Clause Title
Page
702 Horizontal Alignments, Surface Levels, Thickness and Surface Regularity of Pavement
Courses
703 Weather Conditions for Laying of Unbound Granular and Cementitious Materials
708 Weather Conditions for Laying of Asphalt Wearing Course and Other Bituminous
Pavement Layers
709 Cold Milling (Planing) of Bituminous Bound Flexible Pavement. (Cold Milling is described
in Clause 917)
710 Testing for Constituent Materials in Recycled Coarse Aggregate and Recycled, Concrete
Aggregate
March 2003
Volume 1
Specification for Road Works
Series 700
Road Pavements- General
4mm
6mm
+ 5 to
+10mm
10mm
6mm
10mm
20mm
20mm
15mm
20mm
20mm
25mm
March 2003
Volume 1
Specification for Road Works
Series 700
Road Pavements- General
30mm
30mm
30mm
25mm
March 2003
Surfaces of
all other courses
Tol.
Tol.+3mm
(mm)
(mm)
Case a
4mm
7mm
Case b
6mm
9mm
10mm
10mm
13mm
Length (m)
75
300
75
A: Arterial and
Distributor
roads*
B: Other traffic
areas*
20 9
40
18
40 18
60
27
15mm
20mm
Volume 1
Specification for Road Works
Series 700
Road Pavements- General
TABLE 7/2: Limiting Values for Layer Thicknesses lower than Specified
Wearing course ),
binder course and
asphalt base course
together
Wearing course 1)
and asphalt base
course together
Wearing course1)
and binder course
together
Wearing course1)
Combined
Base/Wearing
course
1. Construction areas
greater 3000m or
urban roads over
500m and wearing
courses with more
than 50kg/m
10%
10%
10%
2. Small construction
areas and wearing
courses
up
to
50kg/m
15%
15%
15%
10%
15%
15%
25%
25%
a) Mean Value
b) Single values
1) The values of line b) are applied analogously in case of stage construction, that means if the final surfacing (binder
course and wearing course) will be laid later: therefore a value of 25% is allowed for the upper layer of the
provisional surfacing of the first stage, for the provisional surfacing and the asphalt base course together a value of
15%.
TABLE
7/4:
Tolerances
for
Surface
Irregularities after mechanical laying (4m
length).
On base which is
not bound by binder
On base which is
bound by binder
and the permissible
irregularity of the
base is higher than
6mm
On asphalt base
with
permissible
irregularity of less
than 6mm
Combined
base/wearing
courses
Binder
courses
Wearing
courses
10mm
10mm
10mm
6mm
6mm
(case b)
4mm
(case a)
March 2003
Volume 1
Specification for Road Works
March 2003
Series 700
Road Pavements- General
Volume 1
Specification for Road Works
March 2003
Series 700
Road Pavements- General
Volume 1
Specification for Road Works
Series 700
Road Pavements- General
March 2003
Volume 1
Specification for Road Works
Series 700
Road Pavements- General
Compressed Air
March 2003