CHECKLIST FOR ERECTION OF USS (33 KV)

Project
:

Rating:

Locatio
n

Make:

FQAP/I
TP No:

Drawin
g no:

Sl.
Parameters to be
No.
Checked
General:
1
Foundation
Dimensions and
grade
2
Double pole
Structure
Dimensions ;
material properties
and fasteners
details
4
Conductor Ground
Clearances(Minimu
m)*
PIN & String
5
Insulator assembly
Lightning Arrester:
6
Levelling /
Alignment /
Orientation &
verticality
7
Tightness structure
bolts & nuts with
washers
8
Earthing

Insulation resistance
test
( Megger Volts=
5000 V)

Start
Date/Time
:
Finish
Date/Time
:
Contracto
r:

Acceptance reference
/criteria

Observatio
ns

Remarks

Required
Clearance
5.2 meter

Observed
Clearance

AS per GA diagram
AS per GA diagram

System Voltage
33 KV
As per GA
As Per approved GA
drawing and plan layout
drg no with rev.
Manually check the bolts
and nut are tightened
properly.
As Per approved GA Drg
no with rev and mat
earthing drg. (Earthing
should be done with
risers of MS/GI / Cu flats
on structure to
equipment through surge
monitor.) Ensure the LA
base are provided and
fixed in case surge
monitor is available. In
such cases do not earth
LA separately otherwise
do direct earthing for LA.
Minimum 400 M ohms.

Measured
Value

R-E=
Y-E=
B-E=

Format Number: F-CO-QA-02

Effective Date: 10.10.2015

Page |1

CHECKLIST FOR ERECTION OF USS (33 KV)


Isolator:
10
Levelling /
Alignment /
Orientation /
Verticality
11
Tightness and
alignment of chassis
bolts & nuts
12

Earthing

13

Fixing of
AccessoriesOperating
Mechanism box,
Earth Box, Tandom
pipes, Phase
coupling pipes,
Mechanical
interlock, Counter
weight, Clamps and
connectors, Earth
switch, Fixed and
moving contact etc.
Greasing has been
made on the main
contacts according
to the
manufacturers
instruction.
Closing & Opening
Operation &
Mechanical Interlock

14

15

16

17

Earth switch
connected to earth
through braided
wires
Contact resistance
test
R-R
Y-Y
B-B

Format Number: F-CO-QA-02

As Per approved
manuf.GA Drg.no with
rev.no.
Manufacturer GA drawing
and proper fixing of
moving contact into fixed
contact.
chassis shall be provided
two cross risers wherein
all phases will be covered
or as per manufacturer
GA drawing
As per approved GA
drawing and BOQ.

Smooth rotation of
moving and fixed
contact.

A) Check interlock is
operated for earth switch
- main blades should not
be operate when earth
blades are operated and
vice-versa. B) All phases
should be synchronously
close and open. C)
Operating box should be
operated easily and
without trouble.
Check the operating
torque for manual
operation/it shall be
within the value specified
by the manufacturer.
Observed Should be
equal to GTP.

Effective Date: 10.10.2015

Page |2

CHECKLIST FOR ERECTION OF USS (33 KV)


18

Insulation resistance
test
Megger Voltage
5000 V
5000 V
5000 V
HG fuse.
19.
Levelling /
Alignment /
Orientation &
verticality
20.
Fuse wire Size &
Rating
Earthing Pit :
21.
Earthing pit
Construction
dimensions &
Specifications
22.
Earth resistance
value

Minimum 400 M ohms.


Circuit reference
R-E
Y-E
B-E
As Per approved GA
drawing and plan layout
drg no with rev.
As per Layout GA & BOQ
As per WTG
Manufacturers
Instruction & Earth layout
Plan
Individual Earth
pit( Electrode) resistance
value 8 M and
Overall earth Grid
resistance value 2 M

Remarks:

Contractor

Execution

Quality

Name
Signature
Date

Format Number: F-CO-QA-02

Effective Date: 10.10.2015

Page |3

You might also like