FUNCTION TEST
Sheet No.
Projects 1.General
& Supplies Co. Data
SUD1-03-001
Page 1 of 7
and Information:
Manufacture
HICO
2. Mechanical Check And Visual Inspection: As per TCS P105 Item no 4.1
Item
Description
Check tightness of all connections
1
Inspect for physical damage / defects
2
Panel condition, cleanliness, organization, labeling, readiness for service, panel
3
doors, handles...etc
4
CT shorting checked
Indications checked
5
6
Check the ferrules as per specification
Panel Earthing checked
7
Confirm that each panel has been properly secured to the floor in its final service
8
location.
Confirm that panels are constructed and wired as per SEC relevant
9
specification.
10
Check case cover and gasket for proper seal against dust.
Check all installed equipment nameplate information for compliance to
11
approved drawings and equipment /material lists.
For all internal and external panel wiring, confirm that all screw terminations are
tight and that crimp connectors are firmly secured to the wire and to the
12
termination point. Ensure that no part of the wire is bent
at the termination point. Check Ferrules.
Check that panel equipment is mounted securely and protected against
13
mal operation due to vibration, shock, etc
Use of ring type terminals for wire termination for current circuit wires.
14
15
16
Checked
Yes
N/A
Yes
N/A
Yes
N/A
Yes
Yes
Yes
Yes
Yes
N/A
N/A
N/A
N/A
N/A
Yes
N/A
Yes
Yes
N/A
N/A
Yes
N/A
Yes
N/A
Yes
N/A
Yes
N/A
Yes
N/A
3. Electrical Tests
Item
1
2
3
4
5
Description
Insulation Resistance Test report of all wires to be submitted by the
contractor prior witnessing and made available
Dc power/ control supply checked.
AC Power/ Control supply checked.
Circuit Breaker, Disconnector and Earth Switch Open/Close status
checked
All CBS, DSWs and ESWs should be tested before starting function
Check
Yes
Checked
N/A
Yes
Yes
Yes
N/A
N/A
N/A
Yes
N/A
ENG/YASSER ELKADY
Date of Test
ENG/MOHAMED HAIDER
08/06/2014
Signature:
Control/Record No.: R/PP/TC/1.084
Customer
SEC COA
Substation No.
S/S : 8515
Contractor
DELTA Co.
Contract No.
GT-1 D05
FUNCTION TEST
Sheet No.
SUD1-03-001
Page 2 of 7
Sl no.
Setting
values
Description
st
1
2
3
4
5
CB blocked status
Closing
Tripping
5.7 bar
5.5 bar
6.7 bar
20 SEC
----
open
close
506
505
open
501Y
501Z
Close /
Open
Condition
Remarks
OK
Test
OK
Service
OK
Test
OK
Service
OK
Test
OK
Service
OK
Test
OK
Service
OK
Test
OK
Service
OK
Test
OK
OK
OK
OK
OK
OK
Service
open
close
501X
Remarks
ENG/YASSER ELKADY
OK
Independent
condition
OK
OK
Date of Test
ENG/MOHAMED HAIDER
08/06/2014
Signature:
Control/Record No.: R/PP/TC/1.084
Customer
SEC COA
Substation No.
S/S : 8515
Contractor
DELTA Co.
Contract No.
GT-1 D05
FUNCTION TEST
Sheet No.
Projects 6.
& Supplies
Co.
Functional
SUD1-03-001
Page 3 of 7
Operation
Close/open
Condition
Test
Service-1
Close*
Open
Service-2
Test &
service
Equipments
DS 504&506
CB- S1305
DS 506
CB-S1305
CB-S1305
DS 504
Status
FO
Test
FC
O
O
FC
L0CAL,BCU,REMOTE &
Protection Relays
Operated
Remarks
OK
OK
OK
OK
Close/open
Condition
Test
Service
Bus
Close/open
transfer-1
Bus
Close/open
transfer-2
ENG/YASSER ELKADY
Equipments
ES 501Y
ES 501Z & 141A (bus bar
earth switch)
CB 505
DS 506,
ES 501X, 501Y, 501Z,
141A & S 1401
DS 506,136 & 134
CB 130
ES 501X, 501Y, 501Z , 141A
& S 1301
DS 106,226A,226B,
124A,124B, 236 & ,234
CB 220 & 230
ES 501X, 501Y, 501Z,
141A & S 1301
Status
Remarks
FO
OK
FC
OK
O
FO
FC
C
OK
OK
FO
FC
OK
C
FO
OK
Date of Test
ENG/MOHAMED HAIDER
08/06/2014
Signature:
Control/Record No.: R/PP/TC/1.084
Customer
SEC COA
Substation No.
S/S : 8515
Contractor
DELTA Co.
Contract No.
GT-1 D05
FUNCTION TEST
Sheet No.
Projects 8.
& Supplies
Co.
Functional
SUD1-03-001
Page 4 of 7
Operation
Close/open
Close/open
Close/open
Condition
Test
Service
Bus
transfer-1
Bus
Close/open
transfer-2
Equipments
ES 501Z
ES 501Y & 261A
DS 504,
ES 501X, 501Y, 501Z ,
261A& S1301
CB 505
DS 504, 136 & 134
CB 130
ES 501X, 501Y, 501Z,
261A & S1301
DS 504,226A,226B,
124A,124B,236 & 234
CB 220 & CB 230
ES 501X, 501Y, 501Z
,261A & S1301
Status
FO
FC
Remarks
OK
FO
OK
O
FC
C
OK
FO
FC
OK
C
FO
OK
Condition
Close/open
------------
Equipments
DS 504 & 506
S 1305
Condition
Close/open
------------
Status
FO
Remarks
OK
Test
P
501Z:
Equipments
DS 504 & 506
S 1305
Status
FO
Remarks
OK
Test
P
Condition
Close/open
------------
ENG/YASSER ELKADY
Equipments
DS 504 & 506
Status
FO
S 1305
U27R, U27Y, U27B
Test
VOLT. AVALIABLE
Remarks
OK
Date of Test
ENG/MOHAMED HAIDER
08/06/2014
Signature:
Control/Record No.: R/PP/TC/1.084
Customer
SEC COA
Substation No.
S/S : 8515
Contractor
DELTA Co.
Contract No.
GT-1 D05
FUNCTION TEST
Sheet No.
SUD1-03-001
Page 5 of 7
Condition
Close/open
------------
Equipments
DS 504 & 506
S 1305
Status
FO
Test
Remarks
OK
Condition
Close/open
Service
Equipments
501X
501Y
501Z
Status
FO
FO
FO
Remarks
OK
Note:
FO: fully open
O: open
C: close
ENG/YASSER ELKADY
Date of Test
ENG/MOHAMED HAIDER
08/06/2014
Signature:
Control/Record No.: R/PP/TC/1.084
Customer
SEC COA
Substation No.
S/S : 8515
Contractor
DELTA Co.
Contract No.
GT-1 D05
FUNCTION TEST
Sheet No.
Projects
& Supplies Co.
Channel
Events
no.
1
2
3
4
5
ENG/YASSER ELKADY
SUD1-03-001
Page 6 of 7
Status
OK
OK
OK
OK
OK
Date of Test
ENG/MOHAMED HAIDER
08/06/2014
Signature:
Control/Record No.: R/PP/TC/1.084
Customer
SEC COA
Substation No.
S/S : 8515
Contractor
DELTA Co.
Contract No.
GT-1 D05
FUNCTION TEST
Sheet No.
Projects6& Supplies
CBCo.
TRIP-2
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
SUPPLY FAIL
INDICATION & GAS ALARM SUPPLY FAIL
SPARE
ALARM DC SUPPLY FAIL
ALARM AC SUPPLY FAIL
BCU SUPPLY FAIL
LCC AC SUPPLY FAIL
DS SWITCHING INCOMPLETE
ES SWITCHING INCOMPLETE
CB MOTOR RUNTIME EXCEED &SPRING UNCHARGE
CB OPERATING MECHANISM FAIL
DS/ES MANUAL MODE
SPARE
SPARE
SPARE
VT ISOLATOR OPEN
VT ISOLATOR SWITCHING INCOMPLETE
SPARE
GIS VT MCB TRIP
COMP.G5-1 SF6 GAS PRESSURE LOW STAGE-1
COMP.G5-1 SF6 GAS PRESSURE LOW STAGE-2
COMP.G5-2 SF6 GAS PRESSURE LOW STAGE-1
COMP.G5-2 SF6 GAS PRESSURE LOW STAGE-2
COMP.G5-3 SF6 GAS PRESSURE LOW STAGE-1
COMP.G5-3 SF6 GAS PRESSURE LOW STAGE-2
COMP.G5-5 SF6 GAS PRESSURE LOW STAGE-1
COMP.G5-5 SF6 GAS PRESSURE LOW STAGE-2
COMP.G5-6 SF6 GAS PRESSURE LOW STAGE-1
COMP.G5-6 SF6 GAS PRESSURE LOW STAGE-2
COMP.G5-7 SF6 GAS PRESSURE LOW STAGE-1
COMP.G5-7 SF6 GAS PRESSURE LOW STAGE-2
COMP.G1-1 SF6 GAS PRESSURE HIGH
Events
Channel
no.
38
39
40
41
42
SPARE
COMP.G5-2 SF6 GAS PRESSURE HIGH
SPARE
COMP.G5-3 SF6 GAS PRESSURE HIGH
SPARE
Test Performed by:
Name:
ENG/YASSER ELKADY
SUD1-03-001
Page 7 of 7
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
Status
OK
OK
OK
OK
OK
Date of Test
ENG/MOHAMED HAIDER
08/06/2014
Signature:
Control/Record No.: R/PP/TC/1.084
Customer
SEC COA
Substation No.
S/S : 8515
Contractor
DELTA Co.
Contract No.
GT-1 D05
FUNCTION TEST
Sheet No.
Projects
Co.
43& Supplies
COMP.G5-5
44
45
46
47
48
49
50
51
52
53
54
55
56
SUD1-03-001
Page 8 of 7
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
Note:
All interlock points were checked according to interlocking conditions table which is approved
by system Operation department.
ENG/YASSER ELKADY
Date of Test
ENG/MOHAMED HAIDER
08/06/2014
Signature:
Control/Record No.: R/PP/TC/1.084