shall be allowed for works in
Chitteri Hills, Sittiling in Kalrayan Hills in Dharmapuri District.
xvii. An extra 40% on the Rates of Labour, Rates of Works and

Head Load and

an extra 25% over the Rates of Materials shall be allowed for works in
Kalrayan Hills in Cuddalore and Villupuram Districts.
xviii.An extra 40% on the Rates of Labour, Rates of Works and Head Load and
an extra 25% over the Rates of Materials shall
be allowed for works in
Pachamalai Hills in Trichy, Karur and Perambalur Districts.
6.

ISLANDS in Ramanathapuram District:


a.

For works in Rameswaram Island:


An extra 25% on the Rates of Labour, Rates of Works and Head Load
shall be allowed.

b.

For works in Other Islands:


An extra 125% on the Rates of Labour, Rates of Materials, Rates of
Works, Conveyance Charges and Head Load shall be allowed for other
Islands in Ramanathapuram viz., (1) Upputhannie Island,
(2) Puleevilaichalli Island, (3) Aalaippar Island, (4) Valimunai Island,
(5) Appa Island, (6) Thalaiyari Island,
(7) Valai Island, (8) Mullai
Island, (9) Manoli Island (10) Minoliputti Island, (11) Nadu Island,
(12) Nallathannie Island, (13) Pullivasal Island, (14) Poomarichan Island,
15) Muyal Island, (16) Singala Island and (17) Kurusedar Island.

c.

For works in Islands of Thoothukudi District:


An extra 125% on the Rates of Labour, Rates of Materials, Rates of
Works, Conveyance Charges and Head Load shall be allowed for Van,
Kasuvar, Karaichalli Island and Vilankuchali Islands.

7. TUNNELS:
An extra 15% on the Rates of Labour and Rates of Works shall be allowed
for works inside Tunnels.
8.

DAM SITES UNDER HANGING CONDITION (Other than Periyar Dam


Site)
An extra 75% on the Rates of Labour employed for the items of works,
which may have to be executed by hanging from the top of Dam through
slings (or) rope ladders to work in dizzy height. (This will apply only
for maintenance and repair works).
4

9.

General Foot Note:


i)

The rates of labour means the labour rates fixed under the head, Rates
of Labour.

ii)

Rates of works includes the labour for earthwork, refilling foundation,


dismantling, jungle clearance, head load etc. also where human labour
alone is involved.

iii)

The percentage increase provided for the materials are applicable only
for the materials which are quarried or manufactured locally in
the specified area.

iv)

The percentage increase provided for Rates of Works are allowable


only on the items where human labour alone is involved.

v)

The percentage increase provided for Conveyance Charges are allowable


for the distance covered in the specified area/ Special Tract only.

vi)

The extra percentage allowable as specified above shall not be applicable


for the materials / works covered under Rates of other construction
materials and Rates of Electrical items of works. Similarly, no
conveyance charges shall be allowed for the items covered under these
two categories.
work.

vii)

The rates approved therein are applicable at site of

While adopting source of any materials inside the special tracts viz.,
Corporation limits, Reserve Forest Areas, Hilly areas, Islands, Dam Sites
etc., where extra percentage allowable for the materials which are quarried
or manufactured locally, it is the duty of the officer in charge of the work
(not below the rank of Assistant Executive Engineer), to analyse and
confirm whether the finished cost of such materials/ works are higher if
the materials are conveyed and brought to the site from the areas
outside the specified area, where such extra percentage are not
permissible.

10. LEAD
District-wise average lead may be approved by the concerned Chief
Engineers based on the approved quarry by the PWD.

STATEMENT SHOWING THE EXTRA PERCENTAGE ALLOWABLE AS PER


GENERAL NOTE TO SCHEDULE OF RATES FOR THE YEAR 2014-2015
PERCENTAGE EXTRA ALLOWABLE ON
Sl.
No.

2.

3.

Area

For
works
in
Chennai
Corporation limits and belt area
of 32 KM around Chennai
Corporation,
Madurai
Corporation limits, Coimbatore
Corporation limits and also for
works in Hosur Taluk.
For works in Trichy, Salem,
Tirunelveli, Tiruppur, Erode,
Thoothukudi and Vellore
Corporation limits.

Labour

Material

Rate of work
(where
human labour
involved)

10%

10%

10%

5%

--

5%

5%

Conveyance

Head
Load

Restricted Areas

i.

For Sewer works


unhygienic condition

under

10%

10%

ii

For works in Central jail Campus

10%

10%

10%

iii

For works in Sub Jail Campus

5%

5%

5%

iv

For works in Reserve Forest


Areas

20%

20%

20%

20%

20%

Hills

i.

For works in Nilgiris District

40%

25%

40%

40%

ii.

For works at Mudumalai


Sanctuary, Shandy Nalla Sheep
Form, Dansandle Area

40%

25%

40%

40%

40%

25%

40%

40%

20%

20%

20%

20%

20%

20%

20%

20%

iii
iv

v.

For works at Valparai


For works at Gudiyalathur,
Siruvani, Thavalamalai Hills,
Thalavadi Hills, Bargur Hills,
Anamalai, Chenni Malai and
Sivanmalai Hills
For works in Western Ghats of
Virudhunagar, Coimbatore,
Tirunelveli and Kanyakumari
Districts.

PERCENTAGE EXTRA ALLOWABLE ON


Sl.
No.

Area

Labour

Material

Rate of work
(where
human labour
involved)

50%

25%

Conveyance

Head
Load

In Madurai, Theni & Dindigul


Districts.
vi.

For works at Thekkady

vii

For works at Periyar Dam Site

60%

viii

For works at Periyar Dam Site


under normal condition

100%

ix

For works at Periyar Dam Site


under hanging condition

150%

For works at Lower Camp above


Kuruvanthu Bridge, Bodi Hills,
Cumbum Mettu, Sirumalai,
Pachai Kamatchi Hills, Palani
Hills, Tiruparankundram Hills,
Irdumban Hills, Megamalai
Panchayat and Thummakundu
Panchayat

50%

50%

50%

50%

xi

For works at Kodaikanal

40%

25%

40%

40%

xii.

For works at Yercaud Hills,


Yercaud
Sub-Taluk,
Boothamalai, Aranuthumalai,
Sarugumalai and Tiruchengodu
Hills in Salem & Namakkal
Districts.

25%

25%

25%

25%

40%

25%

40%

40%

40%

25%

40%

40%

40%

25%

40%

40%

xiii

xiv

xv.

For works at Kalrayan Hills,


Pachamalai Hills, Kolli Hills in
Salem and Namakkal Districts.
For works at Jawadhu Hills,
Elagiri Hills, Kalrayan Hills,
Nakkanamalai Hills, Naickenneri
Hills in Thiruvannamalai and
Vellore Districts.
For works at Piranmalai covering
Oduvarpatti, Kattugudipatti,
Pannadaipattu, V.Pudur Villages,
Mamalai covering Vannar Iruppu,
Nagamangalam Villages, Usilamalai
covering Poolankurichi Village,
Hillocks at Musundapatti, Usilam,
Ammapatty and Thuthampatti in
Sivagangai District.

PERCENTAGE EXTRA ALLOWABLE ON


Area

Labour

Material

Rate of work
(where
human labour
involved)

For works at Chitheri Hills,


Sittiling in Kalrayan Hills in
Dharmapuri District.

40%

25%

40%

40%

For works at Kalrayan Hills in


Cuddalore and Villupuram
Districts.

40%

25%

40%

40%

For works at Pachamalai Hills in


Trichy, Karur and Perambalur
Districts.

40%

25%

40%

40%

25%

25%

25%

Sl.
No.
xvi.

xvii

xviii

Conveyance

Head
Load

ISLANDS

For works at Rameswaram


Island in
Ramanathapuram
District.

ii

For works in other Islands viz.,


Upputhannie, Puleevilaichalli,
Alaiappar, Valimunai, Appa,
Thalaiyari, Valai, Mullai, Manoli,
Minidiputti, Nadu, Nallathannie,
Pullivasal, Poomarichan, Muyal,
Singala,Kuruseedar Islands in
Ramanathapuram District.

125%

125%

125%

125%

125%

For works in Van, Kasvar,


Karaichalli and Vilankurichi
Islands in Thoothukudi District.

125%

125%

125%

125%

125%

15%

15%

75%

iii

TUNNELS

Where human labour alone is


involved

DAM SITES UNDER HANGING


CONDITION

i.

For works at dam sites other


than Periyar Dam Site, which
may be executed by hanging
from top of dam through slings
or rope ladders to work in dizzy
height.

RATES FOR LABOUR

TWAD BOARD
RATES FOR LABOUR
Schedule
Item No.
1
2
3
4
5
6
7

8
9
10

11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

Description
Driller
Assistant Driller
Special heavy labour for driving sheet pile
Boring Attendant
Water Meter Reader
Helper for Rig
a. Electrician with LEE/DEE and C certificate
b. Electrician with LEE/ DEE
C. Electrician with ITI and C Certificate
d. Electrician with ITI and B Certificate
e. Electrician with ITI
a. Pump Operator with ITI
b. Pump Operator without ITI
Laboratory Attender SSLC/ 10th Std passed
a. Filter Bed Operator with D.M.E.
b. Filter Bed Operator with ITI
c. Filter Bed operator without I.T.I.
Cleaner for Treatment Unit, Pump and vehicles
Boring Mechanic for Hand Boring set
Turn Cock (Experience in pipe line Operation
and maintenance
Fitter (Pipe laying / Bar bending) I Class
Fitter (Pipe laying / Bar bending) II Class
Sewer Cleaner
Store Attender SSLC /10th Std Passed
Divers and Well Sinkers
Hammer Man (Geophysical survey)
Geological Assistant
Maintenance Assistant
Plant Operator, SSLC passed with 3 years experience
Reverse Osmosis (R.O.) Plant Operator SSLC passed
with 3 years experience
Mechanic with ITI
a. Carpenter I Class
b. Carpenter II Class
a. Cleaner I Gr.
b. Cleaner II Gr.
a. Fitter I Class
b. Fitter II Class
11

Unit

Rate
in Rupees

Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day

381.00
313.00
381.00
279.00
266.00
279.00
487.00
466.00
418.00
381.00
381.00
381.00
324.00
266.00
466.00
381.00
324.00
266.00
324.00

Day
Day
Day
Day
Day
Day
Day
Day
Day
Day

266.00
357.00
331.00
266.00
266.00
487.00
266.00
390.00
279.00
313.00

Day
Day
Day
Day
Day
Day
Day
Day

381.00
381.00
401.00
368.00
215.00
203.00
363.00
339.00

Schedule
Item No.
28
29
30
31
32
33

34
35
36

37
38
39
40
41
42
43
44

45

46

Description
Floor Polisher
Gardener
Head Mazdoor for Well sinking
a. Driver (Light duty)
b. Driver (Heavy duty)
Jumper Mazdoor
a. Maistry, Road Inspector & Work Inspector
b. Maistry, Road Inspector & Work Inspector
(Degree holder)
a. Mason for Brick Work - I Class
b. Mason for Brick Work - II Class
a. Mason for Stone Work - I Class
b. Mason for Stone Work - II Class
a. Mazdoor Category I
b. Mazdoor Category II
c. Head Mazdoor
a. Moplah - I Class
a. Moplah - II Class
a. Painter/Varnisher-I Class
b. Painter/Varnisher-II Class
Pile Driver
a. Plumber I Class
b. Plumber II Class
Pump Driver
a. Stone cutter- I Class
b. Stone cutter- II Class
a. Welder/ Bracer - I Class
b. Welder/ Bracer - II Class
Well sinking Diver working with Helmet
(above two metres depth of water)
Technical Assistant
a. Technical Assistant Gr.I (BE passed)
b. Technical Assistant- Gr.II
(Diploma in Engg. Passed/ B.E. failed/
Degree in Geology for ground water)
c. Technical Assistant Gr.III
(Diploma in Engg. Failed / ITI (Civil) passed
a. Laboratory Assistant. Gr.I
(Post Graduate in Science)
b. Laboratory Assistant. Gr.II (Degree in Science/
Degree in Geology for ground water)
c.

Unit

Rate
in Rupees

Day
Day
Day
Day
Day
Day
Day

317.00
240.00
266.00
317.00
339.00
240.00
306.00

Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day

339.00
410.00
368.00
410.00
368.00
257.00
232.00
266.00
316.00
291.00
331.00
306.00
291.00
357.00
331.00
266.00
316.00
291.00
316.00
291.00

Day

368.00

Day

527.00

Day

474.00

Day

401.00

Day

401.00

Day

368.00

Day

331.00

Laboratory Assistant Grade III (with Degree


qualification to work as works clerk)

12

Schedule
Item No.
47

48
49
50
51

52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80

Description
a.
b.

Mazdoor employed for Geological maping


Mazdoor employed for Pitting, Trenching,
Sampling and Drilling works
c. Mazdoor employed for Geophysical
Investigation works
d. Head Mazdoor to supervise exploratory works
Mixer Operator (including concrete mixer )
Mixer Driver
Compressor Operator
Computer Operator
a. Gr.I [B.E. (Computer Science)/
M.Sc., (Computer Science)]
b. Gr.II [B.Sc., (Computer Science)/
Diploma in Computer Science]
Stone & Crusher Operator
Heavy Mazdoor
Wireman Grade I/ Electrician Grade I
Wireman Grade II/ Electrician Grade II
Electrical Helper
Laboratory Attendant
Electrical Maistry
Axe Mazdoor
Blacksmith - 1st Class
Blacksmith - 2nd Class
Boat Mazdoor
Bullocks pair with driver (with bandy)
Bullocks single with driver (with bandy)
Caulker
Ferry Mazdoor
Hammer Mazdoor
Mechanic - 1st Class
Mechanic - 2nd Class
Navagonies or Javali Man - 1st Class
Sawyer
Smith 1st Class
Smith 2nd Class
Sprayer Mazdoor (for bitumen, tar etc.,)
Syrang-1st Class
Syrang-2 nd Class
Thatcher
Tinker 1 st Class
Tinker 2 nd Class
Turner 1 st Class
13

Unit

Rate
in Rupees

Day

257.00

Day

257.00

Day
Day
Day
Day
Day

257.00
272.00
280.00
266.00
280.00

Day

527.00

Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day
Day

474.00
280.00
280.00
358.00
339.00
255.00
228.00
390.00
240.00
317.00
291.00
266.00
474.00
342.00
266.00
266.00
255.00
317.00
291.00
266.00
291.00
316.00
291.00
240.00
316.00
291.00
255.00
255.00
240.00
291.00

Schedule
Item No.
81
82
83
84
85
86
87
88
89
90
91

92
93
94
95
96

Description
Turner 2 nd Class
Time Keeper Ist Class
Time Keeper 2nd Class
Well Diver for removing silt - 1 st Class
Well Diver for removing silt - 2nd Class
Well sinker - 1st Class
Well sinker - 2nd Class
Wodder
Cinema Operator (ITI Passed)
B.Sc., (Agriculture) Passed
Irrigation Community Organiser Grade I
[B.E(Agri) passed/B.Sc.,(Agri)Passed/PG (Geology) &
Rural Development]
Irrigation Community Organiser Grade II [B.E (Agri)]
failed / B.Sc.,(Agri)failed /Diploma in Agri. Passed)]
Heat Master Operator
Raker
Lift Operator
Sound Service Operator

14

Unit

Rate
in Rupees

Day
Day
Day
Day
Day
Day
Day
Day
Day
Day

266.00
316.00
291.00
316.00
291.00
357.00
331.00
266.00
331.00
474.00

Day

508.00

Day
Day
Day
Day
Day

423.00
266.00
266.00
306.00
255.00

RATES FOR MATERIALS

1.0

PVC PIPE WITH EXCISE DUTY AS PER IS 4985 / 2000

Sl.
No

Description

I
1
2
3
4
5
6
7
8
9
10
11
12
13
II
1
2
3
4
5
6
7
8
9
10
11
12
13
14
III
1
2
3
4
5
6
7
8
9
10
11
12
13
14

4KSC
63mm
75mm
90mm
110mm
125mm
140mm
160mm
180mm
200mm
225mm
250mm
280mm
315mm
6KSC
50mm
63mm
75mm
90mm
110mm
125mm
140mm
160mm
180mm
200mm
225mm
250mm
280mm
315mm
10KSC
50mm
63mm
75mm
90mm
110mm
125mm
140mm
160mm
180mm
200mm
225mm
250mm
280mm
315mm

Rate for 2014-15 in


Rupees

Unit
I Quarter

II Quarter

III Quarter

Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre

54.00
76.00
107.00
156.00
203.00
253.50
332.00
423.50
521.50
668.50
813.00
1050.00
1304.50

55.00
77.50
109.00
158.50
206.50
258.00
338.00
431.00
530.50
680.00
827.00
1067.50
1327.00

55.50
78.50
110.00
160.50
209.00
261.00
342.00
436.50
537.00
688.50
837.50
1080.50
1343.50

Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre

47.00
77.00
107.50
156.00
224.50
298.00
368.00
474.50
608.00
758.50
967.00
1203.00
1511.00
1919.00

48.00
78.50
109.50
158.50
228.50
303.00
374.50
483.00
618.50
772.00
983.50
1223.50
1537.00
1952.00

48.50
79.50
111.00
160.50
231.50
307.00
379.50
489.00
626.50
781.50
996.00
1239.00
1556.00
1976.00

Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre

76.00
119.50
170.00
241.00
358.50
463.00
581.00
760.50
956.00
1216.00
1554.00
1922.50
2408.00
3047.00

77.50
121.50
173.00
245.50
365.00
471.00
591.50
774.00
973.00
1237.00
1580.50
1955.50
2449.00
3099.00

78.50
123.00
175.00
248.50
369.50
477.50
599.00
784.00
985.50
1252.50
1600.00
1979.50
2479.50
3137.00

IV Quarter

Note : The rates are inclusive of all taxes, duties and transportation charges to stockyard
anywhere in Tamilnadu. Unloading, stacking at stock yard and Conveyance from
stock yard to site are extra.Excise Duty-12.36%, VAT-5%.

17

1.1 PVC PIPE WITHOUT EXCISE DUTY AS PER IS 4985/2000


Sl.
No

Description

I
1
2
3
4
5
6
7
8
9
10
11
12
13
II
1
2
3
4
5
6
7
8
9
10
11
12
13
14
III
1
2
3
4
5
6
7
8
9
10
11
12
13
14

4KSC
63mm
75mm
90mm
110mm
125mm
140mm
160mm
180mm
200mm
225mm
250mm
280mm
315mm
6KSC
50mm
63mm
75mm
90mm
110mm
125mm
140mm
160mm
180mm
200mm
225mm
250mm
280mm
315mm
10KSC
50mm
63mm
75mm
90mm
110mm
125mm
140mm
160mm
180mm
200mm
225mm
250mm
280mm
315mm

Rate for 2014-15 in


Rupees

Unit
I Quarter

II Quarter

III Quarter

Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre

49.00
68.00
95.00
138.00
178.50
222.00
290.50
373.00
459.00
590.00
719.00
908.00
1152.00

50.00
69.00
96.50
140.50
181.50
226.00
295.50
379.50
467.00
600.50
731.50
923.50
1172.00

50.50
70.00
98.00
142.00
184.00
229.00
299.50
384.50
473.00
608.00
740.50
935.50
1186.50

Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre

40.50
69.50
95.00
136.50
196.50
261.50
326.00
420.00
532.50
668.50
856.00
1065.50
1340.50
1695.50

41.00
70.50
96.50
139.00
200.00
266.00
332.00
427.50
542.00
680.50
871.00
1084.00
1363.50
1724.50

42.00
71.50
98.00
140.50
202.50
269.50
336.00
433.00
549.00
689.00
881.50
1097.50
1380.50
1746.00

Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre

67.00
106.00
149.50
212.50
316.00
410.00
510.00
668.50
842.00
1079.50
1371.50
1697.00
2129.50
2692.50

68.00
108.00
152.00
216.50
321.50
417.50
519.00
680.50
857.00
1098.00
1395.00
1726.50
2166.00
2738.50

69.00
109.00
154.00
219.00
326.00
422.50
526.00
689.00
868.00
1112.00
1412.50
1747.50
2193.00
2772.50

IV Quarter

Note : The rates are inclusive of VAT at 5% and transportation charges to stockyard
anywhere in Tamilnadu. Unloading, stacking at stock yard and Conveyance from
stock yard to site are extra.
18

1.2

PVC CASING PIPE with Excise Duty AS PER IS 12818 / 2010

Sl.
No

Description

150mm CS

Rate for 2014-15 in


Rupees

Unit
I Quarter

II Quarter

III Quarter

Metre

548.00

557.50

564.50

150mm CM

Metre

705.00

717.50

726.50

150mm RS

Metre

815.00

828.00

837.00

200mm CS

Metre

1000.00

1017.00

1030.00

200mm CM

Metre

1288.00

1310.50

1327.50

200mm RS

Metre

1488.00

1511.00

1528.00

Note :

The rates are inclusive of all taxes, duties andtransportation charges to stockyard
anywhere in Tamilnadu. Unloading, stacking at stock yard and Conveyance from
stock yard to site are extra. Excise Duty-12.36%, VAT-5%.

1.3

PVC CASING PIPE without Excise Duty AS PER IS 12818 / 2010


Rate for 2014-15 in Rupees

Sl.
No

Description

150mm CS

Unit
I Quarter

II Quarter

III Quarter

Metre

489.00

497.50

503.50

150mm CM

Metre

618.50

629.50

638.00

150mm RS

Metre

728.00

739.50

747.50

200mm CS

Metre

893.00

908.50

919.50

200mm CM

Metre

1122.00

1142.00

1157.00

200mm RS

Metre

1329.00

1349.50

1364.50

Note :

IV Quarter

IV Quarter

The rates are inclusive of VAT at 5% and transportation charges to stockyard


anywhere in Tamilnadu. Unloading, stacking at stock yard and Conveyance from
stock yard to site are extra.
CS - Casing Shallow depth up to 80m
CM - Casing Medium depth 81m to 250m
RS - Ribbed screen pipe

19

1.4

UPVC- non pressure pipes as per IS 15328/2003


Rate for 2014- 15in Rupees

Sl No.

Description

SN8-SDR 34(S 16.5)

110mm

Unit

With Excise
duty

Without
Excise duty

Per Metre

204.00

183.00

125mm

Per Metre

288.00

265.00

160mm

Per Metre

438.00

392.00

200mm

Per Metre

690.00

616.00

250mm

Per Metre

1100.00

1019.00

315mm

Per Metre

1745.00

1613.00

400mm

Per Metre

2806.00

2591.00

II

SN4-SDR 41(S 20)

125mm

Per Metre

246.00

196.00

160mm

Per Metre

375.00

265.00

200mm

Per Metre

576.00

421.00

250mm

Per Metre

937.00

658.00

315mm

Per Metre

1468.00

1019.00

400mm

Per Metre

2365.00

1613.00

III

SN2-SDR 51(S 25)

160mm

Per Metre

301.00

269.00

200mm

Per Metre

461.00

412.00

250mm

Per Metre

751.00

694.00

315mm

Per Metre

1188.00

1097.00

400mm

Per Metre

1897.00

1753.00

Note:

The above rates are inclusive of all taxes , duties and transportation charges to
stockyard anywhere in Tamilnadu. Unloading, stacking at stock yard and
Conveyance from stock yard to site are extra. Excise duty at 12.36% and VAT
at 5%.

20

1.5
Sl.No.

PVC SPECIALS AS PER IS 7834/1987

Description

Unit

Rate for 2014 -15 in Rupees

PVC THREADED COUPLER


1

63 mm x 50 mm

Each

35.00

75 mm x 50 mm

Each

53.00

90mm x 80 mm

Each

72.00

110 mm x 100 mm

Each

125.00

140 mm x 125 mm

Each

181.00

UNEQUAL TEE
1

63 mm x 50 mm

Each

64.00

75 mm X 50 mm

Each

129.00

90 mm x 50 mm

Each

186.00

90 mm x 63 mm

Each

155.00

90 mm x 75 mm

Each

155.00

110 mm x 50 mm

Each

278.00

110mm x 63 mm

Each

233.00

110 mm x 90mm

Each

233.00

140mm x 50 mm

Each

387.00

10

140 mm x 63 mm

Each

387.00

11

140 mm x 90 mm

Each

387.00

12

140 mm x 110 mm

Each

397.00

13

160 mm x 50 mm

Each

473.00

14

160 mm x 63 mm

Each

473.00

15

160 mm x 90 mm

Each

473.00

16

160 mm x 110mm

Each

473.00

17

160 mm x140 mm

Each

568.00

PVC REDUCER COUPLER


1

63 mm x 50 mm

Each

35.00

75 mm x 63 mm

Each

36.00

90 mm x 63 mm

Each

56.00

90 mm x 75 mm

Each

56.00

110 mm x 63 mm

Each

75.00

110 mm x 75 mm

Each

75.00

110 mm x 90 mm

Each

98.00

140 mm x 63 mm

Each

112.00

140 mm x 90 mm

Each

113.00

10

140 mm x 110 mm

Each

117.00

11

160 mm x 110 mm

Each

183.00

12

160 mm x 140 mm

Each

198.00

21

Sl.No.

Description

Unit

Rate for 2014 -15 in Rupees

PVC REDUCER MULTI STAGE


1

90 mm x 63 mm

Each

81.00

110 mm x 63 mm

Each

157.00

110 mm x 75 mm

Each

157.00

110 mm x 90 mm

Each

177.00

140 mm x 90 mm

Each

179.00

PVC REDUCER FABRICATED


1

75 mm x 63 mm

Each

48.00

90 mm x 75 mm

Each

73.00

110 mm x 90 mm

Each

112.00

140 mm x 110 mm

Each

179.00

160 mm x 140 mm

Each

272.00

SADDLE PIECE
1

63 mm x 20 mm

Each

75.00

75 mm x 20 mm

Each

93.00

90 mm x 20 mm

Each

108.00

110 mm x 20 mm

Each

119.00

140 mm x 20 mm

Each

177.00

160 mm x 20 mm

Each

231.00

Note:

The above rates are inclusive of all taxes, duties and transportation charges
anywhere in Tamilnadu.Excise duty 12.36% and VAT 5%.

22

23

PVC Couplers fabricated 6 KSC

PVC Bends fabricated 4 KSC

PVC Bends fabricated 6 KSC

PVC Equal Tee Fabricated 4 KSC

PVC Equal Tee Fabricated

PVC Tail piece without flange

12

PVC flanged Tail piece

4.00

9.00

8.00

6.00

5.00

17.00

10.00

10.00

9.00

25.00

13.00

11.00

12.00

27.00

25.00

19.00

29.00

14.00

26.00

53.00

48.00

28.00

39.00

35.00

35.00

32.00

18.00

12.00

20mm 25mm 32mm 40mm 50mm

181.00

31.00

24.00

35.00

96.00

52.00

48.00

86.00

43.00

58.00

38.00

23.00

18.00

63mm

216.00

39.00

43.00

36.00

112.00

77.00

72.00

114.00

46.00

102.00

62.00

26.00

23.00

75mm

Rate for 2014 -15

cont..

270.00

57.00

65.00

65.00

182.00

114.00

113.00

181.00

113.00

142.00

98.00

47.00

34.00

90mm

315.00

86.00

86.00

113.00

290.00

176.00

157.00

304.00

175.00

235.00

140.00

73.00

59.00

524.00

148.00

178.00

173.00

711.00

354.00

231.00

394.00

269.00

618.00

384.00

151.00

116.00

686.00

213.00

251.00

196.00

792.00

436.00

312.00

421.00

324.00

1009.00

624.00

213.00

147.00

1027.00

319.00

383.00

317.00

1186.00

526.00

482.00

500.00

404.00

2044.00

1183.00

402.00

249.00

110mm 140mm 160mm 200mm

in Rupees

PVC SPECIALS AS PER IS 10124/1982 Part-II

Note: The above rates are inclusive of all taxes,duties and transportation charges anywhere in Tamilnadu.Excise duty 12.36% and VAT 5%.

13

PVC End Cap

11

(BIS marks)

PVC Male Threaded Adopter

BIS 7834/1975

PVC Equal tee (Mould)

BIS 7834/1975 Part VI

PVC Elbow (Mould)

BIS 7834/1975 Part VI

PVC Couplers (Mould)

10

PVC Couplers fabricated 4 KSC

BIS 10124/1982 PartV 6 KSC

Description

Sl.
No.

1.5

2.0
Sl.
No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

HDPE PIPES - PE 100 with excise duty AS PER IS 4984/1995


Description
PN 6
50 mm
63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm
355 mm
400 mm
450 mm
500 mm
560 mm
630 mm
PN 8
50 mm
63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm
355 mm
400 mm
450 mm
500 mm

Rate for 2014-15


in Rupees

Unit
I Quarter

II Quarter

III Quarter

metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre

62.00
96.50
139.00
196.00
288.00
373.00
469.00
611.00
771.00
949.00
1189.50
1481.00
1857.00
2351.00
2980.00
3853.00
4874.00
6026.00
7545.00
9551.00

62.00
96.50
139.50
196.50
288.50
374.00
470.00
612.50
773.00
951.50
1192.50
1484.50
1861.50
2357.00
2987.50
3862.50
4886.50
6041.00
7564.00
9575.00

63.50
98.50
142.00
200.50
294.50
381.50
479.50
625.00
788.50
970.50
1216.50
1514.50
1899.00
2404.00
3047.00
3940.00
4984.00
6162.00
7715.00
9766.50

metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre

78.00
124.00
174.50
251.00
373.00
482.00
603.00
786.00
992.50
1224.00
1550.00
1909.00
2395.00
3028.00
3832.00
4966.00
6263.00
7742.50

78.00
124.50
175.00
251.50
374.00
483.00
604.50
788.00
995.00
1227.00
1554.00
1914.00
2401.00
3035.50
3841.50
4978.50
6279.00
7762.00

80.00
127.00
178.50
256.50
381.50
493.00
616.50
803.50
1015.00
1251.50
1585.00
1952.00
2449.00
3096.50
3918.50
5078.00
6405.00
7917.50

24

IV Quarter

Sl.
No

Description

19
20

560 mm
630 mm
PN 10
50 mm
63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm
355 mm
400 mm
450 mm
500 mm
560 mm
630 mm
PN 12.5
50 mm
63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm
355 mm
400 mm
450 mm

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

Rate for 2014-15


in Rupees

Unit
I Quarter

II Quarter

III Quarter

metre
metre

9741.00
12323.00

9765.50
12354.00

9960.50
12601.00

metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre

95.00
151.00
213.00
305.00
451.00
581.00
727.00
949.00
1204.00
1386.50
1873.00
2307.00
2890.00
3661.00
4656.00
6032.00
7609.00
9340.50
11776.00
14918.00

95.00
151.50
213.50
306.00
452.00
582.50
729.00
951.50
1207.00
1390.00
1877.50
2313.00
2897.50
3670.00
4667.50
6047.00
7628.00
9364.00
11805.50
14955.50

97.00
154.50
218.00
312.00
461.00
594.00
743.50
970.50
1231.00
1420.00
1915.50
2359.00
2955.00
3743.50
4761.00
6168.00
7780.50
9552.50
12041.50
15254.50

metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre

115.00
179.00
253.00
366.00
542.00
698.00
876.00
1142.00
1445.00
1782.00
2256.00
2775.00
3480.00
4406.00
5593.00
7251.00
9172.00

115.50
179.50
253.50
367.00
543.50
700.00
878.00
1145.00
1448.50
1786.50
2261.50
2782.00
3488.50
4417.00
5607.00
7269.00
9195.00

117.50
183.00
258.50
374.50
554.00
713.50
896.00
1168.00
1477.50
1822.00
2307.00
2837.50
3558.50
4505.50
5719.00
7414.50
9379.00

25

IV Quarter

Sl.
No

Description

18
19
20

500 mm
560 mm
630 mm
PN 16
50 mm
63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm
355 mm
400 mm
450 mm
500 mm

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Note:

Rate for 2014-15


in Rupees

Unit
I Quarter

II Quarter

III Quarter

metre
metre
metre

11307.00
14174.00
17935.00

11335.50
14209.50
17980.00

11562.00
14493.50
18339.50

metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre

138.00
217.00
307.00
442.00
655.00
847.00
1060.00
1388.00
1750.00
2162.00
2733.00
3372.00
4227.00
5342.00
6778.00
8787.00
11135.00
13731.00

138.50
217.50
308.00
443.00
656.50
849.00
1062.50
1391.50
1754.50
2167.50
2740.00
3380.50
4237.50
5355.50
6795.00
8809.00
11163.00
13765.50

141.00
222.00
314.00
452.00
670.00
866.00
1084.00
1419.50
1789.50
2211.00
2794.50
3448.00
4322.50
5462.50
6931.00
8985.00
11386.00
14040.50

IV Quarter

The above rates are inclusive of all taxes, duties and transportation charges to
stockyard anywhere in Tamilnadu. Unloading, stacking at stock yard and Conveyance
from stock yard to site are extra. Excise duty 12.36% and VAT 5%.

26

2.1 HDPE PIPES - PE 100 without excise duty AS PER IS 4984/1995


Sl.
No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

Description
PN 6
50 mm
63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm
355 mm
400 mm
450 mm
500 mm
560 mm
630 mm
PN 8
50 mm
63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm
355 mm
400 mm
450 mm
500 mm

Rate for 2014-15


in Rupees

Unit
I Quarter

II Quarter

III Quarter

metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre

56.00
88.00
124.50
172.50
255.50
331.00
414.50
541.00
680.50
841.50
1067.50
1309.50
1642.00
2079.50
2633.50
3406.00
4308.00
5326.50
6912.00
8751.50

56.00
88.00
125.00
173.00
256.00
332.00
415.50
542.50
682.00
843.50
1070.00
1313.00
1646.00
2085.00
2640.00
3414.50
4319.00
5340.00
6929.00
8773.00

57.50
90.00
127.50
176.50
261.50
338.50
424.00
553.50
696.00
860.50
1091.50
1339.00
1679.50
2126.50
2693.50
3483.50
4406.00
5447.50
7063.50
8943.50

metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre

70.00
110.00
154.50
222.00
331.50
425.50
532.50
696.00
877.50
1081.00
1370.50
1687.50
2116.50
2678.00
3388.50
4391.00
5515.50
6818.00

70.00
110.50
155.00
222.50
332.50
426.50
534.00
698.00
879.50
1083.50
1374.00
1692.00
2122.00
2685.00
3397.00
4402.00
5529.50
6835.50

71.50
112.50
158.00
227.00
339.00
435.00
544.50
712.00
897.50
1105.50
1401.50
1726.00
2164.50
2739.00
3465.50
4490.50
5642.00
6974.00

27

IV Quarter

Sl.
No

Description

19
20

560 mm
630 mm
PN 10
50 mm
63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm
355 mm
400 mm
450 mm
500 mm
560 mm
630 mm
PN 12.5
50 mm
63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm
355 mm
400 mm

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Rate for 2014-15


in Rupees

Unit
I Quarter

II Quarter

metre
metre

8922.50
11256.00

8944.50
11283.50

9118.00
11503.50

metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre

85.50
132.50
190.00
269.50
399.00
514.00
641.50
839.00
1066.00
1222.00
1655.50

85.50
133.00
190.50
270.00
400.00
515.50
643.00
841.00
1068.50
1225.50
1659.50

87.50
135.50
194.50
275.50
408.00
525.50
656.00
858.00
1090.00
1252.00
1693.00

metre
metre
metre
metre
metre
metre
metre
metre
metre

2041.00
2556.00
3237.50
4117.00
5330.00
6726.50
8310.00
10788.50
13665.50

2046.00
2562.50
3245.50
4127.50
5343.50
6743.50
8331.00
10815.00
13699.00

2087.50
2614.00
3311.00
4210.50
5451.00
6879.00
8498.50
11025.00
13965.00

metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre

102.50
163.00
228.50
334.00
494.50
634.50
795.00
1039.50
1312.50
1619.50
2052.50
2523.00
3167.00
4009.50
5086.50
6596.00

103.00
163.50
229.00
335.00
495.50
636.00
797.00
1042.00
1315.50
1623.50
2057.50
2529.00
3175.00
4019.50
5099.00
6612.00

105.00
166.50
233.50
341.50
505.50
648.50
812.50
1062.50
1341.50
1655.50
2098.00
2578.50
3237.00
4098.00
5199.00
6741.50

28

III Quarter

IV Quarter

Sl.
No

Description

17
18
19
20

450 mm
500 mm
560 mm
630 mm
PN 16
50 mm
63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm
355 mm
400 mm
450 mm
500 mm

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

Rate for 2014-15


in Rupees

Unit
I Quarter

II Quarter

III Quarter

metre
metre
metre
metre

8402.00
10358.50
12981.50
16427.50

8422.50
10384.00
13013.00
16467.50

8586.00
10585.50
13266.00
16787.50

metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre
metre

124.00
206.00
277.50
400.00
597.00
770.00
964.00
1262.00
1591.50
1964.00
2486.50
3067.00
3843.50
4860.50
6165.00
7993.00
10198.50
12878.00

124.50
206.50
278.00
401.00
598.50
772.00
966.50
1265.00
1595.50
1969.00
2492.50
3074.50
3853.00
4872.50
6180.00
8012.50
10223.50
12908.50

127.00
210.50
283.50
409.00
610.00
787.00
985.50
1290.00
1626.50
2007.50
2541.50
3134.50
3928.50
4968.00
6301.00
8169.50
10422.00
13153.50

IV Quarter

Note:The above rates are inclusive of VAT at 5% and transportation charges to stockyard
anywhere in Tamilnadu. Unloading, stacking at stock yard and Conveyance from stock yard
to site are extra.

29

2.2 SPECIALS FOR HDPE PIPES AS PER IS 8360/1977/Part I, II, III


Sl.
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1
2
3
4
5
6
7
8
9

Description

Rate for 2014-15


in Rupees

Unit

90 Degree Bend
PN 6
50 mm
63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm
355 mm
400 mm
450 mm
500 mm
560 mm
630 mm
PN 8
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm
355 mm
400 mm
450 mm
500 mm
560 mm
630 mm
PN 10
50 mm
63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm

Equal Tee

each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each

50.00
73.00
100.00
153.00
252.00
354.00
476.00
679.00
984.00
1336.00
1835.00
2440.00
3375.00
6258.00
8380.00
11866.00
15742.00
24873.00
30745.00
36834.00

57.00
79.00
106.00
218.00
357.00
390.00
536.00
788.00
1120.00
1493.00
2106.00
2863.00
3979.00
5488.00
7676.00
11226.00
15324.00
25016.00
31270.00
47654.00

each
each
each
each
each
each
each
each
each
each
each
each
each
each
each

398.00
532.00
757.00
1058.00
1430.00
1954.00
2629.00
3637.00
7558.00
10777.00
15731.00
22409.00
30736.00
43194.00
61502.00

488.00
668.00
967.00
1349.00
1802.00
2513.00
3390.00
4685.00
6418.00
8928.00
12947.00
18286.00
33075.00
41410.00
52728.00

each
each
each
each
each
each
each
each
each

68.00
112.00
144.00
202.00
326.00
502.00
655.00
926.00
1416.00

72.00
124.00
177.00
282.00
472.00
658.00
908.00
1463.00
1960.00

30

Sl.
No

Description

10
11
12
13
14
15
16
17
18
19
20

200 mm
225 mm
250 mm
280 mm
315 mm
355 mm
400 mm
450 mm
500 mm
560 mm
630 mm
PN 12.5
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm
355 mm
400 mm
450 mm
500 mm
560 mm
630 mm
PN 16
50 mm
63 mm
75 mm
90 mm
110 mm
125 mm
140 mm
160 mm
180 mm
200 mm
225 mm
250 mm
280 mm
315 mm
355 mm
400 mm
450 mm
500 mm

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

Rate for 2014-15


in Rupees

Unit

90 Degree Bend

Equal Tee

each
each
each
each
each
each
each
each
each
each
each

1838.00
2483.00
3315.00
4598.00
9649.00
12223.00
17932.00
22937.00
30755.00
52215.00
74445.00

2584.00
3548.00
4825.00
6897.00
9081.00
13752.00
18850.00
23942.00
41135.00
69428.00
98947.00

each
each
each
each
each
each
each
each
each
each
each
each
each
each
each

586.00
818.00
1171.00
1625.00
2174.00
3094.00
3952.00
5656.00
11999.00
15876.00
22416.00
32670.00
44776.00
62836.00
89491.00

835.00
1178.00
1754.00
2514.00
3444.00
4532.00
6185.00
8717.00
11445.00
16375.00
21896.00
41443.00
59428.00
83429.00
118773.00

each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
each

111.00
173.00
202.00
311.00
568.00
612.00
857.00
1487.00
2007.00
2691.00
3830.00
4898.00
7003.00
14859.00
19670.00
27829.00
39657.00
54365.00

116.00
170.00
290.00
443.00
806.00
1014.00
1427.00
2171.00
3106.00
4263.00
5607.00
7666.00
10793.00
14768.00
21139.00
36867.00
50197.00
72003.00

Note:The above rates are inclusive of Excise duty at 12.36%, VAT at 5% and
transportation charges anywhere in Tamilnadu.
31

2.3 JOINTING OF HDPE PIPES

Sl No.

Description

Unit

Rate for 2014-15


in Rupees.

50 mm

Joint

51.00

63 mm

Joint

64.00

75 mm

Joint

77.00

90 mm

Joint

92.00

110 mm

Joint

112.00

125 mm

Joint

128.00

140 mm

Joint

143.00

160 mm

Joint

163.00

180 mm

Joint

184.00

10

200 mm

Joint

204.00

11

225 mm

Joint

230.00

12

250 mm

Joint

255.00

13

280 mm

Joint

286.00

14

315 mm

Joint

321.00

15

355 mm

Joint

362.00

16

400 mm

Joint

408.00

17

450 mm

Joint

459.00

18

500 mm

Joint

510.00

19

560 mm

Joint

635.00

20

630 mm

Joint

727.00

32

3.0 A.C.PRESSURE PIPES AS PER IS 1592 / 2003


(Without Excise Duty)

Sl.No

Description

Unit

Rate for 2014-15


in Rupees

Class 15

80mm

Metre

228.00

100mm

Metre

301.00

125mm

Metre

392.00

150mm

Metre

564.00

200mm

Metre

966.00

250mm

Metre

1225.00

300mm

Metre

1718.00

350mm

Metre

2114.00

400mm

Metre

2748.00

10

450mm

Metre

3259.00

II

Class 20

80mm

Metre

253.00

100mm

Metre

410.00

125mm

Metre

487.00

150mm

Metre

703.00

200mm

Metre

1229.00

250mm

Metre

1574.00

300mm

Metre

2218.00

350mm

Metre

2748.00

400mm

Metre

3590.00

10

450mm

Metre

4329.00

Note:

Excise duty shall be charged extra at 12.36% for non


fly ash pipes. The
above rates are inclusive of VAT at 5% and transportation charges to stockyard
anywhere in Tamilnadu. Unloading, stacking at stock yard and Conveyance
from stock yard to site are extra.

33

3.1 A.C. COUPLER AS PER IS 1592 /2003


(Without Excise Duty)

Sl.No

Description

Unit

Rate for 2014-15


in Rupees

Class 15

80mm

Each

198.00

100mm

Each

252.00

125mm

Each

318.00

150mm

Each

440.00

200mm

Each

625.00

250mm

Each

739.00

300mm

Each

936.00

350mm

Each

1192.00

400mm

Each

1718.00

10

450mm

Each

2080.00

II

Class 20

80mm

Each

202.00

100mm

Each

256.00

125mm

Each

334.00

150mm

Each

470.00

200mm

Each

685.00

250mm

Each

896.00

300mm

Each

1165.00

350mm

Each

1501.00

400mm

Each

2182.00

10

450mm

Each

2666.00

Note:

Excise duty shall be charged extra at 12.36% for non fly ash pipes. The
above rates are inclusive of VAT at 5% and transportation charges anywhere
in Tamilnadu.

34

3.2

Sl.No

C.I.D.JOINTS AS PER IS 8794 / 1988

Description

Unit

Rate for 2014-15


in Rupees

Class 15

80mm

Each

374.00

100mm

Each

469.00

125mm

Each

592.00

150mm

Each

758.00

200mm

Each

1102.00

250mm

Each

1434.00

300mm

Each

1730.00

350mm

Each

2910.00

400mm

Each

3629.00

10

450mm

Each

4358.00

II

Class 20

80mm

Each

383.00

100mm

Each

475.00

125mm

Each

638.00

150mm

Each

768.00

200mm

Each

1171.00

250mm

Each

1544.00

300mm

Each

1589.00

350mm

Each

3096.00

400mm

Each

3716.00

10

450mm

Each

4389.00

Note:

Excise Duty is applicable on CID Joints.


The above rates are inclusive of Vat at 5% and transportation charges
anywhere in Tamilnadu.

35

4.0

C.I. SPUN PIPES AS PER IS 1536/2001 Amendment No.3.July 2008


Rate for 2014- 15in Rupees

Sl No.

Description

Unit

With Excise
duty

Without
Excise duty

LA Class

80mm

Metre

1135.00

1073.00

100mm

Metre

1406.00

1330.00

125mm

Metre

1824.00

1723.00

150mm

Metre

2182.00

2062.00

200mm

Metre

3182.00

3008.00

250mm

Metre

4290.00

4055.00

300mm

Metre

5534.00

5232.00

350mm

Metre

7116.00

6729.00

400mm

Metre

8661.00

8189.00

10

450mm

Metre

10494.00

9923.00

11

500mm

Metre

12353.00

11678.00

12

600mm

Metre

16427.00

15532.00

13

700mm

Metre

21239.00

20079.00

14

750mm

Metre

23848.00

22549.00

II

A Class

80mm

Metre

1234.00

1166.00

100mm

Metre

1548.00

1464.00

125mm

Metre

1989.00

1881.00

150mm

Metre

2389.00

2259.00

200mm

Metre

3457.00

3269.00

250mm

Metre

4673.00

4417.00

300mm

Metre

6050.00

5720.00

350mm

Metre

7719.00

7298.00

400mm

Metre

9466.00

8949.00

10

450mm

Metre

11526.00

10898.00

11

500mm

Metre

13455.00

12721.00

12

600mm

Metre

17932.00

16956.00

13

700mm

Metre

23133.00

21867.00

14

750mm

Metre

25986.00

24567.00

36

Rate for 2014- 15in Rupees


Sl No.
III

Description

Unit

With Excise
duty

Without
Excise duty

B Class

80mm

Metre

1323.00

1251.00

100mm

Metre

1651.00

1561.00

125mm

Metre

2142.00

2025.00

150mm

Metre

2574.00

2434.00

200mm

Metre

3737.00

3533.00

250mm

Metre

5053.00

4778.00

300mm

Metre

6552.00

6197.00

350mm

Metre

8368.00

7913.00

400mm

Metre

10218.00

9661.00

10

450mm

Metre

12434.00

11758.00

11

500mm

Metre

14559.00

13764.00

12

600mm

Metre

19427.00

18368.00

13

700mm

Metre

24930.00

23562.00

14

750mm

Metre

28115.00

26575.00

Note:

The above rates are inclusive of VAT at 5% and transportation charges to


stockyard anywhere in Tamilnadu. Unloading, stacking at stock yard and
Conveyance from stock yard to site are extra. Excise duty at 12.36%

37

4.1

C.I D/F PIPES AS PER IS 7181/1986 & IS 1537


Rate for 2014- 15in Rupees

Sl No.

Description

Unit

With Excise
duty

Without
Excise duty

STANDARD

80mm to 200mm

Kg

69.00

62.00

250mm to 400mm

Kg

72.00

65.00

450mm to 750mm

Kg

80.00

72.00

II

NON-STANDARD

80mm to 200mm

Kg

77.00

69.00

250mm to 400mm

Kg

79.00

71.00

450mm to 750mm

Kg

80.00

72.00

4.2

CI D/F SPECIALS & S/S SPECIALS AS PER IS 1538/1993


Rate for 2014- 15in Rupees

Sl No.

Description

Unit

With Excise
duty

Without
Excise duty

STANDARD

80mm to 200mm

Kg

67.00

61.00

250mm to 400mm

Kg

81.00

73.00

450mm to 750mm

Kg

84.00

76.00

II.

NON-STANDARD

80mm to 200mm

Kg

68.00

62.00

250mm to 400mm

Kg

82.00

77.00

450mm to 750mm

Kg

84.00

78.00

Note:

The above rates are inclusive of VAT at 5% and transportation charges anywhere
in Tamilnadu.Excise duty at 12.36%

38

5.0

G I PIPES (MEDIUM) AS PER IS 1239/PART I/90


Rate for 2014-15in Rupees.

Sl.No

Size

Unit

15mm

With Excise
duty

Without
Excise duty

metre

94.00

86.00

20mm

metre

124.00

114.00

25mm

metre

179.00

166.00

32mm

metre

226.00

209.00

40mm

metre

263.00

242.00

50mm

metre

356.00

330.00

65mm

metre

456.00

422.00

80mm

metre

565.00

522.00

100mm

metre

806.00

744.00

10

125mm

metre

1157.00

1069.00

11

150mm

metre

1292.00

1195.00

Note:

The above rates are inclusive of all taxes, duties and transportation
charges to stockyard anywhere in Tamilnadu. Unloading, stacking at stock
yard and Conveyance from stock yard to site are extra. Excise duty 12.36%
and VAT 5%.

39

5.1
Sl.No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
1
2
3
4
5
6

G.I. SPECIALS AS PER IS

Description
GI REDUCER (HEAVY)
100 mm x 80 mm
100 mm x 65 mm
100 mm x 50 mm
80 mm x 65 mm
80 mm x 50 mm
80 mm x 40 mm
80 mm x 32 mm
65 mm x 50 mm
65 mm x 40 mm
65 mm x 32 mm
65 mm x 20 mm
50 mm x 40 mm
50 mm x 32 mm
50 mm x 20 mm
40 mm x 32 mm
40 mm x 20 mm
GI REDUCER (MEDIUM)
100 mm x 80 mm
100 mm x 65mm
100 mm x 50 mm
80 mm x 65 mm
80 mm x 50 mm
80 mm x 40 mm
80 mm x 32 mm
65 mm x 50 mm
65 mm x 40 mm
65 mm x 32 mm
65 mm x 20 mm
50 mm x 40 mm
50 mm x 32 mm
50 mm x 20 mm
40 mm x 32 mm
40 mm x 20 mm
G I UNEQUAL TEE (HEAVY)
100 mm x 80 mm
100 mm x 65mm
100 mm x 50 mm
80 mm x 65 mm
80 mm x 50 mm
80 mm x 40 mm
40

Unit

Rates for 2014-15


in Rupees

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

404.00
404.00
404.00
251.00
251.00
251.00
251.00
174.00
174.00
174.00
174.00
95.00
95.00
95.00
64.00
64.00

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

292.00
292.00
292.00
161.00
122.00
122.00
122.00
91.00
91.00
91.00
91.00
61.00
61.00
61.00
40.00
40.00

Each
Each
Each
Each
Each
Each

785.00
785.00
785.00
457.00
457.00
457.00

Sl.No.
7
8
9
10
11
12
13
14
15
16
17

80 mm x 32 mm
65 mm x 50 mm
65 mm x 40 mm
65 mm x 32 mm
65 mm x 20 mm
50 mm x 40 mm
50 mm x 32 mm
50 mm x 20 mm
40 mm x 32 mm
40 mm x 20 mm
32 mm x 20 mm
G.I UNEQUAL TEE(MEDIUM)
100 mm x 80 mm
100 mm x 65mm
100 mm x 50 mm
80 mm x 65 mm
80 mm x 50 mm
80 mm x 40 mm
80 mm x 32 mm
65 mm x 50 mm
65 mm x 40 mm
65 mm x 32 mm
65 mm x 20 mm
50 mm x 40 mm
50 mm x 32 mm
50 mm x 20 mm
40 mm x 32 mm
40 mm x 20 mm
32 mm x 20 mm
MS BOLTS AND NUTS
16 mm dia x 65 to 90 mm
length fully threaded bolts
and nuts with 2 Nos.
20mm dia and above x
90mm to 120mm length fully
threaded bolts and
with nuts 2 Nos.
RUBBER INSERTION SHEET
3 Ply R.I. Sheet
AC COWL
80 mm dia
100 mm dia

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
1

1
1
2
Note

Description

Unit

Rates for 2014-15


in Rupees

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

457.00
336.00
336.00
336.00
336.00
200.00
200.00
200.00
126.00
126.00
90.00

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

445.00
445.00
445.00
220.00
220.00
220.00
220.00
154.00
154.00
154.00
154.00
91.00
91.00
91.00
65.00
65.00
65.00

Kg.

76.00

Kg.

79.00

Kg.

66.00

Each
Each

29.00
49.00

The above rates are inclusive of all taxes, duties and transportation
charges.Excise duty 12.36% and VAT at 5%.
41

42

G.I. Equal Elbow plain


G.I. Equal Tee plain
G.I. Coupling
G.I. Flange set
G.I. Cross
G.I. Hex Nipple
G.I.Three Way Elbow
G.I.Plug Dia Head Taper Thread
G.I.Bend
G.I.Union
G.M. Ferrule
G.I.stop cock
Rubber sheet for Flange set
G.I. Reduced Elbow Plain
G.I.Reduced Tee Plain
G.I. Reduced Socket Plain
G.I. Check Nut
G.I.Reduced Nipple
G.I. Dummy (Heavy)
G.I.Dummy (Medium)
M.S.Saddle Piece
Waste Not Tap
C.I.Footvalve with stainer
M.S.Clampset

Description
15mm
19.00
29.00
17.00

44.00
17.00
38.00
8.00
18.00
51.00
286.00
136.00

24.00
31.00
18.00
11.00
17.00

20mm
26.00
36.00
18.00

55.00
30.00
58.00
16.00
30.00
55.00
429.00
181.00

26.00
43.00
37.00
16.00
20.00

100.00

25mm
40.00
52.00
24.00

89.00
30.00
84.00
16.00
47.00
92.00
632.00
329.00

44.00
64.00
40.00
22.00
36.00

AS PER IS
Rate for 2014-15 in Rupees
32mm
40mm 50mm 65mm
65.00
82.00
125.00
223.00
76.00
112.00
185.00
299.00
43.00
65.00
97.00
172.00

60.00
73.00
144.00
186.00
281.00
451.00
47.00
61.00
83.00
148.00
134.00
176.00
282.00

28.00
28.00
52.00
72.00
58.00
76.00
114.00
211.00
130.00
166.00
235.00
462.00

493.00
733.00 1058.00 1402.00

11.00
11.00
70.00
92.00
136.00
244.00
95.00
125.00
184.00
328.00
56.00
90.00
122.00
184.00
32.00
43.00
58.00
101.00
82.00
96.00
148.00
276.00

18.00
28.00
36.00

16.00
24.00
32.00

70.00
77.00

319.00

CONTINUED.

Note: The above rates are inclusive of all taxes, duties and transportation charges.Excise duty 12.36% and VAT at 5%.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Sl.No.

5.1 G.I. SPECIALS

80mm
329.00
413.00
204.00
82.00
686.00
203.00

102.00
293.00
614.00

1784.00
16.00
366.00
438.00
245.00
131.00
307.00
46.00
40.00
89.00

475.00
396.00

100mm
590.00
738.00
409.00
137.00
904.00
301.00

144.00
514.00
914.00

2822.00

631.00
826.00
348.00
173.00
427.00
82.00
77.00
119.00

43

G.M. Non Return valves

15mm

410.00

20mm

553.00

25mm

725.00

32mm

986.00

40mm

65mm

Tamilnadu Excise Duty 12.36% and VAT at 5%.

80mm

100mm

1594.00 1594.00 2558.00

1608.00 2507.00 3944.00 6768.00

50mm

Note: The above rates are inclusive of all taxes , duties and transportation charges anywhere in

G.M. Gate valves

Description

Sl.No.

Rate for 2014-15 in Rupees

5.2 G.M GATE VALVES AS PER IS

6.0

DUCTILE IRON SOCKET/SPIGOT PIPES FOR CLASS

K7

AS PER IS 8329/2000
Rate for 2014-15in Rupees.
Sl.No

Size

100 mm

metre

1054.00

943.00

150 mm

metre

1558.00

1394.00

200 mm

metre

2013.00

1802.00

250 mm

metre

2651.00

2372.00

300 mm

metre

3344.00

2992.00

350mm

metre

4072.00

3645.00

400 mm

metre

4886.00

4376.00

450 mm

metre

5776.00

5173.00

500 mm

metre

6809.00

6095.00

10

600 mm

metre

8973.00

8036.00

11

700 mm

metre

12288.00

11008.00

12

750 mm

metre

14106.00

12627.00

13

800 mm

metre

16127.00

14436.00

14

900 mm

metre

19945.00

17852.00

15

1000 mm

metre

23503.00

21061.00

Note:

Unit

With Excise
duty

Without
Excise duty

The above rates are inclusive of all taxes , duties and transportation
charges to stockyard anywhere in Tamilnadu. Unloading, stacking at stock
yard and Conveyance from stock yard to site are extra. Excise duty at
12.36% and VAT at 5%.

44

6.1

DUCTILE IRON SOCKET/SPIGOT PIPES FOR CLASS

K9

AS PER IS 8329/2000
Rate for 2014-15in Rupees.
Sl.No

Size

100 mm

metre

1194.00

1068.00

150 mm

metre

1762.00

1577.00

200 mm

metre

2391.00

2139.00

250 mm

metre

3204.00

2866.00

300 mm

metre

4051.00

3624.00

350mm

metre

4899.00

4383.00

400 mm

metre

5878.00

5259.00

450 mm

metre

7066.00

6325.00

500 mm

metre

8173.00

7312.00

10

600 mm

metre

10816.00

9682.00

11

700 mm

metre

13894.00

12438.00

12

750 mm

metre

15589.00

13957.00

13

800 mm

metre

17306.00

15499.00

14

900 mm

metre

21292.00

19052.00

15

1000 mm

metre

25103.00

22485.00

Note:

Unit

With Excise
duty

Without
Excise duty

The above rates are inclusive of all taxes , duties and transportation
charges to stockyard anywhere in Tamilnadu. Unloading, stacking at stock
yard and Conveyance from stock yard to site are extra. Excise duty at
12.36% and VAT at 5%.

45

6.2 DUCTILE IRON CLASS PN10 FLANGED PIPES


AS PER IS 8329/2000
Rate for 2014-15in Rupees.
Sl.No

Size

I)

4 m length of pipes

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
II)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

80 mm
100 mm
150 mm
200 mm
250 mm
300 mm
350mm
400 mm
450 mm
500 mm
600 mm
700 mm
750 mm
800 mm
900 mm
1000mm
5 m length of pipes
80 mm
100 mm
150 mm
200 mm
250 mm
300 mm
350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
750 mm
800 mm
900 mm
1000 mm

Note:

Unit

With Excise
duty

Without
Excise duty

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

6345.00
7347.00
10556.00
14620.00
19283.00
24233.00
32497.00
41620.00
50384.00
59603.00
80512.00
101452.00
134228.00
130636.00
178270.00
209185.00

5813.00
6605.00
9669.00
13392.00
17663.00
22198.00
29524.00
37591.00
45667.00
54594.00
73746.00
91704.00
122950.00
117447.00
160271.00
188064.00

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

7340.00
9516.00
13857.00
18492.00
25119.00
32092.00
39124.00
49250.00
59359.00
68401.00
92884.00
114004.00
129145.00
144886.00
197019.00
231598.00

6724.00
8555.00
12458.00
16625.00
22583.00
28852.00
35700.00
44277.00
53366.00
62204.00
85080.00
104426.00
116682.00
130257.00
177127.00
208215.00

The above rates are inclusive of all taxes , duties and transportation
charges to stockyard anywhere in Tamilnadu. Unloading, stacking at stock
yard and Conveyance from stock yard to site are extra. Excise duty at
12.36% and VAT at 5%.
46

6.3 DUCTILE IRON SPECIALS AS PER IS 9523/2000

Sl.No.

Description

Unit

Rates for 2014-15


in Rupees

ALL SOCKET
1

100mm - 200 mm dia

Kg

112.00

250 mm - 300 mm dia

Kg

112.00

350 mm - 450 mm dia

Kg

114.00

500 mm - 600 mm dia

Kg

119.00

700 mm - 750 mm

Kg

175.00

800mm

Kg

175.00

900 mm

Kg

185.00

1000 mm

Kg

201.00

ALL FLANGE
1

100mm - 200 mm dia

Kg

117.00

250 mm - 300 mm dia

Kg

117.00

350 mm - 450 mm dia

Kg

119.00

500 mm - 600 mm dia

Kg

124.00

700 mm - 750 mm

Kg

185.00

800 mm

Kg

185.00

900 mm

Kg

201.00

1000 mm

Kg

201.00

Note:

In respect of flanged and spigot, flanged and socketted type specials,


the rate applicable for flanged type specials is allowed.

Note:

The above rates are inclusive of excise duty at 12.36% , VAT at 5%


and transportation charges anywhere in Tamilnadu.

47

7.0
Sl.No

PSC
Size

PIPES AS PER IS
Unit

784 / 2001

Rate for 2014-15in Rupees.


With Excise
duty

I.
1
2
3
4
5
6
7
8
9
10
11
II
1
2
3
4
5
6
7
8
9
10
11
III
1
2
3
4
5
6
7
8
9
10
11
IV
1
2
3
4
5
6
7

4 KSC
350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100 mm
1200 mm
6 KSC
350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100 mm
1200 mm
8 KSC
350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100 mm
1200 mm
10 KSC
350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
800 mm

Without
Excise duty

Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre

2202.00
2447.00
2759.00
2791.00
3327.00
3791.00
4609.00
5552.00
6707.00
7529.00
9733.00

2035.00
2261.00
2547.00
2577.00
3073.00
3613.00
4373.00
5292.00
6257.00
7194.00
9143.00

Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre

2477.00
2680.00
2860.00
3004.00
3595.00
3909.00
4763.00
5750.00
6938.00
7772.00
10034.00

2288.00
2510.00
2719.00
2856.00
3400.00
3729.00
4558.00
5488.00
6640.00
7435.00
9651.00

Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre

2491.00
2697.00
2873.00
3040.00
3700.00
4049.00
4947.00
5972.00
7209.00
8115.00
10423.00

2301.00
2571.00
2731.00
2893.00
3496.00
3868.00
4739.00
5707.00
6908.00
7774.00
10035.00

Metre
Metre
Metre
Metre
Metre
Metre
Metre

2515.00
2728.00
2936.00
3122.00
3812.00
4203.00
5138.00

2331.00
2612.00
2794.00
2975.00
3532.00
4020.00
4928.00

48

Sl.No

8
9
10
11
V
1
2
3
4
5
6
7
8
9
10
11
VI
1
2
3
4
5
6
7
8
9
10
11
VII
1
2
3
4
5
6
7
8
9
10
11
Note:

Size

900 mm
1000 mm
1100 mm
1200 mm
12 KSC
350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100 mm
1200 mm
14 KSC
350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100 mm
1200 mm
16 KSC
350 mm
400 mm
450 mm
500 mm
600 mm
700 mm
800 mm
900 mm
1000 mm
1100 mm
1200 mm

Unit

Rate for 2014-15in Rupees.


With Excise
duty

Without
Excise duty

Metre
Metre
Metre
Metre

6199.00
7483.00
8450.00
10812.00

5931.00
7179.00
8105.00
10420.00

Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre

2556.00
2796.00
3014.00
3215.00
3936.00
4374.00
5361.00
6454.00
7763.00
8787.00
11354.00

2379.00
2665.00
2872.00
3067.00
3637.00
4189.00
5149.00
6183.00
7456.00
8438.00
10955.00

Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre

2595.00
2877.00
3092.00
3309.00
4079.00
4546.00
5587.00
6734.00
8240.00
9332.00
11829.00

2413.00
2725.00
2949.00
3159.00
3787.00
4359.00
5371.00
6460.00
7927.00
8976.00
11425.00

Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre

2651.00
2905.00
3170.00
3404.00
4195.00
4720.00
5809.00
7424.00
8593.00
10128.00
12699.00

2514.00
2781.00
3026.00
3253.00
3875.00
4532.00
5592.00
7142.00
8276.00
9661.00
12167.00

The above rates are inclusive of VAT at 5% and transportation charges


anywhere in Tamilnadu.Excise duty 12.36%.
49

8.0
Sl.No

BAR WRAPPED STEEL CYLINDER PIPES AS PER IS 15155


Size

Unit

Rate for 2014-15in Rupees.


With Excise
duty

Without
Excise duty

4 Ksc Pipe
1

350mm

Metre

3167.00

3054.00

400mm

Metre

3481.00

3360.00

450mm

Metre

3949.00

3818.00

500mm

Metre

4245.00

4109.00

600mm

Metre

5750.00

5395.00

700mm

Metre

7111.00

6780.00

800mm

Metre

8457.00

7810.00

900mm

Metre

10885.00

10128.00

1000mm

Metre

12520.00

11570.00

10

1100mm

Metre

15385.00

14737.00

11

1200mm

Metre

17401.00

16076.00

12

1300mm

Metre

20570.00

20148.00

13

1400mm

Metre

24151.00

22311.00

14

1500mm

Metre

24947.00

23048.00

6 Ksc Pipe
1

350mm

Metre

3172.00

3059.00

400mm

Metre

3492.00

3371.00

450mm

Metre

3965.00

3834.00

500mm

Metre

4263.00

4127.00

600mm

Metre

5775.00

5415.00

700mm

Metre

7146.00

6805.00

800mm

Metre

8493.00

7847.00

900mm

Metre

10905.00

10165.00

1000mm

Metre

12791.00

11816.00

10

1100mm

Metre

15395.00

14984.00

11

1200mm

Metre

17624.00

16281.00

12

1300mm

Metre

20590.00

20168.00

13

1400mm

Metre

24216.00

22373.00

14

1500mm

Metre

25011.00

23106.00

8 Ksc Pipe
1

350mm

Metre

3175.00

3062.00

400mm

Metre

3512.00

3391.00

450mm

Metre

3983.00

3852.00

500mm

Metre

4285.00

4149.00

600mm

Metre

5801.00

5431.00

700mm

Metre

7171.00

6826.00

800mm

Metre

8537.00

7887.00

50

Rate for 2014-15in Rupees.


Sl.No

Size

8
9
10
11
12
13
14

900mm
1000mm
1100mm
1200mm
1300mm
1400mm
1500mm
10 Ksc Pipe
350mm
400mm
450mm
500mm
600mm
700mm
800mm
900mm
1000mm
1100mm
1200mm
1300mm
1400mm
1500mm
12 Ksc Pipe
350mm
400mm
450mm
500mm
600mm
700mm
800mm
900mm
1000mm
1100mm
1200mm
1300mm
1400mm
1500mm
14 Ksc Pipe
350mm
400mm
450mm

1
2
3
4
5
6
7
8
9
10
11
12
13
14
1
2
3
4
5
6
7
8
9
10
11
12
13
14
1
2
3

Unit

With Excise
duty

Without
Excise duty

Metre
Metre
Metre
Metre
Metre
Metre
Metre

10931.00
13050.00
15410.00
17843.00
20616.00
24281.00
25081.00

10204.00
12064.00
15091.00
16484.00
20194.00
22434.00
23170.00

Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre

3177.00
3537.00
4005.00
4310.00
5829.00
7197.00
8588.00
10957.00
13080.00
15430.00
18069.00
20642.00
24397.00
25177.00

3064.00
3416.00
3874.00
4174.00
5457.00
6852.00
7934.00
10243.00
12178.00
15111.00
16692.00
20220.00
22539.00
23261.00

Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre

3180.00
3565.00
4031.00
4338.00
5859.00
7226.00
8941.00
10985.00
13106.00
15455.00
18121.00
20668.00
24496.00
25276.00

3067.00
3444.00
3900.00
4202.00
5483.00
6878.00
8262.00
10296.00
12204.00
15136.00
16897.00
20246.00
22632.00
23353.00

Metre
Metre
Metre

3183.00
3587.00
4062.00

3070.00
3466.00
3931.00

51

Rate for 2014-15in Rupees.


Sl.No

Size

4
5
6
7
8
9
10
11
12
13
14

500mm
600mm
700mm
800mm
900mm
1000mm
1100mm
1200mm
1300mm
1400mm
1500mm
16 Ksc Pipe
350mm
400mm
450mm
500mm
600mm
700mm
800mm
900mm
1000mm
1100mm
1200mm
1300mm
1400mm
1500mm
18 Ksc Pipe
350mm
400mm
450mm
500mm
600mm
700mm
800mm
900mm
1000mm
1100mm
1200mm
1300mm
1400mm
1500mm

1
2
3
4
5
6
7
8
9
10
11
12
13
14
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Note:

Unit

With Excise
duty

Without
Excise duty

Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre

4368.00
5894.00
7252.00
9087.00
11011.00
13132.00
15515.00
18389.00
20694.00
24680.00
26642.00

4232.00
5509.00
6904.00
8579.00
10549.00
12230.00
15196.00
17424.00
20272.00
23885.00
24614.00

Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre

3188.00
3612.00
4098.00
4775.00
6092.00
7615.00
9577.00
11971.00
13956.00
16593.00
19425.00
24118.00
26803.00
28007.00

3075.00
3491.00
3967.00
4634.00
5936.00
7435.00
9370.00
11463.00
12893.00
16052.00
17945.00
22734.00
24762.00
25877.00

Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre
Metre

3193.00
3652.00
4162.00
4945.00
6369.00
7963.00
10028.00
12519.00
15049.00
17398.00
21427.00
25159.00
28375.00
31008.00

3080.00
3531.00
4031.00
4802.00
6210.00
7779.00
9816.00
12253.00
14751.00
17060.00
21022.00
23856.00
27862.00
28648.00

The above rates are inclusive of VAT at 5% and transportation charges


anywhere in Tamilnadu. Excise duty at 12.36%.
52

9.0

GRP PIPES AS PER IS 12709 / 1994 (WATER SUPPLY)


Rate for 2014-15 in Rupees

Sl .No

Description

Unit

Stiffness class 248Kpa

Stiffness class 496Kpa

With
Excise
Duty

Without
Excise
Duty

With
Excise
Duty

Without
Excise
Duty

PN 3
1

200mm

metre

1855.00

1682.00

2041.00

1850.00

250mm

metre

2530.00

2291.00

2783.00

2520.00

300mm

metre

2984.00

2703.00

3282.00

2973.00

350mm

metre

3693.00

3345.00

4062.00

3680.00

400mm

metre

4029.00

3649.00

4432.00

4014.00

450mm

metre

4676.00

4235.00

5144.00

4659.00

500mm

metre

5327.00

4826.00

5860.00

5309.00

600mm

metre

7179.00

6503.00

7897.00

7153.00

700mm

metre

9043.00

8190.00

9947.00

9009.00

10

800mm

metre

10946.00

9914.00

12041.00

10905.00

11

900mm

metre

13906.00

12596.00

15297.00

13856.00

12

1000mm

metre

16701.00

15128.00

18371.00

16641.00

13

1100mm

metre

19863.00

17989.00

21849.00

19788.00

14

1200mm

metre

22627.00

20493.00

24890.00

22542.00

15

1300mm

metre

25100.00

22734.00

27610.00

25007.00

16

1400mm

metre

29609.00

26819.00

32570.00

29501.00

17

1500mm

metre

33722.00

30545.00

37094.00

33600.00

18

1600mm

metre

37102.00

33605.00

40812.00

36966.00

19

1700mm

metre

40648.00

36817.00

44713.00

40499.00

20

1800mm

metre

48594.00

44143.00

53453.00

48557.00

21

1900mm

metre

53836.00

48762.00

59220.00

53638.00

22

2000mm

metre

57980.00

52516.00

63778.00

57768.00

23

2100mm

metre

63396.00

57422.00

69736.00

63164.00

24

2200mm

metre

67861.00

61465.00

74647.00

67612.00

PN 6
1

200mm

metre

1890.00

1712.00

2079.00

1883.00

250mm

metre

2564.00

2323.00

2820.00

2555.00

300mm

metre

2998.00

2716.00

3298.00

2988.00

350mm

metre

3705.00

3357.00

4076.00

3693.00

400mm

metre

4040.00

3660.00

4444.00

4026.00

450mm

metre

4696.00

4252.00

5166.00

4677.00

500mm

metre

5372.00

4866.00

5909.00

5353.00

600mm

metre

7190.00

6513.00

7909.00

7164.00

53

Rate for 2014-15 in Rupees


Sl .No

Description

Unit

Stiffness class 248Kpa

Stiffness class 496Kpa

700mm

metre

With
Excise
Duty
9066.00

Without
Excise
Duty
8211.00

With
Excise
Duty
9973.00

Without
Excise
Duty
9032.00

10

800mm

metre

10975.00

9940.00

12073.00

10934.00

11

900mm

metre

13941.00

12626.00

15335.00

13889.00

12

1000mm

metre

16730.00

15154.00

18403.00

16669.00

13

1100mm

metre

19938.00

18060.00

21932.00

19866.00

14

1200mm

metre

22768.00

20622.00

25045.00

22684.00

15

1300mm

metre

25145.00

22776.00

27660.00

25054.00

16

1400mm

metre

29635.00

26842.00

32599.00

29526.00

17

1500mm

metre

33756.00

30575.00

37132.00

33633.00

18

1600mm

metre

37122.00

33623.00

40834.00

36985.00

19

1700mm

metre

40706.00

36869.00

44777.00

40556.00

20

1800mm

metre

48810.00

44212.00

53691.00

48633.00

21

1900mm

metre

53864.00

48788.00

59250.00

53667.00

22

2000mm

metre

58020.00

52553.00

63822.00

57808.00

23

2100mm

metre

63427.00

57450.00

69770.00

63195.00

24

2200mm

metre

67982.00

61576.00

74780.00

67734.00

PN 9
1

200mm

metre

1927.00

1746.00

2120.00

1921.00

250mm

metre

2601.00

2357.00

2861.00

2593.00

300mm

metre

3046.00

2759.00

3351.00

3035.00

350mm

metre

3770.00

3415.00

4147.00

3757.00

400mm

metre

4164.00

3771.00

4580.00

4148.00

450mm

metre

4830.00

4375.00

5313.00

4813.00

500mm

metre

5487.00

4970.00

6036.00

5467.00

600mm

metre

7311.00

6622.00

8042.00

7284.00

700mm

metre

9203.00

8334.00

10123.00

9167.00

10

800mm

metre

11179.00

10126.00

12297.00

11139.00

11

900mm

metre

14113.00

12783.00

15524.00

14061.00

12

1000mm

metre

16977.00

15378.00

18675.00

16916.00

13

1100mm

metre

20249.00

18342.00

22274.00

20176.00

14

1200mm

metre

23189.00

21004.00

25508.00

23104.00

15

1300mm

metre

25637.00

23222.00

28201.00

25544.00

16

1400mm

metre

30187.00

27342.00

33206.00

30076.00

17

1500mm

metre

34470.00

31221.00

37917.00

34343.00

18

1600mm

metre

37781.00

34219.00

41559.00

37641.00

54

Rate for 2014-15 in Rupees


Sl .No

Description

Unit

Stiffness class 248Kpa

Stiffness class 496Kpa

19

1700mm

metre

With
Excise
Duty
41896.00

Without
Excise
Duty
37948.00

With
Excise
Duty
46086.00

Without
Excise
Duty
41743.00

20

1800mm

metre

50071.00

45352.00

55078.00

49887.00

21

1900mm

metre

55220.00

50016.00

60742.00

55018.00

22

2000mm

metre

59556.00

53944.00

65512.00

59338.00

PN 12
1

200mm

metre

1964.00

1780.00

2160.00

1958.00

250mm

metre

2638.00

2389.00

2902.00

2628.00

300mm

metre

3088.00

2798.00

3397.00

3078.00

350mm

metre

3842.00

3480.00

4226.00

3828.00

400mm

metre

4190.00

3795.00

4609.00

4175.00

450mm

metre

4913.00

4450.00

5404.00

4895.00

500mm

metre

5580.00

5053.00

6138.00

5558.00

600mm

metre

7558.00

6845.00

8314.00

7530.00

700mm

metre

9546.00

8646.00

10501.00

9511.00

10

800mm

metre

11530.00

10444.00

12683.00

11488.00

11

900mm

metre

14824.00

13428.00

16306.00

14771.00

12

1000mm

metre

17554.00

15900.00

19309.00

17490.00

13

1100mm

metre

21208.00

19210.00

23329.00

21131.00

14

1200mm

metre

24237.00

21953.00

26661.00

24148.00

15

1300mm

metre

26785.00

24261.00

29464.00

26687.00

16

1400mm

metre

31589.00

28613.00

34748.00

31474.00

17

1500mm

metre

35888.00

32507.00

39477.00

35758.00

18

1600mm

metre

39400.00

35688.00

43340.00

39257.00

19

1700mm

metre

43352.00

39267.00

47687.00

43194.00

20

1800mm

metre

51827.00

46942.00

57010.00

51636.00

21

1900mm

metre

56976.00

51607.00

62674.00

56768.00

22

2000mm

metre

83704.00

75815.00

92074.00

83397.00

PN 15
1

200mm

metre

2001.00

1812.00

2201.00

1993.00

250mm

metre

2675.00

2423.00

2943.00

2665.00

300mm

metre

3176.00

2876.00

3494.00

3164.00

350mm

metre

3972.00

3597.00

4369.00

3957.00

400mm

metre

4356.00

3947.00

4792.00

4342.00

450mm

metre

5104.00

4623.00

5614.00

5085.00

500mm

metre

5786.00

5240.00

6365.00

5764.00

55

Rate for 2014-15 in Rupees


Sl .No

Description

Unit

Stiffness class 248Kpa

Stiffness class 496Kpa

600mm

metre

With
Excise
Duty
7870.00

700mm

metre

9931.00

8995.00

10924.00

9895.00

10

800mm

metre

12136.00

10992.00

13350.00

12091.00

11

900mm

metre

15367.00

13919.00

16904.00

15311.00

12

1000mm

metre

18465.00

16727.00

20312.00

18400.00

13

1100mm

metre

22129.00

20043.00

24342.00

22047.00

14

1200mm

metre

25410.00

23015.00

27951.00

25317.00

15

1300mm

metre

27984.00

25349.00

30782.00

27884.00

16

1400mm

metre

32976.00

29869.00

36274.00

32856.00

17

1500mm

metre

37476.00

33944.00

41224.00

37338.00

18

1600mm

metre

41285.00

37395.00

45414.00

41135.00

19

1700mm

metre

45390.00

41111.00

49929.00

45222.00

20

1800mm

metre

54101.00

49002.00

59511.00

53902.00

Note:

Without
Excise
Duty
7129.00

With
Excise
Duty
8657.00

Without
Excise
Duty
7842.00

The above rates are inclusive of VAT at 5%, transportation charges anywhere
in Tamilnadu and cost of coupling and specials.Excise duty at 12.36%.

56

10.0 M.S. PIPES- SPIRAL/LONGITUDIDNAL WELDING AS PER IS 3589/2001WITH


INTERNAL LINING AND EXTERNAL COATING (WITH EXCISE DUTY)
Rate for 2014-15 in Rupees

Dia metre &

Sl. thickness of
No. pipe in mm

Bare
pipe
per
metre

Internal External
CTE
TranspoCML
CMC
food
e p o x y external External
ration
Internal external
grade
Coating coating Polyethyany
6mm to
20mm
epoxy
406
&
line
where in
1 2 m m thick per coating
micr.
wrapping
S h e e t i n g Tamilthick per m e t r e
406
per
per
metre
micr.per m e t r e
m e t r e per metre nadu per
metre
metre

168.3X2.6

543.00

301.00

503.00

519.00

640.00

562.00

702.00

266.00

168.3X3.2

665.00

301.00

503.00

519.00

640.00

562.00

702.00

266.00

168.3X4

829.00

301.00

503.00

519.00

640.00

562.00

702.00

266.00

168.3X4.5

931.00

301.00

503.00

519.00

640.00

562.00

702.00

266.00

219.1X2.6

712.00

393.00

635.00

672.00

831.00

736.00

910.00

266.00

219.1X3.6

978.00

393.00

635.00

672.00

831.00

736.00

910.00

266.00

219.1X4.5

1219.00

393.00

635.00

672.00

831.00

736.00

910.00

266.00

219.1X6.3

1694.00

393.00

635.00

672.00

831.00

736.00

910.00

266.00

273X3.6

1224.00

489.00

775.00

838.00

1034.00

916.00

1135.00

266.00

10

273X4

1357.00

489.00

775.00

838.00

1034.00

916.00

1135.00

266.00

11

273X5

1690.00

489.00

775.00

838.00

1034.00

916.00

1135.00

266.00

12

273X6.3

2120.00

489.00

775.00

838.00

1034.00

916.00

1135.00

266.00

13

323.9X4

1612.00

582.00

908.00

1003.00

1180.00

1084.00

1348.00

266.00

14

323.9X4.5

1812.00

582.00

908.00

1003.00

1180.00

1084.00

1348.00

266.00

15

323.9X5.6

2248.00

582.00

908.00

1003.00

1180.00

1084.00

1348.00

266.00

16

323.9X7.1

2837.00

582.00

908.00

1003.00

1180.00

1084.00

1348.00

266.00

17

355.6X4

1776.00

640.00

991.00

1003.00

1348.00

1191.00

1478.00

266.00

18

355.6X5

2211.00

640.00

991.00

1003.00

1348.00

1191.00

1478.00

266.00

19

355.6X5.6

2473.00

640.00

991.00

1003.00

1348.00

1191.00

1478.00

266.00

20

355.6X8

3512.00

640.00

991.00

1003.00

1348.00

1191.00

1478.00

266.00

21

406.4X4

2033.00

735.00

1124.00

1208.00

1545.00

1365.00

1691.00

266.00

22

406.4X5

2336.00

735.00

1124.00

1208.00

1545.00

1365.00

1691.00

266.00

23

406.4X6.3

3184.00

735.00

1124.00

1208.00

1545.00

1365.00

1691.00

266.00

57

Dia metre &

Sl.
thickness of
No. pipe in mm

Bare
pipe
per
metre

Internal
CTE
TranspoCML
CMC
food
External external External
ration
Internal external
grade
epoxy
coating Polyethyany
6mm to
20mm
epoxy
Coating
&
line
where in
1 2 m m thick per coating 406 micr. wrapping
S h e e t i n g Tamilthick per m e t r e
406
per
per
metre
micr.per m e t r e
m e t r e per metre nadu per
metre
metre

24

406.4X8.8

4419.00

735.00

1124.00

1208.00

1545.00

1365.00

1691.00

266.00

25

457X4

2289.00

828.00

1146.00

1208.00

1736.00

1121.00

1854.00

266.00

26

457X5

2852.00

828.00

1146.00

1208.00

1736.00

1121.00

1899.00

266.00

27

457X6.3

3584.00

828.00

1146.00

1208.00

1736.00

1121.00

1899.00

266.00

28

457X10

5745.00

828.00

1146.00

1208.00

1736.00

1121.00

1899.00

266.00

29

508X5

3254.00

919.00

1270.00

1315.00

1927.00

1246.00

2112.00

319.00

30

508X5.6

3620.00

919.00

1270.00

1315.00

1927.00

1246.00

2112.00

319.00

31

508X6.3

4093.00

919.00

1270.00

1315.00

1927.00

1246.00

2112.00

319.00

32

508X11

7085.00

919.00

1270.00

1315.00

1927.00

1246.00

2110.00

319.00

33

610X5.8

4514.00

1103.00

1528.00

1573.00

2315.00

1494.00

2534.00

400.00

34

610X6.3

4934.00

1103.00

1528.00

1573.00

2315.00

1494.00

2534.00

400.00

35

610X12.5

9656.00

1103.00

1528.00

1573.00

2315.00

1494.00

2533.00

400.00

36

711X6.3

5719.00

1288.00

1781.00

1809.00

2315.00

1747.00

2955.00

400.00

37

711X7.1

6455.00

1288.00

1781.00

1809.00

2697.00

1747.00

2955.00

400.00

38

711X14.2

12806.00

1288.00

1781.00

1809.00

2697.00

1747.00

2952.00

400.00

39

813X7.1

7400.00

1473.00

2034.00

2107.00

2697.00

1994.00

3382.00

532.00

40

813X8

8345.00

1473.00

2034.00

2107.00

3090.00

1994.00

3382.00

532.00

41

813X18

18527.00

1473.00

2034.00

2107.00

3090.00

1994.00

3377.00

532.00

42

914X8

9394.00

1654.00

2289.00

2365.00

3090.00

2247.00

3798.00

799.00

43

914X8.8

10287.00

1654.00

2289.00

2365.00

3472.00

2247.00

3798.00

799.00

44

914X10

11649.00

1654.00

2289.00

2365.00

3472.00

2247.00

3798.00

799.00

45

914X17.5

20310.00

1654.00

2289.00

2365.00

3472.00

2247.00

4438.00

799.00

46

1016X8.8

11493.00

1837.00

2545.00

2640.00

3854.00

2491.00

4438.00

1596.00

47

1016X10

13015.00

1837.00

2545.00

2640.00

3854.00

2491.00

4438.00

1596.00

48

1016X20

25770.00

1837.00

2545.00

2640.00

3854.00

2491.00

4438.00

1596.00

58

Sl. Dia metre &


No. thickness of
pipe in mm

Bare
pipe
per
metre

Internal
CTE
TranspoCML
CMC
food
External external External
ration
Internal external
grade
epoxy
coating Polyethyany
6mm to
20mm
epoxy
Coating
&
line
where in
1 2 m m thick per coating 406 micr. wrapping
S h e e t i n g Tamilthick per m e t r e
406
per
per
metre
micr.per m e t r e
m e t r e per metre nadu per
metre
metre

49

1067X8.8

12072.00

1837.00

2674.00

2640.00

3854.00

2618.00

4438.00

1596.00

50

1067X10

13698.00

1837.00

2674.00

2640.00

4045.00

2618.00

4438.00

1596.00

51

1067X11

15010.00

1837.00

2674.00

2640.00

4045.00

2618.00

4438.00

1596.00

52

1118X8.8

12648.00

2062.00

2798.00

2910.00

4247.00

2742.00

4648.00

1596.00

53

1118X10

14328.00

2062.00

2798.00

2910.00

4247.00

2742.00

4648.00

1596.00

54

1118X11

15745.00

2062.00

2798.00

2910.00

4247.00

2742.00

4648.00

1596.00

55

1219X10

15639.00

2209.00

2798.00

2910.00

4635.00

2989.00

5067.00

1596.00

56

1219X11

17214.00

2209.00

2798.00

2910.00

4635.00

2989.00

5067.00

1596.00

57

1219X12.5

19524.00

2209.00

2798.00

2910.00

4635.00

2989.00

5067.00

1596.00

58

1422X12.5

22830.00

2573.00

3562.00

4163.00

5405.00

3483.00

5910.00

1596.00

59

1422X14.2

25874.00

2573.00

3562.00

4163.00

5405.00

3483.00

5910.00

1596.00

60

1626X14.2

29601.00

3022.00

4067.00

4163.00

6180.00

3986.00

6742.00

1915.00

61

1626X16

33327.00

3022.00

4067.00

4163.00

6180.00

3986.00

6742.00

1915.00

62

1829X14.2

33379.00

3281.00

4579.00

4680.00

6944.00

4494.00

7528.00

1915.00

63

1829X16

37525.00

3281.00

4579.00

4680.00

6944.00

4494.00

7528.00

1915.00

64

1829X17.5

41041.00

3281.00

4579.00

4680.00

6944.00

4494.00

7528.00

1915.00

65

2032X16

41724.00

3685.00

5090.00

5202.00

7719.00

4944.00

8449.00

2297.00

66

2032X17.5

45607.00

3685.00

5090.00

5202.00

7719.00

4944.00

8449.00

2297.00

67

2032X20

52063.00

3685.00

5090.00

5202.00

7719.00

4944.00

8449.00

2297.00

68

2235X17.5

50226.00

4056.00

5596.00

5719.00

8494.00

5483.00

9292.00

2297.00

69

2235X20

57364.00

4056.00

5596.00

5719.00

8494.00

5483.00

9292.00

2297.00

70

2235X22.2

63556.00

4056.00

5596.00

5719.00

8494.00

5483.00

9292.00

2297.00

71

2540X20

65235.00

4607.00

6360.00

6506.00

9663.00

6236.00

10562.00

2528.00

72

2540X22.2

72321.00

4607.00

6360.00

6506.00

9663.00

6236.00

10562.00

2528.00

73

2540X25

81424.00

4607.00

6360.00

6506.00

9663.00

6236.00

10562.00

2528.00

Note: The above rates are inclusive of Excise duty at 12.36% and VAT at 5%.

59

10.1 M.S. PIPES- SPIRAL/LONGITUDIDNAL WELDING AS PER IS 3589/2001WITH


INTERNAL LINING AND EXTERNAL COATING (WITHOUT EXCISE DUTY)
Rate for 2014-15 in Rupees

Sl. Dia metre &


No. thickness of
pipe in mm

Bare
pipe
per
metre

Internal External
CTE
CML
CMC
food
e p o x y external External
TranspoInternal external
grade
Coating coating Polyethy- ration any
6mm to
20mm
epoxy
406
&
line
where in
1 2 m m thick per coating
micr.
wrapping Sheeting Tamil-nadu
thick per m e t r e
406
per
per
per metre per metre
metre
micr.per m e t r e
metre
metre

168.3X2.6

483.00

268.00

448.00

440.00

570.00

500.00

625.00

266.00

168.3X3.2

592.00

268.00

448.00

440.00

570.00

500.00

625.00

266.00

168.3X4

738.00

268.00

448.00

440.00

570.00

500.00

625.00

266.00

168.3X4.5

829.00

268.00

448.00

440.00

570.00

500.00

625.00

266.00

219.1X2.6

634.00

350.00

565.00

570.00

740.00

655.00

810.00

266.00

219.1X3.6

870.00

350.00

565.00

570.00

740.00

655.00

810.00

266.00

219.1X4.5

1085.00

350.00

565.00

570.00

740.00

655.00

810.00

266.00

219.1X6.3

1508.00

350.00

565.00

570.00

740.00

655.00

810.00

266.00

273X3.6

1089.00

435.00

690.00

710.00

920.00

815.00

1010.00

266.00

10

273X4

1208.00

435.00

690.00

710.00

920.00

815.00

1010.00

266.00

11

273X5

1504.00

435.00

690.00

710.00

920.00

815.00

1010.00

266.00

12

273X6.3

1887.00

435.00

690.00

710.00

920.00

815.00

1010.00

266.00

13

323.9X4

1435.00

518.00

808.00

850.00

1050.00

965.00

1200.00

266.00

14

323.9X4.5

1613.00

518.00

808.00

850.00

1050.00

965.00

1200.00

266.00

15

323.9X5.6

2001.00

518.00

808.00

850.00

1050.00

965.00

1200.00

266.00

16

323.9X7.1

2525.00

518.00

808.00

850.00

1050.00

965.00

1200.00

266.00

17

355.6X4

1581.00

570.00

882.00

850.00

1200.00

1060.00

1315.00

266.00

18

355.6X5

1968.00

570.00

882.00

850.00

1200.00

1060.00

1315.00

266.00

19

355.6X5.6

2201.00

570.00

882.00

850.00

1200.00

1060.00

1315.00

266.00

20

355.6X8

3126.00

570.00

882.00

850.00

1200.00

1060.00

1315.00

266.00

21

406.4X4

1809.00

654.00

1000.00

1075.00

1375.00

1103.00

1505.00

266.00

22

406.4X5

2079.00

654.00

1000.00

1075.00

1375.00

1103.00

1505.00

266.00

23

406.4X6.3

2834.00

654.00

1000.00

1075.00

1375.00

1103.00

1505.00

266.00

60

Sl. Dia metre &


No. thickness of
pipe in mm

Bare
pipe
per
metre

Internal
CTE
TranspoCML
CMC
food
External external External
ration
Internal external
grade
epoxy
coating Polyethyany
6mm to
20mm
epoxy
Coating
&
line
where in
1 2 m m thick per coating 406 micr. wrapping
S h e e t i n g Tamilthick per m e t r e
406
per
per
metre
micr.per m e t r e
m e t r e per metre nadu per
metre
metre

24

406.4X8.8

3933.00

654.00

1000.00

1075.00

1375.00

1103.00

1505.00

266.00

25

457X4

2037.00

737.00

1020.00

1075.00

1545.00

1016.00

1650.00

266.00

26

457X5

2538.00

737.00

1020.00

1075.00

1545.00

1016.00

1690.00

266.00

27

457X6.3

3190.00

737.00

1020.00

1075.00

1545.00

1016.00

1690.00

266.00

28

457X10

5113.00

737.00

1020.00

1075.00

1545.00

1016.00

1690.00

266.00

29

508X5

2896.00

818.00

1130.00

1170.00

1715.00

1129.00

1880.00

319.00

30

508X5.6

3222.00

818.00

1130.00

1170.00

1715.00

1129.00

1880.00

319.00

31

508X6.3

3643.00

818.00

1130.00

1170.00

1715.00

1129.00

1880.00

319.00

32

508X11

6306.00

818.00

1130.00

1170.00

1715.00

1129.00

1880.00

319.00

33

610X5.8

4017.00

982.00

1360.00

1400.00

2060.00

1330.00

2255.00

400.00

34

610X6.3

4391.00

982.00

1360.00

1400.00

2060.00

1330.00

2255.00

400.00

35

610X12.5

8594.00

982.00

1360.00

1400.00

2060.00

1330.00

2255.00

400.00

36

711X6.3

5090.00

1146.00

1585.00

1610.00

2090.00

1555.00

2630.00

400.00

37

711X7.1

5745.00

1146.00

1585.00

1610.00

2400.00

1555.00

2630.00

400.00

38

711X14.2

11397.00

1146.00

1585.00

1610.00

2400.00

1555.00

2630.00

400.00

39

813X7.1

6586.00

1311.00

1810.00

1875.00

2400.00

1775.00

3010.00

532.00

40

813X8

7427.00

1311.00

1810.00

1875.00

2750.00

1775.00

3010.00

532.00

41

813X18

16489.00

1311.00

1810.00

1875.00

2750.00

1775.00

3010.00

532.00

42

914X8

8361.00

1472.00

2037.00

2105.00

2750.00

2000.00

3380.00

799.00

43

914X8.8

9155.00

1472.00

2037.00

2105.00

3090.00

2000.00

3380.00

799.00

44

914X10

10368.00

1472.00

2037.00

2105.00

3090.00

2000.00

3380.00

799.00

45

914X17.5

18076.00

1472.00

2037.00

2105.00

3090.00

2000.00

3380.00

799.00

46

1016X8.8

10229.00

1635.00

2265.00

2350.00

3430.00

2260.00

3824.00

1596.00

47

1016X10

11583.00

1635.00

2265.00

2350.00

3430.00

2260.00

3824.00

1596.00

48

1016X20

22935.00

1635.00

2265.00

2350.00

3430.00

2260.00

3824.00

1596.00

61

Sl. Dia metre &


No. thickness of
pipe in mm

Bare
pipe
per
metre

Internal
CTE
TranspoCML
CMC
food
External external External
ration
Internal external
grade
epoxy
coating Polyethyany
6mm to
20mm
epoxy
Coating
&
line
where in
1 2 m m thick per coating 406 micr. wrapping
S h e e t i n g Tamilthick per m e t r e
406
per
per
metre
micr.per m e t r e
m e t r e per metre nadu per
metre
metre

49

1067X8.8

10744.00

1635.00

2380.00

2350.00

3430.00

2330.00

3950.00

1596.00

50

1067X10

12191.00

1635.00

2380.00

2350.00

3600.00

2330.00

3950.00

1596.00

51

1067X11

13359.00

1635.00

2380.00

2350.00

3600.00

2330.00

3950.00

1596.00

52

1118X8.8

11257.00

1835.00

2490.00

2590.00

3780.00

2440.00

4137.00

1596.00

53

1118X10

12752.00

1835.00

2490.00

2590.00

3780.00

2440.00

4137.00

1596.00

54

1118X11

14013.00

1835.00

2490.00

2590.00

3780.00

2440.00

4137.00

1596.00

55

1219X10

13919.00

1966.00

2490.00

2590.00

4125.00

2660.00

4510.00

1596.00

56

1219X11

15320.00

1966.00

2490.00

2590.00

4125.00

2660.00

4510.00

1596.00

57

1219X12.5

17376.00

1966.00

2490.00

2590.00

4125.00

2660.00

4510.00

1596.00

58

1422X12.5

20319.00

2290.00

3170.00

2836.00

4810.00

3100.00

5260.00

1596.00

59

1422X14.2

23028.00

2290.00

3170.00

3427.00

4810.00

3100.00

5260.00

1596.00

60

1626X14.2

26345.00

2690.00

3620.00

3705.00

5500.00

3616.00

6000.00

1915.00

61

1626X16

29661.00

2690.00

3620.00

3705.00

5500.00

3616.00

6000.00

1915.00

62

1829X14.2

29707.00

2920.00

4075.00

4165.00

6180.00

4000.00

6700.00

1915.00

63

1829X16

33397.00

2920.00

4075.00

4165.00

6180.00

4000.00

6700.00

1915.00

64

1829X17.5

36526.00

2920.00

4075.00

4165.00

6180.00

4000.00

6700.00

1915.00

65

2032X16

37134.00

3280.00

4530.00

4630.00

6870.00

4400.00

7520.00

2297.00

66

2032X17.5

40590.00

3280.00

4530.00

4630.00

6870.00

4400.00

7520.00

2297.00

67

2032X20

46336.00

3280.00

4530.00

4630.00

6870.00

4400.00

7520.00

2297.00

68

2235X17.5

44701.00

3610.00

4980.00

5090.00

7560.00

4880.00

8270.00

2297.00

69

2235X20

51054.00

3610.00

4980.00

5090.00

7560.00

4880.00

8270.00

2297.00

70

2235X22.2

56565.00

3610.00

4980.00

5090.00

7560.00

4880.00

8270.00

2297.00

71

2540X20

58059.00

4100.00

5660.00

5790.00

8600.00

5550.00

9400.00

2528.00

72

2540X22.2

64365.00

4100.00

5660.00

5790.00

8600.00

5550.00

9400.00

2528.00

73

2540X25

72467.00

4100.00

5660.00

5790.00

8600.00

5550.00

9400.00

2528.00

Note: The above rates are inclusive of

VAT at 5%.

62

10.2

Sl.No.
1

MS SPECIALS AS PER IS 1916

Description

Unit

Rate for 2014-15


in Rupees

MS specials with inside lining / epoxy


coating and outside coating with
cement mortar 25mm thick.

91.00

Kg

82.00

Kg

85.00

MS specials without inside lining


and outside coating

Kg

MS specials without inside lining


and outside coating but with anti
rust painting.

Note :

The above rates are inclusive of VAT and transportation charges anywhere
in Tamilnadu. Excise duty 12.36% and VAT 5%.

10.3
Sl.No.

MS CASING PIPE

Description

Unit

Rate for 2014-15


in Rupees

Supply and delivery of MS Casing


pipes confirming to IS
1

100 mm

Metre

823.00

125 mm

Metre

1030.00

150 mm

Metre

1236.00

Note :

The above rates are inclusive of VAT and transportation charges anywhere in
Tamilnadu. Excise duty 12.36% and VAT 5%.

63

11.0

RCC NON PRESSURE SPUN PIPE AS PER IS 458/2003

RCC non pressure spun pipe with socket and spigot ends as per IS 458/2003
manufactured with sulphate resistence cement with 12 mm HI -alumina lining with
rubber ring joints.
Sl. No.

Internal Dia.

Unit

200mm

Rate for 2014-15 in Rupees


NP2 Class

NP3 Class

NP4 Class

One metre

536.00

659.00

686.00

250mm

One metre

633.00

799.00

841.00

300mm

One metre

846.00

1056.00

1112.00

350mm

One metre

1132.00

1397.00

1475.00

400mm

One metre

1457.00

1931.00

2011.00

450mm

One metre

1889.00

2454.00

2678.00

500mm

One metre

2288.00

2780.00

3090.00

600mm

One metre

2449.00

3197.00

3562.00

700mm

One metre

3604.00

4878.00

5045.00

10

800mm

One metre

4196.00

5832.00

6292.00

11

900mm

One metre

4629.00

6725.00

7274.00

12

1000mm

One metre

5489.00

7441.00

8598.00

13

1100mm

One metre

6544.00

10630.00

11837.00

14

1200mm

One metre

7509.00

12974.00

14285.00

15

1400mm

One metre

8982.00

16060.00

18300.00

16

1500mm

One metre

17657.00

19415.00

20255.00

17

1600mm

One metre

20539.00

23880.00

24825.00

Note:

The rate is inclusive of VAT at 5 % and transportation charges to stockyard


anywhere in Tamilnadu. Unloading, stacking at stock yard and Conveyance from
stock yard to site are extra. Excise duty at 12.36% extra

64

11.1

RUBBER GASKETS AS PER IS 5382/1985 (Reaffirmed 1998)


Rate for 2014-15 in Rupees

Sl. No.

Internal Dia.

Unit

200mm

Each

34.00

39.00

46.00

250mm

Each

39.00

46.00

54.00

300mm

Each

46.00

54.00

60.00

350mm

Each

54.00

66.00

72.00

400mm

Each

60.00

85.00

92.00

450mm

Each

66.00

100.00

106.00

500mm

Each

72.00

121.00

126.00

600mm

Each

119.00

158.00

164.00

700mm

Each

165.00

192.00

206.00

10

800mm

Each

185.00

226.00

232.00

11

900mm

Each

226.00

284.00

291.00

12

1000mm

Each

291.00

336.00

357.00

13

1100mm

Each

324.00

397.00

404.00

14

1200mm

Each

337.00

421.00

437.00

15

1400mm

Each

489.00

715.00

731.00

16

1500mm

Each

767.00

936.00

954.00

17

1600mm

Each

846.00

1048.00

1079.00

Note:

NP2 Class

NP3 Class

NP4 Class

The rate is inclusive of Excise duty at 12.36%, VAT at 5% and transportation charges
anywhere in Tamilnadu.

65

12.0

CI D/F SLUICE VALVE WITH CAP/ WHEEL

AS PER IS 14846/2000 PN 1.0 WITH ISI MARKING


Rate for 2014-15in Rupees.
Sl.No

Size

50 mm

Each

3512.00

3184.00

65mm

Each

4228.00

3702.00

80mm

Each

4426.00

4012.00

100mm

Each

5898.00

5347.00

125mm

Each

7385.00

6695.00

150mm

Each

8893.00

8063.00

200mm

Each

15526.00

14076.00

250mm

Each

24774.00

22306.00

300mm

Each

30866.00

27985.00

10

350mm

Each

47994.00

43151.00

11

400mm

Each

61131.00

54962.00

12

450mm

Each

77276.00

69478.00

13

500mm

Each

97104.00

87305.00

14

600mm

Each

142759.00

128353.00

15

700mm

Each

271656.00

246289.00

16

750mm

Each

310185.00

278883.00

17

800mm

Each

374894.00

337062.00

18

900mm

Each

503437.00

456425.00

19

1000mm

Each

632866.00

573768.00

20

1100mm

Each

892792.00

802698.00

21

1200mm

Each

983548.00

891703.00

Note:

Unit

With Excise
duty

Without
Excise duty

The above rates are inclusive of VAT at 5% and transportation charges


anywhere in Tamilnadu.Excise duty at 12.36%.

66

12.1 C.I. D/F REFLUX VALVE AS PER I.S. 5312/2004/ PART I/ 84 PN 1.0
WITH BYE-PASS ARRANGEMENTS WITH ISI MARKING
Rate for 2014-15in Rupees.
Sl.No

Size

50 mm

Unit

With Excise
duty

Without
Excise duty

Each

3515.00

3187.00

65 mm

Each

4114.00

3730.00

80 mm

Each

4992.00

4528.00

100 mm

Each

6439.00

5839.00

125 mm

Each

8029.00

7279.00

150 mm

Each

9764.00

8854.00

200 mm

Each

19582.00

17753.00

250 mm

Each

28867.00

26172.00

300 mm

Each

37730.00

34208.00

10

350 mm

Each

59342.00

53801.00

11

400 mm

Each

85041.00

76460.00

12

450 mm

Each

109288.00

99082.00

13

500 mm

Each

157470.00

142764.00

14

600 mm

Each

211522.00

191770.00

Note

: The above rates are inclusive of VAT at 5% and transportation charges


anywhere in Tamilnadu.Excise duty at 12.36%

67

12.2 C.I. DOUBLE AIR VALVE AS PER ISI 14845/2000


Rate for 2014-15in Rupees.
Sl.No

Size

Unit

With Excise
duty

Without
Excise duty

40 mm

Each

4265.00

3866.00

50 mm

Each

5266.00

4775.00

80 mm

Each

7120.00

6455.00

100 mm

Each

9694.00

8789.00

150mm

Each

19430.00

17615.00

200mm

Each

30504.00

27426.00

Note

: The above rates are inclusive of VAT at 5% and transportation charges anywhere
in Tamilnadu.Excise duty at 12.36%.

12.3

CI SINGLE AIR VALVE AS PER ISI 14845/2000


Rate for 2014-15in Rupees.

Sl.No

Size

Unit

With Excise
duty

Without
Excise duty

15mm

Each

1012.00

918.00

25 mm

Each

1459.00

1322.00

40 mm

Each

1823.00

1652.00

50 mm

Each

2020.00

1831.00

80 mm

Each

2704.00

2453.00

100 mm

Each

2946.00

2670.00

150mm

Each

6053.00

5489.00

Note:

The above rates are inclusive of VAT at 5% and transportation charges anywhere
in Tamilnadu. Excise duty at 12.36%.

68

12.4 DI SINGLE CHAMBER AIR RELEASE VALVE


Manufacture, Supply and Delivery of Tamper proof DI single chamber air release
valves with pressure range from PN 1.0 to 2.5 with body and cover made of Ductile
Iron of Grade GGG 40 conforming to IS 1865 with Food Grade Epoxy Powder
coating(EP-P) inside and for outside of colour blue RAL 5005. All internal parts
such as float, shell etc., cover bolts, made of Austenitic alloy steel of SS AISI
304/316. The float for DN 50 made of Polytetrafluroethylene/ Austenitic alloy steel
of AISI 304/316. Gaskets and seals of EPDM / Neoprene rubber for TWAD Board
works anywhere in Tamil Nadu
Sl.No.

Description

Unit

Rate for 2014-15


in Rupees

50mm

each

25347.00

80mm

each

33815.00

100mm

each

39480.00

150mm

each

48062.00

200mm

each

56074.00

Note:

The rates are inclusive of Transportation charges. Excise duty at 12.36%


and VAT at 5% extra.

12.5

CI SLUICE VALVES NON RAISING SPINDLE TYPES TO PRESSURE RATING


OF 1.6 PN TO BE USED IN PUMP HOUSES (LONG BODY/ LONG FACE TO
FACE) Conforming to IS.

Sl.No.

Description

Unit

Rate for 2014-15


in Rupees

100mm

1No.

7274.00

125mm

1No.

9014.00

150mm

1No.

11704.00

200mm

1No.

20060.00

250mm

1No.

27028.00

300mm

1No.

37303.00

With spur gear arrangements


7

350mm

1No.

59991.00

400mm

1No.

78155.00

450mm

1No.

96596.00

10

500mm

1No.

121380.00

11

600mm

1No.

178447.00

Note

: The rate is inclusive of taxes, duties and handling charges.Excise duty at


12.36%,VAT at 5%
69

12.6

BUTTERFLY VALVES WITH TOP AND BOTTOM OF S.S. 410 SHAFT, WAFER
LINER/ WITH REDUCTION GEAR UNIT INCLUDING ALL TAXES, DUTIES
AND HANDLING CHARGES (Conforming to BS 5155 & IS 13095/1996)
12.6.1 WAFER LINER
Sl.No.

Description

Unit

Rate for 2014-15


in Rupees

100mm

1 No

2812.00

150mm

1 No

3985.00

200mm

1 No

11062.00

250mm

1 No

14281.00

300mm

1 No

19187.00

12.6.2

D/F GEAR OPERATED

Sl.No.

Description

Unit

Rate for 2014-15


in Rupees

400mm

1 No

75923.00

450mm

1 No

88766.00

500mm

1 No

95922.00

600mm

1 No

112255.00

Conforming to standard BS 5155 Butterfly valve with Body, Disc and retainer of
Cast Iron Grade F.260 with EDPM rubber sleeve. Internal hardware shall be confirming
to AISI 304. External hardware Carbon Steel shall be confirming to IS 1367. Top
and bottom shaft stainless steel to AISI 410. Body and disc should be tested
(Hydro test) to 15 kg/sq.cm.
12.7 NON RETURN VALVES
12.7.1 WAFER TYPE (DUAL PLATE CHECK VALVE) CONFORMING TO IS

Sl.No.

Description

Unit

Rate for 2014-15


in Rupees

100mm

1 No

3391.00

150mm

1 No

7551.00

200mm

1 No

13849.00

250mm

1 No

24131.00

300mm

1 No

30828.00

Note : The rate is inclusive of taxes, duties and handling charges. Excise duty at
12.36%, VAT at 5%.

70

12.7.2

DOUBLE FLANGED (DUAL PLATE CHECK VALVE)

Sl.No.

Description

Unit

Rate for 2014-15


in Rupees

400mm

1 No.

76864.00

450mm

1 No.

84192.00

500mm

1 No.

93678.00

600mm

1 No.

115763.00

700mm

1 No.

198775.00

800mm

1 No.

329166.00

900mm

1 No.

460334.00

1000mm

1 No.

598711.00

1200mm

1 No.

1983462.00

Construction conforming to standard API 594. Body should confirm cast iron Grade
FG 260 (IS 210), Disc plates confirming to ASTM A216, hinch pin/ stop pin/ spring
should be of SS to AISI 410/304. Body seat should be of EDPM rubber. The body
should be tested to 15 kg/ sq.cm and seat should be tested to 10 kg/ sq.cm
12.7.3 D/F NON RETURN VALVE (OUT DOOR USE)
CI SINGLE DOOR/ MULTY DOOR NON RETURN VALVE CONFORMING TO IS 5312/
2003(Part I & II) TO BE FIXED AFTER WATER METER/ FLOW RECORDER ON PUMPING
MAIN NEAR PUMP HOUSE WITH DASH POT ARRANGEMENT FOR 90% FAST CLOSING
& 10% SLOW CLOSING.
Sl.No.

Description

Unit

Rate for 2014-15


in Rupees

300mm

1 No.

57988.00

350mm

1 No.

85431.00

400mm

1 No.

107379.00

450mm

1 No.

141976.00

500mm

1 No.

186088.00

600mm

1 No.

285952.00

700/750mm

1 No.

448524.00

800mm

1 No.

520698.00

900mm

1 No.

1046009.00

10

1000mm

1 No.

1359923.00

11

1100mm

1 No.

1673837.00

12

1200mm

1 No.

1882928.00

Note : The rate is inclusive of taxes, duties and handling charges. Excise duty at
12.36%, VAT at 5%.

71

12.8

KINETIC AIR VALVES FOR HANDLING MORE VOLUMES OFAIR IN


PUMPING MAIN, DOUBLE ORIFICE KINETIC AIR VALVE CONFIRMING
TO IS 14845 TAMPER PROOF DESIGN (PN-1)

Sl.No.

Description

Unit

Rate for 2014-15


in Rupees

50mm

1 No

11471.00

80mm

1 No

14198.00

100mm

1 No

19079.00

150mm

1 No

35057.00

200mm

1 No

51603.00

Note : The rate is inclusive of taxes, duties and handling charges. Excise duty at
12.36%, VAT at 5%.
12.9 DI D/F GATE VALVES
SUPPLY AND DELIVERY OF DI D/F GATE VALVES (SOFT SEATED) RESILIENT
SEATED SOFT SEALING GATE VALVES (SLUICE VALVES) WITH BODY BONNET OF
DUCTILE CAST IRON OF GRADE GGG40, WEDGE FULLY RUBBER LINED WITH EPDM,
REPLACEABLE SPINDLE NUT, WITHOUT GLAND PACKING AND WITH 3 O-RING
PROTECTION ON THE SHAFT AND SEALS OF NBR AND THE VALVES SHOULD BE OF
VACCUM TIGHT AND 100% LEAK PROOF WITH FACE TO FACE DIMENTIONS AS EPR
BS5163-89/ ISI 14846-2000/ DIN 3202 F 4. ALL THE VALVES SHOULD BE WITH
ELECTROSTATIC POWDER COATING BOTH INSIDE AND OUTSIDE WITH POCKET LESS
STRAIGHT THRO BODY PASSAGE. ALL LTHE VALVES ARE TO BE COMPATIBLE FOR
BURRIED APPLICATION WITH PRESSURE RATING PN 10/16
Sl.No.

Description

Unit

Rate for 2014-15


in Rupees

50mm

1 No

9042.00

80mm

1 No

11164.00

100mm

1 No

14718.00

150mm

1 No

23173.00

200mm

1 No

38510.00

250mm

1 No

55909.00

300mm

1 No

80607.00

350mm

1 No

207449.00

400mm

1 No

255976.00

Note:

The rates are inclusive of duties, all taxes, transportation charges etc.Excise
duty 12.36%, VAT 5%

72

12.10 DI D/F BUTTERFLY VALVES


SUPPLY AND DELIVERY OF DI D/F BUTTERFLY VALVES WITH GGG 400/12 OR
EQUIVALENT GRADE AS PER IS3896 (PART 2) 1985 AND SUBSEQUENT REVISIONS
DOUBLE ECENTRICALLY DISC WITH RENEVABLE SOFT SEAL ON THE DISC AND BODY
SEAT FACE OF STAINLESS STEEL / NICKEL WELD OVERLAY MICROFINISHED WITH
POWDER OR LIQUID EPOXY COATING WITH MINIMUM THICKNESS OF 250 MICRONS
APPLIED ON BOTH BODY AND DISC INSIDE AND OUTSIDE FACE TO FACE DIMENSIONS
AS PER AWWA C 504 OR BS 5155 OR IS 13095
Sl.No.

Description

Unit

Rate for 2014-15 in Rupees


PN 10

PN 16

400mm

1 No

145681.00

200048.00

450mm

1 No

203285.00

227002.00

500mm

1 No

206473.00

243718.00

600mm

1 No

269411.00

326256.00

700mm

1 No

404117.00

485371.00

800mm

1 No

509174.00

611304.00

900mm

1 No

654861.00

764012.00

1000mm

1 No

843374.00

984445.00

1100mm

1 No

1113152.00

1298798.00

10

1200mm

1 No

1325465.00

1329001.00

Note:

The rates are inclusive of duties, all taxes, transportation charges etc.Excise
duty 12.36%, VAT 5%

12.11 DI Non - Return Valve


Manufacture, Supply and Delivery of DI D/F Slanted seat Swing Check Valve. Body
of ductile cast iron GGG-40 and disc of ductile cast iron GGG-40 with fully
encapsulated EPDM rubber, where both faces can be used. Electrostatic epoxy
powder/liquid coating (EP-P) inside and outside color blue RAL 5005 with minimum
coating thickness of 250 microns. The EPDM rubber & Epoxy Powder should be
approved by W 270. (EP-P it is a resi-coat powder approved for drinking water
application, applied through fusion bonding process by dipping the shot-blasted
casted components heated up to 200 deg C). Face to face dimensions as per
EN558-1, series 48 and flange connections as per EN 1092-2/IS 1538.
Unit

Rate for 2014-15


in Rupees

1 No

10665.00

50mm
1 No
65mm
1 No
80mm
1 No
100mm
1 No
125 mm
1 No
150mm
1 No
200 mm
1 No
250mm
1 No
300mm
1 No
rates are inclusive of duties, all taxes, etc.

11302.00
14457.00
15713.00
18552.00
28249.00
35518.00
56501.00
108182.00
146275.00

Sl.No.

1
2
3
4
5
6
7
8
9
10
Note: The

Description

40mm

73

12.12
DI Wafer type Butterfly Valve
Manufacturing, supply and delivery of resilient seated wafer type butterfly valve in
accordance with EN 593, centric disk mounted in three maintenance-free bearing
bushes, tight in both flow directions, Replaceable rubber sleeve with integrated
seal for functionally reliable use for flared flanges, welding flanges, PE flanges as
well as loose flanges with V-collar, Stable seat due to collar with vulcanized support
ring. Vaccum tight upto 1 Torr. Face to face length acc.to 558-1, basic series
20(DIN 3202/k1). With Electrostatic epoxy powder coating (EP-P) inside and
outside color blue RAL 5005 with minimum coating thickness of 250 microns. The
EPDM rubber & Epoxy Powder should be approved by W 270.(EP-P it is resi-coat
powder approved for drinking water application, applied through fusion bonding
technology process by dipping the shot-blasted casted components heated upto
200 deg C).
Sl.No.

Description

Unit

Rate for 2014-15


in Rupees

40mm

1 No

11653.00

50mm

1 No

11653.00

65mm

1 No

12043.00

80mm

1 No

13113.00

100mm

1 No

15382.00

125 mm

1 No

17436.00

150mm

1 No

26487.00

200 mm

1 No

31311.00

250mm

1 No

52283.00

10

300mm

1 No

87418.00

11

350mm

1 No

133529.00

12

400mm

1 No

182245.00

13

450mm

1 No

305059.00

14

500mm

1 No

312389.00

Note: The rates are inclusive of duties, all taxes, etc.

74

12.13 DI Disk Check Valve


Manufacture, supply and delivery of DI D/F Slanted seat Tilting Disc Swing Check
Valve in single piece body and closed eye disc construction. Hemisherical disc
with 59 degree inclination for fast open and closing. Corrosion proof and wear
resistent(triple offset) disc face & body seat face, both made of fusion bonded
Nickel Chromium weld overlay and microfinished. Body and disc of ductile cast iron
GGG-40, medium free(dry) shafts of stainless steel and bearings of Zinc-free Bronze,
Valve should have provision for internal damping unit for reducing the effects of
water hammer/surge, if required at later stage. Electrostatic epoxy powder/liquid
coating(EP-P) inside and outside color blue RAL 5005 with minimum coating thickness
of 150 microns. The EPDM rubber & Epoxy Powder should be approved by W
270.(EP-P it isa resi-coat powder approved for drinking water application, applied
through fusion bonding technology process by dipping the shot-blasted casted
components heated upto 200deg C). Face to face dimensions as per EN 558-1
series 14 and flange connections as per EN 1092-2/IS

Sl.No.

Description

Unit

Rate for 2014-15 in Rupees


PN 10

PN 16

200mm

1 No

434562.00

434562.00

250mm

1 No

437412.00

437412.00

300mm

1 No

439353.00

439353.00

350mm

1 No

497848.00

497848.00

400mm

1 No

489358.00

489358.00

450mm

1 No

670253.00

674845.00

500mm

1 No

596761.00

658930.00

600mm

1 No

812413.00

825959.00

700mm

1 No

1791004.00

1832909.00

10

800mm

1 No

2081864.00

2161262.00

11

900mm

1 No

2370659.00

2489202.00

12

1000mm

1 No

2900515.00

2937343.00

Note: The rates are inclusive of duties, all taxes, etc.

75

12.14 DI Diaphragm Valve


Manufacture supply and delivery of DI D/F Diaphragm type own medium controlled
valve having visual position indicator with cast body of ductile iron grade GGG 40/
SG 400-12 as per IS 3896-Part-2-1985 with integrated valve seat of Ni-Cr overlay
welding and micro finished, customized control cylinder for linear control behaviour,
preformed diaphragm and pull-out safe profile sealing ring of EPDM, threaded inserts
(CORFIX) to prevent the coating from coming off in the connections area as well
as corrosion and incrustations in the control circuit. Pilot valve system having SS
fittings as per Standard parts acc. DIN 2353/EN ISO 8434, all external tubing
parts of SS 1.4571, ball valves, pilot valve, speed control, High capacity transparent
filter included, Tightness to DIN EN 12 266-1, leakage rate A. 2 pressure gauges
for operator-friendly control to determine the actual inlet and outlet pressure
connected directly to the valve. Flange connection dimensions according to EN
1092, Part 2, all parts(Epoxy coating, and diaphragm) in contact with medium are
as per KTW and DVGW certified(harmless). The EPDM rubber & Epoxy coating (EPP) should be approved by W270.(EP-P)
Sl.No.

Description

Unit

Rate for 2014-15


in Rupees

50mm

1 No

340549.00

65mm

1 No

367694.00

80mm

1 No

367460.00

100mm

1 No

391013.00

125 mm

1 No

422455.00

150mm

1 No

483211.00

200 mm

1 No

737243.00

250mm

1 No

1043249.00

300mm

1 No

1559432.00

10

350mm

1 No

1823336.00

Note: The rates are inclusive of duties, all taxes, etc.

76

12.15 DI Surge Control Valve


Manufacturing, supply and delivery of single chamber, double orifice DI Air Valve
with Triple function(Venting, admitting and venting during operation), Tamper proof
in one piece construction (Both Large and small orifice housed in the housing)
itself directly operated by the medium with customized orifice for controlled venting
of defined quantities of Air. The valve shall prevents vaccum and reduces pressure
surges after power failure at pump stations. It shall controls the filling quantity of
the pipeline when unregulated pumps start up. With high speed discharge up to
sonic velocity(300 m/s), with flange dimension to EN 1092-2. Body and cover in
ductile cast iron of grade GGG 40. All internal parts such as float, shell etc & all
cover bolts of austenitic alloy steel and DN 50 float of HOSTAFLON and gaskets
and seals of EPDM of grade W 270(approved for drinking water) with Electrostatic
epoxy powder coating (EP-P) inside and outside color blue RAL 5005 with minimum
coating thickness of 250 microns.
Sl.No.

Description

Unit

Rate for 2014-15


in Rupees

50mm

1 No

107193.00

80mm

1 No

118285.00

100mm

1 No

133458.00

150mm

1 No

189898.00

200 mm

1 No

279086.00

Note: The rates are inclusive of duties, all taxes, etc.

77

12.16 DI Plunger type flow control Valve


Manufacturing, supply and delivery of DI D/F Plunger type(Control valve) with one
piece body of ductile cast iron of grade GGG-40, all internal parts of stainless
steel. Piston guides of bronze welded overlay & micro-finished and bearing bush of
zinc free Bronze. Valve/profile sealing seat shall be in the no-flow zone. Double
sealing effect between the body and the plunger shall be by Quadring Seal (twist
free operation). The valve shall be designed to operate smoothly throughout the
specified flow range without cavitation. Corrosion protected medium free bearing
in the body by way of double O-ring seal and encapsulated shaft seal. There shall
be no obstacles in the main flow passage except the plunger and the attached
control cylinders. Plunger shall be by means of stainless steel crank drive mechanism.
Face-to-face dimensions EN558-1 basic series 15 and 1.5X DN from DN500 and
flange connections as per EN1092-2.
Sl.No.

Description

Unit

Rate for 2014-15


in Rupees

150mm

1 No

748884.00

200mm

1 No

860631.00

250mm

1 No

1137071.00

300mm

1 No

1403075.00

400 mm

1 No

2096467.00

450mm

1 No

2802841.00

500 mm

1 No

3709545.00

600mm

1 No

5392370.00

700mm

1 No

6043761.00

10

800mm

1 No

7027594.00

11

900mm

1 No

9362319.00

12

1000mm

1 No

10719320.00

Note: The rates are inclusive of duties, all taxes, etc.


12.17 OHT FLOW CONTROL VALVE
Supply and delivery of the following sizes of OHT flow control valve with female
BSP treaded ends, (20mm length) with Stainless Steel Body as per ANSI 202
Grade, Plug, Flange Nylon 66, (to be tested at NABL accredited lab.) Triangular
notch type flow control path with opening reference scale arrangements for flow
notch and Upstream & Downstream pressure checking spring loaded mouth
arrangements. Working Pressure 10 KSC, (FCRI, Palgaut pressure test and flow
test to be furnished).
Rate for 2014-15
Sl.No.
Description
Unit
in Rupees
a.

40mm (1 lpm to 400lpm


adjustable type arrangements)

each

4,950.00

each

17,900.00

100mm (20 lpm to 2000 lpm


adjustable type arrangements)

Note: The above rates are inclusive all taxes and transportation charges.
78

13.0 SALT GLAZED STONEWARE PIPE AS PER IS 651-1992 OF 0.6 M LENGTHOF


0.6 M LENGTH
Sl.No.

Description

Unit

Rate for 2014-15


in Rupees

100mm

Each

76.00

150mm

Each

133.00

200mm

Each

210.00

250mm

Each

322.00

300mm

Each

567.00

Note:

14.0
Sl.No.
1

Excise duty Nil. The rate is inclusive of VAT at 5% and transportation


charges to stockyard anywhere in Tamilnadu. Unloading, stacking at stock
yard and Conveyance from stock yard to site are extra.
SULPHATE RESISTANT CEMENT AS PER IS 12330/1988
Description

Unit

Sulphate Resistant Cement as


per IS 12330/1988 and as
amended from time to time.

MT

Rate for 2014-15


in Rupees

6660.00

Note:

The rate is inclusive of duties all taxes and at F.O.R destination

15.0

FIBER REINFORCED CONCRETE FRAME AND COVER AS PER TYPE


HD - 20, IS 12592/2002 , PART 1 & 2

Sl.No.

Description

Unit

Rate for 2014-15


in Rupees

56cm dia heavy duty

Each

2737.00

56cm dia extra heavy duty

Each

2737.00

60 cm dia heavy duty

Each

3084.00

60 cm dia extra heavy duty

Each

3161.00

Note: Excise duty NIL. The rate is inclusive of VAT at 14.5% and transportation
charges anywhere in Tamilnadu.

79

16.0 WATER METER CONFORMING TO ISO 4064 & DIRT BOX STRAINER
Supply and delivery of Woltman model with removal mechanism water meters confirming
to ISO 4064 part I, II,III class B with life cycle test certificate from FCRI or any Govt .
Organisation . The water meters shall have magnetic drivers or mechanical drivers and
shall be versatile for installation in any position . The meters shall be hydrodynamically,
hydrostatically balanced. The runner, runner chamber, pointers of the meter shall be as
per ISO 4064 class B specification. Dry dial excavated counter housing fully protected
against flooding ensuring easy reading in all climates.
Sl.No.

Description

Rate for 2014-15 in Rupees

Unit

Water meter

Dirt Box

Erection
Charges

15 mm

Each

1112.00

250.00

2
3
4
5
6
7
8
9
10
11
12

20mm
25mm
40mm
50mm
80mm
100mm
150mm
200mm
250mm
300mm
400mm

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

1402.00
3850.00
7968.00
9548.00
12653.00
16232.00
26496.00
29838.00
65736.00
112381.00
187976.00

2814.00
4785.00
5868.00
9292.00
11235.00
24150.00
45172.00
75191.00

350.00
725.00
1600.00
2213.00
2750.00
4300.00
5475.00
6300.00
7500.00
7650.00
7800.00

13

500mm

Each

220500.00

109368.00

7800.00

Note:

1. Excise Duty Nil for Watermeter and Dirtbox Strainer.


2. The rate is inclusive of TNVAT at 5% and transportation charges anywhere
in Tamilnadu.
3. Erection charges includes earth work excavation,labour charges, cutting
and threading, conveyance,welding and hire charges for tools and plants
ets., complete.

16.1 ORIFICE TYPE ELECTRONIC WATER METER


SUPPLY, DELIVERY, FIXING TESTING AND COMMISSIONING OF BEST EFFICIANT ORIFICE
TYPE ELECTRONIC WATER METER USING DIFFERENCIAL PRESSURE SENSING ELEMENT
WITH FLANGE INSERTABLE ORIFICE PLATE SUITABLE FOR D,D/2 TAPPING AS PER BS 1042
SPECIFICATION.THE METER SHOULD BE SUITABLE TO BE CONNECTED TO CONVERTOR
TO GIVE A REMOTE INDICATION OF TOTALISATION AND FLOW RATE WITH A OPTION FOR
COMPUTER CONNECTIVITY INCLUDING SENSOR AND TOTALISER INCLUDING ALL TAXES,
DUTIES AND HANDLING CHARGES.
Sl.No.

Description

Unit

Rate for 2014-15


in Rupees

150 to 450mm

1 NO.

212000.00

475 to 750mm

1 NO.

239664.00

3
Note:

775 to 1200mm
1 NO.
308400.00
The rate includes Excise duty at 12.36%, VAT at 5% handling and
installation charges.

80

16.2

FULL BORE ELECTROMAGNETIC FLOW METER

Electromagnetic Flow Meter shall be a velocity sensing Electromagnetic type,


microprocessor based signal converter, sealed housing, flanged tube meter for 1.0
Mpa working pressure, manufactured to highest standard available for mag-meters,
equipped with minimum six digit digital totalizers, reading in units of kiloliters and
shall be accurate within 0.5% of Measured value, shall operate within a range of
0.3m/sec to 4 m/sec and be constructed as follows:Meter tube (Sensor) shall be
fabricated from stainless steel tube and use class PN10 flat face carbon street
flanges in accordance with IS 1538. These flanges shall be welded to the flow
tube. The internal and external of the meter tube shall be blasted to near white
and lined with hard rubber preferably by SBR or EPDM. Meter tube shall have a
constant nominal inside diameter offering no obstruction to the flow. The accuracy
should be inclusive of linearity, hysteresis, repeatability, temperature and pressure
effectsCoil Housing shall be fabricated from stainless steel for corrosion resistance
and welded to the tube providing a completely sealed environment for all coils,
electrode connections and wiring harness capable of submerged or buried
operation.Signal Converter shall be pulsed DC coil excitation type with auto zeroing.
The signal converter shall be remotely mounted away from the meter. The converter
shall indicate direction of flow and provide a flow rate indication and a total of flow
volume for both forward and reverse directions.The converter shall provide an
isolated 4-20 mA output into minimum 500-ohm load and a frequency output of a
maximum of 0-10 KHZ and a scaled pulse output. The microprocessor based signal
converter shall have a self-diagnostic test mode and a backlit display that
continuously displays Rate of Flow and Total Volume.Converter shall be supplied
with a programmable low flow drop out and empty pipe zero return. The signal
converter housing should be die-cast aluminium with glass window. The converter
cum transmitter should be fully programmable form the front facia. The programming
should be user friendly, self-prompting menu driven.
Sl.No.

Description

Unit

Rate for 2014-15


in Rupees

10MM

1 NO.

82517.00

25 MM

1 NO.

89394.00

50 MM

1 NO.

96270.00

80 MM

1 NO.

103146.00

100 MM

1 NO.

123776.00

125 MM

1 NO.

137529.00

150MM

1 NO.

165034.00

200MM

1 NO.

199417.00

250MM

1 NO.

226922.00

10

300 MM

1 NO.

254428.00

11

350MM

1 NO.

343822.00

12

400MM

1 NO.

412586.00

13

450MM

1 NO.

495103.00

81

Sl.No.

Description

Unit

Rate for 2014-15


in Rupees

14

500 MM

1 NO.

577620.00

15

600MM

1 NO.

756408.00

16

700 MM

1 NO.

797666.00

17

800MM

1 NO.

907689.00

18

900 MM

1 NO.

1072723.00

19

1000 MM

1 NO.

1306522.00

20

1200 MM

1 NO.

1444051.00

21

1400MM

1 NO.

1787872.00

22

1600MM

1 NO.

2062930.00

23

1800 MM

1 NO.

2613044.00

24

2000 MM

1 NO.

3163159.00

25

2200 MM

1 NO.

3438216.00

26

2400MM

1 NO.

3713273.00

27

2600 MM

1 NO.

4125859.00

28

2800 MM

1 NO.

4469681.00

29

3000 MM

1 NO.

4813502.00

Note:

The rate includes Excise duty at 12.36%, VAT at 5%


installation charges.

82

handling and

17.0 HDPE TANK


Unit

Rate for 2014-15


in Rupees

and fixing charges etc.,


200 litres
500 litres

1 No.
1 No.

1460.00
3500.00

1000 litres

1 No.

7000.00

Unit

Rate for 2014-15


in Rupees

1 No.

7300.00

Sl.No.

Description

Supply and delivery and fixing of


HDPE tank as per IS 12701 / 1996
including loading, unloading,
transportation and labour charges
for fixing of the GI pipes and
specials for pipe connection
works including cutting, threading

18.0 MS KIOSK
Sl.No.
1

Description
Supply and delivery of MS Kiosk
of size 0.75m x 0.45m x 0.75m made
up of MS angle of size 50mm x
50mmx 4mm alround covered with
16 gauge MS sheet and kiosk door
made up of MS plates of size 25mmx
3 mm including cutting, welding,
grinding, locking arrangements
and labour charges etc.,

83

19.0 MS LADDER
Sl No.
1

Description

Total Rs/EACH

Supply and Delivery and fixing of outside MS Ladder of


45cm clear wide made out of 50 mm x 50mm x 6mm MS
angle for sides and steps in 16 mm MS plain rods fixed
at 30cm C/C welded jointed etc ., providing with suitable
side supports, clamps and locking arrangements provided
with two coats of approved enamel paint over one coat
of redoxide paint , for providing access to roof top of
OHT of suitable inclined length , including bottom
anchorage and transportation and as directed by TWAD
Board officers. The rate includes concrete bed block in
CC 1:2:4 using 20mm HBGS at top and bottom of suitable
size with necessry anchor bolts.
For OHT Capacities

1. 10000 litres with - 7.5m staging height

18000

b
2

2. 20000 litres with - 7.5m staging height


Fabrication, supply, delivery and fixing of outside MS
Ladder of 45cm clear wide made out of 50 mm x 50mm
x 6mm MS angle for both sides and for steps at 30cm
C/C welded jointed etc ., for I staging from GL to 1st
level brace (weight 4.5kg/m) IInd and IIIrd staging upto
floor slab and IVth staging from floor slab to roof top.
Supply, delivery and fixing of 32 mm GI pipes medium
for hand rails from I stage to IVth stage. RCC M30
Grade mix for Landing slab 5 nos. at Ground Level- 1No.
and above Ground Level - 4Nos. Supply and fixing of
32mm GI pipe medium for hand rails for the Landing
slab. Supplying and fixing of MS Base plate of 100mm X
100mm X 6mm thick for fixing Anchore fastener bolt for
fixing of hand rails at Landing slab and MS Ladder
providing locking arrangements with two coats of
approved enamel paint over one coat of red oxide paint
as per approved Type Design and as directed by TWAD

18000

board officers.
For OHT Capacities
a

30000 litres capacity at 12.0m staging height

88000

40000 litres capacity at 12.0m staging height

88000

50000 litres capacity at 12.0m staging height

88000

60000 litres capacity at 12.0m staging height

88000

100000 litres capacity at 12.0m staging height

88000

84

20.0 MS DOOR / WINDOW/VENTILATOR


Unit

Rate for
2014-15
in Rupees

Fully panelled Double leaf - Door

1.00 x 2.50 m

6050.00

ii.

Fully pannelled Double leaf - Door

1.00m x2.10 m

5280.00

iii.

Fully panelled Double leaf - Door

1.00m x2.00 m

3850.00

iv.

Fully panelled Single leaf - Door

0.75 m x2.10 m

3245.00

Fully panelled Single leaf - Door

0.90 m x 2.00 m

3465.00

vi.

Fully panelled Single leaf - Door

0.90 m x 2.10 m

3850.00

vii

Fully panelled Single leaf - Door

1.00 m x2.00 m

3610.00

viii

Fully panelled Double leaf


1.20 m x0.90 m

2860.00

- Window (without Ventilator)

0.60 m x 0.90 m

2090.00

Ventilator

0.45m x 0.60 m

1320.00

Sl.No.

Description

Supply and Delivery Fabrication of


MS doors and windows with outer
frame and shutter frame in MS
angle of size 40mm x 40mm x 6
mm with MS flat 25mm x 25mm x
6mm and MS sheet of 18 gauge
including ventilating arrangements
using 20mm square MS rods with
locking arrangements including two
coats of approved enamel paint
over coat of red oxide including
cost of angles, plates, sheets,
fabrication charges, cost of hold
fast and transportation charges
etc., complete.

- Window (without Ventilator)


ix

Fully panelled Double leaf

85

21.0 Water Disinfection Equipment using Silver-Ionisation process


Specification:Supply,delivery,erection and commissioning of the following capacity
of micro processor based water disinfection equipment using silver ionization process
based on Oligodynamic technology, suitable to provide directly to pumping main, or
to sump or to overhead tank, with by-pass arrangements, controlling valves, micro
processor based control panel, in-built transformer, relay miniature circuit breaker,
tool kits, spares etc. The water chambers are made of corrosion free stainless
steel confirm to SS 304 investment casting, capable to withstand a pressure of 10
Ksc with inbuilt electrodes mounted on powder coated mild steel cabinet of 20gg
thickness with universal lock and key for safety. The control panel should have
pump active indication to show that the water is flowing inside the chamber,
electrode OK indication- to show that the electrode is working, Electrode high
indication to show that electrode is clogged and electrode low indication to show
that electrode is nearing completion, for easy maintenance of the equipment.
The silver ions produced by the electrode is totally non toxic at the dosed levels,
as permitted by BIS standard and the residual effect of the disinfectant is long
lasting for more than 2 days.The equipment is powered by a single phase 220V/
50Hz power supply and provided with an on site disinfectant analysing kit with
consumables to do a minimum of 10 tests. The efficacy of the equipment must be
proved by the reputed laboratories like NEERI, Nagpur,ITRC,Luknow.

Sl. No.

Capacity of water
disinfection
equipmentin
litres/ hour

Unit

1000

each

19800.00

2000

each

23760.00

3000

each

48055.00

5000

each

50200.00

10000

each

89985.00

15000

each

96600.00

25000

each

194250.00

50000

each

358050.00

100000

each

479850.00

10

200000

each

945000.00

11

300000

each

1410150.00

12

400000

each

1874250.00

13

500000

each

2355150.00

Note : 1.
2.

Rate for
2014-15
in Rupees.

Excise Duty is Nil. The rate is inclusive of transportation and VAT etc.,
The rate is inclusive of electrodes in-built with equipment.

86

21.1

REPLACEMENT ELECTRODE FOR WATER DISINFECTION EQUIPMENT USING


SILVER IONIZATION

Specification: Supply and delivery of electrode assembly suitable for water disinfection
equipment using silver ionization process using pure silver metal electrode and fixed on
PVC/Nylon sheets and nuts with electrical leads for the following capacities. The supply
should be with the quality test certificate from approved organisations.

Sl.No.

Capapcity LPH

Life of electrodes in
million litre at dosage
0.01mg/lt

Rate for 2014-15 in Rupees

0.005mg/lt

1,000

2070.00

2,000

3450.00

3,000

12

5261.00

5,000

16

5845.00

10,000

18

6428.00

15,000

15

30

8768.00

25,000

30

60

23100.00

50,000

60

120

46754.00

100,000

120

240

93509.00

10

200,000

240

480

187017.00

11

300,000

360

720

279999.00

12

400,000

480

960

374035.00

13

500,000

600

1,200

467544.00

The above rates are inclusive of VAT at 5% and transportation charges anywhere in
Tamilnadu. Excise Duty Nil

87

21.2 ELECTRO CHLORINATOR BASED ON COMMON SALT


Sl.No.

Capacity in litres per day

Rate for 2014-15in Rupees.

50,000

42240.00

1,00,000

53474.00

1,50,000

72600.00

2,00,000

82488.00

2,50,000

99924.00

3,00,000

110418.00

3,50,000

120846.00

4,00,000

130350.00

4,50,000

137933.00

10

5,00,000

139788.00

11

10,00,000

342825.00

12

20,00,000

503160.00

13

30,00,000

652470.00

14

40,00,000

811545.00

15

50,00,000

950040.00

16

60,00,000

1234170.00

17

70,00,000

1324575.00

18

80,00,000

1398915.00

19

90,00,000

1552845.00

20

1,00,00,000

1761165.00

The above rates are inclusive of excise duty at 12.36%, VAT at 5% and
transportation charges anywhere in Tamilnadu.

88

22.0 PROVIDING EPOXY COATING TO REINFORCEMENT STEEL BARS

Sl No.

Description

unit

Rate for
2014-15
in Rupees.

Providing Fusion Bonded Epoxy


coating not less than 175microns
thickness and upto 300 microns to
reinforcement of all diameters as per
IS 13620/1993 including testing of
coating at plant.The cost is inclusive
of cost on account of careful
handling, PVC coated binding wires,
touchup material supplied by coating
agency, repair work, loading,
unloading and strengthening of bent
rods etc., complete as per
specification and as directed by the
Engineer in charge. (inclusive of all
taxes)
a.

for 8mm to 16mm

MT

13688.00

b.

for 20mm to 32mm

MT

10363.00

Note : Transportation charges included.

89

23.0 MECHANICAL JOINT COLLARS


Sl No.

Description

Unit

Rate for 2014-15 in Rupees.

Supply and Delivery of


MJ Collars.
1

100mm

Each

2426.00

150mm

Each

3858.00

200mm

Each

5036.00

250mm

Each

7011.00

300mm

Each

9101.00

350mm

Each

12994.00

400mm

Each

15477.00

450mm

Each

17903.00

500mm

Each

23100.00

10

600mm

Each

29164.00

Note : The above rates are inclusive of Excise duty 12.36% and VAT at 5%
23.1 JOINTING OF MECHANICAL JOINT COLLARS

Sl No.

Description

unit

Rate for 2014-15 in Rupees.

Labour charges for


jointing of mechanical
joint collar, nuts, gasket
and fixing in position as
directed by departmental
officers.
1

100mm

Joint

63.00

150mm

Joint

151.00

200mm

Joint

156.00

250mm

Joint

231.00

400mm

Joint

485.00

450mm

Joint

537.00

600mm

Joint

1063.00

90

24.0 DISJOINTING OF GI PIPES


Sl No.

Description

unit

Rate for 2014-15


in Rupees.

Disjointing of GI pipes as directed


by the departmental officers
1

Upto 80mm

Each

35.00

Above 80mm

Each

48.00

unit

Rate for 2014-15


in Rupees.

24.1 WELDING OF G.I. PIPES


Sl No.

Description

a)

Welding of GI pipes as directed


by the departmental officers for
the sizes
Upto 80 mm

b)

Above 80mm

91

one welding
joint
one welding
joint

119.00
134.00

RATES FOR PUMP SETS


For individual specifications for various items regarding
pump sets & Electrical Equipments, the specifications
already given in the Manual for Pump sets should be
followed.

1.0

CENTRIFUGAL MONOBLOC PUMPSET WITH ISI MARK AS PER IS 9079/


1989 WITHOUT PANEL BOARD (3 PHASE)

Sl.No.

Duty
lpmxm

H.P. of
Pumpset

Unit

Rate for 2014-15


in Rupees

100x20

1.5

1 No

8356.00

150x20

1.5

1 No

12310.00

200x20

1 No

12791.00

250x20

1 No

14157.00

300x20

1 No

16366.00

350x20

1 No

16366.00

400x20

1 No

16718.00

450x20

1 No

16718.00

500x20

1 No

16981.00

10

700x20

1 No

20127.00

11

50x35

1 No

13286.00

12

100x35

1 No

15098.00

13

150x35

1 No

18260.00

14

200x35

1 No

20557.00

15

250x35

1 No

23100.00

16

300x35

1 No

23100.00

17

350x35

1 No

23100.00

18

400x35

7.5

1 No

24700.00

19

450x35

7.5

1 No

24700.00

20

500x35

7.5

1 No

24700.00

21

50x50

1 No

20556.00

22

100x50

1 No

23100.00

23

150x50

1 No

23100.00

24

200x50

7.5

1 No

24700.00

25

250x50

7.5

1 No

24700.00

26

300x50

7.5

1 No

24700.00

27

350x50

10

1 No

32290.00

28

400x50

10

1 No

32290.00

29

500x60

10

1 No

35200.00

Note:

Rates are excluding excise duty and VAT. Duty of the Pumpsets is the
criteria for the rates.

95

2.0.

SINGLE PHASE SUBMERSIBLE PUMPSET


WITHOUT PANEL BOARD 2014-15
H.P. of
Pumpset

AS PER IS 8034/1989

Sl.No.

Duty
lpmxm

15x40

0.50

1 No

13945.00

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

15x50
15x60
15x70
15x80
15x90
15x100
15x125
15X150
20x40
20x50
20x60
20x70
20x80
20x90
20x100
20X125
20X150

0.50
0.50
0.75
1.00
1.00
1.00
1.50
2.00
0.50
0.50
0.75
0.75
1.00
1.00
1.00
1.50
2.00

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

13945.00
14500.00
16754.00
16754.00
16754.00
19113.00
21713.00
23375.00
14500.00
14500.00
14500.00
16754.00
16754.00
17063.00
20350.00
21713.00
23238.00

Unit

No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No

Rate for 2014-15


in Rupees

Note:

Rates are excluding excise duty and VAT. Duty of the Pumpsets is the
criteria for the rates.

3.0.

THREE PHASE SUBMERSIBLE PUMPSET SUITABLE FOR 100MM DIA


BOREWELL AS PER IS 8034/1989 WITHOUT PANEL BOARD 2014-2015

Sl.No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Note:

Duty
lpmxm
30x40
30x50
30x60
30x70
30x80
30x90
30x100
30x125
40x40
40x50
40x60
40x70
40x80
40x90
40x100

H.P. of
Pumpset
0.50
0.75
0.75
0.75
1.00
1.00
1.50
2.00
0.75
0.75
1.00
1.00
1.00
1.50
1.50

Unit
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

No
No
No
No
No
No
No
No
No
No
No
No
No
No
No

Rate for 2014-15


in Rupees
14433.00
14568.00
15289.00
16110.00
18523.00
20213.00
20213.00
22138.00
14433.00
15289.00
15289.00
19998.00
20863.00
22480.00
22480.00

Rates are excluding excise duty and VAT. Duty of the Pumpsets is the
criteria for the rates.
96

3.1.

Sl.No.

THREE PHASE SUBMERSIBLE PUMPSET SUITABLE FOR 150MM DIA


BOREWELL AS PER IS 8034/1989 WITHOUT PANEL BOARD 2014-2015
Duty
lpm x m

H.P. of
Pumpset

Unit

Rate for
2014-15
in Rupees

50x40

2.00

1 No

19638

50x50

2.00

1 No

21640

50x60

2.00

1 No

22703

50X75

3.00

1 No

24204

50x100

3.00

1 No

31625

50x125

4.00

1 No

31656

50x175

5.00

1 No

40700

50x200

6.00

1 No

44550

50x225

7.50

1 No

57944

10

50x250

10.00

1 No

58046

11

50x275

10.00

1 No

66885

12

75x40

2.00

1 No

20968

13

75x50

2.00

1 No

21640

14

75x60

3.00

1 No

22703

15

75x75

3.00

1 No

25889

16

75x100

4.00

1 No

31625

17

75x125

4.00

1 No

37780

18

75x150

5.00

1 No

40013

19

75x175

6.00

1 No

40013

20

75x200

7.50

1 No

43760

21

75x225

10.00

1 No

57944

22

75x250

10.00

1 No

66885

23

75x275

10.00

1 No

66885

24

100x30

1.50

1 No

19638

25

100x40

2.00

1 No

20968

26

100x50

3.00

1 No

22925

27

100x60

3.00

1 No

24204

28

100x75

3.00

1 No

28538

29

100x100

4.00

1 No

33748

30

100x125

5.00

1 No

38769

97

Sl.No.

Duty
lpm x m

H.P. of
Pumpset

Unit

Rate for
2014-15
in Rupees

31

100x175

7.50

1 No

38769

32

100x200

10.00

1 No

42313

33

100x225

10.00

1 No

55107

34

100x250

10.00

1 No

62580

35

125x25

1.50

1 No

19828

36

125x40

3.00

1 No

20968

37

125x50

3.00

1 No

22783

38

125x60

3.00

1 No

25207

39

125x75

3.00

1 No

27986

40

125x100

4.00

1 No

32799

41

125x125

6.00

1 No

38783

42

125x200

10.00

1 No

51094

43

125x225

10.00

1 No

62521

44

150x25

1.50

1 No

19828

45

150x40

3.00

1 No

20968

46

150x50

3.00

1 No

21640

47

150x60

3.00

1 No

25207

48

150x75

4.00

1 No

27986

49

150x100

5.00

1 No

36388

50

150x125

6.00

1 No

36388

51

175x40

3.00

1 No

20968

52

175x50

3.00

1 No

25065

53

175x60

3.00

1 No

25778

54

175x75

4.00

1 No

25778

55

175x100

6.00

1 No

32206

56

200x25

2.00

1 No

19828

57

200x40

3.00

1 No

20968

58

200x50

4.00

1 No

25778

59

200x60

5.00

1 No

28538

60

200x75

5.00

1 No

28538

98

Sl.No.

Duty
lpm x m

H.P. of
Pumpset

Unit

Rate for
2014-15
in Rupees

61

200x100

6.00

1 No

38350

62

200x125

7.50

1 No

43386

63

250x40

4.00

1 No

20968

64

250x50

4.00

1 No

25778

65

250x60

5.00

1 No

28538

66

250x75

6.00

1 No

34168

67

250x100

7.50

1 No

42679

68

250x125

10.00

1 No

48621

69

300x40

5.00

1 No

27829

70

300x50

6.00

1 No

28969

71

300x60

6.00

1 No

34168

72

300x75

7.50

1 No

39653

73

300x100

12.50

1 No

48144

74

350x40

5.00

1 No

26794

75

350x50

7.50

1 No

29811

76

350x60

7.50

1 No

39974

77

350x75

10.00

1 No

42679

78

350x100

15.00

1 No

49944

79

400x40

6.00

1 No

32290

80

400x50

7.50

1 No

37749

81

400x60

7.50

1 No

39931

82

400x75

10.00

1 No

49151

83

500x40

7.50

1 No

33453

84

500x50

7.50

1 No

41904

85

500x75

12.50

1 No

53135

86

600x40

7.50

1 No

34605

87

600x50

12.50

1 No

46634

88

600x75

15.00

1 No

53730

Note:

Rates are excluding excise duty and VAT. Duty of the Pumpsets is the
criteria for the rates.

99

4.0

OPENWELL SUBMERSIBLE PUMPSET WITH ISI MARK AS PER IS 14220


WITHOUT PANEL BOARD

Sl.No.

Duty
lpm x m

H.P. of
Pumpset

Unit

Rate for
2014-15
in Rupees

50x25

1.00

1 No

17091.00

50x40

1.00

1 No

17091.00

50x50

1.50

1 No

20296.00

50x60

2.00

1 No

25384.00

50x75

4.00

1 No

38838.00

50x100

5.00

1 No

43017.00

50x125

6.00

1 No

54835.00

75x25

1.00

1 No

17091.00

75x40

1.50

1 No

19418.00

10

75x50

2.00

1 No

21711.00

11

75x60

2.00

1 No

25384.00

12

75x75

4.00

1 No

38838.00

13

75x100

5.00

1 No

43019.00

14

75x125

6.00

1 No

51248.00

15

75x150

7.50

1 No

69187.00

16

100x25

1.00

1 No

19191.00

17

100x40

2.00

1 No

21711.00

18

100x50

3.00

1 No

22823.00

19

100x60

4.00

1 No

38838.00

20

100x75

4.00

1 No

38838.00

21

100x100

5.00

1 No

43018.00

22

100x125

6.00

1 No

54835.00

23

125x25

3.00

1 No

19409.00

24

125x40

3.00

1 No

22823.00

25

125x50

3.00

1 No

28236.00

26

125x75

4.00

1 No

38838.00

27

125x100

5.00

1 No

43018.00

28

125x125

6.00

1 No

54835.00

29

150x25

3.00

1 No

19409.00

30

150x40

3.00

1 No

22823.00

100

Sl.No.

Duty
lpm x m

H.P. of
Pumpset

Unit

Rate for
2014-15
in Rupees

31

150x50

3.00

1 No

22823.00

32

150x60

4.00

1 No

39215.00

33

150x75

4.00

1 No

39215.00

34

150x100

5.00

1 No

43019.00

35

150x125

7.50

1 No

69187.00

36

175x25

3.00

1 No

19409.00

37

175x40

3.00

1 No

22823.00

38

175x50

3.00

1 No

28236.00

39

175x60

4.00

1 No

38838.00

40

175x75

5.00

1 No

38838.00

41

175x100

6.00

1 No

47464.00

42

200x25

3.00

1 No

19409.00

43

200x40

4.00

1 No

22823.00

44

200x50

4.00

1 No

22823.00

45

200x60

4.00

1 No

38838.00

46

200x75

6.00

1 No

38838.00

47

200x100

7.50

1 No

47464.00

48

200x125

10.00

1 No

81955.00

49

250x25

3.00

1 No

19409.00

50

250x40

4.00

1 No

22823.00

51

250x50

5.00

1 No

28236.00

52

250x60

5.00

1 No

38838.00

53

250x75

7.50

1 No

47464.00

54

250x100

7.50

1 No

50271.00

55

250x125

10.00

1 No

85255.00

56

300x25

3.00

1 No

19409.00

57

300x40

5.00

1 No

22823.00

58

300x50

5.00

1 No

28236.00

59

300x60

6.00

1 No

38838.00

60

300x75

10.00

1 No

47464.00

101

Sl.No.

Duty
lpm x m

H.P. of
Pumpset

Unit

Rate for
2014-15
in Rupees

61

300x100

10.00

1 No

50271.00

62

350x25

3.00

1 No

22823.00

63

350x40

5.00

1 No

33393.00

64

350x50

7.50

1 No

33393.00

65

350x60

7.50

1 No

38838.00

66

350x75

10.00

1 No

47464.00

67

350x100

10.00

1 No

50271.00

68

400x25

3.00

1 No

22823.00

69

400x40

5.00

1 No

33393.00

70

400x50

5.00

1 No

33393.00

71

400x60

7.50

1 No

39936.00

72

400x75

10.00

1 No

50271.00

73

500x25

5.00

1 No

22823.00

74

500x40

5.00

1 No

33393.00

75

500x50

5.00

1 No

33393.00

76

500x75

10.00

1 No

50271.00

77

600x25

5.00

1 No

22823.00

78

600x40

7.50

1 No

33393.00

79

600x50

7.50

1 No

39936.00

80

600x75

10.00

1 No

50271.00

81

700x40

10.00

1 No

37323.00

82

700x60

10.00

1 No

50271.00

83

700x80

10.00

1 No

50271.00

84

700x100

10.00

1 No

50271.00

85

800x40

10.00

1 No

37323.00

86

800x60

10.00

1 No

50271.00

87

800x80

10.00

1 No

50271.00

88

800x100

10.00

1 No

50271.00

89

900x40

10.00

1 No

50271.00

90

900x60

10.00

1 No

50271.00

102

Sl.No.

Duty
lpm x m

H.P. of
Pumpset

Unit

Rate for
2014-15
in Rupees

91

900x80

10.00

1 No

50271.00

92

900x100

10.00

1 No

50271.00

93

1000x40

15.00

1 No

59748.00

94

1000x60

15.00

1 No

59748.00

95

1000x80

20.00

1 No

67340.00

96

1000x100

35.00

1 No

107965.00

97

1250x40

20.00

1 No

63180.00

98

1250x60

25.00

1 No

96736.00

99

1250x80

35.00

1 No

117689.00

100

1250x100

35.00

1 No

117689.00

101

1500x40

20.00

1 No

72501.00

102

1500x60

30.00

1 No

104247.00

103

1500x80

40.00

1 No

121836.00

104

1500x100

50.00

1 No

195158.00

105

2000x40

30.00

1 No

108289.00

106

2000x60

45.00

1 No

121836.00

107

2000x80

50.00

1 No

121836.00

108

2000x100

60.00

1 No

121836.00

109

2500x40

35.00

1 No

121836.00

110

2500x60

60.00

1 No

121836.00

111

2500x80

75.00

1 No

121836.00

112

2500x100

90.00

1 No

121836.00

Note:

Rates are excluding excise duty and VAT. Duty of the Pumpsets is the
criteria for the rates.

103

104

2500

3000

3500

4000

5000

6000

7000

8000

9000

10000

15000

20000

25000

30000

10

11

12

13

14

15

15.58

15.66

6.01

5.48

4.45

4.45

4.45

4.33

3.23

3.41

2.95

2.55

2.55

2.55

2.55

25

16.18

15.66

6.13

5.48

4.75

4.75

4.60

4.60

3.23

3.41

2.95

2.55

2.55

2.55

2.55

30

16.94

15.66

6.14

5.50

4.80

4.79

4.61

4.86

4.70

3.41

3.23

3.23

3.23

3.11

3.01

35

16.94

15.66

13.64

6.76

5.58

5.55

5.29

4.86

4.70

3.41

3.23

3.23

3.23

3.23

3.01

40

Rate for 2014-15

16.94

15.66

13.64

6.76

5.58

5.55

5.55

5.33

4.86

4.86

4.18

4.58

3.50

3.91

3.04

45

16.94

15.66

15.31

7.48

5.80

5.56

5.55

5.55

5.44

5.35

4.70

4.70

3.63

3.94

3.82

50

16.94

15.66

15.31

8.80

5.80

5.64

5.79

5.68

5.84

5.39

5.08

5.23

3.63

3.91

3.87

55

Head in Metres

20.31

15.66

15.31

11.68

10.56

5.76

5.95

6.41

6.41

5.94

5.16

5.43

4.15

4.15

3.88

60

22.35

15.66

15.63

13.39

13.39

11.28

10.74

6.43

6.63

6.16

5.29

5.50

4.95

4.63

4.12

70

---

15.66

15.63

13.39

13.39

---

---

---

6.63

6.16

5.29

5.99

4.95

4.79

4.12

80

Rs. in Lakhs.

---

15.66

15.63

13.49

13.49

---

---

---

6.73

6.16

5.29

5.99

4.99

4.79

4.59

90

1) The rates are inclusive of MS base plate, flexible tyre coupling and foundation bolts.
2) The rates are inclusive of all duties taxes handling charges and at F.O.R. destination.
3) Efficiency may be taken from universal curve for calculation of motor HP, otherwise manufacturers may be consulted
for efficiency curve.
4) NPSH requirement should be assessed and sump should be designed accordingly.
5) Excise duty at 12.36%, VAT 5%

1500

Note:

Capacity in LPM

Sl.No.

5.0.RATES FOR HORIZONTAL SPLIT CASTING CENTRIFUGAL PUMP (1500 RPM)

6.0. HORIZONTAL SQUIRREL CAGE MOTOR 1500 RPM


AC 3 Phase /415 V/ Horizontal SPDP 4 Pole Squirrel cage
Induction motor for HSC Centrifugal pumps
Sl.No

KW

HP

Rate for 2014-15


in Rupees

9.3

12.5

87680.00

11

15

92247.00

15

20

107936.00

18.5

25

148081.00

22

30

162863.00

30

40

188515.00

37

50

235342.00

45

60

287375.00

55

75

287375.00

10

75

110

439003.00

11

90

120

462653.00

12

110

150

583322.00

13

125

170

750484.00

14

132

180

794963.00

15

150

200

802756.00

16

160

215

879888.00

17

180

240

879888.00

18

187

250

912250.00

19

200

270

978500.00

20

220

300

1281625.00

21

250

335

1461192.00

22

280

375

2025125.00

23

300

400

2172750.00

Note : The above rates are inclusive of excise duty,


etc.,Excise duty at 12.36%,VAT at 5%

105

taxes, handling charges

7.0. HORIZONTAL SQUIRREL CAGE MOTOR 1000 RPM


AC 3 Phase /415 V/ Horizontal SPDP 6 Pole Squirrel cage
Induction moror for HSC Centrifugal pumps
Sl.No

KW

HP

Rate for 2014-15


in Rupees

9.3

12.5

80124.00

11

15

84194.00

15

20

118657.00

18.5

25

140133.00

22

30

180374.00

30

40

224988.00

37

50

281222.00

45

60

346434.00

55

75

396896.00

10

75

110

476392.00

11

90

120

540392.00

12

110

150

693838.00

13

125

170

825519.00

14

132

180

825519.00

15

150

200

881197.00

16

160

215

950338.00

17

180

240

1329990.00

18

187

250

1351262.00

19

200

270

1462571.00

20

220

300

1654514.00

21

250

335

1852233.00

Note:

The above rates are inclusive of excise duty,


etc.,Excise duty at 12.36%,VAT at 5%

106

taxes, handling charges

107

25000

30000

12

13

21.69

12.12

12.12

10.61

9.39

9.39

8.81

8.81

8.66

7.28

6.48

5.02

2.51

15m

22.76

12.45

12.45

10.61

9.57

9.57

8.81

8.81

8.81

7.34

6.62

5.68

2.51

20m

24.02

13.05

13.05

10.61

9.95

9.86

9.39

9.39

9.39

9.13

7.34

6.27

2.68

30m

25.78

13.37

13.37

10.90

10.33

10.33

9.86

9.86

9.86

9.26

7.88

7.00

2.68

40m

Rate for 2014-15

25.78

13.96

13.96

11.54

10.61

10.61

10.47

10.47

10.47

9.39

8.84

8.18

2.77

50m

27.31

15.17

15.17

11.54

10.90

10.61

10.47

10.47

10.47

9.39

9.00

8.18

2.86

60m

27.31

16.69

16.69

11.82

11.23

11.23

11.23

10.90

10.90

9.69

9.35

8.18

3.02

70m

Head in Metres

3) Rates given are with suspension length of 7m, bronze impeller, SS 40

2) Multiply with 1.15 for oil lubricated pumps (for raw water)

1) The above rates are including excise duty at12.36%, VAT 5% ,transportaion and

20000

11

Note:

15000

10

6000

10000

5000

4000

8000

3000

2000

7000

1500

Capacity in LPM

30.33

19.72

19.72

12.73

11.54

11.23

11.23

11.23

11.23

10.61

9.10

8.51

3.34

90m

33.37

23.98

23.98

13.03

11.54

11.54

11.54

11.54

11.54

10.61

9.39

9.10

3.50

100m

handling charges etc.,

30.33

17.28

17.28

12.45

11.23

11.23

11.23

11.08

11.08

10.33

9.69

8.34

3.02

80m

Rs. in Lakhs.

VERTICAL TURBINE PUMP (WATER LUBRICATED) CONFIRMING TO IS 1710/1989 (REAFFIRMED 1999)


1500 RPM SUITABLE FOR VERTICAL HOLLOW SHAFT SQUIRREL CAGE

Sl.No.

8.0.

9.0 VERTICAL HOLLOW SHAFT MOTORS FOR TURBINE PUMP


AC 3 Phase /415 V/ Vertical Hollow Shaft TEFC & SPDP 4 Pole
Squirrel cage Induction moror 1500RPM
Sl.No

KW

HP

Rate for 2014-15


in Rupees

TEFC MOTORS
1

18.5

25

90583.00

22

30

96569.00

30

40

130250.00

37

50

168234.00

45

60

203025.00

SPDP MOTORS
6

55

75

335620.00

75

100

443689.00

90

120

456064.00

110

150

588566.00

10

125

170

602105.00

11

132

180

685867.00

12

150

200

773450.00

13

160

215

930486.00

14

180

240

966570.00

15

187

250

978219.00

16

200

270

1091529.00

17

220

300

1138112.00

18

250

335

1220780.00

19

280

375

1383250.00

20

300

400

1481601.00

Note:

The rates are inclusive of excise duty,taxes,etc., Excise duty at 12.36%,


VAT at 5%.

108

10.0

Sl.No

OIL NATURAL AND AIR NATURAL (ONAN) COOLED 11KV / 22KV / 11KV
AND 22KV WITH COPPER WINDING CONFIRMING TO IS 2026
Rate for 2014-15in Rupees

Rating in KVA
11KV

22 KV

11KV/22KV

160

225600.00

252000.00

270000.00

200

252000.00

288000.00

306000.00

250

297000.00

324000.00

342000.00

315

333000.00

360000.00

387000.00

400

392400.00

445500.00

479700.00

Note :- Excise duty at 12.36 % and TNVAT at 5% and handling charges are extra.

10.1

Sl.No

OIL NATURAL AND AIR NATURAL (ONAN) COOLED 11KV / 22KV WITH
COPPER WINDING CONFIRMING TO IS 2026
Rating in KVA

Rate for 2014-15in Rupees


11KV/433V

22KV/433V

500

524700.00

564300.00

630

653400.00

693000.00

750/800

803000.00

882000.00

1000

957000.00

1035000.00

Note : Excise duty at 12.36%, TNVAT at 5% and handling charges are extra

109

11.0.

SINGLE PHASE PANEL BOARD WITH TWO LEVEL GUARD AND AUTO START

Sl. No.

HP

Unit

Rate for 2014-15 in Rupees

1 No.

4160.00

1.5

1 No

4550.00

1 No

5200.00

Note

1) The rate are excluding excise duty and taxes


2) Excise duty Nil and VAT at 5 % extra over the above rate.
3) The above rates are inclusive of two level guard worth Rs.550/- and auto
star facility worth Rs. 400/4) Timer is not recommended for this panel board.
5) Panel board should be provided as per specification given in Board circular
No. 23/DCE/QATA/2004/Dt. 23.8.2004

11.1.

3 PHASE PANEL BOARD- D.O.L. WITH TWO LEVEL GUARD AND AUTO START

Sl. No.

HP

Unit

Rate for 2014-15 in Rupees

1 No.

9750.00

1 No

9750.00

1 No

9750.00

1 No.

9750.00

1 No

9750.00

1 No

9750.00

Note

1) The rate are excluding excise duty and taxes


2) Excise duty Nil and VAT at 5 % extra over the above rate.
3)The above rates are inclusive of two level guard worth Rs.550/- and auto
star facility worth Rs. 400/4) For Timer facility if necessoryRs. 4000 may be added as extra.
5) Panel board should be provided as per specification given in Board circular
No. 26/F.13/HOTC/DCE/QATA/2004-2/Dt. 22.9.2004

11.2

3 PHASE PANEL BOARD-STAR DELTA WITH TWO LEVEL GUARD AND AUTO
START
Sl. No.
HP
Unit
Rate for 2014-15 in Rupees
1

1 No.

12259.00

7.5

1 No

12870.00

10

1 No

15590.00

12.5

1 No.

16240.00

15

1 No

18026.00

20

1 No

18975.00

7
Note

25
1 No
18975.00
1) The rate are excluding excise duty and taxes.
2) Excise duty Nil and VAT at 5 % extra over the above rate.
3) The above rates are inclusive of two level guard worth Rs.550/- and auto
star facility worth Rs. 400/-.
4) Timer is not recommended for this panel board.
5) Panel board should be provided as per specification given in Board circular
No. 26/F.13/HOTC/DCE/QATA/2004-2/Dt. 22.9.2004
110

11.3

DOL STARTER WITH SINGLE PHASING PREVNTOR WITH AMMETER


CONFORMING TO IS 13947 WITH AUTO RESTART FACILITY FOR PUMP
HOUSES WHERE PANEL BOARDS ARE AVAILABLE
Up to 10 HP rating Rs. 4416
(The above rates are inclusive of all taxes ,duties and handling charges
Excise duty at 12.36%,VAT 5 %)

11.4

FLEX COMPENSATED MAGNETIC AMPLIFIER SOFT STARTER SUITABLE


FOR L.T.SQUIRREL CAGE MOTOR SQUIRREL CAGE MOTOR

Sl. No.

HP

Unit

30 to 37

1 No

172320.00

38 to 75

1 No

300520.00

76 to 135

1 No

418430.00

136 to 160

1 No

476848.00

161 to 250

1 No

704880.00

251 to 300

1 No

834240.00

301 to 500

1 No

1192760.00

501 to 750

1 No

1540024.00

11.5

Rate for 2014-15 in Rupees

FLEX COMPENSATED MAGNETIC AMPLIFIER SOFT STARTER SUITABLE


FOR H.T.SQUIRREL CAGE MOTOR SQUIRREL CAGE MOTOR

Sl. No.

HP

Unit

250

1 No

682184.00

300

1 No

718217.00

350

1 No

772335.00

400

1 No

808393.00

500

1 No

844453.00

600

1 No

952633.00

700

1 No

1046390.00

800

1 No

1168994.00

900

1 No

1268158.00

10
Note:

Rate for 2014-15 in Rupees

1000
1 No
1475503.00
**
1) The rates are inclusive of excise duty taxes etc.
2) DOL starters are to be adopted up to 6 HP
3) Air break fully automatic star delta starters are suggested for above
6HP upto 20HP except submersible pumpsets for which fully automatic
ATS starters are to be adopted
4) FCMA soft starter are to be adopted for 100 HP and above.
5)Excise duty at 12.36% VAT at 5%
111

11.6

FULLY AUTOMATIC AIR BREAK STAR DELTA STARTER WITH SINGLE PHASING
PREVENTOR WITH AMMETER CONFIRMING TO IS 13947 WITH AUTO
RESTART FACILITY (FOR INSTALLING WHERE MV PANEL BOARD IS USED)

Sl. No.

KW Rating

HP

Unit

Rate for 2014-15 in Rupees

7.5

10

1 No

14165.00

11

15

1 No

14165.00

15

20

1 No

14950.00

18.5

25

1 No

14950.00

22

30

1 No

24400.00

30

40

1 No

27950.00

37

50

1 No

31875.00

Note:

The above rates are inclusive of all taxes duties and handling charges
Excise duty at 12.36 % and VAT 5%

11.7

FULLY AUTOMATIC AIR BREAK AUTO TRANSFORMER STARTER WITH


SINGLE PHASING PREVENTOR WITH AMMETER CONFIRMING TO IS
13947 WITH AUTO RESTART FACILITY

Sl. No.

KW Rating

HP

Unit

Rate for 2014-15 in Rupees

5.5

7.5

1 No

27050.00

7.5

10

1 No

27050.00

12.5

1 No

30350.00

11

15

1 No

31750.00

15

20

1 No

66826.00

22

30

1 No

83275.00

30

40

1 No

90700.00

37

50

1 No

104990.00

45

60

1 No

117225.00

10

60

80

1 No

163315.00

11

75

100

1 No

179050.00

Note:

The above rates are inclusive of all taxes duties and handling charges
Excise duty at 12.36 % and VAT 5%

112

12.0.

Sl.No

3,3.5,4 CORE 1.1 KV GRADE ARMOURED ALUMINIUM CONDUCTOR


CABLE CONFORMING TO IS 1554 PART I WITH ISI MARKING
Description

Rate for 2014-15in Rupees

Unit

3 Core

3.5 Core

4 Core

4sq.mm

metre

59.00

6sq.mm

metre

71.00

126.00

10sq.mm

metre

81.00

138.00

16sq.mm

metre

85.00

182.00

25sq.mm

metre

106.00

220.00

35sq.mm

metre

130.00

259.00

50sq.mm

metre

172.00

338.00

70sq.mm

metre

228.00

433.00

95sq.mm

metre

298.00

560.00

10

120sq.mm

metre

358.00

685.00

11

150sq.mm

metre

437.00

810.00

12

185sq.mm

metre

539.00

994.00

13

240sq.mm

metre

680.00

1255.00

14

300sq.mm

metre

826.00

1540.00

15

400sq.mm

metre

1057.00

1970.00

Note: Excise duty 12.36% and VAT at 5% are extra

113

12.1.

PVC INSULATED AND SHEATHED 3 CORE FLAT TYPE COPPER CABLE


CONFORMING TO IS 694/1990 FOR THE YEAR 2014-15
Rate for 2014-15in Rupees

Sl.No

Description

Unit

1.5 sq.mm

With excise duty

Without
excise duty

meter

69.00

62.00

2.5 sq.mm

meter

111.00

99.00

4.0 sq.mm

meter

162.00

144.00

6.0 sq.mm

meter

220.00

196.00

10.0 sq.mm

meter

386.00

343.00

16.0 sq.mm

meter

587.00

523.00

12.2

RATE FOR CABLE JOINTS INCLUDING JOINTING MATERIALS


AND LABOUR
The cost of cable per meter will be the cost per joint

12.3

CABLE LAYING
Rate for 2014-15in Rupees
Description

For laying below


GL including
earth work in
Rupees

For laying in
trenches inside
the pump room
or in air

up to 95 sq. mm

108.00

72.00

95 to 240 sq.mm

156.00

103.00

240 to 400 sq.mm

228.00

180.00

Sl.No

12.4

CABLE CLAMPS

Sl.No.

Description

Unit

Rate for the


year 2014-15

up to 95 sq. mm

each

234.00

95 to 240 sq.mm

each

286.00

240 to 400 sq.mm

each

416.00

NOTE:

1. For every 3 metre length one set of clamp is to be provided


2. Suitable number of clamps are to be arrived at according to the length
3. Provision for cable trench and delivery pipe ducting are to be provided
in pump house detailed estimate.

114

H.T. CABLE
12.5.
Sl.No

PVC INSULATED ARMOURED ALUMINIUM CONDUCTOR CABLE


Description

Rate for 2014-15in Rupees

Unit

11KV

12KV

3 C 240 sq.mm

metre

984.00

1203.00

3 C 185 sq.mm

metre

820.00

1016.00

3 C 150 sq.mm

metre

696.00

904.00

3 C 120 sq.mm

metre

619.00

813.00

3 C 95 sq.mm

metre

525.00

736.00

3 C 70 sq.mm

metre

470.00

649.00

Note:

Excise duty at 12.36% and VAT at 5% are extra

13.0

VACCUM PUMP SET WITH ACCESSORIES

Sl. No.
1

2
3

Description

Unit

Rate for the


year 2014-15

Price for 5 HP Model/Rotary type


Vaccum pumpsets (Pumpset + GI
Pipes + Fittings + Starters +
Valves + 100 Lr.Tank) including
Transportation, handling charges
all taxes and duties
Price for 10 HP Vaccum pumpset
with all above Accessories

1 No

355000.00

1 No

451300.00

150mm dia Pressure Gauge and


Vaccum guage including all
accessories as per specification
(For Suction and Delivery to be
mounted on wall on Teak
Wood Board)

1 No

6450.00

Note: The rates are inclusive of Excise duty at 12.36% and VAT at 5%.

115

14.0

MOULDED CASE CIRCUIT BREAKER(MCCB)

Sl.No.

Rate for 2014-15 in Rupees

Range

3POLE

4 POLE

32-100

9825.00

12385.00

125

12600.00

15200.00

160

15600.00

19435.00

200

28264.00

29621.00

250

28264.00

33977.00

320

34200.00

39600.00

400

36000.00

41400.00

630

39826.00

48000.00

800

54000.00

71962.00

10

1000

84000.00

108000.00

11

1250

94800.00

138000.00

12

1600

108000.00

170600.00

NOTE:

1) The rates are inclusive of all taxes, duties and handling charges and
F.O.R. destination.
2) The rate for MCB for single phase useage, the PWD schedule of rates
shall be referred.
3) Add 35% cost of MCCB/ACB/ MCB towards the cost of fabrication
other fittings and labour
4) Upto 15 KW distribution box shall be used for more than one outgoing
loads and for rates PWD schedule rates shall be referred.

15.0

RATE FOR MIXED DIE ELECTRIC CAPACITOR WITH TNEB TEST


CERTIFICATE WITH ACCESSORIES INCLUDING BANKING CONFORM TO
IS 2834.
Rs.400/- per KVAR (includign all taxes, duties and handling charges).

Note:

a. The rate for mixed Die Electric Capacitor with Test Certificate given
as Rs.400/- per KVAR is inclusive of all taxes and duties and inclusive
of Banking charges, such as providing of copper bus bars with provision
for adding atleast 2 capacitors at later date, cable entry box, fabricating
charges etc. complete. This rate is not applicable for replacement of
capacitors which do not require banking and fabrication works.

116

16.0

LT METERING BOX

Sl.No.
1
2
3
4

17.0

Description
Up to 50HP/37 KW (which includes LT meter
panel board 6 Nos. suitable fuse carriers
75 HP/56 KW (which includes LT meter
panel board 6 Nos. suitable fuse carriers
75HP-150HP/56-112 KW (which includes LT
meter panel board 6 Nos. suitable fuse carriers
IN HT supply using LT metering board
(Above 150 HP below 200 HP) 112-150 KW

Rate for
the year
2014-15

1 No.

22500.00

1 No.

29364.00

1 No.

36696.00

1 No.

60000.00

Unit

Rate for
the year
2014-15

1 No.

60000.00

TRANSFORMER SUB STATION RELATED WORKS

Sl.No.
1

Unit

Description
Designing and preparation of CEIG drawings,
obtaining Approval and safety certificate
including submission of Completion report and
rectification report.

Supply, delivery of 6 pole structure materials


with suitable Size RSJ along with all structure
material are as under.

For 11 KV Sub station

1 No.

300000.00

For 22 KV Sub station

1 No.

420000.00

Construction of transformer plinth

1 No.

20000.00

Chain link fencing with gate including the


TNEB 2 poles Spreading of materials as per
CEIG requirements

1 No.

54000.00

Transformer yard earthing

Upto 250 KVA Transformer sub station

1 No.

30000.00

Above 250 KVA

1 No.

60000.00

Transformer sub station erection charges

1 No.

19068.00

Note:

Provision for cement concrete flooring has to be made at the sub station
yard

117

17.1 AIR CIRCUIT BREAKER


Sl.No.

Rate for 2014-15 in Rupees

Range in AMPS

3POLE

4 POLE

1000

173125.00

213000.00

1250

183375.00

224625.00

1600

203500.00

261750.00

2000

254375.00

308000.00

2500

307000.00

375375.00

3200

364400.00

447700.00

4000

481625.00

591250.00

Note :

18.0

The rates are inclusive of all taxes, duties, handling charges and F.O.R.
destination.
SAFETY APPLIANCES
Unit

Rate for
the year
2014-15

Electrical gloves tested to 11 KV /22 KV with


wooden box dusted with french chalk powder

1 No.

564.00

Electrical quality 6mm thick rubber mat

1 No.

804.00

5 kg capacity ISI marked Dry chemical powder


fire extinguisher

1 No.

2250.00

Fire Bucket-3 Nos Hooked to MS stand

1 No.

900.00

Laminated shock treatment chart

1 No.

600.00

Wooden First Aid Box

1 No.

756.00

Rechargeable Emergency lamp( 600mm


fluorescent lamp)

1 No.

3256.00

Sl.No.
1

Description

H.T. SUPPLY
8

Wooden ladder 3M Ht.

1 No.

1350.00

Earth Discharge Rod

1 No.

1128.00

Note:

The rates are inclusive of all taxes,duties, handling charges and F.O.R
destination

118

19.0

TOOLS

Sl.No.

Description

Unit

Rate for
the year
2014-15

6 Chain wrench best India make

1 No.

600.00

8Chain Wrench Best India Make

1 No.

840.00

Connector Screw Driver 901 Taparia Make

1 No.

48.00

200mm Screw Driver 825 Taparia Make

1 No.

84.00

300mm Screw Driver 829 Taparia Make

1 No.

156.00

400mm Screw Driver 930 Taparia Make

1 No.

225.00

200mm Cutting Plier Taparia Make

1 No.

276.00

800gm Ball Pane Hammer with Handle


Taparia Make

1 No.

346.00

Digital Tong Tester CE Make

1 No.

3250.00

10

Digital Multi Meter CE Make

1 No.

2100.00

11

15 Screw Spanner Taparia Make

1 No.

720.00

12

12 Bearing Puller

1 No.

713.00

13

Lever Type Grease Gun

1 No.

563.00

14

12Screw Spanner

1 No.

485.00

15

Crow Bar 5

1 No.

495.00

16

1 Cold Chisel

1 No.

173.00

17

Hacksaw Frame with Blade

1 No.

108.00

18

Electrical Air Blower

1 No.

2650.00

19

Digital Tachometer

1 No.

1800.00

20

Hand Crimpling Tool 8

1 No.

446.00

21

DE Spanner set 6 to 32 Jhalani Make

1 No.

900.00

22

Rings spanner set 6 to 32 Jhalani Make

1 No.

2158.00

23

Pipe Wrench 24 Jhalani Make

1 No.

1296.00

24

Pipe Wrench 14 Jhalani Make

1 No.

540.00

25

12 Flat rough File Scissors Make

1 No.

290.00

26

12 Flat smooth File Scissors Make

1 No.

427.00

27

12Round File Rough Scissors

1 No.

340.00

28

12 Round File Smooth Scissors Make

1 No.

390.00

29

12Half Round File Rough Scissors Make

1 No.

625.00

30

12Half Round File Smooth Scissors Make

1 No.

625.00

Note:

The rates are inclusive of all taxes,duties, handling charges and F.O.R
destination
119

20.0

PUMP ROOM WIRING AND OTHER ITEMS

Sl.No.

Description

Unit

Rate for
the year
2014-15

Providing lighting wiring using MS conduit pipes


and specials with 2 runs 1.5 sq.mm PVC copper
wire and 1 run 12 swg GI wire for earthing
for light, fans and 5A plug points including
switch box 5A switch sockets ceiling rose and
consumables

1 No.

986.00

Supply of portable hand lamp with 100w bulb,


lamp guard and wooden handle and 25M long
flexible cable.

1 No.

863.00

Supply of pedestal fan

1 No.

3250.00

Note:1) Add 35% for wiring on the total fittings cost.


2) The above rates are inclusive of all taxes duties handling charges and
F.O.R destination.
3) Excise duty at 12.36% VAT 5%.
21.0 TWIN GI EARTHING
Sl.No.

Description

Unit

Rate for
the year
2014-15

Upto 25 HP installation

1 No.

8663.00

Above 25-60 HP

1 No.

13860.00

Above 60-150 HP

1 No.

20790.00

Above 150 HP

1 No.

34650.00

Note:

In case of collector well the distance from the bank of the river should be
ascertained to find out the weight of GI strip to be usd only in the foot
bridge and rate of Rs.47/- per Kg should be adopted for estimation and
this amount should be added with the above rates.

22.0 H.O.T. CRANE AND ACCESSORIES


Sl.No.

Description

Unit

Rate for
the year
2014-15

2T capacity hand operated over head Travelling


(HOT) crane suitable for a span upto 6 Mtrs,
and travel length upto 10 Mtrs. with clear lift
upto 6 Mtrs. including gear type chain pulley
block and geared Travelling trolley complete
with all accessories excluding Girder

1 No.

330000.00

2T HOT crane with above specifications upto


8 M Span

1 No.

360000.00

2T HOT crane with above specifications upto


10 M Span

1 No.

386000.00

2
3

120

5
6
7

8
9

Note:

3T capacity hand operated over head Travelling


(HOT) crane suitable for a span upto 6 Mtrs,
and travel length upto 10 Mtrs. with clear lift
upto 6 M including gear type chain pulley block
and geared Travelling trolley complete with
all accessories.

1 No.

360000.00

3T HOT crane with above specifications upto


8 M Span

1 No.

386000.00

3T HOT crane with above specifications upto


10 M Span

1 No.

396000.00

5T capacity hand operated over head Travelling


(HOT) crane suitable for a span upto 6 Mtrs, and
travel length upto 10 M with clear lift upto 6 M
including gear type chain pulley block and
geared Travelling trolley complete with all
accessories.
1 No.

420320.00

5T HOT crane with above specifications upto


8 M Span

1 No.

450000.00

5T HOT crane with above specifications upto


10M Span

1 No.

500000.00

The rates are inclusive of all taxes,duties, handling charges.

121

122

2500

3000

3500

4000

5000

6000

7000

8000

9000

10000

15000

20000

25000

30000

10

11

12

13

14

15

158

137

129

104

87

79

72

54

44

40

39

39

39

37

31

25

158

158

137

110

91

79

72

59

44

44

39

39

39

37

31

30

161

158

137

110

91

87

72

68

44

44

42

39

39

37

31

35

161

159

137

110

91

87

79

68

54

44

42

39

39

38

31

40

168

159

137

110

91

87

79

72

54

44

44

40

39

39

31

45

168

159

137

110

91

87

79

72

54

54

44

44

50

168

159

137

110

91

87

79

72

59

54

44

44

55

168

159

137

110

91

87

79

72

59

54

44

44

60

Rate for the year 2014-15


HEAD IN METRES

The rates for testing and repairs, if any required, for pump sets will be extra.

1500

Note:

Capacity in LPM

168

159

137

110

91

87

79

72

70

188

168

158

137

72

80

188

168

158

137

90

Rupees in Thousands

CARRYING ENERGY EFFICIENCY IMPROVEMENT JOB IN HORIZONTAL SPLIT CASE PUMPS

Sl.No

23.0

123

9000

10000

15000

20000

25000

30000

10

11

12

13

14

138450

128550

118650

107760

97860

86970

86970

78110

69200

63260

63260

59300

59300

59300

15

138450

128550

118650

107760

97860

86970

86970

78110

69200

63260

63260

59300

59300

59300

20

168150

158250

143400

133500

118650

113700

113700

103800

93900

89000

89000

84050

84050

84050

25 30 35

192850

182950

178050

168150

158250

148350

148350

138450

133500

126570

126570

118650

108750

93900

40 45 50

Rate for the year 2014-15


HEAD IN METERS

Note:The rates for testing and repairs, if any required, for pump sets will be extra.

8000

5000

4000

7000

3500

3000

6000

2500

Capacity in LPM

Sl.No
55 60

222550

212650

202750

192850

182950

178050

178050

168150

158250

148350

148350

133500

123600

108750

23.1 ENERGY EFFICIENCY IMPROVEMENT IN VERTICAL TURBINE PUMPS

272050

262150

252550

242350

232450

222550

222550

212650

202750

192850

192850

182950

178050

108600

70 80 90

24.0. Submersible Centrifugal Sewage non clog pumps


Supply and delivery of submersible centrifugal sewage non-clog pumps, vertical spindle type
pump , wear resistance with submersible motor for the various duty conditions as stated in
the annexure. Pump shall be capable of handling min 100 mm solid size with sewage specific
gravity of up to 1.05. Pump shall be of robust construction . Liquid passages shall be finished
smooth and designed as to allow free passage to solids. Pump Impeller should be of Nonclog semi open type , single vane / multi vane preferably contra bloc or vortex impeller design.
Double mechanical seal with silicon carbide faces should be provided to protect the motor
from ingress of sewage along the shaft. The critical speed of the rotor shall be at least 30%
above the operating speed. Pumps to have double bearings between the pump & motor. The
bearings life shall be minimum 100,000 hrs of operation with greased for life. Pump should
be provided with automatic coupling device including pedestal, duck foot bend, stainless
steel guide pipe or related accessories of suitable size to facilitate lifting and lowering into
guide rails for easy maintenance. Pump shall be provided with a stainless steel lifting chain
conforming to BS 970 Gr 304. Pump speed shall be of 960 for high duty pumps and 960/1450
rpm for low duty pumpsets. Casing and impeller should be of CI Gr. FG 260 :IS210 more
preferably with hardened impeller. Shaft should be of stainless steel AISI 410. All the
fasteners and bolts shall be of AISI 410.The submersible motor shall be operated with 3 ph
, 415 V( + or 10 % ) , 50 Hz ( + or - 5 % ) dry induction type. Motor shall be capable of
giving rated output without reduction in the expected life span when operated continuously
. The rotating assembly shall be dynamically balanced as per standards. The starting current
of the motor shall not exceed 200% of rated full load current for Star / Delta or ATS starting
under any circumstances .The motor shall be suitable for full voltage star delta / ATS starting.
The locked rotor current of the motor shall not exceed 600% of full load current unless
otherwise specified. Motor shall be designed to withstand 120 % of rated speed for two
minutes without any mechanical damage , in either direction of rotation. The motor vibration
shall be within the limit specified in applicable standards . Motor should be of IE2, explosion
proof compatible for VFD operation together with star-Delta / ATS starter, protection against
increase in stator winding temperature (15 deg Celsius) , bearing temperature, leakage in
the stator housing and terminal box shall be provided and to be suitably interlocked with the
control panel for tripping the pump in case of increase in temperature beyond set limit.
Insulation class shall be of Class H and degree of protection shall be of IP 68 as per IS
4691. Motor shall be suitable for continuous operation in fully submerged or partially
submerged condition.The pumpset shall be supplied with power cable of PVC insulated and
PVC sheathed , copper , flexible ,round type with required conductor size and number of
cores as per starting method and of specified length for continuous use under water and air.
The control cable of PVC insulated , PVC sheathed , flexible for stator winding temperature
sensor 3 core x 1.5 sq.mm copper conductor and for bimetallic switches 2 core x 1.5 sqmm
copper conductor shall be provided. Motor shall be supplied with 10 mts of round submersible
copper cable of suitable size.

Unit

Rate for the year


2014-15

Sl. No.

Description

1
2
3
4
5
6
7
8
9
10
11

10 to 15 m head
Discharge Upto 20 M3/hour
Discharge 20 to 100 M3/hour
Discharge 100 to 200 M3/hour
Discharge 200 to 300 M3/hour
Discharge 300 to 400 M3/hour
Discharge 400 to 500 M3/hour
Discharge 500 to 600 M3/hour
Discharge 600 to 700 M3/hour
Discharge 700 to 800 M3/hour
Discharge 800 to 900 M3/hour
Discharge 900 to 1000 M3/hour

1
1
1
1
1
1
1
1
1
1
1

No
No
No
No
No
No
No
No
No
No
No

418886.00
446000.00
471000.00
712324.00
903840.00
973426.00
1208834.00
1208834.00
1196644.00
1278031.00
1598594.00

12

Discharge 1000 to 1100 M3/hour

1 No

1572333.00

124

13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
NOTE:-

15 to 20 m head
Discharge Upto 20 M3/hour
Discharge 20 to 100 M3/hour
Discharge 100 to 200 M3/hour
Discharge 200 to 300 M3/hour
Discharge 300 to 400 M3/hour
Discharge 400 to 500 M3/hour
Discharge 500 to 600 M3/hour
Discharge 600 to 700 M3/hour
Discharge 700 to 800 M3/hour
Discharge 800 to 900 M3/hour
Discharge 900 to 1000 M3/hour
Discharge 1000 to 1100 M3/hour
20 to 25 m head
Discharge Upto 20 M3/hour
Discharge 20 to 100 M3/hour
Discharge 100 to 200 M3/hour
Discharge 200 to 300 M3/hour
Discharge 300 to 400 M3/hour
Discharge 400 to 500 M3/hour
Discharge 500 to 600 M3/hour
Discharge 600 to 700 M3/hour
Discharge 700 to 800 M3/hour
Discharge 800 to 900 M3/hour
Discharge 900 to 1000 M3/hour
Discharge 1000 to 1100 M3/hour
25 to 30 m head
Discharge Upto 20 M3/hour
Discharge 20 to 100 M3/hour
Discharge 100 to 200 M3/hour
Discharge 200 to 300 M3/hour
Discharge 300 to 400 M3/hour
Discharge 400 to 500 M3/hour
Discharge 500 to 600 M3/hour
Discharge 600 to 700 M3/hour
Discharge 700 to 800 M3/hour
Discharge 800 to 900 M3/hour
Discharge 900 to 1000 M3/hour
Discharge 1000 to 1100 M3/hour

1
1
1
1
1
1
1
1
1
1
1
1

No
No
No
No
No
No
No
No
No
No
No
No

418886.00
446000.00
644049.00
712324.00
903840.00
973426.00
1208834.00
1208834.00
1196644.00
1278031.00
1598594.00
1572333.00

1
1
1
1
1
1
1
1
1
1
1
1

No
No
No
No
No
No
No
No
No
No
No
No

496853.00
494385.00
716082.00
780601.00
977464.00
1104334.00
1598594.00
1598594.00
1572333.00
1729409.00
1938346.00
2246961.00

1
1
1
1
1
1
1
1
1
1
1
1

No
No
No
No
No
No
No
No
No
No
No
No

494598.00
716082.00
780601.00
1060310.00
1060310.00
1523194.00
1527502.00
1527502.00
1734846.00
1734846.00
1904074.00
2500885.00

1) The rates including ED for pumps


2) The Sales Tax / VAT Extra at 14.50%
3) The rates including transportation and handling charges etc.,

125

RATES FOR BUILDING MATERIALS

BUILDING MATERIALS

1.

Cement

Rs. 5,600/ per metric tonne


(Rupees Five Thousand and Six Hundred only)

The rate for cement is inclusive of all taxes, freight charges etc., at Stockyard/
Dealers Godown. Necessary lead charges (i.e. excluding loading and unloading charges),
as applicable as per conveyance table, may be allowed from the Stockyard / Dealers
Godown to the site of work, if duly certified by an Officer not below the rank of Assistant
Executive Engineer.
However, in the case, if the source is specified as Stockyard the same shall be
decided and approved by the Superintending Engineers concerned.
2.

Steel Rods of all sizes-

Rs.48, 000/- per metric tonne


(Rupees Forty Eight thousand only)

The rate for steel is inclusive of all taxes, freight charges, etc., at Stockyard /
Dealers Godown. Necessary lead charges (i.e. excluding loading and unloading charges),
as applicable as per conveyance table, may be allowed from the Stockyard / Dealers
Godown to the site of work, if duly certified by an Officer not below the rank of Assistant
Executive Engineer.
However, in the case, if the source is specified as Stockyard the same shall be
decided and approved by the Superintending Engineers concerned.
(The above rates are subject to revision as and when revised by the PWD authorities)

129

BUILDING MATERIALS
Sl. No.
3
a.
b.
4
a.
b.
5
a
b.
c.
6
a.
b.
7
a.
b.
c.
8
a.
b.
9
a.
b.
10
a.
b.
11
a.
b.
12
a.
b.
c.
d.
e.
f.
g.
13
a.
b.

Description
Bricks-II Class Table Moulded (Chamber burnt)
9 x 4 x 3
9 x 4 3/8 x 2
Bricks-II Class (Ground Moulded Chamber burnt)
9x4 x3
9x4 3/8 x 2
Bricks-III Class (Country Bricks, Kiln burnt)
22 x 11 x 5 cm (8 x 4 x 2)
22 x 11 x 5.7 cm (8 x 4 x 2 )
22 x 11 x 7cm (8 x 4 x 2 )
Fly Ash bricks
230 x 110 x 70mm
230 x 110 x 75mm
Bricks Country (specially moulded for well steining)
8 x 4 x 2
Perforated Bricks 19 x 9 x 9cm
Terrace Bricks 15 x 7.5 x 2.5cm
Flat Tiles
15cm x 15cm x 12mm
15cm x 15cm x 20mm
Brick Jelly
40mm Size
20mm size
Pressed Tiles
20cm x 20cm x 2cm
23cm x 23cm x 2cm
Pan Tiles
23cm x 8cm x 1.7cm
16.5cm x 8cm x 1.7cm
Best Mangalore Tiles
1st Class A
Class AA
Best Mangalore Ridge Tiles
Best Mangalore Ceiling Tiles
Best Mangalore Glass Roofing Tiles
Best Mangalore Ventilating Tiles (Single)
Best Mangalore Ventilating Tiles (Double)
Mosaic Flooring tiles GREY
25cm x 25cm x 2cm
20cm x 20cm x 2cm
131

Unit

Rates
in Rupees

1000 Nos.
1000 Nos.

5830.00
5600.00

1000 Nos.
1000 Nos.

5020.00
4875.00

1000 Nos.
1000 Nos.
1000 Nos.

3185.00
3325.00
4220.00

1000 Nos.
1000 Nos.

4875.00
5020.00

1000 Nos.
1000 Nos.
1000 Nos.

1875.00
2855.00
734.00

1000 Nos.
1000 Nos.

691.00
819.00

cu.m.
cu.m.

524.00
583.00

1000 Nos.
1000 Nos.

9230.00
13080.00

1000 Nos.
1000 Nos.

359.00
298.00

1000 Nos.
1000 Nos.
1000 Nos.
1000 Nos.
Each
Each
Each

8630.00
8790.00
25200.00
5300.00
250.00
37.90
47.45

1000 Nos.
1000 Nos.

11600.00
7400.00

Sl. No.

Description

14
a.
b.
c.
d.
e.

Mosaic (other colour)


25cm x 25cm x 2cm
20cm x 20cm x 2cm
Mosaic (Green) 20cm x 20cm x 2cm
Mosaic (Green) 25cm x 25cm x 2cm
Mosaic Chequered Tile of Grey colour
size 25 cm x 25 cm x 2 cm
Stone and Road materials
Rough stone for Masonry works (Hard Granite)
Rough stone for revetment works
Jeddy size for revetment (Hard granite)
Cut stone pillar of size 0.15 x 0.15 x 2.1M
From boulders without blasting for revetment
From boulders without blasting for masonry
Course Rubble stone for masonry works
Course Rubble stone for Arch works
Chisel dressed stone
70cm x 30cm x 29cm
37cm x 30cm x 29cm
Hammer dressed stone
37cm x 30cm x 29cm
Cut stone fully dressed to size on all faces
Cut stone roughly dressed
Ashlar arch stone fully dressed to size all faces
Flooring stone SS size (not less than 10cm thick)
Stone slab for culvert (3 faces, one line dressed)
Above 1.2m
Up to 1.2m
Stone slab for culvert (3 faces, two line dressed)
For lintel coping (3 faces, two line dressed)
Bond stones
Kilometre stone 1.65 x 0.45 x 0.15m
Hecta metre stone
0.90 x 0.10 x 0.10m
0.75 x 0.23 x 0.10m
0.90 x 0.15 x0.15m
Demarcation stone(Two line dressed for top 30cm)
0.75 x 0.15 x 0.15m
0.90 x 0.23 x 0.23m
0.75 x 0.23 x 0.23m
0.90 x 0.15 x 0.15m

15
16
17
18
19
20
21
22
23
a.
b.
24
a.
25
26
27
28
29
a.
b.
30
31
32
33
34
a.
b.
c.
35
a.
b.
c.
d.

132

Unit

Rates
in Rupees

1000 Nos.
1000 Nos.
1000 Nos.
1000 Nos.

16000.00
9460.00
11600.00
18200.00

1000 Nos.

14550.00

cu.m.
cu.m.
cu.m.
Each
cu.m.
cu.m.
cu.m.
cu.m.

365.00
316.00
348.00
136.00
93.00
122.00
292.00
316.00

Each
Each

145.00
130.00

Each
cu.m.
cu.m.
cu.m.
sq.m.

101.00
5200.00
3590.00
3960.00
290.00

cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
Each

3770.00
3425.00
4200.00
4200.00
500.50
360.00

Each
Each
Each

101.00
185.00
181.00

Each
Each
Each
Each

75.00
97.00
90.00
83.00

Sl. No.
e.
f.
g.
i)
ii)
36. a.
b.

c.

d.

e.
37
i.
ii.
iii.
iv.
v.
vi.
vii.
viii.
ix.
x.
xi.
38
i.
ii.
39
i.
ii.
40
41
42.a
b.

Description

Unit

Rates
in Rupees

Demarcation Stone with letters cut 0.75x0.15x0.15m


Edge stone 0.45 x 0.15 x 0.15m
T.R.S. Bench Mark Stone neatly dressed the exposed
surface to a height of 15cm including cutting letters
0.15 x 0.15 x 0.60m
0.10 x 0.10 x 0.25m
Guard Stone (Two line dressed for 45cm)
23cm dia 1.0m long
Guard stone (Top 0.70m chisel dressed and 0.50m
bottom roughly dressed) 0.23m x 0.23m x 1.20m long
(Two line dressed top 45cm) 23cm dia 1.0m long
Guard stone (Top 0.70m chisel dressed and 0.50m
bottom roughly dressed) 0.23m x 0.23m x 0.9m long
(Two line dressed top 45cm) 23cm dia 0.90m long
Guard stone (Top 0.70m chisel dressed and 0.50m
bottom roughly dressed) 0.15m x 0.15m x 0.90m long

Each
Each

101.00
46.00

Each
Each

116.00
84.00

Each

134.00

Each

143.00

Each

134.00

(Two line dressed top 45cm) 23cm dia 0.90m long


Guard stone 90cm long 23cm dia
Hard broken Granite stone jelly (I.S.S.)
machine crushed / Hand broken.
90mm size
80mm size
63mm size
50mm size
40mm size
25mm size
20mm size
12mm size
10mm size
6mm size
3mm size
Quartz metal
50mm
40mm
Soft broken stone
63mm
40mm
Laterite 40mm to 75mm size
Kankar 40mm to 75mm size
Soling stones 15cm cube (un blasted)
Soling stones 15cm cube (blasted)

Each
Each

93.00
69.00

cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.

350.00
393.00
453.00
525.00
816.00
701.00
1135.00
1053.00
775.00
525.00
474.00

cu.m.
cu.m.

79.80
81.00

cu.m.
cu.m.
cu.m.
cu.m.
cu.m.
cu.m.

61.60
68.90
79.80
79.80
93.10
152.40

133

Sl. No.
43.a

Description

Unit

Rates
in Rupees

Gravel

cu.m.

143.00

b.

Well Gravel

cu.m.

118.00

c.

Screened Kankar Gravel

cu.m.

87.00

Quarry rubbish

cu.m.

79.00

b.

Stone dust

cu.m.

101.00

c.

Pond Ash (wet /dry)

cu.m.

78.00

44.a

Crushed Stone Sand

cu.m.

403.00

45

Sand for Mortar

cu.m.

176.40

46

Sand for Filling

cu.m.

176.40

47

Clay for puddle and masonry

cu.m.

31.40

Cuddapah slab 50mm thick

sq.m

376.00

ii)

Cuddapah slab 38mm/40mm thick

sq.m

363.00

iii)

Cuddapah slab 20mm/30mm thick

sq.m

334.00

49

Shell Lime (Slacked and screened)

cu.m.

1200.00

50

Freshly Slacked and Screened Burnt Lime Stone

cu.m.

885.00

51

Stone Lime or Lime Metal

cu.m.

78.00

cu.m.

107100.00

cu.m.

105400.00

3m in length) - Malabar

cu.m.

102600.00

55

Teakwood scantlings(below 2m in length ) Malabar

cu.m.

91300.00

56

Teakwood planks

48.i)

LIME

TIMBER AND ROOFING MATERIALS


52

Teakwood scantlings (over 3m for joists and rafters)


Malabar

53

Teakwood scantlings (for tiebeams and


principal rafters) - Malabar

54

Teakwood scantlings (over 2m and below

i)

Over 45cm wide and 12mm thick.

cu.m.

113130.00

ii)

Over 30cm and up to 45cm wide and 12mm thick

cu.m.

105000.00

iii)

Over 30cm and up to 45cm wide and


cu.m.

98340.00

25mm to 40mm thick

cu.m.

94350.00

Over 15cm and up to 30cm wide and 12mm thick

cu.m.

91830.00

cu.m.

87300.00

and 25mm to 40mm thick

cu.m.

85580.00

viii)

Up to 15cm wide and 12mm thick

cu.m.

83980.00

ix)

Up to 15cm wide and 12mm to 25mm thick

cu.m.

83980.00

x)

Up to 15cm wide and 25mm to 40mm thick

cu.m.

79320.00

12mm to 25mm thick


iv)
v)
vi)

Over 30cm and up to 45cm wide and

Over 15cm and up to 30cm wide and


12mm to 25mm thick

vii)

Over 15cm and upto 30cm wide

134

Sl. No.
57
i)
ii)
58
i)
ii)
59
60
61
62
i)
ii)
iii)
iv)
63.a.
b.
c.
64
a.
b.
65
66.a.
b.
c.
67
a.
b.
c.
d.
68
a.
b.
c.
d.
e.
69
70
71
i)
ii)

Description

Unit

Teak wood reepers


50mm x 25mm
RM
50mm x 12mm
RM
Country wood Scantlings
Up to 4m in length
cu.m.
Over 4m in length
cu.m.
Country wood scantlings (for tiebeams and
principal rafters for trusses)
cu.m.
Jack wood Scantlings (up to 4m)
cu.m.
Silver Oak Scantling
cu.m.
Country wood planks
40mm thick- upto 30cm wide
cu.m.
25mm thick - up to 30cm wide
cu.m.
40mm thick - over 30cm wide
cu.m.
25mm thick - over 30cm wide
cu.m.
Jack wood planks 25 to 40mm thick
cu.m.
Silver Oak plank (40mm thick)
cu.m.
Blue gum plank
cu.m.
Country wood reepers
50mm x 25mm
RM
50mm x 12mm
RM
Mango Plank
cu.m.
Palmyrah rafter(50mm to 60mm wide and 125mm depth)
RM
Palmyrah leaves
100 Nos.
Palmyrah leaves (Labour for cutting)
100 Nos.
Casurina Poles
13cm to 15cm diameter
RM
10cm to 13cm diameter
RM
8cm to 10cm diameter
RM
5cm to 8cm diameter
RM
Eucalyptus Poles
13cm to 15cm dia
RM
10cm to 13 cm dia
RM
8 cm to 10 cm dia
RM
5 cm to 8 cm dia
RM
Below 5 cm
RM
Eucalyptus Bullies 4cm to 5 cm dia & cross ties
RM
Casurina Bullies 4cm to 5cm dia & cross ties
RM
Bamboo large
10cm diameter and above
RM
7.5cm to 10cm diameter
RM

135

Rates
in Rupees
70.15
56.85
31660.00
33275.00
33275.00
34870.00
14365.00
36330.00
36330.00
36330.00
36330.00
38060.00
16360.00
16760.00
31.90
23.00
15500.00
45.50
236.00
37.00
30.50
23.20
17.80
15.20
30.50
21.80
17.80
15.20
13.90
11.20
12.50
11.20
9.90

Sl. No.

72
73
74.a)
b)
75
76
i)
ii)
iii)
77
78
79

Description

Unit

METAL AND IRON WORKS


Mild steel plates or sheets BG 10
Mild Steel Angles 25mm x 25mm x 3mm
Binding wire (Black 18G)
Binding wire (Galvanised 18G)
G.I. sheets 30cm wide and 1.6mm thick
Weld mesh
7.5 x 2.5cm, 10 gauge
7.5cm x 5cm, 10 gauge
10cm x 10cm, 10 gauge
Chicken Mesh
Fly Proof Mesh
Supplying mild steel grills for windows,
ventilators, etc., including priming coat

Rates
in Rupees

Kg.
Kg.
Kg.
Kg.
sq.m.

48.00
48.00
48.00
48.00
335.00

sq.m.
sq.m.
sq.m.
sq.m.
sq.m.

325.00
292.00
158.00
35.00
100.00

Kg.

65.00

Note:
1.

For Road works, the Schedule of Rates of Highways Department may be adopted in
respect of materials for which rates are not available in this schedule of rates.

2.

For all the materials viz. Bricks and Tile products, Stone Jelly, Gravel, Sand, Lime
Stone etc., necessary incidental charges , loading charges and unloading charges
have been included in the basic cost of materials listed above. Hence no separate
incidental charges, loading and unloading charges shall be allowed for the above
materials.

136

RATES FOR OTHER


CONSTRUCTION MATERIALS

RATES OF OTHER CONSTRUCTION MATERIALS


Note: No extra on cost, conveyance charges shall be allowed for all the items included
under this category. The rates approved therein are applicable at site of work.
Sl. No.

Name of Material

Unit

Rates
in Rupees

Water proofing compound

Kg

42.35

Mild Steel Flats of all sizes

Kg

48.00

Mild Steel Square Rods of all sizes

Kg

48.00

First Quality Design Ceramic tiles of All colours

305 mm x 305 mm x 6 mm

Each

50.80

ii

200 mm x 200 mm x 6 mm

Each

22.35

iii

200 mm x 100 mm x 6 mm

Each

12.10

First Quality Plain ceramic tiles of all colours

305 mm x 305 mm x 6 mm

Each

36.30

ii

200 mm x 200 mm x 6 mm

Each

16.25

iii

200 mm x 100 mm x 6 mm

Each

8.45

First quality White glazed tiles

150 mm x 150 mm x 6 mm

Each

8.45

ii

100 mm x 200 mm x 6 mm

Each

7.25

First quality colour glazed tiles

150 mm x 150 mm x 6 mm

Each

9.65

Each

8.45

ii

100 mm x 200 mm x 6 mm

First quality colour glazed tiles with printed design

150 mm x 150 mm x 6 mm

Each

11.40

ii

100 mm x 200 mm x 6 mm

Each

10.25

White Cement

Kg

23.00

colouring pigments)

Kg

26.65

11

Multi-colour marble chips of all Grades / Sizes

Bag

97.00

12

White Marble slab (Adanga) 18 mm to 20 mm thick

10

Colour Cement (White cement mixed with

40' x 20' and above

sq.m.

935.00

ii

20' x 20" or 20" x 10" or 10" x10"

sq.m.

511.00

13

Granite tiles - (Superfine polished with Machine cut


edges) of size 20" x 10" or 10" x 10" or 10" x 06",
of 10 mm thick

Jet Black

sq.m.

902.00

Ruby Red, Raw Silk

sq.m.

781.00

Sinthetic Grey, Paradise and Similar varieties.

sq.m.

726.00

14

Granite slabs (Super fine polished with machine cut


edges) of sizes 4x2' and above 18mm to 20mm thick.

Jet Black

sq.m.

1815.00

Ruby Red, Raw Silk

sq.m.

1694.00

139

Sl. No.

Name of Materials

Sinthetic Grey, Paradise and Similar varieties.

15

Polished shahabad stone slabs of 20 mm thick with


machine cut edges of size 2' 0" x 20" and above.

16

2' 0" x 20" and above.

1331.00

sq.m.

363.00

sq.m.

302.00

sq.m.

533.00

sq.m.

467.00

Polished Rajasthan Kota stone slabs of 20 mm thick with


machine cut edges of size below 2' 0" x 20".

19

sq.m.

Polished Rajasthan Kota stone slabs of 20 mm thick with


machine cut edges of size

18

Rates
in Rupees

Polished shahabad stone slabs 20 mm thick with


machine cut edges of size below 2' 0" x 20".

17

Unit

Dolphur stone slabs - semi polished with machine cut


edges of all sizes

40 mm thick

sq.m.

398.00

20 mm thick

sq.m.

363.00

20

Aluminium strips of size 40 mm wide x 1.5 mm thick

RM

31.50

21

Brass strips of size 40 mm wide x 1.5 mm thick

RM

60.00

22

Glass strips of size 40 mm wide and 4 mm thick

RM

15.00

23

Marblex Tiles 3 mm thick

sq.m.

605.00

24

Red Oxide - Superior quality for floor finish

Kg

127.00

all sizes and shapes

sq.m.

1027.00

26

Exterior Emulsion Paint - Water based primer (Liquid)

Litre

145.00

27

Alkali Resistant Distemper Primer

Litre

145.00

28

Sandtex matt

Litre

169.00

29

Vinaratex or equivalent Textured coat

sq.m.

218.00

30

Best Lac Polish / French Polish

Litre

282.00

31

Varnish

Litre

290.00

32

Cotton Waste

33

Cement based Hydraulically pressed Anti skid tiles

25

Decorative pressed tiles of 12 mm thick of

Kg

(pattern design) - 20 mm thick


34

Marble Powder

35

Polishing Stone

sq.m.
Kg

9.20
484.00
4.80

Rough

Each

60.50

ii

Medium

Each

84.70

iii

Fine / Nice

Each

96.80

36

Oxalic Acid

Kg

39.80

37

Turpentine

Litre

26.60

38

Mansion polish

400 gram

159.00

39

Poly Sulphide

Kg

181.00

40

Primer for expansion joints

Kg

162.00

41

Filler material

sq.m.

133.00

140

Sl. No.

Name of Materials

Unit

Rates
in Rupees

42

Bond Breaker

RM

3.60

43

PVC Water Bar 150mm wide with singel bulb

RM

284.00

44

Plain G.I. sheet 0.8mm thick (22 Gauge)

sq.m.

332.00

45

Phil Plug

Each

4.80

46

G.I. Screws
Each

1.20

30mm x 6mm

ii

19mm x 6mm

Each

0.75

47

G.I. Limpet / Cup Washers

Each

1.75

48

Bitumen washers 15mm dia

Each

1.20

49

Asbestos Cement pipe - 100mm dia

3 RM

133.35

50

A.C. shoe - 100mm dia

Each

42.40

51

A.C. Bend - 100mm dia

Each

48.50

52

A.C. Cylindrical Cowl - 100mm dia

Each

72.75

53

C.I. Brackets for A.C. pipe 100mm dia

Each

19.95

54

C.I. Grating - 100mm dia

Each

29.30

55

Asbestos cement fully corrugated sheet - 6mm thick

sq.m.

175.50

56

Asbestos cement plain sheet

6mm thick

sq.m.

157.60

ii

4mm thick

sq.m.

109.10

Asbestos cement adjustable ridges

Pair

181.85

58

G.I. J or L Bolts with nuts 6mm Dia

Each

3.60

59

Steel - special extruded sections for steel windows


Kg

63.30

57

and ventilators conforming to I.S.S. 7452 / 1990


including Fabrication charges
60

CRCA pressed steel Box section 18 Gauge or 1.25mm


thick for Door frames including providing holes and
fixing wooden blocks for fixing furniture and fittings

With one coat of Red oxide priming coat.

RM

427.00

With powder coated primer

RM

455.00

61

Aluminium extruded sections (for Doors, windows,

Natural colour matt finish.

Kg

306.00

With powder coating of any colours.

Kg

327.00

62

Alumninum Extruded Box Section for Staircase Hand


thickness - Natural colour matt finish

Kg

312.00

63

Rubber beading for aluminium glazed doors

RM

36.30

64

Rubber beading for aluminium glazed windows.

RM

27.80

65

PVC / Woollen felt for aluminium doors 6mm thick

RM

8.45

ventilartors, partitions, false ceiling etc.) including


charges for Anodising for 15 micron thickness
a

Rails including charges for Anodising for 15 micron

141

Sl. No.

Name of Materials

66

Pivot for Aluminium Door

67

Hydraulic Door closer of various sizes of approved

Unit

Rates
in Rupees

Set

145.20

Each

867.30

equivalent with ISI monogram.

Each

2079.00

69

Lock for Aluminium doors

Each

238.70

70

Lock for Aluminium sliding windows

Each

59.40

71

Aluminium Grill of standard pattern (diamond shape) sq.m.

1960.00

6mm thick including F (or) H Section.

sq.m.

1585.00

73

Bolts and Nuts 10mm dia for false ceiling

Each

5.25

74

Rawl Plugs for false ceiling

Each

8.40

75

PVC Roller for sliding windows

Each

13.95

Kg

181.50

quality using Aluminium Extruded section body


tubular type universal hydraulic door closer with
double speed adjustment like HARDWYN (make)
GAZEL (or) equivalent (with ISI Monogram)
68

Hydraulic Floor springs of various sizes double acton


hydraulic floor spring of approved quality, brand,
manufacture as per BIS standards for doors including
cost of cutting floors as required, embedding in to
floors and Stainles Steel Cover plates with Aluminium
Pivet and single piece M.S. sheet outer box with side
plate etc., capable of taking upto 130 Kg. weight from
door shutter, like HARDWYN make (U-32) or its

10mm thick including F (or) H Section.


72

76

Aluminium Grill of standard pattern (diamond shape) -

Synthetic Resin - Fevicol or equivalent


(Phenol Formal Dehide based Resin)

77

Butt Hinges with nylon washers of various sizes.


Length and width (with required screws).

125mm x 30mm

Each

73.30

100mm x 30mm

Each

58.90

75mm x 30mm

Each

40.40

50mm x 30mm

Each

32.65

d
78

Tower Bolts of various lengths and diameter


(with required screws)

400mm long and 12mm dia

Each

138.60

300mm long and 12mm dia

Each

106.65

250mm long and 12mm dia

Each

80.00

200mm long and 12mm dia

Each

67.25

150mm long and 12mm dia

Each

53.10

100mm long and 10mm dia

Each

46.60

142

Sl. No.
g
79

Name of Materials
75mm long and 10mm dia

Unit

Rates
in Rupees

Each

32.65

Aldrops of following lengths and diameter with required


screws, bolts and nuts.

300mm long and 16mm dia

Each

192.80

250mm long and 16mm dia

Each

166.30

200mm long and 16mm dia

Each

112.60

200mm long and 12mm dia

Each

93.50

80

Handles D type of various sizes with required screws

200mm long

Each

59.30

150mm long

Each

53.10

100mm long

Each

32.60

81

Ornamental handles of various sizes with required


screws

200mm long

Each

152.35

150mm long

Each

101.60

100mm long

Each

56.10

Each

46.60

Each

24.20

With night latch

Each

534.70

Without night latch

Each

399.60

Wire nails

Kg

63.50

85

Teakwood beading

15mm x 12mm

RM

15.80

35mm x 12mm

RM

39.90

86

Teakwood Beading (ordinary)

30mm x 12mm

RM

33.00

25mm x 12mm

RM

26.60

87

Teakwood beading - Ornamental / design

40mm x 12mm

RM

93.15

40mm x 15mm

RM

106.40

25mm x 12mm

RM

72.60

15mm x 12mm

RM

50.00

82

Aluminium door stopper with rubber bush with


required screws

83

Rubber bush - 40 mm dia and 60 mm long with


required screws

84

Mortice Lock-(Godrej or equivalent) with required


screws with 3 Keys

88

Medium Density Fibre (MDF) Board - Exterior Grade,


Both sides pre-laminated including external lipping with
kiln dried soft wood 35mm thick

sq.m.

143

2125.00

Sl. No.
89
90
i
ii
91
a
b
92
a
b
93
94

95
96

a
b
97a

Unit

Rates
in Rupees

sq.m.

1025.00

sq.m.
sq.m.

1730.00
1595.00

sq.m.
sq.m.

1090.00
1225.00

sq.m.
sq.m.

1863.00
1663.00

with teak wook lipping alround 35 mm thick


Solid core Flush shutters with Teak ply on one side
and commercial ply on other side with teak wood
lipping alround 35 mm thick
Solid core Flush shutters with commercial ply on both
side with teak wood lipping alround 35 mm thick
Solid PVC door shutters using 19 Gauge 19mm MS square
tubes for styles and outer frames. 15mm MS square
tubes for top, lock and bottom rails. The steel tubes
shall be covered with 5mm thick solid PVC sheets.
Shutter using 5mm thick solid PVC sheets for panelling
shall rigidly fixed in position including necessary furniture
and fittings. The over all size of styles shall be 50mm x
30mm. The over all size of top rail, Lock rail and
bottom rail shall be 75mm x 30mm. The over all size of
frames shall be 50mm x 45mm, with suitable rabate for
housing the shutter.
Solid panel PVC door with frame
Solid panel PVC door without frame
FRP door Shutter with FRP door frames made out of
FRP Sheets of 3mm thick of over all size 65mm x 50mm
with rebate suitably reinforced using MS Angle / Flats,
cost of holdfasts and solid core FRP shutter Panel of
5mm thick and hollow core frames of 3mm wall thickness
for styles and rails etc., of sizes specified by Engineers.

sq.m.

2195.00

sq.m.

1925.00

sq.m.

1663.00

sq.m.
sq.m.

3015.00
2545.00

sq.m.

3940.00

Excluding door frames

sq.m.

3270.00

Name of Materials
Medium Density Fibre (MDF) Board - exterior Grade Both sides pre-laminated, 12mm thick
MDF Board exterior Grade - Plain including external
lipping with kiln dried soft wood
35mm thick
30mm thick
Medium density fibre (MDF) Board 12 mm thick
Exterior grade - with melamine finish.
One side melamine finish
Both sides melamine finish
Medium density fibre (MDF) board - Exterior grade Plain - With teak wood external lipping alround
35mm thick
30mm thick
Solid core Flush shutters with Teak ply on both side

144

Unit

Rates
in Rupees

fittings.

sq.m.

2155.00

Excluding door frames

sq.m.

1905.00

99

RCC door frame of 100mm x 65mm cross sectional size

RM

300.00

RM

908.00

RM

1270.00

sq.m.

2430.00

Sl. No.

Name of Materials

98a

PVC panelled door shutters hollow type - 200 mm x 20


mm panels with 1 mm wall thickness for panels and
styles and rails of suitable size with 2 mm wall thickness
suitably reinforced using MS Angle / Flat including cost
of necessary Aluminium hinges and other furniture

with necessary rebate for housing the shutters,


manufactured with cement concrete of grade not less
than M20 using 10 mm and below graded stone jelly
and using steel reinforcement as per C.E. (B) circular
instructions.
100

Stainless Steel (Salem Stainless Steel) Door Frame


(Box Section using Stainless Steel Plate of 1mm thick)
of size 100 mm x 60 mm with a rebate of 30/ 35 mm x
15 mm on one side of the frame including supplying and
fixing dovetail splayed end stainless steel Hold fast etc.,

101

Stainless Steel (Salem Stainless Steel) Door Frame


(Box Section using Stainless Steel Plate of 1.6mm thick)
of size100mmx60mm with a rebate of 30/ 35mm x
15mm on one side of the frame including supplying and
fixing dovetail splayed end stainless steel hold fast etc.,

102

Supplying and erecting pull and push type rolling shutter


with ISI make of approved size and section using 18 GI
sheet. The shutter shall be painted with one coat of
red oxide primer and the rate is inclusive of hood covers,
transportation charges etc.,

ROLLING SHUTTERS (WITH ISI MONOGRAM)

Manually operated (up to 8 m2 area)


2

Gear operated type (from 8 m to 12 m area)

sq.m.

2700.00

Electrically operated type (exceeding 12m2 area)

sq.m.

2940.00

ROLLING GRILLS (WITH ISI MONOGRAM)

Manually operated (up to 8 m2 area)

sq.m.

2480.00

sq.m.

2777.00

sq.m.

3090.00

b
c
103

Gear operated (from 8 m to 12 m area)


2

Electrically operated (exceeding 12 m area)


Barbed Wire - 10 Gauge - Two ply and four pronged
(Galvanised)

104

1 Kg or
6 RM

69.30

sq.m.

178.50

Chain link - 2" x 2" using 10 Gauge Galvanised Iron


Wire (of all sizes)
145

Rates
in Rupees

Sl. No.

Name of Materials

Unit

105
106
107
108
i
ii
iii
iv
109
110
111
112
113
114
115
116
117
118

Pin Headed / Fluted / Figured Glass 3mm thick


Plain Glass - 4mm thick
Plain Sheet Glass - 5.5mm thick
Metal screws (for Aluminium Doors, windows etc.)
75mm x 8mm
38mm x 6mm
19mm x 8mm
19mm x 6mm
Cement paint (First quality)
Oil Bound Distemper
Acrylic Distemper
Primer for Plastic Emulsion paint
Plastic Emulsion paint (First quality)
Wood Primer
Synthetic Enamel paint for Wood work
Red Oxide primer for Iron work
Synthetic Enamel paint for Iron work
Brass chromium plated screw down Tap 15 / 12mm Dia
(Heavy Type)
Chromium plated stop cock 15mm Dia
Brass chromium plated pillar Tap (Heavy type) 15/12mm Dia
Brass chromium plated shower Rose - 100mm Dia
Wooden plug, clamp and screws
Shellac
Thread Ball
Oriya Type Indian Water closet 580mm x 440mm
with P or S Trap
White
Colour
European Water closet with P or S Trap with
Double Flapped seat and seat cover with Brass Hinges
and 10 litre capacity PVC low level flusing tank with all
internal fittings
White
Colour
European water closet with P or S Trap with
Double flapped seat and seat cover with Brass
Hinges and 12.5 litre capacity Porcelin low level flusing

sq.m.
sq.m.
sq.m.

242.00
326.70
387.20

Each
Each
Each
Each
Kg
Kg
Kg
Litre
Litre
Litre
Litre
Litre
Litre

2.30
1.65
1.15
0.85
53.10
78.50
90.60
156.75
315.15
156.75
254.10
145.50
242.55

Each
Each

211.00
169.00

Each
Each
Set
100 gram
Each

302.00
217.00
12.10
18.15
3.60

119
120
121
122
123
124
125
i
ii
126

i
ii
127

Set
Set

1143.00
1459.00

Set
Set

2920.00
3300.00

tank with all internal fittings


i

White

Set

4120.00

ii

Colour

Set

4960.00

146

Sl. No.

Name of Materials

128

Wash Hand Basin of size 550mm x 400mm with all

Unit

Rates
in Rupees

accessories such as cast iron brackets, 32mm dia C.P.


waste coupling, rubber plug and chain, 32mm dia B
Class G.I. waste pipe, 15mm dia G.M. wheel valve, 15mm
dia nylon connection, 15mm dia brass nipples, 15mm
C.P. pillar tap etc.
i

White without pedastal

Set

1585.00

ii

White with pedastal

Set

1905.00

iii

Colour without pedastal

Set

2125.00

iv

Colour with pedastal

Set

2345.00

Set

2030.00

Set

729.00

Set

964.00

129

White Porcelin Sink of size 600mm x 450mm x 200mm


with 32mm dia B Class G.I. waste water pipe and
32mm dia C.P. waste coupling.

130

Cuddapah Slab Sink of size 600mm x 450mm x 200mm


with 32mm dia B Class G.I. waste water pipe & 32mm
dia C.P. waste coupling.

131

Cuddapah Slab Sink of size 600mm x 600mm x 200mm


with 32mm dia B Class G.I. waste water pipe & 32mm
dia C.P. waste coupling.

132

Lipped Mouth Porcelin Flat Back Urinal with all


accessories such as 32mm dia Bell mouth PVC
connection, 15mm dia G.M. wheel value, 15mm dia
B Class G.I. waste water pipe, 15mm dia nylon
connection, 15 mm dia brass nipple etc.,

White

Set

889.00

ii

Colour

Set

1018.00

133

Porcelin soap dish of size 150mm x 150mm x 50mm

White

Each

186.00

ii

Colour

Each

254.00

134

Brass chromium plated soap tray of size 150mmx100mm

Each

156.00

135

Brass chromium plated towel rail 60cm long and 20mm


Set

254.00

Set

127.00

dia with Brackets


136

Anodised Aluminium Towel Rail 60cm long and 20mm


dia with Brackets.

137

PVC / Fibre Glass framed 5.5mm thick mirror, shelf


type with Hard Board Backing

600mm x 450mm

Each

471.00

ii

500mm x 400mm

Each

381.00

147

Sl. No.

Name of Materials

138

Stone ware gully trap of size 150mm x 100m with cast


Iron Double Gratings

139
i
ii
140

Unit

Rates
in Rupees

Each

169.00

100mm x 75mm

Each

277.00

75mm x 50mm

Each

217.00

Cast Iron Nahini / Floor Trap with stainless Steel Grating

PVC Nahini / Floor Trap with PVC Grating

100mm x 75mm

Each

150.00

ii

75mm x 50mm

Each

132.00

141

Spun Yarn

Kg

12.60

142

Hemp Yarn

Kg

11.30

143

Gunny Tape / Kithan

sq.m.

11.30

144

Tar

145

Bitumen Felt 15 mm thick pad

146

Supplying, fabricating, erecting and fixing gyp board

Kg

42.60

sq.m.

266.00

false ceiling upto a ceiling height of 4.5m from floor level.


a

Using plain sheets (10mm thick)

sq.m.

763.00

Using perforated sheets (10mm thick)

sq.m.

990.00

147

Supplying and laying Glass wool for insulation including


necessary packing materials.

Using 50mm thick Glass wool

sq.m.

372.00

Using 25mm thick Glass wool

sq.m.

199.00

148

Vitrified Tiles of size 600 x 600 x 8 mm

sq.m.

990.00

149

Pre-polished concrete anti-skid step tiles of 20mm thick

sq.m.

531.00

150

Colour designed glazed tiles 300 x 200 x 6 mm

Each

31.10

151

Squatting Urinal

Set

485.00

152

CI Brackets for fixing the sink

set

115.00

153

Swan Neck Tap

Each

271.00

154

Brass Screws (30 x 6 mm)

Each

2.40

155

Brass Screws (75 x 10 mm)

Each

4.80

156

Special clamp, teak wood plugs and screws

Set

24.15

157

PVC Clamp, teak wood plugs and screws

Set

9.65

158

Teak Wood plug

Each

1.25

159

Teak wood plug (50 x 50 x 100 mm)

Each

6.30

160

Manhole cover 60 x 60 cm (heavy duty) with frame

Each

2079.00

161

Welding Charges

50 mm

Each

1.85

40 mm

Each

1.45

162

Add for painting/ tarring for Hex Nipple

Each

2.40

163

Labour charges for fixing cuddapah slab to cup board

sq.m.

164

Hire charges for polishing machinery


148

Day

38.00
190.00

Sl. No.
165

Name of Materials
Electricity charges

Unit

Rates
in Rupees

Unit

9.90

WATER SUPPLY AND SANITARY ARRANGEMENTS


166

PVC ITEMS FINOLEX (OR) EQUIVALANT


(WITH ISI MONOGRAM)

PVC Pipes

15 mm Dia

RM

15.10

20 mm Dia

RM

22.35

25 mm Dia

RM

38.10

32 mm Dia

RM

56.90

40 mm Dia

RM

89.00

Note

(1) For Rainwater down fall pipe works, only PVC Pipe
of working Pressure of 4 kg. per sq.cm.
shall be adopted.
(2) For Sanitary arrangement items of works, only PVC
Pipe of working Pressure of 6 kg. per sq.cm.
shall be adopted.
(3) For Water Supply arrangement items of works,
only PVC Pipe of working Pressure of
10 kg.per sq.cm. shall be adopted.

167

PVC Specials for water supply arrangements

Coupler

15 mm Dia

Each

3.75

20 mm Dia

Each

4.35

25 mm Dia

Each

5.00

32 mm Dia

Each

6.35

40 mm Dia

Each

9.45

Elbow

15 mm Dia

Each

5.60

20 mm Dia

Each

6.35

25 mm Dia

Each

8.85

32 mm Dia

Each

12.70

40 mm Dia

Each

17.75

BEND

15 mm Dia

Each

6.35

20 mm Dia

Each

7.60

25 mm Dia

Each

10.10

32 mm Dia

Each

15.10

Each

20.30

Each

7.60

40 mm Dia

Tee

15 mm Dia
149

Sl. No.

Name of Materials

Unit

Rates
in Rupees

20 mm Dia

Each

8.85

25 mm Dia

Each

12.70

32 mm Dia

Each

15.20

40 mm Dia

Each

25.40

End Cap

15 mm Dia

Each

3.75

Reducer

20 mm x 15 mm

Each

5.00

25 mm x 20 mm

Each

5.60

32 mm x 25 mm

Each

8.85

40 mm x 32 mm

Each

11.95

50 mm x 40 mm

Each

20.30

Reducer Tee

20 mm x 15 mm

Each

7.60

25 mm x 20 mm

Each

8.85

32 mm x 25 mm

Each

12.70

40 mm x 32 mm

Each

15.20

50 mm x 40 mm

Each

25.40

Reducer Elbow

20 mm x 15 mm

Each

6.35

25 mm x 20 mm

Each

7.60

32 mm x 25 mm

Each

10.10

40 mm x 32 mm

Each

12.70

50 mm x 40 mm

Each

19.05

Jet Nipple

25 mm Dia

Each

16.45

32 mm Dia

Each

21.55

150

Rates in Rupees
Sl. No.

168

A
a
b
c
d
B
a
b
c
d
C
a
b
c
d
D
a
b
c
d
E
a
b
c
d
F
a
b
c
d
G
a
b
c
d
H
a

Name of Materials

PVC SPECIALS FOR SANITARY


ARRANGEMENTS
FINOLEX (OR) EQUIVALENT
(WITH ISI MONOGRAM)
Elbow
75 mm
90 mm
110 mm
160 mm
Door Elbow
75 mm
90 mm
110 mm
160 mm
Tee
75 mm
90 mm
110 mm
160 mm
Tee with Door (Single)
75 mm
90 mm
110 mm
160 mm
Tee with Door (Double)
75 mm
90 mm
110 mm
160 mm
Bend
75 mm
90 mm
110 mm
160 mm
Y
75 mm
90 mm
110 mm
160 mm
Y with Door (single)
75 mm

151

Unit

O Ring
Jointing

Each
Each
Each
Each

69.60
89.00
107.80
120.50

56.90
69.60
89.00
101.80

Each
Each
Each
Each

89.00
114.50
139.80
165.40

63.60
76.30
120.50
139.90

Each
Each
Each
Each

95.10
120.50
158.70
178.10

89.00
107.80
146.00
157.80

Each
Each
Each
Each

120.50
146.00
184.20
222.30

114.50
127.00
171.40
203.70

Each
Each
Each
Each

152.70
209.60
254.60
292.70

146.00
190.80
241.80
259.30

Each
Each
Each
Each

76.30
95.10
114.50
127.10

63.60
76.30
95.10
107.80

Each
Each
Each
Each

101.80
127.10
165.40
184.20

95.10
114.50
152.70
165.40

Each

120.50

114.50

By
Pasting

Rates in Rupees
Sl. No.
b
c
d
I
a
b
c
d
J
a
b
c
d
K
a
b
c
d
L
a
b
c
d
f
M
a
b
N
a
b
c
169
170
171
172
a
b
c
d

Name of Materials
90 mm
110 mm
160 mm
Y with Door (Double)
75 mm
90 mm
110 mm
160 mm
Double Tee with Door (Single)
75 mm
90 mm
110 mm
160 mm
Double Y with Door (single)
75 mm
90 mm
110 mm
160 mm
Reducer
75 mm x 63 mm
110 mm x 63 mm
110 mm x 75 mm
110 mm x 90 mm
160 mm x 110 mm
Shoe
110 mm dia
160 mm dia
Vent Cowl
50 mm dia
75 mm dia
110 mm dia
OTHER ITEMS :
PVC screw down tap heavy type 20 mm dia.
PVC screw down tap heavy type 15 mm dia.
PVC Adhesive (solution)
PVC low level flushing tank with all
internal fittings - (wall mounting type)
White - 10 litre capacity
White - 7.5 litre capacity
Colour - 10 litre capacity
Colour - 7.5 litre capacity

152

Unit

O Ring
Jointing

Each
Each
Each

152.70
203.70
235.20

133.30
178.10
209.60

Each
Each
Each
Each

165.40
222.30
267.30
323.40

158.70
203.70
254.10
292.50

Each
Each
Each
Each

209.60
241.80
284.80
318.20

171.40
196.90
247.90
280.00

Each
Each
Each
Each

229.10
254.60
292.70
356.40

190.80
216.40
273.30
318.00

Each
Each
Each
Each
Each

69.60
89.00
101.80
114.40
133.30

56.90
76.30
89.00
101.80
127.00

By
Pasting

Each
Each

76.30
114.40

Each
Each
Each

31.50
50.90
76.30

Each
Each
100 gm

78.10
60.50
36.30

Set
Set
Set
Set

908.00
696.00
1030.00
817.00

RATES FOR ELECTRICAL ITEMS

ELECTRICAL ITEMS OF WORKS


ELECTRICAL LAMPS, FITTINGS AND CONNECTED ACCESSORIES
Note:- No extra on cost, conveyance charges shall be allowed for all the items included
under this category. The rates approved therein are applicable at site of work.
Item
No.

Description

Unit

Rates
in Rupees

PART-A
1

INCANDESCENT BULBS 230V/ 250V GRADE


BC/ES WITH ISI

a.

15 Watts

Each

11.00

b.

25 Watts

Each

11.00

c.

40 Watts

Each

11.00

d.

60 Watts

Each

11.00

e.

100 Watts

Each

11.00

f.

200 Watts

Each

22.00

INCANDESCENT BULB 230V/250V GRADE BC/ ES


Colour 15 Watts

Each

13.50

Blended lamp 160 Watts

Each

266.00

3
3.a.

PL LAMP (PHILIPS/ OSRAM)

a.

9 Watts

Each

82.50

b.

11 Watts

Each

88.00

c.

18 Watts

Each

138.50

d.

36 Watts

Each

154.00

FLUORESCENT TUBULAR LAMPS WITH ISI MARK


Each

41.50

a.

Cool Day light

b.

Cool Day light 4 Ft. 40 Watts

Each

41.50

c.

Cool Day light 4 Ft. 36 Watts

Each

40.50

2 Ft. 20 Watts

MERCURY VAPOUR DISCHARGE LAMP


230V GRADE 3 PIN BC

a.

80 Watts

Each

191.00

b.

125 Watts

Each

200.00

c.

250 Watts

Each

489.00

d.

400 Watts

Each

689.00

BOX TYPE SINGLE FLUORESCENT FITTING

Each

353.00

Each

519.00

WITH COPPER CHOKE AND CONDENSOR


COMPLETE WITH ISI MARK
a.

4 Ft. 40 Watts with ballast

b.

4 Ft. 40 Watts Box type with Ballast


(Philips/ Crompton / Wipro)

155

Item
No.
7

Description

Unit

Rates
in Rupees

BOX TYPE TWIN FLUORESCENT FITTING


WITH COPPER CHOKE AND CONDENSOR[HPF]
COMPLETE WITH ISI MARK

a.

4 Ft. 40 Watts

b.

4 Ft. 40 Watts Box type (Philips/ Crompton ) With Ballast

INDUSTRIAL TYPE FLUORESCENT FITTING STOVE

Each

663.00

Each

865.00

ENAMELLED WITH COPPER CHOKE AND CONDENSOR


(HPF) 4 Ft. 40W
a.

Single type suitable for 1 No. tube

Each

975.00

b.

Twin type suitable for 2 Nos. tube

Each

1,200.00

DECORATIVE AND SINGLE FLUORESCENT TYPE


FITTING WITH COPPER CHOKE AND CONDENSOR
(HPF) COMPLETE SUITABLE FOR ONE NUMBER
FLUORESCENT TUBE WITH ISI MARK

a.

4 Ft. 40 Watts with Perspex

Deleted

10

DECORATIVE TWIN FLUORESCENT TYPE FITTING


WITH COPPER CHOKE AND CONDENSOR COMPLETE
SUITABLE FOR 2 NUMBERS FLUORESCENT TUBES

a.

4 Ft. 40W Twin Mirror optic Recessed mounting fitting

b.

4 Ft. 40W Twin Mirror optic Suspension type fitting.


(Philips/ Crompton /Wipro)

c.

1,680.00

Each

3,030.00

Each

2,220.00

Each

740.00

Each

995.00

4 Ft. 40W Twin Mirror Optic Recessed mounting type


fitting(Philips/ Crompton/ Wipro)

11

Each

SINGLE TYPE STREET LIGHT FLUORESCENT FITTING


SUITABLE FOR THE ONE NO. FLUORESCENT TUBE
WITH COPPER CHOKE AND CONDENSOR COMPLETE

a.

4 Ft. 40 Watts type

12

TWIN TYPE STREET LIGHTS FLUORESCENT FITTING


SUITABLE FOR 2 Nos. FLUORESCENT TUBES
WITH COPPER CHOKE AND CONDENSOR COMPLETE

a.

4 Ft. 40 Watts type

13

POST TOP LANTERN FITTING OF (INTEGRAL TYPE


WITH COPPER CHOKE AND CONDENSOR &
NECESSARY ACCESSORIES (PHILIPS/
CROMPTON GREAVES/WIPRO)(SPHERICAL /
RIBBED /CONICAL ACRYLIC COVER)

a.

Suitable for 125 Watts M.V lamp

Each

3,580.00

b.

Suitable for 70 Watts S.V. Lamp

Each

3,770.00

c.

Post top lantern fitting with S.C. holder suitable


Each

2,060.00

for 160 W blended lamp/ incandescent lamp

156

Item
No.

Description

Unit

Rates
in Rupees

14

STARTERS FOR FLUORESCENT TUBES

a.

Starters of capacity 20 Watts

Each

11.00

b.

Starters of

Each

11.00

15

POLYSTER FILLED COPPER CHOKE 250V/50 HZ

capacity 40 Watts

GRADE SUITABLE FOR (PHILIPS/CROMPTON/WIPRO)


a.

20 Watts fluorescent Tube

Each

196.00

b.

40 Watts fluorescent Tube

Each

196.00

c.

36/40W Electronic ballast for flu. Tube


Each

324.00

Each

264.00

(Philips/ Crompton )
d.

36/40W Electronic ballast for flu. Tube


(Indo Asean/ Equivalent)

16

CONDENSOR FOR S.V/ M.V LAMP

a.

8 Mfd for 80 Watts Bulb

Each

124.50

b.

10 Mfd for 125 watts Bulb

Each

148.30

c.

15 Mfd for 250 Watts Bulb

Each

198.00

d.

20 Mfd for 400 watts Bulb

Each

273.00

17

Battern type Bakelite holder for lamp

Each

19.80

18

Water tight bulk head fitting suitable for 100/60 watts


Each

330.00

Each

16.50

Each

195.00

Each

1230.00

Each

132.00

lamp with guard heavy type (PHILIPS/ BAJAJ/


CROMPTON GREAVES)
19
20.a.

Ceiling Rose
Ceiling fixtures 250/300mm complete with Gallery etc.
Clear glass opac/ crystal suitable for 40/60 Watts Bulb

b.

Ceiling luminaire with mirror optics suitable for 2 Nos.


9 Watts/11 Watts (Philips/Crompton/Bajaj)
(FOR ITEMS 6 TO 13, 20 & 22 , THE RATES ARE
EXCLUSIVE OF COST OF TUBES AND LAMPS)

21

Fan clamp (dia 12mm) with 6mm MS side plates &


45 cm cross arm

22

CALL BELLS

a.

Call bell/ Buzzar 6mm suitable for AC/DC

Each

49.50

b.

Push bell

Each

19.80

c.

Gong bell 9 size suitable for 250 V

Each

495.00

d.

Gong bell 12 size suitable for 250V

Each

716.00

23

WATER HEATER WITH ISI MARK

a.

Automatic Electrical Water Heater with copper

Each

5,770.00

container, with Glass Wool/ Puf insulation with MS


powder coated shell suitable for 25 Litres capacity
230V/1000W
157

Item
No.

Description

b.

Automatic Electrical Water Heater with copper

Unit

Rates
in Rupees

Each

7,790.00

Each

6,690.00

Each

8,950.00

Each

1,320.00

Each

1,415.00

Each

224.00

Each

179.00

Each

1,495.00

Each

1,615.00

container, with Glass Wool/ Puf insulation with MS


powder coated shell suitable for 25 Litres capacity
230V/1000W(Venus/Racold)
c.

Automatic Electrical Water Heater with copper


container, with Glass Wool/ Puf insulation with MS
powder coated shell suitable for 35 litres capacity
230V/1000W

d.

Automatic Electrical Water Heater with copper


container, with Glass Wool/ Puf insulation with
MS powder coated shell suitable for 35 litres capacity
230V/1000W(Venus/Racold)
PART B

FANS CONFORMING TO ISS 374 / 1979

a.

AC Ceiling fan complete 1200mm (48) sweep with


300mm Down rod.(without regulator)

b.

AC Ceiling fan complete 1400mm (56) sweep with


300mm Down rod. (Without regulator)

c.

Stepped electronic 300W/450W square type fan


regulator (Anchor Deluxe/Equivalent)

d.

Dimmer type electronic 300W/450W square type fan


regulator (Anchor Deluxe/Equivalent)

e.

AC Ceiling fan complete 1200mm (48) sweep with


300mm Down rod.(without regulator) (Crompton make)

f.

AC Ceiling fan complete 1400mm (56) sweep with


300mm Down rod (Without regulator)
(Crompton make)

II

EXHAUST FANS

a.

AC Exhaust Fan 225 mm (9) sweep (Light duty)

Each

1,220.00

b.

AC Exhaust Fan 300 mm (12) sweep (Light duty)

Each

1,395.00

c.

AC Exhaust Fan 375 mm (15) sweep (Light duty)

Each

1,440.00

d.

AC Exhaust Fan 450 mm (18) sweep (Light duty)

Each

2,020.00

e.

AC Exhaust Fan 375 mm (15) sweep (Heavy duty)

Each

2,650.00

f.

AC Exhaust Fan 450 mm (18) sweep (Heavy duty)

Each

3,300.00

III

LOUVER SHUTTERS ARRANGEMENTS


Each

264.00

Each

280.00

a.

MS/Fibre Louvers shutters arrangements for 300mm


AC Exhaust Fan

b.

MS/Fibre Louvers shutters arrangements for 375mm


AC Exhaust Fan
158

Item
No.
c.

Description

Unit

Rates
in Rupees

MS/Fibre Louvers shutters arrangements for 450mm


AC Exhaust Fan

Each

313.00

PART C
I

SWITCHES

a.

5 Amps (Flush type)

Dozen

203.00

b.

5 Amps (Flush type staircase)

Dozen

253.00

II

DOUBLE POLE SWITCHES(GEM / HPL / HAVELLS /


Each

476.00

EQUIVALENT)
a.

16 Amps DP Switch with metal clad (front handle)

b.

32 Amps DP Switch with metal clad (front handle)

Each

975.00

c.

16 Amps DP Switch with metal clad (side handle)

Each

394.00

d.

32Amps DP Switch with metal clad (side handle)

Each

885.00

III.

TRIPLE POLE SWITCHES (SIDE HANDLE)

Each

6,690.00

Each

7,330.00

Each

9,470.00

Each

13,500.00

(STANDARD /HPL/HAVELLS/ EQUIVALENT)


a.

100 Amps TPN Switch with HRC fuses


sheet steel double break

b.

125 Amps TPN Switch with HRC fuses


sheet steel double break

c.

200 Amps TPN Switch with HRC fuses


sheet steel double break

d.

315 Amps TPN Switch with HRC fuses


sheet steel double break

e.

400 Amps TPN Switch with HRC fuses


sheet steel double break

Each

17,300.00

f.

16 Amps TPN Metal clad switch with rewirable fuse units

Each

1,015.00

32 Amps TPN Metal clad switch with rewirable fuse units

Each

1,500.00

63 Amps TPN Metal clad switch with rewirable fuse units

Each

3,270.00

100 Amps Metal clad switch with rewirable fuse units

Each

6,430.00

200 Amps Metal clad switch with rewirable fuse units

Each

9,750.00

IV.A

SWITCH DISCONNECTOR FUSE UNITS IN SHEET

Each

4,130.00

Each

6,950.00

Each

8,200.00

Each

10,300.00

STEEL ENCLOSURE (SDF) (L&T/SIEMENS)


1

63 A TPN switch disconnector fuse units in sheet


steel enclosure with HRC fuses Double break

100 A TPN switch disconnnector fuse units in sheet


steel enclosure with HRC fuses Double break

125 A TPN switch disconnnector fuse units in sheet


steel enclosure with HRC fuses Double break.

200 A TPN switch disconnnector fuse units in sheet


steel enclosure with HRC fuses Double break

159

Item
No.
5
6
7
IV.B.
1
2
3
4
5
6
7
V
a.
b.
c.
d.
e.
VI
a.
b.
c.
VII
a.
b.
c.
d.
e.
f.

Unit

Rates
in Rupees

steel enclosure with HRC fuses Double break


315 A TPN switch disconnnector fuse units in sheet
steel enclosure with HRC fuses Double break
400 A TPN switch disconnnector fuse units in sheet
steel enclosure with HRC fuses Double break
SWITCH DISCONNECTOR FUSE UNITS IN OPEN
EXECUTION (INTERIOR FOR CUBICAL) (L&T/SIEMENS)
63A TPN Switch disconnector fuse units interior only
with HRC fuses Double break
100 A TPN switch disconnnector fuse units interior
only with HRC fuses Double break.
125 A TPN switch disconnector fuse units interior
only with HRC fuses Double break.
200 A TPN switch disconnector fuse units interior

Each

12,850.00

Each

15,400.00

Each

17,700.00

Each

2,730.00

Each

4,970.00

Each

6,770.00

only with HRC fuses Double break.


250 A TPN switch disconnector fuse units interior
only with HRC fuses Double break.
315 A TPN switch disconnector fuse units interior
only with HRC fuses Double break.
400 A TPN switch disconnector fuse units interior
only with HRC fuses Double break.
FUSE UNITS (ANCHOR /EQUIVALENT)
16 Amps Porcelain fuse unit (500 V)
32 Amps Porcelain fuse unit (500 V)
63 Amps Porcelain fuse unit (500 V)
100 Amps Porcelain fuse unit (500 V)
200 Amps Porcelain fuse unit (500 V)
SINGLE PHASE DBS (GEM /EQUIVALENT)
4 Way DB 16 Amps /Way with fuse & Neutral Each (250 V)
6 Way DB 16 Amps /Way with fuse & Neutral Each (250 V)
8 Way DB 16 Amps /Way with fuse & Neutral Each (250 V)
THREE PHASE DBS(GEM /EQUIVALENT)
4 Way TPDB 16A/Way with fuse & Neutral link
6 Way TPDB 16A/Way with fuse & Neutral link
8 Way TPDB 16A/Way with fuse & Neutral link
4 Way TPDB 32A/Way with fuse & Neutral link
6 Way TPDB 32A/Way with fuse & Neutral link
8 Way TPDB 32A/Way with fuse & Neutral link

Each

8,740.00

Each

11,400.00

Each

14,300.00

Each

16,900.00

Each
Each
Each
Each
Each

55.00
97.50
218.00
392.00
634.00

Each
Each
Each

529.00
719.00
892.00

Each
Each
Each
Each
Each
Each

2,085.00
2,860.00
3,460.00
2,640.00
3,520.00
4,460.00

Description
250 A TPN switch disconnnector fuse units in sheet

g.

4 Way TPDB 63A/Way with fuse & Neutral link

Each

6,160.00

h.

6 Way TPDB 63A/Way with fuse & Neutral link

Each

7,930.00

160

Item
No.
VIII
a.
b.
c.
d.
e.
Ia.
b.
c.
d.
e.
f.
g.
II.A.
a.
b.
c.
II.B.
a.
b.
c.

a.
b.
c.
d.
II

Description

Unit

Rates
in Rupees

Each
Each
Each
Each
Each

1,440.00
1,700.00
3,710.00
5,900.00
11,100.00

Each
Each
Each
Each
Each
Each
Each

27.70
62.30
39.20
55.40
64.60
207.00
236.00

Each
Each
Each

1,100.00
1,100.00
1,100.00

Each

2,270.00

Each

2,270.00

Each

2,880.00

Metre
Metre
Metre
Metre

97.30
118.50
128.50
146.00

CHANGE OVER SWITCHES(GEM /HAVELLS /


HPL/STANDARD /EQUIVALENT)
16 Amps three phase 500 V 4 pole Change over switch
32 Amps three phase 500 V 4 pole Change over switch
63 Amps three phase 500 V 4 pole Change over switch
100 Amps three phase 500 V 4 pole Change over switch
200 Amps three phase 500 V 4 pole Change over switch
PART D
5 Amps 3 pin and 2 pin combined flush type wall socket only.
5 Amps /15 amps.3 pin flush type wall socket only.
5 Amps 3 pin Top
15 Amps 3 pin Top
15 Amps Flush type switch
10 Amps M.C plug with 3 pin Top
20 Amps M.C plug with 3 pin Top
SINGLE PHASE WATT HOUR METERS [HPL/
EQUIVALENT)
AC single phase 230V/250V/50 HZ 5 Amps Watt Hour Meter
AC single phase 230V/250V/50 HZ 10 Amps Watt Hour Meter
AC single phase 230V/250V/50 HZ 20 Amps Watt Hour Meter
THREE PHASE WATT HOUR METERS
(ANCHOR / EQUIVALENT)
AC 3 phase 400V 50 HZ unbalanced load 4 wire
10 Amps Watt Hour Meter
AC 3 phase 400V 50 HZ unbalanced load 4 wire
25 Amps Watt Hour Meter
AC 3 phase 400 V 50 HZ unbalanced load 4 wire 50
Amps Watt Hour Meter
PART E
SERVICE CONNECTION ACCESSORIES
LT. 1100V PVC ALUMINIUM CONDUCTOR
ARMOURED UNDER GROUND CABLE WITH ISI MARK
2 Core 6 sq.mm PVC armoured UG cable
2 Core 10 sq.mm PVC armoured UG cable
2 Core 16 sq.mm PVC armoured UG cable
2 Core 25 sq.mm PVC armoured UG cable
PVC INSULATED SINGLE CORE MULTI STRAND
FIRE RETARDANT FLEXIBLE COPPER CABLE WITH
ISI MARK CONFORMING TO IS 694/ 1990

a.

14/0.3 ( 1 sq.mm )

Metre

8.95

b.

22/0.3 ( 1.5 sq.mm )

Metre

14.05

161

Item
No.

Description

Unit

Rates
in Rupees

c.

36/0.3 ( 2.5 sq.mm )

Metre

21.80

d.

56/0.3 ( 4 sq.mm )

Metre

34.60

e.

84/0.3 ( 6 sq.mm )

Metre

51.20

f.

140/0.3 ( 10 sq.mm )

Metre

76.80

g.

101/0.45 ( 16 sq.mm )

Metre

125.50

Metre

277.00

h.

168/0.45 ( 25 sq.mm )

III

CONDUCTOR

a.

Hard drawn copper conductor(Gauge No.8 & 6)

KG

519.00

b.

14 SWG TC wire

KG

531.00

c.

GI No.8 wire and No. 6 wire

KG

88.00

IV

CABLE GLANDS

a.

Cable gland suitable for 2 core 4 sq.mm UG cable

Each

19.50

b.

Cable gland suitable for 2 core 6 sq.mm UG cable

Each

24.20

c.

Cable gland suitable for 2 core 10 sq.mm UG cable

Each

28.80

d.

Cable gland suitable for 2 core 16 sq.mm UG cable

Each

42.60

e.

Cable gland suitable for 2 core 25 sq.mm UG cable

Each

50.80

f.

Cable gland suitable for 3 core 25 sq.mm UG cable

Each

50.80

g.

Cable gland suitable for 3 core 35 sq.mm UG cable

Each

64.60

h.

Cable gland suitable for 3 core 50 sq.mm UG cable

Each

64.60

Cable gland suitable for 3 core 70 sq.mm UG cable

Each

79.60

Cable gland suitable for 3 core 95 sq.mm UG cable

Each

97.00

Cable gland suitable for 3 core 120 sq.mm UG cable

Each

123.50

Cable gland suitable for 3 core 150 sq.mm UGcable

Each

162.50

Cable gland suitable for 3 core 185 sq.mm UGCable

Each

192.50

Cable gland suitable for 3 core 240 sq.mm UG cable

Each

192.50

Cable gland suitable for 3 core 300 sq.mm UGcable

Each

230.00

Cable gland suitable for 3 core 400 sq.mm UGcable

Each

328.00

Cable gland suitable for 3 core 500 sq.mm UG cable

Each

382.00

Cable gland suitable for 4 core 6 sq.mm UG cable

Each

24.20

Cable gland suitable for 4 core 10 sq.mm UG cable

Each

28.80

Cable gland suitable for 4 core 25 sq.mm UG cable

Each

50.80

FUSE WIRE(COPPER)

a.

5 Amps fuse wire

Kg

519.00

b.

10 Amps fuse wire

Kg

519.00

c.

20 Amps fuse wire

Kg

519.00

VI

NEUTRAL LINK 15 AMPS

a.

4 way Neutral Link

Each

26.50

b.

6 way Neutral Link

Each

39.30

c.

8 way Neutral Link

Each

49.00

d.

12 way Neutral Link

Each

71.00

162

Item
No.

Description

Unit

Rates
in Rupees

PART F
M.S. BOX WITH PAINTING (16 SWG)
a.

M.S Box of Size (100 x 100 x 75mm)

Each

48.50

b.

M.S Box of Size (150 x 100 x 75mm)

Each

67.00

c.

M.S Box of Size (200 x 150 x 75mm)

Each

109.00

Each

330.00

d.

M.S Box complete with Lock & Key arrangements with


painting of size (300 x 200 x 100 mm)
PART G

MS ANGLES

a.

1 x 1 x 1/4" (37.5 x 37.5 x 6.24 mm)(1M= 3.25 Kg)

KG

50.40

b.

1x 1 x (37.5 x 37.5 x 12.5mm)

KG

50.40

c.

2" x 2" x (50 x 50 x 12.5 mm)

KG

50.40

II

ALUMINIUM FLAT

a.

Aluminium Flat (1"x 1/4") (25x 6.25 mm)

KG

192.00

b.

Aluminium Flat ( 1"x1/8")

KG

192.00

III

COPPER FLAT

a.

Copper Flat (25 x 3 mm)

KG

519.00

b.

Copper Flat (25 x 6 mm)

KG

519.00

c.

Copper Flat (33 x 6 mm)

KG

519.00

d.

Copper Flat (50 x 6 mm)

KG

519.00

IV

POWER CAPACITOR
KVAR

363.00

a.

Power capacitor for power factor improvement with


oil filled with discharge resistance 3 phase 415/440V
50 HZ conforming to ISS:2384 with ISI marking
PART H

CONDUIT MATERIALS 16 Gauge

a.

Conduit pipe 16 mm (5/8") Heavy Gauge

Metre

33.00

b.

Conduit pipe 19 mm (3/4") Heavy Gauge

Metre

34.10

c.

Conduit pipe 25 mm (1") Heavy Gauge

Metre

41.90

d.

Conduit pipe 32 mm (1) Heavy Gauge

Metre

55.00

e.

Conduit pipe 38 mm (1) Heavy Gauge

Metre

65.00

II

CONDUIT TEE BENDS

a.

Conduit Tee bends 16 mm (5/8")

Dozen

93.00

b.

Conduit Tee bends 19 mm (3/4")

Dozen

94.00

c.

Conduit Tee bends 25 mm (1")

Dozen

112.00

d.

Conduit Tee bends 32 mm (1)

Dozen

116.00

e.

Conduit Tee bends 38 mm (1)

Dozen

145.00

Dozen

181.00

Dozen

88.00

f.

Conduit Tee bends 50 mm (2")

III

CONDUIT BENDS 16 Gauge

a.

Conduit solid bends 16 mm (5/8")


163

Item
No.

Description

Unit

Rates
in Rupees

b.

Conduit solid bends 19 mm (3/4")

Dozen

98.00

c.

Conduit solid bends 25 mm (1")

Dozen

115.00

d.

Conduit solid bends 32 mm (1)

Dozen

136.00

e.

Conduit solid bends 38 mm (1)

Dozen

193.00

f.

Conduit solid bends 50 mm (2")

Dozen

236.00

IV

CONDUIT INSPECTION BEND 16 Gauge

a.

Conduit Inspection bends 16 mm (5/8")

Dozen

88.00

b.

Conduit Inspection bends 19 mm (3/4")

Dozen

91.00

c.

Conduit Inspection bends 25 mm (1")

Dozen

116.00

d.

Conduit Inspection bends 32 mm (1 )

Dozen

140.00

e.

Conduit Inspection bends 38mm (1)

Dozen

181.00

f.

Conduit Inspection bends 50mm (2")

Dozen

205.00

g.

Conduit Inspection bends 65mm (2)

Dozen

264.00

PVC (RIGID) PIPES (1.8 MM THICK)WITH ISI MARK

a.

PVC rigid pipes 16mm (5/8")

Metre

14.20

b.

PVC rigid pipes 20mm (3/4")

Metre

20.40

c.

PVC rigid pipes 25mm (1")

Metre

30.30

d.

PVC rigid pipes 32mm (1)

Metre

45.90

e.

PVC rigid pipes 40mm (1)

Metre

65.40

f.

PVC rigid pipes 50mm (2")

Metre

98.00

PART I

II

PVC RIGID BENDS

a.

PVC rigid bends 16mm (5/8")

Each

3.30

b.

PVC rigid bends 20mm (3/4")

Each

3.30

c.

PVC rigid bends 25mm (1")

Each

4.50

d.

PVC rigid bends 32mm (1)

Each

7.95

e.

PVC rigid bends 40mm (1)

Each

19.80

f.

PVC rigid bends 50mm (2")

Each

24.10

III

PVC COUPLES

a.

PVC Couples 16mm (5/8")

Dozen

14.20

b.

PVC Couples 19mm (3/4")

Dozen

14.20

c.

PVC Couples 25mm (1")

Dozen

27.50

d.

PVC Couples 32mm (1)

Dozen

62.70

e.

PVC Couples 38mm (1)

Dozen

135.00

f.

PVC Couples 50mm (2")

Dozen

141.00

IV

PVC TEES

a.

PVC Tees 16mm (5/8")

Dozen

14.20

b.

PVC Tees 19mm (3/4")

Dozen

16.40

c.

PVC Tees 25mm (1")

Dozen

20.90

d.

PVC Tees 32mm (1)

Dozen

93.60

164

Item
No.

Description

Unit

Rates
in Rupees

e.

PVC Tees 38mm (1)

Dozen

301.00

f.

PVC Tees 50mm (2")

Dozen

330.00

PVC Saddles

a.

PVC Saddles 16 mm (5/8")

Dozen

3.30

b.

PVC Saddles 19mm (3/4")

Dozen

3.80

c.

PVC Saddles 25mm (1")

Dozen

4.40

d.

PVC Saddles 32mm (1)

Dozen

5.50

e.

PVC Saddles 38mm (1)

Dozen

6.60

f.

PVC Saddles 50mm (2")

Dozen

13.20

VI

PVC JUNCTION BOXES

a.

Junction boxes 1,2,3 & 4 way 16 mm (5/8")

Dozen

44.00

b.

Junction boxes 1,2,3 & 4 way 19 mm (3/4")

Dozen

44.00

c.

Junction boxes 1,2,3 & 4 way 25 mm (1")

Dozen

51.70

d.

Junction boxes 1,2,3 & 4 way 32 mm (1)

Dozen

115.00

e.

Junction boxes 1,2,3 & 4 way 38 mm (1)

Dozen

137.00

VII

PVC Hylem sheets

a.

Hylem sheet 3 mm thick

Sq.m

672.00

VIII

Insulation Tape PVC

a.

PVC Insulation Tape (19mm)

Roll/10 mts

16.40

b.

Empire Tape (12 mm)

Roll/10 mts

22.00

c.

Empire Tape (19 mm)

Roll/10 mts

26.40

PART J
TEAK WOOD MATERIALS
I

T.W. BOX CONCEALED TYPE

a.

T.W. Box concealed type 12"x8"x3"

Each

82.60

b.

T.W.Box concealed type 8"x6"x3"

Each

44.00

c.

T.W. Box concealed type 6"x4"x3

Each

19.80

d.

T.W. Box concealed type 4"x4"x3

Each

16.40

e.

T.W. plugs 1 x 1" x2"

1000 Nos.

341.00

f.

T.W. Round blocks

100 Nos.

660.00

165

Item
No.

Description

Unit

Rates
in Rupees

Aluminium

Copper

PART K
I

CRIMPING LUGS SUITABLE FOR THEFOLLOWING SIZES


Size

a.

4 Sq.mm

Each

1.60

4.60

b.

6 Sq.mm

Each

1.80

4.60

c.

10 Sq.mm

Each

2.30

5.75

d.

16 Sq.mm

Each

2.30

6.90

e.

25 Sq.mm

Each

3.45

11.55

f.

35 Sq.mm

Each

4.60

12.65

g.

50 Sq.mm

Each

6.90

14.95

h.

70 Sq.mm

Each

9.20

24.20

i.

95 Sq.mm

Each

10.40

30.00

j.

120 Sq.mm

Each

13.85

41.50

k.

150 Sq.mm

Each

18.45

53.10

l.

185 Sq.mm

Each

24.20

80.80

m.

225 Sq.mm

Each

35.80

115.00

n.

240 Sq.mm

Each

39.25

115.00

o.

300 Sq.mm

Each

54.25

155.80

p.

400 Sq.mm

Each

80.80

236.00

II

CABLE ROUTE INDICATOR

a.

Cable route indicator for L.T/ cable

Each box

77.00

Cable route indicator for H.T/ cable

Each box

77.00

PART L
I

BRASS SCREWS

a.

Brass Screws (20mm) No.6

Gross

71.50

Brass Screws (25mm) 1" No.6

Gross

77.00

c.

Brass Screws (40mm) 1 No.6

Gross

82.50

Gross

71.50

3/4

d.

Brass Screws (20mm)

" No.8

e.

Brass Screws (25mm) 1" No.8

Gross

77.00

f.

Brass Screws (50mm)2" No.10

Gross

159.00

g.

Brass screws (75mm)3" No.10

II

Coach screws 2"x (50 x 6.25mm)

Gross

236.00

Dozen

14.25

III

CONDUIT SADDLES

a.

Conduit Saddles 16mm (5/8")

Gross

44.00

Conduit Saddles 19mm (3/4")

Gross

46.80

c.

Conduit Saddles 25mm (1")

Gross

55.00

d.

Conduit Saddles 32mm (1)

Gross

71.50

e.

Conduit Saddles 38mm (1)

Gross

88.00

f.

Conduit Saddles 50mm (2")

Gross

99.00

g.

Conduit Saddles 65mm (2)

Gross

113.00

166

Item
No.
IV

Description

Unit

Rates
in Rupees

SODIUM VAPOUR FITTINGS & LAMP


(For External Electrification & Campus lighting)

a.

250 Watts Sodium Vapour fittings

Each

3490.00

250 Watts Sodium Vapour lamp

Each

770.00

c.

150 Watts Sodium Vapour fittings

Each

3440.00

d.

150 Watts Sodium Vapour lamp

Each

660.00

e.

70 Watts Sodium Vapour fittings

Each

2780.00

f.

70 Watts Sodium Vapour lamp

Each

440.00

SODIUM VAPOUR LAMP FITTING SINGLE PIECE DIE


CAST ALUMINIUM HOUSING & LAMP FOR HEAVY
TRAFFIC ROADS (PHILIPS/ CROMPTON CREAVES/
WIPRO/BAJAJ)

a.

400 Watts sodium vapour fittings

Each

10460.00

400 Watts sodium vapour lamp

Each

1080.00

c.

250 Watts sodium vapour fittings

Each

7100.00

d.

250 Watts sodium vapour lamp

Each

880.00

e.

150 Watts sodium vapour fittings

Each

6670.00

f.

150 Watts sodium vapour lamp

Each

716.00

g.

70 Watts sodium vapour fittings

Each

2860.00

h.

70 Watts sodium vapour lamps

Each

495.00

VI

MINIATURE CIRCUIT BREAKERS 240 V/ 415 V 50HZ

Legrand

All other

AC SUPPLY SUITABLE FOR BOTH LIGHTING AND

/Hager

ISI makes

MOTOR CIRCUITS.

with ISI
(Std.)/
HPL/
Havells/
equivalent)

a.

Single pole 6A to 32A,10 KA

Each

202.50

148.00

Single pole 40A , 10 KA

Each

412.50

308.50

c.

Single pole & Neutral 6A to 32A, 10 KA

Each

588.00

446.00

d.

Single pole & Neutral 40A, 10 KA

Each

953.00

617.00

e.

Double pole 6A to 32A, 10 KA

Each

588.00

490.00

f.

Double pole 40A, 10 KA

Each

953.00

670.00

g.

Triple pole 6A to 32A, 10 KA

Each

946.00

738.00

h.

Triple pole 63A , 10 KA

Each

1450.00

1185.00

Triple pole & Neutral 6A to 32A, 10 KA

Each

1250.00

963.00

j.

Triple pole & Neutral 63A, 10 KA

Each

1870.00

1490.00

k.

Four pole 6A to 32A, 10 KA

Each

1250.00

1030.00

l.

Four pole 63A, 10 KA

Each

1870.00

1580.00

167

Item
No.
VII

Description

Unit

Rates
in Rupees

MCB ISOLATORS
Legrand(MDS)/Hager(L&T)

All other Makes with IS


(Standard)/HPL/ Havells
/equivalent)

DP

TP

FP

DP

TP

FP

a.

32 A each

310.00

517.00

592.00

40 A each

428.00

740.00

950.00

297.00

544.00

664.00

c.

63 A each

573.00

860.00

1040.00

376.00

592.00

693.00

100 A each

--

687.00

1100.00

486.00

d.

VIII

773.00

845.00

PLUG AND SOCKETS IN SHEET STEEL ENCLOSURE

Legrand

All other

WITHOUT MCBS

(MDS)/

Makes

Hager

with ISI

(L&T)

(Std)/HPL
/Havells/
equivalent)

a.

10A single Pole

Each

974.00

580.00

20A Single Pole

Each

1045.00

585.00

c.

20A Double Pole

Each

1130.00

d.

20A Triple Pole

Each

1920.00

1110.00

e.

32A Triple Pole

Each

2280.00

1500.00

f.

63A Triple Pole

Each

9270.00

IX-I

RCCB/ ELCB

a.

10 Amps 30 MA DP

Each

2750.00

2020.00

25 Amps 30 MA DP

Each

2270.00

1740.00

40 Amps 30 MA DP

Each

2510.00

1840.00

c.
IX-2

RCCB/ELCB (FOUR POLE)

a.

25 Amps 30 MA

Each

3120.00

2140.00

40 Amps 30 MA

Each

3160.00

2190.00

c.

63 Amps 30 MA

Each

3650.00

2490.00

HRC FUSES

a.

16 Amps

Each

64.60

34.60

32 Amps

Each

66.90

57.70

c.

63 Amps

Each

138.00

72.50

d.

125 Amps

Each

323.00

161.00

e.

160 Amps

Each

403.00

217.00

f.

200 Amps

Each

415.00

217.00

g.

250 Amps

Each

577.00

321.00

168

XI VERTICAL THREE PHASE DISTRIBUTION BOARD WITH MCBS


4 Way / 8 way / 12 Way Vertical TPMCB sheet steel distribution boards Flush type/
Surface type fitted with Bus bars and Neutral links with single / Three phase MCB out
goings and separate 4 way provision for accommodating one No. 4 pole incoming MCB
/ Isolator and another separate 4 way provision for accommodating one No. 4 pole
ELCB/ RCD with label holder and provisions for taking up cable for size not less than
35 sq.mm
I MODULE TYPE WITH IP 20 PROTECTION
Description

No. of ways No.of ways


incomer
incomer
MCB/
ELCB/RCD
Isolator

No.of
outgoing
ways

Legrand
All other makes
(MDS) /
with ISI (Std
HAGER
HPL / Havells /
( L & T)
equivalent)
Rate in Rs.
Rate in Rs.

4 Ways 3 Phase DB

12

5360.00

3900.00

8 Ways 3 Phase DB

24

6620.00

5220.00

12 Ways 3 Phase DB

36

9630.00

6350.00

II. TPMCB DB WITH METAL/ACRYLIC DOOR COVER WITH IP 42 PROTECTION


Description

No. of ways No.of ways


incomer
incomer
MCB/
ELCB/RCD
Isolator

No.of
outgoing
ways

Legrand
(MDS) /
HAGER
( L & T)
With
With
metal ACRYLIC
Door
door
(Rate (Rate
in
in
Rupees) Rupees)

All other
makes with
ISI (Std
/HPL /
Havells /
equivalent)
(Rate in
Rupees)

4 Ways 3 Phase DB

12

6220

7500

5110

8 Ways 3 Phase DB

24

7880

9550

6290

12 Ways 3 Phase DB

36

10500 12700

7730

III.INDUSTRIAL TYPE TPMCB DB WITH IP 54 PROTECTION


Description

No. of ways No.of ways


incomer
incomer
MCB/
ELCB/RCD

No.of
outgoing
ways

Legrand (MDS) /
HAGER
( L & T) Rate in Rs.

4 Ways 3 Phase DB

12

11600.00

8 Ways 3 Phase DB

24

14000.00

12 Ways 3 Phase DB

36

18800.00

169

XII HORIZONTAL THREE PHASE DISTRIBUTION BOARD WITH MCBS


4 way / 6 way / 8 way / 12 way TPMCB sheet steel distribution boards Flush type /
Surface type fitted with Bus bars and Neutral links with single/ Three phase MCB outgoings
and separate 4 way provision for accommodating one No. 4 pole incoming MCB / Isolator
and another separate 4 way provision for accommodating one No. 4 pole ELCB / RCD
with label holder and provisions for taking up cable for size not less than 35 sq.mm
I MODULE TYPE WITH IP 20 PROTECTION
Description

No. of ways No.of ways


incomer
incomer
MCB/
ELCB/RCD
Isolator

No.of
outgoing
ways

Legrand
All other makes
(MDS) /
with ISI (Std/
HAGER
HPL / Havells /
( L & T)
equivalent)
Rate in Rs.
Rate in Rs.

4 Ways 3 Phase DB

12

1920.00

1200.00

6 Ways 3 Phase DB

18

2380.00

1510.00

8 Ways 3 Phase DB

24

2830.00

1830.00

12 Ways 3 Phase DB

36

4230.00

2500.00

II. TPMCB DB WITH METAL / ACRYLIC DOOR COVER WITH IP 42 PROTECTION


Description

No. of ways No.of ways


incomer
incomer
MCB/
ELCB/RCD
Isolator

No.of
outgoing
ways

Legrand
(MDS) /
HAGER
( L & T)
With
With
metal ACRYLIC
Door
door
(Rate (Rate
in
in
Rupees) Rupees)

All other
makes with
ISI (Std
/HPL /
Havells /
equivalent)
(Rate in
Rupees)

4 Ways 3 Phase DB

12

2600.00 3030.00

2060.00

6 Ways 3 Phase DB

18

3210.00 3720.00

2610.00

8 Ways 3 Phase DB

24

3850.00 4440.00

3200.00

12 Ways 3 Phase DB

36

5680.00 6760.00

4340.00

III.INDUSTRIAL TYPE TPMCB DB WITH IP 54 PROTECTION


Description

No. of ways No.of ways


incomer
incomer
MCB/
ELCB/RCD
Isolator

No.of
outgoing
ways

Legrand (MDS) /
HAGER
( L & T) Rate in Rs.

4 Ways 3 Phase DB

12

7340.00

6 Ways 3 Phase DB

18

8840.00

8 Ways 3 Phase DB

24

9650.00

12 Ways 3 Phase DB

36

13400.00

170

XIII 7 SEGMENTS (3 TIER) 3 PHASE DISTRIBUTION BOARD WITH MCB


4 Way/6 way/8 way/12 Way TPMCB sheet steel distribution boards Flush type/Surface
type fitted with Bus bars and Neutral links with single /Three phase MCB out goings and
separate 4 way provision for accommodating one No. 4 pole incoming MCB /Isolator and
another separate 4 way provision for accommodating one No. 4 pole ELCB/RCD (Totally
8 ways in one segment)(3 x 4 ways in each segment) and separate provision for MCB /
Isolator)(Totally 12 Nos. ) for sub incomers in 3 segments
with label holder and
provisions for taking up cable for size not less than 35 sq.mm
1. MODULE TYPE WITH IP 20 PROTECTION
Description

No. of
ways
incomer
MCB/
Isolator

No.of ways No.of Sub No. of out Legrand (MDS)


incomer
incomers going ways /HAGER(L&T)
ELCB/RCD
Rate in
Rupees

4 Ways 3 Phase DB

12

12

5780.00

6 Ways 3 Phase DB
8 Ways 3 Phase DB
12 Ways 3 Phase DB

4
4
4

4
4
4

12
12
12

18
24
36

6200.00
6580.00
7590.00

II.TPMCB DB WITH METAL /ACRYLIC DOOR COVER WITH IP 42 PROTECTION


Description
No. of
Legrand (MDS)
ways
No.of ways No.of Sub No. of out /HAGER(L&T)
incomer
incomer
incomers going ways
Rate in
MCB/
ELCB/RCD
Rupees
Isolator
4 Ways 3 Phase DB
4
4
12
12
6140.00
6 Ways 3 Phase DB
4
4
12
18
6900.00
8 Ways 3 Phase DB
4
4
12
24
7700.00
12 Ways 3 Phase DB
4
4
12
36
9800.00
XIVSINGLE PHASE DISTRIBUTION BOARD WITH MCBs
4 Way/8 way/12 Way Vertical SPMCB sheet steel distribution boards Flush type/Surface
type fitted with Bus bars and Neutral links with single phase MCB out goings and separate
2 way provision for accommodating one No. 2 pole incoming MCB /Isolator and another
separate 2 way provision for accommodating one No, 2 pole ELCB/RCD with label holder
and provisions for taking up cable for size not less than 35 sq.mm
I MODULE TYPE WITH IP 20 PROTECTION

Description

No. of ways
incomer
No.of ways
MCB/
incomer
Isolator
ELCB/RCD

No.of
outgoing
ways

Legrand
All other makes
(MDS) /
with ISI (Std
HAGER
HPL / Havells /
( L & T)
equivalent)
Rate in Rs.
Rate in Rs.

4 Ways 3 Phase DB

705.00

383.00

4 Ways 3 Phase DB

880.00

485.00

4 Ways 3 Phase DB

12

1045.00

664.00

171

II. SPMCB DB WITH METAL/ACRYLIC DOOR COVER WITH IP 42 PROTECTION


Description

No. of ways No.of ways


incomer
incomer
MCB/
ELCB/RCD
Isolator

No.of
outgoing
ways

Legrand
(MDS) /
HAGER
( L & T)
Rate in Rs.

All other
makes with
ISI (Std
/HPL /
Havells /
equivalent)
With
With
(Rate in
metal ACRYLIC Rupees)
Door
door
(Rate
(Rates
in
in
Rupees) Rupees)

4 Ways 3 Phase DB

1025.00 1210.00

670.00

4 Ways 3 Phase DB

1280.00 1430.00

915.00

4 Ways 3 Phase DB

12

1540.00 1730.00

1180.00

III.INDUSTRIAL TYPE TPMCB DB WITH IP 54 PROTECTION.


Description

No. of ways No.of ways


incomer
incomer
MCB/
ELCB/RCD
Isolator

No.of
outgoing
ways

Legrand (MDS) /
HAGER
( L & T) Rate in Rs.

4 Ways 3 Phase DB

3080.00

4 Ways 3 Phase DB

3610.00

4 Ways 3 Phase DB

12

4160.00

172

RATES FOR WORKS

INFILTRATION WORKS
Schedule
Item No.
1

Description

Unit

Rate in
Rupees

Earthwork excavation above water level


in light or sandy or clayey soils for
manhole wells, infiltration wells, suction
wells etc. including levelling the site with
an initial lead of 10 metres.

First depth of 2 metres

One Cubic metre

43.00

Second depth of 2 metres

One Cubic metre

67.00

Third depth of 2 metres

One Cubic metre

97.00

Fourth depth of 2 metres

One Cubic metre

135.00

First depth of 2 metres

One metre

343.00

Second depth of 2 metres

One metre

631.00

Third depth of 2 metres

One metre

1326.00

Fourth depth of 2 metres

One metre

2647.00

Fifth depth of 2 metres

One metre

5213.00

Sixth depth of 2 metres

One metre

10434.00

First depth of 2 metres

One metre

381.00

Second depth of 2 metres

One metre

761.00

Third depth of 2 metres

One metre

1516.00

Fourth depth of 2 metres

One metre

2840.00

Fifth depth of 2 metres

One metre

5271.00

Sixth depth of 2 metres

One metre

10529.00

First depth of 2 metres

One metre

440.00

Second depth of 2 metres

One metre

873.00

Third depth of 2 metres

One metre

1727.00

Fourth depth of 2 metres

One metre

3441.00

Fifth depth of 2 metres

One metre

6872.00

Sixth depth of 2 metres

One metre

13684.00

Erection of Ring well below water level


including all incidental charges using
special tools and plants such as air
compressor helmet etc. complete and
including bailing out water.

a.

b.

c.

For 0.90 metre dia Ring well (internal)

For 1.2 metre dia Ring well (internal)

For 1.50 metre dia Ring well (internal)

175

Rate in Rupees
Schedule
Item No.

Description

Unit

Sinking well below water level


including all incidental charges
using special tools and plants
such as air compressor, helmet
etc., complete and including
bailing out water.

a.

For 1.0 metre dia (internal)

b.

c.

Ordinary
soil (or)
loose soil
sandy soil

Silt (or) clay


pocket

First depth of 2 metres

One metre

500.00

722.00

Second depth of 2 metres

One metre

842.00

1322.00

Third depth of 2 metres

One metre

1682.00

2641.00

Fourth depth of 2 metres

One metre

3320.00

5273.00

Fifth depth of 2 metres

One metre

6320.00

9902.00

Sixth depth of 2 metres

One metre

11866.00

18533.00

Seventh depth of 2 metres

One metre

17411.00

25192.00

Eighth depth of 2 metres

One metre

22958.00

31851.00

Nineth depth of 2 metres

One metre

28500.00

38507.00

Tenth depth of 2 metres

One metre

34046.00

45166.00

First depth of 2 metres

One metre

653.00

990.00

Second depth of 2 metres

One metre

1308.00

1982.00

Third depth of 2 metres

One metre

2609.00

4008.00

Fourth depth of 2 metres

One metre

4678.00

7204.00

Fifth depth of 2 metres

One metre

8269.00

12780.00

Sixth depth of 2 metres

One metre

14931.00

23135.00

Seventh depth of 2 metres

One metre

21588.00

33495.00

Eighth depth of 2 metres

One metre

28248.00

43852.00

Nineth depth of 2 metres

One metre

34912.00

54211.00

Tenth depth of 2 metres

One metre

41570.00

64570.00

First depth of 2 metres

One metre

1015.00

1632.00

Second depth of 2 metres

One metre

2024.00

3264.00

Third depth of 2 metres

One metre

4038.00

6516.00

Fourth depth of 2 metres

One metre

6455.00

11943.00

Fifth depth of 2 metres

One metre

12618.00

21717.00

Sixth depth of 2 metres

One metre

25231.00

40569.00

Seventh depth of 2 metres

One metre

37841.00

59439.00

For 1.25 metre dia (internal)

For 2.0 metre dia (internal)

176

Rate in Rupees
Schedule
Item No.

d.

e.

f.

Description

Unit

Ordinary
soil (or)
loose soil
sandy soil

Silt (or) clay


pocket

Eighth depth of 2 metres

One metre

50453.00

78301.00

Nineth depth of 2 metres

One metre

63065.00

97162.00

Tenth depth of 2 metres

One metre

75675.00

116022.00

First depth of 2 metres

One metre

1280.00

2129.00

Second depth of 2 metres

One metre

2662.00

4186.00

Third depth of 2 metres

One metre

5320.00

8338.00

Fourth depth of 2 metres

One metre

9908.00

15495.00

Fifth depth of 2 metres

One metre

18446.00

28655.00

Sixth depth of 2 metres

One metre

35624.00

53662.00

Seventh depth of 2 metres

One metre

52797.00

78664.00

Eighth depth of 2 metres

One metre

69973.00

103668.00

Nineth depth of 2 metres

One metre

87146.00

128671.00

Tenth depth of 2 metres

One metre

104325.00

153674.00

First depth of 2 metres

One metre

1654.00

2881.00

Second depth of 2 metres

One metre

3278.00

5601.00

Third depth of 2 metres

One metre

6548.00

11206.00

Fourth depth of 2 metres

One metre

12638.00

21045.00

Fifth depth of 2 metres

One metre

23620.00

39300.00

Sixth depth of 2 metres

One metre

44770.00

68523.00

Seventh depth of 2 metres

One metre

65918.00

97706.00

Eighth depth of 2 metres

One metre

87066.00

126911.00

Nineth depth of 2 metres

One metre

108214.00

156118.00

Tenth depth of 2 metres

One metre

129364.00

185326.00

First depth of 2 metres

One metre

2104.00

3375.00

Second depth of 2 metres

One metre

4091.00

6624.00

Third depth of 2 metres

One metre

8164.00

13217.00

Fourth depth of 2 metres

One metre

15286.00

24773.00

Fifth depth of 2 metres

One metre

28558.00

47102.00

Sixth depth of 2 metres

One metre

54109.00

87435.00

Seventh depth of 2 metres

One metre

79658.00

127770.00

Eighth depth of 2 metres

One metre

105212.00

168100.00

Nineth depth of 2 metres

One metre

130762.00

208434.00

Tenth depth of 2 metres

One metre

156314.00

248768.00

For 2.5 metre dia (internal)

For 3.00 metre dia (internal)

For 3.50 metre dia (internal)

177

Rate in Rupees
Schedule
Item No.

g.

h.

i.

j.

Description

Unit

Ordinary
soil (or)
loose soil
sandy soil

Silt (or) clay


pocket

For 4.00 metre dia (internal)


First depth of 2 metres

One metre

2405.00

4049.00

Second depth of 2 metres

One metre

4631.00

7752.00

Third depth of 2 metres

One metre

9228.00

15489.00

Fourth depth of 2 metres

One metre

17332.00

29020.00

Fifth depth of 2 metres

One metre

32415.00

54118.00

Sixth depth of 2 metres

One metre

61457.00

102436.00

Seventh depth of 2 metres

One metre

90499.00

150753.00

Eighth depth of 2 metres

One metre

119539.00

199074.00

Nineth depth of 2 metres

One metre

148600.00

247059.00

Tenth depth of 2 metres

One metre

177625.00

291975.00

First depth of 2 metres

One metre

2872.00

4843.00

Second depth of 2 metres

One metre

5631.00

9632.00

Third depth of 2 metres

One metre

11304.00

19223.00

Fourth depth of 2 metres

One metre

19659.00

36048.00

Fifth depth of 2 metres

One metre

34076.00

67408.00

Sixth depth of 2 metres

One metre

63377.00

112320.00

Seventh depth of 2 metres

One metre

92777.00

157233.00

Eighth depth of 2 metres

One metre

122132.00

202145.00

Nineth depth of 2 metres

One metre

151481.00

247393.00

Tenth depth of 2 metres

One metre

180832.00

295711.00

First depth of 2 metres

One metre

3562.00

6007.00

Second depth of 2 metres

One metre

6950.00

11147.00

Third depth of 2 metres

One metre

13825.00

22259.00

Fourth depth of 2 metres

One metre

25942.00

43590.00

Fifth depth of 2 metres

One metre

46842.00

81455.00

Sixth depth of 2 metres

One metre

91598.00

154340.00

Seventh depth of 2 metres

One metre

136353.00

227225.00

Eighth depth of 2 metres

One metre

181106.00

300110.00

Nineth depth of 2 metres

One metre

225864.00

372996.00

Tenth depth of 2 metres

One metre

270621.00

445882.00

One metre

5119.00

For 4.50 metre dia (internal)

For 5.00 metre dia (internal)

For 6.00 metre dia (internal)


First depth of 2 metres

178

8372.00

Rate in Rupees
Schedule
Item No.

NOTE:

Description

Unit

Ordinary
soil (or)
loose soil
sandy soil

Silt (or) clay


pocket

Second depth of 2 metres

One metre

9924.00

16190.00

Third depth of 2 metres

One metre

18851.00

32363.00

Fourth depth of 2 metres

One metre

37149.00

60637.00

Fifth depth of 2 metres

One metre

69436.00

113106.00

Sixth depth of 2 metres

One metre

131622.00

214005.00

Seventh depth of 2 metres

One metre

193816.00

314903.00

Eighth depth of 2 metres

One metre

256003.00

415801.00

Nineth depth of 2 metres

One metre

318193.00

516697.00

Tenth depth of 2 metres

One metre

380380.00

617595.00

In case the water table is met with at depth of 2.00 m and below, from
the bed level, an extra percentage as under may be allowed over the
existing rates for items 3(a) to 3 (j) for the extra lift involved.
Where water table is 2.00m, below bed level
and upto 4.00 m
15% extra
Where water table is beyond 4.00m
and upto 6.00m
20% extra

179

INFILTRATION WORKS
Schedule
Item No.
4a.

b.

Description

Rate in
Rupees

Unit

Earthwork excavation above water level


in light or sandy soil for infiltration gallery,
syphon or connecting pipeline and
connected works including refilling
complete.
First depth of 2 m
Second depth of 2 m
Third depth of 2 m
Fourth depth of 2 m
Earthwork excavation below water level
in light or sandy soil for infiltration gallery,
syphon or connecting pipe line and
connected works including shoring and
strutting and charges for special tools
and plants for bailing/ pumping etc., such
as air compressor and helmet.
First depth of 2 m
Second depth of 2 m
Third depth of 2 m
Fourth depth of 2 m
Earthwork excavation below water level
in clayey soil for infiltration gallery for
laying syphon pipe line or connecting pipe
and connected works, shoring and
strutting and charges for special tools
and plants for bailing/pumping etc., such
as air compressor and helmet.
First depth of 2 m
Second depth of 2 m
Third depth of 2 m
Fourth depth of 2 m
Earthwork excavation below water level
in soft disintegrated rock for infiltration
gallery, laying syphone pipe line/
connecting pipes etc., including shoring,
strutting and charges for special tools
and plants.
First depth of 2 m
Second depth of 2 m
Third depth of 2 m
Fourth depth of 2 m

180

One
One
One
One

cubic
cubic
cubic
cubic

metre
metre
metre
metre

49.00
70.30
102.20
136.70

One
One
One
One

cubic
cubic
cubic
cubic

metre
metre
metre
metre

912.00
1289.20
1933.25
2805.00

One
One
One
One

cubic
cubic
cubic
cubic

metre
metre
metre
metre

1516.35
2107.05
3290.65
4925.80

One cubic metre


One cubic metre
One cubic metre

1060.40
1413.00
2200.00

One cubic metre

3803.80

Schedule
Item No.
NOTE (i)

ii

Description

Unit

Rate in
Rupees

For sinking wells in soil mixed with


pebbles boulder of size 80 mm to 600
mm mixed with clay and silt below water
level, including bailing/ pumping water
and charges for special tools and plants
etc., complete, an extra 20% (Twenty
percentage) over the rates for items
2,3b,3c & 3d in the schedule of rates is
allowed.
In case the water table is met with at a
depth of 2.00m and below from the bed
level, an extra percentage as under
may be allowed over the existing rates
for items 4(b), 4(c) and 4(d) above the
extra lift involved
Where water table is 2.00m below bed
level and upto 4.00m.

10% extra

Where water table is beyond


4.00m and upto 6.00m

15% extra

Pipe laying works


5a

Laying stoneware pipes and open joint


with fillet in the infliltration gallery
excluding cost of pipes but including
charges of special tools and plant etc.,
such as air compressor and helmet.

200 mm dia stoneware pipes

One metre

145.75

ii

225 mm dia stoneware pipes

One metre

178.75

iii

300 mm dia stoneware pipes

One metre

209.00

iv

350 mm dia stoneware pipes

One metre

242.55

375 mm dia stoneware pipes

One metre

300.85

vi

450 mm dia stoneware pipes

One metre

310.20

Laying and jointing PVC slotted pipes in

200 mm dia (OD) PVC pipes

One metre

108.35

315 mm dia (OD) PVC pipes

One metre

165.55

One cubic metre

11.55

the inflitration gallery excluding cost of


pipes but including charges for special
tools and plants etc., complete such as
air compressor and helmet.

Refilling gallery trench and filter basins


with clean excavated sand free from
silt and clay
181

Schedule
Item No.
6

a
b

d.

e.

Description
Labour charges for laying filter media
below water level in all depths as per
specfification for infiltration gallery works
including screening cleaning and charges
for special tools and plant etc., complete
such as air compressor, helmets, sheet
piles
Granite metal 6mm to 40mm
Coarse sand passing through a sieve of
four meshes to 2.5 centimetres and
retained in a sieve of ten meshes to 2.5
centimetres and filling it under water
Coarse sand passing through a sieve of
ten meshes to 2.5 centimetres and
retained in a sieve of 200 meshes to
2.5 centimetres and filling it under water
Cost of coarse sand D-10 and D-20 for
laying gallery media for a lead not
exceeding 200m from the source to the
place of stacking including stacking
etc., complete.
Cost of hard granite metal of size
(B.S.S.) 6 mm to 12 mm filter media
(machine crushed)
(I) NOTE: For 6(a),(b) and (c):
The above rates are labour charges for
laying the filter media including
screening, cleaning etc., for a lead not
exceeding 200 metres from the place
of stacking to the point of laying the
media. The cost of materials and the
lead from the source to the place of
stacking are to be paid for separately.
(ii) NOTE: FOR 6(d):
The above rates are applicable to cases
where the screened materials is not less
than 10% of the collected material. In
specific cases where the screened
material is less than 10% of the collected
material, prior orders of the
Superintending Engineer, TWAD Board are
to be obtained in specific cases for
increased rate of labour required.

182

Unit

Rate in
Rupees

One cubic metre

150.70

One cubic metre

747.45

One cubic metre

283.80

One cubic metre

193.05

One cubic metre

1015.30

Schedule
Item No.

Description

Unit

(iii) NOTE: FOR 6(e)


The above rates are applicable to cases
where the screened materials is not less
than 20% of the collected materials. In
case where the screened materials is less
than 20% of the collected material, prior
orders of the Superintending Engineer,
TWAD are to be obtained in specific cases
for increased rate of labour required.

183

Rate in
Rupees

Schedule
Item No.
7a

Description

Unit

Rate in
Rupees

Lowering of C.I/ D.I Pipes and specials in


the trenches and laying to proper grade
and alignment and as directed by the
TWAD Officers.
For depth upto 2m

80 mm dia C.I/ D.I Pipes and Specials

One metre

7.90

100 mm dia C.I/ D.I Pipes and Specials

One metre

9.20

125 mm dia C.I/ D.I Pipes and Specials

One metre

11.90

150 mm dia C.I/ D.I Pipes and Specials

One metre

15.90

200 mm dia C.I/ D.I Pipes and Specials

One metre

19.90

250 mm dia C.I/ D.I Pipes and Specials

One metre

25.10

300 mm dia C.I/ D.I Pipes and Specials

One metre

27.80

350 mm dia C.I/ D.I pipes and specials

One metre

34.50

400 mm dia C.I/ D.I pipes and specials

One metre

39.80

450 mm dia C.I/ D.I pipes and specials

One metre

46.40

500 mm dia C.I/ D.I pipes and specials

One metre

50.40

600 mm dia C.I/ D.I pipes and specials

One metre

62.30

700 mm dia C.I/ D.I pipes and specials

One metre

78.25

750 mm dia C.I/ D.I pipes and specials

One metre

87.60

800 mm dia C.I/ D.I pipes and specials

One metre

102.20

900 mm dia C.I/ D.I pipes and specials

One metre

118.10

15mm to 40mm dia

One metre

7.90

50mm to 65mm dia

One metre

7.90

80mm to 100mm dia

One metre

10.60

125mm to 150mm dia


Disjointing C.I. Tyton S/S pipes and
specials, and lifting C.I. Pipes from the
trenches and stacking at places shown
by the departmental Officers.
For depth upto 2 m

One metre

10.60

NOTE: i) For depth between 2m to 4m


10% over basic rates and for 4m to 6m
20% over basic rate allowed
ii) For work of laying CI connecting pipe/
syphon basic pipe below water, double
the above rates shall be allowed.
iii) For laying pipes in sewer line except
pumping main 10% more is allowed.
Lowering GI pipes and specials in the
trenches and laying to proper grade and
alignment and as directed by the TWAD
Officers

184

Schedule
Item No.

Description

Unit

80 mm dia C.I. Pipes and specials

One metre

7.90

100mm dia C.I. Pipes and specials

One metre

9.20

125 mm dia C.I. Pipes and specials

One metre

10.60

150 mm dia C.I. Pipes and specials

One metre

14.50

200 mm dia C.I. Pipes and specials

One metre

15.90

250 mm dia C.I. Pipes and specials

One metre

25.10

300 mm dia C.I. Pipes and specials

One metre

26.60

350 mm dia C.I. Pipes and specials

One metre

34.50

400 mm dia C.I. Pipes and specials

One metre

37.20

450 mm dia C.I. Pipes and specials

One metre

43.70

500 mm dia C.I.pipes and specials

One metre

47.80

600 mm dia C.I.pipes and specials

One metre

58.40

700 mm dia C.I.pipes and specials

One metre

67.65

800 mm dia C.I.pipes and specials

One metre

74.35

825 mm dia C.I.pipes and specials

One metre

85.00

900 mm dia C.I.pipes and specials

One metre

94.20

NOTE: For depth between

d.

Rate in
Rupees

% excess
allowed over
basic rate

2m to 4m

10%

4m to 6m

20%

Lowering of M.S pipes and specials into


the trenches and laying to proper grade
and alignment and as directed by the
TWAD Officers.
Up to 350mm dia

One metre

25.10

400 mm Dia

One metre

31.85

450 mm Dia

One metre

34.50

500 mm Dia

One metre

37.15

600 mm Dia

One metre

46.40

700 mm Dia

One metre

59.65

900 mm Dia

One metre

85.00

1000 mm Dia

One metre

106.25

1050 mm Dia

One metre

111.50

1100 mm Dia

One metre

116.85

1200 mm Dia

One metre

127.50

1400 mm Dia

One metre

187.20

1600 mm Dia

One metre

242.90

185

Schedule
Item No.

Description

Unit

NOTE: For depth between

Rate in
Rupees

Percentage
excess allowed
over basic rate

8a

2m to 4m

10%

4m to 6m

20%

Jointing the C.I/ D.I - S/S pipes and


specials with molten lead and Yarn
including caulking the joints. (Including
cost of jointing materials)
For depth upto 2m
80 mm dia C.I/ D.I -S/S pipes and specials

Each Joint

268.30

100 mm dia C.I/ D.I - S/S pipes and specials

Each Joint

326.70

125 mm dia C.I/ D.I - S/S pipes and specials

Each Joint

430.30

150 mm dia C.I/ D.I - S/S pipes and specials

Each Joint

504.70

200 mm dia C.I/ D.I - S/S pipes and specials

Each Joint

684.00

250 mm dia C.I/ D.I - S/S pipes and specials

Each Joint

973.50

300 mm dia C.I/ D.I - S/S pipes and specials

Each Joint

1055.90

350 mm dia C.I/ D.I - S/S pipes and specials

Each Joint

1304.30

400 mm dia C.I/ D.I - S/S pipes and specials

Each Joint

1589.80

450 mm dia C.I/ D.I - S/S pipes and specials

Each Joint

2377.50

500 mm dia C.I/ D.I - S/S pipes and specials

Each Joint

2669.75

600 mm dia C.I/ D.I - S/S pipes and specials

Each Joint

3189.05

700 mm dia C.I/ D.I - S/S pipes and specials

Each Joint

3600.80

750 mm dia C.I/ D.I - S/S pipes and specials

Each Joint

4318.05

NOTE: For depth between

Percentage
excess allowed
over basic rate

8b

2m to 4m

10%

4m to 6m

15%

Jointing C.I/ D.I-S/S pipes and specials


with rubber gaskets (tyton joint)
including cost of lubricants. (including
cost of jointing materials)
For depth upto 2m
80 mm dia C.I/ D.I-S/S pipes and specials

Each Joint

27.80

100 mm dia C.I/ D.I-S/S pipes and specials

Each Joint

34.45

125 mm dia C.I/ D.I-S/S pipes and specials

Each Joint

34.45

150 mm dia C.I/ D.I-S/S pipes and specials

Each Joint

35.75

200 mm dia C.I/ D.I-S/S pipes and specials

Each Joint

63.75

250 mm dia C.I/ D.I-S/S pipes and specials

Each Joint

87.60

186

Schedule
Item No.

Description

Unit

300 mm dia C.I/ D.I-S/S pipes and specials


350 mm dia C.I/ D.I-S/S pipes and specials
400 mm dia C.I/ D.I-S/S pipes and specials
450 mm dia C.I/ D.I-S/S pipes and specials
500 mm dia C.I/ D.I-S/S pipes and specials
600 mm dia C.I/ D.I-S/S pipes and specials
700 mm dia C.I/ D.I-S/S pipes and specials
750 mm dia C.I/ D.I-S/S pipes and specials
800 mm dia C.I/ D.I-S/S pipes and specials
900 mm dia C.I/ D.I-S/S pipes and specials
NOTE: For depth between

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint
Joint

Rate in
Rupees
104.80
114.15
148.70
209.80
258.90
351.90
471.45
588.30
759.72
997.40

Percentage
excess allowed
over basic rate

8c

2m to 4m

10%

4m to 6m

20%

Jointing the C.I/ D.I Double flanged pipes


and specials with rubber insertion to the
required specifications with M.S. bolts
and nuts, complete. (including cost of
jointing materials)
For depth upto 2m
For works above water level
80 mm dia C.I/ D.I Double flanged pipes
and specials

Each Joint

84.95

Each Joint

147.30

Each Joint

155.30

Each Joint

254.95

Each Joint

280.15

Each Joint

401.10

Each Joint

442.20

Each Joint

576.45

Each Joint

865.95

100 mm dia C.I./D.I. Double flanged


pipes and specials
125 mm dia C.I/ D.I Double flanged
pipes and specials
150 mm dia C.I./D.I. Double flanged
pipes and specials
200 mm dia C.I/ D.I Double flanged
pipes and specials
250 mm dia C.I/ D.I Double flanged
pipes and specials
300 mm dia C.I/ D.I Double flanged
pipes and specials
350 mm dia C.I/ D.I Double flanged
pipes and specials
400 mm dia C.I/ D.I Double flanged
pipes and specials
187

Schedule
Item No.

Description

Unit

Rate in
Rupees

Each Joint

961.60

Each Joint

1180.70

Each Joint

1615.10

Each Joint

1698.70

Each Joint

1739.95

Each Joint

1783.75

Each Joint

2026.85

450 mm dia C.I/ D.I Double flanged


pipes and specials
500 mm dia C.I/ D.I Double flanged
`

pipes and specials


600 mm dia C.I/ D.I Double flanged
pipes and specials
700 mm dia C.I/ D.I Double flanged
pipes and specials
750 mm dia C.I/ D.I Double flanged
pipes and specials
800 mm dia C.I/ D.I Double flanged
pipes and specials
900 mm dia C.I/ D.I Double flanged
pipes and specials
NOTE: For depth between

Percentage
excess allowed
over basic rate

8d

2m to 4m

10%

4m to 6m

15%

Jointing C.I/ D.I double flanged pipes and


specials with rubber insertion or any
equivalent to the required specifications
with M.S. bolts and nuts etc., complete
including charges for special tools and
plants such as air compressor and helmets
and sheet piles. etc (including cost of
jointing materials)
For depth upto 2m
For works below water level
80 mm dia C.I/ D.I Double flanged
Each Joint

Pipes and specials

179.20

100 mm dia C.I/ D.I Double flanged


Pipes and specials

Each Joint

266.90

Each Joint

297.50

Each Joint

425.00

Each Joint

490.00

Each Joint

669.40

125 mm dia C.I/ D.I Double flanged


Pipes and specials
150 mm dia C.I/ D.I Double flanged
Pipes and specials
200 mm dia C.I/ D.I Double flanged
Pipes and specials
250 mm dia C.I/ D.I Double flanged
Pipes and specials

188

Schedule
Item No.

Description
300 mm dia C.I/ D.I Double flanged
Pipes and specials
350 mm dia C.I/ D.I Double flanged
Pipes and specials
400 mm dia C.I/ D.I Double flanged
Pipes and specials
450 mm dia C.I/ D.I Double flanged
Pipes and specials
500 mm dia C.I/ D.I Double flanged
Pipes and specials
600 mm dia C.I/ D.I Double flanged
Pipes and specials
NOTE: For depth between

8e

2m to 4m
4m to 6m
Jointing the C.I/ D.I-S/S pipes and
specials with neat cement or cement
mortar and spun yarn including caulking
the joints, curing. (including cost of
jointing materials)
For depth upto 2m

Unit

Rate in
Rupees

Each Joint

738.45

Each Joint

915.10

Each Joint

1257.70

Each Joint

1399.95

Each Joint

1644.30

Each Joint

2315.00

Percentage
excess allowed
over basic rate
10%
15%

80mm dia C.I/ D.I-S/S Pipes and Specials

Each Joint

65.00

100mm dia C.I/ D.I-S/S Pipes and Specials

Each Joint

67.65

125mm dia C.I/ D.I-S/S Pipes and Specials

Each Joint

87.60

150mm dia C.I/ D.I-S/S Pipes and Specials

Each Joint

98.30

200mm dia C.I/ D.I-S/S Pipes and Specials

Each Joint

155.30

250mm dia C.I/ D.I-S/S Pipes and Specials

Each Joint

180.60

300mm dia C.I/ D.I-S/S Pipes and Specials

Each Joint

220.40

350mm dia C.I/ D.I-S/S Pipes and Specials

Each Joint

256.25

400mm dia C.I/ D.I-S/S Pipes and Specials

Each Joint

302.80

450mm dia C.I/ D.I-S/S Pipes and Specials

Each Joint

361.20

500mm dia C.I/ D.I-S/S Pipes and Specials

Each Joint

420.95

600mm dia C.I/ D.I-S/S Pipes and Specials

Each Joint

516.60

Each Joint

564.40

700mm dia C.I/ D.I-S/S Pipes and Specials


NOTE: For depth between

Percentage
excess allowed
over basic rate

2m to 4m

10%

4m to 6m

15%
189

Schedule
Item No.
9

Description

Unit

Rate in
Rupees

Lowering RCC pipes and specials into


the trenches and laying to proper grade
and alignment
For depth upto 2m
150mm dia R.C.C. Pipes and Specials

One metre

23.85

200mm dia R.C.C. Pipes and Specials

One metre

25.10

250mm dia R.C.C. Pipes and Specials

One metre

31.85

300mm dia R.C.C. Pipes and Specials

One metre

37.15

350mm dia R.C.C. Pipes and Specials

One metre

46.40

400mm dia R.C.C. Pipes and Specials

One metre

50.40

450mm dia R.C.C. Pipes and Specials

One metre

58.40

500mm dia R.C.C. Pipes and Specials

One metre

67.65

600mm dia R.C.C. Pipes and Specials

One metre

78.25

700mm dia R.C.C. Pipes and Specials

One metre

87.60

750mm dia R.C.C. Pipes and Specials

One metre

91.55

800mm dia R.C.C. Pipes and Specials

One metre

111.50

900mm dia R.C.C. Pipes and Specials

One metre

131.40

1000mm dia R.C.C. Pipes and Specials

One metre

151.40

1100mm dia R.C.C. Pipes and Specials

One metre

176.55

1200mm dia R.C.C. Pipes and Specials

One metre

196.55

1300mm dia R.C.C. Pipes and Specials

One metre

216.40

NOTE: For depth between

i)

% excess
allowed
over basic rate

2m to 4m

10%

4m to 6m

15%

Each Collar joint is to be treated as one


joint only

ii)

For laying RCC pipes in sewage lines,


except pumping main, 5% more is allowed

10a

Jointing RCC pipes with cement using


necessary collars including the cost of
jointing materials.
For depth upto 2m
150mm dia R.C.C. Pipes and Specials

Each Joint

128.75

200mm dia R.C.C. Pipes and Specials

Each Joint

157.95

250mm dia R.C.C. Pipes and Specials

Each Joint

193.85

300mm dia R.C.C. Pipes and Specials

Each Joint

217.80

350mm dia R.C.C. Pipes and Specials

Each Joint

233.75

400mm dia R.C.C. Pipes and Specials

Each Joint

252.30

190

Schedule
Item No.

Description

Unit

Rate in
Rupees

450mm dia R.C.C. Pipes and Specials

Each Joint

296.10

500mm dia R.C.C. Pipes and Specials

Each Joint

326.70

600mm dia R.C.C. Pipes and Specials

Each Joint

389.05

700mm dia R.C.C. Pipes and Specials

Each Joint

452.85

750mm dia R.C.C. Pipes and Specials

Each Joint

478.15

800mm dia R.C.C. Pipes and Specials

Each Joint

496.75

900mm dia R.C.C. Pipes and Specials

Each Joint

564.40

1000mm dia R.C.C. Pipes and Specials

Each Joint

577.70

1100mm dia R.C.C. Pipes and Specials

Each Joint

632.20

1200mm dia R.C.C. Pipes and Specials

Each Joint

701.30

1300mm dia R.C.C. Pipes and Specials

Each Joint

775.65

NOTE: For depth between

% excess allowed
over basic rate

2m to 4m

10%

4m to 6m

15%

Each collar joint is to be treated as


one joint only.
10b

Jointing RCC pipes with lead and hemp


yarn using steel collars including the
cost of jointing materials and caulking
the joints.
For depth upto 2m
150mm dia R.C.C. Pipes

Each steel collar

136.70

200mm dia R.C.C. Pipes

Each steel collar

171.25

250mm dia R.C.C. Pipes

Each steel collar

203.10

300mm dia R.C.C. Pipes

Each steel collar

235.00

350mm dia R.C.C. Pipes

Each steel collar

266.90

400mm dia R.C.C. Pipes

Each steel collar

277.50

450mm dia R.C.C. Pipes

Each steel collar

347.95

500mm dia R.C.C. Pipes

Each steel collar

389.05

600mm dia R.C.C. Pipes

Each steel collar

464.85

700mm dia R.C.C. Pipes

Each steel collar

555.15

800mm dia R.C.C. Pipes

Each steel collar

638.95

NOTE: For depth between

Percentage
excess allowed
over basic rate

2m to 4m

10%

4m to 6m

15%

191

Schedule
Item No.
11a

Description

Unit

Rate in
Rupees

Lowering AC/ GRP pipes and specials


into the trench carefully, laying to
proper grade and alignment, jointing of
A.C/ GRP pipes with simplex joints with
rubber rings or with C.I. detachable
joints or with M.S. couplers.
For depth upto 2m

11b

80mm dia AC/ GRP Pipes

One metre

11.85

100mm dia AC/ GRP Pipes

One metre

15.90

125mm dia AC/ GRP Pipes

One metre

23.85

150mm dia AC/ GRP Pipes

One metre

26.55

200mm dia AC/ GRP Pipes

One metre

35.75

250mm dia AC/ GRP Pipes

One metre

43.70

300mm dia AC/ GRP Pipes

One metre

55.75

350mm dia AC/ GRP Pipes

One metre

62.30

400mm dia AC/ GRP Pipes

One metre

71.70

450mm dia AC/ GRP Pipes

One metre

83.60

500mm dia AC/ GRP Pipes

One metre

99.55

600mm dia AC/ GRP Pipes

One metre

119.50

700mm dia AC/ GRP Pipes


NOTE: For depth between

One metre
% excess allowed
over basic rate
15%
30%

147.35

2m to 4m
4m to 6m
Lowering PVC rigid/ HDPE pipes and
specials to trench and laying to proper
grade and alignment, jointing with PVC
couplers with cement paste.
For depth upto 2m
Upto 40mm dia (OD) PVC/ HDPE pipe

One metre

4.65

50mm to 75mm dia (OD) PVC/ HDPE pipe

One metre

7.90

90mm to 110mm dia (OD) PVC/ HDPE pipe

One metre

7.90

125mm to 160mm dia (OD) PVC/ HDPE pipe

One metre

11.10

180mm to 250mm dia (OD) PVC/ HDPE pipe

One metre

14.25

One metre
Percentage
excess allowed
over basic rate

20.70

Over 250mm to 315mm dia (OD)


PVC/ HDPE pipe
NOTE: For depth between

2m to 4m

15%

4m to 6m

30%

192

Schedule
Item No.
11c

Description

Unit

Rate in
Rupees

Lowering PSC/ BWSC pipes and specials


into the trench and laying to proper
grade and alignment and Jointing with
rubber gaskets
For depth upto 2m
Upto 350mm diameter

One metre

62.30

400mm diameter

One metre

72.95

450mm diameter

One metre

84.95

500mm diameter

One metre

99.55

600mm diameter

One metre

120.75

700mm diameter

One metre

135.45

800mm diameter

One metre

147.35

900mm diameter

One metre

160.65

1000mm diameter

One metre

175.25

1100mm diameter

One metre

188.60

1200mm diameter

One metre

217.80

1300mm diameter

One metre

241.70

1400mm diameter

One metre

277.50

1500mm diameter

One metre

308.10

NOTE: For depth between

Percentage
excess allowed
over basic rate

11d

2m to 4m

15%

4m to 6m

30%

Lowering CI collars with flange into the


trench and laying to proper grade and
alignment and jointing PSC pipes with
2 Nos of conical rubber rings and MS
bolts and nuts excluding the cost of
jointing materials.
For depth upto 2m
Upto 350mm diameter

Each collar

662.70

400mm diameter

Each collar

775.65

450mm diameter

Each collar

888.50

500mm diameter

Each collar

1000.00

600mm diameter

Each collar

1219.30

700mm diameter

Each collar

1551.35

800mm diameter

Each collar

1666.85

900mm diameter

Each collar

1888.75

1000mm diameter

Each collar

2218.15

1100mm diameter

Each collar

2442.55

193

Schedule
Item No.

Unit

Rate in
Rupees

1200mm diameter

Each collar

2776.00

1300mm diameter

Each collar

3113.35

Description

NOTE: For depth between

% excess allowed
over basic rate

11e

12a

2m to 4m

15%

4m to 6m

30%

Testing of M.S. / C.I. / D.I / P.V.C. /


H.D.P.E / pipes with hydraulic testing
equipment by filling with water (including
cost of water @ Rs. 60/KL) and testing
to recommended pressure in convenient
stetches and attending the bursts if
any occured during the test, excluding
the cost of pipes, including other
incidential and operational charges etc.,
complete for the following diametres of
pipes.
Up to 100mm

One metre

34.00

125mm

One metre

40.00

150mm

One metre

45.00

200mm

One metre

55.00

250mm

One metre

69.00

300mm

One metre

84.00

350mm

One metre

99.00

400mm

One metre

115.00

450mm

One metre

132.00

500mm

One metre

161.00

600mm

One metre

192.00

700mm

One metre

244.00

750mm

One metre

285.00

900mm

One metre

329.00

1050mm

One metre

424.00

1200mm

One metre

533.00

Cutting C.I. Pipes true to axis and


filing smoothly and finishing the ends
complete
80mm dia CI pipes

Each cutting

23.85

100mm dia CI pipes

Each cutting

26.55

125mm dia CI pipes

Each cutting

33.10

150mm dia CI pipes

Each cutting

37.15

175mm dia CI pipes

Each cutting

43.70

200mm dia CI pipes

Each cutting

59.65

194

Schedule
Item No.

`
12b

12c

Description

Unit

Rate in
Rupees

250mm dia CI pipes

Each cutting

75.60

300mm dia CI pipes

Each cutting

84.95

350mm dia CI pipes

Each cutting

107.50

375mm dia CI pipes

Each cutting

132.80

400mm dia CI pipes

Each cutting

139.35

450mm dia CI pipes

Each cutting

149.95

500mm dia CI pipes

Each cutting

165.90

525mm dia CI pipes

Each cutting

200.45

600mm dia CI pipes

Each cutting

204.55

675mm dia CI pipes

Each cutting

244.35

700mm dia CI pipes

Each cutting

257.65

750mm dia CI pipes

Each cutting

265.65

800mm dia CI pipes

Each cutting

278.90

825mm dia CI pipes

Each cutting

304.10

850mm dia CI pipes

Each cutting

318.75

900mm dia CI pipes


Cutting A.C. Pipes true to axis and
finishing the ends complete

Each cutting

326.70

80mm dia AC pipes

Each cutting

9.15

100mm dia AC pipes

Each cutting

10.60

125mm dia AC pipes

Each cutting

11.85

150mm dia AC pipes

Each cutting

14.50

200mm dia AC pipes

Each cutting

19.85

250mm dia AC pipes

Each cutting

31.85

300mm dia AC pipes

Each cutting

33.10

350mm dia AC pipes

Each cutting

39.80

400mm dia AC pipes

Each cutting

49.00

450mm dia AC pipes

Each cutting

55.75

500mm dia AC pipes

Each cutting

63.75

600mm dia AC pipes

Each cutting

72.95

700mm dia AC pipes

Each cutting

80.95

Upto 75mm dia (OD) PVC pipe

Each cutting

3.10

90mm dia PVC pipes

Each cutting

4.65

110mm dia PVC pipes

Each cutting

4.65

125mm dia PVC pipes

Each cutting

4.65

140mm dia PVC pipes

Each cutting

4.65

160mm dia PVC pipes

Each cutting

7.90

180mm dia PVC pipes

Each cutting

9.45

Cutting P.V.C. rigid pipes and specials true


to axis and finishing the ends complete

195

Schedule
Item No.

12d.

Description

Unit

Rate in
Rupees

200mm dia PVC pipes

Each cutting

9.45

250mm dia PVC pipes

Each cutting

11.10

315mm dia PVC pipes

Each cutting

12.65

Cutting and Threading of GI pipes

a.i

15mm dia GI pipe, Cutting

Each

3.95

ii.

15mm dia GI pipe, Threading

Each

5.55

b.i

20mm dia GI pipe, Cutting

Each

3.95

ii.

20mm dia GI pipe, Threading

Each

5.75

c.i

25mm dia GI pipe, Cutting

Each

4.80

ii.

25mm dia GI pipe, Threading

Each

11.60

d.i

32mm dia GI pipe, Cutting

Each

5.75

32mm dia GI pipe, Threading

Each

15.65

40mm dia GI pipe, Cutting

Each

7.65

ii
e.i
ii

40mm dia GI pipe, Threading

Each

17.60

f.i

50mm dia GI pipe, Cutting

Each

9.75

ii.

50mm dia GI pipe, Threading

Each

19.60

g.i

65mm dia GI pipe, Cutting

Each

10.60

65mm dia GI pipe, Threading

Each

23.55

h.i

80mm dia GI pipe, Cutting

Each

13.75

ii.

80mm dia GI pipe, Threading

Each

29.65

i.i

100mm dia GI pipe, Cutting

Each

19.60

ii.

100mm dia GI pipe, Threading

Each

39.25

j.i.

125mm dia GI pipe, Cutting

Each

21.10

j.ii.

125mm dia GI pipe, Threading

Each

42.35

13

Cutting R.C.C. Pipes true to axis and

ii

finishing the ends complete


150mm dia R.C.C. Pipes
200mm dia R.C.C. Pipes
250mm dia R.C.C. Pipes
300mm dia R.C.C. Pipes
350mm dia R.C.C. Pipes
400mm dia R.C.C. Pipes
450mm dia R.C.C. Pipes
500mm dia R.C.C. Pipes
600mm dia R.C.C. Pipes
650mm dia R.C.C. Pipes
700mm dia R.C.C. Pipes
750mm dia R.C.C. Pipes
800mm dia R.C.C. Pipes
900mm dia R.C.C. Pipes

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

cutting
cutting
cutting
cutting
cutting
cutting
cutting
cutting
cutting
cutting
cutting
cutting
cutting
cutting

33.10
37.15
47.80
62.30
65.00
83.50
91.55
102.20
114.15
119.50
131.40
135.45
148.70
157.95

1000mm dia R.C.C. Pipes

Each cutting

170.00

196

Schedule
Item No.

Description

Unit

1100mm dia R.C.C. Pipes


1200mm dia R.C.C. Pipes
1300mm dia R.C.C. Pipes
14a

Each cutting
Each cutting
Each cutting

181.85
195.15
203.10

Removing the burst C.I. pipes from the


pipe line and removal of slushy soil
and bailing out water and replacing
the pipeline with sound pipe including
jointing and cost of refilling the pipeline
with water for retesting the pipe line etc
complete. (excluding cost of sound pipe
and jointing materials and earth work)
and as directed by the TWAD Board
Officers.
For depth upto 2m
80mm dia C.I. Pipes
100mm dia C.I. Pipes
125mm dia C.I. Pipes
150mm dia C.I. Pipes
200mm dia C.I. Pipes
250mm dia C.I. Pipes
300mm dia C.I. Pipes
350mm dia C.I. Pipes
400mm dia C.I. Pipes
450mm dia C.I. Pipes
500mm dia C.I. Pipes
600mm dia C.I. Pipes
700mm dia C.I. Pipes
750mm dia C.I. Pipes
800mm dia C.I. Pipes
825mm dia C.I. Pipes
900mm dia C.I. Pipes

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

NOTE: For depth between

14b

Rate in
Rupees

2m to 4m
4m to 6m
Removing the burst A.C. Pipes from the
pipe line and removal of slushy soil and
bailing out water and replacing the pipe
line with sound pipe including jointing
and cost of refilling the pipe line with
water for retesting the pipe line etc
complete (excluding cost of sound pipe
and jointing materials and earth work)
and as directed by the TWAD Board
Officers
197

Percentage
excess allowed
over basic rate
15%
30%

615.00
771.65
1008.00
1271.00
1773.10
2437.25
3101.35
3511.85
4486.75
4887.95
5484.25
6710.25
7325.20
8406.40
9494.30
11259.45
13736.75

Schedule
Item No.

Description

Unit

For depth upto 2m


80mm dia AC. Pipes
100mm dia AC. Pipes
125mm dia AC. Pipes
150mm dia AC. Pipes
200mm dia AC. Pipes
250mm dia AC. Pipes
300mm dia AC. Pipes
350mm dia AC. Pipes
375mm dia AC. Pipes
400mm dia AC. Pipes
450mm dia AC. Pipes
500mm dia AC. Pipes
600mm dia AC. Pipes

Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

355.95
420.95
529.85
678.60
952.25
1217.90
1516.80
1665.60
1874.00
1984.40
2026..85
2226.10
2591.30

700mm dia AC. Pipes

Each

3191.70

NOTE: For depth between

14c

2m to 4m
4m to 6m
Removing the burst P.V.C. Pipes from the
pipe line and removal of slushy soil and
bailing out water and replacing the pipe
line with sound pipe including jointing and
cost of refilling the pipe line with water
for retesting the pipe line etc., complete
(excluding cost of sound pipe and jointing
materials and earth work) and as directed
by the TWAD Board Officers
Upto 63mm dia (OD) PVC Pipes
75mm dia (OD) PVC Pipes
90mm dia (OD) PVC Pipes
110mm dia (OD) PVC Pipes
125mm dia (OD) PVC Pipes
140mm dia to 160mm dia (OD) PVC Pipes
180mm dia to 200mm dia (OD) PVC Pipes
250mm dia to 280mm dia (OD) PVC Pipes
315mm dia (OD) PVC Pipes
NOTE: For depth between

14d

Rate in
Rupees

2m to 4m
4m to 6m
Removing the burst R.C.C. pipes from the
pipe line and removal of slushy soil and

198

% excess allowed
over basic rate
15%
30%

Each
Each
Each
Each
Each
Each
Each
Each
Each
Percentage
excess allowed
over basic rate
15%
30%

181.85
228.40
304.10
369.20
438.30
540.60
828.30
1009.45
1124.90

Schedule
Item No.

Description

Unit

Rate in
Rupees

bailing out water and replacing the pipe


line with sound pipe including jointing and
cost of refilling the pipe line with water
for retesting the pipe line etc., complete.
(excluding cost of sound pipe and jointing
materials and earth work) and as directed
by the TWAD Board Officers
For depth upto 2m
150mm dia RCC Pipes

Each

988.15

200mm dia RCC Pipes

Each

1389.30

250mm dia RCC Pipes

Each

1726.70

300mm dia RCC Pipes

Each

2050.75

350mm dia RCC Pipes

Each

2428.00

375mm dia RCC Pipes

Each

2884.90

400mm dia RCC Pipes

Each

3106.65

450mm dia RCC Pipes

Each

3473.30

500mm dia RCC Pipes

Each

3865.15

525mm dia RCC Pipes

Each

4399.10

600mm dia RCC Pipes

Each

4518.65

650mm dia RCC Pipes

Each

5042.00

700mm dia RCC Pipes

Each

5142.90

800mm dia RCC Pipes

Each

5675.50

900mm dia RCC Pipes

Each

6269.30

1000mm dia RCC Pipes

Each

6853.75

1100mm dia RCC Pipes

Each

7467.40

1200mm dia RCC Pipes

Each

8059.80

Each
Percentage
excess allowed
over basic rate
15%
30%

8455.60

1300mm dia RCC Pipes


NOTE: For depth between

14e

2m to 4m
4m to 6m
For sewerline works (Except pumping
main) 5% extra over the above rate
may be adopted.
Charges for fixing MS Stepped split up
collar in position in the spigot and socket
ends of the PSC pipe carefully and
caulking the sides of the collar using
hemp yarn cement and hard crete and
pouring the cement slurry mixed with use
of hard crete in the stepped collar
including cost of materials etc. complete
but excluding cost of stepped collar as
directed by the TWAD Board Officers
199

Schedule
Item No.

Description

Unit

Upto 1500mm dia PSC pipes


Upto 1000mm dia PSC pipes
Upto 800mm dia PSC pipes
Upto 700mm dia PSC pipes
Upto 600mm dia PSC pipes
Upto 500mm dia PSC pipes
Note:

For lighting arrangements during night


works due to emergency actual expenditure
incurred based on need for lighting may
be given extra as certified by the Executive
Engineer incharge of work at site

14f

Charges for lowering, positioning and


fixing MS steps collars in AC pipe line
carefully and caulking the sides of collar
using hemp yarn, cement and hard crete
into the stepped collar including cost of
jointing materials such as cement, yarn,
bolt and nuts, MS washers, RI sheet
and hard crete etc. but excluding cost
of step collar and as directed by TWAD
Officers.

i)

ii)

15 a.i)

For 500mm dia AC pipe


For 600mm dia AC pipe
For 700mm dia AC pipe
For removing the burst pipe in the
maintenance works when burst occurs
and replacing it with sound pipes
including the cost of refilling the trench
and the removal of slushy soil etc.,
Complete (Pipes and special jointing
materials will be supplied with in 200m
lead and at the respective TWAD Board
divisional stores free of cost). 2 times
ordinary rate allowed for the works are
during day time since the works are done
in confined reaches.
If the works are done in odd hours (i.e)
8.00 P.M. to 8.00 A.M. of the next day,
3 times of ordinary rate is allowed
since the works are done in the
confined reaches.
Slow Sand / Rapid Sand Filter Works
Labour for filling with broken stone of all
sizes well washed and cleaned, to be
free from impurities, including stacking
and laying in bed
200

Rate in
Rupees

Each
Each
Each
Each
Each
Each

6501.70
5197.30
3031.00
2992.40
2956.60
2864.95

Each
Each
Each

2166.25
2381.40
2708.20

One cubic metre

70.30

Schedule
Item No.
ii)

iii)

15 b

15c

Description

Unit

Labour for filling the coarse sand passing


through a sieve of 10 meshes to 2.5cm
and retained in 20 meshes to 2.5cm well One cubic metre
washed and cleaned to be free from
impurities including stacking
Labour for filling with fine sand passing
through a sieve of ten meshes to
2.5cm and retained in a sieve of 40
One cubic metre
meshes to 2.5 cm well washed and
cleaned to be free from impurities
including stacking
Labour for scraping and removing silt
only from the surface and sides of the
filter basin carrying the same to a
One cubic metre
distance not exceeding 200 metres
Labour for removing dirty sand in layer
of 25 mm uniform thickness from the
slow sand filter, conveying, dropping the
sand in a hopper with a lift of not
exceeding 3 metres within a distance
One square metre
of 30 metres and delivering the washed
sand in filter bed including removal and
carrying the dirt from collecting chamber
to a distance of upto 200 meters.
DRAINAGE WORKS

16

Laying and jointing with cement mortar


stoneware pipes and specials in dry
condition and testing with water
100mm diameter stoneware pipes

One metre

150mm diameter stoneware pipes

One metre

200mm diameter stoneware pipes

One metre

225mm diameter stoneware pipes

One metre

250mm diameter stoneware pipes

One metre

300mm diameter stoneware pipes

One metre

375mm diameter stoneware pipes

One metre

450mm diameter stoneware pipes

One metre

NOTE : The rates to be worked out vide


standard data appended as Item 17

201

Rate in
Rupees

132.80

11.60

13.10

15.85

202

60

60

60

60

60

225

250

300

375

450

Weight of S.W pipes for 30m (As


per Hand Book of PHE)

2425

2180

1375

1185

1043

750

435

Quantity of cement in Kg
for 50 joints

454

318

150

115

104

98

68

45

Cost of cement required for 50


joints (Rs.)
(5600-20+100.80=5680.80)

2579.08

1806.49

852.12

653.29

590.80

556.72

386.29

255.64

Quantity of sand in cubic metres


for 50 mortar joints
0.34

0.28

0.15

0.11

0.10

0.08

0.07

0.04

Cost of yarn at
Rs. 12.00/ Kg
670.68

478.60

314.89

10

18.14 228.56 2129.61

11.34 142.88 1045.66

8.35 105.21 795.65

8.17 102.94 727.51

6.90 86.94

5.45 68.67

3.63 45.74

Total cost of materials


(Total of columns 5,7,& 9)

114.82 27.22 342.97 3036.87

94.56

50.66

37.15

33.77

27.02

23.64

13.51

Cost of sand required for 50


mortar joints at Rs. Per cum
(176.40+161.30=337.70)
Quantity of spun of
tarred yarn in Kg

Nos.
8

Amount
3280

2870

2460

2050

2050

1640

1230

820

Nos.

Fitter
II Class
993

993

993

993

993

662

662

331

12

Amount

Mason I
Class

11

16

14

12

4112

3598

3084

1799

1799

1542

1542

1285

13

Nos.
8

1856

1624

1392

1160

1160

696

696

464

14

Cost of Labour for a length of


30m of SW pipes (Total No. of
column 11,12,13 & 14) (Rs. P.)
10241

9085

7929

6002

6002

4540

4130

2900

15

Total cost of material and cost


of Labour for 30 mts. (Total No.
of Column 10 & 15) ( Rs. P )
13277.87

11214.61

8974.66

6797.65

6729.51

5210.68

4608.60

3214.89

16

Conveyance of pipes from


stock yard to site of work
-

1439.24

1293.83

816.06

703.30

518.68

372.98

216.33

17

442.20

393.80

309.10

299.20

258.50

256.30

189.20

18

Testing charges including


conveyance of water tools and
plants etc. ( Rs.)

13096.05

10662.29

7922.81

7732.01

5987.86

5237.88

3620.42

19

436.54

355.41

264.09

257.73

199.60

174.60

120.68

20

Note : 1. For other diametre of pipes now manufactured, the rates will be fixed in due course after observing data.
2. The rates arrived at adopting the data appended to this schedule of Rates is for works done in the first 2.00m depth extra percentage 5% for 2m
to 2.5m, 7.50% for 2.50m to 3m, 10% for 3m to 3.50m, 15% for 3.50m to 4m and 20% for above 4m depth over basic rates are allowed.
3. The above data does not include baling charges, baling charges to be added as extra as per rates given in the relevant PWD Schedule of Rates
or as per actuals.
4. The conveyance charges adopted for Cement, Sand & Pipes are only for illustration purpose. The average lead for respective districts, as
approved by the Chief Engineer shall be adopted for Cement & Sand. The lead for Pipe shall be adopted, as certified by the respective Assistant
Executive Engineer.

60

200

60

100

60

Diameter (in mm)

150

Length of each pipe in cm

Nos.

Mazdoor
Category I
Amount

Mazdoor
Category II
Amount

Labour for Laying


and jointing

Total cost of laying and jointing


SW pipes with CM and packing
with spun or tarred yarn etc.
complete for 30m length (Rs.P)

DATA ILLUSTRATION (RATES FOR ITEM No.16) ITEM No.17. LAYING AND JOINTING STONE WARE PIPES FOR ONE RUNNING METRE
(Only for illustration purpose assuming Conveyance charges for 20KM for Cement & Sand and 8KM for Stoneware pipes)
Total cost of laying 4 joints
stoneware pipes complete for
1 metre ( Rs. P )

RATES FOR CONVEYANCE OF


MATERIALS

CONVEYANCE
1) Rates for Conveyance of C.I/G.I/D.I. Pipes and Specials
Unloading
Loading
Unloading Transport
from
into carts from carts charges up
Railway
or lorries/ or lorries & to 8km or
wagons or
Tonne
stacking/
part
loading
Tonne
thereof/
into
Tonne
Railway
wagons/
Tonne
2
3
4
5

Size

1
Up to 125 mm
Over 125 mm up
200 mm
Over 200 mm up
350 mm
Over 350 mm up
500 mm
Over 500 mm up
700 mm
Above 700mm

Total/
Tonne

Rs. P.

Rs. P.

Rs. P.

Rs. P.

Rs. P.

218.55

143.60

143.60

139.55

645.30

299.40

192.00

192.00

149.05

832.45

367.40

254.00

254.00

151.75

1027.15

459.60

300.85

300.85

170.75

1232.05

554.85

347.75

347.75

188.30

1438.65

624.40

414.25

414.25

203.25

1656.15

to
to
to
to

For every 1 KM or part thereof

Rate per Tonne in Rupees


up to 500 mm

Above 500 mm

Beyond 8 KM to 25 KM

10.80

12.15

Above 25 KM to 50 KM

7.85

9.20

Above 50 KM to 80 KM

6.85

8.20

Above 80 KM to 125 KM

5.15

6.80

Above 125 KM to 200 KM

5.15

5.15

Above 200 KM

3.40

3.40

Note: 1) For lorry and cart consignments of capacity one Tonne and below, double the
rates may be allowed, when the total quantity to be transported is within
1.00 M.T.
2) For Lorry consignments from 1 to 2 Tonnes, the rates admissible for two Tonnes
may be allowed, when the total quantity to be transported is within 2 M.T.
3) For Lorry Consignments from 2 to 5 Tonnes, the rates admissible for 5 Tonnes
may be allowed, when the total quantity to be transported is within 5 M.T.
4) Above 5 Tonnes of Lorry consignment, full lorry load rate of 9 Tonnes may be
allowed.
5) For the conveyance of E.R.W.M.S. seamless pipes and specials up to 350mm dia,
the rates of C.I. Pipes of respective dia available in the Schedule of rates may be
adopted.
6) An extra rate of Rs.27.20 per Tonne may be allowed for unloading from Railway
wagons and stacking before loading into carts and lorries.
205

2) Rates for Conveyance of M.S. Pipes and Specials

Size

1
Up to 350 mm
Over 350 mm up to
500 mm
Over 500 mm up to
700 mm
Above 700mm

Unloading
Loading
Unloading Transport
from
into carts from carts charges up
Railway
or lorries/ or lorries & to 8km or
wagons or
Tonne
stacking/
part
loading
Tonne
thereof/
into
Tonne
Railway
wagons/
Tonne
2
3
4
5

Total/
Tonne

Rs. P.

Rs. P.

Rs. P.

Rs. P.

Rs. P.

825.50

571.50

571.50

346.90

2315.40

1037.20

677.35

677.35

384.85

2776.75

1251.85

777.10

777.10

425.50

3231.55

1406.10

937.40

937.40

460.70

3741.60

For every 1 KM or part thereof

Rate per Tonne in Rupees


up to 500 mm

Above 500 mm

Beyond 8 KM to 25 KM

24.35

27.05

Above 25 KM to 50 KM

17.45

21.00

Above 50 KM to 80 KM

15.05

18.90

Above 80 KM to 125 KM

11.85

15.10

Above 125 KM to 200 KM

11.85

11.85

Above 200 KM

8.40

8.40

Note : 1) For lorry and cart consignments of capacity one Tonne and below double the
rates may be allowed, when the total quantity to be transported is within
1.00 M.T.
2) For Lorry consignments from 1 to 2 Tonnes the rates admissible for two
Tonnes may be allowed, when the total quantity to be transported is within
2 M.T.
3) For Lorry Consignments from 2 to 5 Tonnes the rates admissible for 5 Tonnes
may be allowed, when the total quantity to be transported is within 5 M.T.
4) Above 5 Tonnes of Lorry consignment, full lorry load rate of 9 Tonnes may be
allowed.
5) An extra rate of Rs.27.20 per Tonne may be allowed for unloading from
Railway wagons and stacking before loading into carts and lorries.

206

3) Rates for Conveyance of R.C.C. /P.S.C/B.W.S.C. Pipes and Specials

Size

Unloading
Loading
Unloading Transport
from
into carts from carts charges up
Railway
or lorries/ or lorries & to 8km or
wagons or
Tonne
stacking/
part
loading
Tonne
thereof/
into
Tonne
Railway
wagons/
Tonne
2
3
4
5

Total/
Tonne

Rs. P.

Rs. P.

Rs. P.

Rs. P.

Rs. P.

169.30

130.00

130.00

159.85

589.15

210.10

166.30

166.30

168.00

710.70

263.05

205.60

205.60

174.80

849.05

328.05

241.90

241.90

197.80

1009.65

356.80

269.10

269.10

214.10

1109.10

150 mm to 200 mm
Over 200 mm up to
350 mm
Over 350 mm up to
500 mm
Over 500 mm up to
700 mm
Above 700mm

Rate per Tonne in Rupees

For every 1 KM or part thereof

up to 500 mm

Above 500 mm

Beyond 8 KM to 25 KM

9.25

12.40

Above 25 KM to 50 KM

6.25

9.40

Above 50 KM to 80 KM

5.20

8.55

Above 80 KM to 125 KM

5.20

6.80

Above 125 KM to 200 KM

5.20

5.20

Above 200 KM

3.45

3.45

Note : 1) For lorry and cart consignments of capacity 1 Tonne and below, double the rates
may be allowed, when the total quantity to be transported is within 1 M.T.
2) For Lorry consignments up to 5 MT (i.e.) above 1 MT Load, the rates admissible
for 5 Tonnes may be allowed.

207

4) Rates for Conveyance of A.C. Pipes and Specials

Size

Unloading
Loading
Unloading Transport
from
into carts from carts charges up
Railway
or lorries/ or lorries & to 8km or
wagons or
Tonne
stacking/
part
loading
Tonne
thereof/
into
Tonne
Railway
wagons/
Tonne
2
3
4
5

Total/
Tonne

Rs. P.

Rs. P.

Rs. P.

Rs. P.

Rs. P.

Up to 125 mm

111.85

99.75

99.75

243.90

555.25

Over 125 mm up to
200 mm

152.65

105.80

105.80

256.10

620.35

173.85

130.00

130.00

291.35

725.20

187.45
187.45
195.00
216.15
229.80
252.45
263.05

136.05
151.20
167.80
187.45
207.10
237.35
243.40

136.05
151.20
167.80
187.45
207.10
237.35
243.40

299.45
303.55
323.90
342.85
353.65
379.40
380.80

759.00
793.40
854.50
933.90
997.65
1106.55
1130.65

Over 200 mm up to
250 mm
For 300 mm
For 350 mm
For 400 mm
For 450 mm
For 500 mm
For 600 mm
For 700 mm

For every 1 KM or part thereof

Rate per Tonne in Rupees


up to 500 mm

Above 500 mm

Beyond 8 KM to 25 KM

18.65

21.75

Above 25 KM to 50 KM

11.00

12.60

Above 50 KM to 80 KM

10.25

11.95

Above 80 KM to 125 KM

8.50

10.25

Above 125 KM to 200 KM

6.80

8.50

Above 200 KM
5.20
6.80
Note : 1) For lorry and cart consignments of capacity one Tonne and below double the rates
may be allowed, when the total quantity to be transported is within 1 M.T.
2) For Lorry consignments from 1 to 2 Tonnes the rates admissible for two Tonnes may
be allowed, when the total quantity to be transported is within 2 M.T.
3) For Lorry Consignments from 2 to 5 Tonnes the rates admissible for 5 Tonnes may
be allowed, when the total quantity to be transported is within 5 M.T.
4) Above 5 Tonnes of Lorry consignment, full lorry load rate of 9 Tonnes may be
allowed.
5) For the conveyance of E.R.W.M.S. seamless pipes and specials up to 350mm dia,
the rates of C.I. Pipes of respective dia available in the Schedule of Rates may be
adopted.
6) An extra rate of Rs.27.20 / Tonne may be allowed for unloading from Railway
wagons and stacking before loading into carts and lorries.
208

5) Rates for Conveyance of PVC/ HDPE /GRP Pipes and Specials

Size

Unloading
Loading
Unloading Transport
from
into carts from carts charges up
Railway
or lorries/ or lorries & to 8km or
wagons or
Tonne
stacking/
part
loading
Tonne
thereof/
into
Tonne
Railway
wagons/
Tonne
2
3
4
5
Rs.

P.

Rs.

P.

Rs.

P.

Rs.

P.

Total/
Tonne

6
Rs.

P.

50mm to 110mm OD

145.10

127.00

127.00

406.55

805.65

125mm to200mm OD

187.45

128.45

128.45

409.20

853.55

190.50

169.30

169.30

440.40

969.50

193.50

173.80

173.80

478.35

1019.45

Over 200mm to
315mm OD
Over 315mm OD

For every 1 KM or part thereof

Rate per Tonne in Rupees

Beyond 8 KM to 25 KM

35.10

Above 25 KM to 50 KM

23.45

Above 50 KM to 80 KM

20.55

Above 80 KM to 125 KM

15.35

Above 125 KM to 200 KM

11.90

Above 200 KM

8.50

Note: 1) For departmentally loading of PVC pipes and


Rs.2.60 each length (6 m)
Specials (excluding transport charges)
Up to 110 mm dia
2) For departmentally unloading of PVC pipes and Rs.2.60 each length (6 m)
Specials Up to 110 mm dia
3) a.
For departmentally loading for
Rs.144.95 per 1 MT
remaining sizes of pipes
b.
For departmentally unloading for
Rs.144.95 per 1 MT
remaining sizes of pipes
4) An extra rate of Rs.28.70/ Tonne may be allowed for unloading from Railway
wagons and stacking before loading into carts and lorries.
5) For lorry and cart consignments of capacity one Tonne and below double the
rates may be allowed, when the total quantity to be transported is within 1 M.T.
6) For Lorry consignments from 1 to 2 Tonnes the rates admissible for two Tonnes
may be allowed, when the total quantity to be transported is within 2 M.T.
7) For Lorry Consignments from 2 to 5 Tonnes the rates admissible for 5 Tonnes may
be allowed, when the total quantity to be transported is within 5 M.T.

209

6) Rates for Conveyance of SW Pipes and Specials

Size

Unloading
Loading
Unloading Transport
from
into carts from carts charges up
Railway
or lorries/ or lorries & to 8km or
wagons or
Tonne
stacking/
part
loading
Tonne
thereof/
into
Tonne
Railway
wagons/
Tonne
2
3
4
5

Total/
Tonne

Rs. P.

Rs. P.

Rs. P.

Rs. P.

Rs. P.

100 to 200 mm

210.10

137.55

137.55

222.20

707.40

Over 200 to 350 mm

266.10

176.85

176.85

239.80

859.60

Over 350 mm to
500 mm

334.10

213.15

213.15

260.15

1020.55

For every 1 KM or part thereof

Rate per Tonne in Rupees

Beyond 8 KM to 25 KM

15.50

Above 25 KM to 50 KM

9.40

Above 50 KM to 80 KM

10.30

Above 80 KM to 125 KM

6.80

Above 125 KM to 200 KM

5.20

Above 200 KM

3.45

Note: 1) For lorry and cart consignments of capacity one Tonne and below double
the rates may be allowed, when the total quantity to be transported is within
1 M.T.
2) An extra rate of Rs.28.70 / Tonne may be allowed for unloading from Railway
wagons and stacking before loading into carts and lorries.

210

7) Rates for Conveyance of Pig lead and Yarn

Size

Pig lead / Yarn

Unloading
Loading
Unloading Transport
from
into carts from carts charges up
Railway
or lorries/ or lorries & to 8km or
wagons or
Tonne
stacking/
part
loading
Tonne
thereof/
into
Tonne
Railway
wagons/
Tonne
2
3
4
5

Total/
Tonne

Rs. P.

Rs. P.

Rs. P.

Rs. P.

Rs. P.

72.50

61.95

61.95

81.30

277.70

For every 1 KM or part thereof

Rate per Tonne in Rupees

Beyond 8 KM to 25 KM

9.25

Above 25 KM to 50 KM

7.85

Above 50 KM to 80 KM

6.85

Above 80 KM to 125 KM

5.20

Above 125 KM to 200 KM

5.20

Above 200 KM

3.45

211

8 a) Rates for Conveyance of Materials by Road in Hills

Bricks II class Chamber burnt


Bricks (Table Moulded/Ground
Moulded), Fly Ash Bricks
(1000 Nos.)

Co- efficient

1.00

1.10

1.60

1.35

1.80

2.25

Cement and Steel


(One metric tonne)

Sl.No.

Distance in Kilometre

Mangalore Tiles (1000 Nos.)


Machine Pressed Tiles (2000 Nos.)
Hydraulically pressed Mosaic
Flooring Tiles (1500 Nos.)

Limestone, Laterite, Brickjelly,


Wood work, Pond Ash (wet /dry)
, stone dust
(One Cubic Metre)
Rough Stone, Bond Stone, Cut
Stone, Broken Stone jelly, Sand,
Gravel, Surki, Earth, Crushed
stone sand
(One Cubic Metre)
Third Class Country Bricks
(Kiln Burnt)
(1000 nos.)

Rate in Rupees

Add for every extra 1 Km and part thereof

0 to 10 kms

10.86

11.94

17.38

14.66

19.54

24.44

10 to 20 kms

9.30

10.24

14.88

12.56

16.74

20.92

20 to 40 kms

8.00

8.80

12.80

10.80

14.40

18.00

40 to 80 kms

6.90

7.60

12.00

9.30

12.40

15.52

Above 80 kms

6.30

6.94

10.08

8.50

11.34

14.18

Note 1

The above rates do not include stacking charges [as per Circular Memo
No.230Wks.IV(2)/62-3 dated 16.06.1962 of Chief Engineer (General)]

For Conveyance of Materials on cart track, allow 20% extra over the above
rates excluding loading and unloading charges.

For Sandy and Slushy soil tracks, add 50% extra over the above rates
excluding loading and unloading charges.

The quantity for Payment towards conveyance of earth in coloumn (5) is for
the pit measured quantity at the site of excavation only.

For conveyance of laterite, broken stone jelly, etc., through lorries, the rates
provided are for the volume with voids.

For all materails which finds place in column 3,4,5,6,7 & 8 above, necessary
incidental charges, loading charges and unloading charges have been included
already under their basic cost furnished below the head Rates of Materials
itself. Hence, no separate incidental charges, loading and unloading charges
shall be allowed for the above materials.

212

8 b) Rates for Conveyance of Materials by Road in plains

Bricks II class Chamber burnt


Bricks (Table Moulded/Ground
Moulded), Fly Ash Bricks
(1000 Nos.)

Co efficient

1.00

1.10

1.60

1.35

1.80

2.25

Cement and Steel


(One metric tonne)

Sl.No.

Distance in Kilometre

Mangalore Tiles (1000 Nos.)


Machine Pressed Tiles (2000 Nos.)
Hydraulically pressed Mosaic
Flooring Tiles (1500 Nos.)

Limestone, Laterite, Brickjelly,


Wood work, Pond Ash (wet /dry)
, stone dust
(One Cubic Metre)
Rough Stone, Bond Stone, Cut
Stone, Broken Stone jelly, Sand,
Gravel, Surki, Earth, Crushed
stone sand
(One Cubic Metre)
Third Class Country Bricks
(Kiln Burnt)
(1000 nos.)

Rate in Rupees

Add for every extra 1Km and part there of

0 to 10 kms

5.43

5.97

8.69

7.33

9.77

12.22

10 to 20 kms

4.65

5.12

7.44

6.28

8.37

10.46

20 to 40 kms

4.00

4.40

6.40

5.40

7.20

9.00

40 to 80 kms

3.45

3.80

6.00

4.65

6.20

7.76

Above 80kms

3.15

3.47

5.04

4.25

5.67

7.09

Loading Charges

80.40

38.40

26.30

37.75

37.75

37.75

UnLoading Charges

80.40

38.40

26.30

37.75

37.75

37.75

Add above extra for


inter state works

16.00

17.60

25.60

21.55

28.75

36.00

Note 1

The above rates do not include stacking charges [as per Circular Memo
No.230Wks.IV(2)/62-3 dated 16.6.1962 of Chief Engineer (General)]

For Conveyance of Materials on cart track, allow 20% extra over the above
rates excluding loading and unloading charges.

For Sandy and Slushy soil tracks, add 50% extra over the above rates
excluding loading and unloading charges.

The quantity for Payment towards conveyance of earth in coloumn (5) is for
the pit measured quantity at the site of excavation only.

For conveyance of Lateriate, Broken stone jelly, etc. through lorries, the
rates provided are for the volume with voids.

For all materails which finds place in coloumn 3,4,5,6,7 & 8 above, necessary
incidental charges, loading charges and unloading charges have been included
already under their basic cost furnished below the head Rates of materials
itself. Hence, no separate incidental charges, loading and unloading charges
shall be allowed for the above materials.
213

9) Rates for Conveyance of materials by Head load


Rate in Rupees

Sl.No

Description of material

Unit

Rough Stone, Broken Stone Jelly,


Cut Stone, RCC Slab, Sand -

LEAD
LIFT
Above
Add extra Add extra
10m and for every for every
upto
additional 1m height
100m
100m or
or part
part
thereof
thereof
for more
than
2m lift
4
5
6

cu.m

55.40

23.05

6.05

cu.m

29.50

23.05

4.50

Cement Block, Wooden Scantling,


Wooden plank
2

Lime, Lime Stone, Laterite,


Brick Jelly, Earth, Sand,Gravel,
Surki, Pond Ash (wet/dry),
Crushed Stone Sand, Stone Dust

a)

Mangalore Tiles

1000 Nos.

60.00

30.20

7.65

b)

Machine Pressed Tiles

2000 Nos.

60.00

30.20

7.65

c)

Hydraulic Pressed Mosaic


1500 Nos.

60.00

30.20

7.65

2500 Nos.

60.00

30.20

7.65

1000 Nos.

60.00

30.20

7.65

M.T

55.40

30.20

6.05

M.T

92.50

36.95

7.65

Flooring Tiles
d)

Terrace Bricks, Flat Tiles


and Pan Tiles

e)
4

Bricks

Cement, A.C. Sheet, Bitumen,


Asphalt, Tar

Steel

Note:
1

Fraction of 100 metres to be rounded off to the nearest 100 metres

The rates indicated in the table shall be applicable only to inaccessible places
(i.e) the places Wherever the Bullock- Carts cannot move [Chief Engineer (General)
Memo No.CTO(A) / 38153 / 89 / dated 03.02.1989]

For an initial lead of 10m and initial lift of 2m, no charge towards head load is
allowable.

214

RATES FOR MISCELLANEOUS


ITEMS

MISCELLANEOUS
Schedule
Item No.
1. A

2
a.
b.
3

Description
PLUMBING
Laying of G.I. Pipes and specials to proper line
and level including jointing but excluding cost
of pipes and jointing materials for plumbing
works for providing water supply and sanitary
works in the premises of the building
6 mm to 32 mm dia
40 mm to 50 mm dia
65 mm to 150 mm dia
Bore cap using M.S. Flat of size 1 cm x 3 mm
and M.S. sheet on top with bolting
arrangements for securing the cap in position
(Bore caps with M.S. Couplings need not be
made)
5" Casing Pipes
6" Casing Pipes
8 Casing Pipes
Labour for cutting open road for laying water
mains or sewer.
B.T. Roads (or) Maccadam road
Concrete Roads
Labour for drilling, cutting, Threading and
Fixing Ferrules in distribution pipes.
10 mm dia
15 mm dia
20mm dia
25 mm dia
Labour charges for Painting TWAD Board
Emblem in accordance with the size and
specifications as approved by the Board on
the Service Reservoirs including cost of all
consumables, one coat of base paint,
scaffolding charges including painting NRDWP
Logo on the Service Reservoirs.

Unit

Rates in
Rupees

One metre
One metre
One metre

9.55
9.55
12.75

Each
Each
Each

292.20
309.65
340.40

One cu.m
One cu.m

390.00
546.30

Each
Each
Each
Each

40.85
51.10
64.20
75.90

Sqm

1432.45

12 mm dia

Each

14.35

15 mm dia

Each

28.80

20 mm dia

Each

41.70

22 mm dia

Each

56.15

25 mm dia

Each

70.55

Drilling holes in C.I/G.I. Dummy Flanges.

217

Schedule
Item No.
6

8a

c
I

Description

Unit

Labour for refilling with sand the socket hollows


of pipes including conveyance and stacking
One cu.m
NOTE : 1) For depth between
Percentage
excess
allowed
over basic
rate
2 m to 4 m
15%
4 m to 6 m
30%
Lifting and positioning of C.I / G.I Pipes in
vertical direction for service reservoir pipe
connection
0 to 2 m
Qtl
2 to 4 m
Qtl
4 to 6 m
Qtl
6 m to 8 m
Qtl
8 m to 10 m
Qtl
10 m to 12 m
Qtl
12 m to 14 m
Qtl
14 m to 16 m
Qtl
16 m to 18 m
Qtl
18 m to 20 m
Qtl
20 m to 22 m
Qtl
22 m to 24 m
Qtl
DRILLING WORKS
Using Hand Bore set
Drilling of borewells of size 4" to 5" dia. in
Sedimentary formation using hand boresets
including insertion of casing pipes and removal
of casing pipes etc., including supplying and
One metre
packing of pebbles and conveyance of hand
Boreset including loading and unloading
Drilling of borewells of size 6" to 8" dia. in
sedimentary formation using hand boreset
including insertion of casing pipe etc., and
One metre
supplying and packing of pebbles
(Conveyance of hand bore set including loading
and unloading to be done by the contractor)
Using Hand Bore set
(For Investigation purpose)
Drilling of borewells of size 4" to 5" dia. in
sedimentary formation using hand boresets
including insertion of casing pipes and removal
218

Rates in
Rupees
14.35

121.15
182.50
286.25
395.90
505.45
613.60
726.10
827.10
936.45
1046.00
1152.80
1260.80

457.20

537.60

Schedule
Item No.

ii

i.
ii.
e
f
g

9a
i.
ii
iii
b

i.
ii
iii
10

11

Description
of casing pipes etc., including collection of
samples as directed by the TWAD Board
Officers.
Drilling of borewells of size 6" to 8" dia. in
sedimentary formation using hand boresets
including insertion of casing pipes and removal
of casing pipes etc., including collection of
samples as directed by the TWAD Board Officers.
Using Calyx Drill
Drilling of 4 1/2" diameter borewell by using
Calyx Drill including transporting charges and
insertion of casing pipes (excluding cost of
casing pipe)
For Hilly terrain area
For Plain area
Drilling 4 1/2" dia meter bores by using In-Well
rig in Hilly areas
Reaming from 6" Pilot bore to 12" size bore as
directed by the TWAD Board Officers
Labour charges for inserting casing pipes
assembly (With slot or without slot) in the
drilled hole including welding the joint etc.,
complete and supplying and packing the
annular space with pebbles of size and quality
as approved by the Executive Engineer
Driving sheet piles for one metre length of
gallery each side in sandy soil
First depth of 2 m
Second depth of 2 m
Third depth of 2 m
Removing sheet piles from one metre length of
gallery on each side including stacking the
sheet piles properly
First depth of 2 m
Second depth of 2m
Third depth of 2 m
Drilling of borwell inside well 115mm dia.
a) Vertical
b) Horizontal
Drilling of borewell inside well 150mm dia.
a) Vertical
b) Horizontal
219

Unit

Rates in
Rupees

One metre

340.40

One metre

398.85

One metre
One metre

1711.00
1414.00

One metre

720.00

One metre

188.00

One metre

180.00

One metre
One metre
One metre

355.00
542.00
1018.00

One metre
One metre
One metre

55.30
84.50
122.70

One metre
One metre

393.00
431.00

One metre
One metre

492.00
520.00

Schedule
Item No.
12

a.
i.
ii
iii
iv
v
vi
vii
viii
ix
x
xi
12 b

i.
ii
iii
iv

Description

Unit

Drilling of Borewells anywhere in Tamilnadu


including transportation from one place to
another with in Tamilnadu in alluvial soil
sedimentary strata of clay and sand stone
P.S. to
shale pebbles boulders etc. By first taking a
M.D.S.S.
pilot bore of 140 mm/150mm dia and then
Special
enlarging to required dia direct or reverse
Specifications
rotary mud circulation method using rotary rigs,
fuel, labour and drilling bentonite and water
required for drilling at site ( Site will be shown
by the TWAD Board Officers) including
construction of mud pit.
Drilling of 140/150 mm pilot bore
Upto 60 m Depth ending below ground level
One metre
From 60 m upto 90 m Depth ending from
ground level
One metre
From 90 m upto 120 m Depth ending from
ground level
One metre
From 120 m upto 150 m Depth ending from
ground level
One metre
From 150 m upto 180 m Depth ending from
ground level
One metre
From 180 m upto 210 m Depth ending from
ground level
One metre
From 210 m upto 240 m Depth ending from
ground level
One metre
From 240 m upto 270 m Depth ending from
ground level
One metre
From 270 m upto 300 m Depth ending from
ground level
One metre
From 300 m upto 330 m Depth ending from
ground level
One metre
From 330 m upto 360 m Depth ending from
ground level
One metre
Reaming 140/150 mm dia pilot bore to
300mm dia bore as directed by the TWAD
Board Officer.
Upto 60 m depth ending below ground level
One metre
From 60 m depth and upto 90 m depth ending
below ground level
One metre
From 90 m upto 120 m depth ending below
ground level
One metre
From 120 m upto 150 m depth ending below
ground level
One metre
220

Rates in
Rupees

822.00
890.00
944.00
994.00
1009.00
1042.00
1072.00
1109.00
1134.00
1161.00
1185.00

206.00
219.00
234.00
237.00

Schedule
Item No.
v
vi
vii
viii
ix
x
xi
12 c
i.
ii
iii
iv
v
vi
vii
viii
ix
x
xi
12 d

i.

Description
From 150 m upto 180 m depth ending below
ground level
From 180 m upto 210 m depth ending below
ground level
From 210 m upto 240 m depth ending below
ground level
From 240 m upto 270 m depth ending below
ground level
From 270 m upto 300 m depth ending below
ground level
From 300 m upto 330 m depth ending below
ground level
From 330 m upto 360 m depth ending below
ground level
Reaming 200 mm dia pilot bore to 350mm dia
bore as directed by the TWAD Board Officer.
Upto 60 m depth ending below ground level
From 60 m depth and upto 90 m depth ending
below ground level
From 90 m upto 120 m depth ending below
ground level
From 120 m upto 150 m depth ending below
ground level
From 150 m upto 180 m depth ending below
ground level
From 180 m upto 210 m depth ending below
ground level
From 210 m upto 240 m depth ending below
ground level
From 240 m upto 270 m depth ending below
ground level
From 270 m upto 300 m depth ending below
ground level
From 300 m upto 330 m depth ending below
ground level
From 330 m upto 360 m depth ending below
ground level
Reaming 300 mm dia pilot bore to 400mm/
450mm dia bore as directed by the
TWAD Board Officer.
Upto 60 m depth ending below ground level

221

Unit

Rates in
Rupees

One metre

248.00

One metre

261.00

One metre

273.00

One metre

283.00

One metre

298.00

One metre

310.00

One metre

321.00

One metre

232.00

One metre

245.00

One metre

261.00

One metre

269.00

One metre

278.00

One metre

299.00

One metre

342.00

One metre

351.00

One metre

359.00

One metre

371.00

One metre

380.00

One metre

318.00

Schedule
Item No.
ii

Description

Rates in
Rupees

One metre

356.00

One metre

380.00

One metre

403.00

One metre

419.00

One metre

431.00

One metre

441.00

One metre

462.00

One metre

479.00

One metre

503.00

One metre

520.00

From 60 m depth and upto 90 m depth ending


below ground level

iii

From 90 m upto 120 m depth ending below


ground level

iv

From 120 m upto 150 m depth ending below


ground level

From 150 m upto 180 m depth ending below


ground level

vi

From 180 m upto 210 m depth ending below


ground level

vii

From 210 m upto 240 m depth ending below


ground level

viii

From 240 m upto 270 m depth ending below


ground level

ix

From 270 m upto 300 m depth ending below


ground level

From 300 m upto 330 m depth ending below


ground level

xi

From 330 m upto 360 m depth ending below


ground level

12

Unit

Labour Charges for inserting 150 mm/200mm/


250 mm dia (M.S. Casing pipes assembly with
slots or with out slots) in the drilled hole
including welding the joints etc., complete and
supplying and packing the annular space with
pebbles of size and quality as approved by the
Executive Engineers of TWAD Board.

i.

150 mm dia Casing Pipes assembly

One metre

185.40

ii

200 mm dia Casing Pipes assembly

One metre

185.40

iii

250 mm dia Casing Pipes assembly

One metre

188.50

13 a

Labour Charges for inserting PVC Casing pipes


assembly (with slots or without slots) in the
drilled hole including jointing the pipes with PVC
Couplers with Cement paste etc., complete,
supply and packing the annular space with
pebbles of size and quality as approved by
the executive engineers of TWAD Board

i.

150 mm dia Casing Pipes assembly

One metre

179.60

ii

200 mm dia Casing Pipes assembly

One metre

185.40

iii

250 mm dia Casing Pipes assembly

One metre

185.40

222

Schedule
Item No.
13 b

14

a.
b.

c.

d.

i.
ii

Description
Charges for developing the Borewell with air
compressor of 600 CFM capacity (Minimum
8 Hours) including transportation, labour and
fuel charges for compressor as directed by
TWAD Officers and conducting yield test by
V notch method.
Note : I) 150 mm dia bore, reaming should be
done upto 300mm dia.
II) 200 mm dia bore, reaming should be done
upto 300mm dia and thereafter 400,450 etc.
Drilling of borewell anywhere in Tamilnadu
including transportation from one place to
another place within Tamilnadu in alluvial soil
or sedimentary strata of clay and sand or sand,
stone, shale, pebbles, boulders etc., by first
taking a pilot bore of 140 mm/150mm dia and
then enlarging to required dia by direct or
reverse rotatry mud and circulation method
using Contractors rig, fuel, labour, drilling,
betonite mud and water required for drilling at
the site shown by the TWAD Officers including
construction of mud pit only Calyx drills are to
be used.
Drilling 140 / 150 mm dia Pilot Bore upto 60 m
depth ending below ground level.
Reaming from 140/150 mm dia pilot bore to
300 mm dia bore as directed by the TWAD
Board Officers upto 60 m Depth ending from
ground level
Labour charges for inserting 150 mm dia
M.S. Casing pipes assembly (With slots or
without slots) in the drilled hole including
welding the joints and packing annular space
with pebbles of size and quality as approved
by the Executive Engineer / TWAD Board
Labour Charges for inserting PVC casing pipes
assembly (with slots or without slots) in the
drilled hole including the jointing the pipes with
PVC couplers with cement paste etc. complete
140 mm OD PVC Casing Pipes Assembly
165 mm/168 mm dia PVC Casing pipes
Assembly
223

Unit

Rates in
Rupees

One hour

1211.20

One metre

599.00

One metre

169.00

One metre

152.00

One metre

130.00

One metre

152.00

Schedule
Item No.
e.

f.

15 a.
i.
ii
ii
iv

b i.
ii
c.
d.
e.
i.
ii
f)

Description

Unit

Charges for developing the borewell with air


compressor of 300 CFM capacity (Minimum 8
One hour
Hours) including transportation labour and fuel
charges for compressor as directed by TWAD
Board Officers and conducting yield test by
V notch method.
Drilling of 12" dia vertical borewell so as to
have a finished size of 6" dia borewell in boulder
area to any required depth as decided by the
TWAD Board Officers including Transportation
from one place to anothr place with in
Tamilnadu State by direct or reverse rotary
One metre
mud circulation method using Contractors rig
tools, fuel, labourers, bentonite mud and water
required for drilling at the site shown by the
TWAD Officers including construction of mud
pit etc. using only calyx rigs.
Conveyance of Hand Pumps and its accessories
from divisional stores to site of works
Conveyance upto 10 Kms
Each Hand
Conveyance 10 to 20 Kms
Pump and its
Conveyance 20 to 40 Kms
accessories
Conveyance above 40 Kms
Note : i) Conveyance of Filter Point, Handpump
with GI Pipes and its accessories from divisional
stores to site of works. 50% of the rate of
conveyance of hand pumps, with its
accessories is applicable for this item for the
respective leads as indicated above
ii) If the Mark II hand pump is conveyed in
cart track even for part distance 20 % extra
over the above rate shall be adopted.
Erection of deep well hand pumps upto 40 m
Each
Above 40 m
Each
Erection of shallow well hand pumps
Each
Erection Extra deep well hand pumps
Each
Removal of deep well hand pumps from borewell
Up to 40 m
Each
Above 40 m
Each
Attending repairs to deep well handpumps for
borewells inclusive of removal of G.I. Pipes,
Plunger rods, Cylinder and re-erection of hand
pumps inclusive of lowering the GI Pipes
Plunger rods cylinder, jointing etc.

224

Rates in
Rupees

942.00

1153.00

372.50
467.50
569.75
660.30

612.10
698.25
270.15
790.35
612.10
771.35

Schedule
Item No.

Description

Unit

Rates in
Rupees

i.

Upto 30 M

Each

650.00

ii)

Above 30 M

Each

760.00

Each

176.70

Each

293.60

16 a

Erection of filter point with G.I. Pipes of


32 mm to 65 mm dia.

17a

Removing the chocked filter point with G.I.


Pipes of 32 mm to 65 mm dia and re-erecting
in another place within 1.00 KM radius after
cleaning the filter points G.I. Pipes etc.,
Complete upto 8 m depth
ERECTION OF POWER PUMPSET IN
BORE/OPENWELL
Labour Charges for erection of Horizontal shaft,
centrifugal pumpset (Coupled/Monoblock) in
bore well/Open well including fixing of suction
pipe and foot valve upto a maximum depth of
7 metres and delivery pipes to the required
length with valves, pressure gauges upto the
exterior wall of pump room and erection of panel
board consisting of TPIC switches starter,
Voltmeter, Ammeter, Capacitor single phasing
preventor and laying and jointing the cables
and twin earthing as per IE rules including
providing bed blocks etc., complete and
operating the pumps and trial run for 10 days
including signing of completion of reports as
required by EB authorities.

i.

Upto 3 HP

Each

3954.35

ii

Above 3 HP upto 7.5 HP

Each

5090.35

iii

Above 7.5 HP to 20 HP

Each

5964.45

17 b

ERECTION OF POWER PUMPS IN BORE WELL


Erection of power pumps in borewell labour
charges for erection of twin packer duplex type
jet pumps in borewells upto 150 mm dia
including fixing of Suction pipe regulating valves
with jet assembly upto a maximum depth of 30
m and delivery pipe valves pressure gauges
upto the exterior wall of pump room and
erection of panel board consisting of TPICN
switches starter, Voltmeter, Ammeter, three
indicator lamps capacitor and laying and jointing
the cables and twin earthing as per IE rules
etc., complete and testing the pumps and trial
run for 10 days including signing of completion
of reports as required by EB authorities and
finishing the pipe holes including the foundation
bolts, nuts and earth pits.

225

Schedule
Item No.

Description

Unit

Rates in
Rupees

i.
ii

Upto 3 HP
Above 3 HP upto 7.5 HP

Each
Each

5290.20
6180.75

iii

Beyond 7.5 HP upto 20 HP


Note : If depth of erection exceeds beyond
30 m 10% increase over the basic rate is
allowed

Each

7067.55

17 c

Labour charges for the erection of submersible


pumpset in borewell/openwell including fixing
and jointing submersible cable with proper
clamps upto the starter to required depth and
also fixing of riser pipes to the required depth
valves erection clamps, pressure gauges upto
the exterior wall of pump room and erection of
panel board consisting of TPICN switches
starter, Voltmeter, Ammeter, three pilot
(indicating) lamps capacitor single phasing
preventor, water level guard and laying and
jointing the cables and twin earthing as per IE
rules etc., complete and testing the pumpset
and trial run for 10 days.

i.

Upto 5 HP

Each

5377.50

ii)

Above 5.00 HP to 10.00 HP

Each

6161.80

Above 10.00 HP to 20.00 HP


Conveyance of power pumpset (centrifugal,
jet and submersible) and its accessories from
divisional stores to site of works.
Conveyance upto 10 Kms

Each

6836.05

iii)
17 d

i.

ii

Conveyance 10 to 20 Kms
Conveyance 20 to 40 Kms
Conveyance 40 to 60 Kms
Conveyance 60 to 80 Kms
Conveyance above 80 Kms
Note : For item 17 (a), (b) and (c)
Removal of centrifugal pumpset/ jet pumps/
submersible pumpsets and its accessories from
borewell/ open well for attending repairs 50%
of the rates mentioned under item 17 (a), (b)
and (c) may be allowed for the respective Horse
power.
Re-erection of centrifugal pumpsets, jet
pumpsets and its accessories into the borewell/
openwell after attending the repairs 50% of
the rate mentioned under item 17 (a), (b) and
(c) may be allowed for respective Horse power.

226

Each Power
Pump and its
accessories
-do-do-do-do-

810.85
891.15
1319.20
1608.50
2111.10
2420.90

Schedule
Item No.

Description

18
a

Hire charges :
Sheet piles (Larsen)

Sheet piles (For dingham)

Compartment sheet with Grills (3' - 0" Wide)

Rate for flushing of borewell of 6" dia requiring


less than 4 hours operation using drill rods/
hose with required size of pipes for various
capacity compressor including transportation,
labour, and fuel charges for compressors as
directed by the TWAD Officer and conducting
yield test by V notch method if required.

i.

600 Cfm ( 100 /150 PSI)

ii)

300/250 Cfm (100 PSI)

ii)

125 Cfm (100 PSI)

Unit

Per Pile/
Perday
Per Pile/
Per day
Per sheet/
Per day

1 hour (or)
Part there of
1 hour (or)
Part there of
1 hour (or)
Part there of

Rates in
Rupees

3.10
4.70
4.70

1211.00
942.00
863.00

Note : Minimum charges for 8 (eight) hours will


be levied if the air compressor issued for other
departmental works or if the air compressor is
hired to other departments.
e

Helmet

Hand test pump

Pile hammer

Concrete mixer 5 Cft. With driver


(Excluding cost of fuel)
Concrete mixer 7 Cft. With driver
(Excluding cost of fuel)
Hand operated winch

i.
j
k
l
m

Pile cap
Hire charges for diesel pumpset upto 3 HP with
fuel and crew charges including transportation
Hire charges for diesel pumpset above 3 HP to
7.5 HP with fuel and crew charges including
transportation
227

Per day/
8 hours
Per day/
8 hours
Per day/
8 hours
Per day/
8 hours
Per day/
8 hours
Per day/
8 hours
Per day/
8 hours

4.70
44.85
4.70
413.35
623.75
41.70
11.15

Per hour

127.00

Per hour

176.70

Schedule
Item No.
19 a

b
20

21

Description
Labour for tying barbed wire fencing
horizontally through the holes in RCC posts
with required tension.
Labour for tying barbed wire fencing vertically
with required tension
Labour charges for putting bore holes of size
3" to 4" in river bed in sandy and other loose
soils using hand boring sets including the
cost of hire charges, conveyance charges of
hand boring sets, collection of soil sample at
frequent intervals and as directed by
TWAD Board Officers.
Desilting light or sandysoil or silt from
infiltration wells below water level including
the charges for special T&P and air
compressor etc. complete.

228

Unit

Rates in
Rupees

One metre

4.70

One metre

4.70

One metre

246.85

One cu.m.

981.60

RATES FOR EARTH WORK


EXCAVATION FOR PIPE LAYING
WORKS

Schedule
Item No.

Description

Unit

Rates in
Rupees

EARTH WORK EXCAVATION FOR PIPE LAYING WORKS FOR WATER SUPPLY
1

Earth work excavation and depositing on bank


with initial lead of 10 m and lift of 2 M in narrow
trenches for laying of pipes for water supply in
the following type of soils as directed by
Departmental officers
Sand, silt or other loose soil, wet sand or silt
not under water light black cotton soil, sandy
loam and ordinary soil.
Hard stiff clay, stiff black cotton, hard red
earth, shales, murram gravel, stoney earth
and earth mixed with small size boulders and
hard gravelly soil.

231

One cubic
metre

77.00

One cubic
metre

115.00

EARTH WORK EXCAVATION FOR SEWERAGE WORKS


Schedule
Item No.

Description

II

Earthwork excavating and depositing on bank


with an initial lead of 10 meters and initial lift
of 2 metres in

Sand, silt or other loose soil, wet sand or silt


not under water, light black cotton soil, sandy
loam and ordinary soil including excavated earth
SS 20 B

Unit

Rates in
Rupees

Cu.m

30.80

Cu.m

38.50

Cu.m

46.00

Slush and silt under water upto 0.75 metre


depth requiring the aid of baskets and vessels
SS 20 B

Hard stiff clay, stiff black cotton, hard red


earth, shales, murram, gravel, stoney earth
and earth mixed with small size boulders SS
20B

Soft disintegrated rock, laterite, soft rock or


kankar, not requiring blasting

Cu.m

68.50

In loose boulders in excavation of various sizes


150mm to 625mm

Cu.m

108.50

Medium Rock and Dense Medium Rock not


requiring blasting

Cu.m

120.75

QUARRYING AND BLASTING

Hard rock measured in solid including blasting


and stacking

Cu.m

326.00

Removing hard rock by wedging chiselling and


trimming to proper shape where blasting is
prohibited.

Cu.m

653.00

Medium rock and dense medium rock requiring


blasting

Cu.m

167.00

Extra for every additional 10 metres lead or


part thereof over the initial lead for blasted
materials

Cu.m

4.00

Extra for every additional 1 metre lift or part


thereof over the initial lift of 2 m for blasted
materials

Cu.m

4.15

Benching hard rock upto an average 10cm depth

Sq.m

315.00

Drilling holes in hard granite 32mm diameter

RM

90.90

Drilling holes in hard granite 40mm diameter

RM

105.90

Drilling holes in hard granite 45mm diameter

RM

123.70

Drilling holes in hard granite 50mm diameter

RM

147.35

Drilling holes in hard granite 75mm diameter

RM

167.35

NOTE: Double the relevant rate will apply in excavation in all the soils and rock classifications
in respect of schedule item No. II only.
232

RATES FOR EARTH WORK


EXCAVATION AND REFILLING FOR
PIPELINE WORKS ON LINEAR
MEASUREMENT BASIS

RATES FOR EARTH WORK EXCAVATION AND REFILLING FOR PIPE LINE WORKS ON
LINEAR MEASUREMENT BASIS
Pipe
size in
mm

Width
in m

Depth
in m

Type

CI/ DI/
MS

AC Cl 15

AC Cl 10

80
100
125
150
200
250
300
350
400
450
500
525
600
700
750
80
100
125
150
200
250
300
350
400
450
500
600
80
100
125
150
200
250
300
350
400
450

0.75
0.75
0.75
0.75
0.80
0.80
0.80
0.90
0.90
1.00
1.00
1.00
1.10
1.20
1.25
0.75
0.75
0.75
0.75
0.80
0.80
0.80
0.90
0.90
1.00
1.00
1.10
0.75
0.75
0.75
0.75
0.80
0.80
0.80
0.90
0.90
1.00

1.05
1.05
1.05
1.05
1.10
1.20
1.35
1.45
1.55
1.70
1.85
1.85
2.05
2.30
2.45
1.05
1.05
1.05
1.05
1.10
1.20
1.35
1.45
1.55
1.70
1.85
2.05
1.05
1.05
1.05
1.05
1.10
1.20
1.35
1.45
1.55
1.70

Earth
work
qty. in
cum/m

0.79
0.79
0.79
0.79
0.88
0.96
1.08
1.31
1.40
1.70
1.85
1.85
2.26
2.76
3.06
0.79
0.79
0.79
0.79
0.88
0.96
1.08
1.31
1.40
1.70
1.85
2.26
0.79
0.79
0.79
0.79
0.88
0.96
1.08
1.31
1.40
1.70

Outer
dia of
pipe in
m

Refilling Earth
Earth Refilling
Qty/
work
work
rate/m
cum/m rate for rate for
other
loose
than
soil/
loose
soil/m
Rs.
Rs.
Rs.

Cost of EWE
Cost of refilling
Cost of loose soil
0.098
0.780
0.118
0.777
0.144
0.771
0.170
0.765
0.222
0.841
0.274
0.901
0.326
0.997
0.378
1.193
0.429
1.251
0.480
1.519
0.532
1.628
0.532
1.628
0.635
1.938
0.738
2.332
0.790
2.573
0.104
0.779
0.124
0.775
0.151
0.770
0.178
0.763
0.235
0.837
0.286
0.896
0.340
0.989
0.396
1.162
0.452
1.235
0.502
1.502
0.559
1.605
0.658
1.915
0.104
0.779
0.124
0.775
0.149
0.770
0.175
0.763
0.229
0.839
0.281
0.898
0.333
0.993
0.389
1.186
0.436
1.246
0.486
1.515
235

115.00
16.15
77.00
90.85
90.85
90.85
90.85
101.20
110.40
124.20
150.65
161.00
195.50
212.75
212.75
259.90
317.40
351.90
90.85
90.85
90.85
90.85
101.20
110.40
124.20
150.65
161.00
195.50
212.75
259.90
90.85
90.85
90.85
90.85
101.20
110.40
124.20
150.65
161.00
195.50

60.83
60.83
60.83
60.83
67.76
73.92
83.16
100.87
107.80
130.90
142.45
142.45
174.02
212.52
235.62
60.83
60.83
60.83
60.83
67.76
73.92
83.16
100.87
107.80
130.90
142.45
174.02
60.83
60.83
60.83
60.83
67.76
73.92
83.16
100.87
107.80
130.90

12.60
12.55
12.45
12.35
13.58
14.55
16.10
19.27
20.20
24.53
26.29
26.29
31.30
37.66
41.55
12.58
12.52
12.44
12.32
13.52
14.47
15.97
18.77
19.95
24.26
25.92
30.93
12.58
12.52
12.44
12.32
13.55
14.50
16.04
19.15
20.12
24.47

Pipe
size in
mm

Width
in m

Depth
in m

Earth
work
qty. in
cum/m

Outer
dia of
pipe in
m

500
600
40
50
63
75
90
110
125
140
160
180
200
350
400
450
500
600
700
800
900
1000
1100
1200
15
20
25
32
40
50
65
80
100
125
150

1.00
1.10
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.75
0.80
0.90
0.90
1.00
1.00
1.10
1.20
1.25
1.40
1.70
1.80
1.90
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75

1.85
2.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.10
1.45
1.55
1.70
1.85
2.05
2.30
2.45
2.60
2.60
2.75
3.00
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05
1.05

1.85
2.26
0.63
0.63
0.63
0.63
0.63
0.63
0.63
0.63
0.63
0.79
0.88
1.31
1.40
1.70
1.85
2.26
2.76
3.06
3.64
4.42
4.95
5.70
0.79
0.79
0.79
0.79
0.79
0.79
0.79
0.79
0.79
0.79
0.79

0.541
0.648
0.040
0.050
0.063
0.075
0.090
0.110
0.125
0.140
0.160
0.180
0.200
0.464
0.514
0.564
0.614
0.724
0.824
0.934
1.054
1.150
1.250
1.350
0.020
0.030
0.030
0.040
0.050
0.060
0.070
0.090
0.110
0.140
0.160

Type

PVC/
HDPE/
GRP

PSC/
BWSC

GI

Refilling Earth
Earth Refilling
Qty/
work
work
rate/m
cum/m rate for rate for
other
loose
than
soil/
loose
soil/m
Rs.
Rs.
Rs.
1.620
1.925
0.629
0.628
0.627
0.626
0.624
0.621
0.618
0.615
0.610
0.760
0.850
1.136
1.188
1.450
1.554
1.844
2.227
2.378
2.768
3.381
3.723
4.269
0.787
0.787
0.787
0.786
0.786
0.786
0.784
0.781
0.778
0.772
0.767

212.75
259.90
72.45
72.45
72.45
72.45
72.45
72.45
72.45
72.45
72.45
90.85
101.20
150.65
161.00
195.50
212.75
259.90
317.40
351.90
418.60
508.30
569.25
655.50
90.85
90.85
90.85
90.85
90.85
90.85
90.85
90.85
90.85
90.85
90.85

142.45
174.02
48.51
48.51
48.51
48.51
48.51
48.51
48.51
48.51
48.51
60.83
67.76
100.87
107.80
130.90
142.45
174.02
212.52
235.62
280.28
340.34
381.15
438.90
60.83
60.83
60.83
60.83
60.83
60.83
60.83
60.83
60.83
60.83
60.83

26.16
31.09
10.16
10.14
10.13
10.11
10.08
10.03
9.98
9.93
9.85
12.27
13.73
18.35
19.19
23.42
25.10
29.78
35.97
38.40
44.70
54.60
60.13
68.94
12.71
12.71
12.71
12.69
12.69
12.69
12.66
12.61
12.56
12.47
12.39

Note:Earth excavation in SDR, DMR,HR etc., the linear measurement rate may be worked
out separately and to be approved by the SE concerned after verification of soil classifications
by putting proper trial pits at closer intervals.( B.P.Ms.No.82 / COM Wing / dt.22.8.2008).

236

RATES FOR EARTH WORK


EXCAVATION OTHER THAN PIPE
LAYING WORKS AND WELLS

EARTH WORK EXCAVATION OTHER THAN PIPE LAYING WORKS AND WELLS
Schedule
Item No.

4a
5

8
9
10
11
12
13
14
15

Description
Earthwork excavating and depositing on
bank with an initial lead of 10 meters and
initial lift of 2 metres in
Sand, silt or other loose soil, wet sand or
silt not under water, light black cotton soil,
sandy loam and ordinary soil including
excavated earth SS 20 A
Sand, silt or other loose soil, wet sand or
silt not under water, light black cotton soil,
sandy loam and ordinary soil including
excavated earth SS 20 B
Slush and silt under water upto 0.75 metre
depth requiring the aid of baskets and
vessels SS 20 B
Trimming the bed and side slope of the bank
in all soils except hard rock upto a thickness
of 7.5 cm and making it ready to receive the
concrete.
7.50 cm to 15cm thick
Sectioning during forming bunds when earth
moving machinery, lorries and rollers are used
for consolidation.
Hard stiff clay, stiff black cotton, hard red
earth, shales, murram, gravel, stoney earth
and earth mixed with small size boulders
SS 20A
Hard stiff clay, stiff black cotton, hard red
earth, shales, murram, gravel, stoney earth
and earth mixed with small size boulders
SS 20B
Soft disintegrated rock, laterite, soft rock
or kankar, not requiring blasting
In loose boulders in excavation of various
sizes 150mm to 625mm
Medium Rock and Dense Medium Rock not
requiring blasting
Extra for every additional 10 meters lead or
part thereof over the initial lead
Extra for every additional 1 meter lift or part
thereof over the initial lift
Breaking clods, consolidating and sectioning
Breaking clods, consolidating and sectioning
the earth scooped by bull dozers
Add relevant TNDSS No.20A, rates for new
tank bunds and closing breaches for extra
watering and consolidation.
239

Unit

Rates in
Rupees

Cu.m

33.80

Cu.m

30.80

Cu.m

38.50

Sq.m

7.95

Sq.m

9.65

Cu.m

5.90

Cu.m

49.00

Cu.m

46.00

Cu.m

68.50

Cu.m

108.50

Cu.m

120.75

Cu.m

5.75

Cu.m
Cu.m

4.60
2.90

Cu.m

8.65

Schedule
Item No.
a)
b)
16
17
18
19a

19.b

Description
By hand roller
By power roller including hire charges
Benching old embankment slopes 45cmx45cm
Puddle wall work
Turfing in slopes including watering and fixing
with initial lead upto 50m.
Refilling with excavated sand complying
with standard specification for filling in
foundation and basement
Refilling with excavated soil (other than
sand) complying with the standard specification
for filling in foundation and basement

Unit

Rates in
Rupees

Cu.m
Cu.m
Cu.m
Cu.m

9.65
16.15
1.90
76.50

Sq.m

16.15

Cu.m

14.25

Cu.m

16.15

The following foot note is applicable for the classifications of soils come under Quarrying
and blasting and Earth Work
Note:
a)

Standard specification No.20-A requires breaking clods, ramming and sectioning of


spoil bank for which separate rate will not be paid.

b)

Standard specification No.20-B does not require breaking clods, ramming and
sectioning but requires neat banking in accordance with the standard specifications.

c)

Double the relevant rate for standard specification No.20-B will apply to excavation
in all the soils and rock classification given above for foundation of buildings, piers,
wings and returns of bridges, culverts, sluices, regulators and cross masonry works,
retaining walls, toe walls, cut-off walls and body walls of anicuts weirs, retaining
walls of cause ways, road dam, pits for avenue trees, and pits for poles and
towards and catch water pits.

d)

An extra 50 percent over the rates for ordinary excavation in all the soils and rock
classification given above shall be allowed for drains, channels, contour trenches
and canals having bed width 1.25 m and below. The extra percentage is applicable
any for depth up to 2.00m the depth being measured from the bottom of excavation.

e)

An extra 25 percent over the rates for ordinary excavation in all the soils and rock
classification given shall be allowed for drains, channels and canals having bed
width 1.25m to 2.00m. The extra percentage is applicable only for depth up to
2.0m the depth being measured from the bottom of excavation.

f)

These rates for earth work do not include baling charge. The baling charges are to
be paid as per actual in case baling is done departmentally or at actual plus 10
percent extra in case baling is done by other agencies. However for estimate
purpose baling charges are to be provided at 10 percent of the rates of respective
items of excavation in all soils including medium rock and dense medium rock and
at 5 percent of the rates for excavation in hard rock.

g)

Double the relevant rate for standard specification No.20B for excavation in all
soils and rock classification given above shall be allowed for circular trenches for
soil and moisture conservation having bed width of 0.25m and below with side
slope of 1/2:1 and not less than 0.75 m in depth.

240

Schedule
Item No.

1
2

3
4

5
6

7
8

9
10
11
12
13
14
15
16
17
18
19
20
21

Description
Dismandling
Dismantling, clearing away and carefully
stacking materials useful for reuse for any
thickness of walls
Brick / stone in clay walls under 3 m high
Brick / stone in clay walls, add for every
additional 3 m or part there of over the initial
height of 3 m
Mud / sun dried brick walls under 3 m high
Mud / sun dried brick walls, add for every
additional 3 m or part thereof over the initial
height of 3 m
Brick / stone masonry in lime mortar walls
under 3 m high
Brick / stone masonry in lime mortar walls, add
for every additional 3 m or part thereof over
the initial height of 3 m
Brick or stone masonry in Cement mortar walls
under 3 m high
Brick or stone masonry in Cement mortar walls,
add for every additional 3 m or part thereof
over the initial height of 3 metre
Terracing work in roof or floor
Flag stone in roof or floor including lifting
Cut stone slab over culverts upto 3.3.m height
below ground level
Cut stone slab over culverts over 3.3.m height
below ground level
Removal of cut stone slabs / RCC Cover slabs
Refixing cut stone slabs/ RCC Cover slab
Pantile or Mangalore tiled roof without roof
timbers
Flat and Pan tiles or Mangalore tiles over flat
tiles, without roof timbers
Asbestos cement sheets roofing without roof
timbers
Corrugated iron sheet roofing over pan tiles,
without roof timbers
Old Thatched roof, including tying materials
into small bundles for reuse
Wrought and put up framed timbers in roofs /
floors
Doors and windows including removal of frames,
hinges and fastenings

241

Unit

Rates in
Rupees

cu.m

28.20

cu.m
cu.m

9.45
18.95

cu.m

5.50

cu.m

86.50

cu.m

9.65

cu.m

106.00

cu.m

11.35

sqm
sqm

28.70
15.25

cu.m

440.00

cu.m
sqm
sqm

459.00
192.90
211.00

sqm

7.55

sqm

10.55

sqm

6.90

sqm

11.35

sqm

3.40

cu.m

277.50

sqm

57.35

Schedule
Item No.
22
23
24
25
26
27

28
29
30
31
32
33
34

35
a
b
c
d
e
f
g
h

Description
Drystone apron or revetment, stacking within
40 m lead
Grouted stones apron or revetment, stacking
within 40 m lead
Dry stone masonry walls
*Dismantling lime concrete
*Dismantling plain cement concrete
*Dismantling reinforced cement concrete
Note * 1) The rate for dismantling lime
concrete,cement concrete and R.C. concrete
are exclusive of baling charges. The rate is
same in all floors.
2) For dismantling below ground level 25%
extra over the basic rates (i.e. the rates
already available in the schedule of rate) for
dismantling is allowed.
Chipping of concrete and roughening
the surface
Pressed tiles & weathering course
One course of pressed tile roof finish in
Cement Mortar
One course of terrace bricks roof finish in
Cement Mortar
Two course of flat tiles roof finish in
Cement Mortar
Mosaic in situ finish in cement mortar in
flooring and in wall surface
Floor finish and dadooing walls in Cement
Mortar with mosaic tiles/ glazed tiles/
cuddapah slabs.
1. Clearing the site
Clearing Heavy jungle
Clearing Light jungle
Clearing Scrub jungle
Uprooting and removing large palmyrah/
coconut stumps
Uprooting and removing small palmyrah/
coconut stumps
Removing weeds in channel and drain
Cleaning juliflora jungle with uprooting
Cleaning juliflora jungle without uprooting

242

Unit

Rates in
Rupees

cu.m

49.30

cu.m
cu.m
cu.m
cu.m
cu.m

57.35
41.95
134.30
182.10
2766.00

sqm
sqm

15.25
17.60

sqm

9.75

sqm

11.35

sqm

11.35

sqm

23.65

sqm

22.85

sqm
sqm
sqm

3.40
2.55
2.35

each

66.30

each
sqm
sqm
sqm

47.40
0.95
3.80
2.90

Schedule
Item No.

Description

Unit

Rates in
Rupees

Note : Definition of large and small stumps : The Diameter of Stumps shall be 1/3 of the
circumferance at a point 0.6 m above the highest ground level at the stump or the
circumferance near the top of the stump if the stump is less than 0.60 m in height (The
measurement for circumferance and determination of the diameter will be to the nearest
full centimetre). Only stumps with Circumferance of 30 cm and more will be measured for
payment. The Sl. No d, is for Stumps of Diameter above 30 cm and
Sl. No. e is for
stumps of diameter 15 to 30 cm.
36
a
b
c
d

f
g
h
I
j
k

QUARRYING AND BLASTING


Hard rock measured in solid including blasting
and stacking
Removing hard rock by wedging chiseling and
trimming to proper shape where blasting is prohibited.
Medium rock and dense medium rock requiring
blasting
Extra for every additional 10 metres lead or
part thereof over the initial lead for blasted
materials
Extra for every additional 1 metre lift or part
thereof over the initial lift of 2 m for blasted
materials
Benching hard rock upto an average 10 cm
depth
Drilling holes in hard granite 40mm diameter
Drilling holes in hard granite 45mm diameter
Drilling holes in hard granite 50mm diameter
Drilling holes in hard granite 75mm diameter
Drilling holes in hard granite 32mm diameter
Note :

Cu.m

326.00

Cu.m

653.00

Cu.m

167.00

Cu.m

4.00

Cu.m

4.15

Sq.m
RM
RM
RM
RM
RM

315.00
105.90
123.70
147.35
167.35
90.90

1) A deduction of 40 percent is to be made for the quantity of voids


and stack measurement and payment is for the lesser of two viz.
Solid measurement or stack measurements less 40 percent of
stack measurement for voids.
2) The rates for extra lead and lift are on the quantity as per the
solid measurement or stack measurement less 40 percent for voids
whichever is less. These rates are applicable for head load only.
3) Payment for blasting the rock in solid shall be made for the lesser
of the two quantities obtained by a) Measurement recorded by
levels or measurement and b) by stack measurement less
deduction for voids (This foot note is applicable for all items of
rock measured in solid)

243

OPEN WELL EXCAVATION


Schedule
Item No.
1

Description

Unit

Rates in
Rupees

Cu.m

30.80

Cu.m

45.90

Cu.m

70.60

Cu.m

114.80

Cu.m

172.65

Cu.m

334.00

Cu.m

47.65

Earth work open well excavation, complying with


relevant clauses of T.N.D.S.S. Well sinking and
with lead up to 10 metres in sand, silt or other
loose soil, Wet sand or silt not under water,
light black cotton soil, sandy loam and ordinary
soil - First depth of 2 metres.

Earth work open well excavation, complying with


relevant clauses of T.N.D.S.S. Well sinking and
with lead upto 10 metres in Hard stiff clay, stiff
black

cotton

soil,

hard

red

earth,

shales,murrams gravel, stoney earth and earth


mixed with small size boulders and hard gravelly
soil - First depth of 2 metres
3

Earth work open well excavation, complying with


relevant clauses of T.N.D.S.S. Well sinking and
with lead up to 10 metres in soft disintegrated
rock, laterite, soft rock or kankar, not requiring
blasting - First depth of 2 metres

Open well excavation, complying with relevant


clauses of T.N.D.S.S. Well sinking and with lead
up to 10m in Medium rock and Dense medium
rock not requiring blasting. First depth of 2
metres

Open well excavation complying with relevant


clauses of T.N.D.S.S. well sinking and with lead
up to 10m in Medium rock and Dense medium
rock requiring blasting. First depth of 2 metres

Open well excavation complying with relevant


clauses of T.N.D.S.S. well sinking and with lead
up to 10m in hard granite measured in solid
including blasting and stacking - First depth of
2 metres

Sinking well in loose soils, light black cotton


soil, sandy loam and ordinary soil under water
including bailing or pumping charges if necessary
etc., complete - First depth of 2 metres
244

Schedule
Item No.
8

Description

Unit

Rates in
Rupees

Cu.m

66.80

Cu.m

66.80

Sinking well in sand, including bailing or pumping


charges if necessary etc. complete - First depth
of 2 metres

Sinking well in hard stiff clay, light black cotton


soil, hard red earth, shales, murram, gravel,
stoney earth and earth mixed with small size
boulders and hard gravelly soil including bailing
or pumping charges if necessary etc. complete
- First depth of 2 metres

Note : Open well Excavation


a)

Up to 2m diameter of wells, 10 percent excess will be allowed over the basic rates
for open well excavation.

b)

The rates do not include baling charges. If the dewatering is to be done


departmentally, 10 percent of cost of excavation shall be allowed for dewatering
for estimate purposes. Actual or 10 percent whichever is less to be allowed for
dewatering charges. For any expenditure above this percentage prior approval of
the competent authority should be obtained.

c)

Stage depth rates for well excavation The stage depth for adopting the rates
from the schedule of rates should be reckoned from ground level only irrespective
of the fact, whether there is parapet wall or not.

d)

For open well excavation for rates up to 12m depth, the progression would be x,
2x, 3x, 4x, 5x, and 6x and rate beyond 12 metre depth, the progression should be
8x, 10x, 12x, 14x and 16x and so on.

245

RATE FOR EARTH WORK BY DEPLOYING MACHINERIES


Schedule
Item No.
1

1.a.

a.
b.
3

a)
1

2
3
i.

Description
Earth work in all soils except hard rock requiring
blasting and conveying for formation of bund
with lead of 0 to 100 metre deploying earth
moving machineries and tippers including
benching, formation of bunds, breaking clods,
sectioning etc., complete.
Earth work in all soils except hard rock requiring
blasting and conveying for formation of bund
with an extra lead of every 100 metre or part
thereof deploying earth moving machineries and
tippers including benching, formation of bunds,
breaking clods, sectioning etc., complete.
Earth work deploying earth moving machineries
for desilting channel and forming bund on either
side and depositing the earth on banks including
jungle clearance etc., complete.
Having width upto 3 m
Having width of 3 m 10 m
Earth work excavation deploying earth moving
machineries for desilting channel having a width
of more than 10 m and forming bund on either
side and depositing the earth on banks including
jungle clearance etc., complete.
Lift charges - concrete - Brick or stone
Masonry above or below ground level
Note: The rate for lime concrete, cement
concrete, reinforced cement concrete, brick
work and stone masonry worked out as per
Standard Data will apply to basement and
foundation up to a depth of 1.50 m below ground
level only (basic rate)
Statement I
Concrete above ground level
Add to the basic rate for works up to 4.50m
height in ground floor (height to be reckoned
from floor level i.e. plinth level in ground level)
Add for works in every upper floor over the
rate of preceding floor
Brick or stone masonry above ground level
Add to the basic rates for works up to 4.50m
height in ground floor (height to be reckoned
from floor level i.e. plinth level in ground level)

246

Unit

Rates in
Rupees

Cu.m

47.55

Cu.m

3.80

Cu.m
Cu.m

28.10
34.25

Cu.m

40.00

Cu.m

49.10

Cu.m

97.90

Cu.m

32.50

Schedule
Item No.
ii.

a)
1
2
3

B)
1
2
3

Description

Unit

Rates in
Rupees

Add for works in every upper floor over the


Cu.m
65.30
rate of preceeding floor
Note: i) For the works above 4.5m height in individual floor the rate of next
floor may be taken. The extra rates allowed for building works are applicable
to irrigation works and road works also. The extra rates may be allowed for
the structures beyond 1.00m above ground level.
ii) The extra rates may be allowed considering the ground level as datum in
respect of service reservoirs (where there is no plinth level)
Statement II
Concrete below ground level
Add the basic rate for works above 1.5m
Cu.m
48.45
depth and upto 4.5m depth below ground level
Add the basic rate for works above 4.5m depth
and upto 9.0 m depth below ground level
Cu.m
97.15
Add extra over the above item 2 for every
additional 4.5m depth beyond 9m depth below
Cu.m
97.15
ground level
Brick or stone masonry below ground level
Add the basic rates for works above 1.5m depth
Cu.m
32.50
and up to 4.5m depth below ground level
Add the basic rates for works above 4.5m depth
Cu.m
65.30
and up to 9.0m depth below ground level
Add extra over the above item 2 for every
additional 4.5m depth beyond 9m depth below
Cu.m
65.30
ground level

Note :
1.

The above extra rates are applicable for buildings, irrigations, and road works.

2.

First Grade stone includes hard granite, trap, etc. second Grade stone includes gneiss, lime
stone etc.

3.

The class of materials to be used should always be defined in the items, description in
tender schedules, contract schedules etc.

4.

For reinforced cement concrete work, only the hardest locally available stone will be used, if
it has good bonding surface and is otherwise suitable proportions for concrete are defined
in the relevant standard specification.

5.

Note under Sl.No.179 to 187 in the standard data book applies to arches over doors and
windows. For large arches in bridges and irrigation works, addition to this rate, extra cost of
centering is to be made.

6.

For concrete mix

a.

Equal mixes (i.e.) 50 percent mortar mixes only should be adopted for plain concrete for
foundation, flooring and RC Concrete for roofs, lintels, etc. wherever cement is used with
hard broken stones or brick jelly.

b.

40 percent or 50 percent mortar mixer may be adopted where lime concrete with brick
aggregate is used according to the condition at site.

247

Schedule
Item No.

2
3
4

1
2

2
3
4
5

6
7

Description

Unit

Rates in
Rupees

CONCRETE VIBRATORS
Where vibrators are specified for consolidation
in plain Cement concrete, this rate per cu.m
Cu.m
over and above the provision made in the
standard data book for consolidation with
manual labour may be allowed.
Where vibrators are specified for consolidation
in RCC, this rate per cu. m over and above the
provision made in the standard data book for
Cu.m
consolidation with manual labour may be
allowed.
Plastering
Clean removal of lime plaster from walls and
racking out joints 20mm deep or from terraced
sq.m
roofs racking out joints 12mm deep
Clean removal of lime plaster from walls
sq.m
sq.m
Clean removal of cement plaster from walls
Clean removal of cement plaster from walls and
racking out joints 20mm deep
sq.m
White washing and colour washing and distempering
Thorough scrapping of old plastered surface
sq.m
Washing of plastered surface with soap, soda
sq.m.
and water( or with soda, lime, brush and water)
Painting, Wood Oiling, Tarring, Varnishing, Bees Waxing etc
Removing old paint from doors and windows by
blow lamp and scrapping, including removal and
sq.m
refitting of shutters
Removing old paint from doors and windows by
sq.m
scrapping and refitting of shutters
sq.m
Removing paint from doors, windows and wood
works by manual labour
Removing old paint from structural steel by
blow lamp or sand paper
sq.m
Repolishing the mosaic flooring including
polishing stone and hire charges for polishing
machine but excluding cost of electrical
sq.m
charges.
sq.m
Scrapping and removing old paint from
structural steel by manual labour
sq.m
Removing old paint from iron surface with sand
paper
248

28.80

38.75

4.00
3.10
3.35
4.35
1.85
2.30

14.35
6.10
4.15

8.65

8.45
3.90
3.65

Schedule
Item No.

Description

Unit

Rates in
Rupees

Bag

3.65

RM

11.25

Miscellaneous
I.

Supplying & filling up the empty Cement gunny


bags with sand, stitching them conveying the
same to site and stacking as directed within a
lead of 10m excluding cost of bags, jute,
thread, needle, sand etc. (labour only)

ii.

Driving piles upto 15 cm dia in river bed

iii.

Pointing the edge and driving bamboo/


casurina/ eucalyptus piles into river bed for the

Each

9.65

RM

9.65

One bundle

1.90

One bundle

0.22

RM

4.70

first 1m depth below ground level


iv.

Driving bamboo/ Casurina/ eucalyptus piles into


ground beyond 1m depth from ground level.
For every 1m (or) part thereof
River Conservancy of Korambu Works

v.

Brush wood bundles one metre girth and one


metre long within an initial lead of 1.6 KM

vi.

Extra for every additional lead of 1.6 KM (for


the above item)

vii.

Driving casurina piles into bed including


scaffolding etc., complete

viii.

Casurina walling pieces 40mm to 50mm diameter


including fixing with nails and tying with ropes.

RM
Labour wrought and put up for Doors, Windows and Ventilators
1

6.45

Labour wrought and put up in position of frames


inclusive of fixing holdfasts for doors, windows
and ventilators etc.

Cu.m

5625.00

sq.m

635.00

sq.m

528.00

Labour wrought and put up in position of


shutters for fully panelled doors (external or
internal) moulded panels including labour
charges for fixing furniture fittings, complying
with standard drawings and standard
specification.

Labour

wrought and put up in position of

shutters for fully panelled doors internal five


plywood panels including labour charges for
fixing furniture fittings, complying with standard
drawings and standard specification.

249

Schedule
Item No.
4

Description

Unit

Rates in
Rupees

sq.m

590.00

sq.m

492.00

sq.m

333.00

sq.m

590.00

sq.m

635.00

sq.m

333.00

sq.m

528.00

sq.m

493.00

Labour wrought and put up in position of


shutters for glazed and panelled doors including
labour charges for fixing furniture fittings,
complying with standard drawings and standard
specification.

Labour wrought and put up in position of


shutters for framed and planked doors including
labour charges for fixing furniture fittings,
complying with standard drawings and standard
specification.

Labour

wrought and put up in position of

shutters for ledged and braced and planked


doors

including labour charges for fixing

furniture fittings complying with standard


drawings and standard specification.
7

Labour

wrought and put up in position of

shutters for glazed windows including labour


charges for fixing furniture fittings, complying
with standard drawings and standard
specification.
8

Labour

wrought and put up in position of

shutters for windows panelled including labour


charges for fixing furniture fittings, complying
with standard drawings and standard
specification.
9

Labour

wrought and put up in position of

shutters for windows, ledged, braced and


planked doors including labour charges for fixing
furniture fittings, complying with standard
drawings and standard specification.
10

Labour wrought and put up in position frames,


shutters for ventilators glazed fixed double
frames and with wire netting complete fixed in
position in accordance with standard drawings
and standard specification.

11

Labour wrought and put up in position frames


shutters for swing ventilators and

fixed in

position in accordance with standard drawings


and standard specification.
250

Schedule
Item No.
12

Description

Rates in
Rupees

sq.m

94.85

sq.m

118.90

sq.m

88.20

sq.m

136.60

sq.m

316.00

sq.m

440.00

Cu.m

168.25

Cu.m

251.70

Cu.m

100.50

Labour charges for fixing doors along with frames


in position etc. complete(finished work)

13

Unit

Labour charges for fixing windows and


ventilators along with frames in position etc.
complete

14

Labour wrought and put up in position flush


shutters for single leaf shutters.

15

Double leaf shutters

16

Labour wrought and put up in position fly proof


wire gauge shutters for doors, windows and
ventilators

17

Labour wrought and put up for providing teak


wood weld mesh screen with frames 3"x3"
(0.075mx0.075m)
Breaking metals

i.

Labour charges for breaking 40mm metal from


departmental blasted stones

ii.

Labour charges for breaking 20mm metal from


departmental blasted stones

iii.

Labour charges for breaking 50mm metal from


departmental blasted stones
Cement Mortar

i.

Grinding Mortar (Special Grinding lime)

Cu.m

152.70

ii.

Grinding Mortar (Ordinary Grinding lime)

Cu.m

116.45

iii.

Mixing Mortar Cement by manual

Cu.m

47.65

iv.

Mixing Mortar- Cement by Machine Mixing

Cu.m

63.35

Kg

22.85

kg

21.15

ventilators, etc.

Kg

13.20

iv.

Fixing MS rods round/square for windows

Kg

12.30

v.

Fixing iron bars in windows and ventilators

Kg

12.30

Metal & Iron works


i.

Petty iron work for truss, straps etc. (Wrought


& fixed) labour only

ii.

Iron works for trusses & record racks (labour


only)

iii.

Fixing in position mild steel grills for windows,

251

252

253

254

255

Minutes for Schedule of rates Committee.


TWAD Board-Finalising the Schedule of rates for adoption during the year 20142015.
A committee consisting of the following members was constituted in the meeting
held on 03.09.2014 on common schedule of rates to be adopted by TWAD and CMWSSB,
chaired by the Principal Secretary to Government, Finance Department as detailed below:
1.Thiru V.Arun Roy, I.A.S.,Joint Secretary, Finance Department
2.Thiru N.Venkatesh, I.A.S., Deputy Secretary (Budget), Finance Department
3.Er. P.G.Illangovan, Enginnering Director (i/c), TWAD
4.Er. A.Mani, Engineering Director (i/c), CMWSSB.
The committee discussed about the proposals for common standard schedule of
rates for the year 2014-15 for both TWAD and CMWSSB.
The Committee after detailed discussion has decided to recommend the rate for
items for adoption in TWAD Board Schedule of Rates for 2014-15 as detailed below.
Materials
Sl.No.
1

Description of item
P.V.C Rigid pipes

% Excess over last year rate


The L1 rate of TWAD may be adopted within a
maximum increase of 15.60% over the 2013-14
1st quarter rate. Further, rates for 2 nd, 3rd and 4th
quarter are to be fixed based on the resin price
as practiced

HDPE pipes

The L1 rate of TWAD may be adopted within a


maximum increase of 19% over the 2013-14 1st
quarter rate. Further, rates for 2 nd, 3 rd and 4 th
quarter are to be fixed based on the resin price
as practiced

CI Spun pipes

The L1 rate of TWAD may be adopted which has


average increase of 7.15% for WED and 9.66%
for WOED over 2013-14.

Ductile Iron socket/spigot


i) K7 pipes

The L1 rate of TWAD may be adopted which has


average increase of 9.91% for WED and 7.44%
for WOED over 2013-14.

ii) K9 pipes

The L1 rate of TWAD may be adopted which has


average increase of 12.41% for WED and 9.80%
for WOED over 2013-14.

256

Sl.No.

Description of item

D I Flanged pipes K9 (4m)

% Excess over last year rate


The L1 rate of TWAD may be adopted which has
average increase of 5.55% for WED and 4.63%
for WOED over 2013-14.

D I Flanged pipes K9 (5m)

The L1 rate of TWAD may be adopted which has


average increase of 6.39% for WED and 4.84%
for WOED over 2013-14.

i) DI specials(All socket)
ii) DI specials (All flanged)

The L1 rate of TWAD may be adopted which has


average increase of 7.57% for WED over 201314.The L1 rate of TWAD may be adopted which has
average increase of 10.02% for WED over 2013-14

Salt Glazed Stone Ware


pipe

The L1 rate of TWAD may be adopted which has


average increase of 10.66% for WOED over 201314.

Mechanical joint collars

The L1 rate of TWAD may be adopted which has


average increase of 10.00% over 2013-14.

New Item

Testing of pipesIn addition to existing data, it was


approved that the rate for testing as applicable to
various sizes in the CMWSSB Schedule of rates will
be adopted. The word testing included with other
items of work found place wherever in the TWAD Bd
schedule of rate may be deleted.

General Note

As per the PWD Schedule of rates 2014-15.

Rates of Labour

For labour 13% increase over the PWD schedule of


rates 2013-14 has been adopted by the PWD for
2014-15 Schedule of rates. The same is adopted by
TWAD Board for the Schedule of Rates 2014-15.

Building materials

As per the PWD Schedule of rates 2014-15.

Electrical items

As per the PWD Schedule of rates 2014-15.

Other construction materials As per the PWD Schedule of rates 2014-15

Rate of works

For works 10% increase over 2013-14 schedule of


rates has been adopted by PWD for 2014-15
schedule of rates. The same is adopted by TWAD
Board for schedule of rates

Conveyance of materials

2014-15.

For conveyance 9.96 to 10.99% increase over 201314 schedule of rates has been adopted by PWD for
2014-15 schedule of rates. The same is adopted by
TWAD Board for schedule of rates 2014-15.
257

Sl.No.

Description of item

Miscellaneous Items

Earthwork excavation
for pipeline works

10.

11

% Excess over last year rate


For works 10% increase over 2013-14 schedule of
rates has been adopted by PWD for 2014-15
schedule of rates. The same is adopted by TWAD
Board for Schedule of rates 2014-15.

For works 10% increase over 2013-14 schedule of


rates has been adopted by PWD for 2014-15
schedule of rates. The same is adopted by TWAD
Board for schedule of rates 2014-15.
Rate for Earthworks
For works 10% increase over 2013-14 schedule of
excavation and refilling
rates has been adopted by PWD for 2014-15
for pipeline works on Linear schedule of rates. The same is adopted by TWAD
Measurement basis
Board for schedule of rates 2014-15.
Earthwork excavation
For works 10% increase over 2013-14 schedule of
other than pipe laying
rates has been adopted by PWD for 2014-15
works and wells.
schedule of rates. The same is adopted by TWAD
Board for schedule of rates 2014-15.
Rates of materials
PVC Casing pipes

When L1 rates arei) Upto +20% over last year rate


= L1 rate
ii) Above 20% excess over last year rate = Last
year rate + 20%
iii) L1 Less than Last Year= Last Year Further, rates
for 2nd, 3rd and 4th quarter are to be fixed based on
the resin price as practiced. Casing pipes of size
300mm is deleted from schedule of rates.

UPVC pipes

When L1 rates are


i) Upto +20% over last year rate = L1 rate
ii) Above 20% excess over last year rate = Last
year rate + 20%
iii) L1 Less than Last Year= Last Year

PVC specials

When L1 rates are


i) Upto +20% over last year rate = L1 rate
ii) Above 20% excess over last year rate = Last
year rate + 20%
iii) L1 Less than Last Year= Last Year

HDPE specials

When L1 rates are


i) Upto +20% over last year rate = L1 rate
ii) Above 20% excess over last year rate = Last
year rate + 20%
258

Sl.No.

Description of item

% Excess over last year rate

HDPE Jointing

iii) L1 Less than Last Year= Last Year

A.C. pressure pipes

When L1 rates are

AC Coupler

i) Upto +20% over last year rate = L1 rate

CID Joints

ii) Above 20% excess over last year rate = Last


year rate + 20%
iii) L1 Less than Last Year= Last Year

CI D/F pipes

When L1 rates are

10

CI D/F, S&S specials

i) Upto +20% over last year rate = L1 rate

11

GI pipes (Medium)

ii) Above 20% excess over last year rate = Last

12

i) GI specials

year rate + 20%

13

ii) GI specials & GM valves

iii) L1 Less than Last Year= Last Year

14

PSC pipes

When L1 rates are

15

Bar wrapped steel cylinder

i) Upto +30% over last year rate = L1 rate

16

GRP pipes

ii) Above 30% excess over last year rate = Last


year rate + 30%
iii) L1 Less than Last Year= Last Year

17

M.S. Pipes as per IS -3589


spirally/ longitudinal welded

When L1 rates are

Internal lining with cement

i) Upto +20% over last year rate = L1 rate

mortar

ii) Above 20% excess over last year rate = Last

External coating with cement

year rate + 20%

mortar

iii) L1 Less than Last Year= Last YearWhen L1 rates

iii)

Internal food grade Epoxy lining

are

iv)

External Epoxy lining

i) Upto +20% over last year rate = L1 rate

v)

Coal Tar Enamel coating

ii) Above 20% excess over last year rate = Last

vi)

External polyethylene sheathing

year rate + 20%

vii)

Transportation charges

iii) L1 Less than Last Year= Last Year

18

M.S. Specials

19

RCC non pressure Pipes with

When L1 rates arei) Upto +20% over last year rate

High Alumina cement lining

= L1 rate

12mm thick

ii) Above 20% excess over last year rate = Last

20

Rubber gaskets

year rate + 20%

21

C.I.D/F sluice valve with ISI

iii) L1 Less than Last Year= Last Year

i)
ii)

marking. (PN.1)
22

C.I.D/F Reflux valves with ISI


marking

23

CI Double Air valve with ISI


marking

259

Sl.No.

Description of item

24

CI single Air valve with ISI

% Excess over last year rate

marking
25

DI Single Chamber Air Release


valve

26

CI Sluice valve PN 1.6

27

CI Butterfly valve

28

CI Non-return valve

29

CI Non-return valve outdoor


use

30

Kinetic Air valve

31

D.I. Gate valve

When L1 rates are

32

D.I. Butterfly valves

i) Upto +20% over last year rate = L1 rate

33

OHT flow control valve

ii) Above 20% excess over last year rate = Last

34

Sulphate Resistant Cement

year rate + 20%

35

Fiber Reinforced Concrete

iii) L1 Less than Last Year= Last Year

manhole frame & cover


36

Water meter & Dirt box strainer

37

Water meter erection charges

38

Electronic water meter

39

HDPE Tank

40

Alum

41

MS Kiosk

When L1 rates are

42

MS Ladder

i) Upto +20% over last year rate = L1 rate

43

MS Doors, Windows and

ii) Above 20% excess over last year rate = Last

Ventilators

year rate + 20%

Water Disinfection equipment

iii) L1 Less than Last Year= Last Year

44

Silver Ionization
45

Replacement of Electrode for


water disinfection equipment

46

Rate for Electro Chlorinator

47

Fusion Bonded Epoxy coating


without conveyance

48

Jointing of MJ collars

49

Disjointing of GI pipes

50

Welding of GI pipes

51

MS Casing pipe

260

New items:
1.

Proposals received for inclusion of DI Non-return valve, wafer type Butter fly valve,
Disk Check Valve, Diaphragm valve, Surge Control Valve, Plunger type flow control
valve, FULL BORE ELECTROMAGNETIC FLOW METER and Electro chlorintor, MS Ladder.
The lowest rate quoted for them may be adopted and included in this year schedule of
rate.

Mechanical and Electrical items:


As per MD/TWAD Proc. No. Mechanical committee/CM II/AE/ 2014 dt. 22.05.2014, the
Committee for finalization of rates for mechanical and electrical items for 2014-15 met
on 01.07.2014 and 02.07.2014 at H.O., Chennai under the Chairmanship of the Joint
Chief Engineer (COM). The quotations received at Head Office, for the Electrical &
Mechanical items, were scrutinized and local market rates were verified. After careful
study of the rates the committee concluded their recommendations vide their report
dt. 02.07.2014.
Sl.No.

Description of item

Centrifugal Monobloc
Pumpset without Panel
Board

Single phase submersible


pumpset without panel

3 phase submersible
pumpset suitable for
100 mm dia borewell
without panel board

3 phase submersible
pumpset suitable for
150 mm dia Borewell
without panel board

Openwell submersible
pumpset without panel
board

% Excess over last year rate


To accept L1 rates not exceeding 20% over last
year rate.i.e.,When L1 rates are
i) Upto +15% over last year rate = L1 rate
ii) Above 15% excess over last year rate = Last
year rate + 15%
iii) Less than Last Year rate = Last Year rate
To accept L1 rates not exceeding 30 % over last
year rate.i.e.,When L1 rates are
i) Upto + 30% boardover last year rate = L1 rate
ii) Above 30 % excess over last year rate = Last
year rate + 30 %
To accept L1 rates not exceeding 25% over last
year rate.i.e.,When L1 rates are
i) Upto +25% over last year rate = L1 rate
ii) Above 25% excess over last year rate = Last
year rate + 25%
To accept L1 rates not exceeding 25% over last
year rate.i.e.,When L1 rates are
i) Upto +25% over last year rate = L1 rate
ii) Above 25% excess over last year rate = Last
year rate + 25%
iii) Less than Last Year rate = Last Year rate
To accept L1 rates not exceeding 30 % over last
year rate.i.e.,When L1 rates are
i) Upto + 30% over last year rate = L1 rate
ii) Above 30 % excess over last year rate = Last
year rate + 30 %
261

Sl.No.

Description of item

Single phase panel board

% Excess over last year rate

with two lewel guard and


auto start

The committee recommended to adopt L1 rate

3 phase D.O.L panel board The committee recommended to adopt L1 rate

3 phase star delta panel

To accept L1 rates not exceeding 15% over last

board for installing where year rate.i.e.,When L1 rates arei) Upto +15%

MV panel Board is not

over last year rate = L1 rateii) Above 15%

used.

excess over last year rate = Last year rate+ 15%

HSC Pump 1500RPM

To accept L1 rates not exceeding 25% over last


year rate.i.e.,i) Upto +25% over last year rate =
L1 rate ii) Above 25% excess over last year rate
= Last year rate + 25%

10

Horizontal Squirrl cage


Motor 1500RPM

11

Horizontal Squirrl cage


Motor 1000RPM

12

The committee recommends to adopt L1 rate


The committee recommends to adopt L1 rate

Vertical Turbine pump


for VHS motor

114 items with +18% to +20% over Last year


rate.To accept L1 rates not exceeding 18 % over
last year rate.i.e.,When L1 rates are i) Upto +18
% over last year rate = Quoted rateii) Above +18
% excess over last year rate = Last year rate +
18 %

13

Vertical hollow Shaft


motors for turbine pump

14

1500 RPM

The committee recommends to adopt L1 rate

Oil Natural Air Natural

i)For11KV/433V

(ONAN) cooled (11KV/

The committee recommends to adopt L1 rate

22KV/11&22KV )

For 22KV/433V

Transformers

The committee recommends to adopt L1 rate


For 11KV/22KV/433V
The committee recommends to adopt L1 rate
ii) L1 Less than Last Year rate = Last Year rate

15

Oil Natural Air Natural

L1 Less than Last Year rate = Last Year rate

(ONAN) cooled 11 KV /
22KV Transformers
16

FCMA Soft Starter for


LT motor

The committee recommends to adopt L1 rate

262

Sl.No.

Description of item

17

FCMA Soft Starter for


HT motor
Fully Auto Star Delta
Starter for installing
where MV panel Board is
used.
Fully Automatic ATS
Starter
L.T.Cables

18

19
20

21

22
23
24
25

26

27
28

29

% Excess over last year rate

The committee recommends to adopt L1 rate

The committee recommends to adopt L1 rate

The committee recommends to adopt L1 rate


Rate quoted is +38.80% to +40.50% compared to
2013-14 Schedule of RatesRate quoted is 22.40% to - 43.70% compared to 2012-13
Schedule of RatesThe committee recommends
to adopt L1 rate Proposed to adopt i) L1 rate
for 3 core cablesii)PWD SOR rates for 2014-15
for 3.5 and 4 core cables
3 Core Flat Cables
Rate quoted is +88.40% to +93.75% compared to
2013-14 Schedule of RatesRate quoted is +5.08
% to +21.35% compared to 2012-13 Schedule of
RatesThe committee recommends to adopt L1
rate not exceeding 10 % excess over 201213 rate
H.T.Cables
To accept 25 % over last year rate for all 10
items.
Vacumn Pumpset
The committee recommends to adopt L1 rate
Rate for cable joints
Cost of cable per meter will be the cost per Joint
including material&labour
as adopted in previous years schedule of rates.
Rate for laying UG Cable
To accept L1 rates not exceeding 20% over last
year rate.i.e., When L1 rates are i) Above 20%
excess over last year rate = Last year rate +
20%
Cable clamps
To accept L1 rates not exceeding 30% over last
year rate.i.e., When L1 rates are i) Above 30%
excess over last year rate = Last year rate + 30%
Capacitor
Rs 400 per KVA rate available in 2013-14 Schedule
of rate may be adopted
LT Meter Box
To accept L1 rates not exceeding 20% over last
year rate.i.e., When L1 rates are i) Above 20%
excess over last year rate = Last year rate + 20%
Designing and preparation To accept L1 rates not exceeding 20% over last
of CEIG drawings approval year rate.i.e.,When L1 rates are i) up to 20%
over last year rate = L1 rateii) Above 20% excess
over last year rate = Last year rate + 20%

263

Sl.No.

Description of item

30

ACB 3 Pole & 4 Pole

31

MCCB 3 Pole & 4 Pole

32

Safety appliances

33

Tools

34
35

Pumproom wiring
Twin GI earthing

36

HOT Crane and


Accessories
Energy Efficiency
Improvement in HSC
pumps
Energy Efficiency
Improvement in mixed
flow pumps
Energy Efficiency
Improvement in
Turbine pumps
NEW ITEMS
Non Clog Submersible
Pumpsets for Sewage
with applications

37

38

39

% Excess over last year rate


To accept L1 rates not exceeding 25% over last
year rate.i.e.,When L1 rates are i) Up to +25%
over last year rate = L1 rateii) Above 25% excess
over last year rate = Last year rate + 25%
To accept L1 rates not exceeding 20% over last
year rate.i.e.,When L1 rates are i) Up to +20%
over last year rate = Quoted rateii) Above 20%
excess over last year rate = Last year rate +
20%
To accept L1 rates not exceeding 20% over last
year rate.i.e.,When L1 rates are i) Up to +20%
over last year rate = Quoted rateii) Above 20%
excess over last year rate = Last year rate +
20%
To accept L1 rates not exceeding 20% over last
year rate.i.e.,When L1 rates are i) Up to +20%
over last year rate = Quoted rateii) Above 20%
excess over last year rate = Last year rate +
20%
To accept L1 rates
Rate quoted is +566 % to +900% compared to
2013-14 Schedule of RatesRate quoted is +73%
to +116 % compared to 2011-12 Schedule of
RatesThe committee recommends to adopt 50 %
excess over 2011-12 rates.
i) To accept L1 rates ii) L1 Less than Last Year
rate = Last Year rate

Last year rate may be retained.


This item may be deleted as mixed flow HSC Pump
and Mixed Flow Turbine Pumps is given separately.
Last year rate may be retained.

The proposal submitted by Cfi.Thanjavur for Non Clog


Submersible Pumpsets for Sewage applications along
I 3 quotations and comparative statement may be
I considered for including in 2014-15 Schedule of
rates.

264

Sl.No.

Name & Designation

Signature

Thiru V.Arun Roy, I.A.S.


Joint Secretarv Finance Department

Thlru N.Venkatesh, I.A.S.


Deputy Secretary (Budqet),
Finance Department

Er. P.G.Illangovan
Enginnering Director (i/c) TWAD Board

Er. A.Mani
Engineering Director (ic), CMWSSB.

265