You are on page 1of 9

S.C. M.C.

General
Construct S.R.L.

Registrul Comerului J/12661/2003


Bucureti, Romnia.
Tel. +40.21.310.60.63
Fax. +40.21.310.60.63

HEATING INSTALATION
CONSTRUCTIE PARC LOGISTIC, DEPOZITE,
BIROURI, PARCARE, IN LOC. CHITILA,
SAT RUDENI, JUD. ILFOV

Design phase
Owner
General Designer
Specialty Designer
Design no.

: P.T.+D.D.E
: S.C. MONTERO S.A.
: S.C. ARCADIA ENGINEERING SRL
: SC. M.C. GENERAL CONSTRUCT S.R.L.
: 50207/2007
-2007-

HEATING, VENTILATION and


AIR CONDITIONING

No.

50207
CROP LIST

Chef designer

Dipl. Ing. Marian Cernovschi

Mechanical engineer

Dipl. Ing. Sorin Lazar

Verifier engineer

Dipl. Ing. Silviu Tanasie

Acest document este proprietatea intelectuala a S.C. MC GENERAL CONSTRUCT S.R.L. in virtutea legii dreptului de autor. Folosirea lui de
catre terti este permisa numai cu acordul expres al autorului. Nici o parte a acestui document nu poate fi reprodusa sau aratata, catre terti,
fara acordul scris al S.C. MC GENERAL CONSTRUCT S.R.L.

SCHEDULE
A. WRITE PARTS :
1.1
1.2
1.3
1.4
1.5

HEATING SYSTEM
BOILER PLANT 80/60C
AIR CONDITIONING SYSTEM
VENTILATION SYSTEM
SMOKE EXHAUST SYSTEM

SCHEDULE
B. DRAWING PARTS :
DESCRIPTION
Heating installations
warehouse
Ground floor
Heating instalations
warehouse
2st floor
Roof warehouse
Heating instalations office
Ground floor
Heating instalations office
1st floor
Heating instalations office
2st floor
Diagram pipe
Diagram boiler
Heating instalations
warehause
Heating instalations office
Ground floor
Heating instalations office
1st floor
Heating instalations office
2st floor
Diagram

NO.
A3-130-EXA-PL-PHA-L00-100-0

SCALE
1:100

A3-130-EXA-PL-PHA-L02-101-0

1:100

A3-130-EXA-PL-PHA-R01-102-0
A3-130-EXA-PL-PHA-L00-103-0

1:100
1:50

A3-130-EXA-PL-PHA-L01-104-0

1:50

A3-130-EXA-PL-PHA-L02-105-0

1:50

A3-130-EXA-SC-PHA-000-106-0
A3-130-EXA-SC-PHA-000-107-0
A3-130-EXA-PL-PHB1-L02-100-0

1:100

A3-130-EXA-PL-PHB2-L00-101-0

1:50

A3-130-EXA-PL-PHB1-L01-102-0

1:50

A3-130-EXA-PL-PHB1-L02-103-0

1:50

A3-130-EXA-SC-PHB1-000-104-0

Acest document este proprietatea intelectuala a S.C. MC GENERAL CONSTRUCT S.R.L. in virtutea legii dreptului de autor. Folosirea lui de
catre terti este permisa numai cu acordul expres al autorului. Nici o parte a acestui document nu poate fi reprodusa sau aratata, catre terti,
fara acordul scris al S.C. MC GENERAL CONSTRUCT S.R.L.

Heating instalations
warehause
Heating instalations office
Ground floor
Heating instalations office
1st floor
Heating instalations office
2st floor
Diagram
Heating instalations
warehause
Heating instalations office
Ground floor
Heating instalations office
1st floor
Heating instalations office
2st floor
Diagram

A3-130-EXA-PL-PHB1-L02-100-0

1:100

A3-130-EXA-PL-PHB2-L00-101-0

1:50

A3-130-EXA-PL-PHB2-L01-102-0

1:50

A3-130-EXA-PL-PHB2-L02-103-0

1:50

A3-130-EXA-SC-PHB2-000-104-0
A3-130-EXA-PL-PHB3-L02-100-0

1:100

A3-130-EXA-PL-PHB3-L00-101-0

1:50

A3-130-EXA-PL-PHB3-L01-102-0

1:50

A3-130-EXA-PL-PHB3-L02-103-0

1:50

A3-130-EXA-SC-PHB3-000-104-0

Acest document este proprietatea intelectuala a S.C. MC GENERAL CONSTRUCT S.R.L. in virtutea legii dreptului de autor. Folosirea lui de
catre terti este permisa numai cu acordul expres al autorului. Nici o parte a acestui document nu poate fi reprodusa sau aratata, catre terti,
fara acordul scris al S.C. MC GENERAL CONSTRUCT S.R.L.

SCOPE OF WORK

2. DESIGN INTRODUCTION
This design treats in the P.T. phase, Heating, Ventilation and Air Conditioning
Installations (HVAC) for the investment LOGISTIC PARK, WAREHOUSE, OFFICES,
PARKING, CHITILA county, RUDENI village ILFOV
The building is designed for meet a certain degree of national and international
standards and is being equipped with the following installations:
Heating system
Boiler plant
Cooling system
Ventilation system
The design is based on the design theme, the architectural plans and the romanian
norms. We used the following romanian standards :

I13-02-Normativ pentru proiectarea i executarea instalaiilor de nclzire central


STAS 7132-86-Msuri de siguran la instalaiile de nclzire central cu ap avnd
temperatura maxim de 115C
SR 1907-1-97-Instalaii de nclzire. Necesarul de cldur. Prescripii de calcul
SR 1907-2-97-Instalaii de nclzire. Necesarul de cldur. Temperaturi interioare
convenionale de calcul
I5-98-Normativ privind proiectarea i executarea instalaiilor de ventilare i climatizare
STAS 6648/1-82-Instalaii de ventilare i climatizare. Calculul aporturilor de cldur din
exterior. Prescripii fundamentale.
STAS 6648/2-82-Instalaii de ventilare i climatizare. Parametrii climatici exteriori
STAS 3317-67-Gaze combustibile
C 142-85-Instruciuni tehnice pentru executarea i recepionarea termoizolaiilor la
elementelor de instalaii
GP-041/98-Proiectarea, alegerea si intretinerea sistemelor si echipamentelor de
siguranta din dotarea instalatiilor de incalzire, cu apa pana la 1150C;
GP-063-01-Proiectarea, executarea si exploatarea sistemelor de evacuarea fumului si
gazelor fierbinti.
C 56-Normativ pentru verificarea calitii i recepia lucrrilor de construcii i instalaii
aferente.
C107/1-C107/5-97-Normative privind calculul termotehnic al elementelor de costructie
P.T-C9-2004-Prescriptii de proiectare; -ISCIR
P.T-C37/2004-Prescriptii de proiectare; -ISCIR
P 118-99-Normativ de siguranta la foc a constructiilor.
Norme generale de protecia muncii/1998.

Acest document este proprietatea intelectuala a S.C. MC GENERAL CONSTRUCT S.R.L. in virtutea legii dreptului de autor. Folosirea lui de
catre terti este permisa numai cu acordul expres al autorului. Nici o parte a acestui document nu poate fi reprodusa sau aratata, catre terti,
fara acordul scris al S.C. MC GENERAL CONSTRUCT S.R.L.

2.1

HEATING SYSTEM

1.1.1 OFFICES HEATING SYSTEM


The building is designed for meet a certain degree of indoor heating standards and
to achieve the interior confort (for winter conditions), the building is designed to be heated
with steel radiators, mounted to the wall-parapet, under the windows, using hot water with a
two pipes distribution.
The thermal energy is distributed through polipropilen with aluminium insertion pipes
in vertical shafts; the horizontal distribution is hidden in the floor (sapa). Each steel
radiator has its own pipes circuit from the floor-distributor. All the risers from the horizontal
distribution (from sapa) to the radiators are visible and connects under the radiator). The
visible pipe joint will be painted in white colour.
All heat distribution tubes must be protected, in the technical areas, against the loss
of heat by suitable insulation materials (mineral wool with aluminium coat).
From the vertical shaft, each horizontal branch is fitted with tapping valve with hose
coupling and stop valve.
Each radiator is fitted with thermostatically valve, balancing valve, air vent valve,
tapping valve.
All the clearances between equipments and walls, floor are in compliance with
Romanian standard STAS 1797/82. Before mounting, the radiator will be tested to 4,5bar
presure test.
While passing other fire compartment the holes will be protected against fire.
For heating is used hot water, 80/60C, prepared in the boiler room.
1.1.2 PHASE A WAREHOUSE HEATING SYSTEM
The main heating system is designed with rooftop-units with natural gas fired burner.
Each roof-top has its heating capacity of 117.5kW. Because the rooftops heating capacity
is not enough, we put two extra gas fired heaters with axial fans.
The air heaters are mounted at 3.5m height; The smoke exhaust and air intake are
provided through the outside wall. The air is blown directly in the warehouse. One air heater
has its heating capacity of 65kW.
The air distribution from the rooftop is from an main isolated rectangular duct with jetnozzels.
The return air is recirculated by the rooftop thought an grille linked to the equipment.
1.1.3 INSTALATII PHASE B1,B2,B3 WAREHOUSE HEATING SYSTEM
The heating system for B1,B2,B3 warehouse is designed with radiant tubes with gas
fired burner and exhauster fan.
In each warehouse are 8 radiant tubes controlled by room-thermostat; the heating
power of each radiant tube is 39kW or 49kW.
The smoke exhaust and air intake are provided through the roof.

2.2

BOILER PLANT 80/60C

All the administrativ building will be provided with hot water from a dedicated boiler
plant. Boiler plant is located in the first or second floor and fulfills all the specific norms.
Acest document este proprietatea intelectuala a S.C. MC GENERAL CONSTRUCT S.R.L. in virtutea legii dreptului de autor. Folosirea lui de
catre terti este permisa numai cu acordul expres al autorului. Nici o parte a acestui document nu poate fi reprodusa sau aratata, catre terti,
fara acordul scris al S.C. MC GENERAL CONSTRUCT S.R.L.

1.2.1

Boilers
Each warehouse office (A,B1,B2,B3) has one condensing wall-boiler with an nominal
heating power of 35kW.
Primary hot water is prepared in one condensing wall-boiler with an nominal heating
power of 35kW; Tsuply/Treturn = 80/60C. The burners are natural-gas burner, modulating
type. The boilers are functioning fully automatic.
The hot water, prepared by the boilers, is used for heating and also for preparing
domestical hot water.
The boilers have one coaxial chimney linked to exterior throught wall. Boiler plant
has natural-gas leakage detector with 2% sensitivity and electromagnetic closing-valve
(operated by the detector) mounted outside, to the natural-gas system supply and an fresh
air intake hole.

1.2.2

Hot water circulators


Hot water is circulated through the pipes with in-line (or by the circulating pumps
inside the wall-boiler).

1.2.3

Installations safety
Installation for production hot water is being protected against suprapressures in
concordance with standard STAS 7132 using:
Expansion tank (under pressure)
Safety-valve 2,5bar
Drainage of the hot water from the safety-valves
Maximum temperature limitator
Lack of water sensor.

1.2.4
Hot water temperature is dinamicaly managed from the automatization of the
boilers.
1.2.5
Domestical hot water is prepared with water heater with coiled pipe, volume
150litres.
1.2.6

Filling water is assured by a softener station.

1.2.7
Functioning of the equipments from boiler plant in the corect parameters is in
concordance with standard I13/94-chapter.15.

2.3

AIR CONDITIONING SYSTEM

The main cooling system only for the warehouse phase A is designed with two
rooftop-units with refrigerant circuit with R134a. Each roof-top has its cooling capacity of
90kW. The roof-tops are TRANE YYKD 350.
The air distribution from the rooftop is from an main isolated rectangular duct with jetnozzels.
The return air is recirculated by the rooftop thought an grille linked to the equipment.

Acest document este proprietatea intelectuala a S.C. MC GENERAL CONSTRUCT S.R.L. in virtutea legii dreptului de autor. Folosirea lui de
catre terti este permisa numai cu acordul expres al autorului. Nici o parte a acestui document nu poate fi reprodusa sau aratata, catre terti,
fara acordul scris al S.C. MC GENERAL CONSTRUCT S.R.L.

2.4

VENTILATION SYSTEM

There are independent systems for evacuating the viciated air from toilets) through
an independent duct and exhaust fan.

2.5

SMOKE EXHAUST SYSTEM


The smoke exhaust system is accordingly FIRE SAFTY SCENARIO

Acest document este proprietatea intelectuala a S.C. MC GENERAL CONSTRUCT S.R.L. in virtutea legii dreptului de autor. Folosirea lui de
catre terti este permisa numai cu acordul expres al autorului. Nici o parte a acestui document nu poate fi reprodusa sau aratata, catre terti,
fara acordul scris al S.C. MC GENERAL CONSTRUCT S.R.L.

CALCULATION SUMMARY
1. HEAT LOSS
Heat loss is calculated acording STAS 1907/1-1997
Design temperatures :
-Exterior temperature
-Interior temperature (in winter time) :
- Offices :
- Warehouse:
- Toilets:
-Relative humidity:

te = -15 C
ti = +20 C1 C
ti = +18 C
ti = +15 C
uncontrolled

2. PIPE DIMENSIONING
The pipes diametres are established in concordance with the thermical duty
transported on the current section of the pipe. The velocity is increassing from the most
disadvantage equipment untill the main supply pipe.

3. COOLING LOADS
Design conditions :
-Exterior temperature
-Interior temperature(summer) :
- Phase A warehouse :
-Relative humidity:

te = 35 C
ti = +18 C1 C
uncontrolled

4. HEATING LOSS CENTRALIZATOR


Heating loss for warehause A:
Heating loss for warehause B1:
Heating loss for warehause B2:
Heating loss for warehause B3:

307kW
292kW
292kW
292kW

Designed by,
Eng. Sorin Lazar
Acest document este proprietatea intelectuala a S.C. MC GENERAL CONSTRUCT S.R.L. in virtutea legii dreptului de autor. Folosirea lui de
catre terti este permisa numai cu acordul expres al autorului. Nici o parte a acestui document nu poate fi reprodusa sau aratata, catre terti,
fara acordul scris al S.C. MC GENERAL CONSTRUCT S.R.L.