Form
Proprietary and Confidential
Revision
1
Release Date
2015-mm-dd
PS-PTP-FR-116-E
Rev 01
Prepared
Name:
Christine McQueen
Title/Role: Supplier
Supplier
Quality
Engineer
Title/Role:
Quality
Engineer
Released
Name:
Dawn Kinnamon
Title/Role: PS Supplier
Quality
Engineer
Title/Role:
BOS Document
Coordinator
Approvals
Name:
Jeff Jentsch
Title/Role: Director of Business Transformation PTP
Name:
Eric C. Liu
Title/Role: Dir Global Supplier Quality & Sustainability
Name:
Deng Value Stream Lead
Title/Role: Lily
Regional
Title/Role: Mgr
Supplier Development, China Purchasing
(Americas)
Name:
Peter Mokrzycki
Title/Role: Supv Quality Assurance
Name:
Muller
Title/Role: Fabien
Regional
Value Stream Lead
Title/Role: Quality
Supply Manager, Supplier Quality
(Americas)
Title/Role:
Title/Role:
This form is to identify what is required from a supplier for PPAP submission.
1.0 PURPOSE
2.0 SCOPE
Region/Country
Region(s) Included
US
x
Mexico
x
Brazil
x
Colombia
x
Europe
x
Middle East
India
China
x
Korea
x
Place an X in each applicable box. Attributes for scope definition may be customized as needed.
Included for:
Johnson Controls Power Solutions locations and majority-owned: Yes
Consolidated joint ventures and affiliates: Yes*
Unconsolidated joint ventures and affiliates: Recommended
*Excludes consolidated joint ventures and affiliates where JCI does not have management control.
3.0 RESPONSIBILTY
4.0
Supplier Quality Engineers (SQEs) are owners of this process. They are responsible for
1. Creating the PPAP Requirements Checklist.
2. Sending the PPAP Requirements Checklist to the supplier.
RECORDS/LOGS
Document Name
Supplier Part Approval
Document
Reference #
PS-PTP-PR-58-E
Record
Format
Electronic
Storage
SQE Team
Shared
Location
Drive
Responsible
Supplier
Quality
Department/Role
Engineer
* Note: All records/logs listed here are in compliance with the Records Retention Policy (PO-LE-RR-01-E) and PS Records Retention Schedule which specifies the
required retention period for each record.
5.0 REFERENCES
Document Type
Document Name
Document Reference #
N/A
Instructions
1 Select the worksheet that applies - components or bulk materials.
2 Complete the yellow boxes.
The form will take the information you entered and determine the supplier PPAP requirements.
3 Take the worksheet you completed and save it as a separate file. Send that file to the supplier.
Component
container
Commodity Name
Material Type
Reason for Submission
Design Responsible
Component
AIAG PPAP Section (These section numbers correspond with the AIAG reference booklets)
Section
No's
Deliverables
(click on cell corner for definition of item)
Component
2.2.1
2.2.2
2.2.3
2.2.4
2.2.5
2.2.6
2.2.7
2.2.8
2.2.9
2.2.10
2.2.11
2.2.12
2.2.13
2.2.14
2.2.15
2.2.16
2.2.17
2.2.18
Design Record
Authorized Engineering Change Documents
Customer Engineering Approval
Design Failure Mode and Effects Analysis (DFMEA)
Process Flow Diagram(s)
Process Failure Mode and Effects Analysis (PFMEA)
Control Plan
Measurement System Analysis Studies (MSA)
Dimensional Studies
Records of Material / Performance Test Results
Initial Process Studies
Qualified Laboratory Documentation
Appearance Approval Report (AAR)
Sample Production Parts
Master Sample
Checking Aids
Customer-Specific Requirements
Part Submission Warrant (PSW)
S
TBD
TBD
S
S
S
S
S
S
S
S
S
NR
S
R
S
S
S
Component
Issue
Actions
Responsible
Due
S
TBD
TBD
NR
S
NR
S
S
NR
S
S
S
NR
S
R
S
S
S
APQP Section (These section numbers do not correspond to any reference manuals. They are only for this document)
Section
No's
Deliverables
(click on cell corner for definition of item)
Deliverable due by
APQP
prior to DV
APQP
prior to DV
APQP
prior to DV
prior to DV
APQP
APQP
APQP
APQP
APQP
APQP
APQP
APQP
APQP
APQP
APQP
APQP
APQP
APQP
APQP
APQP
APQP
APQP
APQP
APQP
APQP
APQP
prior to DV
prior to DV
prior to DV
prior to DV
prior to DV
prior to DV
prior to DV
prior to DV
prior to DV
prior to DV
prior to DV
PRIOR TO PV
PRIOR TO PV
PRIOR TO PV
PRIOR TO PV
PRIOR TO PV
PRIOR TO PV
PRIOR TO PV
PRIOR TO PV
PRIOR TO PV
PRIOR TO PV
% Complete
(use "n/a" for not applicable)
Issue
Actions
Responsible
Due
Level 4 Level 5
*
R
*
R
*
R
*
R
*
R
*
R
*
R
*
R
*
R
*
R
*
R
*
R
*
R
*
R
*
R
*
R
*
R
S
R
of records or documentation items at appropriate locations
vailable to the customer upon request
to the customer upon request
PPAP Level
Bulk
Level 1
Level 2
Level 3
Level 4a
Level 4b
Level 5
Design Record
JCPS Requirements
2.2.1
2.2.2
2.2.3
S
NR
NR
R
R
NR
S
S
NR
S
S
NR
S
R
NR
Select S, Select
R, or NR
S, R, or NR
NR
R
R
NR
Gaskets
Glasmat
Hot Stamp Foil
Labels
Lithium-Ion Cell Components
Mechanical-Lithium-Ion
Pasting Paper
Poly Components
Power Sport Batteries
Purchased Batteries
Scrim
Separator (AGM Optima)
Separator (AGM)
Separator (Li-Ion)
Separator (PE)
Shrink Bags
Component
Component
Component
Component
Component
Component
Component
Component
Component
Component
Component
Component
Component
Component
Component
Component
Acid
Barium Sulfate
Brown Flakes
Carbon Black
Caustic Soda
Chemicals-Lithium Ion
Colorant
Epoxy / Hot melt glue
Fiber
Humic Acid
Lead
Lead Oxide
Magnesium Hydroxide
Recycled Resin
Resin
Smelter Materials
Sodium Perborate
Sodium Sulfate
Vanisperse
Bulk
Bulk
Bulk
Bulk
Bulk
Bulk
Bulk
Bulk
Bulk
Bulk
Bulk
Bulk
Bulk
Bulk
Bulk
Bulk
Bulk
Bulk
Bulk
Dimensional Studies
Control Plan
2.2.4
2.2.5
2.2.6
2.2.7
2.2.8
2.2.9
2.2.10 2.2.11 2.2.12 2.2.13
NR
S
NR
S
NR
NR
S
NR
S
NR
R
R
R
R
R
R
R
R
R
NR
R
R
R
R
R
S
S
R
S
NR
S
S
S
S
S
S
S
S
S
NR
R
S
R
R
R
S
S
S
R
NR
Select S, Select
R, or NR
S, Select
R, or NR
S, Select
R, or NR
S, Select
R, or NR
S, Select
R, or NR
S, Select
R, or NR
S, Select
R, or NR
S, Select
R, or NR
S, R, or NR
NR
R
R
R
R
R
R
R
R
R
NR
S
R
NR
assification
The organization shall submit to the customer and retain a copy of records or documentation
The organization shall retain at appropriate locations and make available to the customer upo
The organization is not required to complete the element
Customer-Specific Requirements
Checking Aids
Master Sample
Organization Part #
Dated
Dated
Yes
No
Weight (kg)
Dated
Customer Name/Division
Street Address
Buyer/Buyer Code
City
Region
Postal Code
Country
Application
MATERIALS REPORTING
Has customer-required Substances of Concern information been reported?
Yes
No
n/a
Yes
No
n/a
Initial Submission
Engineering Change(s)
Tooling: Transfer, Replacement, Refurbishment, or
additional
Correction of Discrepancy
Tooling
Other
Parts
location.
SUBMISSION RESULTS
dimensional
The results for
measurements
material
tests
These results meet all drawing and specification requirements:
and functional
Yes
NO
appearance
statistical
criteria
package
(If "NO" - Explanation Required)
process
I also certify that documented evidence of such compliance is on file and available for review. I have noted any deviations from this declaration below.
EXPLANATION / COMMENTS:
Yes
No
n/a
Date
Print Name
Phone No.
Title
FAX No.
E-mail
FOR CUSTOMER USE ONLY (IF APPLICABLE)
Approved
Rejected
Other
Customer Signature
Print Name
March 2006
Date
Customer Tracking Number (optional)
CFG-1001
hours.
Deliverable
Explanations to FAQ
3 Feasibility Commitment
A commitment by the supplier that the design can be manufactured, assembled, tested,
packaged, and shipped in sufficient quantity at an acceptable cost, and on schedule
5 Design FMEA
Typically not required. Meant for the original designer of a specific product
Has supplier reviewed their process(s) to assure all the JCI quality requirements can be
achieved?
7 Floor Plan
Supplier provides a copy of the Process Flow Diagram for product going through PPAP
process. A copy of the floor plan where this product is being made is to be provided as
well..
8 Process FMEA
Supplier to provide a Process Failure Mode & Effects Analysis report. PFMEA must
identify required process control / Poke Yoke for special characteristics (CC/SCs).
Supplier submits Production special gaging design(s) to JCI Engineering for approval
Certification for gaging special to this program and Gage R&R for all gages used to
check CC and SC characteristics of this product.
Control Plan for Prototype stage of this product (if prototyping is required)
17 Prototype Builds
Supplier submits design of special equipment used to produce this material to JCI for
approval.
20 Tool Qualification
Dimensional proof that tooling has made parts to JCI print design.
21 Material Certification / Material Testing Material physical and chemical test report from material or part supplier
22 Color & Appearance Masters
Master examples used for cosmetic reasons or other test reasons when either color or
appearance is required to determine composition. Safety concerns may also be a reason
for this requirement.
JCI SQE to review supplier PM documentation for equipment used to make this product.
Pre-Launch Control Plan / Containment A written plan for someone other than production to sample review material prior to
24 Plan
Status for completion special fixturing and/or for installing special equipment
27 Operator Instructions
Status of supplier review to Poke Yoke their process to produce this material
30 Capability Study
31 Dimensional Studies
Report for cosmetic reasons or other test reasons when either color or appearance is
required to determine composition. Safety concerns may also be a reason for this
requirement.
Has suppliers product performed as expected during JCI Process Validation testing?
This is a JCI input item.
37 Master Samples
PS-PTP-107-FR-E, Rev. 01
Page 16 of 17
38 Special Characteristics
PS-PTP-107-FR-E, Rev. 01
Page 17 of 17