The outer sheath shall consist of an extruded covering of black PVC complying with as 6746 type 1 compound.
The minimum thickness of outer sheath shall not be less than 1.5 mm.
2.9

CABLE MARKING

A marking bearing the manufacturer's name, year of manufacture, 20-pair pilot cable and BRUNEI
GOVERNEMNT at intervals of not more than 450mm shall be embossed on the outer sheath throughout the length
of the cable.
Ascending numbers from 0 to 500 shall be embossed (preferably) or printed on the cable outer sheath at intervals
of one metre.
2.10 CABLE LENGTH
The length of cable shall be exactly 500 metres per drum. No tolerance in manufactured drum length shall be
allowed.
2.11 CABLE ENDS CAPS
Both ends of the cable shall be sealed with heat-shrinkable caps. The heat-shrinkable caps shall be incorporated
with hot-melt sealant.
2.12 CABLE DRUM
Cables shall be wound on non-returnable wooden drums. For copper identification purpose, all drums shall be
painted yellow. Drum battens shall be suitably impregnated with an approved wood preservative, preferably under
pressure against dampness, dry, rot and termites.
Each cable drum shall have an identification marking distinctly and indelibly stencilled in large characters on the
exterior of the cable drum. The markings shall consist of Yayasan Sultan Haji Hassanal Bolkiah/Department of
Electrical Services, full particulars of the cable ie voltage designation, Conductor size, number of cores, an unique
drum number, gross and nett weights together with an arrow showing the direction for rolling shall be clearly
shown on the drum.
2.13 TEST REPORT
For each lot of cable to be delivered, the Routine and Sample Test Report mustshall be submitted to the Engineer
for comment and approval before despatch.

14356 ENCLOSURE STRUCTURE OF PACKAGE TYPE SECONDARY SUBSTATION

14365 SR

1
All the enclosure structure for secondary substation shall be designed manufactured, and tested generally in
accordance with the latest revision of the following International Electro-technical Commission Publication (IEC)
except where specifically directed otherwise:
Standards

Title

IEC 62271-1

High voltage switchgear and controlgear part 1: Common specification

IEC 62271-100

High voltage alternating current circuit breakers

IEC 62271-102

High Voltage alternating current disconnectors and earthing switches

IEC 62271-103

Switches for rated voltages above 1kV up to and including 52kV

IEC 62271-202

High voltage/low voltage prefabricated substations

IEC 60529

Degrees of protection provided by enclosure (IP Code)

BTB-CC5B-SP-B-1400-01.docxBTB-CC5B-SP-B-1400-01.docxBTB-CC5B-SP-B-1400-00.docx Page 78 of 107


Tender Issue 01
DecemberJanuary 2015

Ministry of Development
Government of Negara Brunei Darussalam

Cadangan Projek Jambatan Temburong


Package CC5B Power Supply System
Specification Part B

Specification for Highway Works

BS4872

Series 1400
Electrical Works

Specification for approval testing of welders when welding procedure


approval is not required. Fusion welding of steel

2
Dimensions of the substation shall be designed as compact as possible of less than 12m2 of total floor area
and be able to accommodate the required equipment for operation and maintenance purposes.
The substation housing shall preferably be made of stainless steel. The entrance door shall be at least 3mm
3
thick stainless steel sheet and ventilation louvers shall be at least 1.5mm thick stainless steel sheet with vermin
proof wire mesh cover.
4
The package substation shall be type-tested to fulfill the requirements of Accessibility type B according to
IEC 62271-202.
5
The package substation shall be enough mounting racks for fixing the battery and charger, control wire
marshalling cubicle, transformer temperature control and pilot marshalling box on the side walls of the enclosure.
6
The frame structure of the substation enclosure should be provided a means of lifting the whole substation for
transportation matter.
7
The base frame of the substation enclosure shall be so arranged that without obstructing the 11kV cable
terminations.
8
All nuts, bolts, studs, and washers shall be of stainless steel.
9
Rivets shall be of pan head type. Whenever practicable, riveting is to be done by hydraulic tools and the
rivets mustshall completely fill the holes when closed. All surfaces to be riveted mustshall be in close contact
throughout.
10 Welding method, procedures and welding operators shall comply with BS 4872 and the relevant BS
specifications.
11 Welding rod used shall be stainless steel. After welding, the weld surface mustshall be brushed clean to
remove all welding flux, dirt and grease. The welding surfaces wishall not be the areas to commence subject to
rusting after a short exposure to rain or moisture.
12 Two earthing brackets of stainless steel plate with contact area equivalent to 100mm2 of copper shall be
provided for direct connection of the earthing conductors to the substation enclosure.
13 Copper earthing conductors of 100mm2 cross sectional area or equivalent shall be provided for bonding the
earth connections for equipment and accessories in a closed loop manner.
14 The enclosure shall have hinged doors giving access to the HV switchgear compartment, HV transformer
compartment and auxiliary equipment. All door and panels assembly shall be waterproof to IP54. The hinged
doors shall be provided with padlocks.
15 For stainless steel sheet made package substation, the minimum thickness of each stainless steel sheet for any
part of the enclosure structure shall be at least 3mm thick. The package substation shall be carefully designed
to ensure the material used and the thickness of the material shall be strong enough to fulfill the wind load
stresses and maximum wind gust speed requirements of 300 km/hr.
16 The ventilation system shall comprise a fresh air louver and be enough for natural cooling to dissipate the
heat from the transformer operating up to full load with an ambient temperature of 40 C (maximum) and 30 C
(yearly average) outside the enclosure.
17 Ventilation fans of low noise type design inside substation to assist ventilation for the transformer working
under possible overload conditions. The fan arrangement shall be designed to prevent rain ingress and to be
equipped with vermin proof mesh cover.

14367 LV Standby Generator


1

14367 SR

The Contractor shall provide three (3) number of 1600kVA and one (1) number of 900kVA, 380V415V,