Mine Name / ID Number

no

Mine Site No.

Mine Site (Perimeter)

1 RW018/WP

Gaseke

2 RW019/WP

Susa

3 RW014/WP

Rukara-Kavumu

4 RW017/WP

Mubuga

5 RW004/WP

Kiburungu

6 RW026/WP

Kavomo

7 RW042/WP

Kiguri

8 RW020/WP

Gakenke

9 RW016/WP

Rukaragara, Biruyi

10 RW023/WP

Ryabunani, Rutagara

11 RW015/WP

Busuku (Bwiza)

12 RW033/WP

Nyabitunda

13 RW022/WP

Ngurugunzu

14 RW021/WP

Kanyana

15 RW016/EP

Rebero

16 RW020/EP

Rugunga

17 RW026/EP

Kibaza/Dihiro

18 RW027/EP

Rubona

19 RW024EP

Rubona

20 RW015EP

Rukankama

21 RW018/EP

Kabayezi-Karambo

22 RW019/EP

Nyagasagara

23 RW021/EP

Murara

24 RW023/EP

Muhanga

25 RW017/EP

Mukarange-Gitoki

26 RW022/EP

Gituza

27 RW014/EP

Munini-Bujyujyu

28 RW015/NP

Runyempundu

29 RW021/NP

Murehe

30 RW013/NP

Bututsi, Kajwi

31 RW022/NP

Rukore

32 RW014/NP

Nkoma, Nyarurama

33 RW018/NP

Kamubanga-Rushari

34 RW017/NP

Ruli

35 RW016/NP

Gitwa

36 RW005/KC

Nunga

37 RW003/KC

Kityazo

38 RW004/KC

Bashyamba

39 RW002/KC

Buhiza, Nkusi

40 RW018/SP

Nyarubande

41 RW016/SP

Nteko

42 RW017/SP

Mutobo

43 RW035/SP

Bukokora-Rwimigozi

44 RW009/SP

Gatebe, Kagihima,
Akanyamwishyura,
Munyiginya,Gahengeri

45 RW23/SP

Murehe-Gihara

46 RW021/SP

Nkoto

47 RW020/SP

Murambi-Cyatenga

48 RW010/SP

Gataba-Nyakirobane

49 RW019/SP

Kirwa

50 RW018/SP

Nyamirama

51 RW016/SP

Kayonza

52 RW017/SP

Bugarama

53 RW024/SP

Binyeri-Gisoro- Rwisha

54 RW013/SP

Gahungeli

55 RW022/SP

Kamuzi

56 RW004/NP

Gifurwe

57 RW001/NP

Rutongo Mines Concession

58 RW002/NP

Nyakabingo

59 RW003/NP

Bugarama Mining Concession

60 RW012/WP

Nyamuremure

61 RW011/WP

Nyagatama

62 RW031/WP

Rwambogo

63 RW027/WP

Mukura-Mwendo-Kagombwa

64 RW033/WP

Kivumu, Nyabirasi

65 RW028/WP

Gitarama

66 RW025/WP

Kabera and Gitwa

67 RW029/WP

Runombe

68 RW009/WP

Giseke, Gihinga

69 RW010/WP

Kamusheshe-Kamajyambere

70 RW032/WP

Rwamatete

71 RW030/WP

Ngoma

72 RW055/EP

Rwinkwavu

73 RW043/EP

Muhamba

74 RW039/EP

Gakoma

75 RW038/EP
76 RW040/EP

Muntambara, Gitega, Batimba and


Kidogo
Ngara

77 RW044/EP

Nyanga

78 RW037/EP

Muhura-Nduba-Akabuga-Nyabisindu

79 RW036/EP

Rugarama

80 RW035/EP

Bibare

81 RW034/EP

Rwamashyongoshyo and Rweri

82 RW030/EP

Rutungu

83 RW041/EP

Karambi

84 RW078/EP

Kangamba

85 RW031/EP

Kibabara

86 RW033/EP

Rwamuhimbura

87 RW039/EP

Ruramira-Bugambira

88 RW032/EP

Murwa-Jarama

89 RW042/EP

Isangano

90 RW031/SP

Nyaruvumu and Gituntu

91 RW030/SP

Gitwa

92 RW028/SP

Kagote

93 RW025/SP

Bahozi

94 RW001/SP

Rongi

95 RW026/SP

Muhanga

96 RW027/SP

Sholi

97 RW012/SP

Mubuga-Gashorera

98 RW005/SP

Nyamyase

99 RW004/SP

Rutobwe

100 RW029/SP

Kyato

101 RW020/NP

Shyunga

Mine site Operator & Owner


Subsite

Mine Site Operator

Kamuramira,Gaseke

Calline Mines LTD

Susa

MMBP Production LTD

Rukara, Gakeri

Ubwiza bw'U Rwanda

Kabatama

MUMICO

Kiburungu

CEMINYAKI

Mararo

Dukoreneza

Kiguli, Muhingo

KKN Mining Company LTD

Banda, Gakenke, Mutongo and Buyungwe

MMTC

Rwamiyaga, Nganzo, Gahira

Kigeyo Mining Cooperative( KIMICO)

Ryabunani

Demikaru Ltd

Rushubi, Kanyoni

Demikaru Ltd

Gakinjiro, Kabuga

Rutabikangwa Emmanuel Ltd

Rusebeya and Kinyovi

BMDC LTD

Kanyana

New Line Development

Rebero A, Rebero B

E and G Company LTD

Rugunga

Kivu Metals Supplier Company LTD

Kibaza/Dihiro

Mining Quality Supply LTD

Nzige, Manene

DUMAC LTD

Kibuye II

Geodex MQC LTD

Rukankama

Ets Hajos

Kabayezi

UNM

Nyagasagara

Hard Metal Rwanda LTD

Murara

KOPABAMANYA

Muhanga

COREMIR Minerals LTD

Cyarushango, Gitoki

CMK Gatsibo

Mugwate

EAMICO LTD

Bujyujyu

Ets Munsad Minerals

Runyempundu

Cooperative Ubukungu

Murehe

Mukarwesa Felicite

Bututsi and Kajwi

Dusuzumimirimo

Rukore

Great Lakes Minerals International (GLMI)

Nkoma, Nyarurama

Umwizararangwa Honorine

Rushari

MCCS LTD

Musave, Mpanga

EPROCOMI

Cyabingo, Busengo

Mugabonake Jeanne

Rugasa A, Rugasa B

Harvest Mining Company

Kityazo

Ets Sindambiwe Simon

Bashyamba

Roka- Rwanda

Buhiza, Nkusi

King Mines Company LTD

Karambo I, Karambo II and Rwimpiri

S.M Sugira S.a.r.l

Nteko

Busanze Mining Company

Rutabo I

Simbarwa Mine LTD

Nyamabuye, Bukokora

Ets Ndaberetse Thadee

Akanyamwishyura

Development Mining Company Ltd (DEMICO)

Murehe

HATALE Company Ltd

Mucyamo

Umuch Mining Company Ltd

Murambi, Cyatenga

COMIRWA

Gataba I

Strategic Rwanda Minerals Company Ltd

Gisizi

Kayenzi Mining Company LTD

Nyamirama

Kayenzi Mining Company LTD

Kayonza

Kayenzi Mining Company LTD

Bugarama

Kayenzi Mining Company LTD

Binyeri

COMIKA

Rubare

Ets Kalinda Valens

Kamuzi

CODEMICOTA

Gifurwe

Wolfram Mining and Processing(WMP)

Nyamyumba, Masoro, Gasambya,Mahaza,


Gisanze and Karambo

Rutongo Mines Ltd

Tunnels no4, 13c, 14, 9, 6, 20, and 12

Eurotrade International (ETI)

Rubona, Foyer, Inferieur, Kabindi, Murundi and


Fumbwe

New Bugarama Mining Company Ltd

Mwogambere, Nyamuremure

COEMIKI

Mbobo1 &2, Nyagatama

Niyigena Mining Company Ltd

Rwambogo, Nganzo

SESECO Ltd

Mwendo

Vision Mining Ltd

Kinyamavuta, Rukomero, Ruraje

COMINYAKI

Bugina and Gihango

UZU Mining Company Ltd

Gitwa( Rushiri)

SODECOMIN Ltd

Rubuye, Runombe

RETC Ltd

Gitwa and Nyarugenge

Cooperative KUAKA

Kamusheshe, Kasambo and Buzogera

Cooperative KAMICO

Rwamatete

Kamina Mining Development Ltd

Ntendese

TNN Mining Company Ltd

Rutonde c, Nyarunazi A

WOlfram Mining and Processing (WMP)

Muhamba

La Misercorde Trading Company Ltd

Gakoma

Real Brothers Ltd

Muntambara

Vision Mining Company (VIMICO) Ltd

Ngara

Cooperative Abahizi

Nyanga

Alfa Minerals Supply LTD

Rumuri

SEAVMC Ltd

Rugarama

SEAVMC Ltd

Bibare and Rwankuba

Union Stone Ltd

Rweri

La Misercorde Trading Company Ltd

Rutungu

WAYCOR Ltd

Karambi

Colone Mines Ltd

Byimana

H&B Mining Company Ltd

Kinyovi

Purity General Service Ltd

Rwamuhimbura

ETS MUNSAD Minerals Ltd

Bugambira

Multiserve Consult Ltd

Murwa-Jarama

Ntidendereza Mining Ltd

Cyasemakamba

Mining Company Gihara Kirehe


( MCGKLTD)

Nyaruvumu, Gituntu

Excellent Mining Company

Ruramba, Rwansibo

SEAVMC Ltd

Kagote

Millenium Mining Company LTD

Bahozi

Ets Kalinda

Gasharu

Ets Sindambiwe Simon

Gasura, Kanyinya

Ets Munsad Minerals

N/A

Ets Hajos

Gashorera, Murambi, Ryakiyange

Ets Sindambiwe Simon

Nyabisindu, Nyabitare, Kanyoni, Nyamyase

Rwanda Rudnik

Rushoka, Gitima, Nyamabondo

COMAR

Kyato

Gasave Mining Company

Shyunga

Shyunga Mining CompanyLTD

Operator Address

Contact Name

Tel: +250788307451

Rubazinda Callixte

Tel: +250788531376

Kabanguka Alexis

Tel : +250788927777

Nturanyenabo Radjab

Tel: +250787502275

Mwiseneza Emmanuel

POBOX: 007 Rubavu

Tel: 250783259419

Tel: +250788524175
Halindintwari Lazare

Twizerimana Jean Baptiste

TEL: +250788301583

Email: demeyo@yhoo.fr
Mutumwa Fiacre

Tel: +250788309168

emil: faidajmv@gmail.com
Jean Marie Vianney Faida

Tel: +250788520876

Muzaliwa Naphtal

Tel: 250788823319

Harerimana Mathias

Tel: 250788823319

Mudeyi Justin

Tel: +250788342252

Rutabingwa Emmanuel

Tel: +250783046502

Bizimana Bernard

Tel: +250788652888

Ngendahayo Edouard

e-mail; ntajeremie84@yahoo.com

Ntagozera Jeremie

Tel: + 250788548895
Email:msebu@yahoo.fr

Sear Dominique Savio

Tel: +250788484604
Email:
ndayisenga_robert@yahoo.fr

Ndayisenga Robert

Tel: +250788541402

Nyandwi Pierre

Tel: +250788518805

Nsanzimana Jean De Dieu

Tel: +250788742634
etshajos@gmail.com

Email:

Siborurema Mathias

P.O.BOX: 722 Kigali


Email:
unm2014@gmail.com Tel:
+250788522066

Mihamed Nassim

Tel: +4916332266600 ,
+250788772592, Email:
metalhard05@gmail.com, P.O.BOX:
2196 Kigali

Dr. Andreas Wieczoek

Tel: +250788491635

Murindahabi Innocent

Tel: +250788417896,
email: ceremirltd@yahoo.com,

Rwigema Fidele

Tel: +250788306907
Email:
rwandacmk@yahoo.com

Ntahomvukiye Salomon/ Kayiranga Valence

Tel: +250788489917, email:


ignace@yahoo.fr, P.O.BOX: 4787

Niyonsaba Emmy

Tel: +250788303331, P.O.BOX: 4016


Kigali

Habimana Fabien

Tel: +250788533991

Safari Jean Baptiste

E-mail: mukarwesa@yahoo.fr,
P.O.BOX: 103224991

Mukarwesa Felicite

Email: nzabonimpaissa20@yahoo.com Nzabonimpa Issa

Email: glmi333@yahoo.com, P.O.BOX: Gashumba Thadee


1603 Kigali

Email: umwizahonorine@gmail.com,
Tel: +250788522066

Mohemed Nassim

Email: miccsltd@yahoo.com

Twahirwa Venuste

P.O.BOX: 7130 Kigali, Email:


ets.munsad@yahoo.fr

Mugisha Jean

P.O.BOX: 122 Ruhengeli

Kagenga Innocent

Tel: +250788532880, email:


uzamf@yahoo.fr

Uzamuranga Francoise

Email: ets.sindimbiwe@gmail.com

Sindambiwe Jean Baptiste

P.O.BOX: 6394 Kigali Rwanda

Emery Rubagenga

Email: kingmines2@gmail.com

Sindambiwe Jean Baptiste

P.O.BOX.: 462 Huye/ Email:


sugira_ltdyahoo.com

Rugamba Robert

Email: mutesaclementine@gmail.com

Mutesa Clementine

P.O.BOX: 6714 Email:


tsimbura@gmail.com

Rwamigabo Emmanuel

Tel: +250788837285

Dushiminana Valens

Email: demico2020@yahoo.com,
Po.Box: 3271 Kigali

Kinyogote Emmanuel

Email: hatalecoltd@yahoo.fr

Nshimiyimana Michael

Email: umuchmining2014@gmail.com

Usengimana Glatien

Tel: +250782794668

Munyarugarama Elie

email: srmc@yahoo.fr

Tuyisenge Emmanuel

Tel: 250788324070

Rugiramumaro Alphonse

Tel: 250788324070

Rugiramumaro Alphonse

Tel: 250788324070

Rugiramumaro Alphonse

Email: alphonsemukono@yahoo.fr

Rugiramumaro Alphonse

Email: koperativecomika@yahoo.co

Nzabamwita Narcisse

Po.Box: 447 Kigali


Email:
kalindavelens@yahoo.fr

Ndatimana Willy

Email: cedemicota@gmail.com

Mbonyubwabo Frodourd

Po.Box: 186 Kigali/ Rwanda Email:


jenmalic@wmprwanda.com

Safari Ely

Po.Box: 6132 Kigali Rwanda, Email:


martin@tincogroup.com

Kevin Buyskes

Po. Box: 749 Kigali Rwanda

Kevin Buyskes

Po. Box: 4062 Kigali Rwanda

Ndabananiye Janvier

Po. Box: 102471071

Ngoragoze Francois

Tel: +250788308419

Niyigena Innocent

Tel: +250788502874

Kambali Bigishiro

Tel: +250788427245

Umurerwa Clementine

Tel: +25078638910/ +250788639172

Barizera Emmanuel

Tel: +250788596180

Uwimana Emmanuel

Tel: +250788300699, Email:


patrickngaboyisonga@yahoo.com

Ngaboyisonga Patrick

Tel: +250788407552

Nsanzineza Ernest

Tel: +25078884486

Sebitama Elias

Tel: +250788351850

Mudahemuka Karekezi Modeste

Tel: +250788305004

Munyabarenzi Boniface

Tel: +250787956708

Po.Box: 1856
jeanmalic@yahoo.fr,

Nsengayezu Jean Damascene

Email:

Safari Elie

Tel: +250783026668

Barasikina Mathieu

Email: muhizi@yahoo.com Tel:


+250788570713

Kamana Charles

Email: ruda@gmail.com, Tel:


+250788744840
Email: abahizicoopec@gmail.com,
Tel: +250783497992

Ntagingira Vianney

Tel: +250788530390

Biriko Semitwe Aime

Email: nyabyenda@yahoo.fr/ Tel:


+250788502079

Mugabo Assumani

Email: nyabyenda@yahoo.fr/ Tel:


+250788502079

Nimuragire Wellars

mars182182@yahoo.ca.tw

Marc Ting

Tel: +250788652888

Muragijimana Pacome

Gasigwa Innocent

Ndayambaje Andre
Tel: +250788692120, Email: waycorltd@gmail.com

Kagame Alexis
Email: manigadodos@yahoo.fr, Tel: +250788527505

Email: hminingcom@hotmail.com

Twagirayezu Jean Chysostome

Nkusi Rodrigue
Tel : +250788778831, Email: nkusirodri@gmail.com

Mutaganzwa Dieudonne
Tel: +250788526173, Emial: dimuta8@yahoo.co.uk

Bwito Patience
Tel: +250788410773, email: safari@wmprwanda.com

Ntidenderezwa Jean Baptiste


Tel: +250788303824, Email: jb.ntidenderezwa@yahoo.fr

Rugema Michel
Tel: +250788458179, Email: musonera.massasse@gmail.com

Sindikubwabo Theodore
Tel: +2507849737, Email: excellentmining2013@yahoo.com

Po. Box: 4017 Kigali

Nyabyenda Emmanuel

Tel: +250788457831

Kabera Esther

Po. Box: 289 Kigali

Kalinda Valence

Po. Box: 4909 Kigali

Sindambiwe Simon

Po. Box: 2673 Kigali

Munyarugerero Damien

Po. Box: 1579 Kigali

Hakizinshuti Jonas

Email: ets.sindimbiwe@gmail.com

Sindambiwe Simon

Jerry Fiala
Email: rwandarudnik@hotmail.com, Po.Box:
4352

Po.Box: 1139 Kigali

Habumuremyi Justin

Tel: +250788456870

Uwamahoro Marie Stells

Tel: +250781776131

Kanamugire Etienne

Contact Number

National or other ID number


of operator

Tel: +250788307451

TIN: 102297280

Tel: +250788531376

TIN: 103307323

Tel : +250788927777

TIN: 102480233

Tel : +250787502275

TIN:103167529

Tel:+250788517162

Email: Ceminyaki@yahoo.com

Tel: 250783259419

N/A

TEL: +250788301583

Email: mfiacre1yahoo.com

Tel: +250788309168

TIN NO: 102331745

Tel: +250788520876

TIN: 103256115

Tel:+250788823319

TIN:1025117994

Tel:+250788823319

N/A

Tel: +250788342252

TIN NO: 101815501

Tel: +250783046502

TIN NO: 102286786

Tel. +250788652888

N/A

Tel: +2507887770946

TIN NO: 102991022

Tel: +250788548895

TIN NO: 102322191

Tel: +250788484604

TIN NO: 102389388

Tel: +250784448689

TIN NO: 102488876

Tel: +250781125449

TIN NO: 102257167

Tel: +250783305998

TIN: 102131975

Tel: +250788522066

TIN NO: 102272086

Tel: +250788772593
+491633226600

TIN: 101807507

Tel: +250788491635

TIN NO: 102123638

Tel: +250788417896

TIN NO: 102992541

Tel: +250788437993/
+250788546394

N/A

Tel:+250785531989

N/A

Tel: +250788575437

N/A

Tel: +250788533991

TIN NO: 103062036

Tel: +250788745051

TIN NO: 103224991

Tel: +250788595942

TIN NO: 103059432

Tel: +250788303516

N/A

Tel: +250788522066

TIN NO: 101477725

Tel: +250783457962

P.O.BOX: 3704 Kigali

Tel: +250788752809

N/A

Tel: +250788356804

N/A

Tel: +250788532880

TIN NO: 102321961

Tel:+250788671499

N/A

Tel: +25088309696

N/A

Tel: +250788671499

ID: 1198380022220091

Tel: +250788234385

N/A

Tel: +25078853768

N/A

Tel: +250788354056

N/A

Tel: +250784923923

N/A

Tel: +250788304020

TIN NO: 102179198

Tel:+250788559973

N/A

Tel: +250788691009

TIN NO: 103073665

Tel: +250782794668

TIN NO: 103108167

Email: tuyirwema@gmail.com

TIN NO: 102339090

Tel: 250788324070

TIN NO: 103285776

Tel: 250788324070

TIN NO: 103285776

Tel: +250788324070

TIN NO: 103285776

Tel: +250788324070

TIN NO: 103285776

Tel: +250783536318

TIN NO: 102915868

Tel: +250788375768

N/A

Tel: +25078508743

TIN NO: 102915787

Tel: +250788450202

N/A

Tel: +250788389933

N/A

Tel: +250788389933

N/A

Tel: +250788424789

N/A

Tel: +250788560780

N/A

Tel: +250788308419

N/A

Tel: +250788502874

N/A

Tel: +250788427245

N/A

Tel: +25076238910

N/A

Tel: +250788596180

TIN NO: 102525734

Tel: +250788703927

TIN NO: 102384878

Tel: +250788407552

TIN NO: 102857686

Tel: +250788498161

TIN NO: 103060841

Tel: +250788351850

TIN NO: 102526331

Tel: +250788305004

TIN NO: 102370315

Tel: +250787956708

TIN NO: 102941810

Tel: +250788450202

TIN NO: 101475528

Tel: +250788689912

TIN NO: 102278920

Tel: +250788637177

TIN NO: 102011947

Tel: +250788759481

TIN NO: 102449938

Tel: +250788358920

TIN NO: 103107414

Tel: +250788530390

N/A

Tel: +250785619425

TIN NO: 101515800

Tel: +250788644661

TIN NO: 101515800

Tel: +250783866439

TIN NO: 102113683

Tel: +250785254883

TIN NO: 102278920

Tel: +250788577593

TIN NO: 102807551

Tel: +250784428316

TIN NO: 102891664

Tel: +2507885851175

TIN NO: 102307052

Tel: +250787880344

TIN NO: 102510730

Tel: +250788526173

TIN NO: 102813365

Tel: +250788598262

TIN NO: 101540242

Tel: +250788303824

TIN NO: 102920048

Tel: +250785098591

TIN NO: 102314385

Tel: +2507888497371

TIN NO: 102454860

Tel: +250788502079

N/A

Tel: +250788457831

TIN NO: 10219660

Tel: +250788308334

N/A

Tel: +250785112964

N/A

Tel: +25078830331

N/A

Tel : +250788742634

N/A

Tel : +250785112964

TIN NO: 100834935

Tel : +250788626534

TIN NO: 100834935

Tel : +250783020519

N/A

Tel: +250788456870

TIN NO: 102507158

Tel: +250788465582

TIN NO: 102557242

Owner Name (if different from


Operator)

Owner Address (if different


from Operator)

N/A

N/A

Mutamuliza Eugenie
1197570001924176

ID :

Tel: +250788772524

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Harerimana Mathias

Tel: +250788823319

N/A

N/A

N/A

N/A

N/A

N/A

Gakwerere Emmanuel

Tel: +2507886221

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Hakizinshuti Jonas

Tel: +250783305998

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Hakiza Shamukiga Ignace

Tel: +250788306907

Niyigaba Ignace

Tel: +250788388846

Munyarugerero Damien

Tel: +250788303331, email:


ets-munsad@yahoo.fr

Nizeyemungu Pierre Damien

Tel: +2507845144020

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Uwizeyimana Venuste

Tel: +250788307050

Munyarugerero Damien

Tel: +250788303331, email:


ets-munsad@yahoo.fr

Mugabonake Jeanne

Tel: +250788511548/
+250788526424

N/A

N/A

Sindambiwe Simon

Tel: +250785112964

N/A

N/A

N/A

N/A

Rugamba Robert

Email:
rugambarobert1@gmail.com

Gatera Antoine

Tel: +250783935466

Simburudari Theodore

Email: tsimbura@gmail.com

Ndaberetse Thadee

Tel: +250788837285

N/A

N/A

Hatangimana Alex

Tel: +2507882360925

Mushimiyimana Christine

Tel: +250783580166

N/A

N/A

Mbarushimana Jean Baptiste

email:
mbarusha11@yaoo.com, Tel:
+250788381555

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Kalinda Valens

email:
kalindavalens@yahoo.com

Kubwimana Francois

Tel: +250788708743

Jean Malic Kalima

Email:
jeanmalic@wmprwanda.com

Governement of Rwanda and is


represented by MINIRENA

TEL: +250788301846

N/A

N/A

N/A

Philippe Lavagna

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Mine site location


National or other ID number Longitude (Degrees, Latitude
of owner (if different from
minutes, seconds)
(degrees, minutes,
operator)
WGS 84 format
seconds) WGS 84
format
N/A

2910'38.6''

221'49.0''

N/A

2911'20.2''

222'23.1''

N/A

2921'15.3''

150'57.7''

N/A

2922'01.9''

147'29.3''

N/A

2918'03.1''

144'24.8''

N/A

2919'13.1''

144'09.9''

N/A

2917'53.8''

145'05.0''

N/A

2912'33.8''

226'49.7''

N/A

2920'44.8''

149'52.5''

N/A

2923'16.2''

142'04.6''

N/A

2924'02.0''

144'59.3''

N/A

2919'55.01''

145'09.3''

N/A

2934'23.1''

158'19.5''

N/A

2931'35.5''

156'33.7''

Tin no: 102991022

3028'46.5''

137'46.6''

N/A

3001'59.6''

0206'37.4''

N/A

3017'11.7''

153'01''

N/A

3020'57.6''

200'45.4''

N/A

3000'58.5''

208'30.9''

P.O.BOX: 997 Kigali

3018'09.8''

205'11.2''

N/A

3027'01.4''

0200'31.3''

N/A

301'26.8''

0209'54.5''

N/A

3003'53''

210'48.7''

N/A

N/A

N/A

TIN NO: 103259104

3020'76''

139'12.5''

TIN NO: 102492166

3017'14.7''

208'04.4''

TIN NO: 102813365

3015'58.6''

159'48.3''

N/A

2950'18.0''

134'41.7''

N/A

2941'.46.5''

136'04.5''

N/A

2948'02.4''

137'30.4''

N/A

2941'37.1''

136'17.5''

N/A

2921'15.3''

150'57.7''

TIN NO: 102172547

2948'27.8''

145'21.2''

TIN NO: 101424683

2980'46.7''

150'46''

TIN NO: 100280882

2941'34.5''

136'59.9''

N/A

3005'23.1''

202'19.7''

N/A

3009'28.5''

150'32.7''

N/A

3000'21.1''

157'38.9''

N/A

3000'15.3''

151'41.2''

TIN NO: 102779731

2940'57.6''

226'44.2''

TIN NO: 102627267

2932'51''

248'9.6''

2930'42.8''

247'45.8''

N/A

TIN NO: 102298170

2955'43.5''

0155'43.5''

N/A

2953'35.7''

154'53.1''

TIN NO: 102496861

2956'05.1''

156'14.9''

N/A

2954'46.3''

153.39.2''

N/A

2953'15.3''

156'53.7''

N/A

2955'34.4''

154'28''

N/A

2952'08.5''

151'.54.2''

N/A

2948'15.9''

153'55.5''

N/A

2948'53.9''

152'30.1''

N/A

2952'45.6''

154'18.1''

N/A

02936'57.4''

0132'08.2''

TIN NO: 100142064

2953'09.7''

0154'42.6''

N/A

2955'46.7''

156'16.6''

2948.44''

133'28.4''

N/A

3003'16.9''

148'52.5''

N/A

2958'16.9''

151'44.7''

2945'58''

123'00.8''

2931'55.9''

159'23''

Tel: +250788302727

Tel: +250788300926

N/A

N/A

2934'03.2''

201'38.7''

N/A

2934'002''

201'22''

N/A

2933'01.7''

201'12.9''

N/A

2919'47.2''

145'08.4''

N/A

2922'40.5''

158'33.5''

N/A

2919'21''

144'02.8''

N/A

2921'47.5''

158'48.5''

N/A

2919'51.2''

157'44.7''

N/A

2918.29.2''

145'16.1''

N/A

2932'58.2''

200'09.1''

N/A

2930'21.5''

150'59.6''

N/A

3036'30.9''

157'59.6''

N/A

3028'16''

219'40''

N/A

3034'26.2''

140'37.8''

N/A

3028'44.9''

147'53.5''

N/A

3026'43''

209'57.2''

N/A

3029'16''

144'15.5''

N/A

3018'06.2''

144'38.4''

N/A

3024'22.7''

105'01''

N/A

3018'35.6''

146'57.9''

N/A

3017'50''

156'52.8''

N/A

3028'37.8''

111'09.5''

N/A

3006'52''

205'59.3

N/A

3017'31.3''

206'39''

N/A

3019'30.7''

159'46.8''

N/A

3026'45.5''

209'45.5''

N/A

3029'46.1''

201'25.3

N/A

3022'06.8''

217'18.1''

N/A

3031'24.4''

223'28.9''

N/A

2943'22.2''

159'46.0''

N/A

2943'26.8''

154'42.0''

N/A

2946'10.0''

157'00.9''

N/A

2941'54.1''

157'55.3''

N/A

2943'29.3''

146'12.7''

N/A

2943'40.3''

201'26.1''

N/A

2944'57.1''

158'05,6''

N/A

2940'50.3''

148'42.0''

N/A

2937'30.5''

206'37.6''

N/A

2945'54.3''

157'16.3''

N/A

2941'01.5''

158'59.3''

N/A

2949'17.1''

147'58.2''

East UTM

South UTM

District

Sector

408509

4738643 Nyamasheke

Kanjongo

4097594

4737573 Nyamasheke

Kanjongo

428160

4795514 Rutsiro

Mushonyi

429580

4801908 Rutsiro

Nyabirasi

422215

4807581 Rubavu

Nyamyumba

424378

4808039 Rubavu

Nyundo

421927

4806345 Rubavu

Nyamyumba

412038

4729344 Nyamasheke

Cyato

427200

4797508 Rutsiro

Kigeyo

431889

4811890 Rubavu

Nyakiriba

433307

4806525 Rutsiro

Nyabirasi

425672

4806214 Rubavu

Nyabirasi, Nyundo

452540

4781954 Ngororero

Bwira, Ndaro

447327

4785202 Ngororero

Sovu

553362

4819816 Gatsibo

Rwimbogo

503695

4766668 Bugesera

Ntarama

531882

4791739 Rwamagana

Fumbwe

4777477

538663 Rwamagana

Mwurire

501821

4763180 Bugesera

Musenyi

533673

4769313 Rwamagana

Karenge

550101

4777903 Rwamagana

Munyaga

502682

4760613 Bugesera

Musenyi

507203

4758948 Bugesera

Nyamata

503643

4761401 Bugesera

Musenyi

537326

4817182 Gatsibo

Gitoki

531968

4763992 Ngoma

Rukumberi

529618

4778920 Rwamagana

Muyumbu

Gakenke

466197

4822946 Gakenke

Gakenke

465912

4822560 Gakenke

Kamubuga

Cyabingo

Nemba

Cyabingo

Gicumbi

Ruvune

478608

4805861 Gakenke

Coko

482901

4795885 Gakenke

Ruli

Gakenke

Busengo

509984

4774582 Kicukiro

Gahanga

517567

4796294 Gasabo

Bumbogo

500651

4783207 Nyarugenge

Kigali

500473

4794191 Gasabo

Jali

464711

4729602 Huye

Rwaniro

449694

4690117 Nyaruguru

Busanze

445733

4690845 Nyaruguru

Busanze

490232

4786746 Kamonyi

Rukoma

488123

4788282 Kamonyi

Rukoma

492739

4785784 Kamonyi

Rukoma

490301

4790573 Kamonyi

Ngamba

487495

4784596 Kamonyi

Rukoma

491738

4789074 Kamonyi

Rukoma

485377

4793798 Kamonyi

Kayenzi

478248

4790111 Kamonyi

Kayenzi

479417

4792696 Kamonyi

Kayenzi

486582

4789372 Kamonyi

Kayenzi

457267

4830213 Kamonyi

Rukoma

487317

4788622 Kamonyi

Rukoma

492254

4785861 Kamonyi

Rukoma

479107

4827753 Nyarugenge

Nyarugenge

506085

4799373 Rulindo

Masoro

496813

4794085 Rulindo

Shyorongi

473973

4847027 Burera

Kagogo

447960

4780003 Ngororero

Ndaro

451896

4775834 Ngororero

Ndaro

451801

4776347 Ngororero

Ndaro

449995

4776347 Rutsiro

Mukura

425431

4806243 Rutsiro

Kivumu

430798

4781517 Rutsiro

Gihango

424620

4808256 Rubavu

Nyundo

429160

4781054 Rutsiro

Gihango

425565

4783012 Rutsiro

Musasa

423022

4806004 Rutsiro

Kivumu

449884

4778586 Ngororero

Ndaro

445038

4795462 Ngororero

Muhanda

567705

4782557 Kayonza

Rwinkwavu

552499

4742641 Kirehe

Gahara

563859

4814557 Kayonza

Murundi

553321

4801163 Kayonza

Rukara

549527

4760527 Ngoma

Karembo

554271

4807869 Kayonza

Murundi

533581

48071165 Gatsibo

Muhura

533581

4807165 Nyagatare

Musheri

534479

4802906 Gatsibo

Muhura

533062

4784620 Rwamagana

Gahengeli

533581

4807165 Nyagatare

Rwimiyaga

512722

4767831 Bugesera

Nyamata

532484

4766614 Rwamagana

Karenge

Rwamagana

Gahengeri

549607

4761324 Ngoma

Karembo

551890

4776245 Kayonza

Ruramira

540993

4746985 Ngoma

Jarama

558215

4735592 Kirehe

Gahara

469167

4779301 Muhanga

Muhanga

465833

4821257 Muhanga

Kiyumba

474351

4584372 Muhanga

Kabacuzi

466445

4782700 Muhanga

Kabacuzi and
Rugendabari

469382

4804278 Muhanga

Rongi

469728

4776226 Muhanga

Muhanga

472099

4782383 Muhanga

Kabacuzi

464469

4799693 Muhanga

Nyabinoni

458303

4766657 Muhanga

Nyarusange and
Kabacuzi

473867

4783891 Muhanga

Kabacuzi

464818

4780733 Muhanga

Rugendabari

480127

4801023 Gakenke

Coko

Types of Minerals produced


Cell

Mineral 1

Mineral 2

Mineral 3

Mineral 4

Susa

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Susa

Cassiterite

N/A

N/A

N/A

N/A

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Mubuga

mixed
concentrate
(cassiteritecoltan)

Coltan

Wolframite

N/A

Burushya

mixed
concentrate
(cassiteritecoltan)

Coltan

Cassiterite

N/A

Kavomo

mixed
concentrate
(cassiteritecoltan)

Coltan

Cassiterite

N/A

N/A

Coltan

Cassiterite

N/A

N/A

N/A

mixed
concentrate
(cassiteritecoltan)

Coltan

Cassiterite

Wolframite

Rukaragata

mixed
concentrate
(cassiteritecoltan)

Wolframite

N/A

N/A

Kanyefurwe

Wolframite

N/A

N/A

N/A

Bwiza

mixed
concentrate
(cassiteritecoltan)

Coltan

Cassiterite

N/A

Gatovu

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Kinyove

Wolframite

N/A

N/A

N/A

Kanyana

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Rwikiniro

mixed
concentrate
(cassiteritecoltan)

Cassiterite

N/A

N/A

Cyugara

Cassiterite

N/A

N/A

N/A

Nyagsambu

Wolframite

N/A

N/A

N/A

Bicumbi

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Rulindo

mixed
concentrate
(cassiteritecoltan)

Cassiterite

N/A

N/A

Karenge

Cassiterite

N/A

N/A

N/A

Zinga

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Musenyi

Cassiterite

N/A

N/A

N/A

Kanazi

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Musenyi

Cassiterite

N/A

N/A

N/A

Bukomane

Cassiterite

Coltan

N/A

N/A

Ntoyi

Cassiterite

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

Bujyujyu

Cassiterite

N/A

N/A

N/A

Rukore

Wolframite

N/A

N/A

N/A

Nyamugali

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Gisozi

Cassiterite

Wolframite

N/A

N/A

Rukore

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Gashiriro

Wolframite

Gold

N/A

N/A

Nyanza

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Ruli

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Birambo

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Nunga

Cassiterite

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

Nkuzuzu

Cassiterite

N/A

N/A

N/A

Ruliba

Cassiterite

Coltan

N/A

N/A

Nkusi

Wolframite

N/A

N/A

N/A

Kamwambi

Cassiterite

Coltan

Wolframite

N/A

Nteko

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Nkanda

mixed
concentrate
(cassiteritecoltan)

Wolframite

N/A

N/A

Taba

mixed
concentrate
(cassiteritecoltan)

Coltan

N/A

N/A

Gishyeshye

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Murehe

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Kazirabonde

Cassiterite

Coltan

mixed
concentrate
(cassiteritecoltan)

N/A

Gishyeshye

Cassiterite

Coltan

mixed
concentrate
(cassiteritecoltan)

N/A

Bugoba

Coltan

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

Kirwa

Cassiterite

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

Nyamirama

Cassiterite

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

Nyamirama

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Bugarama

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Murehe

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Gishyeshye

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Taba

Cassiterite

Coltan

mixed
concentrate
(cassiteritecoltan)

N/A

Kiyovu

Wolframite

N/A

N/A

N/A

Nyamyumba

Cassiterite

N/A

N/A

N/A

Kabaraza

Wolframite

N/A

N/A

N/A

Nyamabuye

Wolframite

N/A

N/A

N/A

Kibanda

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Vuganyana

mixed
concentrate
(cassiteritecoltan)

Coltan

N/A

N/A

Kibanda

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Mwendo

mixed
concentrate
(cassiteritecoltan)

Coltan

N/A

N/A

Bujemje

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Congo Nil

mixed
concentrate
(cassiteritecoltan)

Wolframite

N/A

N/A

Kavomo

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Congo Nil

mixed
concentrate
(cassiteritecoltan)

Wolframite

N/A

N/A

Nyarubuye

mixed
concentrate
(cassiteritecoltan)

Coltan

N/A

N/A

Bunyoni

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Kibanda

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Gasiza

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Nkondo

Cassiterite

N/A

N/A

N/A

Muhamba

Wolframite

N/A

N/A

N/A

Buhabwa

Cassiterite

N/A

N/A

N/A

Rukara

Cassiterite

N/A

N/A

N/A

Akaziba

Cassiterite

Coltan

N/A

N/A

Murundi

Wolframite

N/A

N/A

N/A

Ruhuri

Cassiterite

N/A

N/A

N/A

Nyagatabire

Cassiterite

N/A

N/A

N/A

Bibare

Cassiterite

Wolframite

N/A

N/A

Rweri

Wolframite

N/A

N/A

N/A

Rutungu

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Kayumba

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Byimana

Cassiterite

Coltan

N/A

N/A

Kibare

Wolframite

N/A

N/A

N/A

Akaziba

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Bugambira

Wolframite

N/A

N/A

N/A

Karengera and Jarama Cassiterite

N/A

N/A

N/A

Murehe

Cassiterite

mixed
concentrate
(cassiteritecoltan)

Wolframite

N/A

Remera

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Remera

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Butare

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Bulamba

mixed
concentrate
(cassiteritecoltan)

Wolframite

N/A

N/A

Gasharu

Wolframite

N/A

N/A

N/A

Nyamirama

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Shori

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Gashorera

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Musongati, NgaruKibyimba

mixed
concentrate
(cassiteritecoltan)

Coltan

N/A

N/A

Butare

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Gasave

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Mbilima

mixed
concentrate
(cassiteritecoltan)

N/A

N/A

N/A

Mining Licence Information


ICGLR classification

Type of mineral
license

License number

Artisanal

Exploratiin

0145/MINIRENA/2012

Artisanal

Exploration

0266/MINIRENA/2012

Artisanal

Exploration

0265/MINIRENA/2014

Artisanal

Exploration

0546/MINIRENA/2013

Artisanal

Exploitation

0053/MINIRENA/2010

Artisanal

Exploitation

001/MINIFOM/2010

Artisanal

Exploration

0113/MINIRENA/2012

Artisanal

Exploitation

0368/MINIRENA/2013

Artisanal

Exploration

0541/MINIRENA/2013

Artisanal

Exploration

0458/MINIRENA/2013

Artisanal

Exploration

0119/MINIRENA/2014

Artisanal

Exploration

0434/MINIRENA/2013

Artisanal

Exploration

0149/MINIRENA/2012

Artisanal

Exploration

0240/MINIRENA/2012

Artisanal

Exploration

00557/MINIRENA/ 2013

Artisanal

Exploration

0327/MINIRENA/2013

Artisanal

Exploration

0283/MINIRENA/2014

Artisanal

Exploration

00447/MINIRENA/2013

Artisanal

Exploration

0564/MINIRENA/2013

Artisanal

Exploitation

0516/MINIRENA/2013

Artisanal

Exploitation

0010/MINIFOM/2010

Artisanal

Exploitation

0056/MINIFOM/2010

Artisanal

Exploitation

0126/MINIFOM/2011

Artisanal

Exploration

0474/MINIRENA/2013

Artisanal

Exploitation

056/MINERENA/2013

Artisanal

Exploration

0365/MINIRENA/2014

Artisanal

Exploitation

0203/MINIRENA/2012

Artisanal

Exploration

0162/MINIRENA/2012

Artisanal

Exploration

0309/MINIRENA/2012

Artisanal

Exploitation

036/MINIRENA/2013

Artisanal

Exploration

0158/MINIRENA/2012

Artisanal

Exploitation

0011/MINIFOM/2010

Artisanal

Exploration

0172/MINIRENA/2012

Artisanal

Exploitation

413

Artisanal

Exploitation

032/MINIFOM

Artisanal

Exploration

0315/MINIRENA/16.1

Artisanal

Exploitation

0393/MINIRENA/2013

Industrial and small


scale

Exploitation

0022/16.03/045

Small scale

Exploration

053/MINIRENA/2013

Artisanal

Exploitation

0017/MINIFOM/2010

Artisanal

Exploration

0438/MINIRENA/2013

Artisanal

Exploration

0443/MINIRENA/2013

Artisanal

Exploitation

0278/MINIRENA/2012

Artisanal

Exploitation

0376/MINIRENA/2013

Artisanal

Exploration

0473/MINIRENA/2013

Artisanal

Exploration

0259/MINIRENA/2014

Artisanal

Exploration

0314/MINIRENA/2012

Artisanal

Expoitation

0398/MINIRENA/2013

Artisanal

Exploitation

0272/MINIRENA/2014

Artisanal

Exploitation

0274/MINIRENA/2014

Artisanal

Exploitation

0276/MINIRENA/2014

Artisanal

Exploitation

0273/MINIRENA/2014

Artisanal

Exploration

0412/MINIRENA/2013

Artisanal

Exploitation

01221/MINIRENA/2011

Artisanal

Exploitation

0225/MINIRENA/2014

Small scale

contract for mining

N/A

Small scale

Agreement
(Exploitation)

N/A

Industrial

Special

742/16.03

Small scale

Exploitation

106/MINIRENA/2014

Artisanal

Exploitation

364/MINIRENA/2013

Artisanal

Exploitation

247/MINIRENA/2012

Artisanal

Exploitation

284/MINIRENA/2014

Artisanal

Exploitation

409/MINIRENA/2013

Artisanal

Exploitation

467/MINIRENA/2013

Artisanal

Exploration

542/MINIRENA/2013

Artisanal

Exploration

033/MINIRENA/2014

Artisanal

Exploration

569/MINIRENA/2013

Artisanal

Exploitation

54/MINIFOM/2010

Artisanal

Exploitation

436/MINIRENA/2013

Artisanal

Exploration

335/MINIRENA/2013

Artisanal

Exploration

519/MINIRENA/2013

Industrial

N/A

N/A

Artisanal

Exploration

389/MINIRENA/2013

Small scale

Exploration

449/MINIRENA/2014

Artisanal

Exploitation

217/MINIRENA/2012

Small scale

Exploitation

345/MINIRENA/2014

Artisanal

Exploration

237/MINIRENA/2014

Artisanal

Exploitation

351/MINIRENA/2013

Artisanal

Exploitation

193/MINIRENA/2012

Small scale

Exploitation

193/MINIRENA/2014

Artisanal

Exploration

395/MINIRENA/2013

Artisanal

Exploration

578/MINIRENA/2013

Artisanal

Exploration

15/MINIRENA/2014

Small scale

Exploitation

480/MINIRENA/2013

Artisanal

Exploration

340/MINIRENA/2013

Artisanal

Exploitation

253/MINIRENA/2012

Artisanal and Small


scale

Exploitation

90/MINIRENA/2014

Artisanal

Exploration

73/MINIRENA/2014

Artisanal

Exploration

157/MINIRENA/2014

Artisanal

Exploration

586/MINIRENA/2013

Artisanal

Exploration

173/MINIRENA/2012

Artisanal

Exploration

226/MINIRENA/2012

Artisanal

Exploitation

33/MINIRENA/2010

Artisanal

Exploitation

429/MINIRENA/2013

Artisanal

Exploitation

252/MINIRENA/2012

Artisanal

Exploitation

293/MINIRENA/2014

Small scale

Exploitation

404/MINIRENA/2013

Arisanal

Exploitation

189/MINIRENA/2012

Artisanal

Exploitation

74/MINIRENA/2010

Artisanal

Exploitation

44/MINIRENA/2013

Artisanal

Exploration

0071/MINIRENA/2014

Issued Date

Expiry Date

Surface Area (ha)

23-Jan-2012

23-Jan-16

285

24-Aug-12

8/23/2014

647

6/23/2014

6/22/2017

400

23-Oct-13

23-Oct-17

400

30-Jun-10

30-Jun-15

29-Jan-10

28-Jan-15

3-Jan-12

1/3/2016

152

3/4/2013

3/4/2018

23-Oct-13

23-Oct-17

284

22-Aug-13

22-Aug-17

161

9-May-14

9-May-18

200

5-Aug-13

5-Aug-17

258

23-Jan-12

22-Jan-16

787

13-Jun-14

13-Jun-18

424

11-Jan-2013

11-Jan-17

309

2-Jan-2013

2-Jan-17

23-Jun-14

22-Jun-18

400

13-Aug-13

12-Aug-14

400

20-Nov-13

19-Nov-17

375

7-Oct-13

7/10/2018

360

1,006

2/4/2010

4-Feb-15

325.1

13-Aug-10

14-Aug-16

28-Feb-11

27-Feb-16

9/4/2013

9/3/2018

100

11/01/201

11/1/2018

400

23-Jun-14

23-Jun-19

200

23-Apr-12

23-Apr-17

174

2/8/2012

2/7/2016

10/3/2012

10/3/2016

18

22-Feb-13

21-Feb-13

37

2/8/2012

2/8/2016

30

2/4/2010

2/4/2015

456

2-Aug-12

2-Aug-16

206

4/6/2010

4/6/2015

413

23/03/2010

23/03/2015

1/11/2012

1/11/2016

331

25/04/2013

25/04/2018

N/A

2/1/2009

2/1/2014

101

1/11/2013

1/11/2017

400

15/02/2010

15/02/2010

192

6/8/2013

6/8/2017

13/08/2013

13/08/2017

12

31

264

24/09/2012

24/09/2017

400

3/5/2013

5/3/2018

355

3/9/2013

3/9/2017

375

26/6/2014

26/6/2018

400

12/12/2012

12/12/2016

253

2/4/2013

2/4/2018

400

23/6/2014

23/6/2019

400

23/6/2014

23/6/2019

400

23/6/2014

23/6/2019

375

23/5/2014

23/5/2019

225

8/7/2013

8/7/2018

149

30/12/2011

30/12/2014

90

23/06/2014

23/03/2019

200

12-Nov-12

12-Nov-17

802

27/8/2008

27/8/2012

9,600

15/07/2012

17/07/14

1,600

24/4/2014

11/5/2021

914

22/2/2013

22/2/2017

211

24/8/2012

24/8/2016

245

N/A

N/A

400

20/5/2013

20/05/2017

151

26/08/2013

26/8/2017

400

23/10/2013

23/10/2017

170

21/1/2014

21/1/2018

400

2/12/2013

2/12/2017

216

30/6/2010

30/06/2015

45

6/8/2013

6/8/2018

175

18/01/2013

18/01/2016

150

7/10/2013

7/10/2017

342

N/A

N/A

23/04/2013

22/4/2017

400

23/06/2014

22/06/2019

200

28/05/2012

27/05/2017

399

23/06/2014

22/6/2019

200

23/06/2014

22/6/2018

375

22/2/2013

21/2/2018

1,760

10/4/2012

9/4/2016

23/6/2014

22/06/2019

900

25/4/2013

24/4/2017

800

10/12/2013

9/12/2017

400

18/01/2014

17/01/2018

398

9/9/2013

8/9/2018

555

4,633

10

6/2/2013

5/2/2017

3,128

24/8/2012

23/8/2017

225

26/03/2014

25/03/2019

58

13/2/2014

12/2/2018

31/1/2014

30/1/2016

400

19/12/2013

19/12/2017

39

16/02/2012

16/02/2016

43

29/05/2012

29/05/2016

102

23/3/2010

23/3/2015

152

7-Sep-2013

9/7/2018

554

24/08/2012

24/08/2017

383

17/06/2014

17/06/2019

350

13/05/2013

13/05/2018

400

10/4/2012

10/4/2017

400

27/10/2010

27/10/2015

16

7/8/2013

7/8/2015

191

13/2/2014

13/02/2018

122

Mine Production Details


Type of Mine (open pit,
underground, both)

Mining Activity
Exploitation Begun Number of Workers (incl
Status (Active, NonArtisanal miners)
active, Abandoned)

Open pit

Active

1940

183

Open pit

Active

2012

77

Small open pit


undergound

Active

2014

70

Small open pit


underdround

Active

1962

122

Undergound

Active

1970

200

Small Open
pitUnderground

Active

2009

70

Undergound

Active

2012

155

small open pit

Active

2012

490

Small open pit


underground

Active

1976

52

Underground

Active

2013

135

Small open pit


underground

Active

2014

75

Underground

Active

2013

103

Underground

Active

N/A

154

Underground

Active

2012

120

underground

Active

2013

45

Large open pit


Undergound

Active

1960

70

Underground

Active

1960

107

Underground

Active

1960

120

Underground

Active

2012

66

underground

Active

1961

248

Underground

Active

1935

59

Large open pit,


Underground

Active

2009

48

Large open pit


Undergound

Active

2012

22

Underground

Active

1960

56

Underground

Active

2013

46

Underground

Active

2013

121

Underground

Active

2005

66

Underground

Active

1945

89

Small open pit,


Underground

Active

1962

39

Underground

Active

1960

174

Underground

Active

N/A

64

Small open pit,


Underground

Active

2010

69

Underground

Active

2011

34

Underground

Active

2004

30

Underground

Active

2010

14

Underground

Active

1946

21

Underground

Active

N/A

48

Small open pit

Active

N/A

127

Undeground

Active

2013

574

Underground,Small open Active


pit

2003

150

Underground

Active

2013

121

Uderground

Active

2013

75

Small open pit

Active

2011

80

Underground

Active

2011

394

Underground

Active

2013

38

Underground

Active

2014

43

Underground

Active

2012

89

Underground

Active

2013

134

Underground

Active

2010

108

Underground

Active

2011

24

Underground

Active

2010

34

Underground

Active

2000

33

Underground

Active

2010

177

Underground

Active

2008

70

Underground

Active

2010

139

Large open pit,


Underground

Active

1937

1182

Undergroung

Active

1935

3592

Undergound

Active

1956

700

Underground

Active

1953

723

Small open pit,


Underground

Active

2000

209

Large open pit and


underground

Active

2012

111

small open pit,


Underground

Active

2012

24

Underground

Active

2013

95

Underground

Active

2013

105

Underground

Active

2001

96

Underground

Active

2013

105

Underground

Active

1970

80

Underground

Active

1945

118

Underground

Active

2011

120

Large opne pit

Active

N/A

104

Small open pits

Active

2013

32

Small open pit

Active

1940

2523

Underground

Active

N/A

100

Underground

Active

2012

85

Underground

Active

1960

60

Underground

Active

1960

165

Underground

Active

2012

85

Small open pit,


Underground

Active

1960

98

Small open pit,


Underground

Active

2010

51

Small open pit,


Underground

Active

1960

110

Small open pit,


Underground

Active

1960

180

Small open pit,


Underground

Active

2014

70

Underground

Active

2014

70

Underground

Active

2011

267

Underground

Active

2013

79

Underground

Active

2012

70

Underground

Active

1960

235

Underground

Active

1960

70

Underground

Active

2012

200

Underground

Active

2013

191

Underground

Active

2000

120

Underground

Active

1920

30

Underground

Active

1972

47

Underground

Active

2010

135

large open pit,


Underground

Active

2010

169

Underground

Active

2012

77

Large open pit

Active

1920

139

Large open Pit

Active

1985

99

Underground

Active

1950

308

Underground

Active

2004

57

Underground

Active

2014

235

Average production No of Pits / Tunnels Average /


Mine Site Monthly
per miner per day on Mine Site
Representative
Productive
(kg)
Depth of Pit (metres) Capacity [t]

( 1-1.5)

(6-20)

( 6.5-7.3 )

( 1-1.3 )

( 15-23 )

( 1-1.5 )

( 12-28 )

3.8

10 8 for open pit and 4-30


for undergound
tunnels

( 2.9-4.7)

( 1-1.6 )

(0.3-0.8)

100-150

30-45

0.97

11

100

116.7

0.5

16

100

0.005-0.006

(2-2.9)

30

N/A

(8.6-40)

(1-1.5)

10

( 10-20)

(2.5-5.6)

(0.5-1.5)

11

N/A

(4-5)

(0.9-1)

20

(1-1.5)

N/A

(2-3)

(1-2)

21

N/A

(10-12)

N/A

(10-50)

(7-9)

(1-1.5)

(10-60)

(1-2)

(1-2)

(2-4)

(1.5-2)

12

30

(3.5-5)

(15-30)

0. 151

(3-3.5)

18

(6-6.5)

(1-1.5)

23

(7-25)

(4.8-6.9)

(1-4)

0.2-0.3

(5-42)

(0.10-0.18)

N/A

(15-80)

(0.1-0.2)

(1-2)

(3-10)

(1-2)

(0.5-1)

N/A

(1-2)

(05-1)

(6-100)

(0.5-0.7)

(0.5-1)

12

(5-15)

(1.5-2.5)

(1.3-2)

(30-60)

(0.8-1)

(0.5-1)

10

(3-9)

(1-2)

0.5

(13-15)

0.286

(0.5-1)

(2-10)

(1-2)

(0.13-0.20)

12

(4-8)

(0.19-0.200)

(0.5-1)

(5-10)

(0.5-1)

(1-2.7)

(80-130)

(1-2)

0.50

28

(50-150)

(0.003-0.005)

(0.5-1)

14

(3-30)

(1-2)

200 (horizontal)

(0.6-0.7)

(1.5-2)

(50-60)

(0.6-1)

N/A

21

(30-50)

(7-8)

(1-2.5)

13

(10-20)

(6-7)

(0.7-1)

(40-100)

(2-2.6)

(2.5-3.5)

20

(3-80)

(6-8)

(0.3-1)

N/A

(0.5-0.8)

(01-0.2)

32

(30-302)

(1-2)

(0.1-0.8)

(2-6)

(0.049-0.350)

(0.1-1.4)

(2-4)

(0.076-0.950)

(0.07-0.5)

12

(5-22)

(0.05-0.1)

(0.2-0.8)

(30-120)

(0.675-1.1)

(0.2-0.7)

(15-100)

(0.389-1.173)

(0.5-2)

11

(15-30)

(0.175-0.655)

1.25

13

(10-50)

0.6

(0.5-1.2)

15

(1-5)

(0.2-0.5)

(0.5-1)

10

(10-300)

(2-4)

(0.2-0.8)

(8-30)

(0.266-1.011)

(0.2-0.5)

(5-20)

N/A

(0.75-1.5)

33

(1-112)

(10-12)

(1-1.5)

200

(50-300)

(59-82)

(1-18)

13

(0-200)

35.7

(1- 1.3)

76

13-170

(16-17)

(0.5-1)

(5-15)

(0.3-0.5)

(1-2)

about 10

(3-6)

about 0.5

N/A

(0.1-0.2)

N/A

10

N/A

(10-12)

about 0.5

aboout 5

(1-2.5)

(1-3)

11

about13

(5-8)

(0.5-1)

10

about 30

(3-3.5)

(0.5-1)

about 60

(1-2)

(0.5-1)

18

(5-18)

(0.2-0.5)

(1-2)

26

About 60

(7-13)

(0.5-1)

N/A

(0.3-0.6)

(05-1.5)

N/A

(0.6-1)

(1-3)

N/A

(5-8)

(3-5)

33

60

(10-15)

(0.1-0.5)

12

(0.3-1)

(3-5)

N/A

(6-8)

(0-0.5)

60

92

(1-2)

(1-2)

(30-80)

(4-5)

(1-2)

10

N/A

(3-5)

(1-2)

N/A

(1.5-2.5)

(0.1-0.5)

70

N/A

(0.2-0.5)

(1.5-2)

106

(25-40)

(7-8)

(1-2)

(3-20)

(0.2-0.5)

(3-5)

14

20

(6-7)

(0.5-1)

32

(100-150)

(3-4)

(1-2)

13

(3-5)

(2.5-3)

(1-2)

18

18

(1.5-2.5)

(05-1)

59

N/A

(2-3)

(0.5-1)

(4-18)

(1-1.5)

(3-6)

22

15

(20-30)

(1-2)

30

(1-2)

10

40

(3-4)

(0.5-1)

N/A

1.4

(0.5-1)

185

(0.4-0.6)

(0.5-1)

11

(150-180)

2.83

(1-2)

19

20

0.12-0.15

(1-1.5)

(50-70)

(0.8-1.5)

(3-5)

(8-12)

(2-3)

(0.3-0.5)

(20-22)

(0.7-0.8)

N/A

(5-6)

(1-3)

N/A

(3-4)

(0.9-1)

19

(2-30)

(3-3.9)

Production History
Production 2011 [t] Production 2012 [t] Production 2013 [t] Production 2014[t]

22

88

76

Not Active

28

33

60

Not Active

Not Active

Not Active

30

Not Active

Not Active

47

51

21

Not Active

83

25

39

Not Active

Not Active

Not Active

Not Active

Not Active

Not Active

105

361

Not Active

Not Active

Not Active

50

Not Active

Not Active

49

Not Active

Not Active

Not Active

Not Active

Not Active

Not Active

70

Not Active

207

178

123

Not Active

79

149

123

Not Active

Not Active

Not Active

Not Active

Not Active

Not Active

12

Not Active

Not Active

Not Active

Not Active

Not Active

Not Active

Not Active

Not Active

Not Active

25

81

56

62

Not Active

Not Active

51

11

Not Active

Not Active

Not Active

Not Active

14

Not Active

Not Active

26

70

13

14

Not Active

Not Active

14

19

10

Not Active

Not Active

18

Not Active

Not Active

14

Not Active

Not Active

68

29

14

Not Active

18

18

18

Not Active

Not Active

Not Active

57

10

25

16

Not Active

Not Active

17

18

Not Active

Not Active

Not Active

70

Not Active

Not Active

19

40

Not Active

Not Active

Not Active

Not Active

Not Active

Not Active

Not Active

80

Not Active

Not Active

Not Active

25

17

Not Active

Not Active

Not Active

Not Active

Not Active

Not Active

Not Active

Not Active

Not Active

Not Active

Not Active

Not Active

Not Active

11

Not Active

Not Active

Not Active

Not Active

Not Active

Not Active

Not Active

25

26

30

111

83

59

Not Active

123

98

84

100

1049

1443

839

646

309

233

255

250

124

179

197

197

Not Active

13

12

Not Active

Not Active

39

34

Not Active

Not Active

Not Active

Not Active

87

103

Not Active

Not Active

17

Not Active

Not Active

Not Active

45

Not Active

Not Active

Not Active

45

Not Active

Not Active

27

31

Not Active

33

109

115

219

112

Not Active

Not Active

Not Active

Not Active

Not Active

88

77

59

82

Not Active

Not Active

124

Not Active

Not Active

Not Active

Not Active

Not Active

55

Not Active

Not Active

53

58

62

35

28

24

40

49

Not Active

17

15

23

Not Active

Not Active

Not Active

Not Active

Not Active

24

68

Not Active

Not Active

Not Active

Not Active

Not Active

Not Active

32

Not Active

66

34

39

Not Active

Not Active

Not Active

Not Active

Not Active

Not Active

30

Not Active

25

28

Not Active

Not Active

Not Active

Not Active

Not Active

Not Active

16

Not Active

Not Active

Not Active

44

Not Active

Not Active

Not Active

Not Active

23

10

20

10

13

Not Active

29

52

40

30

32

10

Not Active

Not Active

Not Active

17

15

59

22

24

28

Not Active

50

33

54

Not Active

48

55

60

Not Active

Not Active

Not Active

38

Production 2015[t]

The current status of the mine


site: Green (Certified) - Yellow Red (Un-Certified)

Date of last mine


inspection

Green

12-Dec-2014

Green

12-Dec-2014

Green

12-Dec-2014

Green

12-Dec-2014

Green

11-Dec-2014

Green

11-Dec-2015

Green

11-Dec-2014

Green

11-Dec-2014

Green

11-Dec-2014

Green

11-Dec-2014

Green

12-Feb-2015

Green

12-Feb-2015

Green

11-Dec-2014

Green

11-Dec-2014

Green

12-Dec-2014

Green

12-Dec-2014

Green

12-Dec-2014

Green

11-Dec-2014

Green

11-Dec-2014

Green

12-Dec-2014

Green

12-Dec-2014

Green

12-Dec-2014

Green

11-Dec-2014

Green

11-Dec-2014

Green

12-Dec-2014

Green

11-Dec-2014

Green

12-Dec-2014

Green

12-Dec-2014

Green

12-Dec-2014

Green

12-Dec-2014

Green

12-Dec-2014

Green

12-Dec-2014

Green

12-Dec-2014

Green

11-Dec-2014

Green

12-Dec-2014

Green

11-Dec-2014

Green

12-Dec-2014

Green

12-Dec-2014

Green

12-Dec-2014

Green

12-Dec-2014

Green

12-Dec-2014

Green

12-Dec-2014

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Yellow

12-Feb-2015

Yellow

12-Feb-2015

Green

12-Feb-2015

Green

Green

12-Feb-2105

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Dec-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Dec-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Feb-2015

Green

12-Dec-2014

Entity Responsible for the Last Mine


Inspection

Individual Repsonsible for


last Mine Inspection

Geology and Mines Department

Kayihura Juvenal
Karangwa Ernest

Geology and Mines Department

Kayihura Juvenal
Karangwa Ernest

Geology and Mines Department

Karangwa Ernest
Kagabo joseph

Geology and Mines Department

Kayihura Juvenal

Geology and Mines Department

Kagabo Joseph Karangwa


Ernest

Geology and Mines Department

Kagabo Joseph Karangwa


Ernest

Geology and Mines Department

Karangwa Ernest
Kagabo joseph

geology and Mines Department

Kayihura Juvenal
Karangwa Ernest

Geology and Mines Department

Kayihura Juvenal

Geology and Mines Department

Karangwa Ernest
Kagabo joseph

Geology and Mines Department

Karangwa Ernest
Kagabo joseph

Geology and Mines Department

Karangwa Ernest

Geology and Mines Department

Karangwa Ernest

Geology and Mines Department

Karangwa Ernest

Geology and Mines Department

Uwamahoro Fiona

Geology and Mines Department

Karangwa Ernest, Bagilijabo


Jean D'Amour
Byayesu Nathan

Geology and Mines Department

Bagilijabo Jean D'Amour

Geology and Mines Department

Bagilijabo Jean D'Amour

Geology and Mines Department

Bagilijabo Jean D'Amour

Geology and Mines Department

Uwamahoro Fiona
Kayihura Juvenal

Geology and Mines Department

Kayihura Juvenal

Geology and Mines Department

Karangwa Ernest, Bagilijabo


Jean D'Amour

Geology and Mines Department

Karangwa Ernest, Bagilijabo,


Byayesu Nathan

Geology and Mines Department

Bagilijabo Jean D'Amour

Geology and Mines Department

Uwamahoro Fiona

Geology and Mines Department

Bagilijabo Jean D'Amour,


Uwamahoro Fiona

Geology and Mines Department

Uwamahoro Fiona, Byeyesu


k. Nathan

Geology and Mines Department

Karangwa Ernest, Kagabo


Joseph

Geology and Mines Department

Juvenal Kayihura

Geology and Mines Department

Karangwa Ernest, Kagabo


Joseph

Geology and Mines Department

Kayihura Juvenal

Geology and Mines Department

Karangwa Ernest, Nkaka


Victor and Kagabo Joseph

Geology and Mines Department

Uwamahoro Fiona, Byeyesu


k. Nathan

Geology and Mines Department

Uwamahoro Fiona, Byeyesu


k. Nathan

Geology and Mines Department

Uwamahoro Fiona, Byeyesu


k. Nathan

Geology and Mines Department

Byayesu K. Nathan

Geology and Mines Department

Byayesu K. Nathan

Geology and Mines Department

Byayesu K. Nathan

Geology and Mines Department

Byayesu K. Nathan

Geology and Mines Department

Bagirijabo Jean D'Amour,


Uwamahoro Fiona

Geology and Mines Department

Bagirijabo Jean D'Amour,


Uwamahoro Fiona

Geology and Mines Department

Bagirijabo Jean D'Amour,


Uwamahoro Fiona

Geology and Mines Department

Uwamahoro Fiona

Geology and Mines Department

Uwamahoro Fiona

Geology and Mines Department

Uwamahoro Fiona

Geology and Mines Department

Uwamahoro Fiona

Geology and Mines Department

Uwamahoro Fiona

Geology and Mines Department

Uwamahoro Fiona

Geology and Mines Department

Uwamahoro Fiona

Geology and Mines Department

Uwamahoro Fiona

Geology and Mines Department

Uwamahoro Fiona

Geology and Mines Department

Uwamahoro Fiona

Geology and Mines Department

Uwamahoro Fiona

Geology and Mines Department

Uwamahoro Fiona

Geology and Mines Department

Uwamahoro Fiona

Geology and Mines Department

Kayihura Juvenal

Geology and Mines Department

Kayihura Juvenal

Geology and Mines Department

Kayihura Juvenal

Geology and Mines Department

Kayihura Juvenal

Geology and Mines Department

Karangwa Ernest

Geology and Mines Department

Karangwa Ernest

Geology and Mines Department

Karangwa Ernest

Geology and Mines Department

Karangwa Ernest

Geology and Mines Department

Karangwa Ernest

Geology and Mines Department

Karangwa Ernest

Geology and Mines Department

Karangwa Ernest, Kagabo


Joseph

Geology and Mines Department

Karangwa Ernest

Geology and Mines Department

Karangwa Ernest

Geology and Mines Department

Karangwa Ernest

Geology and Mines Department

Karangwa Ernest

Geology and Mines Department

Karangwa Ernest

Geology and Mines Department

Bagilijabo Jean d'Amour

Geology and Mines Department

Bagilijabo Jean d'Amour

Geology and Mines Department

Bagilijabo Jean d'Amour

Geology and Mines Department

Bagilijabo Jean d'Amour

Geology and Mines Department

Bagilijabo Jean d'Amour

Geology and Mines Department

Bagilijabo Jean d'Amour

Geology and Mines Department

Bagilijabo Jean d'Amour

Geology and Mines Department

Bagilijabo Jean d'Amour

Geology and Mines Department

Bagilijabo Jean d'Amour

Geology and Mines Department

Bagilijabo Jean d'Amour

Geology and Mines Department

Bagilijabo Jean d'Amour

Geology and Mines Department

Bagilijabo Jean d'Amour

Geology and Mines Department

Bagilijabo Jean d'Amour

Geology and Mines Department

Bagilijabo Jean d'Amour

Geology and Mines Department

Bagilijabo Jean d'Amour

Geology and Mines Department

Bagilijabo Jean d'Amour

Geology and Mines Department

Bagilijabo Jean d'Amour

Geology and Mines Department

Bagilijabo Jean d'Amour

Geology and Mines Department

Byayesu K. Nathan

Geology and Mines Department

Byayesu K. Nathan

Geology and Mines Department

Byayesu K. Nathan

Geology and Mines Department

Byayesu K. Nathan

Geology and Mines Department

Byayesu K. Nathan

Geology and Mines Department

Byayesu K. Nathan

Geology and Mines Department

Byayesu K. Nathan

Geology and Mines Department

Byayesu K. Nathan

Geology and Mines Department

Byayesu K. Nathan

Geology and Mines Department

Byayesu K. Nathan

Geology and Mines Department

Byayesu K. Nathan

Geology and Mines Department

Kayihura Juvenal

The current Progress


Criteria Score of the
mine site

Reference of last Mine


Inspection Report

JK/RW018WP/2014/001

3.3

JK/RW019WP/2014/001

2.8

EK/RW014WP/2014/001

2.6

JK/RW017WP/2014/001

3.29

EK/RW004WP/2014/001

3.03

EK/RW026WP/2014/001

3.02

EK/RW024/2014/001

3.3

JK/RW020WP/2014/001

2.9

JK/RW016WP/2014/001

2.99

EK/RW023WP/2014/001

2.75

EK/RW015WP/2014/001

EK/RW033WP/2014/001

3.025

EK/RWO11WP/2014/001

3.1

EK/RW021WP/2014/001

2.9

UF/RW016EP/2014/001

3.025

KE/RW020EP/2014/001

3.5

JB/RW026EP/2014/001

3.3

JB/RW027EP/2014/001

3.1

JB/RW024EP/2014/001

3.4

UF/RW015EP/2014/001

3.3

KJ/RW018EP/2014/001

3.1

KE/RW019EP/2014/001

2.7

KE/RW021EP/2014/001

3.2

JB/RW023EP/2014/001

3.2

UF/RW017EP/2014/001

FU/RW022EP/2014/001

UF/RW014EP/202014/001

2.96

EK/RW015NP/2014/001

JK/RW021NP/2014/001

2.74

EK/RW013NP/2014/001

JK/RW022NP/2014/001

3.1

EK/RW014NP/2014/001

2.4

FU/RW018NP/2014/001

2.8

FU/RW017NP/2014/001

3.3

FU/RW016NP/2014/001

3.4

BKN/RW005KC/2014/005

BKN/RW003KC/2014/001

3.4

BKN/RW004KC/2014/001

3.6

BKN/RW002KC/2014/001

3.7

JB/RW018SP/2014/001

3.3

JB/RW016SP/2014/001

3.5

JB/RW017SP/2014/001

2.8

FU/RW003SP/2014/002

3.208

FU/RW009SP/2014/002

2.9

FU/RW023SP/2014/001

2.9

FU/RW021SP/2014/001

2.8

UF/RW020SP/2014/001

3.37

FU/RW005SP/2014/002

2.7

FU/RW019SP/2014/001

2.7

FU/RW031SP/2014/001

2.9

FU/RW016SP/2014/001

FU/RW032SP/2014/001

3.125

FU/RW024SP/2014/001

2.7

FU/RW013SP/2014/002

EK/RW008NP/2014/001

3.7

JK/RW004NP/2014/003

3.6

JK/RW002NP/2014/003

3.6

JK/RW002NP/2014/003

3.6

JK/RW003NP/2014/002

3.1

EK/RWO12WP/2014/002

3.12

EK/RWO11WP/2014/002

3.12

EK/RWO31WP/2014/002

3.04

EK/RWO27WP/2014/001

3.1

EK/RWO33WP/2014/001

3.2

EK/RWO28WP/2014/001

3.15

EK/RWO25WP/2014/001

2.99

EK/RWO29WP/2014/001

3.1

EK/RWO9WP/2014/001

3.03

EK/RWO10WP/2014/001

3.15

EK/RWO32WP/2014/001

3.1

EK/RWO30WP/2014/001

3.5

BJ/RW055EP/2014/002

2.9

BJ/RW043EP/2014/001

2.8

BJ/RW039EP/2014/001

3.2

BJ/RW038EP/2014/001

3.4

BJ/RW040EP/2014/002

BJ/RW044EP/2014/001

3.1

BJ/RW037EP/2014/001

3.3

BJ/RW036EP/2014/001

3.2

BJ/RW035EP/2014/001

2.8

BJ/RW034EP/2014/001

3.3

BJ/RW030EP/2014/001

2.9

BJ/RW041EP/2014/001

3.6

BJ/RW078EP/2014/002

3.3

BJ/RW031EP/2014/001

3.4

BJ/RW033EP/2014/001

BJ/RW039EP/2014/001

3.5

BJ/RW032EP/2014/001

BJ/RW042EP/2014/001

3.5

BKN/RW014SP/2014/002

3.7

BKN/RW031SP/2014/001

3.6

BKN/RW028SP/2014/001

3.6

BKN/RW028SP/2014/001

3.7

BKN/RW001SP/2014/002

3.7

BKN/RW026SP/2014/001

3.5

BKN/RW027SP/2014/001

3.8

BKN/RW012SP/2014/002

3.8

BKN/RW005SP/2014/002

3.6

BKN/RW004SP/2014/002

3.7

BKN/RW029SP/2014/001

JK/RW020NP/2014/001

2 Red Flag Information


Inspection Comments

Non-state Armed
Groups present in Mine

Some small subsites were temporally suspended for


None
further measures of correction on their current status and
the company was advised to halt stop washing in straems

The unsafe area should be corrected and well shaped

None

the company should stop mining operations in marshland


and forest and shift activities in a new place

None

The cooperative has been recommended to have nursery None


bed, avoid washing in streams,provide enough PPEs to
worker and provide office and storehouse near the office.

There is a need to manage well tailings and also PPEs are None
not adequate

Tailings are dispessed all around the mine. The company


shoild estabilsh a way on how tailings are managed and
expropriate the families near by mine

None

The company uses trenches which accelerates erosion,


wast rock is not well managed and tunnels are not safe

None

There are no fast aid kits available on the site,some


workers have not PPE S, no sign poston roads and at
mine sites, hytgiene facilities not available and all
documents are not available.

None

The taxes are not pait to government, office is not


organised and sign posts are not adequate

None

No enough PPEs, tailings are not well maintained and ther None
is no sanitatio facilities to workers
No PPEs to miners, Tailings are not well managed, tunnels None
are unsafe, no sanitation facilities for workers.

Tailings are not well managed, there are few documents in None
the site, and tunnels are not sefe

Tailings are not well managed and PPE's are not adequate none
and there are few documents in the office

Tailings are not well managed are not well managed there None
are few documents in the office and ground
sluicingaccelerates erosion

The operational area is located within crop field and not


fenced for security provision, PPEs are not adequate, no
sanitation facilities at the mine

None

Some mine documents are kept in headquarter in kigali


and very few sign posts on the main roads, also there is
no mine map

None

Hard roch in the tunnels is a barrier to get more production None


because is delaying mining activities. Open pit are not
covered
Tunnels are not fenced, no nursery bed, and PPEs are not None
available, no nursery bed.

No first aid kit at the mine, office is not well equiped,


hygiene facilities are not adequate and workers are paid
by hand

None

There is a partial fencing of the site, there are risk tunnels None
near people's habitat , some families are close to the
poerational site, some dociments are kept in Kigali.

Rain water from the hill enters the mine and reach the
None
entrances of the tunnels, PPEs are not adequate, the dam
where water is pumped is not fenced, the office is not well
arranged
PPE's are not enough, ensure security and safety in
tunnels, no improved washing structure, no enough
signpost

None

Waste rock management problem, tunnels are unsafe, no None


document on site, mineral washing is not improved

Poor Filing, the shafts are not covered and the sanitation
facilities are the same for both sex.

None

Inadequate PPEs, Few mining tools, some documents are None


missing from the site office and there are very few
activities on the site
All sites are not fenced, some documents are missing from None
the site office, tunnels and shafts are open to disect rain
water

The entrance are not propery timbered, no safety signs in None


the mine, some documents are missing in the mine office
and policies are verbally communicated but not
documented
No signpost either warning or directing signpost, poorly
None
constructed office,no plan for managing waste and tunnels
are not well constructed

Some quantity of tailings goes to the bottom of the valley None


under settled ponds and some tunnels are risky because
walls fall down especially during rainfall season. The office
is not well arranged and the mine is not fenced

Waste rock at Bututsi sub-site is not well managed, there None


is a problem of erosion, no infrastructure at both sites and
signposts are not available.
No enough PPE's for workers , shafts are not safe, affice
documents are not arranged, mine is not fenced, no
signposts and first aid kit at the site

None

No signpost at the office, few documents at the site,


tailings are not well managed, policies are not written.

None

Workers do not have adequate PPE's, the shafts are not


in good condition, there is water inlets, waste water and
tailings are not well managed, no documents at the site
office, no directing and safety signs

None

Workers were found without PPE's, mining was in disNone


organised way, tailings are not well managed,tunnels are
not strongly timbered and some documents are kept at the
company's heardquarter/Kigali

No PPE''s available, tunnels are not well developed, they


are poen to outlets and rain water, some documents are
kept in Kigali office

None

No written policies, no signposts, there is a need to install None


lightening in the tunnels

Signposts were not adequate, workers getting salaries by


cash, no written policies

None

Insufficient PPE's on site, No sign post Indicating the


company, insufficient documents at the site and tailings
are not well managed

None

No sign posts inside and outside mine, PPE's are


available but no big enforcement to some workers

None

Mineral washing is placed in wetland, workers were not


None
fully equiped, the site is poorly extracted, all site were not
fenced and wer near the crop field. Also some documents
were not kept at the site office
workers were not fully equiped, tunnels are not well
developped, documents are not kept in site office and no
post sign directing to the mine site and no safety signs

None

Washing place is near the wetland and so high possibility


of polluting it, no sign post directing to the mine site, poor
document filing and some of documents were missing in
the site office kept in Kigali

None

Large volume of waste water and tailings are released


None
from the mine sites, no directing and safety sign posts in
place, some documents are kept at Kigali and the name of
the company is not written on the PPE'S.

workers were not fully equipped, the operational site is not None
fenced, mining is done in dis-organised way and few
workers are paid by cash

Exploitation is done in dis-organised way, there was a


large volume of waste, sites are not fenced and office
documents are not organised

None

There are many waste and no sustainable way for


managing them, all workers were not fully equipped,
tunnels entrance are not controlled, no site hygiene
facilities and store, sing-post were not adequate and
operational site was not fenced

None

Sites are not fenced, large volume of mine waste that are None
not well managed and some tunnels are developped near
the road

Hyiene gender sensitive bath rooms are not available,


some workers were found not fully equipped

None

Nyabarongo river is polluted by the company, on site store None


is not used, miners's clothes is kept at the tunnel entrance
and the site is not fenced

Bakokwe river is polluted by mineral washing , no PPE's,


site was not fenced and no hygiene facilities at the site.

None

PPE's are not adequate, no plan for mineral


exploration/exploitation, no hygiene facilities at the site,
site is not fenced and there are no adequate sign-post.

None

Mining is done in dis-organised way which can cause


accedent easly, the site is not fenced , there are very few
directing sign-post

None

Tunnels entries are not controlled, there are hanging


rocks; the site is not fenced and no technics in place to
protect soil erosion.

None

No technics in place to manage tailings and waste rocks


None
from the site, site is not fenced and one family is very
close to the operational site, all docements are kept at the
office of Kigali, no adequate PPE's and sign-postto direct
and for safety.
some workers are paid by cash

None

At the mine site's office there is no suffucient documents None


related to the mine, tailings are found every where of hill,
at some places of the roads, there are no signpost and
some miners have PPE's but not wear them and others go
back home wearing PPE's which is not allowed.

At the entry ponts of the mine sites, there are no warning


post, some miners working underground wear their own
clothes, however they have all PPE's.

None

Hand Paning causes loss of minerals because the mineral None


technology washing is low, tailings are not well managed
Miners go back h there home with PPE's and there are
None
some tunnels located near by internal roads and not yet
closed, the mineral recovery is still low and due to lack of
appropriate methods of blasting some miers are working in
confined areas
unsafe tunnels/ pits with risky hunging rocks, waste rock is None
not well managed and poor mineral washing structure

waste rock not well managed, use of ground


sluicing(trenches) contaminates the near by river

None

tailings not well managed, no office and documents on the None


site

Erosion problems, tailings not well managed and PPE's


available but not enforced

None

No PPE's to some workers, erosion problem, waste rock


not well managed and minerals are not well recorded for
each site

None

Few PPE's, waste rock not well managed and few


documents in the office

None

Waste rock not well managed, few/no documents on the


site and no basic infrastructure ( toilets, stock) at the site

None

Erosion problem, tailings not well managed, PPEs are not None
enough tp all workers and the mine is not fenced and it
located near household

There are few documents in the site office, few PPE's to


workers and no first aid kit to the mine

None

Few PPE's to workers and the mine is not well prepared


and basic infrastructure in the site.

None

Erosion problems, trench which contaminates water

None

Working near the river which might destroy it.

None

Office documents are kept at the head office /Kigali, site is None
not fenced and some workers are paid by cash
tunnels are without roofing, mine site is not fenced, rick of None
oxygen defiency and poor filing of documents
Tailings management is critical, Mine site and tunnels are
not well fenced and no sign post

None

Mine site is not fenced, tunnels are not roofed and there is None
risk of oxygen defiency
Tunnels are not roofed and fenced, all workers are not
None
equipped and there is poor tailings management

Tunnels are roofed and fenced, records/office documents None


are not well filed, singposts are not adequate and workers
are paid via cash
Poor filing, mine site not fenced and all workers are not
equipped

None

Mining site is not fenced, all workers are not equipped,


and there is poor filing of documents

None

No documents records on mine sites, all workers are not


equipped and the production is low.

None

Tunnels are not controlled/roofed, office records are not


None
available on mining site and there is poor hygien facilities.
poor filing, poor hygiene facilities, insufficient sign post
Tailings are scattered

None

No sign post, insufficient sanitation facilities, workers are


paid by cash, poor filing and PPEs are not adequate

None

some office records are not available at mine site office,


tailings are scattered and tunnels are not roofed

None

There is no plan for sustainable mineral exploitation,


tunnels are not fenced and roofed, PPEs are not
adequate, there is no proper office arrangement for
documents and workers are paid via cash

None

The shafts are not roofed, office documents are not well
None
managed, no nursery bed and gender sensitive toilets and
wash rooms available and there is no mine plan

Shafts not fenced, all workers are not equipped and no


documents record on mine site

None

Tailings management is critical and likely to move down


None
the lake if not catered for, no sign post, workers are still
paid via cash, sanitation facilities are not adequate and the
mine is not fenced
Poor filing of mine documents, workers are paid by cash
and tunnels are not fenced and roofed

None

the site is located on a steep slope making it easier for


None
tailings or waste water to be eroded into near water bodies
and the size of retaining ponds is small

Insufficient PPEs, the washing facilities are in poor state,


waste water are eroded into near by water body

None

No sign post from main road to the operational area,


insufficient document kept at the site, insufficient PPEs,
and there are no written policies

None

No documents at the mine site, few awareness safetysigns None


at the site and no written policies

Sign posts are not adequate, emergency plan, no


condoms and bronchures and no records of accidents

None

No safety awareness signposts in the mine site, no vivitors None


book, scanty washing facilities, tunnels are constructed in
shaddy wayand there are challenges of managing waste.

No safety awareness signposts in the mine site, the size of None


rataining ponds is not tunnels are not well constructed
and timbered, PPEs are insufficient and washing facilities
are not well constructed.
Documents relating to Gashorera site were not availled,
retaining ponds and tailings dums are few in number, no
workers'organisation

None

Retaining ponds are full, no terraces, erosion problems, no None


visitors book, no security fences and locked gates the
walls are slopeangle

Install sign posts from the main road to the mine site,
tailings are released into water bodies,

None

No written Policies, few awareness safety signs in the


mine site and retaining pondsare in poor state.

None

No signpost, no fences to the water ponds,mine site not


None
fenced, no first aid kit, some tunnels are very risky due to
hanging rocks at enrty ponts, tailings management is very
critical, they move easly down the slope

Illegal Armed Forces or


Police Present in Mine

Children present in Mine

Forced Labor at Mine

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

None

None

None

None

No

None

None

No

None

None

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

None

No

No

AFP
Influx of Foreign
Minerals

Sampling took Place


(complete, partly, none)

None
done by GMD with BGR
support
None

Data Source

done by GMD with BGR


support

None

Police, National Army,


inspector and local leaders

inspector, local leaders and


mine manager
Local Authorities and
Company Manager

not yet done

None
not yet done

None
done by GMD with BGR
support
None

The committee of the


cooperative was interviewed
and local Authority

site Manager, local leaders


and Police

Police,Local Authorities,Miners
done by GMD with BGR
support

None
done by GMD with BGR
support
None

Local Authorities, Site


observation, site manager

Manager and local Authorities


done by GMD with BGR
support

None

Manager and local Authorities


not yet done

None
not yet done
None

Manager,Local Authorities and


observation.
Local Authoroties, Cooperative
Manager

not yet done

None
done by GMD with BGR
support
None
done by GMD with BGR
support
None
done by GMD with BGR
support
None
not yet done

None
not yet done
None
done by GMD with BGR
support
None

Local Authority, Mine


Manager and site observation

Local Authority and Mine


Manager

Local Authority, Site


observation and mine
Manager

Local Authority, Local


community, Company
Manager

Local Authority,Site
observation, mine Manager

Local Authority,Site
observation, mine Manager

N/A
not yet done

None

N/A
not yet done

None
done by GMD with BGR
support

Local Authority, lacal


Community, the company's
administration

None

Manager, Local Authority


not yet done

None
not yet done
None

Local Authority and Mine


Manager

Local Authority, Mine manager


not yet done

None
not yet done

Local Authorities, Site


observation

partly done (only Gitoki


site)

The company's administration,


Local Authority, local
community

not yet done

The company's administration,


Local Authority, local
community

None

None

None

Company's administration,
Local Authority
not yet done

None
done by GMD with BGR
support
None

Manager, Miners,
Documentation.

Manager, Miners,
Documentation.
done by GMD supported
by BGR

None
not yet done
None

Local Authority, on site


observation

Local Authority, Police, Miners,


Store keeper of the company
not yet done

None

None

partly done (only


Nyarurama site)

Local Authority, Mine manager

Company's administration,
Local Authority and local
done by GMD supported Community
by BGR

None

Local Authority, Mine manager


not yet done

None
done by GMD supported
by BGR
None

Local Authorities, Mine


Manager, Site Observation

The office operator


not yet done

None

the operator's head office


not yet done

No

the operator's head office


not yet done

None

done by GMD supported


by BGR

None
partly done (only
Rwimpiri site)
None

the operator's head office

The company's office, Local


Authority, Local Community

not yet done

The company's administration,


Local Authority, Local
Community

not yet done

The company's administration,


Local Authority, Local
Community

None

None
partly done
(onlyBukokora site)

Local Athority, Local


Community,the company's
administration

None

Local Athority, Local


Community,the company's
done by GMD supported administration
by BGR

None

Local Athority, Local


Community,the company's
administration

not yet done

None
not yet done

None
done by GMD with BGR
support
None
done by GMD with BGR
support
None
partly done (only
Rwibiraro site)
None

Local Authority, Local


Community and Company's
office

Local Authority, Local


Community and Company's
administration

Local Authority, Local


Community and Company's
office

Local Authority, Local


Community and Company's
office (headquarter)

idem

Local Authority, Local


Community and Company's
office (headquarter)

idem

Local Authority, Local


Community and Company's
office (headquarter)

None

None
idem

Local Authority, Local


Community and Company's
office (headquarter)

not yet done

Local Community, Local


Authority and Company's
administration

None

None

Local Community, Local


Authority and Company's
done by GMD supported office( headquarter)
by BGR

None

Local Community, Local


Authority and Company's
office

not yet done

None
done by GMD supported
by BGR

Local Authority and


Management team of the
Company

None

Interviews of the manager of


the company, local Authorities
done by GMD supported at District level
by BGR

None

Company Management and


done by GMD supported District Authorities
by BGR

None

Company's management
team, District Authorities
done by GMD supported
by BGR

None

Local Authority, Mine manager


and inspection observation on
done by GMD supported site
by BGR

None
done by GMD supported
by BGR
None

Site observation, local


Authority and mine manager

Site observation, local


Authority and mine manager
not yet done

None
not yet done

None
partly done (only
Kinyamavuta site)
None

Site Manager Information,


local Authorities and site
observation

Local Authority, Mine Mnager


and site Observation

Local Authority, Mine Mnager


and site Observation
not yet done

None

Local Authority, Mine Mnager


and site Observation
not yet done

None

Local Authority, Mine Mnager


and site Observation
not yet done

None

Local Authority, Mine Manager


and mine staff and site
done by GMD supported Observation
by BGR

None

Local Authority, Mine Manager


and members and site
Observation

partly done (only


Rwibiraro site)
None
done by GMD supported
by BGR

Local Authority, Mine Manager


and site Observation

None

Local Authority, Mine Manager


and site Observation
not yet done

None
not yet done
None

Local Authority and site


done by GMD supported Observation
by BGR

None
not yet done
None

Local Authority, Company and


site Observation

not yet done

None
not yet done
None
not yet done

Local Authority and company


administratiom
Local Authority and Site
Observation
Local Authority and
cooperative administration

Local Authority and


cooperative administration

None

Local Authority and Company


done by GMD supported administration
by BGR

None

Local Authoroty, Company


done by GMD supported Administration
by BGR

None
not yet done
None

Site Observation, local


Authority and company
Administration

Local Authority, Site


done by GMD supported Observation and Company
by BGR
Mnagement

None
not yet done

None

Site Observation, Company's


Administration and Local
Authority

Site Observation, Company's


Administration
not yet done

None

Local Population, Local


done by GMD supported Authority Company
Administration
by BGR

None

Inspection and local


Authorities
not yet done

None

Local Authority and Company


Administration
not yet done

None
not yet done

None

Local Authority and Company


Administration, Observation
on mine site

Site visit and local Authority


Information
not yet done

None
not yet done

None

Observation on mine site,


Local Authority and Company
Administration

Form the operator's office


done by GMD supported
by BGR

None

Form the operator's office


not yet done

None

Form the operator's office


not yet done

None

Form the operator's office


done by GMD supported
by BGR

None

done by GMD supported


by BGR

Form the operator's office

None

Form the operator's office


not yet done

None

Form the operator's office


done by GMD supported
by BGR

None

Form the operator's office


partly done (only
Gashorera site)

None

Form the operator's office


partly done (only Kanyoni
and Nyabitare site)

None

Form the operator's office


done by GMD supported
by BGR

None

Form the operator's office


done by GMD supported
by BGR

None

Local Authority, interviews of


miners on site
not yet done

National mine site requirements


PPE's Available

Safety at the operating site

Available but not adequate

Miners at Kamuraramira and gaseke


( some sub-sites) were mining in unsafe
way with risk under rock-falls

Available

the walls of the pit are sleepy and need to b


well sheped in order to avoid accident

Not enough PPEs

safe tunnels and and PPEs are not


provided to miners

PPEs not available

some tunnels are risky with soft rock

Enough PPEs

More improvement needed

PPEs are available but not adequate

More improvement is needed

Enough PPEs

unsafe tunnels

PPEs available but not adequate

Very Good

PPEs not adequate

tunnels and open mines are typically


artisanal where no timbers are used to
inforce the roof of tunnlels

Not enough PPEs

More improvement needed

No PPEs available

Tunnels are not safe

enough PPEs

Tunnels are not safe

Not enough PPEs

More improvement needed

More improvement needed

More improvement needed

Not enough PPEs

More improvement needed

Not enough PPEs

More improvement needed

PPEs available

More improvement needed

PPEs are insufficient

More improvement needed

More improvement is needed

More improvement needed

Enough PPEs

A small part of the site is fenced and near


local people's habitat

Not enough PPEs

At some entrances of tunnels there are rock


falls

Not enough PPEs

More improvement needed

PPEs available

unsafe tunnels

enough PPEs

More improvement needed

Not enough PPEs

More improvement needed

enough PPEs

More improvement needed

enough PPEs

More improvement needed

enough PPEs

Tunnels are not well constructed and not


safe

enough PPEs

some tunnels are risky and fall down


especially during rainfall season

Raise awareness to workers to wear


PPE's

More improvement needed

Not enough PPEs

shafts are very vertical and hanging blocks


likely to cause accidents

enough PPEs

More improvement needed

Not enough PPEs

More improvement needed

PPEs not available

Tunnels are not well constructed and not


safe

PPEs not available

Tunnels are not well constructed and not


safe

PPE's to miners is provided though


more awareness on being worn is
needed

More improvement needed

PPE's related to their activities are


available

More improvement is needed

PPE's are not adequate

More improvement needed

PPE's not enforced to some workers

More improvement needed

Workers were not fully equipped,

More improvement needed

Workers were not fully equipped,

Tunnels are not well developed

More improvement is needed

More improvement needed

Not enough PPEs

More improvement needed

Not enough PPEs

More improvement needed

Not enough PPEs

More improvement needed

Not enough PPEs

More improvement needed

Not enough PPEs

More improvement needed

More improvement is needed

More improvement needed

PPEs are available but not well


managed

More improvement needed

PPEs not available

More improvement needed

Not enough PPEs

More improvement needed

Not enough PPEs

The mining activities is done in disorganisation way such that it can cause
accident easily

More improvement needed

More improvement needed

Not enough PPEs

More improvement needed

More improvement needed

More improvement needed

some workers have PPEs but do not


use them

More improvement needed

Enough PPEs

Safe

Enough PPEs

More improvement needed

Enough PPEs

Blasting method which is not advanced at


the company site make some miners to
work under confined areas

Enough PPEs

tunnels are unsafe

Enough PPEs

More improvement is needed

Enough PPEs

More improvement is needed

Enough PPEs but not enforced

More improvement is needed

PPEs available but not adequate

More improvement is needed

PPEs available but not adequate

More improvement is needed

PPEs available

More improvement is needed

PPEs are not adequate

More improvement is needed

PPEs are not adequate

More improvement is needed

Not enough PPEs

More improvement is needed

PPEs available

More improvement is needed

PPEs available

More improvement is needed

PPEs available

Very Good

PPEs available

More improvement is needed

PPEs available

More improvement is needed

PPEs available

Tunnels are not roofed

PPEs available but not adequate

Tunnels are not roofed

PPEs available

Tunnels are not roofed

PPEs available but not adequate

More improvement is needed

PPEs available but not adequate

More improvement is needed

PPEs available but not adequate

More improvement is needed

PPEs available

More improvement is needed

PPEs available

More improvement is needed

PPEs available

More improvement is needed

PPEs available

More improvement is needed

PPEs available

More improvement is needed

PPEs available

More improvement is needed

PPEs available

More improvement is needed

PPEs available

More improvement is needed

PPEs available

More improvement is needed

PPEs available

More improvement is needed

PPEs available

More improvement is needed

PPEs available

More improvement is needed

PPEs available

More improvement is needed

PPEs available

More improvement is needed

PPEs available

More improvement is needed

PPEs available but not adequate

More improvement is needed

PPEs available but not adequate

More improvement is needed

PPEs available but not adequate

More improvement is needed

PPEs available but not adequate

More improvement is needed

PPEs available

More improvement is needed

PPEs available

More improvement is needed

Environmental status

Streams are polluted by mineral


washing

good

Tailings are not well managed and the


company is working in marshland
where river is polluted. Is also working
in governmental forest

Washing is done in streams and there


is no plan for rehabilitation

There are no environmental threats,


Mine site waste water and tailings are
well managed and controlled.

Tailings aredispessed all around the


minemanaged

Tailings are not well managed , use of


trenches is acceraleting erosion.

Very good

good

Tailings are not well managed

Tailings are not well managed

Tailings are not well managed

More improvement needed

Tailings are not well managed and


ground sluicing accelerates erosion

More improvement is needed

No written policies, office is not


equipped, PPEs are not adequate,
sign post are not enough.
good

good

good

More improvement is needed

No nursery bed is available

No improved washing structure

waste rock is not well managed

More improvement needed

More improvement is needed

More improvement is needed

More improvement is needed

There is no plan for managing waste

some quantity of tailings goes to the


bottom of the valley under settled
ponds

waste rock is not well managed

More improvement needed

Tailings are not well managed

Waste water and tailings are not well


managed

waste/ Tailings are not well managed

More improvement is needed

good

Good

More improvement needed

More improvement needed

Washing is done in wetland

Recent damages are due to to


uncontrolle soil erosion

More improvement is needed

Large volume of waste water and


tailings are released from the mine site

Mining is done in dis-organised way

Large volume of tailings is released


from the mine site and no plan for their
management

washing activities are done very close


to Rwobe river which can easly
polluted without sustainable technics
for protecting it

Waste is not well managed

Very good

Nyabarongo river is polluted by mining


activities

Bakokwe river is polluted by mineral


washing

More improvement needed

More improvement needed

More improvement needed

tailings and waste rocks are not well


managed

More improvement needed

Very good

Very good

Tailings are not well managed

some tunnels are located near by


roads

waste rock is not well managed

waste rock is not well managed and


use of ground sluicing contaminates
the river

Tailings are not well managed

Tailings are not well managed

Erosion problem at the site and waste


rock are not well managed

waste rock not well managed

waste rock not well managed

Erosion problem at the site and waste


rock are not well managed

Nursery bed is not available

More improvement is needed

More improvement is needed

erosion problem, contaminated mine


water released into water bodies,
rivers swamps

Very good

More improvement is needed

Tailings are not well managed, erosion


problem, no nursery bed available.
Erosion Problem
More improvement is needed

More improvement is needed

More improvement is needed

More improvement is needed

More improvement is needed

More improvement is needed

More improvement is needed

Tailings are not well maintained and


erosion protection measures are not
implemented

good

More improvement is needed

No nursery bed is available

good

Erosion Protective measures are not


implemented and no nursery bed for
reclamation

More improvement is needed

More improvement is needed

More improvement is needed

More improvement is needed

erosion protection measures are not


implemented

good

good

More improvement is needed

More improvement is needed

More improvement is needed

More improvement is needed

More improvement is needed

More improvement is needed

Wayforward/comment

Improve environmental issue provide adequate PPEs to workers .

More improvement is need for healthy and sacurity of workers in small open pit

the company should stop mining operations in marshland , and the company should
provide a safe working environment for workers and also there should be a plan for
waste management

More improvement is needed to safe environment and also providing enough PPEs to
workers

More improvement is needed for Tailing management and the company should provide
adequate PPEs to workers and rise awareness to wear them

establish a way on how environment is managed and the company was advised to
purchase insurance for all workers

The company should put in place mechenisms for tailing management and mineral
washing should managed to evoid erosion. Tunnels should be well constructed in order
to ensure safety of workers
The company shold put adequate sign post on roads and in the mines, provide hygienic
facilities and enough PPEs to workers and documents related to mines must be kept at
the mine site office.

The cooperative has been recommended to pay taxes and organise office and also
provide enough PPEs to workers and put enough sign post where necessary

There should be a mechanism for tailing management and PPEs and sanitation facilities
should be provided to workers
the cooperative should provide sanitation facilities and PPEs to workers and also there
should be plan and specific place to manage waste.

Need mechanism for waste rosk management, equip the office with all necessary
document and construct a well supported tunnels

The company has been recommended to put in place mechamism for waste rock and
provide enough PPE's to miners and all necessary documents should be present in the
office.
Tailings should be well managed and all documents should be present in the office.
Washing structure which is advanced should be put in place.

the company was recommended to fence the operational area and to provide
adeaquate PPEs and hygiene facilities to workers

All mine documents should be kept on mine site,provide all necessary PPEs and
inrease sign posts .

the company has been advised technically on how they could remove hard roch which
limits production and then increase mineral production.

the company was recommended to fence the operational area and make tunnels more
accessible and provide adeaquate PPEs to workers.

the company has been recommended to pay workers via bank/ SACCO and provide
adequate hygiene facilities to workers and also have first aid kit at the site.

the company has been recommended to fully fence the site for security provision and to
have a plan for expropriating families which are near the operational site and transfer all
missing documents to the site office.

the company was advised to take measures for avoiding rain fall in the mine, provide
enough PPEs to workers, fence the area where water is captured, remove soft rock
that may fall on miners at the entry of the tunnels, to have nursery bed and to imrove
the office arrangement.
It should provide enough PPEs and construct a well suported tunnel, washing structure
should be improved and put in place appropriate signpost

It should put in place mechanism of waste rock management and ensure safety and
security for workers in tunnels,pits. Also document should always be present in the
office at mine site. There should be an improvement in mineral washing and then
increase mineral recovery.
the company has been recommended to improve office filing and the shafts must be
covered and also toilet must be separate from men to women
Needs to provide PPEs to all workers and tools should be provided in adequacy,
transfer all missing documents to the office site and then inrease mining activities

The company has been advised to fence the sites for security provision , roofing the
tunnels and ensure their security for a safe work environment and also transfer all
missing documents to the site office.

The company has been advised to propery timber and control the tunnel entrance, put
in place safety sign post within the mine, put all missing documents in the office and
write all policies and propery file thwm in the office

The cooperative should put where necessary the signposts, and also office/ store
shuold be equipped. The company was recommended to put in place the plan for waste
management and provide security in tunnels so as to provide good working environment
for workers.
Measures for safety should be taken and the office should be well organised and the
should be a proper plan for running activities and administration set up.

the Company should put in place measures on how to mitigate erosion and also plan for
managing waste. It should be all necessary infrastructure at the both sub-sites and all
signposts should be put in place
Enforce PPE's to all workers and close risky tunnels , install singpost as soon as
possible, prepare office very well and bring first aid kit on the site

The company should provide signposts where necessary and improve mine office and
documents at the site. Policies should be written and communicated to miners.
The company has been recommended to provide adequate PPE's to all workers,
provide safe tunnels, manage waste water and tailings, all related documents must be
available in the site officeand put in place directing sign posts.

The company has been recommended to use PPE's and not keep them in the store, put
in place a basic plan for mineral exploitation and stop mining in dis-organised way,well
manage tailings and transfer all missing documents from head-quarter to the site office

The company has been recommended to provide PPE's to all workers , develop well
constructed tunnels and transfer related documents at the site office

Policies should be written and not communicated verbally, there is a need of signpost
from the main road to the operation area.

The cooperative was requested to increase signpost and pay workers'via Bank and
have written policies.
The company has been recommended to provide enough PPE's for workers and put
edeaute signpost in place and a way of managing waste should be found.

The company should immediatery install warning and sign post and should enforce the
discipline of wearing PPE's.
The company has been recommended to relocate the washing place and to have a
propoer plan for mineral exploitation and keep all documents to the site office

The company should provide adequate PPE's to workers, Develop safe tunnlels and
transfer all related documents at the site office as well as putting in place derecting and
safety signs in the place

The company has been recommended to relocate the washing place , put in place
derecting and safety signs and improve in documentation filing and transfer all missing
documents to the site office.

to immediate establish sustainable plan for managing waste water and tailings from the
sites, put in place the sign posts, transfer all related documents to the mine site office
and write company's name on PPE's

Sensitize and provide adequare PPE's and fence the poerational site for security
provision, have proper plan for mineral exploitation and all workers should be paid via
bank account.

The company has been recommended to have plan for mineral exploitation rehabilitate
and plant trees, put in place a sustainable plan for managing waste water and tailings,
fence operational sites and all documents must be transferred to site office.

Put in place sustainable plans for managing mine waste, provide adequate PPE's,
Control tunnels entrances with strong support, build gender sensitive hygiene facilities
and chenge room at operational site, directing and safety signpost must be adequate
and mine site must be fenced.

Need for fencing all sites for security provision, plan a sustainable way of managing
waste water and there must be a buffer zone from the road to the developped tunnels
for not bracking the access to the road

The company has been recommended to build hygiene bath rooms at all operational
sites and sensitize miners to always be equiped with PPE's.

The company has been recommended to relocate washing from near the bank of the
Nyabarongo river, use facilities (store) to keep miner's clothes and fence the site for
security provision

the company has been recommended to immediatery prepare safe place for washing
and protect Bakokwe river from pollution, provide PPE's to all miners and sensitize their
usage, fence the site for security and build on site hygiene facilities.

The company should provide adequate PPE's to all workers, provide a basic plam for
mineral exploitation, fence the site for security provision and put in place adequate signpost.

Put in place a basic plan for mineral exploitation, fence the operational site for security
provision and increase adequate directing and safaty post signs.

to urgently remove the hanging rocks from the entrance of the tunnels and prevent
water flows into tunnels; fence the site for both the neighbouring families and the
cooperatives security ; to adopt technics for tailings management and find a proper
place for waste management
prepare appropriate place for tailings and waste rock management; fence the site for
security provision and relocate the family near by to a safer place; all related documents
should be transferred to the site office; provide adequate PPE's to all workers and put in
place directing and warning sign-posts.

Payment must be done through bank transfer

The company had been recommended to tranfer all document related to WMP/Gifurwe
to the site office, improve tailing management , put adequate sign on roads and
increase the enforcement on wearing PPEs and construct storehouse for PPE's
management

The company should install the sign posts at every point of entry and to have
appropriate uniform suitable for underground mining and leave them in the store when
miners are going home.

There has to be a plan for highest possible mineral recovery plan and there is need to
improve tailings management through plant installation for cleaning up the tailings
Measures should be taken for prohibiting miners going back home with PPEs and
abandonned tunnels near the road should be closed, the recovery should be improved
and tunnels should be well shaped .

tunnels shold be well constructed and wall slope should be reduced to ensure safe
working environment. The cooperative should construct tailing storage facilities to evoid
erosion and siltation of rivers.

There should be mechanism for waste rock management and advanced washing
structure for minerals should be set to ensure mineral recovery and reduce erosion

the company has been recommended to prepare area where waste rock must be stored
to manage it and all documents related to mine should be available in the office

The Company should put measures to avoid erosion and there should be mechanism
for tailings mechanism for tailings management and enforcement on usage of PPE's

All workers at the site should be fully equipped with PPE's, set up measures to control
erosion that rise from destroyed site, set mechanism on how to manage waste rock and
minerals should be well recorded .

Enough PPE's must be distributed to all workers and waste rock management should
be enforced and improved. All documents should be available in site office

There should be Management for waste rock, improve site office documents and
necessary infrastructure at the site

There should be measures to prevent erosion and the mine should provide tailings
storage facilities on site and PPE's should be distrubuted to all workers and also the
household near the site sould be expropriated.

All documents concerning mining operations must be present in the office and company
must provide enough PPE's to all workers and first aid kit with sufficient equipment must
always be on site.

All workers should be equipped with PPE's and the site should be well prepared with
safe tunnels, environmental management and improve basic infrastructure in the site
(toilet, houses in site,)

There should be mechenism to evoid erosion and advenced washing structure should
be set to ensure mineral recovery and stop erosion

Mining operation should be far away from river or any water body

All mine documents should be at the mine office at Rwinkwavu, fence the site and all
mine workers should be paid through the bank account.
the shaft should be roofed and linked for more oxygen, the site should be fenced and all
documents should be well filed.
The company has been advised to plan for a sustainable tailings management, fence
the site and tunnels and the necessary sign post should be installed
The company has been recommended to fence the site and roof tunnels and linked
them for more oxygen
The Company has been advised to roof tunnels and fence the site, provide adequate
PPEs to all miners and manage them through site store and also avail all related
documents at the site.
They should be roofed/fenced tunnels, the company should establish an office to
improve document filing, install signpost in and out of the office and all workers should
be paid via Bank transfer
The company has been advised to avail all documentsat the site, fence the operational
site and provide edequate PPEs to all workers.
The Company has been recommended to fence the operational site and provide
adequate PPEs to all workers andthem through store and also to avail all documents on
site
The company has been recommended to avail all related documents at the site, provide
adequate PPEs to all workers and increase mineral production

Tunnels should be controlled/ fenced/ roofed, all documents should be available on


mining site and the company should develop adequate hygiene facilities to the mine
site.
The Company has been advised to improve ducuments filing, provide adequare hygiene
facilities, put on proper sign post and proper management of tailings

The Company has been advised to set up sign post on main roads and at the office, to
avail sanitation facilities, to pay worker via Bank transfer, and improve document filing

The Company has been advised to avail all related documents a mine office, fix a
proper management of tailings and roof tunnels

The has to be a written plan for sustainable mining, tunnels should be roofed and
fenced, enforce the use of PPEs, the office should have an office equipped with all
document.

The company has been recommended to roof the shaft, to improve office filing, to
prepare a nursery bed for mine reclamation, and provide adequate toilet and wash
rooms

Shafts should be fenced/roofed, all workers should be equopped with PPEs ad manage
them through site store and all related document should be available at mine office

the company has been advised to plan for a sustainable tailings management, to install
the necessary signposts including warning signpost, and fence the operational mine site

All documents should be well filed, all workers should be paid via bank account and all
tunnels should be fenced and roofed

The company needs to construct big retaining pond in order to avoid the silting of river,
terraces must be advocated in placr where the terrain is steep and the rataining pont
must be enlarged

The company should avail enough PPEs to all workers and manage waste water for not
penetrate into the water bodies

the company should install sign posts from the main road to operational area, all
documents must be kept at mine site office, provide adequate PPEs to all workers and
there should be written policies

The company has been adviced to have written policies, to increase signs at the site
showing out the operational site.

The company has been advised to increase more sign posts, to develop an emergency
plan and put in writing laws on gender and buy condoms and bronchures.

the company has been advised to plant trees on steep slopes so they can mitigate
tailings challenge, the size of tunnels should be looked up on width and height, visitors
book should be available at the mine office, safety awereness sign post must be
increased,
the company has been recommended to enlarge the size of retaining ponds, safety
awareness signs post need to be installed around the site, well construct tunnels,
provide adequate PPEs to all miners and develop hygien facilities.

All documents must be at the site, retaining and tailings dams must be increased,
develop emergency plan, workers organisation must be formed.

the company has been advised to install terraces at the mine sites, mitigating measures
must be place to stop erosional challenges visitors book must be bought

the company has been advised to increase signposts , there must be regular
environmental monitoring to curb the release of water into water bodies and they need
to roof off tunnels to stop dropings inside of tunnels.

Writen policies should be available at the mine site, safety awareness signposts should
be installed and the size of rataining ponds should be enlarged.

the company has been advised to put sign post on road and in mine, fencing the pound
available, support the risky tunnels, roofs and entry points, put a big trench down slope
to capture the tailings moving down the stream.