Technical Specification fo

Description
Wall extension
Window installation
Door replacement
Floor tiles
Handwashing tiles
Floor drains
Faucet installation
Lavatory installation
Handwashing adjustment
Plumbing & sanitary works repair
Water network repair/reconnection
Deep well rehablitation
Steel water tank
Electric water pump provision
Concrete water tank and pipes rehabilitation (Punta Buri only)

ical Specification for Rehabilitation


Specifications
one-block high CHB zocalo wall, 1/4" marine plywood double-faced wall, extend up to ceiling
0.6m x 0.6m square dimension jalousie window with clear glass blade on jalouplus type frame

0.80m x 2.10m flush door with lever type door knob


Unglazed floors tiles 20cm x 20cm
Unglazed floors tiles 20cm x 20cm, sink only
Stainless steel floor drain 10cm x 10cm, directed to soak-away pit
High quality faucet
Wall hang type ceramic lavatory sink
Elevation adjustment, 70cm height
repair leakages and improve, 2" dia. drain pvc pipes directed to soak-away pits, 2" dia. pvc vent pi
dia. upvc pipes for septic tanks
high quality pipes with stable pressure
additional excavation and deep well cleaning
1 cubic meter steel tank
Double suction electric motor pump, 1hp with foot valve and float switch
Provision of tiles in concrete water tank, repair leakage in tank, replacement of leaked pipes

QUIASAN ELEMENTARY SCHOOL


DESCRIPTION

TARGET

QUANTITY

Toilet

Construction

Construction of 3 seater toilet with hand washing

Extend walls of CR , Add window, Add faucet to CR, Add


Lower hand washing facility to 70 cm height, Repair plumb
the hand washing facility, add floor tiles in CR, add tiles
plumbing works

Room 1 CR/Hand washing


facility

Rehabilitation

SCOPE/PROGRAM OF WORKS

Room 2 CR/Hand washing


facility

Rehabilitation

Repair wall and door of CR, add window and faucet, repa
from toilet to the septic tank, divide 150cm length hand
lower elvation of the other half and add faucet for the han
add floor tiles in CR, add tiles in handwashi

Room 3 CR/Hand washing


facility

Rehabilitation

Repair doors and walls and install widow, add floor tiles i
toilet and handwashing, plumbing works

Room 4 CR/Hand washing


facility

Rehabilitation

Repair walls and door, install window and faucet for the CR
CR, add tiles in handwashing, plumbing wo

Repair walls and door, install window and faucet for the C
lower the hand washing facility to 70 cm heigth and lower
tiles in CR, add tiles in handwashing, plumbing

Room 5 CR/Hand washing


facility

Rehabilitation

Room 6 CR/Hand washing


facility

Rehabilitation

Repair walls and door, install window and faucet for the
leakage for hand washing facility, add floor tiles in CR
handwashing, plumbing works

Deep Well

Rehabilitation

Excavate to more meters and clean the well, provision o


pump

Deep Well

Rehabilitation

Excavate to more meters and clean the well, provision o


pump

OGRAM OF WORKS
toilet with hand washing facility

, Add faucet to CR, Add floor tiles for CR,


cm height, Repair plumbing and faucet for
oor tiles in CR, add tiles in handwashing,
mbing works

window and faucet, repair damage pipe


vide 150cm length hand washing facility,
d add faucet for the hand washing facility,
R, add tiles in handwashing

ll widow, add floor tiles in CR, add tiles in


washing, plumbing works

dow and faucet for the CR, add floor tiles in


ndwashing, plumbing works

dow and faucet for the CR, add drainage,


o 70 cm heigth and lower faucet, add floor
handwashing, plumbing works

window and faucet for the CR and repair


cility, add floor tiles in CR, add tiles in
ng, plumbing works

lean the well, provision of electric water


pump

SALONG ELEMENTARY SCHOOL


DESCRIPTION

TARGET

QUANTITY

SCOPE/PROGRAM OF WORKS

Toilet

Construction

Construction of 3 seater toilet with hand washing facil

Room 1 CR/Hand washing


facility

Rehabilitation

Repair doors and walls, add faucet and lavatory, floor tiles
, plumbing works

Room 2 CR/Hand washing


facility

Rehabilitation

Repair walls and door of CR and repair drainage of the a


washing facility, plumbing works

Room 3 CR/Hand washing


facility

Rehabilitation

Repair door and walls, repair drainage for CR and hand wa


facility, add vent pipe, plumbing works

Room 4 CR/Hand washing


facility

Rehabilitation

Repair walls and door, install window for the CR, repair dra
and install tiles for hand washing facility, add floor tiles f
and handwashing, plumbing works

Room 5 CR/Hand washing


facility

Rehabilitation

Room 6 CR/Hand washing


facility

Rehabilitation

Water Supply

Rehabilitation

Repair door, install window and repair drainage for the


plumbing works

Repair walls and door, install window and repair drainage f


CR and repair hand washing facility, plumbing works

provision of electric water pump

Water Supply

Rehabilitation

provision of electric water pump

M OF WORKS
with hand washing facility

t and lavatory, floor tiles in CR,


g works

d repair drainage of the and


lumbing works

nage for CR and hand washing


e, plumbing works

dow for the CR, repair drainage


g facility, add floor tiles for cr
plumbing works

d repair drainage for the CR,


works

dow and repair drainage for the


g facility, plumbing works

ric water pump

ric water pump

CAMAMBUGAN ELEMENTARY SCHOOL


DESCRIPTION

TARGET

QUANTITY

SCOPE/PROGRAM OF WORKS

Toilet

Construction

Construction of 4 seater toilet with hand washing facil

Room 1 CR/Hand washing


facility

Rehabilitation

Repair doors and water supply connection, install 2 fauce


repair ceiling for the hand washing facilty, plumbing wo

Room 2 CR/Hand washing


facility

Rehabilitation

Repair doors and water supply connection, install 2 fauce


repair ceiling for the hand washing facilty, plumbing wo

Deep well

Rehabilitation

provision of electric water pump

M OF WORKS
with hand washing facility

onnection, install 2 faucet and


hing facilty, plumbing works

onnection, install 2 faucet and


hing facilty, plumbing works

ric water pump

ARANJUEZ ELEMENTARY SCHOOL


DESCRIPTION

TARGET

QUANTITY

Toilet

Construction

Construction of 3 seater toilet with hand washing facil

Repair walls and door, install faucet, repair drainage and


connecting toilet and septic tank for the CR, close windo
the CR, repair drainage and install faucet for the hand wa
facility, plumbing works

Room 1 CR/Hand washing


facility

Rehabilitation

SCOPE/PROGRAM OF WORKS

Room 2 CR/Hand washing


facility

Rehabilitation

Repair walls and door, install faucet and repair drainage


install vent pipe for the CR and install faucet for the ha
washing facility, add tiles for toilet and handwashing , plu
works

Water supply

Construction

Water exploration, 1 concrete stand for water tank, provis


1 cub. M steel tank, provsion of electric water pump a
construction of 1 hand pump.

M OF WORKS
with hand washing facility

ucet, repair drainage and Pipe


k for the CR, close window on
ll faucet for the hand washing
bing works

ucet and repair drainage and


d install faucet for the hand
t and handwashing , plumbing
ks

nd for water tank, provision of


of electric water pump and
1 hand pump.

PUNTA BURI ELEMENTARY SCHOOL


DESCRIPTION
Room 1 CR

TARGET
Rehabilitation

QUANTITY

SCOPE/PROGRAM OF WORKS

Repair water lines, repair floor drain, repair roofing, instal


install vent pipe, repair pipe connection from toilet to se
tank, install lavatory and add soak pit.

Room 2 CR

Rehabilitation

Repair water lines, repair floor drain, repair roofing, repair


repair drainage, install tiles, install vent pipe, repair pi
connection from toilet to septic tank, install lavatory and
soak pit.

Room 3 CR

Rehabilitation

Repair water lines, repair floor drain, repair roofing, repair


repair drainage, install tiles, install vent pipe, repair pi
connection from toilet to septic tank,repair lavatory,

Room 4 CR/Hand washing


facility (Daycare)

Rehabilitation

Repair door, window and drainage, install 2 faucet, tiles


vent pipe for the CR. Lower the hand washing facility to 7
heigth, repair drainage and install faucet.

Room 5 CR/Hand washing


facility

Rehabilitation

Repair door, window and drainage, tiles and vent pipe a


repair faucet for the CR. Lower the hand washing facilit
70cm heigth, repair drainage and install faucet.

Room 6 CR/Hand washing


facility

Rehabilitation

Room 7&8 CR/Hand washing


facility

Rehabilitation

Repair walls and floor drainage. Install window, faucet lav


and floor tiles for the CR.

Water Supply

Rehabilitation

Rehabilitation of water source & pipe connections. Repair


tank and water supply connections to each classroom

Install water lines.

Water Supply

Rehabilitation

Rehabilitation of water source & pipe connections. Repair


tank and water supply connections to each classroom

M OF WORKS

ain, repair roofing, install tiles,


nnection from toilet to septic
and add soak pit.

ain, repair roofing, repair door,


nstall vent pipe, repair pipe
tank, install lavatory and add
pit.

ain, repair roofing, repair door,


nstall vent pipe, repair pipe
ptic tank,repair lavatory,

ge, install 2 faucet, tiles and


hand washing facility to 70cm
e and install faucet.

age, tiles and vent pipe and


the hand washing facility to
age and install faucet.

er lines.

nstall window, faucet lavatory


for the CR.

pipe connections. Repair water


ections to each classroom.

TAGUBANHAN ELEMENTARY SCHOOL


DESCRIPTION

TARGET

QUANTITY

SCOPE/PROGRAM OF WORKS

Toilet

Construction

Construction of 3 seater toilet with hand washing facil

Room 1 CR (Boys)

Rehabilitation

Repair floor drain, water lines, ceiling, door and lavato


plumbing works

Room 1 CR (Girls)

Rehabilitation

Repair floor drain, door and lavatory, plumbing work

Room 2 CR (Rigth side)

Rehabilitation

Repair floor drain, ceiling, door and lavatory, plumbing w

Room 3 CR

Rehabilitation

Repair door and roofing. Install lavatory and soak away


plumbing works

Water Supply

Construction

1 concrete stand for water tank, provision of 1 cubic mete


tank, provision of electric water pump

M OF WORKS
with hand washing facility

ceiling, door and lavatory,


works

lavatory, plumbing works

and lavatory, plumbing works

lavatory and soak away pit,


works

provision of 1 cubic meter steel


ectric water pump

PINAY ESPINOSA ELEMENTARY SCHOOL


DESCRIPTION

TARGET

QUANTITY

SCOPE/PROGRAM OF WORKS

Toilet

Construction

Construction of 4 seater toilet with hand washing facil

Room 1 CR

Rehabilitation

Repair door, drainage, roofing and ceiling. Install window


tiles for the floor, plumbing works

Room 2 CR

Rehabilitation

Repair door, drainage, roofing and ceiling. Install window


tiles for the floor, plumbing works

Water supply

Construction

1 concrete stand for water tank , provision of water tan


provision of electric water pump

M OF WORKS
with hand washing facility

nd ceiling. Install window and


plumbing works

nd ceiling. Install window and


plumbing works

nk , provision of water tank,


ric water pump

LANJAGAN ELEMENTARY SCHOOL


DESCRIPTION

TARGET

QUANTITY

SCOPE/PROGRAM OF WORKS

Toilet

Construction

Construction of 3 seater toilet with hand washing facil

Room 1 CR

Rehabilitation

Repair door, drainage, roofing and ceiling. Install windo


lavatory, faucet and toilet bowl, plumbing works

Room 2 CR

Rehabilitation

Repair door, drainage, roofing and ceiling. Install lavatory


faucet, plumbing works

Water supply

Construction

1 concrete stand for water tank , provision of water tan


provision of electric water pump

M OF WORKS
with hand washing facility

and ceiling. Install window,


bowl, plumbing works

nd ceiling. Install lavatory and


bing works

nk , provision of water tank,


ric water pump

Bay-ang Health Center


DESCRIPTION

TARGET

QUANTITY

SCOPE/PROGRAM OF WORKS

Waste Management

Construction

Construction of Plancenta Pit

Accessibility

Rehabilitation

Improve ramps and PWD pathways

Excavation

Rehabilitation

Excavate for soak away pit

Water supply

Rehabilitation

Installation of pipelines connecting the Barangay water s


to the Health Center.

M OF WORKS

Plancenta Pit

d PWD pathways

oak away pit

ng the Barangay water source


h Center.

Lanjagan Health Center


DESCRIPTION

TARGET

QUANTITY

SCOPE/PROGRAM OF WORKS

Waste Management

Construction

Construction of Plancenta Pit

Water supply

Construction

Excavation

Rehabilitation

Construction of Concrete Water Stand with steel 1 cu.m w


tank. Installation of pipelines and locate a good ground w
source.

Excavate for soak away pit

M OF WORKS

Plancenta Pit

Stand with steel 1 cu.m water


d locate a good ground water
ce.

oak away pit

Ajuy Rural Health Unit


DESCRIPTION

TARGET

QUANTITY

SCOPE/PROGRAM OF WORKS

Waste Management

Construction

Construction of Plancenta Pit

Water supply

Construction

Excavation

Rehabilitation

Excavate for soak away pit

Toilet

Rehabilitation

Repair of Malfunction toilets and Lavatory

Construction of Concrete Water Stand with steel 1 cu.m w


tank. Installation of pipelines.

M OF WORKS

Plancenta Pit

Stand with steel 1 cu.m water


n of pipelines.

oak away pit

oilets and Lavatory

Balasan Rural Health Unit


DESCRIPTION

TARGET

QUANTITY

SCOPE/PROGRAM OF WORKS

Water supply

Construction

Construction of 1 cu.m Concrete Water Tank.

M OF WORKS

Concrete Water Tank.

Balasan Rural Health Unit


DESCRIPTION

TARGET

QUANTITY

SCOPE/PROGRAM OF WORKS

Waste Management

Construction

Construction of Plancenta Pit

Water supply

Construction

Excavation

Rehabilitation

Excavate for soak away pit

Water Source

Rehabilitation

Reahabilitation of Existing Water Source

Construction of Concrete Water Stand with steel 1 cu.m w


tank. Installation of pipelines.

M OF WORKS

Plancenta Pit

Stand with steel 1 cu.m water


n of pipelines.

oak away pit

sting Water Source

2 cl
4 cl
6 cl

qu
sa
ca
pdez
tag
lan
pes

35000
50000
80000

486249
498149
512871
536449
531219
512649
566421