1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Bill No. 1
ITEM No.
DESCRIPTION
UNIT QUANTITY
1.1
PRELIMINARY(CONTRACTUAL)REQUIREMENTS
Price all liabilities, obligations and risk set forth or implied
in the contract ,not included in the rates and prices entered
elsewhere in the Bill of Quantities in complying with any
Clause of the Conditions of Contract for the entire project
period.
1.1.1
Sum
1.00
15,000.00
1.1.2
Performance Bond
Sum
1.00
15,000.00
1.1.3
Insurance of Works
Sum
1.00
11,250.00
1.1.4
Sum
1.00
7,500.00
1.1.5
Sum
1.00
7,500.00
1.1.6
Insurance of Workmen
Sum
1.00
7,500.00
1.2
1.2.1
Sum
1.00
375,000.00
1.2.2
mth
12.00
7,500.00
Sum
1.00
15,000.00
RATE (US $)
1.2.1
1.2.1
1.2.1.1
Sum
1.00
30,000.00
1.2.1.2
Sum
1.00
7,500.00
1.2.2
mth
12.00
3,750.00
AMOUNT (US $)
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Bill No. 1
ITEM No.
DESCRIPTION
UNIT
1.3
1.3.1
mth
1.4
1.4.1
1.4.2
QUANTITY
RATE (US $)
12.00
1,500.00
No.
4.00
35,000.00
mth
12.00
3,750.00
1.4.3
Provide Telephone
No.
2.00
500.00
1.4.4
sum
1.00
2,000.00
1.4.5
No.
4.00
1,500.00
1.5
1.5.1
mth
3.00
7,500.00
1.5.2
mth
12.00
1,500.00
1.5.3
Sum
1.00
5,000.00
1.6
1.6.1
mth
12.00
1,200.00
1.6.2
Provide Chainmen
mth
12.00
500.00
1.6.3
Provide Secretary/typist
mth
12.00
350.00
1.6.4
mth
12.00
200.00
1.6.5
Provide Security
mth
12.00
400.00
1.6.6
mth
12.00
300.00
1.6.7
mth
12.00
3,750.00
1.7
Testing of Materials
1.7.1
1.7.2
Fine sand
No.
10.00
200.00
1.7.3
Coarse sand
No.
10.00
200.00
1.7.4
Aggregate
No.
10.00
200.00
1.7.5
Stone fill
No.
10.00
200.00
AMOUNT (US $)
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Bill No. 1
ITEM No.
DESCRIPTION
UNIT
1.7.6
1.7.6.1
No.
10.00
250.00
1.7.6.2
Steel Reinforcement
No.
5.00
300.00
1.8
Testing of Works
Testing of the whole of the works are part of the individual
Bill of Quantities
Sum
1.00
QUANTITY
RATE (US $)
1.9
Temporary Works
1.9.1
Traffic diversion
Sum
1.00
20,000.00
1.9.2
Traffic regulation
Sum
1.00
10,000.00
1.9.3
Access roads
Sum
1.00
30,000.00
1.9.4
De-watering
Sum
1.00
7,500.00
1.9.5
Sum
1.00
5,000.00
1.9.6
Sum
1.00
30,000.00
Sum
1.00
50,000.00
1.00
19,000.00
1.00
22,800.00
1.00
28,500.00
1.00
100,000.00
1.9.7
1.10
1.10.1
PROVISIONAL SUMS
Daywork
1.10.2
Sum
1.10.3
1.10.4
Sum
1.10.5
1.10.6
Sum
1.10.7
1.11
1.11.1
Sum
1.11.2
1.11.3
Sum
1.00
44,100.00
1.11.4
Sum
1.00
1,000.00
Page 3 of 44
AMOUNT (US $)
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 4 of 44
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Bill No. 1
ITEM No.
DESCRIPTION
UNIT
1.11.5
Sum
1.00
12,000.00
1.11.6
Sum
1.00
1,000.00
1.11.7
Sum
1.00
500.00
1.11.8
mth
12.00
300.00
1.11.9
mth
12.00
300.00
1.11.10
Sum
1.00
10,000.00
1.11.11
Sum
1.00
20,000.00
1.12
1.12.1
Sum
1.00
3,000.00
QUANTITY
RATE (US $)
1.12.2
Sum
1.00
6,750.00
1.12.3
Sum
1.00
7,500.00
Page 5 of 44
AMOUNT (US $)
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 6 of 44
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Bill No. 1
DESCRIPTION
UNIT QUANTITY
COLLECTION SHEET
PAGE NO.
1
2
3
4
Page 7 of 44
RATE (US $)
AMOUNT (US $)
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Bill No. 1
ITEM No.
DESCRIPTION
UNIT QUANTITY
1.1
PRELIMINARY(CONTRACTUAL)REQUIREMENTS
Price all liabilities, obligations and risk set forth or implied
in the contract ,not included in the rates and prices entered
elsewhere in the Bill of Quantities in complying with any
Clause of the Conditions of Contract for the entire project
period.
1.1.1
Sum
1.00
15,000.00
1.1.2
Performance Bond
Sum
1.00
15,000.00
1.1.3
Insurance of Works
Sum
1.00
11,250.00
1.1.4
Sum
1.00
7,500.00
1.1.5
Sum
1.00
7,500.00
1.1.6
Insurance of Workmen
Sum
1.00
7,500.00
1.2
1.2.1
Sum
1.00
375,000.00
1.2.2
mth
12.00
7,500.00
Sum
1.00
15,000.00
RATE (US $)
1.2.1
1.2.1
1.2.1.1
Sum
1.00
30,000.00
1.2.1.2
Sum
1.00
7,500.00
1.2.2
mth
12.00
3,750.00
AMOUNT (US $)
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Bill No. 1
ITEM No.
DESCRIPTION
UNIT
1.3
1.3.1
mth
1.4
1.4.1
1.4.2
QUANTITY
RATE (US $)
12.00
1,500.00
No.
4.00
35,000.00
mth
12.00
3,750.00
1.4.3
Provide Telephone
No.
2.00
500.00
1.4.4
sum
1.00
2,000.00
1.4.5
No.
4.00
1,500.00
1.5
1.5.1
mth
3.00
7,500.00
1.5.2
mth
12.00
1,500.00
1.5.3
Sum
1.00
5,000.00
1.6
1.6.1
mth
12.00
1,200.00
1.6.2
Provide Chainmen
mth
12.00
500.00
1.6.3
Provide Secretary/typist
mth
12.00
350.00
1.6.4
mth
12.00
200.00
1.6.5
Provide Watchmen
mth
12.00
400.00
1.6.6
mth
12.00
300.00
1.6.7
mth
12.00
3,750.00
1.7
Testing of Materials
1.7.1
1.7.2
Fine sand
No.
10.00
200.00
1.7.3
Coarse sand
No.
10.00
200.00
1.7.4
Aggregate
No.
10.00
200.00
1.7.5
Stone fill
No.
10.00
200.00
AMOUNT (US $)
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Bill No. 1
ITEM No.
DESCRIPTION
UNIT
1.7.6
1.7.6.1
No.
10.00
250.00
1.7.6.2
Steel Reinforcement
No.
5.00
300.00
1.8
Testing of Works
Testing of the whole of the works are part of the individual
Bill of Quantities
Sum
1.00
QUANTITY
RATE (US $)
1.9
Temporary Works
1.9.1
Traffic diversion
Sum
1.00
20,000.00
1.9.2
Traffic regulation
Sum
1.00
10,000.00
1.9.3
Access roads
Sum
1.00
30,000.00
1.9.4
De-watering
Sum
1.00
7,500.00
1.9.5
Sum
1.00
5,000.00
1.9.6
Sum
1.00
30,000.00
Sum
1.00
50,000.00
1.00
19,000.00
1.00
22,800.00
1.00
28,500.00
1.00
100,000.00
1.9.7
1.10
1.10.1
PROVISIONAL SUMS
Daywork
1.10.2
Sum
1.10.3
1.10.4
Sum
1.10.5
1.10.6
Sum
1.10.7
1.11
1.11.1
Sum
1.11.2
1.11.3
Sum
Page 10 of 44
1.00
AMOUNT (US $)
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 11 of 44
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Bill No. 1
ITEM No.
DESCRIPTION
UNIT
1.11.4
Sum
1.00
1.11.5
Sum
1.00
1.11.6
Sum
1.00
1.11.7
Sum
1.00
1,000.00
1.11.8
Sum
1.00
12,000.00
1.11.9
Sum
1.00
1,000.00
1.11.10
Sum
1.00
500.00
1.11.11
mth
12.00
300.00
1.11.12
mth
12.00
300.00
1.11.13
Sum
1.00
10,000.00
1.11.14
Sum
1.00
20,000.00
1.12
1.12.1
Sum
1.00
3,000.00
QUANTITY
RATE (US $)
44,100.00
1.12.2
Sum
1.00
6,750.00
1.12.3
Sum
1.00
7,500.00
Page 12 of 44
AMOUNT (US $)
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 13 of 44
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Bill No. 1
DESCRIPTION
UNIT QUANTITY
COLLECTION SHEET
PAGE NO.
1
2
3
4
Page 14 of 44
RATE (US $)
AMOUNT (US $)
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Bill No. 1
ITEM No.
DESCRIPTION
UNIT QUANTITY
PRELIMINARY(CONTRACTUAL)REQUIREMENTS
Price all liabilities, obligations and risk set forth or implied
in the contract ,not included in the rates and prices entered
elsewhere in the Bill of Quantities in complying with any
Clause of the Conditions of Contract for the entire project
period.
111
Sum
121
Performance Bond
Sum
131
Insurance of Works
Sum
141
Sum
151
Sum
161
Insurance of Workmen
Sum
171
171(i)
Sum
171(ii)
Sum
RATE (US $)
Sum
GENERAL (SPECIFIED) REQUIREMENTS
Price should include all costs for items as specified in
Particular specifications and be provided and maintained
during entire project period.
21
2122
Sum
2122(i)
Sum
2122(ii)
Sum
2162
Sum
Page 15 of 44
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 16 of 44
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Bill No. 1
ITEM No.
DESCRIPTION
UNIT
22
2244
mth
23
2311(i)
2311(ii)
2321
QUANTITY
nr
Provide Telephone
nr
2341
wk
52
2351
nr
24
2431
mth
2441
mth
12
2461
Sum
25
2511
mth
12
2521
Provide Chainmen
mth
12
2541
Provide Secretary/typist
mth
12
2551
mth
12
2561
Provide Watchmen
mth
12
2571
mth
12
2581
mth
12
26
Testing of Materials
262
2622
Fine sand
nr
2623
Coarse sand
nr
2624
Aggregate
nr
10
2625
Stone fill
nr
10
Page 17 of 44
10
10
RATE (US $)
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 18 of 44
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Bill No. 1
ITEM No.
DESCRIPTION
UNIT
264
2642
nr
10
2643
Steel Reinforcement
nr
27
Testing of Works
Testing of the whole of the works are part of the individual
Bill of Quantities
sum
QUANTITY
28
Temporary Works
281
Traffic diversion
sum
282
Traffic regulation
Sum
283
Access roads
sum
287
De-watering
Sum
288
Sum
2891
Sum
Sum
2892
4
41
PROVISIONAL SUMS
Daywork
411
Sum
412
413
Sum
414
415
Sum
416
51
52
532
sum
Sum
Page 19 of 44
RATE (US $)
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 20 of 44
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Bill No. 1
ITEM No.
DESCRIPTION
UNIT
533
sum
534
sum
537
sum
538
sum
539
sum
5310
sum
5311
sum
5312
sum
5313
sum
5314
sum
5315
sum
58
581
QUANTITY
sum
582
sum
583
Sum
Page 21 of 44
RATE (US $)
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 22 of 44
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
DESCRIPTION
UNIT QUANTITY
COLLECTION SHEET
PAGE NO.
1
2
3
4
Page 23 of 44
RATE (US $)
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
AMOUNT (US $)
Page 24 of 44
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 25 of 44
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
AMOUNT (US $)
Page 26 of 44
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 27 of 44
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
AMOUNT (US $)
Page 28 of 44
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 29 of 44
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
AMOUNT (US $)
Page 30 of 44
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 31 of 44
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Bill No. 1
AMOUNT (US $)
Page 32 of 44
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Bill No. 1
ITEM No.
DESCRIPTION
UNIT
PRELIMINARY(CONTRACTUAL)REQUIREMENTS
Price all liabilities, obligations and risk set forth or implied
in the contract ,not included in the rates and prices entered
elsewhere in the Bill of Quantities in complying with any
Clause of the Conditions of Contract for the entire project
period.
111
Sum
121
Performance Bond
Sum
131
Insurance of Works
Sum
141
Sum
151
Sum
161
Insurance of Workmen
Sum
171
171(i)
Sum
171(ii)
Sum
QUANTITY
RATE (US $)
Sum
GENERAL (SPECIFIED) REQUIREMENTS
Price should include all costs for items as specified in
Particular specifications and be provided and maintained
during entire project period.
21
2122
Sum
2122(i)
Sum
2122(ii)
Sum
2162
Sum
22
2244
23
2311(i)
mth
nr
AMOUNT (US $)
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Bill No. 1
ITEM No.
DESCRIPTION
UNIT
2311(ii)
2321
Provide Telephone
nr
2341
wk
52
2351
nr
24
2431
mth
2441
mth
12
2461
Sum
25
2511
mth
12
2521
Provide Chainmen
mth
12
2541
Provide Secretary/typist
mth
12
2551
mth
12
2561
Provide Watchmen
mth
12
2571
mth
12
2581
mth
12
26
Testing of Materials
262
2622
Fine sand
nr
2623
Coarse sand
nr
2624
Aggregate
nr
10
2625
Stone fill
nr
10
264
2642
nr
10
2643
Steel Reinforcement
nr
27
Testing of Works
Testing of the whole of the works are part of the individual
Bill of Quantities
sum
QUANTITY
10
10
28
Temporary Works
281
Traffic diversion
sum
282
Traffic regulation
Sum
Page 34 of 44
RATE (US $)
AMOUNT (US $)
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Bill No. 1
ITEM No.
DESCRIPTION
UNIT
283
Access roads
sum
287
De-watering
Sum
288
Sum
2891
Sum
Sum
2892
QUANTITY
4
41
PROVISIONAL SUMS
Daywork
411
Sum
412
413
Sum
414
415
Sum
416
51
52
532
Sum
533
sum
534
sum
537
sum
538
sum
539
sum
5310
sum
5311
sum
5312
sum
sum
Page 35 of 44
RATE (US $)
AMOUNT (US $)
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Page 36 of 44
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Bill No. 1
ITEM No.
DESCRIPTION
UNIT
5313
sum
5314
sum
5315
sum
58
581
QUANTITY
sum
582
sum
583
Sum
Page 37 of 44
RATE (US $)
AMOUNT (US $)
Bill No.1: Design and Rehabilitation of the Secondary and Tertiary Distribution system - Part 3 and 4: Preliminary and General Works
Bill No. 1
DESCRIPTION
UNIT
COLLECTION SHEET
PAGE NO.
1
2
3
4
Page 38 of 44
QUANTITY
RATE (US $)
AMOUNT (US $)
Bill No. 1
ITEM No.
DESCRIPTION
UNIT
QUANTITY
GENERAL ITEMS
1A1
PRELIMINARY REQUIREMENTS
Sum
Sum
Sum
Sum
Sum
Sum
Sum
Sum
RATE (US $)
AMOUNT (US $)
1,500.00
9,000.00
(CONTRACTUAL)
1A111
1A121
Performance Security
Onshore (Local currency)
1A131
Insurance of Works
Onshore (Local currency)
1A141
1A161
1A171
Insurance of Workmen
GENERAL REQUIREMENTS
1A21
1A212.2
1A213.2
1A22
1A223.4
mth
1A224.4
mth
1A224.5
Percentage on 1A224.4.
9,000
Bill No. 1
ITEM No.
DESCRIPTION
UNIT
QUANTITY
1A23
1A234.1
Provide
nr
1A234.2
Maintain
wk
30
1A24
1A243.1
mth
Sum
1A246
1A251.1
mth
1A252.1
Chainmen Provide
mth
1A254.1
Secretary/typist Provide
mth
1A255.1
mth
1A256.1
Watchmen Provide
mth
1A257.1
mth
RATE (US $)
AMOUNT (US $)
1A26
Testing of Materials
By Third Party Inspection (natural materials)
1A262.2
Sand
nr
10
1A262.4
Aggregate
nr
10
1A262.5
Stone fill
nr
10
Concrete cubes
nr
10
1A264.3
Steel Reinforcement
nr
1A28
Temporary Works
1A282
Traffic regulation
Sum
1A287
De-watering
Sum
1A289.1
Sum
Bill No. 1
ITEM No.
DESCRIPTION
UNIT
QUANTITY
1A4
PROVISIONAL SUMS
RATE (US $)
AMOUNT (US $)
Daywork
1A411
Sum
1A413
Sum
1A415
Sum
1A5
1A532
Sum
2,000.00
1A533
sum
400.00
1A534
sum
1,200.00
1A537
sum
1,600.00
sum
500.00
sum
1,500.00
sum
400.00
sum
200.00
1A538
1A5310
1A5311
1A5312
sum
500.00
1A5313
sum
2,000.00
1A5314
sum
2,000.00
1A5315
sum
1,000.00
1A54
13,300
UNIT
QUANTITY
ITEM No.
RATE (US $)
Bill No. 1
AMOUNT (US $)
COLLECTION SHEET
PAGE NO.
1
2
3
AMOUNT (US $)
AMOUNT (US $)
AMOUNT (US $)
AMOUNT (US $)