Wellbore departure
Types of Sidetracks
Types of Sidetracks
Open hole
Open hole
whipstock
Cement
plug
Cased hole
Cased hole
whipstock
Section mill
Why sidetracking
Production Increase
Slot Reuse
Planned
Multilateral
Horizontal
Reason for
Sidetrack
Obstruction
Collapsed Casing
Unplanned
Directional Issues
Target change
DRILCO
NON-MAGNETIC
COLLAR
SERVCO
40'
MUD MOTOR
SERVCO
Mill Section
20 to 40 feet of casing
High amount of metal
Underream the section
Cement Plug
Sidetrack with Bit and Motor
MUD MOTOR
3' REDRILL
1 to 5
PER 100'
MILL SECTION
UNDERREAMER
CEMENT PLUG
SIDETRACK
Anchors
Mechanical
Retrievable
Packer
Permanent Packer
Expandable
Gauge Section
Elongates full gauge window
Reduce DLS
Optional hook slot for retrieval
Thicker whip cross-section
Mid-Ramp
Mechanically pushes mill across casing
center (15)
Reduces center point coring
Hinge Pin
Can be used with various types of Whipstocks and
anchors. (not cementing)
Allows the top of the whipstock to lay flush with the
wellbore
Allows flexibility when passing though doglegs
The Hinge Pin can be modified, adding shims, to allow
the whipstock to be set Low Side
Accessories
Hook Retrieval Tool
Mid Ramp
Fastrack Mills
Trimill (Formaciones con UCS < 15000 PSI)
Cutter Technology
Crushed Sintered Carbide
Millmaster Inserts
Used in the Follow Mill and Dress
Mill
Used also in Lead Mill for soft to
medium formation
GeoTrack Mills
Applicable for cased and
open hole applications
Impact and wear resistant
PDC cutting structure
Designed for extended
rathole when using
steerable BHAs.
Standard Pin connection
allows connection to PDM
or rotary BHA.
Running Tool
Slide 20
Slide 21
Orient Whipstock
Non-Advancing Multi-Cycle
Bypass Valve
Use with MWD
Six cycles of closing/opening
Perform surface test prior to
use
NAMCBPV piston
Hi-flow piston
Page 15
23
Whipsim
IAW
I-DRILL
Slide 24
Static
PC based where user performs simulation
Simulation time: minutes
Dynamic
Linux based simulation ran in China using PC
based user input format
Result time frame: 81% prob. 48hrs or less
Dynamic
Linux based ran by I-Drill group
Result time frame: ~ 2 weeks
CORRIDA DE CALIBRACION
1
BIT SUB
WATER MELON
CAISING SCRAPER
SUB DOBLE CAJA
Sistema de acople
Bajada de el sistema
La valvula bypass permitira el autollenado de la tuberia por
lo que no sera necesario prender bombas para dicho
proposito.
Bombas nunca debe ser encendidas durante la bajada de el sistema.
Customer:
Field:
Well:
PDVSA PETROLEO
PETROMONAGAS
CHC 0913
Job #:
Rig:
Date:
Posicionamiento de el sistema
Expandable Anchor
Mechanical Anchor
8878-232136
PDV-22
25/09/2013
4,782
Top Collar
4,789
Top of Whipstock
4,803
Bottom of
Window/Whipstock
4,817
Bottom of Formation
Casing Information
Size:
Weight:
Grade:
I.D.:
Drift I.D.:
Wall:
OD_9.625
43.500
N-80
8.755
8.599
0.435
4,814
4,819
Bottom of Tool
Bottom Collar
Orientacion de Whipstock
0
(North)
0
(High Side)
90
(LOHS)
90
(ROHS)
90
(East)
180
(South)
180
(OHS)
270
(West)
de
de
Asentamiento de el sistema
Asegurarse que las bombas tengan la suficiente capacidad
para el asentamiento del equipo (de 3000 a 3500 PSI).
El taladro debe tener suficiente capacidad para el peso de la
sarta de perforacin y capacidad de reserva para seccionar
el perno de cizallamiento. (55 Klb)
Una vez en profundidad reciprocar la tubera. Compaa
Gyrodata hara un viaje con su herramienta para confirmar la
orientacion del equipo.
Una vez orientado el equipo adecuadamente se realiza
asentamiento presurizando hasta 3000 PSI. Verificar
asentamiento con 15 klbs de peso y tension.
Apertura de Ventana
Abrir ventana utilizando los siguientes parmetros:
Parmetros para un 9 5/8 casing:
RPM: 80 - 120
WOB: 2 - 15 Klb
Calibracion en superficie
Desgaste de la ultima fresa no debe exceder 3/8 para
garantizar la calidad de ventana y el paso de el proximo
esamblaje a travez de ella.
Un viaje adicional sera necesario en caso un desgaste mayor
al mencionado.
Otras considernaciones
El especialista o Ingeniero de campo mantedran informado a todo el
personal involucrado de la operacion a realizarse.
Le velocidad de bajada sera condiciona hasta un maximo de 10 parejas
por hora al momento de bajar emsamblaje de asentamiento.
Pildoras viscosas deben ser bombeadas por cada 3 pies de milado
durante la apertura de la ventana para garantizar la limpieza de virutas
metalicas.
Personal de control de solidos sera el responsible de la limpieza de los
imanes.
El personal de la compania direccional seran los encargados de scribe el
tool face del Whipstock con Orienting Sub o MWD segun sea el caso.
La ventana sera la nueva zapata de el pozo.
GRACIAS!!