CO-GENERATION DEPARTMENT
TRIP INCIDENT REPORT
Report Date: 17.12.13
Incident Date:21.11.13
Crushing stoppage:YES
Phase
Section
Sub-Section
SGU-Pahse-2
boiler#2
Mechanical
Electrical
Control
Department
vinoth kumar
operation
DCS operators
What Happened?
Black out due to Steam Temprature low.
Signature:
Yousif
Date
PANY
MENT
Ref No: WCG-SG-ITR-C13-14/01
Total Loss Time in Hrs: 3:20
Other Outage:
Irrigation
Equipment Code No
Boiler#2-attemperator
Defect
Operation
Operation.
Shift Supt Name
Yousif Mohammed Abdelmalik
ccur?
ccur?
cur?
cur?
completion date.
ncident in future
Date: 16/12/2013
Incident Date:22.11.13
Blackout:Yes
Phase
Section
SGU-Phase-2
Boiler#2&4
Area responsible for the Defect
Mechanical
Electrical
Designation
Ali Altoum
Wali Eldin
Mech.Technicain
Herald Varghese
DCS operator
What Happened?
Bagasse transfer to baggase yard PH-01 at any starting of mill,during gap from mill and when low Feeding beca
with Mill Shift Supt to inform us for any gap or trash or any mill bypassed.
Action to be taken to avoid similar incident in future
Arrangement with Mill Shift Supt to inform us for any gap or trash or any mill bypassed,feed boilers through bac
Signature:
Eihab
ERATION DEPARTMENT
Nos of Similar Incident: 2
Crushing stoppage:YES
Sub-Section
Equipment Code No
Fuel feeding
Bagasse
Operation
Operation
Department
Mill House
Ali Altoum
Operation
Operation
What Happened?
during gap from mill and when low Feeding because of trash. Arrangement
bypassed.
Signature:
Eihab
Date: 16/12/2013
Incident Date:24/11/13
Section
SGU-Phase-02
BHS
Area responsible for the Defect
Mechanical
Electrical
Field operator
Abdel Rahim
Shift Supv
Herald Varghese
DCS operator
What Happened?
Chute Jam due to Angle Piece which led to BHS stoppage and Boiler 2&4 pressure drop and blackout.
When did the incident occur?
23/11/2013 7:10 hr
Where did the incident occur?
Ph-02 Bagasse Handling System
How did the incident occur?
during boiler 2&4 runnig with back feeding angle piece in conveyor which led to final chute jam and BC-6A trip.
Why did the incident occur?
foreign material in BHS
Determine corrective action and its completion date.
Chute Jam Cleaning started and finished 8:00 Am
Action to be taken to avoid similar incident in future
Bagasse yard PH-02 cleaned from foreign material as well as the walk way for all conveyor PH-02.
Signature: Eihab
Sub-Section
Equipment Code No
BC-6A
BC-6 conveyer
Operation
Operation
Department
Operation
Operation
Operation
What Happened?
piece in conveyor which led to final chute jam and BC-6A trip.
Why did the incident occur?
ljack
Signature: Eihab
Date: 16/12/2013
Incident Date:11/12/13
Time: 17:58
Crushing stoppage: Yes
Phase
Section
Sub-Section
SGU-Pahse-I
Boiler#1
Travelling Grate
Electrical
Electrical
Control
Control
Department
What Happened?
Travelling grate NO.1 motor stopped due to communication problem
Signature:
Yousif
Date
Operation
tion date.
t in future
usif
Date: 16/12/2013
Crushing stoppage:Yes
Phase
Section
Sub-Section
BOILER
BOILER-03
Electrical
Control
Department
HERALD K. VARGHESE
Dcs operator
BOILER
K.C. BHORADE
BOILER
Mohamed.Elsagadi
BOILER
What Happened?
Boiler-3 pressure, and furnace temp. coming down, due to wet baggase from mills.
When did the incident occur?
20\12\2014 02:27pm
Where did the incident occur?
Boiler-03
How did the incident occur?
After NO-CANE mills started at 1.20pm. Wet baggasse and more gap and less cane feeding starting from 1.5
we close the silo gates and max. bagasse diverted to yards mean time seeing SC4 current we are taking yard
empty we opened silo gates this wet bagasse entered to silo. Due to moisture baggase in silo furnace temp
to 580 deg.c we closed PRDS (2.5ATA, 11ATA). At 53KG/Sq cm we try to start oil burner but BURNER READY i
( after seeing furnace condition we started oilbpump, and purging given)
Why did the incident occur?
DUE to wet baggase furnace got dumped and furnace temp. comes down
Determine corrective action and its completion date.
We have to stop Belt Conveyors as not allow from mills go to the boilers.
Action to be taken to avoid similar incident in future
we have to stop bc-3, and we have to take back feeding, , and situation not improved we have to put minim
service
Signature:
Date: 20/12/2
Operation
ion date.
in future
e:
Date: 20/12/2014
Crushing stoppage:Yes
Phase
Section
Sub-Section
BOILER
Slat conveyor
Electrical
Control
Department
Tanaji Patil
Dcs operator
BOILER
Rajendra Badode
Dcs operator
BOILER
BOILER
What Happened?
Slat conveyor SC-4B break down.
When did the incident occur?
On 14\01\2015 at 05:06pm
Where did the incident occur?
SC-4B
How did the incident occur?
1-Mill stopped at 3:28 pm due to some problem mill side,3:56pm mill started again, improper low feeding up to
same time wet bagasse entered in silo,Boiler pressure drop to 56.1Kg/cm2 at 04:18pm,
2- @04:25 pm crushing stopped as per our request ,BC-3 &BC-1 stopped accordingly due to wet bagasse.
3- @04:31pm Mill crushing started after pressure maintained ,boiler Pressure dropped again d
bagasse one burner lighted up @04:42pm and @04:50pm crushing stop from boiler side by stopping BC-3&BC
improvement in bagasse quality at,
4-@5:01pm Mill start, Pressure 63kg/cm2.
5- @ 5:06pm Pull cord operated by SC-4 Operator observed abnormal sound at drive end side,Same time all SC
near blr 01 silo gate to monitor bagasse quality and to close silo gates.
SC-4B occured break down due to a lumps of bagasse fallen in SC-4B discharge chute,not moved forwerd and ch
Determine corrective action and its completion date.
Breakdown maintenance immediately started after SC-4 stopped,damaged slats has been removed,renewed by
attachment ,completed at 02:00 am on 15/01/2015.
Action to be taken to avoid similar incident in future
To give more attention to discharge chute to avoid chocking of discharge chute during mill start up
Signature:
Date: 14/01/2015
Operation
ion date.
in future
g mill start up
Date: 14/01/2015