Bill No.

1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

TITLE: Preliminary and General Works

Bill No. 1

ITEM No.

DESCRIPTION

UNIT QUANTITY

PRELIMINARIES AND GENERAL ITEMS

1.1

PRELIMINARY(CONTRACTUAL)REQUIREMENTS
Price all liabilities, obligations and risk set forth or implied
in the contract ,not included in the rates and prices entered
elsewhere in the Bill of Quantities in complying with any
Clause of the Conditions of Contract for the entire project
period.

1.1.1

Advance Payment Bond

Sum

1.00

15,000.00

1.1.2

Performance Bond

Sum

1.00

15,000.00

1.1.3

Insurance of Works

Sum

1.00

11,250.00

1.1.4

Insurance against Damage to person and property

Sum

1.00

7,500.00

1.1.5

Third Party Insurance

Sum

1.00

7,500.00

1.1.6

Insurance of Workmen

Sum

1.00

7,500.00

1.2

Facilities and Items for the contractor

1.2.1

Establishment of the contractor's camp(s) ,plant


and offices including mobilisation of all required plant,
site,infrastructure,equipment,tools, machinery and personnel
and their accomodation

Sum

1.00

375,000.00

1.2.2

Operate and maintain the contractor's camp(s), plant


and offices including mobilisation and demobilisation
of all required plant,site,infrastructure,equipment,tools,
machinery and personnel and their accomodation.

mth

12.00

7,500.00

Sum

1.00

15,000.00

RATE (US $)

Demobilise Contractor's camp(s),plant and offices, including


mobilisation of all required plant, site, infrastructure, equipment,
tools, machinery and personnel and their accommodation
1.2.3
1.2

GENERAL (SPECIFIED) REQUIREMENTS


Price should include all costs for items as specified in
Particular specifications and be provided and maintained
during entire project period.

1.2.1

Facilities for the Engineer's Staff

1.2.1

Establish & remove offices


on land provided by Client Floor area 50 - 150 m

1.2.1.1

Establish site offices for Engineer, including all furnishing,


equipment and fittings as detailed in the specifications

Sum

1.00

30,000.00

1.2.1.2

Demobilise site offices for Engineer, including all furnishings,


equipment and fittings as detailed in specifications

Sum

1.00

7,500.00

1.2.2

Maintain the site office for the Engineer in the project,


including costs for rent

mth

12.00

3,750.00

TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET


Page 1 of 44

AMOUNT (US $)

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

TITLE: Preliminary and General Works

Bill No. 1

ITEM No.

DESCRIPTION

UNIT

1.3
1.3.1

Accommodation for the Engineer's Staff


Rent accomodation Type D house (single unit - 4
bedrooms)

mth

1.4

Services for the Engineer's Staff

1.4.1

Provide Transport vehicles for Engineer supervision staff, as


per specifications.

1.4.2

QUANTITY

RATE (US $)

12.00

1,500.00

No.

4.00

35,000.00

Operate, maintain and insure(comprehensive insurance)


Engineers' vehicles, as per specifications.

mth

12.00

3,750.00

1.4.3

Provide Telephone

No.

2.00

500.00

1.4.4

Provide Water & Electricity

sum

1.00

2,000.00

1.4.5

Provide Sign boards for each of the construction site as per


description in particular specs.

No.

4.00

1,500.00

1.5

Equipment for use by the Engineer's staff

1.5.1

Provide Survey Equipment according to Engineers


Specifications

mth

3.00

7,500.00

1.5.2

Provide Stationary & other consumables to specifications

mth

12.00

1,500.00

1.5.3

Provision of National & International Standards


As per clause 1.52 of the General Specifications

Sum

1.00

5,000.00

1.6

Attendance upon the Engineer's staff

1.6.1

Provide drivers (4 No.)

mth

12.00

1,200.00

1.6.2

Provide Chainmen

mth

12.00

500.00

1.6.3

Provide Secretary/typist

mth

12.00

350.00

1.6.4

Provide Office messenger

mth

12.00

200.00

1.6.5

Provide Security

mth

12.00

400.00

1.6.6

Provide Servants/ Cleaners

mth

12.00

300.00

1.6.7

Provide supporting staff to the Engineer representative


as per specification

mth

12.00

3,750.00

1.7

Testing of Materials

1.7.1

By Third Party Inspection (natural materials) as directed


by Engineer

1.7.2

Fine sand

No.

10.00

200.00

1.7.3

Coarse sand

No.

10.00

200.00

1.7.4

Aggregate

No.

10.00

200.00

1.7.5

Stone fill

No.

10.00

200.00

TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET


Page 2 of 44

AMOUNT (US $)

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

TITLE: Preliminary and General Works

Bill No. 1

ITEM No.

DESCRIPTION

UNIT

1.7.6
1.7.6.1

By Third Party Inspection (man-made other than pipes)


Concrete cubes

No.

10.00

250.00

1.7.6.2

Steel Reinforcement

No.

5.00

300.00

1.8

Testing of Works
Testing of the whole of the works are part of the individual
Bill of Quantities

Sum

1.00

QUANTITY

RATE (US $)

1.9

Temporary Works

1.9.1

Traffic diversion

Sum

1.00

20,000.00

1.9.2

Traffic regulation

Sum

1.00

10,000.00

1.9.3

Access roads

Sum

1.00

30,000.00

1.9.4

De-watering

Sum

1.00

7,500.00

1.9.5

Compressed air for tunneling

Sum

1.00

5,000.00

1.9.6

Bypass pipework where disruption for more


than 12 hrs is anticipated (PROVISIONAL)

Sum

1.00

30,000.00

Relocation of existing services incl. tel., electr.,


sewer, etc where anticipated (PROVISIONAL)

Sum

1.00

50,000.00

1.00

19,000.00

1.00

22,800.00

1.00

28,500.00

1.00

100,000.00

1.9.7

1.10
1.10.1

PROVISIONAL SUMS
Daywork

1.10.2

Labour (carried from Dayworks Schedule)

Sum

1.10.3

Percentage adjustment to provisional sum for


day work labour

1.10.4

Material (carried from Dayworks Schedule)

Sum

1.10.5

Percentage adjustment to provisional sum for


day work materials

1.10.6

Plant (carried from Dayworks Schedule)

Sum

1.10.7

Percentage adjustment to provisional sum for


day work plant

1.11

PRIME COST ITEMS

1.11.1

Work on site by nominated sub-contractor

Sum

1.11.2

Percentage adjustment to work onsite by nominated


subcontractor

1.11.3

Upkeep and travel for Engineer's staff

Sum

1.00

44,100.00

1.11.4

Install telephones for Engineers' staff Reverts to Employer


at end of Contract.

Sum

1.00

1,000.00

Page 3 of 44

AMOUNT (US $)

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET

Page 4 of 44

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

TITLE: Preliminary and General Works

Bill No. 1

ITEM No.

DESCRIPTION

UNIT

1.11.5

Provide computer equipment complete


with accessories, e-mail service
provider connection and software.
Reverts to Employer at end of Contract.

Sum

1.00

12,000.00

1.11.6

Provide digital camera complete


with accessories and software.
Reverts to Employer at end of Contract

Sum

1.00

1,000.00

1.11.7

Maintenance of computer equipment


and digital camera

Sum

1.00

500.00

1.11.8

Electricity and water bills for the Engineer's staff

mth

12.00

300.00

1.11.9

Telephone bills for Engineer's staff

mth

12.00

300.00

1.11.10

Miscellaneous goods and services for the Engineer.

Sum

1.00

10,000.00

1.11.11

Compensation and entry upon land.

Sum

1.00

20,000.00

1.12

Records and Documents

1.12.1

Photographical records of the site prior, during and after


completion of works. Documentation is to be prepared as per
specifications

Sum

1.00

3,000.00

QUANTITY

RATE (US $)

1.12.2

Instruction manuals (operation and maintenance manuals) as


specified in the Specifications

Sum

1.00

6,750.00

1.12.3

"As-built" drawings as specified in the Specifications

Sum

1.00

7,500.00

TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET

Page 5 of 44

AMOUNT (US $)

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

Page 6 of 44

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

TITLE: Preliminary and General Works


ITEM No.

Bill No. 1

DESCRIPTION

UNIT QUANTITY

COLLECTION SHEET
PAGE NO.
1
2
3
4

TOTAL CARRIED TO GRAND SUMMARY

Page 7 of 44

RATE (US $)

AMOUNT (US $)

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

TITLE: Preliminary and General Works

Bill No. 1

ITEM No.

DESCRIPTION

UNIT QUANTITY

PRELIMINARIES AND GENERAL ITEMS

1.1

PRELIMINARY(CONTRACTUAL)REQUIREMENTS
Price all liabilities, obligations and risk set forth or implied
in the contract ,not included in the rates and prices entered
elsewhere in the Bill of Quantities in complying with any
Clause of the Conditions of Contract for the entire project
period.

1.1.1

Advance Payment Bond

Sum

1.00

15,000.00

1.1.2

Performance Bond

Sum

1.00

15,000.00

1.1.3

Insurance of Works

Sum

1.00

11,250.00

1.1.4

Insurance against Damage to person and property

Sum

1.00

7,500.00

1.1.5

Third Party Insurance

Sum

1.00

7,500.00

1.1.6

Insurance of Workmen

Sum

1.00

7,500.00

1.2

Facilities and Items for the contractor

1.2.1

Establishment of the contractor's camp(s) ,plant


and offices including mobilisation of all required plant,
site,infrastructure,equipment,tools, machinery and personnel
and their accomodation

Sum

1.00

375,000.00

1.2.2

Operate and maintain the contractor's camp(s), plant


and offices including mobilisation and demobilisation
of all required plant,site,infrastructure,equipment,tools,
machinery and personnel and their accomodation.

mth

12.00

7,500.00

Sum

1.00

15,000.00

RATE (US $)

Demobilise Contractor's camp(s),plant and offices, including


mobilisation of all required plant, site, infrastructure, equipment,
tools, machinery and personnel and their accommodation
1.2.3
1.2

GENERAL (SPECIFIED) REQUIREMENTS


Price should include all costs for items as specified in
Particular specifications and be provided and maintained
during entire project period.

1.2.1

Facilities for the Engineer's Staff

1.2.1

Establish & remove offices


on land provided by Client Floor area 50 - 150 m

1.2.1.1

Establish site offices for Engineer, including all furnishing,


equipment and fittings as detailed in the specifications

Sum

1.00

30,000.00

1.2.1.2

Demobilise site offices for Engineer, including all furnishings,


equipment and fittings as detailed in specifications

Sum

1.00

7,500.00

1.2.2

Maintain the site office for the Engineer in the project,


including costs for rent,water, electricity,communication
and security

mth

12.00

3,750.00

TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET


Page 8 of 44

AMOUNT (US $)

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

TITLE: Preliminary and General Works

Bill No. 1

ITEM No.

DESCRIPTION

UNIT

1.3
1.3.1

Accommodation for the Engineer's Staff


Rent accomodation Type D house (single unit - 4
bedrooms)

mth

1.4

Services for the Engineer's Staff

1.4.1

Provide Transport vehicles for Engineer supervision staff, as


per specifications.

1.4.2

QUANTITY

RATE (US $)

12.00

1,500.00

No.

4.00

35,000.00

Operate, maintain and insure(comprehensive insurance)


Engineers' vehicles, as per specifications.

mth

12.00

3,750.00

1.4.3

Provide Telephone

No.

2.00

500.00

1.4.4

Provide Water & Electricity

sum

1.00

2,000.00

1.4.5

Provide Sign boards for each of the construction site as per


description in particular specs.

No.

4.00

1,500.00

1.5

Equipment for use by the Engineer's staff

1.5.1

Provide Survey Equipment according to Engineers


Specifications

mth

3.00

7,500.00

1.5.2

Provide Stationary & other consumables to specifications

mth

12.00

1,500.00

1.5.3

Provision of National & International Standards


As per clause 1.52 of the General Specifications

Sum

1.00

5,000.00

1.6

Attendance upon the Engineer's staff

1.6.1

Provide drivers (4 No.)

mth

12.00

1,200.00

1.6.2

Provide Chainmen

mth

12.00

500.00

1.6.3

Provide Secretary/typist

mth

12.00

350.00

1.6.4

Provide Office messenger

mth

12.00

200.00

1.6.5

Provide Watchmen

mth

12.00

400.00

1.6.6

Provide Servants/ Cleaners

mth

12.00

300.00

1.6.7

Provide supporting staff to the Engineer representative


as per specification

mth

12.00

3,750.00

1.7

Testing of Materials

1.7.1

By Third Party Inspection (natural materials) as directed


by Engineer

1.7.2

Fine sand

No.

10.00

200.00

1.7.3

Coarse sand

No.

10.00

200.00

1.7.4

Aggregate

No.

10.00

200.00

1.7.5

Stone fill

No.

10.00

200.00

TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET


Page 9 of 44

AMOUNT (US $)

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

TITLE: Preliminary and General Works

Bill No. 1

ITEM No.

DESCRIPTION

UNIT

1.7.6
1.7.6.1

By Third Party Inspection (man-made other than pipes)


Concrete cubes

No.

10.00

250.00

1.7.6.2

Steel Reinforcement

No.

5.00

300.00

1.8

Testing of Works
Testing of the whole of the works are part of the individual
Bill of Quantities

Sum

1.00

QUANTITY

RATE (US $)

1.9

Temporary Works

1.9.1

Traffic diversion

Sum

1.00

20,000.00

1.9.2

Traffic regulation

Sum

1.00

10,000.00

1.9.3

Access roads

Sum

1.00

30,000.00

1.9.4

De-watering

Sum

1.00

7,500.00

1.9.5

Compressed air for tunneling

Sum

1.00

5,000.00

1.9.6

Bypass pipework where disruption for more


than 12 hrs is anticipated (PROVISIONAL)

Sum

1.00

30,000.00

Relocation of existing services incl. tel., electr.,


sewer, etc where anticipated (PROVISIONAL)

Sum

1.00

50,000.00

1.00

19,000.00

1.00

22,800.00

1.00

28,500.00

1.00

100,000.00

1.9.7

1.10
1.10.1

PROVISIONAL SUMS
Daywork

1.10.2

Labour (carried from Dayworks Schedule)

Sum

1.10.3

Percentage adjustment to provisional sum for


day work labour

1.10.4

Material (carried from Dayworks Schedule)

Sum

1.10.5

Percentage adjustment to provisional sum for


day work materials

1.10.6

Plant (carried from Dayworks Schedule)

Sum

1.10.7

Percentage adjustment to provisional sum for


day work plant

1.11

PRIME COST ITEMS

1.11.1

Work on site by nominated sub-contractor

Sum

1.11.2

Percentage adjustment to work onsite by nominated


subcontractor

1.11.3

Provide furniture for Engineer's office

Sum

Page 10 of 44

1.00

AMOUNT (US $)

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET

Page 11 of 44

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

TITLE: Preliminary and General Works

Bill No. 1

ITEM No.

DESCRIPTION

UNIT

1.11.4

Office stationary and consumables

Sum

1.00

1.11.5

Upkeep and travel for Engineer's staff

Sum

1.00

1.11.6

Maintain vehicles for Engineer's staff

Sum

1.00

1.11.7

Provide and install telephones and radio telephones


for Engineer's staff Reverts to Employer at end of Contract.

Sum

1.00

1,000.00

1.11.8

Provide computer equipment complete


with accessories, e-mail service
provider connection and software.
Reverts to Employer at end of Contract.

Sum

1.00

12,000.00

1.11.9

Provide digital camera complete


with accessories and software.
Reverts to Employer at end of Contract

Sum

1.00

1,000.00

1.11.10

Maintenance of computer equipment


and digital camera

Sum

1.00

500.00

1.11.11

Electricity and water bills for the Engineer's staff

mth

12.00

300.00

1.11.12

Telephone bills for Engineer's staff

mth

12.00

300.00

1.11.13

Miscellaneous goods and services for the Engineer.

Sum

1.00

10,000.00

1.11.14

Compensation and entry upon land.

Sum

1.00

20,000.00

1.12

Records and Documents

1.12.1

Photographical records of the site prior, during and after


completion of works. Documentation is to be prepared as per
specifications

Sum

1.00

3,000.00

QUANTITY

RATE (US $)

44,100.00

1.12.2

Instruction manuals (operation and maintenance manuals) as


specified in the Specifications

Sum

1.00

6,750.00

1.12.3

"As-built" drawings as specified in the Specifications

Sum

1.00

7,500.00

TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET

Page 12 of 44

AMOUNT (US $)

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

Page 13 of 44

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

TITLE: Preliminary and General Works


ITEM No.

Bill No. 1

DESCRIPTION

UNIT QUANTITY

COLLECTION SHEET
PAGE NO.
1
2
3
4

TOTAL CARRIED TO GRAND SUMMARY

Page 14 of 44

RATE (US $)

AMOUNT (US $)

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

TITLE: Preliminary and General Works

Bill No. 1

ITEM No.

DESCRIPTION

UNIT QUANTITY

PRELIMINARIES AND GENERAL ITEMS

PRELIMINARY(CONTRACTUAL)REQUIREMENTS
Price all liabilities, obligations and risk set forth or implied
in the contract ,not included in the rates and prices entered
elsewhere in the Bill of Quantities in complying with any
Clause of the Conditions of Contract for the entire project
period.

111

Advance Payment Bond

Sum

121

Performance Bond

Sum

131

Insurance of Works

Sum

141

Insurance against Damage to person and property

Sum

151

Third Party Insurance

Sum

161

Insurance of Workmen

Sum

171

Facilities and Items for the contractor

171(i)

Establishment of the contractor's camp(s) ,plant


and offices including mobilisation of all required plant,
site,infrastructure,equipment,tools, machinery and personnel
and their accomodation

Sum

171(ii)

Operate and maintain the contractor's camp(s), plant


and offices including mobilisation and demobilisation
of all required plant,site,infrastructure,equipment,tools,
machinery and personnel and their accomodation.

Sum

RATE (US $)

Demobilise Contractor's camp(s),plant and offices, including


mobilisation of all required plant, site, infrastructure, equipment,
tools, machinery and personnel and their accommodation
171(iii)
2

Sum
GENERAL (SPECIFIED) REQUIREMENTS
Price should include all costs for items as specified in
Particular specifications and be provided and maintained
during entire project period.

21

Facilities for the Engineer's Staff

2122

Establish & remove offices


on land provided by Client Floor area 50 - 150 m

Sum

2122(i)

Establish site offices for Engineer, including all furnishing,


equipment and fittings as detailed in the specifications

Sum

2122(ii)

Demobilise site offices for Engineer, including all furnishings,


equipment and fittings as detailed in specifications

Sum

2162

Maintain the site office for the Engineer in the project,


including costs for rent,water, electricity,communication
and security

Sum

Page 15 of 44

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET

Page 16 of 44

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

TITLE: Preliminary and General Works

Bill No. 1

ITEM No.

DESCRIPTION

UNIT

22
2244

Accommodation for the Engineer's Staff


Rent accomodation Type D house (single unit - 4
bedrooms)

mth

23

Services for the Engineer's Staff

2311(i)

Provide Transport vehicles for Engineer supervision staff, as


per specifications.

2311(ii)

Operate, maintain and insure(comprehensive insurance)


Engineers' vehicles, as per specifications.

2321

QUANTITY

nr

Provide Telephone

nr

2341

Provide Water & Electricity

wk

52

2351

Provide Sign boards

nr

24

Equipment for use by the Engineer's staff

2431

Provide Survey Equipment according to Engineers


Specifications

mth

2441

Provide Stationary & other consumables to specifications

mth

12

2461

Provision of National & International Standards


As per clause 1.52 of the General Specifications

Sum

25

Attendance upon the Engineer's staff

2511

Provide drivers (4 No.)

mth

12

2521

Provide Chainmen

mth

12

2541

Provide Secretary/typist

mth

12

2551

Provide Office messenger

mth

12

2561

Provide Watchmen

mth

12

2571

Provide Servants/ Cleaners

mth

12

2581

Provide supporting staff to the Engineer representative


as per specification

mth

12

26

Testing of Materials

262

By Third Party Inspection (natural materials) as directed


by Engineer

2622

Fine sand

nr

2623

Coarse sand

nr

2624

Aggregate

nr

10

2625

Stone fill

nr

10

Page 17 of 44

10
10

RATE (US $)

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET

Page 18 of 44

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

TITLE: Preliminary and General Works

Bill No. 1

ITEM No.

DESCRIPTION

UNIT

264
2642

By Third Party Inspection (man-made other than pipes)


Concrete cubes

nr

10

2643

Steel Reinforcement

nr

27

Testing of Works
Testing of the whole of the works are part of the individual
Bill of Quantities

sum

QUANTITY

28

Temporary Works

281

Traffic diversion

sum

282

Traffic regulation

Sum

283

Access roads

sum

287

De-watering

Sum

288

Compressed air for tunneling

Sum

2891

Bypass pipework where disruption for more


than 12 hrs is anticipated (PROVISIONAL)

Sum

Relocation of existing services incl. tel., electr.,


sewer, etc where anticipated (PROVISIONAL)

Sum

2892

4
41

PROVISIONAL SUMS
Daywork

411

Labour (carried from Dayworks Schedule)

Sum

412

Percentage adjustment to provisional sum for


day work labour

413

Material (carried from Dayworks Schedule)

Sum

414

Percentage adjustment to provisional sum for


day work materials

415

Plant (carried from Dayworks Schedule)

Sum

416

Percentage adjustment to provisional sum for


day work plant

PRIME COST ITEMS

51

Work on site by nominated sub-contractor

52

Percentage adjustment to work onsite by nominated


subcontractor

532

Provide furniture for Engineer's office

sum

Sum

Page 19 of 44

RATE (US $)

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET

Page 20 of 44

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

TITLE: Preliminary and General Works

Bill No. 1

ITEM No.

DESCRIPTION

UNIT

533

Office stationary and consumables

sum

534

Upkeep and travel for Engineer's staff

sum

537

Maintain vehicles for Engineer's staff

sum

538

Provide and install telephones and radio telephones


for Engineer's staff Reverts to Employer at end of Contract.

sum

539

Provide computer equipment complete


with accessories, e-mail service
provider connection and software.
Reverts to Employer at end of Contract.

sum

5310

Provide digital camera complete


with accessories and software.
Reverts to Employer at end of Contract

sum

5311

Maintenance of computer equipment


and digital camera

sum

5312

Electricity and water for the Engineer's staff

sum

5313

Telephone for Engineer's staff

sum

5314

Miscellaneous goods and services for the Engineer.

sum

5315

Compensation and entry upon land.

sum

58

Records and Documents

581

Photographical records of the site prior, during and after


completion of works. Documentation is to be prepared as per
specifications

QUANTITY

sum

582

Instruction manuals (operation and maintenance manuals) as


specified in the Specifications

sum

583

"As-built" drawings as specified in the Specifications

Sum

TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET

Page 21 of 44

RATE (US $)

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

Page 22 of 44

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

TITLE: Preliminary and General Works


ITEM No.

DESCRIPTION

UNIT QUANTITY

COLLECTION SHEET
PAGE NO.
1
2
3
4

TOTAL CARRIED TO GRAND SUMMARY

Page 23 of 44

RATE (US $)

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

AMOUNT (US $)

Page 24 of 44

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

Page 25 of 44

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

AMOUNT (US $)

Page 26 of 44

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

Page 27 of 44

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

AMOUNT (US $)

Page 28 of 44

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

Page 29 of 44

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

AMOUNT (US $)

Page 30 of 44

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

Page 31 of 44

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

Bill No. 1
AMOUNT (US $)

Page 32 of 44

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

TITLE: Preliminary and General Works

Bill No. 1

ITEM No.

DESCRIPTION

UNIT

PRELIMINARIES AND GENERAL ITEMS

PRELIMINARY(CONTRACTUAL)REQUIREMENTS
Price all liabilities, obligations and risk set forth or implied
in the contract ,not included in the rates and prices entered
elsewhere in the Bill of Quantities in complying with any
Clause of the Conditions of Contract for the entire project
period.

111

Advance Payment Bond

Sum

121

Performance Bond

Sum

131

Insurance of Works

Sum

141

Insurance against Damage to person and property

Sum

151

Third Party Insurance

Sum

161

Insurance of Workmen

Sum

171

Facilities and Items for the contractor

171(i)

Establishment of the contractor's camp(s) ,plant


and offices including mobilisation of all required plant,
site,infrastructure,equipment,tools, machinery and personnel
and their accomodation

Sum

171(ii)

Operate and maintain the contractor's camp(s), plant


and offices including mobilisation and demobilisation
of all required plant,site,infrastructure,equipment,tools,
machinery and personnel and their accomodation.

Sum

QUANTITY

RATE (US $)

Demobilise Contractor's camp(s),plant and offices, including


mobilisation of all required plant, site, infrastructure, equipment,
tools, machinery and personnel and their accommodation
171(iii)
2

Sum
GENERAL (SPECIFIED) REQUIREMENTS
Price should include all costs for items as specified in
Particular specifications and be provided and maintained
during entire project period.

21

Facilities for the Engineer's Staff

2122

Establish & remove offices


on land provided by Client Floor area 50 - 150 m

Sum

2122(i)

Establish site offices for Engineer, including all furnishing,


equipment and fittings as detailed in the specifications

Sum

2122(ii)

Demobilise site offices for Engineer, including all furnishings,


equipment and fittings as detailed in specifications

Sum

2162

Maintain the site office for the Engineer in the project,


including costs for rent,water, electricity,communication
and security

Sum

22

Accommodation for the Engineer's Staff

2244

Rent accomodation Type D house (single unit - 4


bedrooms)

23

Services for the Engineer's Staff

2311(i)

Provide Transport vehicles for Engineer supervision staff, as


per specifications.

mth

nr

TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET


Page 33 of 44

AMOUNT (US $)

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

TITLE: Preliminary and General Works

Bill No. 1

ITEM No.

DESCRIPTION

UNIT

2311(ii)

Operate, maintain and insure(comprehensive insurance)


Engineers' vehicles, as per specifications.

2321

Provide Telephone

nr

2341

Provide Water & Electricity

wk

52

2351

Provide Sign boards

nr

24

Equipment for use by the Engineer's staff

2431

Provide Survey Equipment according to Engineers


Specifications

mth

2441

Provide Stationary & other consumables to specifications

mth

12

2461

Provision of National & International Standards


As per clause 1.52 of the General Specifications

Sum

25

Attendance upon the Engineer's staff

2511

Provide drivers (4 No.)

mth

12

2521

Provide Chainmen

mth

12

2541

Provide Secretary/typist

mth

12

2551

Provide Office messenger

mth

12

2561

Provide Watchmen

mth

12

2571

Provide Servants/ Cleaners

mth

12

2581

Provide supporting staff to the Engineer representative


as per specification

mth

12

26

Testing of Materials

262

By Third Party Inspection (natural materials) as directed


by Engineer

2622

Fine sand

nr

2623

Coarse sand

nr

2624

Aggregate

nr

10

2625

Stone fill

nr

10

264
2642

By Third Party Inspection (man-made other than pipes)


Concrete cubes

nr

10

2643

Steel Reinforcement

nr

27

Testing of Works
Testing of the whole of the works are part of the individual
Bill of Quantities

sum

QUANTITY

10
10

28

Temporary Works

281

Traffic diversion

sum

282

Traffic regulation

Sum

TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET

Page 34 of 44

RATE (US $)

AMOUNT (US $)

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

TITLE: Preliminary and General Works

Bill No. 1

ITEM No.

DESCRIPTION

UNIT

283

Access roads

sum

287

De-watering

Sum

288

Compressed air for tunneling

Sum

2891

Bypass pipework where disruption for more


than 12 hrs is anticipated (PROVISIONAL)

Sum

Relocation of existing services incl. tel., electr.,


sewer, etc where anticipated (PROVISIONAL)

Sum

2892

QUANTITY

4
41

PROVISIONAL SUMS
Daywork

411

Labour (carried from Dayworks Schedule)

Sum

412

Percentage adjustment to provisional sum for


day work labour

413

Material (carried from Dayworks Schedule)

Sum

414

Percentage adjustment to provisional sum for


day work materials

415

Plant (carried from Dayworks Schedule)

Sum

416

Percentage adjustment to provisional sum for


day work plant

PRIME COST ITEMS

51

Work on site by nominated sub-contractor

52

Percentage adjustment to work onsite by nominated


subcontractor

532

Provide furniture for Engineer's office

Sum

533

Office stationary and consumables

sum

534

Upkeep and travel for Engineer's staff

sum

537

Maintain vehicles for Engineer's staff

sum

538

Provide and install telephones and radio telephones


for Engineer's staff Reverts to Employer at end of Contract.

sum

539

Provide computer equipment complete


with accessories, e-mail service
provider connection and software.
Reverts to Employer at end of Contract.

sum

5310

Provide digital camera complete


with accessories and software.
Reverts to Employer at end of Contract

sum

5311

Maintenance of computer equipment


and digital camera

sum

5312

Electricity and water for the Engineer's staff

sum

sum

Page 35 of 44

RATE (US $)

AMOUNT (US $)

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET

Page 36 of 44

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

TITLE: Preliminary and General Works

Bill No. 1

ITEM No.

DESCRIPTION

UNIT

5313

Telephone for Engineer's staff

sum

5314

Miscellaneous goods and services for the Engineer.

sum

5315

Compensation and entry upon land.

sum

58

Records and Documents

581

Photographical records of the site prior, during and after


completion of works. Documentation is to be prepared as per
specifications

QUANTITY

sum

582

Instruction manuals (operation and maintenance manuals) as


specified in the Specifications

sum

583

"As-built" drawings as specified in the Specifications

Sum

TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET

Page 37 of 44

RATE (US $)

AMOUNT (US $)

Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works

TITLE: Preliminary and General Works


ITEM No.

Bill No. 1

DESCRIPTION

UNIT

COLLECTION SHEET
PAGE NO.
1
2
3
4

TOTAL CARRIED TO GRAND SUMMARY

Page 38 of 44

QUANTITY

RATE (US $)

AMOUNT (US $)

TITLE: Preliminary and General Works

Bill No. 1

ITEM No.

DESCRIPTION

UNIT

QUANTITY

GENERAL ITEMS

1A1

PRELIMINARY REQUIREMENTS

Sum

Sum

Sum

Sum

Onshore (Local currency)

Sum

Establishment and maintenance

Sum

Sum

Sum

RATE (US $)

AMOUNT (US $)

1,500.00

9,000.00

(CONTRACTUAL)
1A111

Advance Payment Security


Onshore (Local currency)

1A121

Performance Security
Onshore (Local currency)

1A131

Insurance of Works
Onshore (Local currency)

1A141

Third Party Insurance


Onshore (Local currency)

1A161

1A171

Insurance of Workmen

of Contractors Camp, incl. Training Levy.


Onshore (Local currency)
1A2

GENERAL REQUIREMENTS

1A21

Facilities for the Engineer's Staff

1A212.2

Establish & remove offices


on land provided by Client Floor area 50 - 150 m (Provisional)

1A213.2

Establish & leave offices on land


provided by Client Floor area 50 - 150 m
(Rate Only -NOT CARRIED FORWARD)

1A22

Accommodation for the Engineer's Staff

1A223.4

Maintain house Type D house (single unit-3 bed)

mth

1A224.4

Rented and furnished house Type D (single unit-3 bed)

mth

1A224.5

Percentage on 1A224.4.

9,000

TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET


Preliminary 1-A2

TITLE: Preliminary and General Works

Bill No. 1

ITEM No.

DESCRIPTION

UNIT

QUANTITY

1A23

Services for the Engineer's Staff


Signboards

1A234.1

Provide

nr

1A234.2

Maintain

wk

30

1A24

Equipment for use by the Engineer's staff

1A243.1

Survey Equipment -Provide

mth

Provision of National & International Standards

Sum

1A246

As per clause 1.52 of the General Specifications


1A25

Attendance upon the Engineer's staff

1A251.1

Driver Provide (1 No.)

mth

1A252.1

Chainmen Provide

mth

1A254.1

Secretary/typist Provide

mth

1A255.1

Office messenger Provide

mth

1A256.1

Watchmen Provide

mth

1A257.1

Servants/ Cleaners Provide

mth

RATE (US $)

AMOUNT (US $)

1A26

Testing of Materials
By Third Party Inspection (natural materials)

1A262.2

Sand

nr

10

1A262.4

Aggregate

nr

10

1A262.5

Stone fill

nr

10

By Third Party Inspection (man-made other than pipes)


1A264.2

Concrete cubes

nr

10

1A264.3

Steel Reinforcement

nr

1A28

Temporary Works

1A282

Traffic regulation

Sum

1A287

De-watering

Sum

1A289.1

Bypass pipework where disruption for more


Sum

Sum

than 12 hrs is anticipated (PROVISIONAL)


1A289.2

Relocation of existing services incl. tel., electr.,


sewer, etc where anticipated (PROVISIONAL)
TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET

TITLE: Preliminary and General Works

Bill No. 1

ITEM No.

DESCRIPTION

UNIT

QUANTITY

1A4

PROVISIONAL SUMS

RATE (US $)

AMOUNT (US $)

Daywork
1A411

Labour (carried from Dayworks Schedule)

Sum

1A413

Material (carried from Dayworks Schedule)

Sum

1A415

Plant (carried from Dayworks Schedule)

Sum

1A5

PRIME COST ITEMS

1A532

Provide furniture for Engineer's office

Sum

2,000.00

1A533

Office stationary and consumables

sum

400.00

1A534

Upkeep and travel for Engineer's staff

sum

1,200.00

1A537

Maintain vehicles for Engineer's staff

sum

1,600.00

Provide and install telephones and radio telephones

sum

500.00

sum

1,500.00

sum

400.00

sum

200.00

1A538

for Engineer's staff Reverts to Employer at end of Contract.


1A539

Provide computer equipment complete


with accessories, e-mail service
provider connection and software.
Reverts to Employer at end of Contract.

1A5310

Provide digital camera complete


with accessories and software.
Reverts to Employer at end of Contract

1A5311

Maintenance of computer equipment


and digital camera

1A5312

Electricity and water for the Engineer's staff

sum

500.00

1A5313

Telephone for Engineer's staff

sum

2,000.00

1A5314

Miscellaneous goods and services for the Engineer.

sum

2,000.00

1A5315

Compensation and entry upon land.

sum

1,000.00

1A54

Percentage adjustment to Items 1A533 to 1A5315

13,300

UNIT

QUANTITY

TOTAL CARRIED FORWARD TO BILL COLLECTION SHEET

ITEM No.

TITLE: Preliminary and General Works


DESCRIPTION

RATE (US $)

Bill No. 1
AMOUNT (US $)

COLLECTION SHEET
PAGE NO.
1
2
3

TOTAL CARRIED TO GRAND SUMMARY

AMOUNT (US $)

AMOUNT (US $)

AMOUNT (US $)

AMOUNT (US $)

You might also like