CONSTRUCTION OF OFFSHORE
PLATFORMS AND PIPELINES
DISCIPLINE
ENGINEER
TRANSPORTATION AND
INSTALLATION
Date:
PROJECT
ENGINEER
Date:
CERTIFIED BY
Date:
OF
CONSTRUCTION
AGENCY
Date:
OPERATIONS
CONTROL NUMBER
By:
Date:
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
1
of
32
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
CERT
PMT
OPERNS.
5.0 WELDING
7
11
DATE
16
17
19
12.0 GROUTING
23
24
25
26
16.0 CLEAN-UP
26
27
28
31
DISCIPLINE
ENGINEER
Date:
PROJECT
ENGINEER
Date:
CERTIFIED BY
Date:
CONSTRUCTION
AGENCY
Date:
OPERATIONS
By:
Date:
CONTROL NUMBER
(*)
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
1.0 SCOPE
REV.
NO.
JOB/EWO
DESCRIPTION
ENGG
TABLE OF CONTENTS
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
CERT
PMT
1.0
SCOPE
ENGG
This Specification defines the minimum requirements for installation of offshore facilities
including offshore transportation, launching, lifting, upending, setting and final installation
of jackets, piles, conductors, decks and equipment as described herein and as shown on
the Contract Drawings.
DESCRIPTION
REV.
NO.
DATE
JOB/EWO
2.1
DISCIPLINE
ENGINEER
Date:
PROJECT
ENGINEER
DE-119887
Structural Materials
DE-119889
DE-119892
DE-119893
DE-119895
DE-119957
DE-119896
Welding
DE-119959
Date:
CERTIFIED BY
2.2
Date:
CONSTRUCTION
AGENCY
Date:
OPERATIONS
By:
Date:
CONTROL NUMBER
SAES-H-100
SAES-H-101
SAES-M-005
SAES-Q-004
SAES-W-011
SAES-W-012
SAES-W-013
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
OPERNS.
2.0
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
OPERNS.
ENGG
CERT
PMT
AE-036386
AE-036451
DATE
JOB/EWO
DESCRIPTION
O.I. 1.519
M.I. 1197.001
---
AHSOPS
Form 3063
REV.
NO.
The latest edition of the following Industry Codes and Specifications shall apply:
DISCIPLINE
ENGINEER
AISC
API RP-2A
Planning, Designing
Platforms
AWS D1.1
AWS A5
SSPC
Date:
PROJECT
ENGINEER
Date:
CERTIFIED BY
3.0
Date:
CONSTRUCTION
AGENCY
(*)
Offshore
3.2
Any deviation from this Specification, Scope of Work, or from the Contract
Drawings will not be permitted unless prior written approval is obtained from
SAUDI ARAMCO. Responsibility for identifying differences and/or deviations
and obtaining approval shall rest with CONTRACTOR.
By:
Date:
CONTROL NUMBER
Fixed
SPECIFICATION FOR
(DCC) NO.:
EDSD
VERIFICATION
REVISION CERTIFICATION
Constructing
3.1
OPERATIONS
Date:
and
GENERAL REQUIREMENTS
Date:
G.I. 0002.100
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
3.4
3.5
3.6
3.7
3.8
ENGG
DESCRIPTION
JOB/EWO
DATE
REV.
NO.
Date:
PROJECT
ENGINEER
Date:
CERTIFIED BY
3.9
All construction barges are required to have three attendant anchor handling
tug boats while in the SAUDI ARAMCO concession area. In addition, no
cargo barge shall be left unattended whether in the field or at anchorage
outside the field. Each cargo barge shall be attended by its own tug at all
times. Each vessel shall meet the requirements of SAUDI ARAMCO
Operating Instruction No. 1.519 and the "Basic Marine Vessel Specifications
and Requirements" document. In addition, vessels shall meet the
requirements of Specification DE-119959.
3.10
CONTRACTOR shall move into the work site only after all applicable
provisions of SAUDI ARAMCO Operations Instruction No. 1.519 and the
"Basic Marine Vessel Specifications and Requirements" document have been
met. This includes but is not limited to the notification period for offshore
installation and testing equipment, the submittal of all required procedures, a
Work Review and Planning Meeting with CONTRACTOR's representative in
attendance, and compliance with General Instruction No. 0002.100 for Work
Permit issuance. These provisions apply to each separate work site move-in.
No work shall be performed without a Work Permit. CONTRACTOR shall be
responsible for obtaining Work Permits on a timely basis to start work.
Date:
CONSTRUCTION
AGENCY
Date:
OPERATIONS
CONTROL NUMBER
By:
Date:
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.3
CERT
PMT
OPERNS.
DISCIPLINE
ENGINEER
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
All barges and vessels utilizing anchors shall have fluke and gravity style
anchors decked or secured with a double strap clear of the water in an Aframe during anchor movements across pipelines or cables regardless of
water depth.
3.12
CONTRACTOR shall provide a daily installation report for the installation work
in accordance with Specification DE-119895 and Appendix A, Daily Installation
Report (Sample).
3.13
CONTRACTOR shall provide a senior full time English speaking Safety Officer
on all construction barges, diving vessels, and work boats. One Safety Officer
per shift is required on construction barges. Safety Officer shall report either
to the Master or Barge Superintendent. Safety Officer shall have full authority
to stop work at any time that he should see fit based on breaches of safety.
Safety Officer shall be familiar with SOLAS regulations, diving procedures and
regulations, life saving operations, fire equipment and breathing apparatus,
helicopter safety, hygiene standards, SAUDI ARAMCO Work Permit
requirements, SAUDI ARAMCO emergency procedures, and all other aspects
of offshore work. Safety Officer shall also be responsible for implementing
and enforcing CONTRACTOR's safety program and procedures. Safety
Officer shall be subject to the approval of SAUDI ARAMCO and may be
subject to a SAUDI ARAMCO test at SAUDI ARAMCO's discretion.
3.14
CONTRACTOR shall be responsible for ensuring that the owners of all nonCONTRACTOR owned vessels used by CONTRACTOR in the performance of
any part of the work in Saudi Arabian waters have a Port Captain and Port
Engineer on 24-hour call resident in the Eastern Province of Saudi Arabia
during the course of the work.
ENGG
DESCRIPTION
JOB/EWO
DATE
REV.
NO.
Date:
PROJECT
ENGINEER
3.15
Date:
CERTIFIED BY
The term "pile" as used in this Specification shall be taken to mean both main
pile and conductor. Otherwise, they will be differentiated as "main pile" and
"conductor".
Date:
CONSTRUCTION
AGENCY
Date:
4.0
4.2
4.3
OPERATIONS
CONTROL NUMBER
By:
Date:
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.11
CERT
PMT
OPERNS.
DISCIPLINE
ENGINEER
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
CERT
PMT
4.4
JOB/EWO
DESCRIPTION
ENGG
5.0
WELDING
5.1
All welding, weld inspection, and other similar welding activities shall be
conducted in accordance with Specifications DE-119896 and SAES-W-011,
SAES-W-012 and SAES-W-013 as applicable.
5.2
5.3
5.4
PROTECTIVE COATINGS
6.1
6.2
REV.
NO.
DATE
6.0
Date:
PROJECT
ENGINEER
Date:
CERTIFIED BY
Date:
CONSTRUCTION
AGENCY
7.0
SURVEY REQUIREMENTS
7.1
General
7.1.1
7.1.2
Date:
OPERATIONS
CONTROL NUMBER
By:
Date:
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
OPERNS.
DISCIPLINE
ENGINEER
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
DESCRIPTION
ENGG
CERT
PMT
7.1.3
CONTRACTOR shall provide a dive survey vessel for the pre and
post construction surveys. This vessel shall have a propulsion unit
complete with bow thruster, and a four point mooring system meeting
the requirements of SAUDI ARAMCO Operating Instruction No.
1.519 and the "Basic Marine Vessel Specifications and
Requirements" document and Specification DE-119959 together with
a hydraulically powered telescopic crane with a 5-ton capacity at 40
foot radius, fully qualified and experienced personnel and the
necessary survey equipment including the following in addition to
that described in Section 7.2.2 of this Specification:
JOB/EWO
DATE
REV.
NO.
7.2
Barge Management
7.2.1
General
CONTRACTOR shall supply a comprehensive barge management
system (BMS) configured to provide accurate positioning facilities to
CONTRACTOR's construction/installation barges and associated
anchor handling tugs (AHTs) in accordance with the "Basic Marine
Vessel Specifications and Requirements" document.
Date:
PROJECT
ENGINEER
Date:
CERTIFIED BY
7.2.2
Date:
7.2.2.2
CONSTRUCTION
AGENCY
Date:
OPERATIONS
CONTROL NUMBER
By:
Date:
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
OPERNS.
DISCIPLINE
ENGINEER
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
7.2.2.3
ENGG
CERT
PMT
(*)
DESCRIPTION
JOB/EWO
DATE
7.3
7.3.1
REV.
NO.
Pre-Construction Survey
Date:
PROJECT
ENGINEER
Date:
CERTIFIED BY
Date:
CONSTRUCTION
AGENCY
7.3.2
Date:
OPERATIONS
By:
Date:
SPECIFICATION FOR
(DCC) NO.:
CONTROL NUMBER
Date:
EDSD
VERIFICATION
DISCIPLINE
ENGINEER
REVISION CERTIFICATION
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
OPERNS.
7.2.3
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
DESCRIPTION
ENGG
CERT
PMT
7.3.3
7.4.2
REV.
NO.
DATE
JOB/EWO
7.4
Date:
PROJECT
ENGINEER
7.4.2.1
7.4.2.2
7.4.2.3
Date:
CERTIFIED BY
7.5
Post-Construction Survey
Date:
CONSTRUCTION
AGENCY
7.5.1
7.5.2
Date:
OPERATIONS
CONTROL NUMBER
By:
Date:
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
10
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
OPERNS.
DISCIPLINE
ENGINEER
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
7.5.4
7.5.5
7.5.6
7.5.7
ENGG
DESCRIPTION
JOB/EWO
DATE
REV.
NO.
Date:
PROJECT
ENGINEER
8.0
Date:
CERTIFIED BY
Installation Spread
CONTRACTOR shall refer to Appendix C, Installation Spread Pre-Mobilization
Survey Requirements, for details of the installation spread pre-mobilization
requirements. Reference is made to SAUDI ARAMCO Operating Instruction No.
1.519 and the "Basic Marine Vessel Specifications and Requirements" document
for addition details.
Date:
CONSTRUCTION
AGENCY
Date:
OPERATIONS
8.1.2
8.1.3
By:
Date:
CONTROL NUMBER
8.1.1
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
11
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7.5.3
CERT
PMT
OPERNS.
DISCIPLINE
ENGINEER
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
Three dedicated anchor handling tug boats one of which will serve as
a tow tug. One of the non-towing tugs shall be equipped with a Aframe capable of clearing from the water the largest size gravity
anchor to be used.
8.1.5
ENGG
DESCRIPTION
8.2
Construction/Installation Barge(s)
REV.
NO.
DATE
JOB/EWO
Date:
PROJECT
ENGINEER
Mooring system - (eight winches, eight gravity anchors, and eight fluke
type anchors
Mooring system with winch tension and length meters, brake status
indicator, friction control, visible or TV monitored drums (from control
room), and remote and adjacent emergency stop switches
Scott (or SAUDI ARAMCO approved equivalent) air packs (in sufficient
quantity)
Date:
CERTIFIED BY
Date:
CONSTRUCTION
AGENCY
Date:
OPERATIONS
CONTROL NUMBER
By:
Date:
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
12
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.1.4
CERT
PMT
OPERNS.
DISCIPLINE
ENGINEER
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
CERT
Jetting/airlifting equipment
Color monitors in the SAUDI ARAMCO office to monitor diving (and ROV if
applicable) operations complete with audio
JOB/EWO
DATE
REV.
NO.
All equipment shall be suitable for the water depths, facility component sizes,
and facility component weights described in the Scope of Work and Contract
Drawings. Crane operators shall be English speaking. Gravity anchors shall
have friction teeth. Damage prevention buoys shall as much as possible be of a
uniform size. Qualified labor, certified welders and supervision to accomplish the
work shall be provided. Communications equipment and facsimile machines
shall be compatible with Saudi Arabian communications system.
Date:
PROJECT
ENGINEER
Date:
CERTIFIED BY
Date:
CONSTRUCTION
AGENCY
Date:
OPERATIONS
CONTROL NUMBER
By:
Date:
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
13
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
DESCRIPTION
ENGG
OPERNS.
DISCIPLINE
ENGINEER
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
Qualified inspection personnel, including as a minimum:
-
DESCRIPTION
ENGG
CERT
PMT
8.3.1
8.3.2
REV.
NO.
DATE
JOB/EWO
Anchor Patterns
DISCIPLINE
ENGINEER
Date:
PROJECT
ENGINEER
Date:
CERTIFIED BY
8.3.3
8.3.4
Date:
CONSTRUCTION
AGENCY
Date:
OPERATIONS
Reporting
A general daily record of all work carried out on the installation barge shall be
maintained including details of anchor movements, loading operations, weather
downtime, installation progress, hold-ups for repairs and mechanical downtime,
and other related activities. This information in combination with Appendix A,
Daily Installation Report (Sample), and Specification DE-119895 shall be
submitted by CONTRACTOR to SAUDI ARAMCO.
By:
Date:
CONTROL NUMBER
8.4
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
14
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
OPERNS.
8.3
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
CERT
PMT
8.5
Procedures
8.5.1
General
DESCRIPTION
ENGG
REV.
NO.
DATE
JOB/EWO
8.5.2
Transportation
Jacket Installation
Pile Installation
Grouting
Deck Installation
Date:
PROJECT
ENGINEER
(*)
8.5.3
Date:
8.5.3.2
8.5.3.3
CERTIFIED BY
Date:
CONSTRUCTION
AGENCY
Date:
OPERATIONS
CONTROL NUMBER
By:
Date:
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
15
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
OPERNS.
DISCIPLINE
ENGINEER
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
"As-Built" Drawings
8.6.1
8.6.2
8.6.3
8.6.4
REV.
NO.
DATE
JOB/EWO
DESCRIPTION
ENGG
CERT
PMT
8.6
9.0
Date:
PROJECT
ENGINEER
Date:
CERTIFIED BY
(*)
TRANSPORTATION
9.1
9.2
9.3
9.4
9.5
Date:
CONSTRUCTION
AGENCY
Date:
OPERATIONS
By:
Date:
CONTROL NUMBER
(*)
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
16
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
OPERNS.
DISCIPLINE
ENGINEER
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
CERT
PMT
(*)
10.1.1
(*)
10.1.2
10.1.3
The proposed installation method shall provide for the safety of all
personnel and the prevention of damage to, or loss of the various
component structures that comprise the jacket.
Installation
equipment shall be provided in sufficient quantity, quality and
capacity to perform the required work.
10.1.4
REV.
NO.
DATE
JOB/EWO
DESCRIPTION
ENGG
10.1
10.2
Date:
The location and orientation of the jacket shall be as specified on the Contract
Drawings and detailed in the Scope of Work. Marker buoys or other means shall
be provided by CONTRACTOR to locate the general jacket location as
prescribed in the Scope of Work.
PROJECT
ENGINEER
Date:
CERTIFIED BY
10.3
Seabed Survey
Date:
CONSTRUCTION
AGENCY
10.3.1
10.3.2
CONTRACTOR shall remove all debris, humps and other sea floor
imperfections which might hinder the jacket installation.
10.3.3
Date:
OPERATIONS
CONTROL NUMBER
By:
Date:
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
17
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
OPERNS.
DISCIPLINE
ENGINEER
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
Setting Jacket
10.4.1
Immediately after setting the jacket on the seabed, the water level
shall be read from a tide gauge provided by CONTRACTOR. The
reading shall be compared to the calculated water level taking into
account the tide variation given by the tide tables for that location at
that time and day, adjusted to L.A.T.
10.4.2
If the tide gauge reading is more than the tolerance allowed in the
Scope of Work from the required reading, CONTRACTOR shall take
remedial action as agreed with SAUDI ARAMCO that may include
jetting around legs and mud mats or applying a load at the top of
each jacket leg equal to the static weight of the pile driving hammer
in an attempt to lower the jacket.
DESCRIPTION
ENGG
CERT
PMT
10.4
JOB/EWO
10.5.1
Stab and partially drive the pile on the low corner. Then level the
jacket and temporarily weld this pile to the jacket.
10.5.2
Verify the level and perform a similar procedure on the other corner if
also found to be low.
10.5.3
10.5.4
REV.
NO.
If the jacket is out of level by more than the tolerance allowed in the Scope of
Work, leveling shall be attempted in accordance with the following procedure:
DATE
Leveling Jacket
DISCIPLINE
ENGINEER
Date:
PROJECT
ENGINEER
Date:
CERTIFIED BY
Date:
CONSTRUCTION
AGENCY
10.6
Date:
OPERATIONS
CONTROL NUMBER
By:
Date:
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
18
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
OPERNS.
10.5
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
CERT
PMT
11.1.1
11.1.2
11.1.3
REV.
NO.
DATE
JOB/EWO
DESCRIPTION
ENGG
(*)
General Requirements
11.2
Date:
PROJECT
ENGINEER
Pile Driving
11.2.1
11.2.2
11.2.3
11.2.4
A cushion block shall be provided at the top of the pile. The cushion
material shall not compress to the extent that the cushioning effect is
lost.
The cushion blocks used shall be in accordance with
recommendations of the hammer manufacturer such as Hammortex
or Nicas. All other cushion block materials shall be subject to prior
SAUDI ARAMCO approval.
Date:
CERTIFIED BY
Date:
CONSTRUCTION
AGENCY
Date:
OPERATIONS
CONTROL NUMBER
By:
Date:
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
19
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
OPERNS.
DISCIPLINE
ENGINEER
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
11.2.6
11.2.7
11.2.8
11.2.9
If the prevailing soil conditions are such that an adequate blow count
is not achieved at terminal penetration, SAUDI ARAMCO may at its
discretion require that an additional pile add-on be driven to achieve
the minimum required blow count.
ENGG
DESCRIPTION
JOB/EWO
DATE
REV.
NO.
11.2.10 Field splices shall be made as shown on the Contract Drawings. The
pile head shall be inspected for damage after driving and shall be
cut-off to a minimum of 6 inches with a maximum cut off allowance
as shown on the Contract Drawings.
Date:
PROJECT
ENGINEER
Date:
CERTIFIED BY
Date:
CONSTRUCTION
AGENCY
Date:
OPERATIONS
By:
Date:
CONTROL NUMBER
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
20
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
11.2.5
CERT
PMT
OPERNS.
DISCIPLINE
ENGINEER
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
Pile designation
Penetration - meters
Splice locations
DATE
CERT
ENGG
DESCRIPTION
JOB/EWO
Date:
PROJECT
ENGINEER
Date:
CERTIFIED BY
11.3
Date:
CONSTRUCTION
AGENCY
Drilling
11.3.1
Drilling of soil plugs, pilot holes or for insert piles shall be conducted
in accordance with Specification SAES-Q-004 and this Specification.
11.3.2
In the event that a pile has met refusal and can no longer be driven
using CONTRACTOR pile driving equipment and the design
penetration has not been attained, SAUDI ARAMCO may require
CONTRACTOR to use one of several procedures to achieve a
penetration that is acceptable to SAUDI ARAMCO.
11.3.3
Date:
OPERATIONS
CONTROL NUMBER
By:
Date:
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
21
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
REV.
NO.
OPERNS.
DISCIPLINE
ENGINEER
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
11.3.5
The drill rig for these operations shall be a power swivel type as
specified in Contract Schedule "B", or better. A pile top drill unit shall
also be supplied as specified in Contract Schedule "B" (or better) to
operate independently from the barge during inclimate weather.
11.3.6
11.3.7
11.3.8
11.3.9
ENGG
DESCRIPTION
JOB/EWO
DATE
REV.
NO.
Date:
PROJECT
ENGINEER
11.4
Insert Piles
Date:
CERTIFIED BY
11.4.1
11.4.2
11.4.3
The holes for grouted insert piles shall provide at least 3 inches clear
cover space around the pile. In order to provide a straight true hole
stabilizers shall be used.
Date:
CONSTRUCTION
AGENCY
Date:
OPERATIONS
CONTROL NUMBER
By:
Date:
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
22
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
11.3.4
CERT
PMT
OPERNS.
DISCIPLINE
ENGINEER
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
Drilling mud shall be used in accordance with Specification SAES-Q004. Drilling mud supply shall be adequate to maintain a continuous
drilling operation.
11.4.5
Insert piles shall be of the size and length indicated on the Contract
Drawings or as otherwise determined by SAUDI ARAMCO. All insert
piles shall be equipped with centralizers at maximum spacings of 9
meters to ensure proper alignment in the pre-drilled holes and to
permit a grout envelope to form uniformly around the entire pile.
11.4.6
Insert piles shall be placed in the pre-drilled holes under their own
weight or with the additional weight of the pile hammer originally
intended to drive the pile to target penetration.
11.4.7
ENGG
DESCRIPTION
JOB/EWO
12.0 GROUTING
REV.
NO.
DATE
12.1
General
12.1.1
Grouting shall conform to the requirements of Specification SAES-Q004 and this Specification.
12.1.2
Date:
PROJECT
ENGINEER
Date:
CERTIFIED BY
12.1.3
12.1.4
12.1.5
12.1.6
Cement shall be mixed with 48 percent sea water by weight and shall
have a minimum 7-day strength of 2500 psi. This is equivalent to the
mixing ratio:
Date:
CONSTRUCTION
AGENCY
Date:
OPERATIONS
CONTROL NUMBER
By:
Date:
Cement
Sea Water
Slurry
94 lb sack
45 lb (5.3 gals)
50 kg sack
24 kg (24 liters)
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
23
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
11.4.4
CERT
PMT
OPERNS.
DISCIPLINE
ENGINEER
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
Grouting Procedures
12.2.1
12.2.2
12.2.3
12.2.4
12.2.5
12.2.6
REV.
NO.
DATE
JOB/EWO
DESCRIPTION
ENGG
CERT
PMT
12.2
Date:
PROJECT
ENGINEER
Date:
CERTIFIED BY
Date:
CONSTRUCTION
AGENCY
General
13.1.1
13.1.2
Date:
OPERATIONS
CONTROL NUMBER
By:
Date:
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
24
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
OPERNS.
DISCIPLINE
ENGINEER
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
13.1.4
Critical welds such as deck leg to pile, deck leg splices, pile
transitions, truss/girder splices and so forth, shall be completed,
tested and inspected before succeeding components or major
equipment is installed.
13.1.5
Deck Tolerances
13.2.1
The final elevation of the platform decks shall be within the design
elevation tolerance stipulated in the Contract Drawings and Scope of
Work. A constant step height shall be provided for all staircases with
one full step at the bottom and at the top.
13.2.2
ENGG
DESCRIPTION
REV.
NO.
DATE
JOB/EWO
13.2
Date:
PROJECT
ENGINEER
Date:
CERTIFIED BY
Date:
CONSTRUCTION
AGENCY
Date:
OPERATIONS
14.2
By:
Date:
CONTROL NUMBER
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
25
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
13.1.3
CERT
PMT
OPERNS.
DISCIPLINE
ENGINEER
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
OPERNS.
15.1
15.2
15.3
15.4
DESCRIPTION
ENGG
CERT
PMT
REV.
NO.
DATE
JOB/EWO
16.0 CLEAN-UP
DISCIPLINE
ENGINEER
Before the work is accepted, CONTRACTOR shall return all SAUDI ARAMCO
surplus material to a location designated by SAUDI ARAMCO.
16.2
16.3
CONTRACTOR shall remove any objects which may intentionally or unintentionally be deposited on the seabed or platforms during the course of the work.
Date:
PROJECT
ENGINEER
Date:
CERTIFIED BY
Date:
CONSTRUCTION
AGENCY
Date:
OPERATIONS
CONTROL NUMBER
By:
Date:
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
16.1
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
26
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
PMT
APPENDIX A
CERT
SAMPLE
ENGG
OPERNS.
DESCRIPTION
Date:
COMPANY Supt.
CONTRACTOR Supt.
JOB/EWO
DATE
D) Comments:
REV.
NO.
TIME OF DAY
H
REPORT ITEM
8H
12H
16H
20H
DISCIPLINE
ENGINEER
Date:
PROJECT
ENGINEER
Date:
CERTIFIED BY
Tide
Wind Direction/Velocity
Significant Wave Height
Wave Direction/Period
Water Dept. Feet
Date:
CONSTRUCTION
AGENCY
OPERATIONS
Barge Location
By:
Date:
CONTROL NUMBER
Pile Driving
Diving
SPECIFICATION FOR
(DCC) NO.:
EDSD
VERIFICATION
Date:
REVISION CERTIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
27
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
PMT
APPENDIX B
CERT
OPERNS.
ROV REQUIREMENTS
ENGG
(*)
General
DESCRIPTION
This Appendix identifies the specific items that CONTRACTOR shall address as part of
the required ROV procedure submittal to SAUDI ARAMCO if specified in the Scope of
Work.
CONTRACTOR shall provide a complete specification and description to cover the
following ancillary equipment as specified in the Scope of Work.
REV.
NO.
DATE
JOB/EWO
DISCIPLINE
ENGINEER
Date:
PROJECT
ENGINEER
Date:
CERTIFIED BY
Date:
CONSTRUCTION
AGENCY
Date:
CONTRACTOR shall state the number of personnel required and the type of ROV
necessary to undertake the work and to operate the required ancillary equipment.
Ancillary equipment for any one type of ROV shall be interchangeable. Complete
spares and back up parts or systems shall be provided on board the support vessel.
CONTRACTOR shall provide operating procedures for the ROVs including launch and
recovery, and video tape recording of underwater operations. CONTRACTOR shall also
provide a description of emergency and back-up procedures including but not limited to:
Performance characteristics shall be provided for the ROV and shall include, but not be
limited to:
OPERATIONS
By:
Date:
CONTROL NUMBER
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
28
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
PMT
ENGG
APPENDIX B
CERT
OPERNS.
In addition, CONTRACTOR shall also state limiting conditions, if any, for operating near
and around structures and for dives in poor visibility or with no natural daylight.
DESCRIPTION
Video
JOB/EWO
CONTRACTOR shall supply a closed circuit TV camera system and identify in the
procedure details of:
ROV mounted camera(s) with remote pan/tilt and focus 75 mm to infinity, built-in
monitor, and all spares and back-up.
REV.
NO.
DATE
DISCIPLINE
ENGINEER
Date:
PROJECT
ENGINEER
Date:
Video recording equipment compatible with survey vessel power supplies, with
duplicated monitors and recorders.
Video typewriter (VTM) having the ability to input on-line annotation (that is, numerals,
alphabet characters).
CONTRACTOR shall provide a schematic layout of the recording and peripheral video
components, indicating their inter-connections and indicating both audio and visual
paths.
CERTIFIED BY
Date:
CONSTRUCTION
AGENCY
Date:
OPERATIONS
CONTRACTOR shall identify in the procedure the provision of regular summary videos
of fifteen minutes (approximate) duration that are edited to contain highlights as required
by SAUDI ARAMCO. The video tapes shall become the property of SAUDI ARAMCO,
and shall be indexed, referenced and submitted as part of the diving and ROV reports.
CONTRACTOR shall state in the procedure that no video tapes will be erased or
disposed without prior written agreement of SAUDI ARAMCO.
By:
Date:
CONTROL NUMBER
Videos shall meet the requirements of Sections 7.0 and 8.0 of this Specification.
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
29
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
PMT
ENGG
APPENDIX B
CERT
OPERNS.
35 mm color camera for ROV mounting, with remote pan/tilt and focus, together
with all necessary strobe lights, ancillary equipment, back-up and spares.
The procedure shall state that all prints and negatives shall become the property
of SAUDI ARAMCO. No prints may be reproduced or published under any
circumstances unless specific permission is granted in writing by SAUDI
ARAMCO.
REV.
NO.
DATE
JOB/EWO
DESCRIPTION
DISCIPLINE
ENGINEER
Date:
PROJECT
ENGINEER
Date:
CERTIFIED BY
Date:
CONSTRUCTION
AGENCY
Date:
OPERATIONS
CONTROL NUMBER
By:
Date:
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
30
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
PMT
APPENDIX C
CERT
OPERNS.
DESCRIPTION
ENGG
REV.
NO.
DATE
JOB/EWO
Vessel
DISCIPLINE
ENGINEER
Date:
PROJECT
ENGINEER
Date:
Structural
Corrosion*
Gantries*
Storm Anchor(s)
Helideck**
Machinery Systems:
Electrical Generation
Steam
Ballasting
Fresh Water
Ventilation
Fuel & supply
Fire Fighting*
Emergency Exits*
Safety Equipment*
CERTIFIED BY
Date:
CONSTRUCTION
AGENCY
Date:
OPERATIONS
CONTROL NUMBER
By:
Date:
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
31
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps
PMT
ENGG
APPENDIX C
CERT
OPERNS.
Construction Equipment
DESCRIPTION
Cranes**
Bevelling Equipment
Line-up Clamps
Welding - Automatic, Semi-automatic and Manual
NDE Equipment
Coating Application Equipment
REV.
NO.
DATE
JOB/EWO
DISCIPLINE
ENGINEER
Miscellaneous Equipment
Date:
PROJECT
ENGINEER
Date:
CERTIFIED BY
Date:
CONSTRUCTION
AGENCY
Support Vessels**
Date:
OPERATIONS
CONTROL NUMBER
By:
Date:
*
**
***
SPECIFICATION FOR
(DCC) NO.:
REVISION CERTIFICATION
EDSD
VERIFICATION
Date:
DOC
SAUDI ARABIA
*
JOB# *
DRAWING NO.
DE-119894
32
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
lcp\DE-119894 Trans-Install of
Jackets & Decks\09 feb 99\jps