You are on page 1of 4

Losses

Index

Hollowcore

slab length

50 < 0-100

Distance

4000 mm

8000 < outside to outside length

1. Relaxation of strand
Jacking_Factor
Jack_tot
Relax Percent
Delta Pr

0,7
2064,0 kN
3,0 %
10,84 kN

< StrandSetupInfo.StressFactor
< TotalJackInfo.ApsFpu
< =1.2*(1+(Jacking_Factor*100-60)*0.15)
< =Jack_tot*Jacking_Factor*Relax_Percent/400

2. Elastic shortening
h_slab
A_slab
Ix_slab
y_Slab_top
y_strands
E_strand
total_Aps
conc_fci
conc_fcu
M_sw
e_centroid
P_es_init
P_A_es
Pee_I_es
Msw_e_I_es
stress_es
Ec 28
Ec t
m
Delta Pe
P_transfer
% losses Tr

200
308996
1,41E+09
100,19
31,25
195
1110
40
50
61,03
68,56
1433,96
4,64
4,77
-2,96
6,45
30,00
26,40
7,39
52,86
1381,11
4,41

mm
mm
mm4
mm
mm
kN/mm
mm
N/mm
N/mm
kNm
mm
kN
N/mm
N/mm
N/mm
N/mm
kN/mm
kN/mm
kN
kN
%

< FSize.y - thickness of slab, no screed included


< AyI_noncomp.Area
< AyI_noncomp.Ixx
< AyI_noncomp.y_bar - measured from top fibres
< TotJMoment/TotJForce - measured from btm fibres
< JackingInfo.ApsFpu_E/JackingInfo.ApsFpu
< JackingInfo.Aps
< ConcreteInfo.transfer_str
< ConcreteInfo.service_str
< TransferMom[FIdx]
< =y_Slab-y_strands
< =Jack_tot*Jacking_Factor-Delta_Pr
< =1000*P_es_init/A_slab
< =1000*P_es_init*(e_centroid)^2/Ix_slab
< =-1000000*M_sw*e_centroid/Ix_slab
< =P_A_es+Pee_I_es+Msw_e_I_es Stress @ centroid of strands
< =20+conc_fcu/5
< =Ec_28*(0.4+0.6*conc_fci/conc_fcu)
< =E_strand/Ec_t
< =m*stress_es*total_Aps/1000
< =Jack_tot*Jacking_Factor-(Delta_Pr+Delta_Pe)
< =100*(1-P_transfer/(Jack_tot*Jacking_Factor))

3. Shrinkage of Concrete
e_strain
300 (x1e-6)
Delta Ps
64,92 kN

< Strain for indoor exposure


< =E_strand*e_strain*total_Aps/1000000

4. Creep
Creep_factor
P_Creep
P/A creep
Pee/I creep
stress_creep
Delta Pc
P_service
p_Loss_Serv

< ConcreteInfo.creep_factor
< =P_transfer
< =1000*P_Creep/A_slab
< =1000*P_Creep*(e_centroid)^2/Ix_slab
< =P_A_creep+Pee_I_creep+Msw_e_I_es
< =Creep_factor*m*stress_creep*total_Aps/1000
< =Jack_tot-4*Delta_Pr-Delta_Pe-Delta_Ps-Delta_Pc
< =100*(1-P_service/(Jack_tot*Jacking_Factor))

2
1381,11
4,47
4,59
6,10
100,03
1183,65
18,08

kN
N/mm
N/mm
N/mm
kN
kN
%

< =slab_length*Index/100

Stress Calcs

Distance

4000 mm

< from left hand end of slab

MINUS indicates tension


1. Transfer Stresses
P_init/A
Pi_eyt/I
Pi_eyb/I
M swi strs_t
M swi strs_b
f t init
f b init
p tens init
p comp init

4,47
-6,71
6,68
4,32
-4,31
2,08
6,85
-2,85
18,00

N/mm
N/mm
N/mm
N/mm
N/mm
N/mm
N/mm
N/mm
N/mm

< =1000*P_transfer/A_slab
< =-1000*P_transfer*e_centroid*y_Slab_top/Ix_Slab
< =1000*P_transfer*e_centroid*(h_slab-y_Slab_top)/Ix_Slab
< =1000000*M_sw*y_Slab_top/Ix_Slab
< =-1000000*M_sw*(h_slab-y_Slab_top)/Ix_Slab
< =P_init_A+Pi_eyt_I+M_swi_strs_t Total stress top transfer
< =P_init_A+Pi_eyb_I+M_swi_strs_b Total stress btm transfer
< =-0.45*SQRT(conc_fci) - permissible concrete stress at transfer in tension
< =0.45*conc_fci - permissible concrete stress at transfer in compression

2. Intermediate stresses at wet screed stage


M_screed_wet
37,45 kNm
< M_screed_wet[FIdx]
f_scrd_top_wet
2,65 N/mm
< =1000000*M_screed_wet*y_Slab_top/Ix_Slab
f_scrd_btm_wet
-2,64 N/mm
< =-1000000*M_screed_wet*(h_slab-y_Slab_top)/Ix_Slab
f tt scrd
4,74 N/mm
< =P_init_A+Pi_eyt_I+M_swi_strs_t+f_scrd_top Total stress for wet screed top
f tb scrd
4,20 N/mm
< =P_init_A+Pi_eyb_I+M_swi_strs_b+f_scrd_btm Total stress for wet screed btm
conc_fcs
45,00 N/mm
< =AVERAGE(conc_fci,conc_fcu)
p tens scrd
-3,02 N/mm
< =-0.45*SQRT(conc_fcs) Permissible concrete tension stress at wet screed
p_comp_scrd
15,00 N/mm
< =conc_fcs/3 Permissible concrete compression stress at wet screed
3. Service Stresses
Overall Depth
280
Screed
80
M sw jointed
60,92
Msuper
131,04
M_screed_prop
0,00
y_comp_top
132,36
Ix_comp
3571042863
P serv/A Slab
3,83
Ps_eyt/I
-5,75
Ps_eyb/I
5,73
fbtm fibres
9,56
ftop fibres
-1,92
M sws strs_t
4,32
M sws strs_b
-4,30
f_top_super
1,92
f_btm_super
-5,42
f_scrd_top_prop
0,00
f_scrd_btm_prop
0,00
f t serv
6,97
f b serv
-2,80
p tens serv
-3,18
p_comp_serv
16,67

mm
mm
kNm
kNm
kNm
mm
mm4
N/mm
N/mm
N/mm
N/mm

< FDataRec.oa_Height
< FDataRec.ScreedVars.Screed - screed depth
< M_sw_jointed[FIdx]
< Msuper[FIdx]
< M_screed_prop[FIdx]
< AyI_comp.y_bar - measured from top of structural floor
< AyI_comp.Ixx
< =1000*P_service/A_slab
< =-1000*P_service*e_centroid*y_Slab_top/Ix_Slab
< =1000*P_service*e_centroid*(h_slab-y_Slab_top)/Ix_Slab
< =P_serv_A_Slab+Ps_eyb_I

N/mm
N/mm
N/mm
N/mm
N/mm
N/mm
N/mm
N/mm
N/mm
N/mm
N/mm

< =P_serv_A_Slab+Ps_eyt_I
< =1000000*M_sw_jointed*y_Slab_top/Ix_Slab
< =-1000000*M_sw_jointed*(h_slab-y_Slab_top)/Ix_Slab
< =1000000*Msuper*(y_comp_top-screed_depth)/Ix_comp
< =-1000000*Msuper*(Overall_Depth-y_comp_top)/Ix_comp
< =1000000*M_screed_prop*(y_comp_top-screed_depth)/Ix_comp
< =-1000000*M_screed_prop*(Overall_Depth-y_comp_top)/Ix_comp
< =P_serv_A_Slab+Ps_eyt_I+M_sws_strs_t+f_scd_top_wet+f_scd_top_prop+f_top_su
< =P_serv_A_Slab+Ps_eyb_I+M_sws_strs_b+f_scd_btm_wet+f_scd_btm_prp+f_btm_su
< =-0.45*SQRT(conc_fcu)
< =conc_fcu/3

4. Elastic Moment of resistance (for non-composite slab only)


3
Z top
1,41E+07 mm
< =Ix_Slab/y_Slab_top
f prestr top
-1,92 N/mm
< =P_serv_A_Slab+Ps_eyt_I
MR elastic top
208,14 kNm
< =(p_comp_serv+f_prestr_top)*Z_top/1000000
Z btm
f prestr btm
MR elastic btm
MR elastic

3
1,42E+07 mm
9,56 N/mm
180,50 kNm

180,50 kNm

< =Ix_Slab/(h_slab-y_Slab_top)
< =P_serv_A_Slab+Ps_eyb_I
< =(f_prestr_btm-p_tens_serv)*Z_btm/1000000
< =MIN(MR_elastic_top,MR_elastic_btm)

BM Calcs
Screed
Mu
Force

Distance
80 mm
385,77 kNm
1906,81 kN

4000 mm

< from left hand end of slab

< FDataRec.ScreedVars.Screed - screed depth


< ULS moment due to gravity loads
< Sum of all Horizontal forces in section

Positive Bending capacity


dcbtm
244,69 mm
deff
248,75 mm

< Distance of Tension Force to Top surface in mm

xpos
Lever arm
MR pos

< =2*(h_slab+screed_depth-dcbtm) - d of Compression blk


< =deff-xpos/2
< =Force*Lever_arm/1000

70,62 mm
213,44 mm
406,99 kNm

Negative Bending capacity


Force neg
1304,64 kN
dcbtm neg
12,13 mm
deff neg
31,25 mm
xneg
24,27 mm
Lever arm neg
19,12 mm
MR neg
24,94 kNm

< Distance of Compression Force to Btm surface in mm

< Sum of all Horizontal forces in section


< Distance of Compression Force to Btm surface in mm
< Distance of Tension Force to Btm surface in mm
< =2*dcbtm_neg - depth of Compression block
< =deff_neg-xneg/2
< =Force_neg*Lever_arm_neg/1000

Shear Calcs
Mo
Section cracked

Distance

4000 mm

< from left hand end of slab

184,97 kNm
< =0.8*fbtm_fibres*Ix_comp/(y_comp*1000000)
< =IF(Mo<Mu,"Section cracked","Section uncracked")

Uncracked Shear (Vco)


V applied

0,00 kN

< UltAppliedShear[FIdx] - Ultimate Applied Shr due to all gravity loads

f average

3,83 N/mm

< fcp_effective - Avg prestress on concrete @ centroid (=P/A)

h effective

147,03 mm

bv effective

768,00 mm

ftension
feff
VcoCap
Cracked Shear (Vcr)
Area steel
Loss fpu
Loss factor
pAs
vc
Vcr1
Vcr2
d effective
Vcr min
Vcr

< h_eff - Effective dpth on which shr is taken - 2nd Mom div by 1st Mom
< bv_effective - nett width of concrete near mid-depth

1,70 N/mm

< =0.24*SQRT(conc_fcu)

2,84 N/mm

< =SQRT(ftension^2+0.8*ftension*fcp_effective)

321,00 kN

1109,68
0,57
0,57
0,58
0,69
90,83
0,00
248,75
135,09
135,09

mm

%
N/mm
kN
kN
mm
kN
kN

< =bv_effective*h_effective*feff/1000

< Total area of tension steel


< =Jacking_Factor*(1-p_Loss_Serv/100)
< =MIN(0.6,Loss_fpu)
< =100*Area_steel/(bv_effective*deff)
< =MAX(0.79*(pAs*40/25)^(1/3)*(400/deff)^(1/4)/1.25,0.35)
< =(1-0.55*Loss_factor)*vc*bv_effective*deff/1000
< =Mo*ABS(V_applied)/Mu
< =IF(Mu>0,deff,deff_neg)
< =0.1*SQRT(conc_fcu)*bv_effective*d_effective/1000
< =MAX(Vcr_min,Vcr1+Vcr2)