Professional Documents
Culture Documents
Purpose
Kishor S Satam
Process of Procurement under Chapter X for export
Document ID
MM-BPML-018
Version
1
Revision Date
10/08/2015
Revision Description
Revised By
Initial Version
Page 1 of 5
Reviewed By
As-Is Document
Module: Material Management (MM)
Sub-Module:
Signof
Business Process Owners
Name
Project Role
Kishor S Satam
Uday Dalvi
Dipak Salunke
Sopan Mojad
Ravi Panchal
Tejal Mayekar
Mr. Vijith N.
H.P.Kamath
Functional Head
Date
Page 2 of 5
Signature
As-Is Document
Module: Material Management (MM)
Sub-Module:
Project Role
Date
Signature
Date
Signature
Project Manager
Project Role
MM Consultant
Mr. Ramakrishnan.B
Project Manager
Page 3 of 5
As-Is Document
Module: Material Management (MM)
Sub-Module:
4
5
6
Activity / Inputs
Result /Output
Current Problems
Expectations
Procurement process from Purchase Requisition till intimation to accounts for advance payment is same as purchase of Raw Material / Packing Material
Generation of PO (having Excise Nil Duty)
PO Prepared.
NA
NA
Approval of PO, Sending copies to Supplier, Stores
PO Copies sent to
Manual process possible
PO shall get reflected in Stores
and Accounts
supplier/stores
delays due to sending by mail /
and Accounts through System.
plant/accounts
courier
Provision to send PO by mail
to Supplier
Preparation of Annex 45 in duplicate at Plant,
Annex 45 prepared
Manual work
Excise Annx-45 should be
certified by Excise (4 copies)
generated by system once PO
is generated. Annex should
show basic value of product
and not tax - included value.
Receipt of Excise certified Annex 45 in duplicate
Annex 45 received.
from plant by courier
Sending Annex to supplier for arranging despatch
Annex 45 sent to Supplier
Despatch of material by supplier along with both the
Receipt of material at plant
copies of excise annexure
Purchase for raising PO, excise dept at plant for arranging Annex, stores at plant for receipt of material
-
Other Requirements
Page 4 of 5
As-Is Document
Module: Material Management (MM)
Sub-Module:
Page 5 of 5