2. Mechanical Check And Visual Inspection: As per TCS P105 Item no 4.1
Item
Description
1
Check tightness of all connections
Inspect for physical damage / defects
2
Panel condition, cleanliness, organization, labeling, readiness for service, panel
3
doors, handles...etc
CT shorting checked
4
Indications checked
5
Check the ferrules as per specification
6
Panel Earthing checked
7
Confirm that each panel has been properly secured to the floor in its final service
8
location.
Confirm that panels are constructed and wired as per SEC relevant
9
specification.
Check case cover and gasket for proper seal against dust.
10
Check all installed equipment nameplate information for compliance to
11
approved drawings and equipment /material lists.
For all internal and external panel wiring, confirm that all screw terminations are
tight and that crimp connectors are firmly secured to the wire and to the
12
termination point. Ensure that no part of the wire is bent
at the termination point. Check Ferrules.
Check that panel equipment is mounted securely and protected against
13
mal operation due to vibration, shock, etc
Use of ring type terminals for wire termination for current circuit wires.
14
15
16

Disconnectors Manual operation by handle and related interlocking


conditions to be checked
Mechanical interlocking between DS & ES to be checked

Checked
Yes
N/A
Yes
N/A
Yes
N/A
Yes
Yes
Yes
Yes
Yes

N/A
N/A
N/A
N/A
N/A

Yes

N/A

Yes
Yes

N/A
N/A

Yes

N/A

Yes

N/A

Yes

N/A

Yes

N/A

Yes

N/A

3. Electrical Tests
Item
1
2
3
4
5

Description
Insulation Resistance Test report of all wires to be submitted by the
contractor prior witnessing and made available
Dc power/ control supply checked.
AC Power/ Control supply checked.
Circuit Breaker, Disconnector and Earth Switch Open/Close status
checked
All CBS, DSWs and ESWs should be tested before starting function
Check

Test Performed by:


Name:

ENG/ YASSER ELKADY

Test Witnessed by:


ENG/MOHAMED HAIDER

Yes

Checked
N/A

Yes
Yes
Yes

N/A
N/A
N/A

Yes

N/A

Date of Test
09/06/2014

Signature:
Control/Record No.: R/PP/TC/1.084

Customer

SEC COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Contract No.

Site Test Record

GT-2 D01
FUNCTION TEST

Sheet No.

Projects 4.
& Supplies
Co. breaker
Circuit

Sl no.

Setting
values
st

SF6 Gas pressure 1 Stage


nd
SF6 Gas pressure 2 Stage
rd
SF6 Gas pressure 3 Stage
CB spring charged condition
Anti-Pumping condition

CB blocked status
Closing
Tripping

5.7 bar
5.5 bar
6.7 bar
20 SEC
----

5. Checking of operation and indications:


Operation
Indication
Equip.
Command LOCAL BCU SAS
LOCAL BCU
Ref
SAS
close
104

open

close

106

105
open
101Y
101X
101Z

Close /
Open

OK
OK
OK
OK
OK

Condition

Remarks

Service

OK

Test

OK

Service

OK

Test

OK

Service

OK

Test

OK

Service

OK

Test

OK

Service

OK

Test

OK

Service

OK

Test

OK

Test Performed by:


Name:

Remarks

open

close

Page 2 of 7

closing / tripping blocking conditions :


Description

1
2
3
4
5

SUD1-03-001

ENG/ YASSER ELKADY

Test Witnessed by:


ENG/MOHAMED HAIDER

OK
Independent
condition

OK
OK

Date of Test
09/06/2014

Signature:
Control/Record No.: R/PP/TC/1.084

Customer

SEC COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Contract No.

Site Test Record

GT-2 D01
FUNCTION TEST

Sheet No.

SUD1-03-001
Page 3 of 7

Projects & Supplies Co.

6. Functional and interlocking test for circuit breaker -105:


Operation

Condition

Close*

Service-2

Equipments
DS 104&106
CB- S1405
DS 106
CB-S1405
CB-S1405
DS 104

Open

Test &
service

L0CAL,BCU,REMOTE &
Protection Relays

Close/open

Test
Service-1

Status
FO
Test
FC
O
O
FC
Operated

Remarks
OK
OK
OK
OK

7. Functional and interlocking test for Bus Disconnector 104:


Operation
Close/open

Close/open

Condition
Test

Service

Bus
Close/open
transfer-1

Bus
Close/open
transfer-2

Equipments
Status
ES 101Y
FO
ES 101Z & 141A (bus bar
FC
earth switch)
CB 105
O
DS 106,
ES 101X, 101Y, 101Z,
FO
141AA & S 1401
DS 106,136 & 134
FC
CB 130
C
ES 401X, 401Y, 401Z , 141A
FO
& S 1401
DS 106,226A,226B,
FC
124A,124B, 236 & ,234
CB 220 & 230
C
ES 101X, 101Y, 101Z,
FO
141A & S 1401

Remarks
OK
OK
OK
OK
OK
OK
OK
OK

8. Functional and interlocking test for Bus Disconnector 106:


Test Performed by:
Name:

ENG/ YASSER ELKADY

Test Witnessed by:


ENG/MOHAMED HAIDER

Date of Test
09/06/2014

Signature:
Control/Record No.: R/PP/TC/1.084

Customer

SEC COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Contract No.

Site Test Record

GT-2 D01
FUNCTION TEST

Sheet No.

SUD1-03-001
Page 4 of 7

Projects & Supplies Co.

Operation
Close/open

Close/open

Condition
Test

Service

Bus
Close/open transfer-1

Bus
Close/open transfer-2

Equipments
ES 101Z
ES 101Y & 261A
DS 104,
ES 101X, 101Y, 101Z ,
261A& S1401
CB 105
DS 104, 136 & 134
CB 130
ES 101X, 101Y, 101Z,
261A & S1401
DS 104,226A,226B,
124A,124B,236 & 234
CB 220 & CB 230
ES 101X, 101Y, 101Z
,261A & S1401

Status
FO
FC

Remarks
OK
OK

FO

OK

O
FC
C

OK

FO

OK

FC
C

OK

FO

OK

OK

9. Functional and interlocking test for Earth Switch 101Y:


Operation

Condition

Close/open

------------

Equipments
DS 104 & 106
S 1405

10. Functional and interlocking test for earth switch


Operation

Condition

Close/open

------------

Status
FO
Test
P
101Z:

Equipments
DS 104 & 106
S 1405

Status
FO
Test
P

Remarks
OK

Remarks
OK

11. Functional and interlocking test for Earth Switch 101X:


Operation

Condition

Close/open

------------

Test Performed by:


Name:

ENG/ YASSER ELKADY

Equipments
DS 104 & 106

Status
FO

S 1405
U27R, U27Y, U27B

Test
VOLT. AVALIABLE

Test Witnessed by:


ENG/MOHAMED HAIDER

Remarks
OK

Date of Test
09/06/2014

Signature:
Control/Record No.: R/PP/TC/1.084

Customer

SEC COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Contract No.

Site Test Record

GT-2 D01
FUNCTION TEST

Sheet No.

Projects 12.
& Supplies
Co.
Functional

SUD1-03-001
Page 5 of 7

and interlocking test for Earth Switch s1401:

Operation

Condition

Close/open

------------

Equipments
DS 104 & 106
S 1405

Status
FO
Test

Remarks
OK

13. Functional and interlocking test for circuit breaker s1405 :


Operation

Condition

Close/open

Service

Equipments
101X
101Y
101Z

Status
FO
FO
FO

Remarks
OK

All checked under normal sf6 gas pressure operating conditions


* Protection relays should be reset

Note:
FO: fully open

FC: fully close

O: open

C: close

Test Performed by:


Name:

ENG/ YASSER ELKADY

Test Witnessed by:


ENG/MOHAMED HAIDER

Date of Test
09/06/2014

Signature:
Control/Record No.: R/PP/TC/1.084

Customer

SEC COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Contract No.

Site Test Record

GT-2 D01
FUNCTION TEST

Sheet No.

Projects 14.
& Supplies
Co.
Checking

28
29
30
31
32
33
34
35
36
37

Events
CB MOTOR SUPPLY FAIL
DS/ES MOTOR SUPPLY FAIL
CB CLOSE SUPPLY FAIL
DS/ES CONTROL SUPPLY FAIL
CB TRIP-1 SUPPLY FAIL
CB TRIP-2 SUPPLY FAIL
INDICATION & GAS ALARM SUPPLY FAIL
SPARE
ALARM DC SUPPLY FAIL
ALARM AC SUPPLY FAIL
BCU SUPPLY FAIL
LCC AC SUPPLY FAIL
DS SWITCHING INCOMPLETE
ES SWITCHING INCOMPLETE
CB MOTOR RUNTIME EXCEED &SPRING UNCHARGE
CB OPERATING MECHANISM FAIL
DS/ES MANUAL MODE
SPARE
SPARE
SPARE
VT ISOLATOR OPEN
VT ISOLATOR SWITCHING INCOMPLETE
SPARE
GIS VT MCB TRIP
COMP.G1-1 SF6 GAS PRESSURE LOW STAGE-1
COMP.G1-1 SF6 GAS PRESSURE LOW STAGE-2
COMP.G1-2 SF6 GAS PRESSURE LOW STAGE-1
COMP.G1-2 SF6 GAS PRESSURE LOW STAGE-2
COMP.G1-3 SF6 GAS PRESSURE LOW STAGE-1
COMP.G1-3 SF6 GAS PRESSURE LOW STAGE-2
COMP.G1-5 SF6 GAS PRESSURE LOW STAGE-1
COMP.G1-5 SF6 GAS PRESSURE LOW STAGE-2
COMP.G1-6 SF6 GAS PRESSURE LOW STAGE-1
COMP.G1-6 SF6 GAS PRESSURE LOW STAGE-2
COMP.G1-7 SF6 GAS PRESSURE LOW STAGE-1
COMP.G1-7 SF6 GAS PRESSURE LOW STAGE-2
COMP.G1-1 SF6 GAS PRESSURE HIGH
Test Performed by:

Name:

Page 6 of 7

of LCC, Annun. Indication &Alarm :( annunciator)

Channel
no.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

SUD1-03-001

ENG/ YASSER ELKADY

Test Witnessed by:


ENG/MOHAMED HAIDER

Status
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
Date of Test
09/06/2014

Signature:
Control/Record No.: R/PP/TC/1.084

Customer

SEC COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Contract No.

Site Test Record

GT-2 D01
FUNCTION TEST

Sheet No.

Events

Projects
& Supplies Co.
Channel

SUD1-03-001
Page 7 of 7

Status

no.
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56

SPARE
COMP.G1-2 SF6 GAS PRESSURE HIGH
SPARE
COMP.G1-3 SF6 GAS PRESSURE HIGH
SPARE
COMP.G1-5 SF6 GAS PRESSURE HIGH
CB SF6 GAS PRESSURE LOW STAGE-1
COMP.G1-6 SF6 GAS PRESSURE HIGH
CB SF6 GAS PRESSURE LOW STAGE-2
COMP.G1-7 SF6 GAS PRESSURE HIGH
CB SF6 GAS PRESSURE HIGH
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE

OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

Note:
All interlock points were checked according to interlocking conditions table which is approved
by system Operation department

Test Performed by:


Name:

ENG/ YASSER ELKADY

Test Witnessed by:


ENG/MOHAMED HAIDER

Date of Test
09/06/2014

Signature:
Control/Record No.: R/PP/TC/1.084

You might also like